Sunghwan Um PORTFOLIO+WORK SAMPLE v03 2022

Page 1

PORTFOLIO WORK SAMPLE Selected works 2016-2021

Sung-hwan Um Master of Architecture 22’ Pratt Institute School of Architecture Graduate Architecture and Urban Design


Sung-hwan Um

347 - 585 - 8155 sumx2@pratt.edu Brooklyn, New York, 11205

M.Arch / LEED Green Associate Authorized to work in the U.S. & South o K rea

Education

Brooklyn, NY 2018.08 - 2022.05

GPA: 3.74/4.0 Graduate e F llowship, Annual Scholarship Recipient Graduate Assistant under GAUD Chairperson (2019-2022) Assistant d E itor, INPROCESS 26 (Yearly publication of Pratt SOA) •

Pratt Institute GAUD, Master of Architecture • •

Yeungnam University, Bachelor of Engineering in Architectural Design

Daegu, S.Korea

Graduated with Summa Cum Laude Academic Excellence Scholarship Awardee (7 Consecutive semesters) YU Leader e F llowship Awardee / President of Student Council (2016-2017) • • •

Employment

2013.03 - 2017.08

Hyundai Engineering and Construction

Seoul, Korea

Assistant Project Manager / Beomo mix-use apartment project construction field • Participated in general review of design documents / confirm consistency in uantities between estimated construction budget and contract supplies / Assisted in preparing contracts in different phases of construction / Manage general construction process

2020.09 - 2021.07

Pratt Institute GAUD Office

Brooklyn, NY

Design Manager / GAUD Office and MLA Studio renovation • Assisted in GAUD office renovation project interior drawings supervised Alexandra Bar er (Summer )

2019.05 - 2019.07

y professor

Dangjoo Architects and Planners CO. Ltd

Daegu, Korea 2016.07 - 2018.07

Junior Architectural Designer • Dongchon Commercial(2018) / SD to ,D 3D modeling, client meetings • Supia Art Museum(2017) / SD to ,D 3D modeling, client meetings • Joongsan POSCO the Sharp Apartment Complex(2016-2017) / Unit drawings, technical drawings, construction documentations

Achievement

Pratt GAUD Critic at Large Finalist

Brooklyn, NY

Selected project for the exhi ition and presention in GAUD finals main event isiting Critic Thom Mayne( A ), Merrill Elam Mac Scoggin(SP )D

academic / professional

• •

Pratt ‘Earth Action Week’ Finalist in AIANY Center for Architecture • •

Pratt GAUD Open Portfolio Review Award •

Daegu, Korea 2017.11

Excellence award in participation of Commerciel Design Proposal Project Name: Dongchon Commercial by Dangjoo Architects

Korea Ministry of Natural Science & Engineering Award •

Seoul, Korea 2016.09

National scholarship for academic excellence

President of National Science Museum Award •

Certification

Paris & Daegu 2016.01

xE cellence in the exhibition work of a P ris-Daegu Bio-digital international workshop collaborated with c É ole nationale supérieure d’architecture de a P ris-La Villette and Yeungnam University about urban vertical farming project in the city of Daegu

LEED Green Associate

U.S. Green Building Council

Credential ID: 11410832-GREEN-ASSOCIATE

Unmanned Multicopter Operation Certification

2021.05

Korea Transportation Safety Authority 2020.09

Revit Certification (Intermediate Level) CNC Certification

Spring 2020

a F ll 2018

Daegu Architecture Biennale Award •

)

Brooklyn, NY

3rd prize winner of the 1st year open portfolio review •

ora Mesa(SP

Manhattan, NY

Selected project for the exhibition and presentation in AIANY Center for Architecture SP20 Project Name: Waste-to-Energy the Museum of Anthropocene a P rticipants: Bjarke Ingels Group, Amager Bakke, AIANY Center for Architecture

A F 19, SP20, SP22

Udemy

2019.01

Pratt Institute CNC Fabrication Lab 2018.09

Skill

Rhinoceros / Revit / AutoCAD / Enscape / Photoshop / Illustrator / Indesign / Prusa 3D Printing / DJI Drone / Grasshopper / CNC RhinoCAM / Sketchup

