FRAMEWORKS FOR PLACEMAKING_ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
THIS STUDY WAS PREPARED BY THE CENTER FOR SUSTAINABLE DEVELOPMENT THE UNIVERSITY OF TEXAS AT AUSTIN SCHOOL OF ARCHITECTURE ON BEHALF OF THE CITY OF AUSTIN
2019
PRINCIPAL INVESTIGATOR Dean Almy, RA, FFUD, Associate Professor Director of the Graduate Program in Urban Design COLLABORATING INVESTIGATORS Jake Wegmann, Ph.D., Assistant Professor Community and Regional Planning Greg Hallman, Ph.D., Distinguished Senior Lecturer in Finance and Real Estate Finance, McCombs Graduate School of Business Allan W. Shearer, Ph.D., Associate Dean for Research and Technology, School of Architecture Carmen Garufo, AIA, Research Fellow, School of Architecture Sarah Wu, Assistant Director of Research, Center for Sustainable Development GRADUATE RESEARCH ASSISTANTS Andre Boudreaux, M ARCH I Katelyn Merry, MSCRP Candidate Patrick Murray, MBA Candidate Valentina Scalia, MSUD Seonhye Sin, MSUD Candidate Kirsten L Stray-Gundersen, M ARCH I Candidate William Swofford, MBA Joey Valenzuela, MSCRP
Contents EXECUTIVE SUMMARY INTRODUCTION SECTION 1_AUSTIN, THE EVOLVING CENTRAL CITY 1 THE WALLER GRID 2 AUSTIN CREEKS 3 THE SHIFTING CENTER 4 EMERGING SECTORS SECTION 2_THE SOUTHEAST QUADRANT 5 OVERVIEW 6 LANDSCAPE SYSTEMS 7 MOBILITY SYSTEMS 8 REAL ESTATE DEVELOPMENT SECTION 3_CULTURAL PARAMETERS 9 CULTURE AND COMMERCE 10 CULTURE AND COMMUNITY 11 DISTRICT FRAMEWORKS SECTION 4_FINANCIAL CONSIDERATIONS 12 METHOD OF ECONOMIC ANALYSIS 13 PROJECTING DEMAND SECTION 5_AUSTIN CONVENTION CENTER_REDEVELOPMENT SCENARIOS 14 OVERVIEW 15 PROGRAMMING 16 REDEVELOPMENT SCENARIOS 17 COMPARATIVE ANALYSIS SECTION 6_APPENDIX A CATALOG OF EMERGING PROJECTS B REFERENCE CATALOG, BEST PRACTICES FOR CONVENTION CENTERS C ESTIMATING ECONOMIC IMPACT D ACKNOWLEDGEMENTS AND EXTERNAL FEEDBACK E REFERENCES
EXECUTIVE SUMMARY
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Executive summary
charged with analyzing the economic
The Austin Convention Center is a
decision on whether and how to expand
considerations that will help guide a
linchpin in the city’s downtown and overall the convention facility. This Executive economy. It is, however, showing its age.
Summary includes the most important
Originally built in 1992 and expanded
findings from the full report.
in 2002, today the Austin Convention Center is undersized in comparison to
Surrounding context
comparable facilities in peer cities such as Denver and Nashville. Its limitations do Emphasizing placemaking means paying not simply concern its size and age; the
careful attention to the urban and natural
surrounding context of Downtown Austin
environments that surround the site.
has dramatically changed in the decade
These include Austin’s original street
and a half since the last expansion.
grid, which has been interrupted by the elimination of through-routes traversing
In December of 2017, Austin’s City Council the six-block convention center site.
E-01 AUSTIN CONVENTION CENTER
authorized a group of The University of
Austin’s downtown is bracketed by two
Texas at Austin academic researchers,
creeks running north to south; the more
to study and report on possibilities and
easterly one, Waller Creek, is adjacent
considerations for an expansion of the
to the site, but the current facility does
Austin Convention Center facility, located
not invite its users to explore it. Waller
between Fourth Street, Cesar Chavez,
Creek is set for a major transformation
Trinity Street, and Red River in downtown
in the coming years into a usable bike
Austin. The brief was to specifically
and pedestrian route with a restored
focus on placemaking, or interventions
ecosystem. Austin’s downtown also has a
that would make the outdoor public
shifting center. With developments such as
environment surrounding the convention
the Saltillo Transit Oriented Development
center more inviting to Austin residents
underway east of I-35, the convention
and visitors. The research team was also
center is no longer on the eastern edge EXECUTIVE SUMMARY _II
of the urban core; today, it is better
that can accommodate outdoor events
described as lying near the center. This
such as SXSW, bicycle routes, and Capital
change has been reinforced by the rise of
Scenarios
convention center facility could be
Metro’s plans to expand high-capacity
The following convention center expansion
with differences such as a pedestrian
sectors such as the Rainey Street district
transit in the immediate vicinity. Mobility
scenarios were developed and studied:
extension of Second Street through the
since the convention center was last
must also accommodate needs such as
expanded in 2002.
off-street parking and loading. Another key element is private development. The
District development
•
No-Build: Scenarios 1 and 2.
These establish the base of the
configurations for a state-of-the-art,
existing and proposed new convention
functional convention center, but to do
facilities. Options for tying all of these
so as part of an urban district within
elements together could include
and beyond the convention facility. Our
establishing a district framework.
approach was informed and inspired by historical examples of early market and
Modular program for a convention center
private development on its own parcel. The second phase entails demolishing the original 1992 portion of the
private development that is likely to
integrating mixed-use development into the immediate district surrounding the
site via a covered retail galleria, and
existing condition (Scenario 1) and
research team explored different ways of
The task was to not only identify
built west of Trinity Street, albeit
convention center and replacing it with
take place in coming years if there is
a new facility, public space, and private
no convention center expansion
(Scenario 2).
•
Austin Convention Center Master
development. •
Phased Westward Expansion with Full Demolition: Scenarios 5.1 and 5.2.
Plan Westward Expansion:
As with Scenarios 3 and 4, this entails
Scenario 3.
Also included is the Austin Convention
building a new convention center
exhibition halls seamlessly integrated
Through the case study research, a
Center Phase III Co-development
facility west of Trinity, but at the
into their urban surroundings, such as
modular program for new convention
Concept, that was generated from a
largest scale possible, with minimal
Les Halles in 19th-century Paris. This
center buildings was developed. The
2015 proposal that was recommended
private development in the first phase.
meant mobilizing several key elements,
modules consist of various components
in the Austin Convention Center Plan.
This then allows total demolition of
including landscape systems: parks and
such as exhibition halls, meeting rooms,
This entails a new convention center
the existing facility east of Trinity, with
public spaces, the hydrological system
and the supporting circulation and
facility west of Trinity Street, topped
subsequent construction of another
(including Waller Creek), and trees and
“back of house” space. These modules
with a private mixed-use tower.
convention building and private
other vegetation. The research team also
have the spatial arrangement and
intensively studied the role of current
relative proportions to work together
and future mobility systems, including
as a functional unit. This modular unit
the Great Streets Plan, that prioritize
can be scaled up or down to achieve a
the experience of people on foot and on
given, targeted level of convention center
Also developed is a phased scenario
nonmotorized vehicles, festival streets
expansion.
development. This scenario allows for •
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Phased Westward Expansion with
the convention center complex to fully
Partial Demolition: Scenarios 4.1
embrace a transformed Waller Creek
and 4.2.
as its front door.
in which, as in Scenario 3, a new
SCENARIO 2
SCENARIO 3
SCENARIO 4.1_4.2
SCENARIO 5.1_5.2
• No changes to existing convention center or public infrastructure.
• Existing convention center remains in operation during construction.
• Addition to the existing 2002 portion of the convention center remains.
• New pedestrian promenade at Neches Street.
• New Capital Metro lines servicing the district.
• Consolidation of Western Parcels.
• Extention of Second Street to Palm Park.
• Convention center has new orientation toward the Waller Creek Corridor.
• Public-private partnership opportunity.
• 1 block for public-private partnership opportunity.
• 1 block for new public event space.
• Limited retail along Trinity Street.
• New festival street at Trinity and Fourth Street.
• 1 block for public-private partnership opportunity.
• Pedestrian paseo at Second Street.
• New public park at southeast corner.
• New public pavillion on the park.
• Below-grade service and parking.
• Below-grade service and parking.
• Below-grade service and parking.
• 2 1/2 blocks of projected market-rate development.
• Semi-public park on roof. EXECUTIVE SUMMARY _IV
_SUMMARY OF SCENARIOS
No Expansion No Expansion (Buildout)
Austin Convention Center Master Plan
Scenario 1
Scenario 3
Total convention center floor area, including existing (thousands of square feet) (1)
Scenario 2
UT Austin Phased Scenario
Scenario 4.1 (first phase)
UT Austin Phased Scenario
Scenario 4.2 Scenario 5.1 (second phase) (3) (first phase)
Scenario 5.2 (second phase) (3)
881
881
1,911
1,631
1,336
2,135
1,279
Estimated cost to develop new convention center facility (nearest $25 mm) (2)
N/A
N/A
525
450
950
725
1,150
Estimated cost to build public space and infrastructure (nearest $5 mm)
N/A
N/A
60
5
120
Estimated value of private development (nearest $5 mm)
75 (4)
1,000
570
30
485
15 230
60 340
(1) Excludes loading and parking. (2) Excludes land acquisition and demolition costs. (3) Includes previous phase. (4) Property tax valuation (Travis Central Appraisal District).
Each Scenario has various benefits and costs, some of which are summarized in the table above.
Economic Findings
as spanning the range of reasonable
factors. The table on the right shows some in Section 4 are discussed, the analysis
outcomes, from pessimistic (Downside
of the economic consequences of the
The economic analysis considered several
Case) to middle-of-the-road (Base Case)
three demand cases. Using simple, scaled financing mechanism or estimating the
questions: Is there sufficient latent demand to optimistic (Upside Case). For various
comparisons with completed real-world
does not include determining the optimal city’s bonding capacity.
for out-of-town visitors to Austin to fill an
reasons that are outlined, the research
projects, development costs of the various
expanded convention center? How much
team found that the base case and even
scenarios, including the value of the
Finally, the question of whether the
would expansion cost? Do the benefits
upside cases are entirely plausible given
private development components if they
economic benefits outweigh the costs
outweigh the costs? For demand, three
the review of trends in Austin’s economy,
existed today were estimated. Note that
of convention center expansion is not a
scenarios were modeled that are regarded
hotel market, investment trends, and other although some of the financing options
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
simple one. The city’s increased sales
Base Case
_ANALYSIS OF INCREASED ATTENDANCE
Upside Case
Downside Case
Attendance assumptions Increase in annual attendance over status quo
200,000
500,000
50,000
Increase in annual attendance over status quo (%)
40%
100%
10%
Restaurant and hotel spending effects Direct, induced, and indirect spending per year ($mm) Value added per year ($mm)* Labor income per year ($mm)*
40.7 25.6 14.8
109.4 68.9 39.9
8.8 5.5 3.2
Direct incremental sales tax collections ($mm)
0.1
0.3
0.02
Direct incremental Hotel Occupancy Tax collections ($mm)
1.8
4.8
0.4
Full-time equivalent jobs supported per year*
355
954
70
* Includes indirect and induced effects. and hotel taxes resulting from increased
costs of such an expansion. Whether or not to Austin. An expanded convention center
solutions for the Austin Convention Center.
visitation to an expanded convention center such an expansion is justifiable therefore
would place Austin roughly on par with
Instead, they emphasize the role that any
are straightforward to project within a
depends on the value one assigns to other
recently expanded facilities in three of
future scenario must play in reimagining
reasonable range. Given the approach to
benefits, such as enhancement to Austin’s
its peer cities, Denver, San Antonio, and
both an important facility, and the
the economic analysis discussed in
“brand value,” a dramatic improvement
Nashville.
associated public space that will define an
Section 4, which does not include all
in circulation and public space in the
possible economic benefits, even in the
Southeast Quadrant of Downtown Austin,
entire quadrant of Downtown Austin. Finally, it should be noted that the
Upside Case, the incremental tax increases and the importance of attracting a greater
scenarios in this report are not intended
would not be sufficient to cover the capital
to provide fully formed architectural
number of influential business travelers
EXECUTIVE SUMMARY _VI
E-02 FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
INTRODUCTION _
I
The Austin Convention Center is a linchpin in Austin’s downtown and in the city’s overall economy. It is, however, showing its age. It was originally built in 1992, and later expanded in 2002, at times when Austin was a smaller and less visible city, nationally and internationally, than it is today. The Austin Convention Center is undersized in comparison to convention facilities in other booming, ascendant peer cities such as Denver and Nashville. The limitations with the Austin Convention Center do not simply concern its size and its age. Downtown Austin has dramatically transformed even in the decade and a half since it expanded. During that time, thousands of new residences and hotel rooms, as well as office space, have emerged in Austin’s urban core, including in the Southeast Quadrant in the immediate vicinity of the Austin Convention Center. Today Downtown Austin is more bustling than it has ever been. However, the convention center interrupts circulation and potential activity downtown, since it breaks the street grid and impedes movement among and between established and emerging downtown hot spots.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Furthermore, the convention center was
The University of Texas.” The resolution
once located on the perceptual eastern
also articulated a strong commitment to
edge of downtown, it no is longer true.
The Research Team and Approach
Austin Convention Center as it relates to
placemaking, or the enhancement of the
The team is made up of university-based
in the Southeast Quadrant of Downtown
With the opening of the Mexican American
experience of spending time in streets,
researchers, urban designers, faculty,
Austin. The associated task is to generate
Cultural Center in 2007, the emergence
public parks and plazas, and buildings.
administrators, and graduate students,
propositions and information that shed
of the surging Rainey Street district, the
The resolution advocated that “the design
all within the School of Architecture
light on these questions.
transit-oriented development of the Plaza
should minimize impact to the street grid
and the McCombs School of Business
Saltillo area east of Interstate 35, and the
system, work to restore the street grid
at The University of Texas at Austin.
Austin’s City Council includes a diverse
coming transformation of Waller Creek into system to the historic Waller Grid plan
As noted above, Austin’s City Council
range of opinions about the convention
an urban, green corridor, the convention
where possible and prudent, [and] activate
passed a resolution selecting the team to
center. This work was performed under
center now occupies a connection point
as much as possible and prudent the street analyze scenarios for, and the feasibility
between important urban corridors. In
level experience.” In December of 2017,
of, expansion of the Austin Convention
pre-determined outcomes. In return,
many ways its current configuration–
City Council authorized the funding that
Center specifically because of the
the research team has the obligation to
which does not always interface with the
has made this report possible.
independence and academic freedom
approach the work with an open mind, and
enjoyed as a result of association with
to let the work be influenced by the widest
surrounding city, and in which loading
broader placemaking and urban planning
the condition that there would be no
docks and other “back of house” activities
This report is intended to provide
a major research university. Although
possible range of viewpoints, as expressed
treat its eastern edge as an area to be
information to Austin’s elected leaders,
some of the team frequently receive
by prior reports, written comments, and
avoided by people on foot–no longer
as well as to city staff, other interested
funding for research, design work, and
meetings with a variety of stakeholders.
maximizes the potential of its location.
parties, and the public as a whole that
other activities from outside entities,
None of the team claims to be free from
will be useful in deciding how to proceed.
none of the team has any vested interest,
all bias; however, the team pledges to do
It reviews the current state of the Austin
financial or otherwise, in the findings of
the utmost to live up to the title of “honest
on September 28, 2017, City Council
Convention Center; proposes various
this study, nor from any public decisions
brokers” in the production of this report.
“request[ed] information relevant to make
options for reconfigurations of the
that it may eventually influence.This study
a decision on whether or not to expand or
convention center, with an emphasis on
is a major undertaking, and one that is
renovate the Austin Convention Center,”
public space and placemaking, while also
approached with the utmost seriousness;
and asked the City Manager to “explore
including provisions for associated private
however, the team’s respective career
options for design of any renovation or
development; and provides an overview of
trajectories do not depend on what is
expansion including working with the
the economic considerations of expansion.
reported here. The brief is to evaluate the
In Resolution #20170928-052 adopted
Center for Sustainable Development at
“whether” and the “how” of expanding the INTRODUCTION _2
One strong viewpoint that the team brings gathering spaces where people can come
restraints. This translates directly into
to the work is the belief that major civic
together on a daily basis, or in large
dollars and cents; the city as a whole is
institutions such as a convention center
numbers during major events such as
dependent on the robust tax revenues
At some point, a decision on whether
should not exist in isolation, but should
South by Southwest? Convention centers,
generated by economic activity taking
and how to expand the Austin Convention
serve the city in which they are embedded. including the one Austin currently has,
Creating Scenarios
place downtown.
Center will be forthcoming. It will be made, Accordingly, the analysis does not lead
are enormous buildings that often impair
of course, by Austin’s elected mayor and
with the question of how the best possible
the public realm by cutting off streets,
Whether citizens are most concerned about
City Council members, with input from the
convention center can be created? This is,
creating an obstacle to movement, and
expanding affordable housing, improving
City Manager, but it will be influenced by
without a doubt, an important question,
presenting blank, imposing walls to
parks and open space in neighborhoods,
a lengthy process of deliberation. Without
and one that is taken seriously in this
passers-by. As scenarios were developed,
shoring up public safety, or any other area
a doubt, many of the discussions will be
study. However, the foremost question that the team constantly asked whether the
passionate and heated. This is as it should
motivates the analysis, one that honors
touched by city spending, they should
scenarios were contributing to an enriched care about the overall health of downtown
be. The research team does not believe that the charge given by Austin’s City Council
public realm. In other words, in spite of
Austin. In addition, downtown looms large
it is our role to put our thumbs on the scale is: Can an expanded convention center
the undeniable importance of the Austin
in ways that go beyond the fiscal. The city’s
of any particular outcome to this process.
be used as a vehicle to create a better
Convention Center to the city’s economy
heart is the seat of Austin’s municipal
Rather, as professionals operating within
functioning city? The immediate next
at present, the team primarily viewed it
government; it is where many of the city’s
an academic institution, the contribution is question is: If so, how?
and its possible expansion as a means to
most renowned events take place, and it is
to synthesize and summarize an enormous
the end of a more vital, welcoming, and
where citizens gather in times of triumph
convivial downtown.
and in times of grieving. Importantly, it is
variety of information that already exists,
As a research team with a strong
and to create new information by creating
grounding in the discipline of urban
and thoroughly analyzing several distinct
design, particular attention was given
Why the emphasis on downtown?
area to most out-of-town visitors.
expansion scenarios, two of which involve
to the public realm in Downtown Austin
Downtown has outsized importance to
As is discussed in more detail in Section 1
no expansion at all. The hope is that this
and in nearby neighborhoods. What is
the City of Austin and to the metropolitan
(Austin, the Evolving City), although
information can allow, as much as
it like to walk the streets? Does it feel
region that it anchors. As the symbolic
Downtown Austin is booming and in many
possible, for members of the general
safe, comfortable, and welcoming to
heart of a region spanning hundreds
ways thriving, there are fundamental
public and elected officials to base their
all? Do people feel protected from the
of square miles, it is where, more than
shortcomings, particularly in the
opinions and positions on analysis that is
heat and rain, and do they walk without
anywhere else, commercial and residential Southeast Quadrant, where the Austin
reasoned, thorough, and digestible.
fear of being struck by speeding cars, or
development of all kinds can flourish at
Convention Center is located. For instance,
being accosted? Are there beloved public
the greatest intensity and with the fewest
the circulation of people, bicycles, and
the foremost face of the entire metropolitan
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
motorized vehicles of all kinds in that
Scenario 1 is essentially “no build,”
section of downtown is difficult and
whereas Scenario 2 analyzes the trajectory scenarios, as in Scenario 3, assume that a any time. The same is true for Scenarios
frustrating. There is a lack of welcoming
of private development that is projected
new convention center building is first built 5.1 and 5.2. These real options offer the
and memorable public space on par with
to take place in the coming years if no
to the west of the existing facility, albeit
advantage of determining whether a
the revamped Republic Square to the
convention center expansion takes place
with placemaking strategies that differ
first phase has been successful before
west, or Butler Metro Park across Lady
in the parcels to the west of the current
from Scenario 3, in Scenario 4.1 or 5.1.
proceeding to a second phase. It also
Bird Lake. Important constituencies in
facility.
downtown–including musicians and other
Scenarios 4.1, 4.2, 5.1, and 5.2: These
to proceed with Scenario 4.2, or not, at
offers the opportunity to take advantage The completion of a new Austin
of timing. For instance, construction on a
participants in the city’s renowned creative
Scenario 3 (westward expansion):
Convention Center building to the west of
second phase can be timed to begin during
economy, and the owners and employees
The finding from a prior study by the
Trinity Street from the current site makes
a market downturn, when construction
of live music venues, art galleries, and
architectural firm Gensler, detailed in
it possible, as a subsequent phase of an
costs are low, and an employment boost to
other gathering places that enrich Austin’s
the Austin Convention Center Long-
overall project spanning many years (in
the economy is most welcome.
culture–are feeling the squeeze of rising
Range Master Plan, suggests that the
Scenarios 4.2 or 5.2), to remove some
land prices and rent. All of this occurs at
only realistic option for expanding the
(4.2) or all (5.2) of the current convention
It must be noted that the elucidation of the
a moment when downtown continues to
convention center without reducing its
facility to make room for replacement
various scenarios should not be thought
experience rapid real estate development
occupiable floor space during construction buildings. This assures there will be no
of as architectural design. Actually,
as well as a likely push to improve public
is to expand to the west across Trinity
designing the precise forms, internal
transit in the coming years.
Street, from the current site. An expansion convention center, which is treated as an
spaces, and systems of the new convention
southward would disrupt an existing high-
essential requirement in order to avoid
center buildings and the associated
In this report, several scenarios are
rise affordable development, the Lakeside
crippling the existing operations of the
other buildings and public spaces would
analyzed (described in Section 5).
Apartments. An eastward expansion would Austin Convention Center (see further
require far more detailed work than what
They are as follows:
interfere with ambitious plans to revamp
discussion below). Scenarios 4.2 and
is presented here. The propositions that
Waller Creek. Finally, Capital Metro’s
5.2 differ as to what is to be built on the
are put forth should instead be thought of
Scenarios 1 and 2 (no-build): Because
Downtown Station on the Red Line on
differing sections of the existing Austin
as urban design, with an emphasis on the
not expanding the convention center is an
Fourth Street lies directly in the path of
Convention Center footprint occupying six
public realm of streets and other outdoor
option, the possibility of leaving the facility
a northward expansion. In Scenario 3,
city blocks. These scenarios offer what is
spaces, and how the buildings frame those
in its current configuration, though repairs
Gensler’s well-vetted westward expansion
sometimes referred to in economic theory spaces, rather than detailed design of the
and updates would be needed to keep it in
is accepted as a starting point, with some
as real options: If Scenario 4.1 is built,
buildings themselves. Nevertheless, this
good working order, is analyzed.
modifications, for an expansion.
then a subsequent decision can be made
report demonstrates that the research
net reduction in leasable area for the
INTRODUCTION _4
team’s propositions could function for the
through the six city blocks it currently
such as vacationers or those in town to
hotels provide their own large ballrooms
intended purpose of accommodating an
occupies could be restored and framed by
visit friends or family. Austin’s metro
to enable them to host meetings, a space
expansion of the Austin Convention Center. new public and private buildings. There
region has a higher share of meeting
for meetings of the size of the Austin
Should the city proceed with expansion,
are certainly some in Austin who might
travel (seven percent, or just under half of
Convention Center would almost certainly
more detailed architectural design will be
advocate this position, but the scenario
total business travel) than all other major
never be provided by private business
necessary, but at the present stage the
development illustrated in this report
Texas metropolitan areas. Removing the
interests. Removing the existing convention
most urgent design questions that need to
takes it as a given that changes should
convention center would give away an
center would be a blow to the health of
be resolved concern urban design. Should
not result in a net reduction or elimination advantage that Austin currently holds over existing hotels, particularly those in and
there be a pedestrian extension of Second
of the total leasable space offered by the
its nearby competitors. The spending from near downtown Austin.
Street from San Jacinto and Trinity, or all
current Austin Convention Center.
business travelers attending meetings
the way to Waller Creek? If so, what form should it take? Should private development be stacked on top of convention center
Why not consider eliminating the current Austin Convention Center facility?
space, or lie on its own parcels? Can a
is also highly important because of
Third, in the competition for tourism,
its timing, and its magnitude. Meeting
removing the Austin Convention Center
travel is disproportionately important in
would be tantamount to Austin ceeding
generating crowds of restaurant, night
economic opportunity with respect to
new convention center facility be designed
There are four primary arguments against club, and live music patrons on slow
its competitors. All of the largest–and
to take full advantage of Palm Park and a
eliminating the current Austin Convention
nights of the week, from Sunday through
highest–profile cities in the United States—
reimagined Waller Creek? These are the
Center Facility. First, business travelers
Wednesday nights, whereas local demand
New York, Chicago, Los Angeles, Houston,
for these establishments is much more
and Dallas, for example—have major
types of questions that the scenarios in this who are strongly attracted by meetings report can help address, at this critical,
such as those that take place at convention concentrated on Thursday, Friday, and
convention facilities, as do the cities that
early stage of decision making about the
centers are of outsized importance to the
can be plausibly seen as Austin’s peers and
future of the Austin Convention Center.
overall tourism industry. In a presentation by Nate Gieryn, Travel Research Manager
Why not analyze a demolition of the existing Austin Convention Center with no replacement?
for Travel Texas, a division of the Texas Economic Development and Tourism Office, to Austin’s Tourism Commission
There is one possibility that was not
on December 12, 2018, Gieryn noted
considered in this report: demolishing the
that research shows that group meeting
existing Austin Convention Center facility
travelers stay longer and spend more
and not replacing it, so that the street grid
than all other categories of travelers,
Saturday nights. Second, as noted in Section 4 and in greater detail in Appendix C, Austin has an extraordinarily robust hotel industry that would be the envy of most other cities in the United States. Market conditions have remained generally sound despite the addition of thousands of rooms to the market in recent years. Although some
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
direct competitors in the tourism market such as Portland, San Antonio, Denver, Nashville, and Charlotte. Finally, removing the existing Austin Convention Center might inadvertently damage the value of the city’s image, which is difficult to quantify but has
unquestionably risen in recent years. The
surrounding neighborhoods. Accordingly,
existing facility facilitates large gatherings
the varying scenarios developed take into
of national and international visitors who
account the effects on the surrounding
meet to discuss an endless variety of
neighborhood and beyond, at least as much
topics, and in so doing discuss and share
as they consider the viability of various
their impressions of Austin. Attracting
reconfigurations of the Austin Convention
business travelers in particular likely has
Center facility itself.
additional benefits that go beyond the spending impacts discussed above, which are hard to quantify. For instance, inducing business persons in positions of influence to visit Austin could shape decisions on business expansions or relocations that could benefit the city. One other very specific way in which the convention center shapes perceptions of Austin is its close link with the globally renowned SXSW gathering. The convention center and SXSW have grown in tandem, and the existing facility plays an essential role in providing a physical space for a large share of SXSW events that take place. The team’s research approach views the future of the Austin Convention Center as a potential opportunity to not only reimagine the shape and function of an important facility, but of an entire quadrant of Austin’s downtown, and its’ INTRODUCTION _6
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
1
The Transformation of the Central City _Overview _The Waller Grid _Austin Creeks _The Shifting Center _Emerging Sectors _The New Nexus
OVERVIEW
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Methodology
between the role of the convention center
Long Beach, are relocating away from
as a component of the city (Les Halles),
impacted urban sites, taking advantage of
Convention center buildings have their
and the need for the design of a convention an adjacent landscape, and adding diverse
origins in the exhibition halls and market
center to be driven exclusively by internal
programs that turn these facilities into
buildings of the nineteenth century. These
functional planning (Memorial Hall).
mixed-use environments.
buildings were sometimes part of an urban Today, cities contend with the inherent complex, as in the original market halls of conflict between these two models: extra- In order to more fully understand the 1-01 LES HALLES, PARIS_1956
Les Halles in Paris (pictured), often located large buildings that are inherently antiurban, and the desire to embed facilities at the heart of a bustling urban district
MEMORIAL HALL, PHILADELPHIA_1876
both the policy and design decisions
and connected to the streets of the city, or
into the city and make them a part of a
that will determine the future status of
they were stand-alone pavilions such as
vital urban district.
the Austin Convention Center, a wide range of urban trends that are emerging
Memorial Hall in Philadelphia (pictured).
1-02
ways in which these issues could inform
These types of buildings generally were
The existing Austin Convention Center
from the changing face of the city, both
situated in parks, and therefore had only
strives to achieve this balance, but the
existing and projected, have been explored
a symbolic relationship with nearby urban
urban situation is rapidly changing, as is
through an extensive series of diagrams.
neighborhoods.
the business of conventions. More and
These document the social, cultural,
more, event planners have a desire for
physical, and economic pressures that
However, throughout the twentieth century, their conventions to capitalize on the qualities of a destination as a whole, as the building type evolved into the large
are contributing to the evolving urban condition. They expand the study beyond
warehouse-like structures that comprise
beyond the building and out into the city.
documenting the internal needs of the
the majority of these facilities today,
Many new and centrally located facilities
individual convention center and look out
convention centers became more and more such as those in Seattle, Cleveland, Vancouver, and Charlotte are departing separated from the fabric of the city. This
into the city, striving to strike a balance
condition was partially a function of the
from the model of sizeable single level
performance requirements that make a
necessity to move large amounts of goods
buildings separated from their urban
convention center urban.
in and out of the buildings, and it was
surroundings, by either opening the
partially a result of the need for an ever-
buildings up to the street network or
expanding building footprint. The result
vertically stacking the program in new
of these phenomena was a disconnection
flexible arrangements. Others, such as
between the internal and the external
SECTION 1 AUSTIN, THE EVOLVING CITY _10
THE WALLER GRID Designed by Edwin Waller in 1839, the Waller Grid, a survey which corresponded
WG
with the founding of the city, was an effective system for dividing and selling the plots of land that would organize the city. Enfronting the Colorado River, the grid is carefully laid onto the landscape in order to work with the topographic features of the site. The western boundary of the grid, West Street, sits adjacent to Shoal Creek, while the eastern boundary, formerly East Avenue (now I-35), extended slightly past Waller Creek. The Waller Grid also included a central park square, on which the state capitol is located, and four secondary park squares. The city blocks are designed to be 276 feet by 276 feet. Each half block is divided into either four or six land parcels that are a multiple of twenty-three feet in width (due to the limitations of heavy timber construction), and each block includes a service alley that is twenty feet in width. The grid is organized by a grid of eightyfoot wide right-of-ways (streets). The street grid provides the connective armature that organizes the commercial frontages of the land parcels. A careful study of the
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
grid reveals how the orientation of the
urban life in Downtown Austin.
parcels changes to reinforce the primary division within the grid, which is centered
Three primary factors adversely impact
around Congress Avenue and Sixth Street.
the integrity of the grid in the Southeast
These two streets were designed to be
Quadrant. They are Waller Creek, The
the primary commercial armatures of the
establishment of the I-35 corridor in place
system, and they subdivide the grid into
of East Avenue, and the consolidation
four quadrants, each centered around one
of the blocks that were assembled to
of the four urban parks.
provide a site for the convention center. Among these, the I-35 corridor is the most
The Austin Convention Center is located in
disruptive and has historically disconnected
the Southeast Quadrant, bounded by 6th
central Austin from the east side
Street to the north, Congress Avenue to the neighborhoods. Various alternatives for its west, Water Street (Cesar Chavez) to the
reconstruction are currently under review
south, and East Avenue (I-35) to the east.
by TXDOT. These alternatives have the potential to either exacerbate the situation
Maintaining the integrity of the original
or to heal it. Secondarily, the consolidation
Waller Grid is essential for many reasons.
of the six blocks on which the convention
Doing so helps mitigate automobile
center site is located compresses traffic to
traffic in the area by allowing for multiple
a limited set of streets — a situation that
alternative routes, this also increases
contributes to the significant congestion
pedestrian walkability by reducing the
problems, most notably along Cesar
number of impediments between heavily
Chavez Street. While the severance of the
traversed areas. Furthermore, it allows for
grid seemingly had minimal impact upon
the possibility of continuous street frontage the urban condition of the quadrant during in the downtown area: retail, restaurants,
the initial construction of the facility, now,
cafes, etcetera. These factors, taken all
with recent and ongoing development
together, work to eliminate dead zone areas shifting eastward, this has become a in the district and increase the quality of
critical factor impacting the area.
1-03
SECTION 1 AUSTIN, THE EVOLVING CITY _12
AUSTIN CREEKS Situating the Waller Grid between two of Austin’s most significant creeks has
AC
adversely impacted the development of the adjoining land parcels, due to the regular incidences of flooding along their lengths. Additionally, the community’s desire to preserve the creeks as an environmentally important ecosystem has also always been present in the ongoing political discourse of the city and continues to be an essential component of Austin’s planning. While not always considered an asset for development, Waller Creek, traversing the eastern edge of central Austin from north of The University of Texas campus down to the Colorado River is in the process of becoming one of the country’s major urban park systems, and it will bring much needed social and recreational space to an area of the city that has been historically underserved. As a result of this transformation, there is now an excellent opportunity to reorient the Austin Convention Center to engage Waller Creek, linking together the city’s public infrastructure and populating it with shops, restaurants, and new public spaces that will serve both visitors to the city, and the Austin community alike.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
1-04 THE AUSTIN CREEKS PLAN_1976
SECTION 1 AUSTIN, THE EVOLVING CITY _14
THE SHIFTING CENTER When first built, the Austin Convention
SC
Center, located on the edge of the downtown, was designed and organized so that the primary public faรงade of the facility faced the downtown. The eastern side of the building was reserved mainly for service related functions, accessed from Red River. This service relationship was not a significant urban issue at the time, as there was limited development to the east. Still, the design did acknowledge the importance of Waller Creek on its southeast corner, anticipating the future importance of the creek. Now, with ongoing development migrating towards the edges of downtown, what was once the edge is now the center of a set of rapidly developing urban districts. A large amount of housing and entertainment venues has sprung up in the Rainey Street district to the south, an innovation District is emerging on the North, the Second Street corridor continues to flourish, and development is pushing into East Austin. The Austin Convention Center now is located at a critical juncture in the city, one that impacts the city on every side of the building.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
1-05 CENTRAL AUSTIN_1963
SECTION 1 AUSTIN, THE EVOLVING CITY _16
1980 1987 1988 1990
Townlake Comprehensive Plan Downtown Neighborhood PLan District Design Guidelines for the Austin Convention Center
1963 Development Alternatives for the Rainey Area
1970 1980 1990 1995
1992
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Hilton Austin Hotel Opens
Austin Convention Center Expansion Completed
2002
2004
Great Streets Master Plan Issued
Austin City Council authorized the decommissioning of the Seaholm Plant and its adaptive reuse.
2001
1996
Austin Convention Center Opened and handled 40 conventions during its first 15 months
Austinplan
1989
1992
CBD Parking Management Study
Austin Tomorrow Comprehensive Plan
1979
1985
Lower Waller Creek Development Plan
1976
CONVENTION CENTER_PLANNING AND DEVELOPMENT HISTORY
2000
2002
2011-18
2015
2010
Palm Park Concept Design Phase Plan
WCC signs Joint Development Agreement with the City of Austin 2014
On-going Waller Creek Works
Waller Creek Conservancy (WCC) Founded as a non-profit 2010 Plaza Saltillo Station Opened 2010
Master Development Agreement for Seaholm approved 2008
2005 2015 2018 2019 2025 2030
2018
SECTION 1 AUSTIN, THE EVOLVING CITY _18
Seaholm Power, LLC selected to redevelop Seaholm
Waller Creek TIRZ (TIF) created 5th & Brazos Parking Garage Construction
Waller Creek District Master Plan Issued
Imagine Austin
Austin Convention Center Long-Range Master Plan Waller Creek Creek Corridor Framework Plan Completed Plaza Saltillo Development, Begins Construction
Plaza Saltillo Development, Phase 01 Delivered Austin Central Library Opens Fairmont Hotel Opens Plaza Saltillo Development, Phase 02 Constructed
Frameworks for Placemaking_CSD Report
2005
2007 2008
2010
2012
2015 2015 2016
2017 2017 2018 2019
[2019]
URBAN DEVELOPMENT_THE SHIFTING CENTER
2002
1992 Planned in the late 1980s, and completed
on Congress Avenue. The area around
By the early 2000s, development activity
two additional blocks and creating a new
in 1992, the first phase of construction
the new center was mostly undeveloped,
in the area south of the Texas State
entrance fronting onto Brush Square. Some
of the Austin Convention Center was sited
with many vacant lots and neglected
Capitol continued to expand, although
construction was beginning to drift east, in
at the southeast corner of downtown. At
buildings. The location, backing up to
much of the construction still focused
particular on those blocks enfronting the
the time, Austin was emerging from an
I-35 had the advantage of being easily
around Congress Avenue. During this
lake.
economic downturn, and any
serviced from the freeway and from Red
same period, the Austin Convention
development that was occurring focused
River.
Center expanded to the north, capturing
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
2010
Present
While still focused along Congress
east of I-35 was beginning to intensify,
Today, the Austin Convention Center, no
redevelopment of Waller Creek, a rapidly
Avenue, in 2010 development activity was
marking a distinct shift in the historic
longer located on a peripheral site on the
intensifying Rainey Street district, and
expanding both east and west within the
development pattern of the city. The
edge of downtown, is now positioned at
significant new construction east of I-35,
warehouse districts south of Sixth Street
Austin Convention Center would now
what has become the heart of a new
needs to adjust to the evolving urban
and along the Second Street corridor.
become situated in the middle of an area
nexus in central Austin. The convention
situation. Over the past twenty-five years,
The Rainey Street Historic District was
of increasing development pressure.
center site, with new development
what had been the edge is now becoming
occurring on all sides: the pending
an important center for the community.
beginning to transform, and development
SECTION 1 AUSTIN, THE EVOLVING CITY _20
EMERGING SECTORS _THE FOUR VECTORS OF URBAN DEVELOPMENT A survey of recent and projected ongoing development in central Austin indicates
E
that many emerging projects (illustrated in Appendix A) are concentrating along four major vectors in the city. Each of these four vectors intersect with the district around the Austin Convention Center. The new focus created by this overlapping phenomenon has the potential to connect sections of the city together into a larger urban network that pinwheels around the convention center site, tying it into the city at large. Each of these four vectors is documented in the diagrams on the following pages, illustrating the intensity of actual and pending urban development. This overlapping situation will be even further reinforced by planned infrastructural improvements including: the provision of high-capacity transit concentrating around the Downtown Station, the revitalization of the Waller Creek corridor, potential reconstruction of I-35, and a future connection to the South Shore Waterfront.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
V2
V1
ATX_CC
V3
V1_ CREEK TO CREEK V2_ UP WALLER CREEK V3_ ACROSS THE CORRIDOR V4_ SOUTH SHORE TO SXSW
V4 SECTION 1 AUSTIN, THE EVOLVING CITY _22
V1 _W > E : CREEK TO CREEK
Seaholm represents the
Shoal Creek connects together
western edge of Second
a series of new developments
Street, and is a mixed use
on the western edge of the city,
EcoDistrict.
including the new city library.
Congress Avenue features wide sidewalks and is a social heart of Downtown Austin
Although privately owned,
Second Street ends at
the Fareground provides
the Austin Convention
outdoor space open to the
Center, with limited
public.
connections to the Creek.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Seaholm: EcoDistrict Library Pedestrian Bridge
_W > E : CREEK TO CREEK
Moody Theater Fareground
Existing Convention Center
With recent development activity along
corridor with shops, restaurants, and
the Shoal Creek and Waller Creek trail
Second and Third Streets, walkability in
entertainment, from Shoal Creek to the
systems is currently impeded by the Austin
the area has dramatically improved in
edge of the Austin Convention Center.
Convention Center, which breaks the grid
the last ten years, creating a tree-lined
Second Street’s potenial to connect
in the Southeast Quadrant.
N
SECTION 1 AUSTIN, THE EVOLVING CITY _24
V2 _N > S : UP WALLER CREEK
Fourth Street Transit Stop
Sixth Street
Trinity Street has been
Existing street conditions in many
Entertainment District
flagged as a potential high
parts of V3 are not inviting for
capacity transit corridor,
pedestrians. with few active street
an additional catalyst for
frontages north of Sixth Street,
development in the area.
and narrow sidewalks.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
UT Medical Campus
_N > S : UP WALLER CREEK UT Medical Offices Medical District Waterloo Park Red River Cultural District Capitol Metro Station Expansion 6th Street Entertainment District Austin Convention Center Brush Square
Austin Police Station
Palm Park
The Innovation District, bound by I-35
in progress. Notable emerging projects
master plan for the state capital complex
improve the pedestrian, bicycle, transit,
on the east, MLK Blvd on the north, San
include: the Waller Creek Corridor
engages the area on the west side. These
and vehicular connections between
Jacinto on the west, and Cesar Chavez
redevelopment, Waterloo Park, Brush
emerging projects are documented in
the The University of Texas campus,
Street on the south, is a rapidly developing
Square, and the University of Texas
more detail in Appendix A. This district
the Convention Center District, and
area with a number of planned projects
medical campus. Additionally, a new
has the potential to significantly
destinations in-between.
N
SECTION 1 AUSTIN, THE EVOLVING CITY _26
V3 _E > W : ACROSS THE CORRIDOR
The Lance Armstrong Bikeway currently
Crossing points at Fourth Street and
Fifth Street Frontage: I-35 disrupts the
Saltillo TOD is under construction, and
parallels the transit station on Fourth
Sixth Street are currently the only ways
connections along Fifth Street,
should be completed in 2019, providing
Street, and should be integrated into
for pedestrians to cross the I-35 corridor.
redirecting pedestrians to cross at
more housing and mixed-use to the area.
future redevelopment proposals.
Fourth street.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Convention Center Capitol Metro Station Brush Square
_E > W : ACROSS THE CORRIDOR
6th Street
Saltillo
Palm Park
The Saltillo TOD, which extends ten
with a significant amount of large scale
blocks east of the Austin Convention
mixed-use projects planned or under
Center, is a major redevelopment zone,
construction.
N Saltillo Transit SECTION 1 AUSTIN, THE EVOLVING CITY _28
V4 _S > N : FROM SOUTH SHORE TO SXSW
The intersection of Red River and CĂŠsar Chavez is the main crossing point from Rainey into Convention Center, but it is not the safest intersection for pedestrians.
Rainey Street is an active nightlife area and is a significant destination for the community and for visitors attending conventions. Add southshore waterfront change water color add park color Add remaining buildings on rainey
The southern end of Rainey Street is primarily high rise residential, with walkable streets and ground floor retail
The pending redevelopment of the South Shore Waterfront District will substantially change the dynamics along Lady Bird Lake. A proposed future pedestrian and transit bridge connection (Blue Line) would link it across the lake. FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
_S > N : FROM SOUTH SHORE TO SXSW
Southshore Waterfront Redevelopment Lady Bird Lake and Park
Waller Creek Mouth
Existing Convention Center
Future Transit Bridge
The Palm School
Rainey Street Historic District
The Rainey Street Historic District, once a
a significant transformation in the last
2004, It has emerged as one of the most
been completed, ranging from housing,
small residential neighborhood on the
fifteen years. After being rezoned as a
agressively developed areas of the city
hotels, restaurants and bars, and
edge of Downtown Austin, has undergone
part of the Central Business District in
with multiple projects having recently
additional development on the way.
N
SECTION 1 AUSTIN, THE EVOLVING CITY _30
THE NEW NEXUS _URBANIZING SECTORS The mapping of the four vectors suggests a significant shift in the intensity of urban
N
development from a historical focus along Congress Avenue, to new opportunities along the eastern and western edges of the downtown. The Austin Convention Center District, located in the middle of much of the new development on the east, occupies a central location between these initiatives. This location presents the city with a strategic opportunity to link together many of the ongoing projects into an entire network of active public places. It is transforming the convention center site from its initial status on the edge of central Austin to one in it which it becomes a primary hub of social and economic activity connecting a whole number of developing urban areas. Redevelopment strategies for the convention center should recognize the problems and opportunities surrounding the new nexus and strive to resolve the conflicts inherent with competing interests and initiatives, to ensure that the eastern edge of Downtown Austin becomes a safe, vibrant, and attractive area serving the community and its guests.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
_ATX : THE FOUR VECTORS
N
SECTION 1 AUSTIN, THE EVOLVING CITY _32
2
The Southeast Quadrant
_Overview _Landscape Systems _Mobility Systems _Real Estate Development
OVERVIEW _
2-01 FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Over the past 30 years, the Southeast
residents who work downtown and live
Quadrant of downtown has undergone a
on the north side of the city and beyond,
massive transformation, ushering in a host as far away as Leander. Potential transit of new options for dining, entertainment,
improvements on the horizon would
hotels, housing, and an energized street
increase and enhance the accessibility of
life. Illustrated and analyzed in the
the area.
following section are the area bounded by I-35 to the east, Lady Bird Lake to the
With the Waller Creek Master Plan
south, Congress Avenue to the west, and
underway, additional park space is under
Eighth Street to the north. The Austin
development, and will eventually provide
Convention Center is positioned in the
a continuous pedestrian connection from
middle of this quadrant and plays a
The University of Texas medical campus to
major role in defining the current urban
Lady Bird Lake. The City of Austin’s Parks
character of the area. The convention
and Recreation Department has initiated
center occupies a single parcel that is
a redevelopment of the historic Brush
made up of six historic city blocks. It has
Square, which will eventually become a
a large presence in the Southeast Quadrant,small but lively urban park for festivals, both physically and programmatically.
weekend markets and much more.
Today, areas of the Southeast Quadrant are defined by an active nightlife, a multitude
There is still great potential for
of cultural venues to explore (live music,
improvement and growth in the district,
bars, clubs, museums, and theaters), and
and the Austin Convention Center has
an ever-improving pedestrian environment. the potential to play a significant role in There are also areas, however, that
this transformation. All of the various
are devoid of active street life and the
programs that are taking root in the
perception of a lack of public safety.
Southeast Quadrant have the potential to work together in a symbiotic way, creating
The MetroRail, which began operating in
a vital urban district in a significant part of
2010, is servicing a growing contingent of
Downtown Austin. SECTION 2 THE SOUTHEAST QUADRANT_36
LANDSCAPE SYSTEMS _
LS
There are four significant factors that
Third, implementation of the Great Streets
are impacting the landscape systems
master plan will improve pedestrian
surrounding the Austin Convention
connectivity downtown and in addition, will
Center. Each of these is in a state of
provide a network of tree-lined streets that
transition, and with proper guidance has
will help to reduce heat island effect, while
the potential to work together to
providing ample shade for pedestrians and
transform ecosystem services in the
for cafes. Finally, as storm water flows
district. First, and most significant, is
across the district and into the creek, low-
the Waller Creek Corridor. Historically,
impact systems for cleaning the water prior
despite numerous attempts to transform
to distributing polutents into the watershed
the corridor into a significant linear
should be implemented. The mitigation
park, Waller Creek has resisted attempts
of pollutants prior to entering the creek,
at significant placemaking along its
together with the refurbishment of the
edges. However, the construction of the
riparian system along the creek, should
flood control tunnel has changed the
result in significant improvements to the
game. Now with the efforts of the Waller
performance of the ecosystem services
Creek Conservancy, and those of the
that the creek provides.
City of Austin, what had always been a residual space in the city is on the verge of transforming into one of the most significant linear urban parks in the country. Second, the potential revitalization of Brush Square, together with the redesigned Downtown Station, will create a new urban space that is flexible enough to handle high transit demand while serving the needs of festivals and events in the heart if the Southeast Quadrant.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
2-02
WALLER CREEK CORRIDOR_CREEK SHOW SECTION 2 THE SOUTHEAST QUADRANT_38
LANDSCAPE SYSTEMS_PARKS AND PUBLIC SPACE The Southeast Quadrant is home to several parks and public spaces. In the immediate vicinity of the Austin Convention Center there is Brush Square Park to the north, and Sir Swante Palm Neighborhood Park, or Palm Park, to the east. The Waller Creek greenbelt also runs throughout the Southeast Quadrant. These parks are used by the community, by the city, and for large cultural events, such as South by Southwest. Currently, efforts are in place to enhance and expand the Waller Creek park system through a dedicated funding stream. Brush Square Park released a draft master plan in November 2018 detailing planned improvements. The City of Austin has also begun the visioning process for improving Palm Park. There is not only a need for increased quality of parks and public spaces, but also for an increased quantity. Residential and mixed-use development is booming in the Southeast Quadrant, and for certain areas, such as Rainey Street, access to open space is limited.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
WATERSHED A majority of the Southeast Quadrant is located within the Waller Creek watershed. The watershed empties into Lady Bird Lake, and covers a total area of six square miles. Lady Bird Lake is one of Austin’s most famous and wellloved attractions, and maintaining an acceptable water quality level is extremely important. Any development within the watershed should be mindful of the amount of impervious cover being used, as well as the potential for runoff. One of the strategies to mitigate these effects is to integrate the Great Streets framework with the Green Streets framework. A Green Street, as defined by the EPA, is an approach to storm water management that incorporates vegetation, soil, and physical elements, such as pervious pavers, to help slow and clean storm water runoff. Addressing storm water runoff at the source level, the street, will lead to more efficient subsequent treatment and overall improved water quality.
SECTION 2 THE SOUTHEAST QUADRANT_40
MOBILITY SYSTEMS _
MS
The Austin Convention Center District is
convention center site, and the closure of
located at an important crossroads in the
streets during major festivals and events
city’s transportation system, for several
have a significant impact on congestion
reasons. Already, the downtown terminus
within and through the district. When one
of the commuter rail Red Line is located
considers the intensity of vehicle trips into
immediately adjacent to the north of the
and out of downtown along Cesar Chavez
convention center, while future initiatives
and in the Rainey Street District, there
will intensify the intersections between
are significant conflicts to be resolved.
multiple transportation modes. Among
These conflicts can be partially addressed
them is the pending implementation
by increasing the performance of multi-
of Capital Metro’s Project Connect, in
modal systems in downtown, increasing
which two more high-capacity transit
choices, and enhancing the connectivity
lines are planned to intersect at the
of the transportation infrastructure
new Downtown Station, between the
through initiatives like Reconnect Austin
convention center and Brush Square (the
and the ongoing implementation of the
future Green and Blue Lines). Already
Great Streets Master Plan. Perhaps most
traversing the north side is the Lance
significant would be a reduction in the
Armstrong Bikeway, whose route may
amount of automobile traffic downtown.
have to be modified to accommodate the
Already, the increase in parking under
upgraded transit facilities. Together with
construction as a part of development
the completion of the Great Streets Plan,
in the Rainey Street District has led to
these infrastructural improvements will
recommendations to restrict access to
significantly enhance connectivity between residents exclusively. This situation will the district and other sections of the city.
only intensify as new projects come online. Provisions for multi-modal choices would
Alternatively, a street grid that was
be a step toward relieving some of these
severed by the original construction
conflicts.
of I-35, the elimination of the through streets that once ran through the six-block
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
2-03
GREAT STREETS_SECOND STREET SECTION 2 THE SOUTHEAST QUADRANT_42
MOBILITY SYSTEMS_GREAT STREETS Great Streets are streets for people. They prioritize pedestrians, transit, bicycles, and cars, in that order, and are an integral component in any successful city. By improving the quality of both the streets and the sidewalks, Great Streets create a safer, more inviting atmosphere for any mode of transportation. Great Streets improvements include space for sidewalk cafes, street trees, consistent paving materials, wider walking spaces, and benches. Streets and open spaces make up 50% of downtown land, and continued public and private investment is necessary to continue to improve the quality of these spaces. Redevelopment of the Austin Convention Center district should include Great Streets improvements in order to enhance connectivity in the area.
Pedestrian Dominant Street Mixed Mode Street Rapid Transit Street Bicycle & Local Access Street Commuter Street Commuter Boulevard
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
_BICYCLE INFRASTRUCTURE Between 2009 and 2015, the City of Austin expanded its designated bicycle routes by 70%, increasing from 126 to 210 miles. Not only has the network gotten larger, it has gotten better, with more protected bicycle lanes. In and around the Southeast Quadrant, there are plenty of options for biking, but many of these bike lanes are difficult for riders due to poor road conditions, accumulation of debris in rideable space, and a lack of physical barriers between riders and vehicles. The Lance Armstrong Bikeway is a major east-west route for the city but the portion that passes along Fourth Street creates potential conflicts with Capital Metro’s Station Expansion plans and potential redevelopment of the Austin Convention Center. These conflicts should be considered in any convention center scenario.
ROUTE COMFORT RATINGS HIGH MEDIUM LOW B-CYCLE STATION RESTRICTED SIDEWALKS
SECTION 2 THE SOUTHEAST QUADRANT_44
MOBILITY SYSTEMS_TRANSIT SYSTEMS COMMUTER RAIL GREEN LINE RED LINE SPECIAL BUS ROUTE ORANGE LINE - METRO AIRPORT FLYER HIGH CAPACITY RAPID TRANSIT BLUE LINE - RIVERSIDE ORANGE LINE - NORTH LAMAR/SOUTH CONGRESS
BUS RAPID TRANSIT LIGHT PINK LINE - CROSSTOWN PURPLE LINE - CROSSTOWN
Austin’s traffic congestion is one of the biggest problems facing the city, and is a symptom of our diminished mobility. This congestion costs our people, our businesses, and our environment, while diminishing our quality of life. Transit in the Southeast Quadrant is slowly improving, with potential changes and improvements on the way, via Capital Metro’s Project Connect plan. A mixture of rapid bus, regular bus service, and commuter rail, all of which have stops around the convention center, service the area. One of the proposed elements of Project Connect
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
is the Blue Line, a new high-capacity rapid transit line, which would run along Trinity Street and connect the University of Texas at Austin main campus and the Austin-Bergstrom International Airport. In addition to the Blue Line, extended express bus routes and additional rapid bus routes are also proposed in the vicinity of the convention center. These projects will take some time to implement, and will likely start emerging over the next few years with expected completion in 10-15 years. Some of the transit changes have the potential to affect how streets around the convention center are currently being used, as well as the east-west traffic flow. The area around the convention center is relatively accessible via existing transit; however, Rainey Street residents to the
2-04
south are currently out of reach of any
likely be updated to reflect the changes.
major transit lines. As more development
Increasing accessibility across all modes
comes online in the coming years, transit
of transportation, as well as all users, is an
will need to expand in order to mitigate the important element of the future convention center’s success as a Southeast Quadrant number of vehicle trips in the downtown area, and facilitate a greater connection
hub.
to surrounding communities. As these transit options improve, other mobility components, such as Great Streets, will SECTION 2 THE SOUTHEAST QUADRANT_46
MOBILITY SYSTEMS_PARKING Downtown Austin parking is a mixture of on-street parking, surface lots, and parking garages. There are 65,099 offstreet spaces (surface lots and parking garages), and 6,405 on-street spaces. Given this abundance of parking in the downtown area, and the perceived shortages during peak load times, it will be important to encourage smarter parking, rather than additional parking. Furthermore, alternative modes of localized transportation (scooters, B-cycles) will need to continue to be refined and encouraged in order to decentralize parking during peak load times. Additional public parking should not be a part of any convention center redevelopment.
ENTRANCE PARKING GARAGE SURFACE PARKING STREET PARKING 1/4 MILE WALKABILITY FROM CONVENTION CENTER
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
_SERVICE ENTRYWAYS Service entryways in Downtown Austin have a profound effect on urban street life in the district. As a general pattern, blocks to the east of Brazos are serviced along alleyways which run east-west. This allows for greater walkability along the east-west axis because sidewalks remain uninterrupted. Blocks on either side of Congress avenue are serviced on a north-south axis, which allows for greater walkability along Congress Avenue. In coming years, as a part of the implementation of the Great Streets Master Plan, streets will be shifting from one-way to two-way. Near the Convention Center, there is a conflict between Red River (the main access road for the existing convention center), and the future redevelopment of Waller Creek. Designing for service access along Trinity Street will also create potential problems by reducing the possibilities for continuous street frontage, interrupting sidewalks, and creating additional traffic congestion in the area.
ENTRANCE
SECTION 2 THE SOUTHEAST QUADRANT_48
REAL ESTATE DEVELOPMENT _ In addition to the public infrastructure
However, these undeniable opportunities
in the Southeast Quadrant, the status
also heighten the importance of addressing
quo and future possibilities for the
a variety of the impacts that come with
Convention Center District are also heavily development and densification, including
RE
shaped by private development. As we
stormwater runoff, traffic congestion, the
demonstrate in the following pages,
need for usable and inviting open space,
Downtown Austin is a unique area within
and others.
the city in which robust demand for various types of real estate development coincides with comparatively permissive land use regulations. In recent years, private market actors have responded to these conditions by filling a robust pipeline of projects recently completed, under construction, planned, and under consideration. In so doing, the traditional function of Downtown Austin as primarily a jobs center is being remixed into a more balanced district that also includes a much larger number of permanent residents, and where the role of tourism has been increasing. For the most part, these trends offer great opportunities to enliven what in the past have been dead zones in many of the streets surrounding the Austin Convention Center, devoid of people, commerce, and visual interest. All indications are that they will continue on the current trajectory in the coming years.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
2-05
RAINEY STREET_NEW CONSTRUCTION SECTION 2 THE SOUTHEAST QUADRANT_50
REAL ESTATE DEVELOPMENT_REGULATORY FRAMEWORKS 12
Several regulatory frameworks impact
4
development patterns in the district. First are the Capitol View Corridors, established through legislative action in 1984,in order to preserve 30 key public 14
views to the Capitol building and its
10
dome. Recently, although there have been talks about increasing the number of Capitol View Corridors to the east, as they currently stand, the Capitol View Corridors do not affect any of the convention 15
center redevelopment scenarios. The
14
closest restricted area (#15) falls east 17
of any potential build sites. Second, OFFICE MANUFACTURING RAILROAD FACILITIES HOUSING
the boundaries of the Waller Creek Tax Increment Reinvestment Zone (TIRZ). The Waller Creek TIRZ was created in 2008
SINGLE FAMILY
and utilizes Tax Increment Financing in
APARTMENT/CONDO
order to maintain and improve the Waller
WALLER CREEK TIF
Creek Chain of Parks. The TIRZ does
CAPITOL VIEW CORRIDORS
not limit the redevelopment opportunity
MEETING AND ASSEMBLY
of the convention center, but would
CULTURAL SERVICES
benefit if property values surrounding
GOVERNMENT SERVICES
the convention center were to increase.
UTILITIES
Finally, The center falls within the CBD
COMMERCIAL MIXED USE
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
the convention center also lies within
zoning of central Austin, allowing for an FAR of 25:1 for future private development.
_LONG TERM HOUSING Housing options downtown have increased substantially in the past ten years, with a number of major multi-story residential developments on the way. However, even with increases in inventory, the cost of housing in this area is prohibitive for a large segment of the population. Right now, the average single-bedroom apartment in Austin rents for $1,150 per month, while the same apartment located in the downtown area rents for nearly $1,900 per month. The economy in the Convention Center District depends on workers from all income levels being able to either live near their workplace, live in close proximity to viable public transit, or be able to commute and park near their workplace (which increases overall living expenses). The lack of affordable housing in this area is not only harmful to those who can no longer afford to live in the area, but it also hinders business, and it reduces the vibrancy of street activity.
MULTI-STORY RESIDENTIAL SINGLE STORY RESIDENTIAL
SECTION 2 THE SOUTHEAST QUADRANT_52
_HOTELS The tourism industry in Austin, which sees over 22 million visitors annually, continues to experience growth and the hotel market has taken note. Within a quarter-mile walking radius of the Austin Convention Center, there are fourteen hotels, with 6,248 rooms. In the downtown area alone, 13 new hotels have opened in the last three years, adding nearly 2,000 additional rooms. The growth of the hotels in this area is an opportunity that activates what would otherwise be a dead zone around the convention center. During events, the influx of thousands of visitors to the area creates a challenge for a transportation network that is already under pressure. With all of these pedestrians in the area, it is more necessary now than ever to make the current “back of house� loading dock area feel safer and more welcoming to pedestrians. This also presents an opportunity to improve retail offerings in the area.
1/4 MILE WALKABILITY FROM CONVENTION CENTER HOTEL
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
_EMERGING PROJECTS There are a number of Emerging Projects in the Southeast Quadrant, notably including the Waller Creek redevelopment and the Fourth Street transit stop at the Saltillo TOD, east of I-35, which will add 21
additional housing, and will provide this area with a much-needed grocery store.
18 24 19 20
8
33
Waller Creek
18
Sabine Street Promenade
21
Osten Hall
24
Saltillo TOD
19
Downtown Metro Rail Station Expansion
20
Block 36 Micro Apartments
34 26 27
33
8 28
35
Marriot Hotel at Cesar Chavez
26
Waller Park Place
27
Red River Tower
28
The Travis (Residential, Hotel)
29
Fairfield Inn and Suites Hotel
30
70 Rainey Street Residential
31
48 East Residential
32
44 East Avenue
29 30
31 32
SECTION 2 THE SOUTHEAST QUADRANT_54
3
CULTURAL PARAMETERS
_Culture and Commerce _Culture and Community _District Frameworks
CULTURE AND COMMERCE _ One of the two principal axes of the
of the urban space around the convention
original Waller plan, Cedar Street (now
center. In short, it is a district that does not
Sixth Street) continues to be one of the
realize its full social or economic potential.
significant cultural and entertainment venues in central Austin. New areas have
Many ongoing initiatives promise to help
recently been emerging however, sections the situation. Renovations to the Waller
CC
of the city which are rivaling Sixth Street
Creek corridor, the construction of the new
in urban intensity. In particular, during
Sabine Street Promenade, Palm Park, and
the last decade the Rainey Street District
the redesign of Brush Square, all have the
has completely transformed into an area
potential to improve the public space in the
of the city laden with restaurants, bars,
district significantly. Capital Metro’s Project
hotels, and housing.