Language

English (Fluent) / Korean (Native) / Japanese (Basic) 2


Contents Academic Portfolio / Pratt GAUD SPRING 2022

01. RE:Park Ave

...04

FALL 2021

02. TO:Gather Home

...16

SPRING 2020

03. Museum of the Anthropocene

...24

SPRING 2019

04. Redhook Maritime Education Institution

...34

Work Sample / Professional Experience

2016 - 2017

05. POSCO the Sharp Apartment Complex

...40

2017

06. Supia Art Museum

...42

2017 - 2018

07. Dongchon Commercial

...44

2020 - 2021

08. Hyundai Hillstate Beomo Central Apartment

...46

3


01. RE:Park Ave Reimagining Social Infrastructure • • • • • •

Pratt Institute M.Arch Program Spring 2022 Design 06: Studio of Experiments Role: Collaborative Work of 2 Members / Partner: Youjin Rhee Program: Housing Conversion Instructor: Kai-Uwe Bergmann Achievement: Selected Project for the Pratt GAUD Critic at Large with Débora Mesa of Ensamble Studio & Prattshow Graduation Exhibition

4


In 2020, New York City emitted about 56.5 million tons of carbon dioxide equivalent; that is projected to fall to 6.7 million tons in 205undertheDiversi…edPathway,evenasNYCspopulationgrows. Amongtheemission,buildingsarebyfarthelargestcontributorof greenhousegasemissionsinNewYorkCity.Thecityhasanewgoalto reduceemissionsfromlargebuildings40%citywideby203compared to205levels.Inpartofmakingbetterbuildingperformance,NewYork CitysLocalLaw84,7and97requirebuildingownerstoassesstheir energyusageandimproveit.Thesepackageoflegistlationistoreduce greenhousegas(GHG)emissions80%by205. AccordingtoQSEL,researchdatashowsthatMidtownisthe largestenergyconsumingdistrict.Equivalenttoitsconsumption trictemitsthemostgreenhousegases.Thesepackageoflegistlationi toreducegreenhousegas(GHG)emissions80%by205.Researchdata alsoshowsthatocebuildingsinMidtownarethelargestcontributor theenergyuseintensity.

5


28% Building Operation BUILDINGS 11% Building Materials Construction

Despiteitslargeemissionindex,Midtownisexpandingwith newoceplanseventhoughtheocevacancyratehasbeenrecord everhighersincethepandemicandthemodeofwork-homecondition haschanged.Thebuildingsareoperatingandemittingastheyarebut theyarenotperformingwell. In2017,DepartmentofCityPlanningapprovedtheGreater EastMidtownRezoning.Residentialconversionactivityispartofits commitment.Themainpurposeofitistorevitalizethelowperforming businessdistrictthatwerebuiltprimarilyinmid190s.Theocestock isincreasinglyoutdatedanddoesntliveuptoitsneeds. Some developments are reasonably taking advantage of this rezoning by demolishing the entire building and constructing new ones in the district which creates tons of waste. Buildings are already creating tons of tangible and intangible waste and these actions will burden the environment, not the least. This project starts and tackles this trend, trying to find a niche to existing assets for their better performance.

6


“Office inoccupancy rate has risen higher since pandemic but the buildings are still operating they are”

7


“Upgrade poorly performing office buildings into new types of housing and sustainability”

AmongthebuildingsintheGreaterEastMidtown,85%areoce buildingsimpactedwithpandemicsituationbyanymeans.Approximately 40ocebuildingsareunderCgradeinenergyscore.Theprojectquestions, How can existing buildings in New York City better perform both socially and environmentally with our current needs? 8

Office Buildings Under C Grade in Energy


350 Park Ave, New York, NY

Floors : 30 Size : 570,000 SF Built : 1960 Architect : Emery Roth & Sons

9


10


HOUSING

OFFICE

RECREATION

ATRIUM

LODGING

“WORK, PLAY, LIVE!”