Connect Vision Plan, the build-out of the Great Streets network, and the possible
In between these two vital urban areas
reconstruction of I-35 into a less divisive
lies the Austin Convention Center. Visitors form of infrastructure, are all catalysts for to Austin who come for conventions and
improving public life.
events are concentrated in this area. Nightlife flows back and forth between
Situated at the center of all of this
Sixth Street and Rainey Street, and when
dynamism, the Austin Convention Center
visitors are not attending sessions, these
can reinforce its role as a cultural nexus,
are prime destinations.
bringing together visitors with the citizens of Austin, and reinforcing connections
Connections across the district are
across the city, contributing to the active
less than ideal, however, resulting in
street life that the Southeast Quadrant
disconnected street life and reduced
aspires to.
economic opportunity for the Austin community. The low quality of the public infrastructure and the lack of active street frontages is detrimental to the character
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
3-01
SIXTH STREET_SOUTH BY SOUTHWEST SECTION 3 CULTURAL PARAMETERS_58
CULTURE AND COMMERCE _ACTIVE STREET FRONTAGES Active street frontages are an important component in any successful urban district. When the ground-floor levels of buildings are active, there is a more inviting environment for pedestrian activity, while adding an additional layer of security in the area. There are areas in downtown Austin that support urban life, such as the retail and cafe cooridor lining Congress Avenue, or the tree lined sidewalks of Second Street. However, many of the areas that do not support urban life fall near the Convention Center. In this area, there are fewer retail frontages or sidewalk cafes, making walking the streets a less-thandesireable experience.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
_ENTERTAINMENT AND CULTURE Downtown Austin is full of valuable cultural resources, including museums, theaters, galleries, and live music clubs, providing visitors with a host of entertainment options. Many of these establishments are within walking distance of the Austin Convention Center, providing visitors with a number of dining and entertainment options in the area. However, the blocks immediately surrounding the Convention Center are lacking continuous, active street frontage and pedestrian activity in the area would greatly benefit from additional points of interest.
DINING ENTERTAINMENT HISTORIC LANDMARK CULTURAL VENUE
SECTION 3 CULTURAL PARAMETERS_60
EVENTS AND FESTIVALS_STREET CLOSURES During major events like SXSW, it becomes necessary to close a significant portion of the street grid in the Southeast Quadrant to vehicular traffic. These street closures occur immediately adjacent to the Convention Center, portions of the Rainey Street District, and six blocks of Sixth Street. While these street closures improve pedestrian walkability and safety, they have significant impacts on vehicular traffic in the area. These impacts should be accounted for during any potential convention center scenarios. Note: The diagram to the left is the street closure plan from SXSW. Street closures will vary depending on size and programatic requirements of a convention center event. We do not know that this is always going to be the diagram for street closures, but in the past, street closures have affected the convention center in the following ways:
PARTIAL LANE CLOSURE FULL LANE CLOSURE
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
_PEDESTRIAN CONNECTIVITY Pedestrian activity in Downtown Austin has increased in recent years, with the emergence of Rainey Street, the Seaholm District, and East Cesar Chavez as hubs for economic activity. As a part of the Great Streets Master Plan, the quality of walkable streets in the Southeast Quadrant has improved, creating a more inviting pedestrian experience. However, even with the improvements in recent years, the pedestrian connectivity in this area needs subsantial consideration. Walking between major hotspots such as Rainey Street and East Cesar Chavez, or along East Sixth Street across I-35 can present challenges for pedestrians. Many of the busiest intersections prioritize cars over the safety of people on foot. As illustrated in this diagram, the Convention Center District becomes a deadz one when there are no scheduled events. This is the result of three factors: 1) The infrastructural barrier of I-35; 2) convention center cuts off street connectivity of the original grid; 3) there is a lack of contiguous retail frontage in the area. PEDESTRIAN CONNECTION ECONOMIC HOTSPOT
SECTION 3 CULTURAL PARAMETERS_62
CULTURE AND COMMUNITY _ Once located on the edge of downtown, the Austin Convention Center now lies at the center of rich cultural activities and many communities and organizations. Situated in the middle of two lively urban areas and surrounded by vital communities, the Convention Center has an opportunity to reinforce culture and community. Given its central location within a rapidly changing area, it is important that the convention center be designed to enhance community connections. In order to serve the public as
CC
a whole, any redevelopment of the Austin Convention Center must be done with the greater community in mind as well as convention visitors. Music, art, and culture are essential to Downtown Austin. Facilities such as the Emma S. Barrientos Mexican American Cultural Center foster creativity and provide a critical role in preserving culture in the city, while venues like those in the Red River Cultural District provide people countless opportunities to experience live music and restaurants. Challenges exist in the quadrant related to homelessness and related services however; these issues must not be ignored or forgotten when
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
considering the transformation of street life and public experiences around the Austin Convention Center. There are many existing districts within Downtown Austin, each with its own characteristics. It is important not to reduce the re-envisioning of the Southeast Quadrant to a mere branding exercise. This quadrant must respond to the qualities of urban and cultural life existing around and within it, and it is important to make this a vibrant and connected part of the city as a whole. A comprehensive reimagining of the quadrant should take into account the environment, equity, and economics of the area. For example, a majority of the Southeast Quadrant is located within the Waller Creek watershed. There are also complex problems with homelessness in
3-02
downtown Austin. Hospitality-related jobs in downtown
for filling rooms many nights each week. In community-oriented landmarks within
provide rare employment career pathways
no other area of downtown do environment, the Southeast Quadrant. Communities
that do not require a college education
equity, and economics all play such a vital
contribute to the culture of the Southeast
and allow long-term opportunities for
and integrated role.
Quadrant, and there are many voices and
advancement. Austin has a robust hotel
organizations to consider when making
industry, particularly in and near downtown While not an exhaustive list, the following
any plans for the future of the Austin
that is dependent on the convention center
represent some of the cultural and
Convention Center and its context. SECTION 3 CULTURAL PARAMETERS_64
_CULTURE AND COMMUNITY
3-03
Emma S. Barrientos Mexican American Cultural Center
MACC is a resource for the community and
3-04
ARCH
legal, employment and other needs.
visitors to learn and participate in classes
The Downtown Austin Alliance identified
and programs. The Education Department The Austin Resource Center for the
“welcoming places” as a priority for
The Emma S. Barrientos Mexican
within the ESB-MACC seeks to provide
Homeless (ARCH) serves as a point of
downtown, including a need to “broadly
American Cultural Center (ESB-MACC) is
dynamic, innovative, and socially relevant
entry into a coordinated homeless social
address the needs of people experiencing
dedicated to the preservation, creation,
programming that preserves, creates, and service system for many of Austin’s
homelessness…”, in their “Dowtown Austin
presentation, and promotion of the cultural promotes Mexican American and Latinx
adults experiencing homelessness.
Vision” report. The Austin Resource Center
arts of Mexican Americans and Latino
ARCH Emergency Night Shelter provides
for the Homeless (ARCH) is an important
cultural arts and heritage.
cultures. The Center houses two galleries,
overnight shelter and showers to up to190 constituency to consider in this quadrant
community rooms, and an auditorium,
The ESB-MACC is a vibrant arts center
adult men each night. The ARCH assess
and is located just three blocks north of the
theater, and dance studio. The
with 100,000 annual visitors. In a
client needs, provide information on how
Austin Convention Center.
organization hosts annual events, works
complimentary fashion to the function of
and where to access services, meet the
with community organizations and
the Austin Convention Center, the ESB-
basic emergency needs of homeless
partners, and co-produces collaborations
MACC organizes year-round activities
adults and connect them to safe and stable
with Latino organizations that are free and
and cooperates with a large number of
housing. The ARCH also provides sleeping
open to the public.
partners who complete and strengthen
areas for homeless people to rest, day
programming through rentals and
or night, and a Day Resource Center.
collaborations.
Partnering agencies help to make the
The idea of establishing a cultural facility for Latinx artists and the community
ARCH a one-stop shop where clients can
emerged in the early 1970s. The ESB-
receive support for mental health, medical,
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
3-05
Waller Creek
3-06
15th Street to Lady Bird Lake, the new
Red River Cultural District
and a summer festival. The Music Venue Alliance Austin (MVAA) became the first
Waller Creek parks district will include Waller Creek is a one and half mile linear
more than thirty-seven acres of newly
The Red River Cultural District is an
American chapter of the Music Venue
park and trail that traverses the east
designed and connected urban parks
entertainment district in Downtown
Trust and Alliance UK in 2016. Its mission
side of downtown, connecting Lady Bird
and public open space, and more than
Austin, between 7th and 12th streets
is to organize Austin’s venue community
Lake, The University of Texas, Palm Park,
three miles of new hike and bike trails,
along Red River Street. The Austin City
with a unified focus and voice, in order to
Symphony Square, and Waterloo Park.
along with engaging art and educational
Council approved a resolution creating the achieve policy protection for invaluable
The Waller Creek Boat House is near the
programming.
district in 2013. The Red River Cultural
cultural assets that make up a substantial
mouth of Waller Creek. The Waller Creek
District provides residents and visitors
sector of the Austin economy. MVAA seeks
Conservancy is a 501(c)(3) non-profit
with countless opportunities to experience to protect Austin’s live music network by
whose mission is to create and maintain a
live music in the Live Music Capital of the
securing the long-term future of iconic
chain of extraordinary urban parks along
World. Live music venues, restaurants,
music venues. These venues have played
a restored Waller Creek, in partnership
cultural organizations, hotels, and
a crucial role in the incubation of Texas
with the City of Austin, for the benefit of
additional establishments are all part of
music by nurturing local talent. Venues
all. The Conservancy renews the natural
the activity in this cultural district.
provide a platform for artists to build
environment, promotes play, health and
their careers, while developing music
wellness, economic vitality, and mobility,
In 2016, the Red River Merchants
and performance skills. MVAA works
and engages the community through
Association was formed and since then
to preserve venues, making them more
outreach, education, cultural events, and
has executed a number of placemaking
efficient, with an improved experience for
the arts. Running from Waterloo Park at
projects in the district, including a murals
performers and audiences. SECTION 3 CULTURAL PARAMETERS_66
DISTRICT FRAMEWORKS _ The Austin Convention Center’s central location offers a great opportunity to serve as a catalyst for placemaking and district development. The many physical and cultural elements of the surrounding area weave a rich urban fabric that can seem disconnected from the current convention center. In redeveloping the convention center, there is an opportunity to create a more cohesive Austin Convention District through infrastructure and programming that would engage the surrounding
DF
Southeast Quadrant as well as other Austin residents and visitors. Several existing frameworks for creating a district can help to provide the guidance and support necessary to ensure success. An Innovation District is already in place, stretching Lady Bird Lake along I-35 to the newly completed University of Texas Dell Medical Complex. Another potential framework to consider would be the EcoDistrict, which emphasizes sustainability. Regardless of which frameworks are chosen, stakeholder and community engagement are essential, and would require the Austin Convention Center to engage in shared placemaking.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
3-07
Innovation District One of the frameworks already in place is the Innovation District, founded in 2017 by Central Health, Seton Health, and The University of Texas at Austin Dell Medical Center. The Innovation District is intended to be a hub of activity dedicated to collaboration, creativity, and opportunity. Innovation districts are a way for cities to cluster the work of academic, medical, and corporate institutions, firms, and people through proximity, development, innovation, and community engagement. Innovation districts have the potential to spur productive, inclusive, and sustainable
economic development. They can help
_Place
a holistic, forward-thinking, inclusive
companies, universities, and investors
_Prosperity
approach to building communities, which
across disciplines collaborate on new
_Health and Wellbeing
can maximize a district’s economic, social,
opportunities. The Austin Convention
_Connectivity
and environmental potential.
Center could provide collaborative
_Living Infrastructure
community spaces for connectivity and
_Resource Regeneration
EcoDistricts across the United States have already capitalized on the ability
innovation that support a successful
In addition to these priorities, certification of a convention center to serve as an
Innovation District.
as an EcoDistrict requires a dedicated
anchor institution within the district. Lloyd
Capital City Innovation is the non-profit
group of stakeholders who are to be
EcoDistrict in Portland, St. Paul EcoDistrict
organization that was created to help
involved in the planning and execution
in St. Paul, and Capitol Hill EcoDistrict
of projects within the district. The
in Seattle all include convention centers.
EcoDistrict model emphasizes the
Convention centers are large business
importance of public-private-civic
operations and their commitments to
3-08
develop and sustain the Innovation District. Its board includes representatives from the founding organizations as well as
EcoDistrict
from Opportunity Austin and the
Another potential guiding frameworks that
partnerships to improve cross-sector
waste reduction, renewable energy
Downtown Austin Alliance. The Innovation
could be considered is the establishment of
collaboration and build new models
generation, and community engagement
of inclusive governance to ensure
can have a significant impact. Designating the Southeast Quadrant as an EcoDistrict
District will encourage development that is an EcoDistrict Sustainable Neighborhood. complementary to the anchor institutions,
The EcoDistrict promotes sustainability
efficiency and efficacy. Implementation
focusing on technology and healthcare.
by advancing a new model of urban
of a successful EcoDistrict relies on a
is one strategy that could be used to
The district hopes to foster economic
development and can be applied at a
collaborative governance framework,
capitalize on the Austin Convention
growth, job creation, and innovative
neighborhood and district-level scale.
part of which includes identifying a
Center’s potential impact and provide
technology development. It also outlines
Designating the Southeast Quadrant as
backbone organization, which serves as
guidance for other businesses within the
objectives such as access, inclusion, and
an EcoDistrict could potentially propel
a decision-making body and provides
district.
collaboration. The Innovation District is
forward the sustainability goals identified
leadership for the other stakeholders
still early in its development, and is
by the City of Austin. An EcoDistrict is a
involved, as well as for the community.
actively searching for new companies to
physically defined area that embodies
An EcoDistrict certification is valuable
join its growing roster of network partners. three imperatives, equity, resilience, and
because it demonstrates a city’s
climate protection, by focusing on a set of
commitment to creating intentional,
six priorities:
sustainable spaces. EcoDistricts are SECTION 3 CULTURAL PARAMETERS_68
4
Economic Considerations _Overview _Method of Economic Analysis _Projecting Demand
OVERVIEW _
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
METHOD OF ECONOMIC ANALYSIS_
This section reviews the basic economic considerations that should inform any
REVENUE GENERATING PROGRAMS_HOTEL OCCUPANCY TAX GROWTH OF CBD ASSESSED VALUE_
decision on whether and how to expand the Austin Convention Center. It begins with three brief treatments of discrete topics: i) the Hotel Occupancy Tax, an important potential revenue source for any expansion
COUNT OF SUBSET OF AUSTIN HOSPITALITY WORKERS_BY ZIP CODE
proposal, whose usage is constrained under state law; ii) the importance of
PROJECTING DEMAND_
Downtown Austin as a revenue generating engine for the entire city; and iii) the geographic distribution of hospitality workers within Austin. Next, this section outlines the method of economic analysis which addresses the question: “Do the benefits of expanding the convention center outway the costs?” Finally, the section closes with an overview of how demand for an expansion is projected, which deals with the question, “Will there be enough demand to fill an expanded convention center with incremental attendees?” Further elaboration of economic and demand analysis can be found in Appendix C.
SECTION 4 FINANCIAL CONSIDERATIONS _72
METHOD OF ECONOMIC ANALYSIS _ The opportunity to reshape the public
analytical procedures and tools that
realm in Downtown Austin will be an
are well-accepted. For instance, in the
important consideration in City Council’s
quantification of spinoff economic benefits
eventual decision on whether and
from increased visitation to Austin, the
how to expand the Austin Convention
research team relies on IMPLAN, widely-
Center. Another important element
used software that is the industry standard
of the calculation, however, concerns
for such estimates. Also presented are
economics. Simply put: will expanding the economic calculations derived from Austin Convention Center yield greater
future attendance estimates as ranges
economic benefits for the City of Austin
rather than as single numbers, to show
than the costs required? This is a complex their level of sensitivity to the underlying question with no straightforward answer. The economic analyses of the various scenarios, strive for estimates that are
EA
assumptions.
Our Basic Approach
conservative and defensible. Estimates
Large publicly-financed facilities, such as
are conservative in that they follow what
sports stadia and performing arts centers,
are regarded as best practices among
that are sold to the public on the basis
economic analysts. There are economic
of boosting entertainment and tourist
benefits that would likely result from the
spending are often criticized for failing to
expansion of the convention center, such
yield public benefits to offset their costs.
as improvement to circulation downtown
However, a convention center is somewhat
and the creation or enhancement of public different from an entertainment facility for spaces, that would likely yield expanded
the simple reason that, if successful, it will
economic activity on surrounding privately- induce more people who live elsewhere owned parcels, that are too difficult to
to visit a city than otherwise would have.
credibly quantify. To be conservative, these In economic terms, an influx of visitors to are left out of our analysis. The analysis
a city represents an export economy for
also strives for defensible estimates by
that city rather than just a reshuffling of
using, whenever possible, off-the-shelf
entertainment spending by local residents.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
It is certainly true that there is a consensus existence of the new facility, how much
scooters and ride-hailing services (Lyft,
businesses pay suppliers in order to
among academic researchers on economic local entertainment spending would have
Uber, Wingz). The analysis is focused on
provide goods and services, such as hotel
development that taxpayer-funded
taken place? It is the increment in local
the two largest forms of spending, whose
stays or restaurant meals, with dollars
sports stadia and similar facilities do not
spending that is relevant for justifying a
magnitudes are quite easy to estimate:
that continue to circulate in the local
usually generate enough benefits to offset
new facility, not its total amount. This is the hotel spending and restaurant spending.
economy (although some of the dollars
expenditures. Part of these researchers’
reason that we focus our analysis of the
It is assumed that a fixed proportion of
argument is that while studies justifying
economic benefits of a convention center
attendees at a convention center event
amount of these types of induced and
such investments often tabulate the direct
expansion on new out-of-town visitors
stay in a hotel and buy a restaurant meal.
indirect spending as a multiple of direct
consumer spending that results, all too
as the drivers of incremental economic
Although these forms of spending vary
spending is sometimes referred to as an
benefits.
greatly across visitors, in the aggregate
economic multiplier. Economic multipliers
they are relatively simple to model
are a recognized concept; however, they
because spending behavior of visitors to
are notorious for being overestimated in
often they fail to estimate the extent to which these expenditures are simply diverted from what otherwise would be
Direct Spending
“leak” outside the local economy). The
Austin is well-documented, and on the
studies intended to paint an overly rosy
For instance, spending at a new sports
Visitors to Austin who attend events
whole new visitors to Austin will behave
picture of the benefits of a proposed
stadium on tickets, food, and beverages at
at the convention center who do not
much as previous visitors have with
public investment. Computing indirect
the facility, and at bars and restaurants in
reside in the Austin metropolitan region
regard to their spending habits.
and induced spending using the IMPLAN
the vicinity, is likely to be predominantly
spend money during their visit, above all
(though not exclusively) made by local
for accommodations and restaurants.
residents, who would otherwise have been
Spending for accommodations principally
expending their entertainment dollars at
occurs at downtown hotels, although some Indirect and induced spending consists of
would be (rightfully) open to question.
other locally available alternatives. Any
visitors stay at hotels in more outlying
ripple effects from direct spending. For
Instead, the team employs an industry
given entertainment option is unlikely to,
locations, while others use short-term
example, when visitors to Austin spend
standard, widely recognized tool.
different types of local expenditures.
on its own, dramatically increase the share rental services such as Airbnb or VRBO,
software mentioned above, by using off-
Induced and Indirect Spending
the-shelf “black box” software, avoids creating a bespoke economic model that
money on accommodations in downtown
or amount of local residents’ household
while still others stay with friends or
budgets devoted towards entertainment.
relatives who live in Austin. Other common recirculated into the economy via wages
A study that takes no account of this
forms of spending include beverages and
paid by the hotels to hotel workers, who
dynamic is failing to account for what
entertainment, as well as spending on
in turn spend money locally on goods
economists sometimes refer to as the “but
consumer goods and on transportation
and services. This is known as induced
for” question. In other words, “but for” the
services, such as rental cars, taxis,
spending. Indirect spending occurs when
hotels, some portion of that spending is
SECTION 4 FINANCIAL CONSIDERATIONS _74
METHOD OF ECONOMIC ANALYSIS Taxes on Direct and Indirect Spending
Taxes on Direct and Indirect Spending
All of the foregoing benefits accrue
music venues can accrue on what would
to the positive side of the ledger of
otherwise be much slower nights of the
Some portion of the increased direct and
In some of the scenarios, land that
the benefits and costs of a convention
week, e.g., Sundays, Mondays, Tuesdays,
indirect spending resulting from a net
is currently publicly owned as part of
center expansion. Additional benefits are
and Wednesdays.
increase in visitors will be recaptured by
the existing Austin Convention Center
acknowledged but are mostly unquantified
the municipal government in the form
site is eventually developed by private
in the report. These are as follows.
Career pathways
of tax collections. This occurs primarily
owners, whether via a land sale, a
through Hotel Occupancy Tax (HOT) and
leasing arrangement, or a public-private
sales tax, though there are other taxation
partnership. Provided that the land was
An expanded convention center
rare source of employment that does not
mechanisms, including beverage taxes
not owned by a governmental entity,
would likely allow Austin-Bergstrom
require a college education and that offers
and car rental taxes. Although these funds
such transactions would, all else equal,
International Airport (ABIA) to support
long-term opportunities for advancement.
are a subset of, rather than in addition
increase the amount of taxable land on
more flights. It is also possible there could Expanding the Austin Convention Center
to, the overall visitor-related spending
which property taxes are collected, of
be other transportation benefits, such as
would allow these opportunities to grow.
that occurs, they are important to analyze
which the City of Austin would receive its
more robust transit service connecting
Accordingly, estimates of the number of
separately because they represent funds
share (about a fifth of the total collected).
downtown to ABIA than currently exists.
jobs created via the hotel and restaurant
that accrue to city coffers and therefore
In such cases, it can be assumed that any
serve to offset expenditures that the
resulting development that occurs would
city would have to make to expand the
mirror current developments elsewhere
convention center. In addition, some tax
in Downtown Austin. Incremental property It is not only the quantity, but the timing,
collections, above all from the HOT, are
tax collection to the City of Austin is
Transportation improvements
Support for the Hospitality and Creative Economies of spending by Austin Convention Center
restricted as to what they can be expended estimated but all other economic benefits visitors that helps underpin Austin’s
Some hospitality-related jobs, such as at the large hotels in downtown, offer a
spending referenced above are reported. Most, though not all, of these jobs are in the hospitality sector. Leisure and hospitality plays an important role in Austin’s economy. Fully 14.8% of the
on. For this reason, estimating the likely
to the city of real estate development are
extensive hospitality and creative economic five-county Austin region’s private-sector
increase in HOT collections is important
ignored. Currently existing zoning and
sectors. Nightlife-and restaurant-heavy
jobs are in this industry, as up 2017, up
for projecting increases to particular
other land use restrictions such as
areas near Austin Convention Center such
sharply from 11.4% in 2000, and higher
kinds of public spending, such as historic
Capital View Corridors, and generally
as West Sixth, East Sixth, South Congress,
than the 12.9% share statewide.
preservation and other HOT-eligible
adheres to urban design best practices
and others receive heaviest visitation
expenditures, that may result from an
and replicates typical developments
from local residents on Thursday, Friday,
expanded Austin Convention Center.
elsewhere in Downtown Austin.
and Saturday nights. Austin Convention Center attendees help even out the sales that night spots, restaurants, and
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
and mayor make their decision on whether for the Western Parcels estimates their
Overall Improvements to Downtown Austin
that these benefits do not exist, as they
very likely do for Austin, and their existence and how to proceed with expansion.
total value; the real market value may
Some of the scenarios would result in
in general has been acknowledged by
differ from this amount, but it provides a
overall enhancements to the Southeast
academic researchers. For instance, the
On the other side of the proverbial
Quadrant of Downtown Austin, such as
existing convention center facility has
ledger from the benefits from an Austin
improved circulation, more and better-
been essential to the globally renowned
Convention Centerexpansion are the costs.
quality public spaces, more attractive
SXSW festival from the beginning, and
There are four major categories of costs
streetscapes, and others. It is possible
continues to be to the present day.
for an expanded Austin Convention Center. expansion of the Austin Convention Center
that these improvements would increase
However, likely changes to “brand value”
the amount and quality of real estate
arising from various expansion scenarios
development and other types of economic
are too difficult to credibly quantify and are Expanding the Austin Convention
taxes from the tax rolls. Some of this land,
activity in Downtown Austin over what they
therefore omitted from the analysis.
Centerunder the scenarios we analyze in
as well as land underneath the current
would have otherwise been. It is difficult
Property Acquisition Costs
reasonable metric for analysis.
Property Tax Opportunity Costs Acquiring the parcels for westward would entail removing parcels that are currently generating property and sales
Section 5 would necessitate acquiring the
footprint of the convention center, if
to quantify the extent to which these
Because of these various benefits that
right to develop a series of land parcels
eventually restored to private ownership
improvements would represent an overall
are difficult, if not implausible, to credibly
lying to the west of Trinity Street from
and revenue-generating uses, as is true
increase in economic activity in Austin,
quantify, it is possible that expanding the
the current site, which we refer to as the
in several of the scenarios, could return
or simply a diversion from other parts
Austin Convention Center could be judged
Western Parcels.This acquisition could
to the tax rolls. However, the majority
of Austin or the suburbs to Downtown.
to be worthwhile even if a conservative,
occur via several pathways, including
of the land underneath the convention
Because these benefits are so difficult to
defensible analysis shows a negative value voluntary sale or lease by the existing
center would likely be publicly owned and
credibly quantify, they are ignored in this
for the investment. The conservative,
property owners. Another possibility is a
therefore not subject to property taxation.
report.
defensible, economic figures presented
public-private partnership between the city Note that in the analysis only property
here provide useful information, but are
and a consortium of the existing (multiple) taxes are considered from the standpoint
not intended to be the last word in the
property owners, where the owners’ land
Psychic Benefits It is possible that a nationally or
of the City of Austin, which collects one
ultimate decision-making process. In other value becomes an equity contribution to
fifth of total property taxes. However, other
words, the decision of whether and how to
taxing entities, such as the local public
the partnership. Still another—the most
internationally-recognized expanded Austin expand the Austin Convention Center is not extreme—is for the city to use eminent
school district and Travis County, would be
Convention Center and surrounding district reducible to a single number. Instead, many domain powers to purchase the land.
affected as well.
that was regarded as cutting edge would
complex factors will ultimately need to be
enhance Austin’s “brand.” It is not argued
taken into consideration as the City Council Central Appraisal District (TCAD)’s values
Appraisal assessments from the Travis
SECTION 4 FINANCIAL CONSIDERATIONS _76
METHOD OF ECONOMIC ANALYSIS Operating Financials From 2015-2017 the Austin Convention Center operated at an average annual loss of approximately $15 million per year, a shortfall that is made up via contributions from the city’s Hotel Occupancy Tax (HOT) revenues. This current state of affairs is not an indictment of the Austin Convention Center’s management practices; indeed, the Austin Convention Center should be seen as a “loss leader” whose operating losses make possible the collection of a far greater quantity of revenues, in the form of tax receipts, to the city. Such a practice is common for convention centers elsewhere in the nation. To a large extent, it is an artifact of accounting practices 4-01
that vary from city to city. For example, San Antonio’s convention facility shows no
Development Costs
operating losses because it is managed by The various scenarios entail varying costs
actual costs from completed convention
for expanding the Austin Convention
a special revenue fund, allowing it to show
for developing the new buildings that are
center expansions in peer cities are
Center. Full details are provided in
certain tax revenues as income. Austin’s
proposed. These costs include but are not
used, adjusted by components, size, and
Appendix C.
convention center, which is operated as
limited to construction costs (“hard costs”). local differences in construction labor
an enterprise fund, cannot. If the Austin
True construction cost estimation has not
and materials costs, including inflation
Convention Center were to attempt to close
been undertaken, as such an analysis is
over time, to produce rough-order-of
its operating shortfall by raising its rates, it
beyond the scope of this study. Instead,
magnitude construction cost assumptions
would likely lose a great deal of convention
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
business to many peer cities whose rates
would be a single Net Present Value, or
of publicly-owned land, and others. In
also assume similar operating losses.
a series of such values, that would belie
the end, however, analyzing various ways
Nonetheless, the model must account for
the degree of uncertainty concerning the
of raising funds to expand the Austin
the city’s need to fill the operating gap in
model inputs, and that would give the
Convention Center would do little to shed
an expanded Austin Convention Center. It
false impression that the future is more
light on the question of whether it is a
can be assumed that the operating
knowable than it really is. Instead, a better
sound investment. Whether or not it is
shortfall would scale up according to the
approach was to estimate the benefits and
worthwhile to build a project is, ultimately,
total size of the expanded facility in
costs per year at completion, in present-
a separate question from what is the
relation to what exists today, i.e., it is
day dollars, and gauge their sensitivity
best way to pay for it. The analysis in this
assumed that operating losses would
to the various expansion scenarios
report sheds light on the first question,
begin to dwindle as the scale of
and demand cases. The results are
although it does not answer it, since that
operations grew bigger.
summarized in Section 5 and described in
is ultimately the responsibility of Austin’s
detail in Appendix C.
elected leaders.
Running a Discounted Cash Flow (DCF) analysis was considered but ultimately
The demand model also does not grapple
decided against. A DCF is a technique that
with the myriad ways that an expansion
is commonly used in investment analysis
of the Austin Convention Center could
to reduce an investment, which can be
be financed. Possibilities include issuing
thought of as a stream of influxes and
bonds backed by future increased
outflows of dollars over time, down to a
revenues, which would not require a public
single number (Net Present Value). There
vote, although the model’s results show
is too much variation in the possible
that future increases in HOT and sales tax,
dollar amounts, both on the revenue and
on their own, are not sufficient to finance
cost sides, as well as different possible
the capital cost of a convention center
choices for model parameters, such as
expansion. Another possibility is creating a
assumptions about timing and discount
Tax Increment Finance district surrounding
rates, for DCF to be a useful tool for the
the current Austin Convention Center and
purposes of analyzing the economics of
bonding against future diverted property
convention center expansion. The result
tax revenue, using proceeds from the sale SECTION 4 FINANCIAL CONSIDERATIONS _78
REVENUE GENERATING PROGRAMS_HOTEL OCCUPANCY TAX
J W MARRIOT HOTEL_CONGRESS AVENUE AND SECOND STREET
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
4-02
One available funding mechanism for this
funding tourism promotion through Texas’s Within these four categories, there
Austin’s local ordinance also specifically
project is the hotel occupancy tax. The HOT ad campaign. The City of Austin, while
are additional regulations that provide
notes that no HOT revenue may be used
has been collected in Austin since 1959,
limited to legal uses for hotel occupancy
more detail about what is considered
as general fund revenue for overall
and as tourism in Austin has increased
tax revenues as defined by the state, is
an approved expenditures of HOT
governmental operations for the city. This
the revenues generated by the HOT have
able to specifiy how to allocate its revenues revenues. Within the Convention Center
prevents the city from using the HOT for
increased as well. The HOT is an additional across projects that support tourism and
Fund, revenues must be used for
purposes such as street lighting, waste
tax paid by any hotel guest in Austin. Under the convention and hotel industry.
city expenses related to registering
management, and similarly routine
HOT regulations, the definition of a hotel
convention delegates, marketing of
expenditures, even if they contribute
In order to regulate the use of funds,
convention services, and the construction, Austin has identified specific expenditure maintenance, and operation of convention rentals, inns, hostels, short term rentals of housing units, or any other buildings where categories that every hotel HOT expenditure facilities. must fit into. The first seven percent of the public can pay to stay for durations of
towards tourism by maintaining Austin’s
less than 30 days. Currently, the HOT rate is the city’s HOT revenues is distributed 15%, of which 9% goes to the City of Austin among four categories. Because funds are
The remaining two percent of the city’s
revenue can be used to fund eligible
is broad and includes motels, vacation
physical attractiveness and state of good repair. However, if the available amount of HOT revenue increases, the additional
Hotel Occupancy Tax is allocated to a
activities that are currently funded through
distributed by defined percentages and
venue project fund, and is currently being
the city’s general fund. This allows for
not dollar amounts, when hotel occupancy
used to back venue bonds. The bond
those general fund dollars to be allocated
The use of HOT funds is regulated by both
rates increase and more revenue is
measure was approved by voters in 1998
to other priorities that the city has
local ordinance and state tax legislation.
generated, every category benefits.
to fund expansion of the Austin Convention identified. Thus, increased hotel occupancy
and 6% to the State of Texas.
Broadly, the HOT revenue must be used to directly enhance and promote tourism and the convention and hotel industry. This mandate comes directly from the state tax legislation and therefore cannot be modified by local ordinance. Funds from the state’s six percent hotel occupancy tax flow directly to the Texas comptroller’s office and are largely used for the general governmental operations. A portion of the state HOT revenue also goes toward
Expenditure categories : 1. Convention Center Capital Fund (64.3%) 2. Tourism/Promotion Fund (5.7%) 3. Historic Preservation Fund (15%) 4. Cultural Arts Fund (15%)
Center and the Waller Creek tunnel. The
tax revenues can be beneficial to the City
HOT revenues that are obligated to the
of Austin as a whole, and not just the
venue project fund may only be used to
recipients of the HOT revenues.
reimburse costs, make any necessary payments on the bonds, and pay operation or maintenance costs of these projects. Once the bonds are paid off in 2029 this 2% of hotel occupancy tax will no longer be collected unless another use is identified and approved by voters.
SECTION 4 FINANCIAL CONSIDERATIONS _80
GROWTH OF CBD ACCESSED VALUE_COMPARISON TO ALL OTHER PROP TAX ACCESSED VALUE As Austin has grown, property values as
tremendous growth in recent decades.
in Austin, starting at 4.2% in 2000 and
assessed by the Travis Central Appraisal
From 2009 to 2018 the property tax
more than doubling to 9.0% in 2018. As a
District (TCAD) have increased across the
revenue from the CBD alone has nearly
consequence, Austin has a vested interest
city. Since the City of Austin receives about tripled, while the property tax revenue
in supporting future growth and investment
20% of property taxes collected, increased
from all other areas in Austin has not quite in the CBD, not only for the recreational
property values result in additional
doubled, as seen in the graph below. This
and cultural benefits it offers, but also
revenue available for the city’s budget.
is due to the growth in property values,
because of its importance in sustaining the
Even though property values are not rising which have increased by 781% in the CBD at the same rate across Austin, the entire
between 2000 and 2018, compared to 344%
city is able to benefit from the increased
for the rest of Austin. In terms of land area,
city’s fiscal health.
revenues from those areas where property the CBD accounts for less than 0.4% of values are increasing the most, above all
Austin’s total area. However, the assessed
Austin’s central business district (CBD),
value in the CBD makes up a proportionally
or Downtown. Downtown Austin has seen
large percentage of the total property value
5.5% 2011
6.9% 2013
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
8.0% 2015
8.0% 2016
$ 5.8 B
$ 5.3 B
$ 47.6 B
7.1% 2014
$ 4.7 B
$ 3.8 B
$ 41.5 B $ 2.9 B
6.3% 2012
$ 3.2 B
$ 39.1 B
$ 36.9 B
$ 33.7 B
5.5% 2010
$ 2.6 B
$ 1.8 B
$ 1.9 B
$ 2.3 B
$ 31.8 B
$ 30.6 B
5.5% 2009
$ 43.9 B
CBD TAX ACCESSED VALUE
YEAR
$ 52.9 B
ALL OTHER PROP TAX ACCESSED VALUE
$ 58.5 B
GROWTH OF CBD AND ALL OTHER PROP TAX ACCESSED VALUE
8.9% 2017
8.9% 2018
COUNT OF SUBSET OF AUSTIN HOSPITALITY WORKERS_BY ZIP CODE The growing hospitably industry employs an estimated 125,900 residents in the five county Austin area. The map shows a subset of 36,000 food service workers who live in Austin, as as can be seen 1
above, hospitality workers who live in the city are concentrated in certain areas, especially in the south, southeast, north, and far northwest. Promoting growth in the industry allows for employees that live in these areas to have more employment options. This increased demand for labor can also lead to higher salaries and more competitive benefits packages.
LEGEND 1 - 200
ATX.CC
201 - 500 501 - 1,000 1,001 - 1,500 1,501 - 3,500
SECTION 4 FINANCIAL CONSIDERATIONS _82
PROJECTING DEMAND Equally important as whether a given
analytic approaches, the research team
amount of increased attendance in an
created three demand cases that span what
expanded convention center will deliver
the team views as a reasonable range of
benefits enough to offset the costs of
plausible outcomes. Using them, the team
expansion is the question of how much
was able to test the sensitivity of various
demand will materialize. The honest
outcomes, such as the boost to the local
answer is that there is no way for anyone
economy, and increase in tax revenue, to
to know. Demand for attending conventions these varying cases. They are refered to as
PD
in Austin is, surely, constrained by the
the Base Case, or the middle-of-the road
amount of space available, but there is
case, in which convention center attendance
no guarantee that in the future there
increases to 700,000 per year, or about
will be enough latent demand to use an
40% above current levels; a pessimistic
expanded convention center to its full
Downside Case, in which attendance
potential. Convention center attendance
increases only to 550,000, an increase of
is influenced, to be sure, by the quality
10%; and an optimistic Upside Case, in
and capacity of the convention center
which it doubles to 1 million. Demand is a
facility and the urban environment that
somewhat separate issue from supply, i.e.,
surrounds it, but many other factors
how much latent demand for increased
are entirely beyond the control of local
attendance at the convention center does
decisionmakers. These include the state
not depend (at least not entirely) on the size
of the national economy; long-term trends of the convention center facility. For that in the meetings segment of the travel
reason, our top-line findings reported near
industry; the ease and affordability of air
the end of Section 5 are split into those that
and other forms of long-distance travel;
vary with supply-side and demand-side
and Austin’s reputation—or “brand”—in
factors. Appendix C provides an extensive
the wider world. In short, even if built,
description of the demand-side analysis
there is no certainty that people will come. methodology, along with more detailed However, the city is not helpless in the
findings than what are summarized in
face of uncertainty. Using a variety of
Section 5.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
A Comment on the Critiques of Dr. Heywood Sanders
attracting more out-of-town visitors, where shows that Austin’s downtown hospitality
Dr. Sanders also makes a point in his
that effort did not succeed as planned. One industry is currently performing very well
writing that the convention center industry
of Dr. Sanders’ key observations is that city and is economically robust. Based on the
as a whole is not growing, although that
Dr. Heywood Sanders is a professor, and is
political leaders often try to use sometimes health of Austin’s downtown, there is no
claim is time-dependent and based on
Interim Chair of the College of Public Policy misguided convention center investment
evidence that the proposed expansion of
at The University of Texas at San Antonio.
the Austin Convention Center is a proposal and early 2000s). The team searched
to rejuvenate ailing downtowns, and that
He is known as a critic of convention center they build with the underlying assumption
to rejuvenate an ailing downtown.
expansions. Due to his national reputation, that “if you build it, they will come.” Dr.
older data (generally from the late 1990s for data on national convention center attendance over time, but as Dr. Sanders
as well as the proximity of his academic
Sanders is critical of the convention
To address issue number two, which is
points out, reliable and complete data on
home to Austin, numerous parties with
consultant industry, whose practitioners,
generally a claim that cities undertake
national convention center attendance
whom the research teaam engaged as
in his view, seem to project large increases convention center building or expansion
is hard to find. The team was not able to
part of the due diligence for this report
in convention attendance no matter which
based on an unsubstantiated assumption
find reliable complete, data on national
mentioned his work and urged the team to
city hires them, and rarely if ever check
of demand, the team researched demand
convention center attendance.
take it into consideration.
their past projections against actual data to for Downtown Austin visitors by again determine if their methods are accurate.
Although the research team did not meet
analyzing data on the Austin hotel industry. The team obtained hotel
with or speak to Dr. Sanders, it reviewed
The research team took Dr. Sanders’
performance data specifically for
some of his most influential publications.
writings seriously and addresses two of
Downtown Austin from Smith Travel
Dr. Hallman, reviewed Dr. Sanders’ book,
his major warnings: (1) political leaders
Research (which speaks to current and
Convention Center Follies: Politics, Power,
use convention projects to attempt to
recent historical demand), and private
and Public Investment in American Cities
rejuvenate ailing downtowns, (2) cities build capital flow data for the hotel industry
(2014), along with his earlier Brookings
with the unsubstantiated assumption that
from Real Capital Analytics (which speaks
Institute paper, “Space Available: The
“if you build it, they will come.” To address
to investor’s expectations of future
Realities of Convention Centers as
issue number one, the team researched
demand). Demand research shows that
Economic Development Strategy”
the health of Austin’s downtown to see if
there is strong demand from out-of-town
(January 2005). His work documents
there is evidence that Downtown Austin
visitors to visit Downtown Austin, and that
numerous examples of cities that invested
is ailing and in need of rejuvenation.
is a positive demand sign for the proposed
in new convention centers or convention
The research on Downtown Austin hotel
new convention center space.
center expansions with the aim of
economic health, detailed in Appendix C, SECTION 4 FINANCIAL CONSIDERATIONS _84
5
Austin Convention District_ Redevelopment Scenarios _Overview _Programming
Existing Facility
Best Practices
Modular Framework
_Redevelopment Scenarios
Prior Proposals
Scenarios [ 1_2_3_4.1_4.2_5.1_5.2 ]
_Comparative Analysis
Using this Report
OVERVIEW _REDEVELOPMENT SCENARIOS
5-01 FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
This section outlines several different
Each scenario is also represented both
groups and task forces has also provided
Part one documents the existing facility
scenarios that together demonstrate
within the current urban situation and
direction.
and evaluates the functional organization
a diversity of approaches to the future
the projected future context within
redevelopment of the Austin convention
which the facility will likely reside. It is
This section provides an analytical basis
requirements of the market. Part two
district. Each scenario proposes different
of critical importance that the existing
with which to evaluate these potential
describes a selection of competing
responses to balancing the internal
convention center remains functional
development strategies, to establish
facilities from peer cities and measures
programmatic requirements of the
throughout the redevelopment process. In
whether they can achieve the performance the current Austin Convention Center
convention center with the placemaking
this regard, the representative scenarios
requirements of the facility, meet the
against them. This analysis is then used
needs of the Austin community. Each
are designed to maintain the ongoing
goals of the community, and provide
to develop a programmatic strategy that
is shown in a series of renderings and
revenue-generating operations of the
and ability to accommodate the changing
an economic benefit to the city. Three
is designed to establish the functional
diagrams, illustrating how to manage both facility. Phasing strategies will be required
key considerations have informed the
parameters guiding the internal
the internal organization of the program
if the existing structure is to be modified.
development of the scenarios delineated in organization of each scenario. Part three
and adjustments to the urban situation of
Two of the scenarios present phasing
this section. They are:
the southeast quadrant.
options, ultimately allowing for either
describes each scenario and shows its status within a series of development
partial or complete replacement of the
• Resolve the internal programmatic
The representative scenarios are
existing facility, while others leave the
requirements of the facility and provide
demonstrative of strategies that range
existing structure intact and opt instead for options for additional community
The investigation preferences a long-
between leaving the existing facility as it
expansion on adjacent properties.
term view toward the potential urban
functions.
is, letting the market determine adjacent
contexts.
transformation of the Austin Convention
development, expanding the existing
The Downtown Austin Plan, the Austin
• Help resolve conflicts in the
Center, evaluating the prospects for each
facility, partially redeveloping the existing
Convention Center Long-Range Master
organization of adjacent infrastructure to
scenario to react to the ongoing changes in
facility, and completely replacing it. Each
Plan, the subsequent report of the urban
enhance connectivity and urban life within the district. The representative scenarios
scenario organizes the programmatic
land institute and the recently released
the district.
requirements within the project in order
Project Connect Vision Plan, each provide
to address the different urban conditions
development recommendations that
are not illustrative of every possible outcome; instead, they document a range
• Balance ongoing urban development
of possibilities intended to illustrate
of the site and respond to the pressures of inform the preparation of the scenarios in
in the district with augmented public
a broad set of approaches. Finally, a
the district at-large.
benefits.
comparative framework provides a basis
this report. Further ongoing research by the Downtown Austin Alliance, the Waller
from which to inform decisions about the
Creek Conservancy, and additional citizens
future of the district. SECTION 5 REDEVELOPMENT SCENARIOS_88
PROGRAMMING _ANALYSIS
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
EXISTING FACILITY_ANALYSIS BEST PRACTICES_ANALYSIS MODULAR FRAMEWORK_THE PLANNING MODEL
SECTION 5 REDEVELOPMENT SCENARIOS_90
EXISTING FACILITY _ANALYSIS Introduction_The Austin Convention Center
The existing Austin Convention Center occupies what is rapidly becoming an essential intersection between ongoing urban development initiatives within the city. Extensive development is already underway in the Rainey Street District, while the Second Street Corridor continues to be an essential east-west pedestrian connection across the city. Development along the Waller Creek Corridor from The University of Texas at Austin south toward the site is rapidly transforming what was once an underutilized district
EF
of the downtown grid into a vital Innovation District. Moreover, the potential reconstruction of I-35 promises to connect central Austin with the Saltillo Transit Oriented District and the neighborhoods in East Austin. All of these projects promise to transform the connective infrastructure of the city into a compact and connected system. At the center of this nexus, the six contiguous blocks of
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
the existing convention center remain an obstruction to the emerging system of connective public spaces, despite the quality of the architecture. While urban design guidelines have long existed to help guide development in this area, many of their promises remain unfulfilled. Many important festivals and events are centered around the facility throughout the year, ranging from large, two-week-long festivals such as SXSW to small trade conventions. Many of these events overflow onto what is currently an inadequate system of adjacent streets and parks, while a lack of active
5-02
street frontages in the area remains. In order to serve the greater Austin
4
community, in addition to the large number of visitors that are attracted to Austin and
3
supported by the venue, any redevelopment
2
or expansion to the convention center must be considered in concert with the public
5
1
role it plays within the district. Level 1: Street Level
Level 2
Level 3
Level 4
SECTION 5 REDEVELOPMENT SCENARIOS_92
FACILITY_SITING PHASE I_SITE CONDITIONS 1992
The original construction of the Austin
components of the building face Red River
Convention Center (first opened in 1992)
Street, including kitchen facilities and
is located on the southeastern corner of
storage, servicing the 125,970 sq. ft. of
the Waller grid [blocks: 9, 10, 14, 15], and
exhibition halls on a level with large trucks
required the consolidation of three and
meant that a significant loading area was
one-half city blocks. Also accompanying
required on site. As was the standard
the project was the development of a
at the time, the exhibition halls were
District Master Plan and associated Urban
designed to be clear-span, flexible, and
Design Guidelines for the surrounding
contiguous spaces--a structural condition
district.
that precludes any future vertical additions
B shh Sq Brus S
Hilttton
4th Street
3rd Street
to the building.
Palm Park
To accommodate the 441,000 sq. ft. building on the site meant that two street
The facility was designed with its principal
segments, Second Street and Neches
orientations facing Cesar Chavez Street,
Street, which crossed through the site,
Trinity Street, and Fourth Street. Primary
would need to be closed off. Even with this
internal circulation was designed to
alteration of the urban grid, the design of
wrap the exhibition halls and connect the
the original Convention Center presented
building to the surrounding streets, with
difficult challenges. Situating the vast
smaller elements located in reference to
exhibition halls that were central to the
the urban context of the district.
building’s function on the site in a way
Around the perimeter, the Convention
that could address the functional needs of
Center responds to the conditions of the
the facility, while meeting the aspirational
city with a large entrance hall in the form
goals of the project to address the urban
of an octagonal turret that signifies the
conditions of the city, meant that certain
eastern entrance to downtown Austin
conflicts were inevitable. In response to
along Cesar Chavez, while an elevated
the site’s location adjacent to the I-35
walkway on the southeastern corner of
corridor, and what was then a flood-prone
the structure faces onto Waller Creek,
Waller Creek on the east, the service
anticipating its future redevelopment.
2nd Street
1992 Convention C Center
Cesar Chavez
5-03 ACC_PHASE I (1992)
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
PHASE II_SITE CONDITIONS 2002 ADDITION
B shh Sq Brus S
A substantial addition to the original
As a result of the expansion, the facility
facility, completed in 2002, expanded
has undergone a substantial reorientation
the site to include two more contiguous
toward the northeast corner of the site,
blocks on the1992 northern side of the original with the original public circulation corridor Convention Center
Hilttton
building whileTotal removing additional Space | 441,000sf
4th Street
2002 2 Addiition
building and expanding into a large pre-
Street from the urban grid. The expansion
function space that is now the facility’s
essentially doubled the square footage of
front door to the city.
the original facility to 881,000 sq. ft. and
3rd Street
2002 Addition
added 120,000 sq.ft. of exhibition halls, Palm Park
designed to
Total Space | 881,400sf work contiguously | 247,000sf Exhibit Space Exhibit Halls | 5
with the
original venues, which brought the total 2nd Street
Cesar Chavez
continuing around the perimeter of the
Exhibit Space | 120,000sf segments of Third Street and Neches Exhibit Halls | 3
1992 Convention C Center
With the reconstruction of Fourth Street as a major transit stop connecting the Red Line into the city, and the orientation
amount of available space in the exhibition of the northern facade onto Brush Park, halls to 247,052 sq. ft. This newer section
this corner of the building is now the most
of the facility added significant associated
significant aspect of the facility. Designed
programs as well, including 42,000 sq. ft.
by Page in collaboration with the sculpture
of ballrooms, along with meeting room
Jamie Carpenter, the northeast corner,
spaces, a kitchen, and storage facilities.
marked by the faceted glass façade, has become the signature icon of the expanded
The 2002 addition was designed with
Convention Center.
programmatic functions that more closely approximate the newer mixtures of uses that were desired by the industry, and is still the most actively used section of the building. The northern kitchen serves most of the catering functions of the building while the original kitchen facilities are rarely used. 5-04 ACC_PHASE II (2002)
SECTION 5 REDEVELOPMENT SCENARIOS_94
PROGRAMMATIC DISTRIBUTION_EXHIBITION HALLS / BALLROOMS
BR -F 5040 SF E H-3 49,230 SF E H-2 32,640 SF E H-1 44,100 SF
BR -E 4830 SF
E H-4 77,650 SF
BR -G 5585 SF BR -D 26580 SF
BR -C 4230 SF
E H-5 41,540 SF
BR -B 3610 SF BR -A 15285 SF
EXHIBITION HALL
The existing facility contains five exhibition
BALLROOMS
such as ballrooms, meeting rooms, and
range of programmatic functions that can
to accommodate break-out meetings
halls located on a single level, contiguously break-out spaces adversely affects the
host simultaneous events more easily.
and set-ups for events than the newer
organized in order to facilitate large
ability of the original section of the center
As a result, the original portion of the
expansive circulation space in the 2002
conventions, and can be subdivided
to accommodate coincident functions,
facility is in less demand with planners
addition. Regardless of the future direction of the convention center development, the
into smaller venues in order to support
however. In this regard, the northern
than the newer northern section. Pre-
a series of simultaneous events. The
addition to the facility is superior to the
function space located along the perimeter original facility, now over twenty-five years
lack of availability of ancillary facilities
original, as it includes a more diverse
of the original facility is also less able
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
old, is in need of renovation.
_MEETING ROOMS
MEETING ROOMS
PRE-FUNCTION_ CIRCULATION
EXHIBIT HALL_SET UP
BACK OF HOUSE_STAFF
BALLROOM D_EVENT W/ STADIUM
due to a lack of porosity within the facility.
services. The building infrastructure
Beyond the requirements of the primary
autonomously from the rest of the facility.
programmatic venues, the existing
Overall storage space is still problematic,
functions of the center perform relatively
however, with many of the storage
Overall, the facility is superior in the
communication infrastructure capable of
well concerning service, loading, and food
functions overlapping into circulation
provision of technological support for
moving voice, video, and data at
distribution. Functional performance is
corridors. Additionally, the original
venues, and with a gigabit-rated building,
one billion bits per second.
significantly better in the northern 2002
kitchen is underutilized, and the length of
the Convention Center achieves a high
addition, which can operate relatively
circulation around the facility is excessive,
standard for technical capabilities and
leads the convention industry with a
SECTION 5 REDEVELOPMENT SCENARIOS_96
CURRENT CONDITIONS_EXTERIOR BUILDING CONDITIONS
SOUTHEASTERN ENTRY PLAZA
RED RIVER AND 3RD_VIEW TOWARDS NORTH ENTRANCE
The ballroom of the original facility is
During certain events, the space is used
To the north along Fourth Street, the
the northern concourse of the convention
located on the southeastern corner of the
as a public venue associated with the
tracks of the Red Line enter the
center and Brush Square. With the addition
site, from where it overlooks the corner
facility.While this is one of the most
downtown station. Above, a recently
of new transit lines and the potential
of Waller Creek and Cesar Chavez Street.
significant public spaces surrounding the
completed bridge connects the
refurbishment of Brush Square this space
Exterior stairs and a walkway connect the
Convention Center, the narrow sidewalks
convention center across to the Hilton
will be a center of public activity in the district.
internal program out onto the public
flanking the Cesar Chavez bridge limit
hotel. This right-of-way is about to
space of the corner and also connect to
pedestrian connections to Palm Park and
undergo a significant transformation,
the new bridge that links across the creek
the Rainy Street District.
creating a new shared space that will
to the Fairmont Hotel.
significantly improve connectivity between
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
RED RIVER AND 3RD ST_VIEW TOWARDS WEST FACADE
SERVICE YARD, NORTHERN DOCKS
Service access to the building is off of
immediately adjacent to the site,
infrastructure of the street and its limited connectivity to the urban grid.
semi-trucks are able to be accommodated
Red River Street. As a result, most of the
this closed condition makes connecting
support functions for the facility are
either the public spaces around the
located on this, the eastern side. The
building or the venues of the internal
The building has a generous service yard
schedules for ongoing events are managed
result is a closed faรงade that can do little
events to the new park space problematic.
protected from the public space of the
to avoid conflicts.
to activate the streetscape and creates
Conflicts also exist between the taxi
street with a large gate. Loading and
conflicts with other activities emerging
loading that services the Fairmont Hotel
unloading of equipment for events are
along the street. With the redevelopment of and the loading of trucks in and out of the
relatively straightforward, given the single
the Waller Creek Corridor and Palm Park
level organization of the venues. Large
facility. In part this is due to the narrow
within the service court, and with a new marshaling yard located off-site, loading
SECTION 5 REDEVELOPMENT SCENARIOS_98
BEST PRACTICES _ANALYSIS
BP FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
PEER FACILITIES
HUNTINGTON CONVENTION CENTER
Documented in this report (Appendix B)
of the exhibition halls and whether they are
are twenty-seven convention center
contiguous, the associated meeting rooms,
_CLEVELAND, OHIO
WASHINGTON STATE CONVENTION CENTER ADDITION
facilities gathered from cities across North and ballrooms, and whether additional facilities exist to support the broader
America.
community within their district such as theaters, retail, or transit.
They range from modestly sized facilities
_SEATTLE, WASHINGTON
in secondary markets to extensive facilities in major cities. Together they establish
In addition to requiring a range of
CHARLOTTE CONVENTION CENTER
a comparative basis for evaluating the
available amenities, the contemporary
organizational and programmatic make-up market necessitates design solutions that
_CHARLOTTE, NORTH CAROLINA
HENRY B GONZALEZ CONVENTION CENTER
_SAN ANTONIO, TEXAS
MUSIC CITY CENTER
_NASHVILLE, TENNESSEE
VANCOUVER CONVENTION CENTER
, BRITISH COLUMBIA
of peer facilities. Appendix B documents
are responsive to their urban context.
each of these.
This aspect of convention center design reinforces the branding potential and
From these facilities, six are documented
marketability of a facility while extending
here for direct comparison, ordered
its influence beyond the boundaries of the
by size. This smaller group contains
building and out into the district, building
examples from markets either in
upon the salient characteristics of each
direct competition with Austin, or are
destination.
representative of strategies recently adopted by cities to adapt their facilities to either urban situations or contemporary market conditions from which Austin can learn. This evaluation considers the size
SECTION 5 REDEVELOPMENT SCENARIOS_100
HUNTINGTON CONVENTION CENTER_CLEVELAND, OHIO WHAT TO LEARN FROM CLEVELAND
•
Project focuses on expanding the public lawn that defines the downtown civic center
•
Campus strategy connected to multiple facilities
•
Project massing is developed to fit within the city’s historic master plan
•
Partially below grade exhibition halls with 20’-40’ ceiling heights
•
Connects to 54,000 sq. ft. auditorium
•
Prefunction space occupies a separate volume above grade connected below grade
5-05
designed Group Plan District. In so doing
existing buildings. The exhibition halls are
it expands the original public park that is
connected to the adjacent Hilton hotel and
the centerpiece of the project by locating
SIZE OF EACH SPACE
RELATIVE FACILITY SIZE
EXHIBIT SPACE
225,000
a pre-existing large fixed-seat auditorium.
MEETING SPACE
53,600
the bulk of the new facility underground.
The exhibition halls are not clear span due
BALLROOM
43,200
The facility extends under the street
to the required 20-30 foot ceiling heights
so as not to interrupt the urban grid.
within much of the facility.
OVERALL CC BUILDING AREA
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
410,000
ATXCC
VANCOUVER
buildings fits within the massing of the
MUSIC CITY CENTER
fits within the historic Daniel Burnham
HENRY B. GONZALEZ
edges of the park in a series of connected
CHARLOTTE
Huntington Convention Center masterfully
WASHINGTON
Additional program located around the
HUNTINGTON
Cleveland’s 2013 redevelopment of the
WASHINGTON STATE CONVENTION CENTRE ADDITION_SEATTLE, WASHINGTON WHAT TO LEARN FROM WASHINGTON
5-06
to house future residential and commercial
variety of dining options. It is also within
development in the area. The exhibition
205,000
walking distance of Pike Place Market. The spaces are not contiguous due to the
MEETING SPACE
57,000
1.4 million sq. ft. addition will be one of
constraints of the site and as a result of the
BALLROOM
39,732
the largest projects in downtown Seattle
topography are serviced vertically. OVERALL CC BUILDING AREA
Planned expansion including residential and commercial development
•
15 levels connected with outdoor terraces
•
Interior circulation is at the edge of the building to activate the facade
•
Adjoining 542,000 sq. ft. office tower and 440 units of housing
•
Stacked column free spaces
•
Public private partnership project delivery
RELATIVE FACILITY SIZE
EXHIBIT SPACE
history, with a projected cost of $960
•
414,722
ATXCC
VANCOUVER
includes shops, theaters, hotels, and a
SIZE OF EACH SPACE
Compact urban site
MUSIC CITY CENTER
space. Two adjacent building podiums are
•
HENRY B. GONZALEZ
the existing convention center’s exhibition
is part of a larger cultural district, which
Non-contiguous flexible exhibition halls
CHARLOTTE
the Washington State Convention Center
•
WASHINGTON
million. The expansion will nearly double
Vertical loading of event spaces
HUNTINGTON
Located in the heart of downtown Seattle,
•
SECTION 5 REDEVELOPMENT SCENARIOS_102
CHARLOTTE CONVENTION CENTER_CHARLOTTE, NORTH CAROLINA WHAT TO LEARN FROM CHARLOTTE
• The interior is open to public and activated by a central food court
5-07
Originally built in 1995, the remodel
to exhibition hall access. A light rail
engages the city streets and is open to
transit line runs through the facility. The
the public. An internal food court attracts
SIZE OF EACH SPACE
280,000
Charlotte Convention Center is conceived
MEETING SPACE
112,000
people who work downtown and also
as a central component of the city’s
BALLROOM
serves as an interior passage from the
Cultural Arts District. OVERALL CC BUILDING AREA
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Windows into exhibit halls
•
Multiple events are scheduled simultaneously
•
Exhibit hall spans are supported with space interrupting columns
•
Tourist office inside
RELATIVE FACILITY SIZE
EXHIBIT SPACE
parking structure to adjacent attractions.
•
75,000
1,300,000
ATXCC
VANCOUVER
bring visitors into the food court central
Adjacent LYNX light rail stop
MUSIC CITY CENTER
relationship to the convention center.
•
HENRY B. GONZALEZ
termination of vehicular streets and
Service is underground and shared with the NASCAR Hall of Fame
CHARLOTTE
developing rapidly and now has a close
•
WASHINGTON
Entrances are designed to face the
Surrounded by a growing cultural district within walking distance of 200 restaurants and bars, new museums, office buildings and transportation hubs.
HUNTINGTON
Like Austin, Charlotte’s downtown is
•
HENRY B. GONZALEZ CONVENTION CENTER_SAN ANTONIO, TEXAS WHAT TO LEARN FROM SAN ANTONIO
•
Meeting rooms and flexible space adjacent to river
•
514,000 sf of connected exhibit space
•
Large central service kitchen for growing catering needs
•
Adjacent theater
•
Incorporated large ballrooms
•
Same construction market conditions
•
Extensive integration of technology
•
Connection to San Antonio’s famous River Walk
5-08
famous River Walk. The renovation and
increased square footage by 20 percent,
expansion included the integration of the
was $325 million.
RELATIVE FACILITY SIZE
EXHIBIT SPACE
497,000
latest technology and the flexibility for
MEETING SPACE
120,300
future technology integration. The center
BALLROOM
The renovation and expansion included
has contiguous exhibition space, but
demolishing the west wing to make room
stretches across a large site area.
OVERALL CC BUILDING AREA
94,300
1,600,000
ATXCC
VANCOUVER
to Austin. The 2016 expansion, which
SIZE OF EACH SPACE
MUSIC CITY CENTER
a green connection to San Antonio’s
HENRY B. GONZALEZ
the construction of a new park that creates
construction costs per square foot similar
CHARLOTTE
from Austin can be expected to have
WASHINGTON
for the development of Hemisfair park and
HUNTINGTON
San Antonio’s location only 80 miles
SECTION 5 REDEVELOPMENT SCENARIOS_104
MUSIC CITY CENTER_NASHVILLE, TENNESSEE WHAT TO LEARN FROM NASHVILLE
•
Re-branded as the Music City Center
•
Built with a phased expansion
•
The expansion is programmed to increase food and beverage services and will be entirely financed by self generated revenue
•
The new expansion adds pre-function, food court, and flexible space for temporary convention retailers
•
LEED Gold building with a green roof
•
Actively engaged with community
•
Designed to respond to the surrounding street grid
5-09
special culture. In 2006, Nashville built an
$1.8 billion in direct economic impact,
entirely new downtown convention center
adding 1,000 jobs to the city--internal
designed to attract 75% of the convention center market. In 2013, the building was
SIZE OF EACH SPACE
RELATIVE FACILITY SIZE
EXHIBIT SPACE
353,000
revenue that greatly exceeds predictions--
MEETING SPACE
82,000
and has been reporting monthly profits.