11



01. A-A’ Section 02. Section Model Exterior 03. Exploded Axonometric

13


01. WORK, STAY

02. PLAY

LOWER LEVEL

MID LEVEL

A

14


03. LIVE UPPER LEVEL

A’

15


02. TO:Gather Home Low-rise LA Housing Project • • • • • •

Pratt Institute M.Arch Program Spring 2021 Design 05: Advanced Design Research Role: Individual Work Program: Low-rise Affordable Housing Instructor: Peter Zellner Achievement: Entry to ‘Low-rise LA’ Affordable Housing Competition, Entry to Bee Breeders ‘Modular Home’ Competition

16


Theprojectstartswithcreatingmodularprototypesthatcaneithercombinea createacommunityinthecornerlotsoftypicalsouthLosAngelesortofunction asAcc ryDwellingUnits(ADUs)inindividuallots.Consideringtheimportanceofcornercondi wheretheyarehighlyexposedandwherecommunitiesmeetandintegrate,itisassumedtobe ahypotheticallotthatshouldbein‰exiblecondition.Modularsolution ytothink isthebestwa about‰exibleconditionsanditiswellcoincidedwithtypical eprevalent ADUsin that thear LA communities. BycreatingaCLTmegastructureinthecornerlots,themodularprototypescans bepluggedorunpluggedtoformacommunity.Themegastructureisopenforadded - constru tionwhentherearemorehousingdemands.Iftheparticularblockdoesntneedmuchhousin themegastructurecanactasotherhypotheticalprogramssuchasmarkets.Thisisv tothetheoryofMetabolismorMobileArchitecturewherecitiesarethoughtofasanorgan process.

17


Prototypes

Module(private unit)

Semi-private

Shared

ModuleCombinationsandParameters

COMBI 02-01

COMBI 02-02

COMBI 02-03

COMBI 02-04

COMBI 02-05

COMBI 02-06

COMBI 02-07

COMBI 02-08

COMBI 02-09

Combination of 2

COMBI 03-01

COMBI 03-02

COMBI 03-03

COMBI 03-04

COMBI 03-05

COMBI 03-06

18

Combination of 3


Community M

19


TheprototypedmodulesareassumedtobestandardizedbyInternational Standards(IS)tobeeasilyscalableandtransportable.Thisassumptionismostly becauseofthedockingconditions.However,withintherangeofitsstandard, thepri vatemoduleunitcanfeaturedifferentlybasedontheindividualstyleofliving.These prototypecanaggregateandcreateadifferentfeaturesofcommunity.Alsoitcanbe disassembled individually to other lots for different reasons and purposes. TheprototypealsoaddressesCOVID-19issueswhichhaschangedthe lifestyleofpeoplenotonlyintheUSbutworldwide.Themoduleiscombinedwitha 01 CLTbuiltstructureconsistingofanddistributedwithsemi-privateandsharedspace. Thesemi-privatespaceactsasasubsidiaryareathatisseparatedwithprivate bedroom.Theideaderivedfromthepandemicsituationwherepeopleneededan extraspacetodosomethingoutofquarantinesituation.AccordingtotheHousing characteristicsandstayingathomeduringCOVID19pandemicbyGrant - Schellen berg,peoplehaveworkedthroughzoomorinvirtualityintheirprivatearea.Thisis themainreasonofcreatingsemi-privatespaceasanadditionalspacecomplying withthegloballyaffectedhistoricalpandemicsituationwhichhaslastedfortwo years.Moreover,italsoaffectedinpeoplescraveforprivateoutdoorspacewhere they need direct access to outdoor air circulation. 03

20

02

04


05

01. Modular Living - 8’ (W) x 20’(L) x 10’(H) - Size by International Standard(IS)

05. Spatial Distribution - Private Living + Semi Private Space + Shared Space

02. Combination - Private Living + Semi Private Space + Shared Space

06. Outdoor (Green) Space - Private Green Space + Community Green Space

03. Modular + Docking - Modular Unit docks into the system to create a prototype - Private dwelling unit take on-the-grid

07. Vertical Circulation - Shared Space operates vertical circulation

06

04. Combined / Circulation - Outside > Private > Semi-private > Shared > Outside 07

08

21

08. Service Area - Horizontally, shared space operates as service area consisting kitchen, dining and living


01. Site Plan (Top view focused on vegetation)

A

Community M

03. General Axon View 02. Gound Floor Plan

04. A-A’ Section

A’