BALLROOM
75,400
expanded to emphasize a new relationship to the community. In the single month of
OVERALL CC BUILDING AREA
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
2,100,000
ATXCC
VANCOUVER
Within 5 years of opening, the MCC reports
MUSIC CITY CENTER
that its greatest attraction is the city’s
HENRY B. GONZALEZ
million in economic impact for the city.
CHARLOTTE
culture. The convention center recognizes
WASHINGTON
June, Music City Center generated $74.9
HUNTINGTON
Nashville is a city known for music and
VANCOUVER CONVENTION CENTRE_VANCOUVER, BRITISH COLUMBIA WHAT TO LEARN FROM VANCOUVER
•
Multi-level circulation and service and facilities
•
Integration of sustainability strategies
•
Amplified flexible spaces and catering for events and down-time
•
Event space for community engagement
•
Integrated retail space facing waterfront
•
Adjacent waterfront running and biking trail
•
East and west buildings each have a complementary interface with the adjacent urban condition
5-10
differences in level across the site.
spaces support both local community
RELATIVE FACILITY SIZE
EXHIBIT SPACE
316,000
events and conventions. The Centre is
The organization of multilevel spaces is a
MEETING SPACE
84,000
located adjacent to a public waterfront
model for accommodating extensive square
BALLROOM
69,300
trail and is within walking distance to the
footage within a downtown site that hss
waterfront transportation hub.
limited space.
OVERALL CC BUILDING AREA
2,120,000
ATXCC
VANCOUVER
levels, and sustainable practices. The
SIZE OF EACH SPACE
MUSIC CITY CENTER
service functions, in order to solve the
HENRY B. GONZALEZ
flexible non-exhibition spaces, multiple
CHARLOTTE
organizing the location of spaces and
WASHINGTON
Circulation splits into different levels,
exemplar of the growing desirability of
HUNTINGTON
Vancouver’s new Convention Centre is an
SECTION 5 REDEVELOPMENT SCENARIOS_106
MODULAR FRAMEWORK _THE PLANNING MODEL Space-Making and Place-Making
The creation of an economically viable convention center will attract a more varied and stronger customer base than the existing facility, while enhancing Austin’s reputation as a vital destination city will require a facility that can accommodate a variety of both public and private uses. The Convention Center must be at the center of a robust and active peoplecentered environment that will define the “Convention Center District” as a desirable destination in central Austin. In
MF
order to achieve this goal, it is essential to incorporate uses that support and strengthen the retail and hospitality environment in the downtown core, in particular, activating the development of Second and Third Streets between Shoal Creek and Waller Creek, and enhancing the connections between Sixth Street and the Rainey Street District. Regardless of which direction the future redevelopment of the Austin Convention
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Center takes, maintaining the existing
Austin’s unique place as a premier
location of the facility in the downtown
destination within the industry. It is
core continues to be critical. Existing
therefore of critical importance that the
hotels and those currently approved for
grid is maintained and even reconnected
construction provide approximately 9,500
to establish the pedestrian connections
hotel rooms, restaurants, and conference
provided by the Waller Grid, to capitalize
facilities all within walking distance to
upon the potential of public transit and
the convention center. Clients prefer
to reposition the facility to engage Waller
convention centers that are an extension
Creek and beyond to East Austin.
of the host city, and the venues adjacent to the Austin Convention Center are valuable assets--enhanced by ongoing adjacent development. Given its central location within a rapidly transforming area, it is imperative that the convention center be designed to enhance the physical connections between adjacent ongoing development and the facility so that a socially and economically active district can be enhanced. Only in this way can the city capitalize upon its ongoing investments in urban infrastructure in order to capture the potential that defines
THE WALLER GRID
SECTION 5 REDEVELOPMENT SCENARIOS_108
THE PLANNING MODEL_ROOM TYPES AND CAPACITIES PER EXHIBITION MODULE SERVICE
BALLROOM (4000-4500 SQFT)
LARGE LECTURE HALLS
LARGE CLASSROOM (2100-2500 SQFT)
(4000-4500 SQFT)
STANDARD CLASSROOM
BREAK ROOMS (200 SQFT)
(900-2300 SQFT)
_PROGRAM RATIOS_THE BASIC MODULE After researching changing programmatic
These ratios have been established to
requirements in the industry, studying best-practices, and reviewing the Austin
required to service an event, or series of
Ballroom
4000-4500 sq. ft.
provide maximum flexibility in determining simultaneous events, based upon current
Large lecture halls
4000-4500 sq. ft.
how the overall space of the facility
industry trends. In most cases the ratio of
Large classrooms
2100-2500 sq. ft.
Convention Center Long-Range Master
can be subdivided and used, either by a
exhibition space to conference and banquet Standard classroom
Plan, an abstract model was developed to
range of smaller clientele or by larger
space is four to one (4:1). Moreover, most
define the ideal ratios between the various organizations. Each module provides
precedents show a standard list of room
primary elements of the spatial program.
types:
the necessary programmatic mixture
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Breakout rooms
900-2300 sq. ft. 200 sq. ft.
CIRCULATION
SERVICE
CIRCULATION
CIRCULATION
SERVICE
CIRCULATION
EXHIBIT HALL (75,000 SQFT)
EXHIBIT MODULE
X SQFT
2X SQFT
9X SQFT
4X SQFT
THE MODULAR GRID
multiples of one dimension so that rooms
twenty feet space, etc. Each exhibition hall
gross area of exhibition space of 450,000
75,000 square feet, each. Following the
can be easily combined - large rooms can
module contains an allotted amount of
square foot. The diagrams assume a site
4:1 ratio generates 19,000+/- square feet
be subdivided to create smaller rooms or
service space, two elevators, an escalator,
condition bounded by the nine city blocks
of conference space and 19,000+/- square
can be combined to create larger rooms.
and an egress stair. Primary room types do
between Fourth Street and Cesar Chavez,
feet of ballroom space allocated to each
For example, a room that is ten feet by
not have fixed seating so that they can be
and from Red River to San Jacinto. The
exhibit module. In order to maintain
ten feet can be combined with three
flexible.
model then uses the street grid to divide
flexibility, room sizes can be planned in
similar rooms to create a twenty feet by
The model applies these ratios to a desired the exhibition space into similar modules,
SECTION 5 REDEVELOPMENT SCENARIOS_110
_PROGRAMMATIC RELATIONSHIPS Most of the precedents researched include to their urban situation, expanding their large contiguous exhibition space, with
site context to become part of a district.
easily accessible conference spaces.
Recently designed urban facilities are
This arrangement is preferred by 89% of
foregoing completely contiguous space
convention center clients when booking a
in favor of stacking program in order to
facility (EXPO). Associations that sponsor
fit within urban locations. These facilities
CONFERENCE
large, meeting-intensive events rely on a
are taking a mixed-use approach to urban
(19,000 SQFT)
trade show component or similar large
development, preferring to incorporate
exhibit as the primary revenue-generating
the center within a range of public-private
EXHIBIT HALL
SERVICE
program. In response, most convention
development programs including mixed-
(75,000 SQFT)
(TBD)
centers are constructed on large, non-
use development.
BALLROOM
urban sites that allow for a contiguous horizontal arrangement of exhibition
Many are also incorporating retail, fixed
spaces and serviced on the same level
seat classrooms for 200 +/- people, and/
as the exhibition halls. Many of these
or an auditorium/theater (2,000-2,500
facilities located along the edges of urban
people) for combining the convention
centers are separated from urban fabric
center with public uses. These programs
or are adjacent to highways. As was
provide enhanced facilities for staging
Austin’s when first constructed, these
public events and can equally serve both
facilities are not compatible with more
the community and visitors. Additionally,
dense urban environments as they leave
95% of convention center clients seek
entire sides of the facility for service and
facilities with the latest technologies
without active public faces. As newer
and seek spaces that encourage
facilities begin to capitalize upon the
networking opportunities to promote a
urban destination within which they are
sense of community among attendees
situated, this paradigm is beginning to
(19,000 SQFT)
CAPACITY
ROOM TYPE
THEATER
CLASSROOM
DINING
4 BALLROOMS
4,600 SQFT/EA
32O
220
200
2 LARGE LECTURE HALLS
4,500 SQFT/EA
320
220
200
(EXPO). This type of networking may also
2 LARGE CLASSTOOMS
2,500 SQFT/EA
150
120
NA
change. Facilities such as those located
capitalize upon the urban attributes of the
4 CLASSROOMS
900 - 1,100 SQFT/EA
NA
30
NA
in Seattle, Cleveland, and Charlotte are
destination city through the provision of
4 BREAKOUT ROOMS
250 SQFT/EA
NA
12 - 15
NA
challenging the status-quo by adapting
public event spaces.
EXHIBI HALL MODULE
75,000 SQFT/EA
-
-
-
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
_STACKED PROGRAM Most urban convention centers include ground-floor space dedicated to a combination of civic, public, and retail LECTURE HALLS / BALLROOMS
spaces that coordinate with the convention center and provide a robust active social environment at the street. Sectionally stacking the primary functions of the
EXHIBIT HALLS
center allows the facility to fit within constrained urban sites. The adjacent diagram illustrates how exhibition halls, conference rooms, and ballroom spaces
PUBLIC SPACE / RETAIL
can be stacked and serviced from below
SERVICE
through vertical circulation. The structure can then be designed to span large
PARKING
sections of the facility in order to provide maximum flexibility.
SECTION
EXHIBIT HALL
5-11
BALLROOM
5-12
LECTURE HALLS
5-13
CLASSROOM
5-14 SECTION 5 REDEVELOPMENT SCENARIOS_112
REDEVELOPMENT SCENARIOS _
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
PP_PRIOR PROPOSALS SC1_NO BUILD SC2_PRIVATE DEVELOPMENT BLOCKS [8_16_32] SC3_WESTERN EXTENSION . MAXIMUM BUILDOUT BLOCKS [8_16_32] SC4_PHASE 01 . ALTERNATE DEVELOPMENT BLOCKS [8_16_32] SC4_PHASE 02 . REPLACE 1992 FACILITY BLOCKS [9_10_14_15] SC5 _PHASE 01 . ALTERNATE DEVELOPMENT BLOCKS [8_16_32] SC5_PHASE 02 . REPLACE EXISTING FACILITY BLOCKS [9_10_14_15_33_34] SECTION 5 REDEVELOPMENT SCENARIOS_114
PRIOR PROPOSALS _AUSTIN CONVENTION CENTER LONG-RANGE MASTER PLAN AND URBAN LAND INSTITUTE REPORTS Challenges Cited From Previous Studies Recent reports authored by both the Gensler Strategic Planning Consultancy and the Urban Land Institute (ULI) have each made recommendations concerning the future expansion of the Austin Convention Center. Each was developed with significant community input through workshops and stakeholder meetings including leaders from the Austin Convention Center, industry representatives, meeting planners and customers, local business leaders, and representatives from the city. As a part of this extensive visioning process, a series of scenarios were studied, and recommendations regarding the future of
PP
the facility were made. The six scenarios that were developed during this process range from infilling gaps in the current site (option 1) to entirely relocating the existing structure (option 6). In order to avoid redundancy with these prior studies each of the prior scenarios has been analyzed and are documented here for comparative purposes.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
The Urban Land Institute Technical
with the ongoing densification of the
a premium. And while many of the
project, while a third Blue Line is projected
Assistance Panel’s evaluation of the
Rainey Street district and the construction
surrounding streets are closed off to
to run north-south along Trinity Street.
“Austin Convention Center Long-Range
of large-scale development projects
automobile traffic during the event, access This alignment thereatens to cause
Master Plan” report included an extensive
in the surrounding area. As a result, a
to public space remains restricted. This
conflicts with future street closures during
fact-finding process involving numerous
recent study prepared by Big Red Dog
condition is especially acute throughout
important festivals if it is not designed
stakeholders. Many of the ULI observations Incorporated, an Austin planning firm,
the year when other events that do not
carefully.
surrounding the challenges posed by the
for the Rainey Street Neighborhood
warrant the closure of streets take place.
project concur with those in the master
Association recommends eliminating
While the renovation and development of
Recommendations cited in these studies
planning document and continue to be
public parking from the district. While
the adjacent open spaces such as Brush
have guided the development of these
relevant.
this may reduce the traffic loads to the
Park Square to the north and Waller Creek prior scenarios as follows:
district, it will also increase the need
to the east promise to relieve some of this
Among these are:
for pedestrian connectivity in the area.
pressure, they are not easily accessible
• The perception of the district as a
While an abundance of structured parking
given the status of Red River Street as
“dead zone.” Many factors contribute
is being built to support these private
primarily a service street. The separation
to this impression, including the inward
developments, this factor only exacerbates between Brush Park and the Austin
orientation of the existing center and the
the traffic load on what is already
Convention Center created by the current
lack of engagement with the surrounding
inadequate infrastructure. The disruption
design of the commuter rail tracks on
streets, in particular, Red River Street.
in the urban grid initially caused by the
Fourth Street is a barrier to pedestrian
Additionally, there is a lack of retail on
I-35 corridor has also limited connectivity
connectivity.
many of the surrounding blocks, and the
between the district and neighborhoods
proliferation of parking garages in the
to the east and choices for traffic flow in
•
Capital Metro’s recently updated
area do not contribute to active and vibrant the area. The resulting infrastructural
Project Connect Vision Plan outlines an
street life. As a result, there are many
situation is causing significant conflicts,
ambitious strategy for regional mobility
concerns about safety and security.
including those between truck loading for
that will have a direct impact upon the
the convention center facility and the taxi
Austin Convention Center. Currently
line-up servicing the Fairmont Hotel.
located at the terminus of the Red Line,
• Numerous traffic issues are affecting the district including congestion that has
an additional Green Line is also planned
been caused by the dismantling of the
• During important festivals such
to terminate at the Convention Center
urban grid. This condition is worsening
as SXSW, access to public space is at
as part of the pending Downtown Station SECTION 5 REDEVELOPMENT SCENARIOS_116
PRIOR PROPOSALS_OPTIONS FROM THE AUSTIN CONVENTION CENTER LONG-RANGE MASTER PLAN REPORT
5-15
5-16
OPTION 02: EASTERN EXPANSION
OPTION 01: INFILL
5-17
OPTION 03-A: WESTERN EXPANSION
5-18
OPTION 04: SOUTHERN EXPANSION
Among the options developed during the
the projected expansion needs of the
or require the removal of below market
Center master planning process, Option
Gensler Strategic Planning Consultancy
convention center or did not respect the
housing. Neither of the options would
03-B, which proposes a non-contiguous
study, only one option (Option 03-B, next
urban considerations of the district. Two
contribute to the important place-making
western expansion, was considered to be
page) was considered to have adequately
of the options (2 and 03-A) each disrupt
qualities that are needed in the district.
the preferred solution. It includes stacked
addressed the considerations necessary
major additional sections of the urban
to expand the business opportunities of
grid, while others (1 and 4) either do not
Finally, of the six scenarios developed
existing available space of the original
the facility. The rest either failed to meet
provide enough expansion possibilities
during the original Austin Convention
convention center. It would require the
exhibition halls that would double the
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
5-19
OPTION 03-B WESTERN EXPANSION acquisition of the blocks to the west of the
for additional schematic development
existing center and the closure of Second
by Gensler. This option proposes the
and Third Streets. Trinity Street would
construction of a self-sufficient facility
current owners of the land west of Trinity.
that Option 03-B would be the prefered development scenario. The updated
The findings of the “Austin Convention
schematic design of Option 03-B has
remain open to traffic. Of the six scenarios, that can operate autonomously from
Center Long-Range Master Plan� report
therfore been included for further analysis
Option 03-B provides the most promising
were subsequently evaluated by the Urban among the scenarios (Scenario 3) in the
the existing one. Option 03-B would be
resolution to the challenges outlined in the constructed through a public-private
Land Institute Technical Assistance Panel, following section of this report.
report. This option was therefore chosen
which concured with the recommendation
partnership agreement, includingthe
SECTION 5 REDEVELOPMENT SCENARIOS_118
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Introduction
the current six-block site. Second, four
some major modifications. Scenario 4.2,
of the scenarios (4.1, 4.2, 5.1, and 5.2)
The scenarios described below are as
if it is subsequently pursued, involves
Having reviewed completed convention
entail phasing. In other words, Scenario
follows:
removing the original (1992) portion of
center projects in other cities and past
4.2 would not take place until Scenario
the existing convention center facility
proposals for expanding the Austin
4.1 was already completed. Furthermore,
Convention Center, this subsection
Section 4.2 could be pursued, or not, or
the Austin Convention Center facility
private development, and open space,
presents several scenarios. While they
modified, and its timing adjusted, in
remains largely unchanged, as do the
while leaving the 2002 addition in place.
by no means exhaust all of the possible
accordance with whether or not Scenario
properties on the Western Parcels.
• Scenario 1: “No Build.” In this scenario,
pathways for expanding the current facility, 4.1 met expectations, and according the research team believes that they
to the state of the economy and other
represent a spectrum of possibilities that are varied yet realistic. They are intended
and replacing it with a new facility,
• Scenarios 5.1 and 5.2: These phased • Scenario 2: “No Build,” projected
scenarios involve first building (in
timing considerations. The same holds
forward. This is also a status quo
Scenario 5.1) the largest feasible
for Scenarios 5.1 and 5.2. In economics
scenario, but projected forward, in
new convention center facility on the Western Parcels. Scenario 5.2, if
to allow Austin’s decision-makers and
parlance, phasing offers the possibility
which it is assumed that private real
residents to weigh the pros and cons of
of real options. In real estate investment
estate development, in keeping with the
pursued, begins with the total removal
different options, from the standpoints
theory, according to pioneering research
prevailing trends in Downtown Austin,
of the existing convention center facility,
of placemaking, the operations of the
by University of Texas McCombs Business
unfolds over a period of years on the
making way for a new convention
convention center facility, and economic
School professor Sheridan Titman, real
Western Parcels.
center facility, private development,
considerations.
options are a benefit to those who hold them. It is in this spirit that the research
and open space that take full advantage • Scenario 3: Gensler proposal. This
Before describing the scenarios in detail,
team developed two distinct pairs of
scenario is an update, produced by
two observations are worth making. First,
scenarios (or four in total, i.e., 4.1/4.2 and
Gensler, from the recommended
for the reasons discussed earlier in this
5.1/5.2) that incorporate phasing.
proposal for expansion in the Austin
section, the research team concurs with
of a revamped Waller Creek corridor on the eastern edge of the site.
Convention Center Master Plan.
the recommendation from Gensler, the authors of the Austin Convention Center
• Scenarios 4.1 and 4.2: These phased
Master Plan, and later confirmed by the
scenarios entail first building (in
ULI Study Panel, that expansion, should it
Scenario 4.1) a new convention center
occur, take place on the Western Parcels,
facility on the Western Parcels, with
i.e., to the west of Trinity Street from
some similarities to Scenario 3 but with SECTION 5 REDEVELOPMENT SCENARIOS_120
SCENARIO 1 _NO BUILD Completed in 1992, during a period of
with the growing need for enhanced
limited development on the eastern edge
pedestrian connections in the district. This
of the Southeast Quadrant of Downtown,
necessity will be even more acute if the
the original Austin Convention Center
reconstruction of the I-35 corridor can be
was designed to terminate the downtown
designed in a manner that enhances the
grid by making an edge to the urban core.
connection to the neighborhoods on the
As a result, and typical of many older
east side and provides access to additional
convention center facilities, the facility
park space.
oriented the service functions of the
1
building toward the freeway and toward
While the six-block, horizontally organized
Waller Creek, not considered a significant
facility can accommodate a contiguous
asset at the time. The main entrance was
arrangement of exhibition halls, the
from an automobile dropoff along Cesar
internal public circulation is organized
Chavez Street, an indication of the lack of
continuously in a layer along the perimeter
provision of pedestrian-oriented public
of the facility and is excessively long. The
space in the area. The 2002 addition
resultant programmatic distribution of the
transformed the primary orientation of
building requires long walking distances
the building toward the north with a large
to traverse the site between venues on
atrium facing onto Trinity Street and Brush the north and south sides of the building. Square.
This situation, together with the lack of supporting functions in the original 1992
With recent developments shifting
section of the building, has resulted in
activities toward the edges of the
reduced usage of this area of the facility.
downtown, and major initiatives such as
The pre-function space (internal corridor)
the redesign of Palm Park and the Waller
encircling the facility is not able to
Creek Corridor underway, along with the
accommodate associated programming,
rapidly emergence of the Rainey Street
such as retail stores or restaurants, a
District as an entertainment destination,
situation that also hinders the activation of
the existing facility is not compatible
streets around the facility.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
• The existing facility is primarily oriented
V2
Hilton Hotel
Brush Square Redevelopment
some additional entrances to the west.
I-35 Corridor (TXDOT)
(WCC)_Future Sabine Promenade
toward Brush Square on the north, with
Red River Cultural District
Congress Avenue
6th Street Historic District
CAPMETRO_Future Blue Line
_SWOT ANALYSIS
• Downtown commuter rail station promises to improve connectivity by creating a “shared space” between the facility and the square. • The building terminates Second and
CC Parking Garage
Downtown Station
CAPMETRO_Red I Green
Development Site
Fairmont Hotel Fareground
in many sections of the building.
V3 Cesar Chavez Street
• Access to exterior public space is limited. LEGEND BUILDING FOOTPRINT
CULTURAL NODES
EMERGING PROJECT
Future Development
I-35 Corridor (TXDOT)
Waller Center Development
Traffic I Pedestrian Pinchpoint
V4
• Service related functions on the east
• There is a lack of active street frontage
Palm School Redevelopment
Rainey Street Historic District
Colorado River
Line
River toward Waller Creek. Deck Park Location (Projected)
(WCC)_Palm Park Renovations
1992
(CAPMETRO_Transit Bridge (Projected)
V1
2nd Street Promenade
Service Yard
Taxi Lineup
Truck Conflict
disrupts the urban grid. side create a “dead zone” along Red
Mixed-Use development
2002
ATX_CC
Third Streets at Trinity Street and
Saltillo Development TOD
CRITICAL DEVELOPMENT
BLOCKED ACCESS
PARK
CONFLICT POINT
TRANSIT LINES
WALLER CREEK CONNECTION
BLUE LINE (FUTURE)
RETAIL FRONTAGE PUBLIC FRONTAGE
SERVICE ENTRANCE VISITOR’S ENTRANCE
TRANSIT INFRASTRUCTURE PARKING / SERVICE ENTRANCE
SECTION 5 REDEVELOPMENT SCENARIOS_122
SCENARIO 1_PUBLIC SPACE
There is only limited public space
to the Fairmont Hotel. It is one of the few
around the edges of the facility, the most
spaces available for public functions during
noteworthy of which is on the southeast
events. As development to the south and
corner. This area is a significant distance
east continues to expand, this side of the
away from the more active side facing
facility as the only public space overlooking
Brush Square, however. Access is limited
Waller Creek Corridor will become more
also to the creek and across the footbridge significant.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
_ECONOMIC
AUSTIN CONVENTION CENTER_VIEW FROM FAIRMONT HOTEL
In this report, the research team concurs
bounded by Trinity Street, Fourth Street,
Scenario 1. Property valuations from the
leasing agreement. At present, the City of
with the conclusion from the “Austin
San Jacinto Boulevard, and the east-west
Travis Central Appraisl District (TCAD)
Austin’s share of property taxes collected
Convention Center Master Plan” that if the
alley that splits the block between Cesar
are used to estimate what the city would
from the western parcels is roughly
convention center is to expand its footprint, Chavez and Second Street. To allow for a
have to pay to the landowners to purchase $330,000 per year.
the only reasonably feasible option for it
comparison with the various scenarios that the land outright, or recognize as their de
to do so is to the west. What is refered to
envision expansion, a “no build” scenario
facto equity contribution to a public-private
here as the “western parcels” is the area
is included on the western parcels as
partnership, or factor into negotiations in a
SECTION 5 REDEVELOPMENT SCENARIOS_124
SCENARIO 2 _PRIVATE DEVELOPMENT_BLOCKS [8_16_32] Scenario 2 illustrates market-rate private
Based upon current development trends
development on the five half-block parcels in the Central Business District this would west of the existing Convention Center and likely generate the following building south of Fifth Street. Zoning regulations
volumes:
in the Central Business District allows a Floor Area Ratio of 25:1 without height
Office Typology_4 Half-Block Sites
limitation. • Projected ground floor square footage For the purposes of comparison this
per ½ block : 35,328
scenario assumes a likely development
(276 x 128_not including alley)
outcome that is based upon the current
@ 11:1 FAR (limited by parking load)
market trends and would generate a
388,608 SQ. FT.
combination of mixed-use development
New Office Development 1,554,432 SQ.FT.
with retail at the ground floor. Housing Typology_ Existing streets and alleys would remain intact, with retail at street level. Significant • Projected ground floor square footage structured parking would likely accompany per ½ block : 35,328
2
each development. This would add a
(276 x 128_not including alley) @ 25:1
significant traffic load to the district’s
883,200 SQ. FT.
already overburdened infrastructure.
1 half block site
Some parking loads could be reduced with Total Leasable Area_ the projected completion of the CAPMetro projected Blue Line, which would most likely run along of surface of Trinity Street. New development would contribute to the build-out of sections of the Great Streets Master Plan.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
883,200 SQ. FT. 2,437,632 SQ. FT.
• The existing convention center
V2
Hilton Hotel
Brush Square Redevelopment
modifications to the surrounding public
I-35 Corridor (TXDOT)
(WCC)_Future Sabine Promenade
remains unchanged with no substantive Red River Cultural District
Congress Avenue
6th Street Historic District
CAPMETRO_Future Blue Line
_SWOT ANALYSIS
space. • Assumes redevelopment of the five half-block parcels with existing alleys to remain intact. • Existing connectivity with Second and
CC Parking Garage
Downtown Station
CAPMETRO_Red I Green
Development Site
1992 Fairmont Hotel
Fareground
V3
Square. LEGEND BUILDING FOOTPRINT
CULTURAL NODES
EMERGING PROJECT
Future Development
I-35 Corridor (TXDOT)
Waller Center Development
V4
on Trinity Street. Stop located at Brush
Cesar Chavez Street
Rainey Street Historic District
Colorado River
• Structured parking is likely to create
• Future Blue Line is located at grade
Palm School Redevelopment
Traffic I Pedestrian Pinchpoint
(CAPMETRO_Transit Bridge (Projected)
V1
2nd Street Promenade
(WCC)_Palm Park Renovations
Line
stories. Deck Park Location (Projected)
ATX_CC
Taxi Lineup
Truck Conflict
• Retail is located along major streets. lifeless facades above the street for 5-7
Mixed-Use development
2002
Service Yard
Third Streets will remain.
Saltillo Development TOD
CRITICAL DEVELOPMENT
BLOCKED ACCESS
PARK
CONFLICT POINT
TRANSIT LINES
WALLER CREEK CONNECTION
BLUE LINE (FUTURE)
RETAIL FRONTAGE PUBLIC FRONTAGE
SERVICE ENTRANCE VISITOR’S ENTRANCE
TRANSIT INFRASTRUCTURE PARKING / SERVICE ENTRANCE
SECTION 5 REDEVELOPMENT SCENARIOS_126
SCENARIO 2_PRIVATE DEVELOPMENT_BLOCKS [8_16_32]
PUBLIC SPACE_ LANDSCAPE INFRASTRUCTURE
URBAN DEVELOPMENT_ PROJECTED DENSITY
The existing network of public space that
undergoing a public process to guide its
TOD district. Pedestrian connections
to reconnect the urban grid will be an
surrounds the Austin Convention Center is
rehabilitation. Even with these ongoing
to Rainey Street are also inadequate.
essential component of this effort, as will
seriously inadequate. The “Great Streets
improvements, there is a decided lack of
Critical improvements to the public
the completion of the “Great Streets Plan.”
Plan” is slowly being built out, block by
connectedness in the district as a whole.
infrastructure are needed in order to
Projected private development would add
block. Waller Creek is in progress and
I-35 continues to be a significant barrier
resolve the pressures that are being
five new towers rising as high as 600 feet
promises to provide much-needed park
to the east side neighborhoods, as do
generated by the intensity of ongoing
and would put additional strain on an area
space, and Brush Square is currently
new developments within the Saltillo
development. Restructuring I-35 in order
that is already overburdened.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
AERIAL WITH PROJECTED ADJACENT DEVELOPMENT ENVELOPES (GREEN VOLUMES)
SECTION 5 REDEVELOPMENT SCENARIOS_128
SCENARIO 2_PRIVATE DEVELOPMENT_BLOCKS [8_16_32]
URBAN DEVELOPMENT_ REPRESENTATIVE BUILDING ENVELOPES The likely scenario for private development Towers would likely rise to 600 feet or would be five half-block size projects.
more as zoning within the CBD allows
Following real-estate models that are
25:1 FAR. This scale of development
trending in Austin, this would result in
would significantly alter the demand on
a series of towers built atop podium
infrastructure and continue to put traffic
structures that would contain retail at
pressure on the remaining street grid.
street level with structured parking above.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Scenario 2 This scenario can be thought of as
300
in every case, but rather reflects the research teams understanding, from ial
ent
others knowledgeable about downtown
no convention center expansion takes
development patterns, of a plausible
place on the western parcels, but private
buildout scenario, along with what are
development does. It serves both as a
judged to be good outcomes from the
measure of the opportunity cost of a
standpoint of urban design.offiItcetotals
Public Costs
resi d
projected forward into the future, where
decision by the city to pursue expansion
900
development capacity allowed by zoning
0 conversations with landowners and
the “baseline” condition of Scenario 1
Public Costs
office
0
Private Development Value
Private Development Value
_ECONOMIC
tail
re $1 billion worth of private development, parking
of the convention center into the western
generating about $4 million in property
parcels, and also as a useful reminder
tax revenue for the city per year.
900
quickly and begin to close off westward
r cente ntion conve amenities y it n commuland aqu isition demolition
that private development could unfold
300
expansion as a feasible option for the city
resi d
enti
al
if not pursued in a timely manner. It is not possible to predict with certainty the various decisions that western parcels landowners will make about when and how to develop their parcels, nor for
600
“full buildout” is presented (“Buildout” refers to a condition where every parcel
now occupied by buildings that are smaller than expected given current market conditions has been redeveloped.) As
0
retail
0
persist, but here a plausible end state at
Private Development Value
Private Development Value
how long today’s booming economy will
mentioned earlier, what is presented here does not assume the use of the maximum
osts
SECTION 5 REDEVELOPMENT SCENARIOS_130
osts
VALUE IN MILLIONS OF DOLLARS
600
SCENARIO 3 _WESTERN EXTENSION . MAXIMUM BUILDOUT_BLOCKS [8_16_32] Scenario 3 is illustrative of the most
Fourth Street. A linear pre-function space
recent status of Option 03-A, the preferred located facing Trinity Street would be the option suggested in the Austin Convention primary point of entry, and it would connect Center Long-Range Master Plan and
the levels of program vertically throughout
subsequently endorsed by the ULI report.
the building, culminating in a semi-public
This scenario has since undergone further park on the roof. Retail space is intended schematic redesign by Gensler.
to activate the street frontage along San Jacinto.