23


03. Museum of the Anthropocene Museum Space in Waste-to-Energy Plant • • • • • •

Pratt Institute M.Arch Program Spring 2020 Design 04: Integrated Contexts & Mediums Role: Collaborative Work of 2 Members / Partner: Ricardo Palacio Program: Waste-to-Energy Plant with interstitial Museum Space Instructor: Jonas Coersmeier Achievement: Selected Project for the Pratt GAUD Critic at Large with Mack Scoggin & Merril Elam ‘Earth Action Week’ nominated project in AIANY Center for Architecture. Presented to BJarke Ingels Group & The Amager Bakke Foundation

Localizingwastemanagementtoreducepollutionandcostfromregional transportationnetworks.Allowingpublicaccessintoinfrastructuralprograms toincreaseawarenessofwasteissues,creatingapublicamenity andantic ipatingtheincreaseddensi…cationofthecity,wherescarcityofground-level space will prompt public spaces to continue to stratify. With the purpose of inspiringtheusertomakeachangeintheirdailyroutines.

24


25


The Brooklyn Navy Yard

Distance

NewYorkgenerates14milliontonsofgarbageperyear,or12,0tonsperday.Mostissenttoland…llsoutofstate.A209studyshowsthatburning wasteisgreenerthanland…llsandgeneratesmoreenergy.Localizingwastemanagementreducespollutionandcostfromregionaltransp asexempli…edbyWTEfacilitiesinLongIslandthatservelocaljurisdictions.Layeringpublicprogramsontoinfrastructuralpro ofwasteissues,createsapublicamenity,andanticipatestheincreaseddensi…cationofthecity,wherescarcityofground-levelspacew spacestocontinuetostratify.ThisstrategyhasbeenemployedindowntownTokyowhereacombinedWTEandrecreationcenterhasmanagedtocl 9%offacilityemissions.

26


03. Material Studies&Effects 01. Massing View A

02. Massin View B

04. Massing Application

03

04

27


Program The diagram shows the different - pro01. Ferry grams by sectors and the four circula 02. Museum Entrance tion paths showing their relationship 03. Common Collecting & Sorting between program, private and public04. MRF Sorting 05. MRF Barge Out circulations.

28

Circulation Incineration MRF General Course


Ground Level Plan

29

Upper Level Plan


Long Section 30


Cross Section 31


The Structure Parti Theprojectisstartedwithanideaofhavingaprimarysystemwhichholdsfrom thegroundandthenconnectsitwiththesecondarysystemconnectedwithvectorsofthe originalmass. IntroducedTreeStructureconceptinwhichthebuildinghasasolidbaseand expandsintothebranchesconsistingof‰oorplatesandwalls 32


33


04. Red Hook Maritime Education Institute Educational Institute with Public Playscape • • • • •

Pratt Institute M.Arch Program Spring 2019 Design 02: Interiorities & Contexts Role: Individual Work Program: Educational Institute & Public Playscape Instructor: Eric Schoenenberger

34


The project goal was to design learning environment specifically focused on investigating interiority and massing. Interiority which is understood and represented as to be empty and furnished after architectural consideration is considered as a mass in this project. Specifically, the project focused interiority as one entire form as well as an exterior massing. The first step was to investigate the poche of the precedents specifically on the interior. Since the project was designing maritime middle school in Red Hook, Brooklyn, the precedent in this project focused on it with the relevant context. It started with investigating the interior of various types of vessels to eventually aggregate them into one single form. The aggregation features massing, circulation, occupancy and space of explorations.

35


The Inside Out Thedesignstudioaddressesaspeci…csitethroughitsinterior.Itemphasizes therelatedconceptualandmaterialimpactsofthisinsideoutapproach.Circulation anditsmaterialandspatialqualitiesareexploredthroughthedesignofasmallbuilding thatrespondstoadetailedensembleofarchitecturalprogramsandthemultiple contextsofalocalinstitution.Thestudioworkedwithavarietyofcommunitybasedor ganizationsforthepurposesofknowledgeexchange,allowingtointimatelyunderstand theactivitieshousedintheirdesignproposals.CoordinatedinparallelwithArchitectural Mediums II and Structures II, contemporary structural and representational techniques areexploredwithinthestudiointroducingstudentstobasicideasofintegrationand comprehensivedesign.

36


Interiority Massing

Poche / Long

Poche / Cross

Whole Massing

Application to Site

37


A

01. Lower Level Plan

02. Chunk Model

A’

04. A-A’ Section 38


03. Upper Level Plan

B’

B

05. B-B’ Section 39


05. POSCO the Sharp Apartment Complex • • • • • •

Professional Experience in Dangjoo Architects and Planners Location: Daegu, South Korea Role: Junior Architect / Assistant Team Member Project Duration: 2016 - 2017 / Experienced DD focused on unit drawings Program: Mixed-use Residential Status: Completed (07.2017)

40


01. 84 Type Unit

경북 경 산 중 산 지구 10540 2850

2005

6900

895

4790

2755 200

펜타힐즈 The # 1차 공동주택 신축공사

4145

2400

155

1500

1335

1310

주기 NOTE

1.바닥,벽,천장부분에 가구(주방, 침실,욕실,신발장등) 및 거울 (수납장 포함)등으로 가려지는 부분은 최종마감재 설치되지 않음. 2.선홈통의 개소와 위치는 실시시공시 변경될수 있음.

135

3.실내재료마감표와 타도면의 재료 표기가 상이한 경우 실내.외 재료 마감표를 우선한다. 다만, 단열마감은 단열계획도를 우선한다. 4.모델하우스 인테리어 사항과 상이할 경우 모델하우스 우선적용.

PW

침실 1

2905

3

ELEV.20인승

2700

2700

DN

1층 필로티세대

UP 3 PW

침실 2

결로방지단열재 상부 커튼박스

80

1 WD

545

1890

2635

현 관

155

2

110 110

FSD

2400

2675

1

3000

70 2105

6695

84M2-B형

14365

2200

5

135 1130

1200

200

1500

80

주방/식당

설 계 변 경 DESCRIPTION OF REVISION

PW

4825

80 80

2

135

1930

욕실 2

욕실 1

1600

1930

250

PD

PD

3180

70 70

1 WD

113M2형

6 PW

설계회사명

거실

1 SD

1

155

560

결로방지단열재 상부 커튼박스

실외기실

AG

1395

1

980

2

4

7

2

PW

PW

PW

설계 DRAWN BY

검토 CHECKED BY

심사 SUBMITTED BY

승인 APPROVED BY

1500

FSD

대피공간

대구광역시 수성구 지산동 1157-2 (수성구재향군인회 빌딩 4층) TEL/ (053) 782-5530 FAX/ (053) 782-5535

155

155

PS

1500

1500

6515

PD

3600

6665

3000

드레스룸

3235

6665

3235

필로티

WD

안 방

6780

1 온수분배기

1

드레스룸

1 PW

축척 SCALE

국기게양대설치

A1 : 1/50 , A3 : 1/100 1585

일자 DATE

2495

2017.07

3900

2000 135

70 70

2205

4500 110 110

4080

일련번호 SHEET NO.

4777.5

167.5

2037.5

13100

도면화일명 FILE NAME

도면번호 DRAWING NO.

84M2-B 단위세대 평면도 (확장형)

1 A

A02 - 208 도면명 DRAWING TITLE

축척 A1 : 1/50 A3 : 1/100

84M2-B 단위세대 평면도 (확장형)

02. 113 Type Unit

경북 경 산 중 산 지구 펜타힐즈 The # 1차 공동주택 신축공사

12975 1815 135

1805

1600

80

80

1600

2900 125 125

4645

2700

75 75

2390

1810

4500

70 70

1665

주기 NOTE

75

1.바닥,벽,천장부분에 가구(주방, 침실,욕실,신발장등) 및 거울 (수납장 포함)등으로 가려지는 부분은 최종마감재 설치되지 않음.

510

2.선홈통의 개소와 위치는 실시시공시 변경될수 있음.

7

PW

PW

5

6

PW

PW

1층 필로티세대

4.모델하우스 인테리어 사항과 상이할 경우 모델하우스 우선적용.

UP

950

N

8

3.실내재료마감표와 타도면의 재료 표기가 상이한 경우 실내.외 재료 마감표를 우선한다. 다만, 단열마감은 단열계획도를 우선한다.