Scenario 3 proposes a stand-alone expansion of the existing facility, connected Entry and exit to the public parking are by pedestrian bridges at an upper level.
from the Trinity Street side of the building.
The primary benefit of this option is that it While this would increase revenue
3
can function independently, and will allow
generation for the facility, the access from
the existing facility to remain in operation
Trinity is potentially in conflict with the
during the process of construction. Upon
role of Trinity as a festival street during
completion, it would increase the total
significant events, and with the potential for
exhibition space from 247,000 sq. ft. to
the future Blue Line that would be located
466,000 sq.ft. An additional 75,000 sq.ft.
on Trinity.
of meeting space and 65,000 sq. ft. of ballroom space are also added, along with Due to the inclusion of a mixed-use tower a new kitchen and service functions. The
on the north side of the facility, Scenario 3
new building would have its own below-
has the potential to be developed through a
grade service docks accessed from San
public-private partnership, contributing to
Jacinto, and two levels of public parking
the city’s tax base.
accessed from Trinity. Scenario 3 would require the acquisition of 2 1/2 blocks of land parcels located between Trinity, San Jacinto, and south of
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
• The existing convention center can
V2
Hilton Hotel
Brush Square Redevelopment
• The blocks west of the existing
I-35 Corridor (TXDOT)
(WCC)_Future Sabine Promenade
remain in operation during construction. Red River Cultural District
Congress Avenue
6th Street Historic District
CAPMETRO_Future Blue Line
_SWOT ANALYSIS
convention center are consolidated into one large parcel, closing short sections of Second and Third Street. • A pedestrian Paseo connects the Second Street promenade through the
CC Parking Garage
Downtown Station
CAPMETRO_Red I Green
Development Site
1992 Fairmont Hotel
Fareground
V3
off of Trinity Street. LEGEND BUILDING FOOTPRINT
CULTURAL NODES
EMERGING PROJECT
Future Development
I-35 Corridor (TXDOT)
Waller Center Development
V4
San Jacinto, with public parking accessible
Cesar Chavez Street
Rainey Street Historic District
Colorado River
toward Trinity Street.
• Below-grade service is accessed from
Palm School Redevelopment
Traffic I Pedestrian Pinchpoint
(CAPMETRO_Transit Bridge (Projected)
V1
2nd Street Promenade
(WCC)_Palm Park Renovations
Line
frontages. Deck Park Location (Projected)
ATX_CC
Taxi Lineup
Truck Conflict
• A new pre-function space is oriented • Retail is limited along major street
Mixed-Use development
2002
Service Yard
block to Trinity Street.
Saltillo Development TOD
CRITICAL DEVELOPMENT
BLOCKED ACCESS
PARK
CONFLICT POINT
TRANSIT LINES
WALLER CREEK CONNECTION
BLUE LINE (FUTURE)
RETAIL FRONTAGE PUBLIC FRONTAGE
SERVICE ENTRANCE VISITOR’S ENTRANCE
TRANSIT INFRASTRUCTURE PARKING / SERVICE ENTRANCE
SECTION 5 REDEVELOPMENT SCENARIOS_132
SCENARIO 3_WESTERN EXTENSION . MAXIMUM BUILDOUT_BLOCKS [8_16_32] STREET FLOOR Scenario 3 is organized vertically into Brush Square
stacked programmatic units. It contains two large exhibition halls that double the overall size of the existing facility. Access is from Trinity Street through a new prefunction space. The lower hall is located below grade with a double height volume that extends past street level. Service functions are along the south and west edges of the facility, meeting rooms are located at the northern end of the building
3rd st
at the base of a mixed-use tower, financed through a public-private partnership. Palm Park
A ballroom with an outdoor terrace is located above the halls, with a large outdoor semi-public park on the roof.
2nd st
LEGEND
Cesar Chavez
PRE-FUNCTION
LOBBY
EXHIBITION
RETAIL
BALLROOM
OFFICE
MEETING ROOM
RESIDENTIAL
KITCHEN
PARKING
SERVICE
EXTRA
GARDEN
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
9F - 15F
B
1
2F - 3F
4F
5F
SQUARE FOOTAGE [EXISTING]
[PROPOSED WESTERN FACILITY]
6F
7F
8F
16F - 27F
SECTION EXHIBIT SPACE
247,000
MEETING SPACE
55,800
BALLROOM
63,920
OVERALL CC BUILDING AREA
881,000
EXHIBIT SPACE
219,808
MEETING SPACE
75,882
BALLROOM
64,440
OVERALL PROPOSED BUILDING AREA
2,060,854
SECTION 5 REDEVELOPMENT SCENARIOS_134
SCENARIO 3_WESTERN EXTENSION . MAXIMUM BUILDOUT_BLOCKS [8_16_32]
PUBLIC SPACE_ LANDSCAPE INFRASTRUCTURE
_ LONG-RANGE IMPROVEMENTS
Scenario 3 does not significantly improve
rehabilitation of Brush Square would help
to both traffic and pedestrians would
point, with the primary entrances to both
the status of public space in the district,
to resolve some significant shortcomings
limit connectivity, although a small paseo
facilities located across from each other,
and many of the issues facing the
on the northern edge of the facility,
along the Second Street right-of-way has
and access and egress to public parking,
disconnected public infrastructure would
additional strain would be put on the
been included to connect pedestrians
drop-offs and a transit line all vying
still lack resolution. While some of these
street grid and pedestrian connectivity
through the block. The section of Trinity
for space. The conflicts would be more
improvements such as the construction
in the southeast quadrant. In particular,
Street between Cesar Chavez and Fourth
pronounced during events such as SXSW.
of the new Downtown Station and the
closing off both Second and Third Streets
Street would become a significant pinch
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
URBAN DEVELOPMENT_ EXISTING CONTEXT
_ PROJECTED DENSITY
Adding programs to the facility, such as
parcels that would need to be acquired
and the facility mostly turns its back to
minimal gesture of the small paseo. A new
offices and housing, would help to activate
would need to be relocated, however,
downtown. The problematic connections
semi-public park on the roof of the facility
the district by bringing more residents to
reducing the amount of space available
between the existing facility and the Waller would provide much-needed gathering
the area on a twenty-four-hour basis, and
for local business. Even with the addition
Creek Corridor are still unresolved in this
space during convention center events,
the addition of some retail frontage would
of a through-block paseo on Second
scenario, and Second Street’s status as
perhaps relieving some of the pressure to
help to activate San Jacinto. Smaller scale
Street, the orientation of the facility is
a significant east-west connective axis
close surrounding streets during events.
development currently occupying the
predominantly toward Trinity Street,
through the city is terminated with the
SECTION 5 REDEVELOPMENT SCENARIOS_136
SCENARIO 3_WESTERN EXTENSION . MAXIMUM BUILDOUT_BLOCKS [8_16_32]
CONVENTION DISTRICT_ FACILITIES AND INFRASTRUCTURE
CONVENTION DISTRICT_ BUILDOUT
There is considerable ongoing development has a significant impact on the quality of
connectivity between the district and
workings of the facility. This area of the
within and around the southeast quadrant. places available for public activity. While
region, making the area more accessible
city occupies what has now become one of
The Austin Convention Center sits at the
the redesign of the Waller Creek Corridor
to local residents, while enhancing the
the most critical urban locations in central
nexus of this development, a condition
promises to be an essential benefit to the
quality of Austin as a destination city. It is
Austin and the public infrastructure that
important, however, that the place-making serves it needs to be commensurate with
made even more pronounced with an
area, additional improvements will still be
expansion to the facility. Currently, this
necessary. Capital Metro’s Project Connect aspects of the Convention Center be
is resulting in a disconnected state that
Vision plan should help to improve
given just as much priority as the internal
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
that status.
AERIAL WITH PROJECTED ADJACENT DEVELOPMENT ENVELOPES (GREEN VOLUMES)
SECTION 5 REDEVELOPMENT SCENARIOS_138
SCENARIO 3_WESTERN EXTENSION . MAXIMUM BUILDOUT_BLOCKS [8_16_32]
PHILADELPHIA CONVENTION CENTER
PUBLIC SPACE_ SECOND STREET PROMENADE Due to the primary orientation of the
While a modest Paseo connects the
expansion facing toward Trinity Street,
Second Street promenade through the
Scenario 3 stacks the service functions
block to Trinity Street, this limited access
vertically along the western edge of the
through the block further disrupts active
building. This condition creates an opaque
pedestrian street life in the district, with
faรงade that extends for two and one-half
only minimal retail opportunities available
blocks, deadening the street wall.
at street level along San Jacinto.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
5-20
Scenario 3 is a representation of the
300
building, it is likely that this would not be an attractive environment for retail. Second, service functions of the building
0 are all located along the San Jacinto
currently designed by Gensler following
Street side of the building, potentially
the recommendations of the “Austin
creating a lifeless facade and adversely
Convention Center Master Plan”. It
impacting the atmosphere of the street.
accommodates, in a single phase, a new
Third, the mixed-use tower is stacked on
state-of-the-art convention center building top of a portion of the convention center that would represent a considerable expansion over the space that exists
Public Costs
Public Costs
resi d
ent
ial
westward expansion scenario as
office retail parking
900
Private Development Value
Private Development Value
Scenario 3
0
900
building, as is an above-grade parking garage serving the private development.
300
er ent nc tio ties ven meni con ity a mun com land aquisition demolition
r cente ntion conve amenities y it n commuland aqu isition demolition
These configurations increase structural
now. It would also accommodate private
complexity and constructionofficosts. Also, ce
development on the western parcels that
is estimated to be valued at approximately they increase the risk faced by any private retail
park ing entity developing the mixed-use tower,
$230 million under current market conditions, compared to the $1 billion in
and parking garage whose control over
Scenario 2. The semi-public park on the
timing and other aspects of the project
roof of the new convention center building would be tied to the city’s timeline for the enhance
600
construction of the new convention center building.
tower, particularly if direct access were
There are, however, some downsides to this proposal. First, although this retail
0
provided from the tower to the park.
proposal extends a pedestrian walkway,
Private Development Value
the value of the combined mixed-use Private Development Value
0
or “paseo,” from Second Street eastward through the new convention center SECTION 5 REDEVELOPMENT SCENARIOS_140
osts
VALUE IN MILLIONS OF DOLLARS
would provide an amenity that would
600
osts
00
_ECONOMIC
SCENARIO 4 _PHASE 01 . ALTERNATE DEVELOPMENT_BLOCKS [8_16_32] Scenario 4.1 proposes an alternative to
transit line, Cesar Chavez, and the new
Option 03-A from the “Austin Convention
festival street. There would be no parking
Center Long-Term Master Plan�.
access from Trinity Street.
Occupying the same two and one-half blocks as Scenario 3, this option adjusts
Service access and parking would be
the place-making aspects of the expansion underground and accessed from San in order to respond more directly to the
Jacinto Street, with vertical cores servicing
urban pressures of the district. Like
the exhibition halls from below. The service
Scenario 3, this alternative can function
functions of the building are organized in
autonomously from the existing facility. A
a zone between the circulation atrium and
linear atrium located along Trinity provides the exhibition spaces, meeting rooms, and
4.1
access to the series of stacked programs
ballrooms. This arrangement allows event
and serves as the primary pre-function
spaces within the building to overlook San
space. Second Street continues through
Jacinto Street, providing views toward
the block with a covered pedestrian
downtown and contributing to activating
galleria lined with retail.
the public space of the street.
The section of Trinity Street between
This option provides an additional 152,000
the existing facility and the expansion is
square feet of exhibition space. While
proposed to be redesigned as a festival
not as extensive as Scenario 3, limiting
street along with a one-block extension
the halls to two blocks in length allows
of Fourth Street west to San Jacinto. This
for the inclusion of the Galleria. Private
section of the grid extends the plaza from
development south of Second Street could
the Downtown Station and provides a new
be financed through a public-private
public space during important festivals.
partnership. Additional space located in a
The proposed new Blue Line would
tower on the southwest corner is available
proceed in a tunnel from south of Cesar
for lease.
Chavez to north of Fifth Street in order to eliminate conflicts between the new
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
• The existing convention center can
V2
Hilton Hotel
Brush Square Redevelopment
• The blocks west of the existing
I-35 Corridor (TXDOT)
(WCC)_Future Sabine Promenade
remain in operation during construction. Red River Cultural District
Congress Avenue
6th Street Historic District
CAPMETRO_Future Blue Line
_SWOT ANALYSIS
convention center are consolidated into one large parcel, closing short sections of Second and Third Streets. • A pedestrian Galleria connects Second Street through to Trinity.
CC Parking Garage
Downtown Station
CAPMETRO_Red I Green
Development Site
1992 Fairmont Hotel
Fareground
V3
for a five block section of Trinity Street. LEGEND BUILDING FOOTPRINT
CULTURAL NODES
EMERGING PROJECT
Future Development
I-35 Corridor (TXDOT)
Waller Center Development
V4
• Future Blue Line is located below grade
Cesar Chavez Street
Rainey Street Historic District
Colorado River
• Below-grade service is accessed from
are redesigned to be festival streets.
Palm School Redevelopment
Traffic I Pedestrian Pinchpoint
(CAPMETRO_Transit Bridge (Projected)
V1
2nd Street Promenade
(WCC)_Palm Park Renovations
Line
• Portions of Trinity and Fourth Streets Deck Park Location (Projected)
ATX_CC
Taxi Lineup
Truck Conflict
frontages. San Jacinto.
Mixed-Use development
2002
Service Yard
• Retail is located along major street
Saltillo Development TOD
CRITICAL DEVELOPMENT
BLOCKED ACCESS
PARK
CONFLICT POINT
TRANSIT LINES
WALLER CREEK CONNECTION
BLUE LINE (FUTURE)
RETAIL FRONTAGE PUBLIC FRONTAGE
SERVICE ENTRANCE VISITOR’S ENTRANCE
TRANSIT INFRASTRUCTURE PARKING / SERVICE ENTRANCE
SECTION 5 REDEVELOPMENT SCENARIOS_142
SCENARIO 4_PHASE 01 . ALTERNATE DEVELOPMENT_BLOCKS [8_16_32] STREET FLOOR This scenario locates two large flexible Brush Square
exhibition halls above street level in order to provide significant space for ground floor retail. Pre-function space, organized around a vertical atrium connects the event functions in section along the Trinity Street faรงade. Similar to Scenario 3, the ballroom functions are located on top of the building with a sizeable semi-public park on the roof. Moving the service zones between the pre-function spaces and the
3rd st
exhibition halls provides an opportunity for the interior rooms to have views back to Palm Park
the city, and allows daylight into the halls. Offices are connected across the galleria with a series of bridges, animating the public space.
2nd st
LEGEND
Cesar Chavez
PRE-FUNCTION
LOBBY
EXHIBITION
RETAIL
BALLROOM
OFFICE
MEETING ROOM
KITCHEN
SERVICE
GARDEN
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
2F
3F/ 5F
4F/ 6F
EXHIBIT SPACE
247,000
MEETING SPACE
55,800
BALLROOM
63,920
OVERALL CC BUILDING AREA [PROPOSED WESTERN FACILITY]
TOWER
SECTION
SQUARE FOOTAGE [EXISTING]
7F
881,000
EXHIBIT SPACE
152,000
MEETING SPACE
72,500
BALLROOM
48,000
OVERALL PROPOSED BUILDING AREA
1,815,000
SECTION 5 REDEVELOPMENT SCENARIOS_144
SCENARIO 4_PHASE 01 . ALTERNATE DEVELOPMENT_BLOCKS [8_16_32]
PUBLIC SPACE_ LANDSCAPE INFRASTRUCTURE
_ LONG-RANGE IMPROVEMENTS
The planned reconstruction of the
extension of the shared space one block
Downtown Station will convert a section
further and on Trinity between Fifth Street well to the Second Street galleria. These
Trinity would remain accessible at most
of Fourth Street immediately north of the
and Cesar Chavez. This new festival street infrastructural improvements together
times during the year but would have the
existing facility into a shared space that
infrastructure would become a central
with the continued build-out of the Great
option of being closed off during significant
the western expansion and connect as
the Downtown Station, and Brush Square.
will improve access between the existing
public event space during important
Streets plan would significantly improve
events. Keeping parking access and transit
convention center, Brush Square, and
festivals. The new public space would
pedestrian connections between the
from this section would additionally reduce
public transit. This scenario proposes the
link the existing convention center with
Second Street promenade, Trinity Street,
conflicts.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
URBAN DEVELOPMENT_ EXISTING CONTEXT
_ PROJECTED DENSITY
Second Street continues to be the most
Street District, across Congress Avenue,
continues the axis through to Trinity
and members of the local community.
critical east-west pedestrian corridor in
alongside the Fareground, and on to the
Street and links through to the faรงade
Scenario 4.1 engages the streets on all
Downtown. This condition is becoming
convention center, this axis requires an
of the existing facility. This new urban
sides with retail and helps to activate the
more significant with the completion of
appropriate response appropriate to the
component provides a distinctive element
district even when there are no scheduled events in the facility.
additional development. Transversing
importance of this urban experience.
to the district and will help to brand the
across the city from the Seaholm project
Scaled to the size of the right-of-way,
Convention Center as an essential public
and Shoal Creek, through the Second
the galleria proposed in this scenario
destination, serving both the tourist trade
SECTION 5 REDEVELOPMENT SCENARIOS_146
SCENARIO 4_PHASE 01 . ALTERNATE DEVELOPMENT_BLOCKS [8_16_32]
CONVENTION DISTRICT_ FACILITIES AND INFRASTRUCTURE
CONVENTION DISTRICT_ BUILDOUT
Given the intensity of development in the
the transit corridor and is linked across
be enhanced as well by many pending
Creek Tax Increment Finance district is
district, the need for an increase in the
the I-35 corridor and Waller Creek to the
projects: the redesign of Palm Park,
promising to top-out at over 600 feet. The
amount of public space is paramount. In
Downtown Station. The Festival Street
development of the Palm School property,
place-making aspect of this scenario helps
this regard, the infrastructural strategy
strategy extends this connection down
the refurbishment of Brush Square, and
to mitigate this density and responds to the
incorporated in Scenario 4.1 plays a critical along Trinity Street, through the galleria,
the potential for a significant improvement compact and connected mandate inscribed
connective role. Development in the Saltillo and onto the Second Street promenade.
to the I-35 corridor. Much of the adjacent
Transit Oriented District is connected along The connective role of this sequence would private development within the Waller
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
in Imagine Austin.
AERIAL WITH PROJECTED ADJACENT DEVELOPMENT ENVELOPES (GREEN VOLUMES)
SECTION 5 REDEVELOPMENT SCENARIOS_148
SCENARIO 4_PHASE 01 . ALTERNATE DEVELOPMENT_BLOCKS [8_16_32]
5-21
PUBLIC SPACE_ SECOND STREET PROMENADE
GALLERIA_SALT LAKE CITY
A large exterior covered galleria is lined with retail space and provides for entrances to both the new facility and to additional office space. The galleria extends the pedestrian connection through the block, connecting the Second street promenade through to Trinity Street.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
The private development sits entirely on
Scenario 4.1
its own piece of land, thus maximizing
Scenario 4.1 accepts some of the premises the flexibility of a private development
0
of Scenario 3—a new convention center
partnership for launching this component
building on the Western Blocks, along
of the redevelopment and decoupling it
with private development—but with some
from the convention center building’s
key differences. The convention center
construction.
proposal in Scenario 4.1 is somewhat smaller and less costly to develop than in
Public Costs
e il rking
Scenario 3, and the private development
900
300 er ent nc tio ties ven meni con ity a mun com land aquisition demolition
office
re parktail ing
component is more extensive (valued at $340 million, as compared to $230 million). The pedestrian passage eastward from Second Street is in a much more spacious roofed open-air passage or Galleria than the paseo in Scenario 3. As a result, the retail space is more likely to succeed, as well as being larger. A considerable amount of flexible space (710,000 square feet) offers the possibility public private investment opportunities. As in Scenario
Private Development Value
VALUE IN MILLIONS OF DOLLARS
600
3, the mixed-use development’s value would likely be enhanced by proximity to the semi-public rooftop open space above the convention center, especially given the direct footbridge access provided.
0
SECTION 5 REDEVELOPMENT SCENARIOS_150
osts
00
Private Development Value
_ECONOMIC
SCENARIO 4 _PHASE 02 . REPLACE 1992 FACILITY_BLOCKS [9_10_14_15] Scenario 4.2 pre-supposes a long-term,
of updating. Kitchen facilities are rarely
phased approach to redevelopment in
used, and the pre-function space does not
the Austin Convention Center district.
allow for supporting program such as food
Implementation of this scenario would
services and informal meeting spaces.
first require the completion of Scenario 4.1 As is outlined in the Gensler consultancy before construction. Phasing the project
report, the clear-span structure over
to follow a western expansion would allow the existing exhibition halls will not for the continuous operation of the facility
accommodate loading for additional floors.
without any disruption to the convention
The redesign would expand the mixture
center business. This scenario proposes
of functions in the building and increase
the removal of the original 1992 section
the total amount of exhibition space while
of the existing facility and replacing it
adding additional pre-function space,
with a new addition to the 2002 section.
ballrooms, meeting rooms, and service
This strategy accomplishes two primary
facilities.
objectives: First, it would provide for an
4.2
updated mixture of functions which would
The addition compresses the footprint of
be more in line with the demands of the
the original convention center site so that
current market. Second, it would allow
the entire building, both the 2002 facility
for a more compact solution that would
and Scenario 4.2, would fit within the four
significantly enhance the place-making
contiguous blocks north of 2nd Street.
qualities of the facility.
This would require the new program to be stacked vertically on the site. A tower with
The original 1992 structure was
meeting rooms, ballrooms, and offices is
programmed at a time when requirements oriented east toward Waller Creek, while a for additional meeting rooms, break-out
new entrance faces south onto a pedestrian
spaces and auxiliary programs such as
right-of-way and urban square that are
fixed-seating auditoriums were not central designed to extend Second Street through to the functional requirements of the facility. As such, the facility is badly in need
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
the site to Palm Park and beyond.
• A phased expansion allows ongoing
V2
Hilton Hotel
Brush Square Redevelopment
original 1992 facility is removed and a new
I-35 Corridor (TXDOT)
(WCC)_Future Sabine Promenade
convention business to continue while the Red River Cultural District
Congress Avenue
6th Street Historic District
CAPMETRO_Future Blue Line
_SWOT ANALYSIS
addition is added to the 2002 section. • A compact, vertically stacked addition stays north of Second Street allowing for public connections through to Palm Park. • A new face for the convention center is
CC Parking Garage
Downtown Station
CAPMETRO_Red I Green
Development Site
Fairmont Hotel Fareground
Creek and provides a new landing for the
V3 Cesar Chavez Street
Fairmont hotel pedestrian bridge. LEGEND BUILDING FOOTPRINT
CULTURAL NODES
EMERGING PROJECT
Future Development
I-35 Corridor (TXDOT)
Waller Center Development
Traffic I Pedestrian Pinchpoint
V4
Street is made available for public-private
interface of Second Street and Waller
Palm School Redevelopment
Rainey Street Historic District
Colorado River
Line
• A new publc park is located at the Deck Park Location (Projected)
Taxi Lineup
2nd Street Promenade
(CAPMETRO_Transit Bridge (Projected)
V1
(WCC)_Palm Park Renovations
• A complete block south of Second development use.
Mixed-Use development
2002
ATX_CC
oriented toward the Waller Creek Corridor.
Saltillo Development TOD
CRITICAL DEVELOPMENT
BLOCKED ACCESS
PARK
CONFLICT POINT
TRANSIT LINES
WALLER CREEK CONNECTION
BLUE LINE (FUTURE)
RETAIL FRONTAGE PUBLIC FRONTAGE
SERVICE ENTRANCE VISITOR’S ENTRANCE
TRANSIT INFRASTRUCTURE PARKING / SERVICE ENTRANCE
SECTION 5 REDEVELOPMENT SCENARIOS_152
SCENARIO 4_PHASE 02 . REPLACE 1992 FACILITY_BLOCKS [9_10_14_15] STREET FLOOR After removal of the original 1992 building, Brush Square
expansion of the newer 2002 section is organized around two 80,000 square feet exhibition halls stacked vertically. Pre-function space extends around the new construction with entrances from the Second Street promenade. The facility is serviced from below grade via tunnel access from Third Street. Ballrooms, meeting rooms, and offices are stacked vertically on the southeast corner facing
3rd st
east toward Waller Creek, and are accessed by a circulation atrium along the Palm Park
south facade of the building that overlooks the new public square. The remaining block south of Second Street is available for either public or private development.
2nd st
LEGEND
Cesar Chavez
PRE-FUNCTION
LOBBY
EXHIBITION
RETAIL
BALLROOM
OFFICE
MEETING ROOM
KITCHEN
SERVICE
FESTIVAL STREET
GARDEN
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
2F
3F
4F
5F
TOWER SECTION
SQUARE FOOTAGE [EXISTING]
EXHIBIT SPACE
121,080
MEETING SPACE
28,952
BALLROOM
40,510
OVERALL CC BUILDING AREA [PROPOSED EASTERN FACILITY]
441,000
EXHIBIT SPACE
161,000
MEETING SPACE
60,000
BALLROOM / AUDITORIUM
120,500
PROPOSED PPP DEVELOPMENT AREA
508,200
OVERALL PROPOSED BUILDING AREA
2,022,500
SECTION 5 REDEVELOPMENT SCENARIOS_154
SCENARIO 4_PHASE 02 . REPLACE 1992 FACILITY_BLOCKS [9_10_14_15]
PUBLIC SPACE_ LANDSCAPE INFRASTRUCTURE
_ LONG-RANGE IMPROVEMENTS
Scenario 4.2 completes the sequence of
to Palm Park and potentially beyond to
restaurants facing onto the square and
the heart of the two facilities as they create
improvements to the public infrastructure
East Austin completing the promise of
acts as a forecourt to a new southern
a new nexus for the Convention Center
begun in Scenario 4.1. The Second Street
a “Creek to Creek” axis that connects
entrance to the facility. The existing
District. These public improvements
promenade is continued through the
the entirety of downtown Austin. The new
Fairmont bridge connects to the park
work in combination with the Downtown
galleria and across Trinity Street along
public park that anchors the southeast
space, further activating it by connecting
Station on the north, a refurbished Brush
the southern façade of the new convention
corner of the site provides a gathering
the hotel to the promenade. Trinity retains Square, the completion of the Sabine Street
center addition. This axis connects through place for the community with shops and
its role as a festival street and becomes
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Promenade, and connections from
URBAN DEVELOPMENT_ EXISTING CONTEXT
_ PROJECTED DENSITY
Rainey Street, to complete the circuit of
south of the promenade, is made available The removal of the service court, currently east over the Waller Creek Corridor
connected public spaces, bind the district
for mixed-use development, either
loading off of Red River Street, and
and create a new faรงade facing Palm
together, activate its streets, and enhance
privately or through a public-private
relocating the service facilities below
Park. In this way, the facility would link
it as a destination for both visitors and
development agreement. Ground-floor
grade, would create an opportunity for
development on the east with central
the local community. Due to the compact
retail and/or restaurants would be required the Convention Center facility to re-orient
Austin and no longer be a barrier to
nature of the addition, an entire block on
in order to activate the public spaces.
connectivity in the district.
the corner of Trinity and Cesar Chavez,
some of the programs such as offices, meeting spaces, and ballrooms to face
SECTION 5 REDEVELOPMENT SCENARIOS_156
SCENARIO 4_PHASE 02 . REPLACE 1992 FACILITY_BLOCKS [9_10_14_15]
CONVENTION DISTRICT_ FACILITIES AND INFRASTRUCTURE
CONVENTION DISTRICT_ BUILDOUT
The position of the newly reconstructed
Given the intensity of ongoing development, as the binding agent for a renaissance in
of the contemporary market. Private
Austin Convention Center at a nexus of
this is an opportunity to fulfill the mission, the southeast quadrant. More compact
development opportunities are opened
development between East Austin, Rainey
inscribed in Imagine Austin, of creating a
than the existing facility, organizing the
up to return properties onto the tax rolls.
Street to the south, the Innovation District
compact and connected city. A complete
project with vertical program opens up
Below-grade service, accessed from Third
to the north, and downtown Austin to
network of public infrastructure connects
previously unavailable opportunities to
Street, removes conflicts on Red River and
the west, requires an approach to public
the parts of the city with the new facility
bind the district together while updating
provides an opportunity to orient the new
infrastructure that reconnects the city.
and its associated public spaces, acting
the original facility to meet the demands
section of the center onto Waller Creek.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
AERIAL WITH PROJECTED ADJACENT DEVELOPMENT ENVELOPES (GREEN VOLUMES)
SECTION 5 REDEVELOPMENT SCENARIOS_158
SCENARIO 4_PHASE 02 . REPLACE 1992 FACILITY_BLOCKS [9_10_14_15]
PUBLIC SPACE_ WALLER CREEK OVERLOOK The new addition re-orients the Convention site overlooking the creek, and provides center toward the south and east. The
a new gathering place for the community.
Second Street promenade continues
The vertically stacked functions of the
through the site, connecting the heart of
center look east over Palm Park with a
Downtown Austin to Palm Park, extending
circulation atrium along the south faรงade
the axis from creek to creek. A new urban
overlooking the park, the creek, and past
park anchors the southeast corner of the
Rainey Street toward Lady Bird Lake.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
den
tial
Scenario 4.2 Scenario 4.2 is the second phase of a
0
Scenario 4.2. Furthermore, the public
4.1. Although it entails partial demolition
park at the southeast corner of the site
of the existing convention center -- the
(completed earlier as part of Scenario
original 1992 portion which is most in
4.1) provides a value-enhancing amenity
need of updating -- by waiting until the
for the mixed retail/office tower in 4.2.
been constructed in the Western Blocks
900
Public Costs
Public Costs
further activating the retail from Scenario
place after the completion of Scenario
new convention center building has
ter cen ion vent land aquisition demolition
con
no net reduction of leasable
After the completion of Scenario 4.2, private development will total about
300
$570 million in valuation, replacing the
in Scenario 4.1, it assures that theren isn
com con munit ven y a tion me cen nitie ter s
300
west through route for pedestrians,
0 4.1 as well as that which is added in
unified project that is assumed to take
900
Second Street into an important east-
retail
Private Development Value
_ECONOMIC
600 Private Development Value
600
olitio sitio dem d aqui convention al n
highest proportion (over half) of the $1
center space over what exists now. As
billion development potential in “no build”
such, it provides “option value” to the
Scenario 2. This is the highest share of
city, where the decision makers can
valuation “backfill” of all the scenarios.
assess the success of the expansion and of private development in Scenario 4.1 office
retail parking
VALUE IN MILLIONS OF DOLLARS
600
before proceeding to Scenario 4.2, and if
600
necessary time the redevelopment phasing according to the business cycle, or make needed modifications. With added office space over Scenario 4.1, at the completion of Scenario 4.2 the entire site will offer a total of over 1.2 million square feet of office space. The extension of Second Street to Palm Park towards Waller Creek will turn
SECTION 5 REDEVELOPMENT SCENARIOS_160
SCENARIO 5 _PHASE 01 . ALTERNATE DEVELOPMENT_BLOCKS [8_16_32] Scenario 5.1, similar to Scenario 3, and Scenario 4.1 would be a stand-alone structure that occupies the two and one-half contiguous blocks to the west of the existing facility. The primary event functions of the facility are stacked vertically with retail functions on the ground floor activating the principal streets. The facility would be accessed via pre-function spaces oriented toward Trinity Street across from the existing facility. An atrium connects all the pre-function spaces vertically along the eastern faรงade of the building with the significant event spaces facing west onto San Jacinto Street. The Second and Third Street rights-ofway continue through the block as either
5.1
pedestrian passages or as complete streets connecting through to Trinity Street. The future Blue Line would run at grade along Trinity with a stop located at Brush Square. Service is from below grade with truck access and employee parking accessed from San Jacinto Street. Ballrooms and a large semi-public park are located on the roof of the facility.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
• The existing Convention Center can
V2
Hilton Hotel
Brush Square Redevelopment
• The blocks west of the existing
I-35 Corridor (TXDOT)
(WCC)_Future Sabine Promenade
remain in operation during construction. Red River Cultural District
Congress Avenue
6th Street Historic District
CAPMETRO_Future Blue Line
_SWOT ANALYSIS
Convention Center are consolidated into one large parcel, closing short sections of Second and Third Streets. • A pedestrian passage connects 2nd Street through to Trinity.
CC Parking Garage
Downtown Station
CAPMETRO_Red I Green
Development Site
1992 Fairmont Hotel
Fareground
V3
oriented with views down Second Street. LEGEND BUILDING FOOTPRINT
CULTURAL NODES
EMERGING PROJECT
Future Development
I-35 Corridor (TXDOT)
Waller Center Development
V4
• Terraces at each floor of the facility are
Cesar Chavez Street
Rainey Street Historic District
Colorado River
• Below-grade service is accessed from
grade along Trinity Street.
Palm School Redevelopment
Traffic I Pedestrian Pinchpoint
(CAPMETRO_Transit Bridge (Projected)
V1
2nd Street Promenade
(WCC)_Palm Park Renovations
Line
• The proposed Blue Line is located on Deck Park Location (Projected)
ATX_CC
Taxi Lineup
Truck Conflict
frontages. San Jacinto.
Mixed-Use development
2002
Service Yard
• Retail is located along major street
Saltillo Development TOD
CRITICAL DEVELOPMENT
BLOCKED ACCESS
PARK
CONFLICT POINT
TRANSIT LINES
WALLER CREEK CONNECTION
BLUE LINE (FUTURE)
RETAIL FRONTAGE PUBLIC FRONTAGE
SERVICE ENTRANCE VISITOR’S ENTRANCE
TRANSIT INFRASTRUCTURE PARKING / SERVICE ENTRANCE
SECTION 5 REDEVELOPMENT SCENARIOS_162
SCENARIO 5_PHASE 01 . ALTERNATE DEVELOPMENT_BLOCKS [8_16_32] STREET FLOOR Scenario 5.1 elevates the new exhibition Brush Square
halls above street level and provides for retail frontages along the principal streets. Second and Third Streets continue under the facility as open passages. Loading and employee parking is located underground, accessed from San Jacinto Street. Pre-function spaces are organized along Trinity Street. Service functions are located between the pre-function areas
3rd st
and major event spaces, allowing natural light into the building with event spaces Palm Park
and terraces oriented back toward the heart of downtown. A semi-public park is located on the roof.
2nd st
LEGEND
Cesar Chavez
PRE-FUNCTION
LOBBY
EXHIBITION
RETAIL
BALLROOM
OFFICE
MEETING ROOM
KITCHEN
SERVICE
GARDEN
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
2F
3F
4F
EXHIBIT SPACE
247,000
MEETING SPACE
55,800
BALLROOM
63,920
OVERALL CC BUILDING AREA [PROPOSED WESTERN FACILITY]
6F
7F
SECTION
SQUARE FOOTAGE [EXISTING]
5F
881,000
EXHIBIT SPACE
260,000
MEETING SPACE
209,500
BALLROOM OVERALL PROPOSED BUILDING AREA
75,000
1,632,300
SECTION 5 REDEVELOPMENT SCENARIOS_164
SCENARIO 5_PHASE 01 . ALTERNATE DEVELOPMENT [BLOCKS [8_16_32]
PUBLIC SPACE_ LANDSCAPE INFRASTRUCTURE
_ LONG-RANGE IMPROVEMENTS
The primary differences between Scenario
adjacent to the new facility should be
The new western face of the facility would
5.1 and those previously illustrated that
designed according to the guidelines set
expose the interior program to San Jacinto, public park provides new event space on
similarly occupy the western blocks
out in the Great Streets Master Plan. The
helping to animate the streetscape,
the roof of the building, therefore relieving
(Scenarios 3 and 4.1) are in the through-
Blue Line is scheduled to run along the
while retail would face primary street
some of the congestion on the principal
frontages, providing an active pedestrian
streets during significant festivals.
block passages that allow the extensions
surface of Trinity Street with a stop at
of Second and Third Streets to continue
Brush Square and with a connection to the environment. An outdoor terrace adjoining
through to Trinity Street. The streetscape
Downtown Station.
the primary ballroom on the top floor is
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
oriented toward Second Street, and a semi-
URBAN DEVELOPMENT_ EXISTING CONTEXT Scenario 5.1 is a compact, vertically
built. This strategy does not include the
_ PROJECTED DENSITY This scenario provides the most significant and Third Streets, respectively. Access
stacked, stand-alone scenario, designed to provision for public-private partnerships,
amount of exhibition space, adding an
to the Waller Creek Corridor would
function separately from the existing facility. as this aspect of the development -
additional 260,000 sq.ft. Together with
still largely be blocked by the existing
The exhibition halls, elevated above street
the existing facility, a total of 507,000 sq.ft. convention center.
deferred until phase 2 (Scenario 5.2), is
level and serviced from below, are designed completed.
of exhibition space would be available
in such a way as to be part of a network of
for events. Terraces, accessible from the
flexible spaces if and when Scenario 5.2 is
exhibition halls face west down Second
SECTION 5 REDEVELOPMENT SCENARIOS_166
SCENARIO 5_PHASE 01 . ALTERNATE DEVELOPMENT [BLOCKS [8_16_32]
CONVENTION DISTRICT_ FACILITIES AND INFRASTRUCTURE
CONVENTION DISTRICT_ BUILDOUT
Even with the addition of the new
This condition is primarily due to the
the status of the district has changed
Given the amount of public investment and
facility (Scenario 5.1) and the attendant
disruption of the urban grid that the
significantly since 1992. The urban grid
private philanthropy directed toward the
improvements to the surrounding
construction of the original convention
remains disconnected, and significant
Waller Creek Corridor, it is disappointing
infrastructure, connectivity between
center created. Built at a time when
conflicts still exist along Red River Street,
that downtown Austin remains
central Austin and the Waller Creek
the southeast quadrant was mostly
mainly due to the service yard of the
disconnected from the promise of this new
Corridor is still significantly compromised. underdeveloped, and single-family homes primarily occupied Rainey Street,
existing facility occupying the eastern side public landscape. of the building.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
AERIAL WITH PROJECTED ADJACENT DEVELOPMENT ENVELOPES (GREEN VOLUMES)
SECTION 5 REDEVELOPMENT SCENARIOS_168
SCENARIO 5_PHASE 01 . ALTERNATE DEVELOPMENT [BLOCKS [8_16_32]
PUBLIC SPACE_ SECOND STREET PROMENADE A new passageway continues the Second
would open to terraces that face west
Street promenade through to Trinity Street. down Second Street, providing an activated While not as extensive a passage as that
faรงade toward downtown. The passage
illustrated in Scenario 4.1, it would be
could be either completely pedestrian
significantly larger than that in Scenario
or allow automobile traffic to continue
3. The passage would be lined with retail.
through to Trinity Street. A similar strategy
Above street level, the exhibition halls
could be employed on Third Street.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
If the city’s priority is to add the largest
retail
0
Scenario 5.1
Private Development Value
600
Private Development Value
_ECONOMIC
by more in the second phase as well as significant private development.
0
amount of state-of-the-art convention center space all at once, then Scenario 5.1 will be the one that delivers this outcome. It essentially maximizes the
900
convention center program. Public space enhancements and private development
300
opportunities 900 can co-exist with this
ven
the second phase (Scenario 5.2). The one exception is about 104,000 square feet
300
con
expansion but are mostly deferred until
enities nity am commu land aquisitio n demoliti on
n n olitio sitio dem d aqui n la
Public Costs
Public Costs
potential of the western parcels to add
com con munit ven y a tion me cen nitie ter s
00
600
tio
nc
ent
er
of retail, which would serve an essential function in activating primary street
offi
ce
frontages.
600
As in Scenario 4, Scenario 5, taken as a
600
retail g parkin
VALUE IN MILLIONS OF DOLLARS
whole, offers significant option value to the city, allowing for the further construction of a state-of-the-art convention center program and associated private development. Whereas in Scenario 4 there are significant private development opportunities in both the first and second phases, Scenario 5 is weighted more heavily towards a large convention center expansion in the first phase, followed
SECTION 5 REDEVELOPMENT SCENARIOS_170
SCENARIO 5 _PHASE 02 . REPLACE EXISTING FACILITY_BLOCKS [9_10_14_15_33_34] Scenario 5.2 replaces both the 1992 and
This scenario provides approximately
the 2002 facilities in their entirety. There
1,000,000 sq.ft. of office space between
are two primary reasons for this: first, this the two towers included in the facility, and strategy would enable all of the exhibition
the new, mixed-use block immediately
hall floors included in both phases of the
to the east of Neches Street could
facility to align; and second, it would allow generate revenue through a public-private for a more compact, vertically stacked
partnership.
arrangement of functions. Connected by bridges to Scenario 5.1, aligning the floors Scenario 5.2 provides a new public event between both phases of the construction
space that would extend Palm Park to
would maximize the overall flexibility of
Neches Street and connect the Waller
the entire facility.
Creek Corridor with the new Convention Center. A new public pavilion located on
5.2
The reopening of the Neches right-of-way
the southeast corner of the site would be
would create a north-south pedestrian
available for community functions. Overall,
connection across the site, acting as a
this scenario would maximize the public
central spine to bring together all of the
benefit and provide improved connectivity
public improvements within the district.
in the district.
The ground floor would then be available for retail and community functions, fully activating the district. The Second and Third Street axes would continue through the new facility as pedestrian passages and create a network of public spaces that reconstruct the connectivity of the urban grid entirely.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
• Neches Street is continued as a public
V2
Brush Square Redevelopment
Hilton Hotel
• The convention center is reoriented
I-35 Corridor (TXDOT)
(WCC)_Future Sabine Promenade
promenade through to Cesar Chavez. Red River Cultural District
Congress Avenue
6th Street Historic District
CAPMETRO_Future Blue Line
_SWOT ANALYSIS
toward the Waller Creek Corridor. • A new park extends Palm Park onto the site connecting to the Neches Promenade. • A complete block east of Neches Street is made available for public-private
CC Parking Garage
Downtown Station
CAPMETRO_Red I Green
Fairmont Hotel Fareground
Street, and connected under Trinity Street
V3 Cesar Chavez Street
to the undercroft of Scenario 5.1. LEGEND BUILDING FOOTPRINT
CULTURAL NODES
EMERGING PROJECT
Future Development
I-35 Corridor (TXDOT)
Waller Center Development
Traffic I Pedestrian Pinchpoint
V4
available for community programming.
• Service is below grade from Third
Palm School Redevelopment
Rainey Street Historic District
Colorado River
Line
connects through to Palm Park. Deck Park Location (Projected)
(WCC)_Palm Park Renovations
• A new public pavillion facing the park is • The Second Street promenade
Mixed-Use development
2nd Street Promenade
(CAPMETRO_Transit Bridge (Projected)
V1
Park Extension
Taxi Lineup
Development Site
ATX_CC
development use.
Saltillo Development TOD
CRITICAL DEVELOPMENT
BLOCKED ACCESS
PARK
CONFLICT POINT
TRANSIT LINES
WALLER CREEK CONNECTION
BLUE LINE (FUTURE)
RETAIL FRONTAGE PUBLIC FRONTAGE
SERVICE ENTRANCE VISITOR’S ENTRANCE
TRANSIT INFRASTRUCTURE PARKING / SERVICE ENTRANCE
SECTION 5 REDEVELOPMENT SCENARIOS_172
SCENARIO 5_PHASE 02 . REPLACE EXISTING FACILITY_BLOCKS [9_10_14_15_33_34] STREET FLOOR In order to facilitate connections between Brush Square
exhibition halls, ballrooms, and meeting rooms, the floor levels between Scenario 5.1 and Scenario 5.2 are aligned in section. These facilities are stacked and connected by a network of pre-function spaces. Two programmed bridges connect the two phases of the project. A rooftop terrace and balconies are situated to overlook Palm Park and connect the internal event spaces to the new park space on the east.
3rd st
Two office towers, aligning with both Second and Third Streets are incorporated Palm Park
into the project, and together with an additional mixed-use block, provide approximately 1,000,000 square feet of office space.
2nd st
LEGEND
Cesar Chavez
PRE-FUNCTION
LOBBY
EXHIBITION
RETAIL
BALLROOM
OFFICE
MEETING ROOM
KITCHEN
SERVICE
FESTIVAL STREET
GARDEN
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
2F
3F
SQUARE FOOTAGE [PROPOSED EASTERN FACILITY]
4F
5F
6F
TOWERS
SECTION EXHIBIT SPACE
154,000
MEETING SPACE
90,000
BALLROOM
93,500
PROPOSED PPP DEVELOPMENT AREA PROPOSED COMMUNITY FACILITY
1,000,000 127,000
OVERALL PROPOSED BUILDING AREA
2,688,600
PEDESTRIAN PROMENADE AND PARK
253,000
SECTION 5 REDEVELOPMENT SCENARIOS_174
SCENARIO 5_PHASE 02 . REPLACE EXISTING FACILITY_BLOCKS [9_10_14_15_33_34]
PUBLIC SPACE_ LANDSCAPE INFRASTRUCTURE Scenario 5.2 expands the infrastructural
The continuation of Neches Street from
_ LONG-RANGE IMPROVEMENTS space. The new event space extends the
business and cultural events. Together, this
strategy begun in Scenario 5.1 by extending Fourth Street to Cesar Chavez can open up landscape infrastructure of Waller Creek
arrangement of programs brings a new
both the Second and Third Street walkways a connection that has been closed since
west to the new face of the convention
public space to the district that is designed
across Trinity Street and through the
1992. While this connection is not open to
center. Surrounding this new event space
to be used by the local community as well as visitors to the city.
site, connecting to the proposed Neches
automobile traffic, the new promenade
are a public pavilion, to be designed for
promenade and on to the Waller Creek
acts as an organizational spine that ties
community event use, as well as retail,
Corridor.
together the entire network of public
restaurants, and incubator spaces for local
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
URBAN DEVELOPMENT_ EXISTING CONTEXT Scenario 5.2 compresses overall massing
private partnership. Together with the
_ PROJECTED DENSITY provides space for markets, events, and
reconstructed I-35 would extend this new
of the convention site onto the three blocks two office towers, designed as part of the
other community functions. Together,
infrastructural network and connect it to
facing Trinity Street. In so doing, two
convention center building, this would
these new facilities provide substantial
east Austin, by reconnecting the public
and one-half urban blocks are opened
provide up to 1,000,000 square feet of
new place-making attributes for the
space of the city.
up for new uses. Of these, the northern-
leasable office space. The new pavilion
community and provide significant new
most block is available for mixed-use
located on the one block between Cesar
spaces for festivals, relieving pressure
development, financed through a public-
Chavez and the new event landscape
from the surrounding street network. A
SECTION 5 REDEVELOPMENT SCENARIOS_176
SCENARIO 5_PHASE 02 . REPLACE EXISTING FACILITY_BLOCKS [9_10_14_15_33_34]
CONVENTION DISTRICT_ FACILITIES AND INFRASTRUCTURE By opening up new systems of public
been primarily used by conventioneers.
CONVENTION DISTRICT_ BUILDOUT cultural and economic needs of the local
space, Scenario 5.1 provides much-needed Together, Scenario 5.1 and Scenario
community. Together, the combination
access to parks - in an area of the city
5.2 provide 400,00 square feet of new,
of all of these new facilities, and the
that is rapidly densifying. New retail and
connected exhibition space, making the
attendant landscape infrastructure, can
public functions line the major streets and
facility more competitive with those in
make the new Convention Center District
passages of the district, bringing active
peer markets, while 127,000 square feet
one of the most significant public places in
life to areas of the city that have previously of space for public uses will address the
the City of Austin.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
AERIAL WITH PROJECTED ADJACENT DEVELOPMENT ENVELOPES (GREEN VOLUMES)
SECTION 5 REDEVELOPMENT SCENARIOS_178
SCENARIO 5_PHASE 02 . REPLACE EXISTING FACILITY_BLOCKS [9_10_14_15_33_34]
PUBLIC SPACE_ NECHES PROMENADE A new pedestrian promenade, lined
landscape up into the site and provides
with shops, restaurants, and space for
new public space for events and festivals.
community functions, extends Neches
Facing this new event space is a large
Street through the site from Brush Square
public pavilion that could house markets,
south to Cesar Chavez. The new facility is
theaters or other community activities.
reoriented toward Waller Creek to the east, while an extension of Palm Park brings the
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
00
_ECONOMIC
Private Development Value
600
Public Costs
0
900
con
300
enities nity am commu land aquisitio n demoliti on
ven
tio
nc
ent
er
offi ce
Scenario 5.2
development, will both be significantly
Creating a large new convention center
Waller Creek. Between the Waller Creek
building in the western parcels in
access, the inclusion of a community
Scenario 5.1 sets the stage for the
performance venue, and the large
demolition of the entire existing facility
concentration of retail and community
at the outset of building Scenario 5.2.
space, Scenario 5 at full buildout would
Subsequent construction of a new
arguably do the most of any of the
facility as part of this second phase
scenarios to draw local Austin residents
would provide entirely state-of-the-art
to the convention center district. On
convention facilities on both sides of
the downside, because of the land area
Trinity Street, connected to form one
devoted to public space, Scenario 5 offers
complete network of flexible convention
total private development value that is less
infrastructure. Scenario 5.2 also yields
than in Scenario 4 ($485 million vs. $570
the most significant amount of total retail
million).
enhanced by orientation to the revamped
of any of the scenarios, about 194,000 square feet (including retail built in 5.1), as compared to about 115,000 square feet to
retail g parkin
VALUE IN MILLIONS OF DOLLARS
600
be delivered in the Saltillo Transit Oriented Development project. Scenario 5.2 is still able to accommodate about 1 million square feet of additional space, which can be accomodate multiple uses, as part of a public private investment program, although less than Scenario 4. The experience of visiting the new convention center building east of Trinity, as well as the value of the mixed-use SECTION 5 REDEVELOPMENT SCENARIOS_180
COMPARATIVE ANALYSIS _REDEVELOPMENT SCENARIOS
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
CONVENTION CENTER PROGRAM DISTRIBUTION_IN EACH SCENARIO EXHIBITION
BALLROOM
AUDITORIUM
MEETING ROOM
KITCHEN
RETAIL
COMMUNITY SPACE
SUPPORTING PROGRAM
RESIDENTIAL
OFFICE
Scenario 1_ .9 million sq. ft.
SC_1
SC_4.1
1,300,000
1,388,600
1,632,300 75,000
Scenario 4.1_ 2.1 million sq. ft.
SC_4.2
Scenario 5.1_ 2.45 million sq. ft.
SC_5.1
PUBLIC PRIVATE INVESTMENT _OFFICE
154,000
260,000
90,000
209,500
93,500
127,000
Scenario 4.1 + 4.2_ 3.2 million sq. ft.
EXISTING CONVENTION CENTER
PUBLIC PRIVATE INVESTMENT _OFFICE
658,200
142,010 88,952 282,080
PUBLIC PRIVATE INVESTMENT _OFFICE
48,000 72,500 152,000
75,882 219,808
SC_3
EXISTING CONVENTION CENTER
770,000
SC_2
Scenario 3_ 2 million sq. ft.
PUBLIC PRIVATE INVESTMENT _HOUSING _OFFICE
64,440
Scenario 2_ .9 million sq. ft.
EXISTING CONVENTION CENTER
PUBLIC PRIVATE INVESTMENT _HOUSING
EXISTING CONVENTION CENTER
247,000
55,800 62,920
881,000
991,502
1,069,352
1,194,000
2,022,500
1,994,266
_OFFICE
PUBLIC PRIVATE INVESTMENT * NOT INCLUDED IN TOTAL NUMBERS
Scenario 5.1 + 5.2_ 3 million sq. ft.
SC_5.2
SECTION 5 REDEVELOPMENT SCENARIOS_182
SCENARIO_1
SCENARIO_2
SCENARIO_3
• No changes to existing convention center or public infrastructure.
• No changes to existing convention center or public infrastructure.
• Existing convention center remains in operation during construction.
• New Capital Metro lines servicing the district.
• New Capital Metro lines servicing the district.
• Consolidation of western parcels.
• 2 1/2 blocks of projected market-rate development.
• Public-private partnership opportunity. • Limited retail along Trinity Street. • Pedestrian paseo at Second Street. • Below-grade service and parking.
FINANCIAL DATA_
• Semi-public park on roof.
SC_1
SC_2
SC_3
NET INCREASE IN LEASABLE CONVENTION CENTER SPACE OVER STATUS QUO (SQUARE FEET, ROUNDED TO NEAREST THOUSAND)
0
0
360,000
DEVELOPMENT COST OF NEW CONVENTION CENTER FACILITIES (MILLIONS OF US DOLLARS_TO THE NEAREST $5 MILLION)*
0
0
535
75
1,000
230
VALUE OF COMPLETED PRIVATE DEVELOPMENT (MILLIONS OF US DOLLARS_TO THE NEAREST $5 MILLION)
* INCLUDES ALL LAND ACQUISITION, DEMOLITION, PUBLIC SPACE, AND INFRASTRUCTURE COSTS FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
SCENARIO_4.1
SCENARIO_4.2
SCENARIO_5.1
SCENARIO_5.2
• Existing convention center remains in operation during construction
• Addition to the existing 2002 portion of the convention center remains.
• Existing convention center remains in operation during construction.
• New pedestrian promenade at Neches Street.
• Public-private partnership opportunity.
• Extention of Second Street to Palm Park.
• Consolidation of Western Parcels into one large parcel.
• Convention center has new orientation toward the Waller Creek Corridor.
• Retail along principal streets.
• 1 block for public-private partnership opportunity.
• Pedestrian extension to Second and Third Street.
• 1 block for new public event space.
• Pedestrian galleria at Second Street.
• New festival street at Trinity and Fourth Street.
• Retail along principal streets.
• 1 block for public-private partnership opportunity..
• New festival street at Trinity and Fourth Street.
• New public park at southeast corner.
• Below-grade service and parking.
• New public pavillion on the park.
• Below-grade service and parking.
• Below-grade service and parking.
• Semi-public park on roof
• Below-grade service and parking.
• Semi-public park on roof
SC_4.1
SC_4.2
SC_5.1
SC_5.2
273,000
165,000
545,000
515,000
450
950**
725
1,150***
340
570**
30
485***
**DOES NOT INCLUDE DEVELOPMENT COMPLETED IN SCENARIO 4.1
***DOES NOT INCLUDE DEVELOPMENT COMPLETED IN SCENARIO 5.1 SECTION 5 REDEVELOPMENT SCENARIOS_184
COMPARATIVE ANALYSIS_REDEVELOPMENT SCENARIOS Comparative Analysis Between Scenarios
fact that Two of the Scenarios (4.2 and 5.2) real (inflation-adjusted) construction entail demolition of part (4.2) or all (5.2)
costs or other development costs, such as properties, in or nearby Downtown Austin.
The decision on whether and how
of the existing convention center facility.
architecture and engineering. They include Again, further details are in Appendix C.
to proceed with expanding Austin’s
Thus, in Scenario 4.1, a new convention
all development costs, including soft costs All of the expansion scenarios (save for
convention center is a complex one,
center building is built west of Trinity
(costs not directly related to physical
Scenario 5.1) incorporate private real
complex because there are so many
Street, while the existing facility remains,
construction). Note that it is possible that
estate whose value exceeds what currently
valuations using “comps,” or comparable
factors to consider simultaneously. In this for an increase of 273,000 leasable
not all of the estimated $75 million cost of exists on the western parcels (i.e., Scenario
section, some of the factors that can be
acquiring
1) but is less than what could ultimately
quantified numerically in the descriptions Scenario 4.2, some of the existing facility
the Western Parcels, nor the demolition
plausibly exist on the western parcels if left
of the scenarios above are summarized.
is demolished, even as a second new
costs, would be incurred directly,
to market forces (i.e., Scenario 2). Scenario
convention center building is built east of
depending on how a redevelopment plan
4.2 “backfills” the highest proportion of
The table below summarizes supply-side
Trinity Street, leaving a total net increase
is structured. For instance, the city may
private development value that would
factors. These are costs and benefits that
of 165,000 square feet of leasable space
elect to partner with the landowners of
accrue under Scenario 2 (i.e., $570 million
will accrue to Austin’s city government
over what exists today. From this row, it
the western parcels, in which case their
versus $1 billion).
and citizens as a direct consequence of
can be seen that Scenario 5.1 yields the
land value may be counted as an equity
a decision to undertake a given scenario
largest convention aggregated facilities,
contribution towards a public-private
Assuming a public entity owns the
over another. The first row of the table
with 5.2 close behind, Scenario 4.2 yields
partnership instead of a direct land
convention center facilities, as is the case
summarizes total convention center
the smallest, and Scenarios 3 and 4.1 are
sale to the city. A detailed methodology
now, those facilities would not owe any
square footage in each scenario. Square
in between.
and breakouts of the computations for
property taxes. Note that the computations
estimated development costs for the
(described in more detail in Appendix C)
square feet over what exists currently. In
footage refers to floor space (meeting space, exhibition halls, ballrooms, and
The second row summarizes the
various scenarios are included in
assume that in Scenario 3, even though the
auditoria) that is used for formal meeting
estimated costs that would be borne,
Appendix C.
private development would be “stacked” on
purposes during events. It also includes
likely by a public entity, to build
other types of internal space, such as
a convention center expansion,
top of publicly owned land, it pays property The bottom row in the supply-side
taxes. Depending on the exact details of
corridors and other “pre-meeting” spaces, excluding associated public spaces and
table shows the value of the private
the redevelopment, this may or may not
whose primary purpose is circulation
infrastructures (third row) as well as
development incorporated within
prove to be the case. As with the value of
or “back of house” or other supporting
demolition and land acquisition. These
the various scenarios at the time of
private development, Scenario 4.2 comes
functions that are essential but tangential costs are all expressed in 2018 dollars
completion if it were to exist today.
closest to replacing the opportunity cost of
to meetings. “Net increase” alludes to the and do not account for any changes in
We straightforwardly estimated these
property tax revenue flowing to the city that
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
_SUMMARY OF SCENARIOS
No Expansion No Expansion (Buildout)
Austin Convention Center Master Plan
Scenario 1
Scenario 3
Total convention center floor area, including existing (thousands of square feet) (1)
Scenario 2
UT Austin Phased Scenario
UT Austin Phased Scenario
Scenario 4.2 Scenario 5.1 (second phase) (3) (first phase)
Scenario 4.1 (first phase)
Scenario 5.2 (second phase) (3)
881
881
1,911
1,631
1,336
2,135
1,279
Estimated cost to develop new convention center facility (nearest $25 mm) (2)
N/A
N/A
525
450
950
725
1,150
Estimated cost to build public space and infrastructure (nearest $5 mm)
N/A
N/A
60
5
120
Estimated value of private development (nearest $5 mm)
75 (4)
1,000
570
30
485
15 230
60 340
(1) Excludes loading and parking. (2) Excludes land acquisition and demolition costs. (3) Includes previous phase. (4) Property tax valuation (Travis Central Appraisal District).
would be expected to eventually be realized public spaces, more connectivity in the in the no-build Scenario 2 ($2.5 million vs.
street network, and the “brand value�
$4.4 million).
that would result from a state-of-theart new convention center facility whose
There are other possible factors to consider design emphasizes place-making in the in a convention center expansion beyond
surrounding area. This does not mean
costs and benefits tied directly to the land
that they would not be real, only that they
parcels where it would occur. Some of
cannot be reasonably predicted ahead of
these factors cannot be credibly estimated
time.
or predicted, such as an enhancement to Downtown Austin from added and improved
SECTION 5 REDEVELOPMENT SCENARIOS_186
COMPARATIVE ANALYSIS_REDEVELOPMENT SCENARIOS Demand Side Case Comparison
for Austin (as well as the rationale for
of this report). It is estimated (detailed
The second and third to the last lines of
selecting the three demand cases).
in Appendix C) that indirect and induced
the table summarize the boost to city
Another set of factors for decision-makers However, nothing is guaranteed, and for
spending amount to about 59% of direct
coffers that would accrue from spending
to consider in deciding whether and how
that reason, the research team analyzes
spending. This direct, indirect, and induced on restaurants (from sales tax) and hotels
to expand the convention center are on
three demand scenarios and examines
spending combined is truly incremental
(from Hotel Occupancy Tax). The last
the demand-side. It is tempting to assume
the extent to which various consequences
to the local economy; it is not a case of
line reports the number of full-time job
that “if you build it they will come,” but the
are sensitive to which one unfolds.
“shuffling dollars around” that would have equivalents supported per year, within the
reality is that for an expanded convention
been spent elsewhere in the absence of
local economy, by restaurant and hotel
center to be used to its full potential, there Although convention center demand is
an enlarged convention center. Attracting
spending. As an example, ten full-time job
must be enough attendees to fill it.
far from predictable, hotel and restaurant
out-of-town visitors to spend money in
equivalents could mean ten full-time jobs
spending are entirely predictable.
hotels and restaurants can be thought of,
that exist for one year or forty full-time
In this report, three demand cases, all of
Convention center attendees vary in their
in economic terms, as an export economy. jobs that exist for three months.
which are summarized in the table below,
spending patterns, but among those
are considered. These are a middle of the
who do not stay with friends or in short-
As beneficial as direct spending is, not all
There are two main takeaways from
road Base Case, an optimistic Upside
term rentals, it can be predicted with
of it directly benefits the local economy
the demand-side table. First, economic
Case, and a pessimistic Downside Case.
near-certainty that they will sleep in a
since some of the locally spent dollars
benefits such as local spending and tax
They represent increases of 40%, 100%,
hotel and that they will eat a restaurant
go towards goods and services that come
collections are highly sensitive to the
(i.e. a doubling) and 10% over current
meal. Although the details are explained
from elsewhere. Value added is the portion amount of demand. For instance, Scenario
annual attendance, which is roughly
in Appendix C, the “direct, induced, and
of direct spending that accrues to the
5.2 (the most extensive expansion scenario)
500,000 per year. Which one represents
indirect spending” line in the adjoining
local economy—roughly equivalent to an
could accommodate the Upside Case,
what will actually take place in the next
table captures the spending in the local
increase to the local economy’s Gross
and in so doing generate $109 million of
ten years in Austin? It is impossible to
economy (defined as Travis County) that
Domestic Product (GDP). Finally, a subset
new local spending, $69 million in value
know—the answer depends on unknowable results from these two activities as a
of value-added ends up as labor income
added, and $40 million in labor income.
factors such as the state of the national
result of attracting more convention
or dollars that find their way into the
On the other hand, if the Downside Case
economy, structural trends in the
attendees than at present. Note that this
household budgets of local workers and
proved to unfold—which is unlikely but not
convention and meeting industry, and
spending includes two spinoff effects
business owners via wages and business
impossible—the equivalent figures would
many others. In Appendix C, there is a
beyond the expenditures in hotels
earnings.
be drastically reduced to $9 million, $6
lengthy explanation of the argument that
and restaurants: indirect and induced
the Upside Case is entirely plausible
spending (both defined in the introduction
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
million, and $3 million, respectively.