113M2형

84M2-B형

대피공간

2

PW

WD

4

930

930 2300

2545

120

현 관

욕실 2 2

1

1

WD

WD

7755

1

설 계 변 경 DESCRIPTION OF REVISION

PW

2780

침실1

3900

알파룸

155

155

결로방지단열재 상부 커튼박스 1

1500

필로티

침실 1

침실 2 거실

안 방 결로방지단열재 상부 커튼박스

1500

1565

2620

2500

1320

165

PD

110

110 110

욕실 1

70 70

PD

110 1200 70 70

WD

2

PANTRY

주방/식당

1

3250

1600

155 침실 3

3515

온수분배기

2200

155

상부 커튼박스 결로방지단열재

드레스룸

11630

80

FSD

FSD

2885

1

125

1500

1 PD

3

설계회사명

실외기실

1500

1280

4 PW

SD

1

3

3

PW

PW

665

155

PS

1

대구광역시 수성구 지산동 1157-2 (수성구재향군인회 빌딩 4층) TEL/ (053) 782-5530 FAX/ (053) 782-5535

PW 국기게양대설치

1

2

AG

PW

설계 DRAWN BY

검토 CHECKED BY

심사 SUBMITTED BY

승인 APPROVED BY

축척 SCALE

1480

A1 : 1/50 , A3 : 1/100

2900

일자 DATE

1805 135

2010

4200 70 70

4800 110 110

4380

5020

3000 110 110

3180

3000 70 70

3205

135

2017.07 일련번호 SHEET NO.

17795

도면화일명 FILE NAME

도면번호 DRAWING NO.

1 A

113M2 단위세대 평면도 (확장형) 축척 A1 : 1/50 A3 : 1/100

A02 - 210 도면명 DRAWING TITLE

113M2 단위세대 평면도 (확장형)

41


06. Supia Art Museum • • • • • •

Professional Experience in Dangjoo Architects and Planners Location: Chilgok, South Korea Role: Junior Architect / Team Member Project Duration: 2017 / Experienced whole phase from SD to CD Program: Art Museum Status: Completed (10.2017)

01. Underground Level (Main Corridor)

02. Ground Level (Main Gallery)

42

03. Roof Level (Above Ground Outdoor Space)


01.

02.

A

03.

A’

04.

01. Underground Level Plan 02. Ground Level Plan 03. South Elevation 04. A-A’ Section

43


07. Dongchon Commercial • • • • • •

Professional Experience in Dangjoo Architects and Planners Location: Daegu, South Korea Role: Junior Architect / Team Member Project Duration: 2017 - 2018 / Experienced SD to DD Program: Commercial / Neighborhood Facility Status: Not Built (Proposed) / Design Permit (07.2018)

A1

A2

A3

7600

A4

7600

A5

7600

68400

7600

A6

A7

7600

A8

7600

A9

7600

A10

7600

5000

B1

7600

B2

2600

B3

7600

CAFE

Y3

5100

C/P

Y4

CAFE

6600

EPS

CAFE P.S

Y1

5000

Y2

A.V

7500

7500

7500

7500

7500

7500

7500

7500

7500

67500

X1

X2

X3

X4

X5

X6

44

X7

X8

X9

X10


45


08. Hyundai Hillstate Beomo Central Apartment

Image Credit : Hyundai E&C / Kunjung Architects

Professional Experience in Hyundai Engineering & Construction Location: Daegu, South Korea / Headquarters in Seoul Role: Assistant Project Manager (Quality Control Department Team Member) Project Duration: 2020 - 2021 / Experienced 30% of the whole duration from 07.2020 to 07.2021 (Mainly framework to finishing state) Program: Mixed-use Residential Status: Completed (01.2022)

Image Credit : Hyundai E&C

• • • • • •

46 46


Aerial Render View

Image Credit : Hyundai E&C / Kunjung Architects

Aerial Drone View (07.2021)

47

Image Credit : Hyundai E&C

Master Schedule Process Minutes Image Credit : Hyundai E&C

Image Credit : Hyundai E&C


Copyright 2022 by Sunghwan Um All rights reserved


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.