_ANALYSIS OF INCREASED ATTENDANCE
Base Case
Upside Case
Downside Case
Attendance assumptions Increase in annual attendance over status quo
200,000
500,000
50,000
Increase in annual attendance over status quo (%)
40%
100%
10%
Restaurant and hotel spending effects Direct, induced, and indirect spending per year ($mm) Value added per year ($mm)* Labor income per year ($mm)*
40.7 25.6 14.8
109.4 68.9 39.9
8.8 5.5 3.2
Direct incremental sales tax collections ($mm)
0.1
0.3
0.02
Direct incremental Hotel Occupancy Tax collections ($mm)
1.8
4.8
0.4
Full-time equivalent jobs supported per year*
355
954
70
* Includes indirect and induced effects.
SECTION 5 REDEVELOPMENT SCENARIOS_188
USING THIS REPORT _ This report ends by noting that it is
Master Plan and the Urban Land Institute’s
not intended to provide fully-formed
review of its findings. The acceptance of
scenarios or proposals for convention
previous, well-vetted findings, such as
center expansion to be implemented in
the identification of westward expansion
their entirety. It is unlikely that any of the
across Trinity Street as the optimal
scenarios presented—irrespective of the
option, solidifies understanding of basic
details concerning design or economics
background facts, while putting new ideas
provided—will be built exactly as drawn.
into circulation for what will come next.
As just one example among many: Should
UR
it be determined that an even larger
Advancing the process forward will
convention center expansion is warranted
require considerable further efforts
than provided by even Scenario 5.2, an
moving on parallel tracks, from more
additional roughly 150,000 square feet
in-depth financial modeling to community
of exhibition hall space could be yielded
engagement, to space programming
by adding a level to the proposed new
analysis. Austin’s policymakers and citizens
convention center facility. Determining
will have to simultaneously consider, as
the exact pathway forward will require
we have, programmatic requirements
considerable further work.
for expanded convention center facilities, placemaking in the Southeast Quadrant,
Rather than providing fully baked options,
traffic circulation, the ideal configuration
by providing novel and useful information,
of on-site, mixed use development, public
this report contributes to the deliberative
benefits, economic feasibility, and various
process that will come before any decision other considerations. Coming to a decision on whether and how to proceed with
point is an unavoidably complex, iterative
convention center redevelopment. It is
process that cannot be boiled down to a
hoped and expected that this report will
simple, linear procedure.
serve as a launch pad of sorts—one that rests on a foundation of earlier work, such as the Austin Convention Center
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
If the team has succeeded, then these
• Reimagining the convention center
The Southeast Quadrant of Downtown
• Burying Capital Metro’s
necessary next steps will be shaped
facility as the hub of a bustling downtown
by some of the ideas injected, via this
district with robust connections to activity Trinity Street to avoid conflicts with
and nearly unlimited possibilities for the
report, into the deliberation process. By
centers emanating in all four cardinal
pedestrian activity above and with traffic
future, deserves nothing less.
comparing several scenarios, all of which
directions.
on Cesar Chavez.
Austin, with its present-day challenges
proposed Blue Line in a tunnel under
have a baseline level of basic feasibility, yet represent considerably divergent outcomes, • Expanding the convention the team has endeavored to demonstrate
center in two phases, to make it possible
the tradeoffs that come with different
to demolish all or part of the existing
possible “big moves.” Some of these—not
facility, enabling the creation of new
all of which can be pursued in any single
through connections and public spaces
decision pathway—that have been explored
with no net loss in convention center floor
in these pages include the following:
area over what exists now.
• Moving loading facilities underground to preserve the public realm. • Using mixed-use private development to increase activity levels on the site. • Including a public venue on-site for the purposes of drawing local creative
• Using the footprint of the existing and
• Reorienting the front of the convention economy participants, and their local
future land parcels under the convention
center facility to face east, towards Waller audiences, to a site that is currently
center more efficiently by vertically
Creek.
viewed as primarily for visitors.
stacking programs. • Deploying retail spaces to activate • Connecting Second and/or Third Streets from San Jacinto to Trinity, and possibly
street frontages in a part of downtown
of the public should “think big” about
where these are currently lacking.
the possibilities for convention center
onward to Waller Creek, so that they can form a “creek to creek” connection from
Above all, City Council and the members
expansion, which entails thinking beyond • Transforming streets running
simply the future needs of the convention
Shoal to Waller Creeks, the waterways that
through a convention center district into
center facility, however important they are.
bookend Downtown Austin from west to
pedestrian-oriented “festival streets”
It also entails moving away from ad-hoc
east.
to create a lively atmosphere and
planning, and instead thinking holistically
accommodate special events.
and strategically about the future of the entire area surrounding the convention center. SECTION 5 REDEVELOPMENT SCENARIOS_190
6
Appendix A_Catalog of Emerging Projects B_Reference Catalog: Best Practices for Convention Centers C_Estimating Economic Impact D_Acknowledgements and External Feedback E_References
APPENDIX
A-01 FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Included in the Appendix are listings of projects, either in progress or pending, that are located within each of the four vectors that have been identified in this report as interfacing with the convention center site, and that are likely to impact the future of Downtown Austin. The listing is not comprehensive, as the landscape is perpetually changing, but is as inclusive as possible given the data available. Also included here is a catalog of twenty-seven convention center case-studies that have been researched in order to establish criteria from which to extract principles that inform the programming and planning of the scenarios. Additionally, a listing of individuals and organizations that have in some way informed the report, along with references and attributions may also be found in the following section.
SECTION 6 APPENDIX_194
A_CATALOG OF EMERGING PROJECTS DELL MEDICAL HEALTH DISCOVERY BUILDING DELL SETON MEDICAL CENTER AT UT CENTRAL HELTH BRACKENRIDGE CAMPUS WATERLOO PARK WATERLOO PARK TOWER HOTEL ALEXAN CAPITOL (MIXED USE) HYATT HOUSE HOTEL EAST 9TH STREET MULTIFAMILY EPISCOPAL CHURCH BLOCK 87 (MIXED USE) SABINE STREET PROMENADE DOWNTOWN METRORAIL STATION EXPANSION BLOCK 36 MICROAPARTMENTS WALLER PARK PLACE 91 RED RIVER
E
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
THE TRAVIS (RESIDENTIAL, HOTEL) FAIRFIELD INN AND SUITES HOTEL 70 RAINEY STREET RESIDENTIAL 48 EAST RESIDENTIAL
44 EAST AVENUE DISTRICT COOLING PLANT #3
The Austin Convention Center is located in Given its central location within a rapidly the Southeastern Quadrant of downtown,
transforming area, it is imperative that the
bounded by Sixth Street to the north,
convention center is designed to enhance
BLOCK 185 OFFICE
Congress Avenue to the west, Water Street the physical connections between itself
AUSTIN PROPER HOTEL AND RESIDENCES
Avenue (I-35) to the east. Downtown Austin Doing so will allow the Austin Convention
THIRD AND SHOAL OFFICES THE REPUBLIC OFFICES 300 COLORADO OFFICE
(Cesar Chavez) to the south, and East
and the adjacent ongoing development.
has dramatically transformed since the
Center to integrate with and enhance the
convention center last expanded. During
surrounding socially and economically
this time, thousands of new residences
active district. Analysis and consideration
and hotel rooms, as well as office space,
of emerging projects and developments
have emerged in Austin’s urban core,
in the downtown district have informed
THIRD AND COLORADO RESIDENTIAL TOWER
including the Southeast Quadrant in the
the scenarios and writings of this report.
MARRIOT HOTEL AT CESAR CHAVEZ
immediate vicinity of the Austin Convention In order to serve the greater Austin Center.
community, in addition to the large number of visitors that are attracted
With ongoing development migrating
to Austin and supported by the venue,
towards the edges of downtown, what was any redevelopment or expansion to the once the edge is now the center of a set of convention center must be considered in rapidly developing urban districts. A large
concert with the public role that the center
amount of housing and entertainment
plays within the district.
venues have sprung up in the Rainey Street district to the south, An innovation
Note:
district is emerging to the north, the Second Street corridor continues to
The emerging projects presented in this
flourish, and development is pushing
section are in various stages of planning,
into East Austin. The Austin Convention
design, construction, and finished
Center is now located at a critical juncture completion. Project certainty also varies, in the city, and has the potential to affect
and is subject to change.
development in every direction. SECTION 6 APPENDIX_196
W > E _FROM CREEK TO CREEK DISTRICT COOLING PLANT #3_1 BLOCK 185 OFFICE_2 AUSTIN PROPER HOTEL AND RESIDENCES_3 THIRD AND SHOAL OFFICES_4 THE REPUBLIC OFFICES_5 300 COLORADO OFFICE_6 THIRD AND COLORADO RESIDENTIAL TOWER_7 MARRIOT HOTEL AT CESAR CHAVEZ_8
Creek to Creek The area is bounded on the west by Lamar Blvd, on the north by Fourth Street, on the east by the I-35 frontage road, and on the south by Cesar Chavez Street. Second Street has been redeveloped in recent years with widened sidewalks lined with active street frontage. Along the Second Street corridor are, the Seaholm EcoDistrict,
E
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
the Green Redevlopment, Second Street District, Congress Avenue, and the Fareground. Second Street terminates into the existing Austin Convention Center.
V1
SECTION 6 APPENDIX_198
DISTRICT COOLING PLANT #3_1
BLOCK 185 OFFICE_2
A-02
A-03
Planned: Austin Energy is proposing to
Planned: The 1.27-acre site will have
build a new district cooling plant adjacent
a high-rise mixed use building with an
to the Gables Park Tower and the future
underground parking garage. This is a
Bowie Underpass in Austin’s downtown
proposed 35-story, 593-foot office tower.
Seaholm EcoDistrict. The project makes use of a small infill parcel that is considered undevelopable for other uses. CE
D
SA
2N
R
ST
CH
BUDGET EXPECTED COMPLETION
N/A $49 M 2020
LV D
EZ
ET
SQUARE FOOTAGE
AR B
AV
RE
LAM
PROJECT DETAILS
PROJECT DETAILS
SQUARE FOOTAGE
N/A
BUDGET
N/A
EXPECTED COMPLETION
N/A
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
SAN
ANT
O N IO
ST
AUSTIN PROPER HOTEL AND RESIDENCES_3
THIRD AND SHOAL OFFICES_4
Under Construction: The Tramell Crow
Under Construction: The project is a
Company is working with the Kor Group,
160 unit apartment project with ground
a hotel developer, to build a 243-room
floor retail/restaurant. It’s a five story
hotel on Block 188 in the Green Water
mixed-use building with integrated
development just south of the former
micro-housing units, 8,000 square feet of
Austin Music Hall site. The 32 story tower
restaurant space, a parking garage, and
will also have 100 condominium units.
A-04
live-work spaces with street access.
A-05
3R
2N
D
D
ST
RE
BUDGET EXPECTED COMPLETION
500,000 N/A 2019
NT AN A
O N IO
ET
ET
PROJECT DETAILS S
SQUARE FOOTAGE
RE
ST
PROJECT DETAILS
ST SAN
SQUARE FOOTAGE BUDGET EXPECTED COMPLETION
ANT
O N IO
ST
370,000 N/A 2019
SECTION 6 APPENDIX_200
THE REPUBLIC OFFICES_5
300 COLORADO OFFICE_6
A-07
A-06
Planned: Developer Lincoln Property
Under Construction: A 34-story office
Co. and partner Phoenix Property Co.
tower is under construction at 300
proposed a 709 foot, 46 story skyscraper
Colorado Street. The building will have
overlooking newly renovated Republic
340,000 square feet of office space, 10,000
Square. The project is still in its early
square feet of restaurant space, and 727
stages, but would include 687,471 square
parking spaces. The project broke ground
feet of office, 19,423 square feet of retail,
in December of 2018.
1,644 parking spaces.
PROJECT DETAILS
SQUARE FOOTAGE
PROJECT DETAILS
900,000
STR
EET
SQUARE FOOTAGE
N/A
BUDGET
N/A
EXPECTED COMPLETION
N/A
CO L
ORA
DO
ST RE ET
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
D
ET
3R
RE
N/A
ST
EXPECTED COMPLETION
UPE
H
N/A
DAL
4T
BUDGET
GUA
STR
EET
MARRIOT HOTEL AT CESAR CHAVEZ_7
A-08
Under Construction: White Lodging
sit-down restaurant, and four levels of
Services Corp., downtown Austin’s
underground parking.
dominant hotel owner, has broken ground on another hotel, this time just west of the Austin Convention Center. Fronting Cesar Chavez, this 27-story Marriot hotel will have 610 rooms and a high-turnover
PROJECT DETAILS
SQUARE FOOTAGE BUDGET EXPECTED COMPLETION
534,000 N/A 2020
T R IN
IT Y
STR
EET
CE SA R CH AV EZ
SECTION 6 APPENDIX_202
EMERGING PROJECTS _N > S: UP WALLER CREEK DELL MEDICAL HEALTH DISCOVERY BUILDING_9 DELL SETON MEDICAL CENTER AT UT_10 CENTRAL HELTH BRACKENRIDGE CAMPUS_11 WATERLOO PARK_12 WATERLOO PARK TOWER HOTEL_13 ALEXAN CAPITOL (MIXED USE)_14 HYATT HOUSE HOTEL_15 EAST 9TH STREET MULTIFAMILY_16 EPISCOPAL CHURCH BLOCK 87 (MIXED USE)_17 SABINE STREET PROMENADE_18 DOWNTOWN METRORAIL STATION EXPANSION_19 BLOCK 36 MICROAPARTMENTS_20 WALLER CREEK_21
E
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
V2
SECTION 6 APPENDIX_204
DELL MEDICAL HEALTH DISCOVERY BUILDING_9
DELL SETON MEDICAL CENTER AT UT_10
A-09
A-10
Recently Completed: Some of the world’s
Recently Completed: A 220 bed hospital,
best researchers will make their home
one of four buildings in the first phase of
in the wet and dry labs in the Health
Dell Medical School at the University of
Discovery Building. On the University
Texas at Austin.
of Texas They will also have access to advanced imaging equipment and a technology incubator.
SQUARE FOOTAGE BUDGET COMPLETION
260,000 N/A 2017
T R IN
IT Y
STR
EET
SQUARE FOOTAGE BUDGET COMPLETION
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
ET
ET
RE
RE
ST
ST
TH
TH
15
15
E
PROJECT DETAILS
E
PROJECT DETAILS
517,000 $260M 2017
T R IN
IT Y
STR
EET
CENTRAL HEALTH BRACKENRIDGE CAMPUS _11
WATERLOO PARK_12
A-11
A-12
Planned: Central Health, Travis County’s
connects the new University of Texas
Under Construction: A dramatic
Park will feature a great lawn, a variety of
publicly funded health care district
Medical District, including Seton’s new
makeover of Waterloo Park is underway
gardens, an elevated promenade, water
is working with community partners
state-of-the-art teaching hospital that
after work began in September of 2017.
features, meditative spaces and childrens
and experts on the future reuse and
will replace UMC Brackenridge in 2017,
Improvements to the park will include
play spaces. The park is expected to open
redevelopment of its Brackenridge
with the Texas State Capitol complex
the addition of an ampitheater that can
to the public in late 2019.
Campus, following the planned closing of
and Downtown Austin, including the
accommodate up to 5,000 people, made
University Medical Center Brackenridge
city’s envisioned Innovation District. The
possible by a $15 million grant from the
in 2017. Central Health’s Brackenridge
masterplan was approved by the Central
Moody Foundation. In addition, Waterloo
Campus is a vital community asset that
Health Board of Managers on Jan 27,2016. E
PROJECT DETAILS
E 15
15
PROJECT DETAILS
TH
TH
ST
ST
N/A 2035
T R IN
IT Y
STR
EET
SQUARE FOOTAGE
ET
EXPECTED COMPLETION
ET
BUDGET
N/A
RE
RE
SQUARE FOOTAGE
11 ACRE
BUDGET
$64M
EXPECTED COMPLETION
2020
T R IN
IT Y
STR
EET
SECTION 6 APPENDIX_206
WATERLOO PARK TOWER HOTEL _13
ALEXAN CAPITOL (MIXED USE)_14
A-13
A-14
Planned: This is a proposed 260 room
Planned: With 30 floors, Alexan Capitol
16,500 square feet of residential units per
hotel on the site of the current Brick Oven
will be the tallest tower in the brand’s
floor as the tower component rises.
Pizza, east of Waterloo Park and south of
Texas portfolio to-date. The building’s
UMC Brackenridge.
podium includes three subterranean floors of garage, a lobby floor, three floors of parking above the lobby, and a fifth floor with roughly 21,000 square feet of office space. After that, it’s an average of
PROJECT DETAILS
PROJECT DETAILS E
E
12
12
ER S
T
BUDGET
N/A
EXPECTED COMPLETION
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
N/A
ET
R IV
N/A
RE
N/A
RED
SQUARE FOOTAGE
ST
EXPECTED COMPLETION
ET
N/A
RE
BUDGET
ST
N/A
TH
TH
SQUARE FOOTAGE
RED
R IV
ER S
T
HYATT HOUSE HOTEL _15
EAST 9TH STREET MULTIFAMILY_16
A-15
A-16
Completed: Nine-story, 190 room Hyatt
Planned: The project is a 160 unit
House extended stay hotel is just blocks
apartment project with ground floor
from the Texas State Capitol, the Austin
retail/restaurant. It’s a five story mixed-
Convention Center, and Sixth Street.
use building with integrated micro-
The project includes four stories of
housing units, 8,000 square feet of
underground parking, and 960 square feet
restaurant space, a parking garage, and
of meeting and event space.
live-work spaces with street access.
PROJECT DETAILS
PROJECT DETAILS E
E
ST
ET
ET
RE
RE
ST
136,028
H
SQUARE FOOTAGE
H
284,000
9T
9T
SQUARE FOOTAGE BUDGET EXPECTED COMPLETION
N/A 2017
R
IV ED R
ER S
BUDGET
N/A
EXPECTED COMPLETION
N/A
T
IH - 3
5
SECTION 6 APPENDIX_208
EPISCOPAL CHURCH BLOCK 87 (MIXED USE)_17
SABINE STREET PROMENADE_18
A-17
A-18
Planned: This block will be made up of
restricts building height to four stories on
Planned: The Sabine Street Promenade,
several components, intricately pieced
about 75% of the site.
now under design, is the construction of
together to maximize the usability of
the Sabine Street pedestrian and bike
the site. An Archives building, two office
promenade from Fourth Street to Sixth
buildings, underground parking, ground
Street. It will be designed in accordance
floor retail, and a residential tower have
with the Waller Creek District Master
been proposed. A Capitol View corridor
Plan.
PROJECT DETAILS
PROJECT DETAILS E 7T
H
RE
N/A
TR
STR
EET
BUDGET EXPECTED COMPLETION
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
$3.4 MIL 2019
ET
N/A
Y IN IT
RE
EXPECTED COMPLETION
N/A
ST
ET
BUDGET
4T
ST
SQUARE FOOTAGE
E
~600,000
H
SQUARE FOOTAGE
SAB
IN E
STR
EET
DOWNTOWN METRORAIL STATION EXPANSION_19
BLOCK 36 MICRO-APARTMENTS_20
A-19
A-20
Planned: The current downtown station on The station will serve as both a landmark
Planned: The project is a 160 unit
The site is restricted by Capitol View
East Fourth Street has a single track and
apartment project with ground floor
Corridors #15 and #17.
and a hub, and riders will be able to
platform, with room for one car lane in the connect to local MetroBus service, electric
retail/restaurant. It’s a five story mixed-
block between Trinity and Neches streets. cab, Car-2-Go, B-cycle, and bicycle trails.
use building with integrated micro-
The final design will move the station one
housing units, 8,000 square feet of
block east of the current location, and
restaurant space, a parking garage, and
expand to two platforms with three tracks.
live-work spaces with street access.
PROJECT DETAILS
SQUARE FOOTAGE
136,000
4T
N/A
E
SQUARE FOOTAGE
PROJECT DETAILS
H ST
E RE ET
2021
RED
STR
EET
BUDGET EXPECTED COMPLETION
N/A
ET
ST
EXPECTED COMPLETION
ER R IV
RE
H
$39.4 MIL
4T
BUDGET
2019 IH -
35
SECTION 6 APPENDIX_210
E > W _ACROSS THE INFRASTRUCTURAL DIVIDE OSTEN HALL (MIXED USE)) _21 SALTILLO PLAZA _22 KLINE HOTEL_23 EAST AUSTIN HOTEL_24 RECONNECT AUSTIN_25
Across The Infrastructural Divide This sector encompases projects ranging from Palm Park on the west, to the potential amplification of Capital Metro’s rail service with a new Green Line, and a number of projects underway within the Saltillo Transit Oriented Development District. The future status of the I-35 corridor remains the most critical component of the relationship between Downtown and East Austin.
E
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
V3
SECTION 6 APPENDIX_212
OSTEN HALL (MIXED USE)_21
A-21
Planned: The project is a four story, mixed-use office building with retail and restaurant space and a robotic parking garage. A demolition permit has been applied for.
PROJECT DETAILS E 6T
EXPECTED COMPLETION
N/A
ET
N/A
RE
BUDGET
ST
129,000
H
SQUARE FOOTAGE
SAN
MAR
CO S
STR
EET
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
A-22
KLINE HOTEL_22
EAST AUSTIN HOTEL_23
A-23
A-24
Planned: The site has been cleared for
Under Construction: Plans for the East
this forty-two room boutique hotel with a
Austin Hotel call for roughly 29,000
small 1,700 square foot cafe.
square foot complex with five buildings that each rise three stories. Plans also call for a swimming pool, courtyard, salon, and restaurant.
PROJECT DETAILS
E
PROJECT DETAILS
6T H
H RE ET
$8.1 MIL M
EXPECTED COMPLETION
N/A
A E D IN
STR
EET
BUDGET EXPECTED COMPLETION
136,028 N/A
ET
SQUARE FOOTAGE
ST
BUDGET
30,000
RE
6T
ST
E
SQUARE FOOTAGE
MED
IN A
STR
EET
JAN, 2019
SECTION 6 APPENDIX_214
SALTILLO_24
A-25
Under Construction: Saltillo Plaza is a
of office space and more than eighteen
six-block, ten acre site which is being
acres of public open space with public art.
developed into a mixed-use, transit
The Red Line tracks that once bisected
oriented development. The project will
the site have now been relocated to the
feature appoximately 800 apartments,
south at Fourth Street.
with at least fifteen percent being deeply affordable. It will also house 110,000 square feet of retail, 120,000 square feet
PROJECT DETAILS E 4T H ET
EXPECTED COMPLETION
RE
BUDGET
~900,000
ST
SQUARE FOOTAGE
IH - 3
5
N/A 2019
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
A-26
RECONNECT AUSTIN_25
A-27
Proposed: I-35 is currently the most
water pollution, and provide an economic
congested, dangerous highway corridor
boost in the form of new, centrally
in Texas. “Reconnect Austin is a
located housing and businesses. Much
A-28
grassroots campaign to bury I-35 through of Reconnect Austin’s focus is directed Downtown Austin and reclaim this vital
towards encouraging TxDOT to consider
corridor as public space and developable the needs of Austin as they rebuild the land.” The campaign’s vision is to create
stretch of I-35 that extends from Holly St.
a new, civilized boulevard, reconnect East to 12th Street. Austin to downtown, mitigate air and PROJECT DETAILS
SQUARE FOOTAGE
N/A
BUDGET
N/A
EXPECTED COMPLETION
N/A
IH - 3
5
SECTION 6 APPENDIX_216
EMERGING PROJECTS _S > N: FROM SOUTHSHORE TO SXSW WALLER PARK PLACE_26 91 RED RIVER_27 THE TRAVIS (RESIDENTIAL, HOTEL)_28 FAIRFIELD INN AND SUITES HOTEL_29 70 RAINEY STREET RESIDENTIAL_30 48 EAST RESIDENTIAL_31 44 EAST AVENUE_32
Southshore to SXSW The district, is bounded on the west side by Congress Avenue, on the north by Third Street, on the east by the I-35 frontage road, and on the south by Riverside Drive. This area includes the Southshore Waterfront District, the Rainey Street Historic District, and the edge of the Southeast Quadrant. The diagram V4 shows the South Shore Waterfront
E
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
redevelopment as proposed. The Rainey Street Historic District is undergoing a significant redevelopment, with a number of mixed-use residential highrises on the way. The southern end of the Waller Creek redevelopment terminates at the edge of Lady Bird Lake.
V4
SECTION 6 APPENDIX_218
WALLER PARK PLACE_26
91 RED RIVER_27
A-29
A-30
Planned: The 1.4 million square foot
Planned: The 0.74-acre site will have
project, as envisioned, would have three
a 30-story mixed use tower. Project
towers with 300,000 square feet of
includes 328 apartments, three floors of
office, a 150 room hotel, 498 residential
office space, and ground level retail.
units, and 60,000 square feet of retail. Demolition was completed in February of 2016, and construction is currently obtaining entitlements.
PROJECT DETAILS
SQUARE FOOTAGE
PROJECT DETAILS
1.5 MIL
N/A
EXPECTED COMPLETION
N/A
EZ
EZ
AV
AV
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
CH
BUDGET
EET
R
N/A
STR
IT Y
SA
SQUARE FOOTAGE
T R IN
CE
CH
TBD
R
EXPECTED COMPLETION
SA
$1B
IT
EET
CE
BUDGET
T R IN
R Y ST
THE TRAVIS (RESIDENTIAL, HOTEL)_28
FAIRFIELD INN AND SUITES HOTEL _29
A-31
Planned: The applicant is proposing
Planned: the 0.3 acre site will have a 107-
two towers with parking and associated
room hotel.
improvements. The 2.29-acre site will have multifamily residential units and a hotel in two towers.
PROJECT DETAILS
PROJECT DETAILS
N/A
EXPECTED COMPLETION
N/A
IT Y
STR
EET
CH
BUDGET
T R IN
R
N/A
SA
N/A
SQUARE FOOTAGE
CE
EXPECTED COMPLETION
EZ
EZ
AV
AV
CH
N/A
IT
R
BUDGET
T R IN
SA
N/A
ET
CE
SQUARE FOOTAGE
RE Y ST
SECTION 6 APPENDIX_220
70 RAINEY STREET RESIDENTIAL_30
48 EAST RESIDENTIAL_31
A-32
A-33
Under Construction: New York developer
Planned: Austin developer Robert Lee is
Sackman Enterprises has started
planning a $100 million, thirty-one story
construction of a 200 unit, thirty-fivestory
condo tower that will be built around
condominium tower with a ground floor
the corner from SkyHouse Austin in the
restaurant in the Rainey Street district.
Rainey Street district.
PROJECT DETAILS
SQUARE FOOTAGE BUDGET
550,00
T R IN
IT
EET
SQUARE FOOTAGE
N/A
STR
IT Y
EET
~$150 MIL R EZ
EZ
AV
AV
CH
CH
N/A
SA
R
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
268,000
T R IN
CE
EXPECTED COMPLETION
SA
2019
BUDGET CE
EXPECTED COMPLETION
PROJECT DETAILS R Y ST
44 EAST AVENUE_32
WALLER CREEK _33
A-34
Planned: A fifty-one story high rise condo tower is planned for Rainey Street. This 545 foot tall project includes 330 condo units, 3,000 square feet of ground floor
A-35
Under Construction: The Waller
parks, all connected by a creek-side trail
Creek redevelopment, a public-private
system. This redevelopment will activate
partnership between the City and the
a north-south pedestrian corridor on the
Waller Creek Conservancy, includes the
east side of Downtown.
stretch of creek from Lady Bird Lake to
retail/restaurant space, and 500 parking
Waterloo Park at Fifteenth Steet. The
spots.
redevelopment will provide the city with two park improvements and three new
PROJECT DETAILS
PROJECT DETAILS
SQUARE FOOTAGE
N/A
BUDGET
N/A
SQUARE FOOTAGE BUDGET
N/A
T R IN
IT Y
STR
EET
$220M SA R
EZ
EZ
AV
AV
CH
CH
R
2025
CE
EXPECTED COMPLETION
SA
FALL 2022
IT
ET
CE
EXPECTED COMPLETION
T R IN
RE Y ST
SECTION 6 APPENDIX_222
B_REFERENCE CATALOG _BEST PRACTICES FOR CONVENTION CENTERS Documented within this appendix are
situation and expanding their site context to
twenty-seven convention center facilities
become part of a district. Many, if not most,
located in cities across North America.
urban convention centers include ground-
They range from modestly sized facilities
floor space dedicated to a combination of
in secondary markets to extensive
civic, public, and retail use that coordinate
facilities in major cities, and establish
with the convention center and provide
a comparative basis for evaluating the
an active street environment. Convention
organizational and programmatic make-
centers selected for comparison and
up of peer facilities. The selection of
evaluation of best practices represent
convention centers within this appendix is
three size categories of exhibit space: less
meant to provide a representative sample
than 250,000 square feet, 250,000-500,000
of conventions centers across the country. square feet, and more than 500,000 square In deciding which convention centers to
feet. The convention centers within this
include, attention was directed towards
appendix are organized from smallest
those in urban areas or cultural districts,
amount of exhibit space to largest amount
as well as those without contiguous exhibit of exhibit space. space. Many of the facilities in this appendix are
R
Note: The amount of total exhibition,
located along the edges of urban centers,
meeting, and ballroom space is detailed
separated from the urban fabric, or are
for each convention center, as well as the
adjacent to highways, as was Austin’s
overall building area. Overall building area
convention center when first constructed.
includes additional categories of space
As newer facilities begin to capitalize upon such as restrooms, service areas, and the urban destinations within which they are situated, this paradigm is changing. Facilities such as those located in Seattle, Cleveland, and Charlotte are challenging the status quo by adapting to their urban
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
prefunction areas.
BRANSON CONVENTION CENTER
WASHINGTON STATE CONVENTION CENTER
_BRANSON, MISSOUR IRVING CONVENTION CENTER AT LAS COLINAS
_SEATTLE, WASHINGTON CLEVELAND CONVENTION CENTER
_IRVING, TEXAS MONTEREY CONFERENCE CENTER
_GRAPEVINE, TEXAS VANCOUVER CONVENTION CENTER
OREGON CONVENTION CENTER
_PALM SPRING, CALIFORNIA RALEIGH CONVENTION CENTER _RALEIGH, NORTH CAROLINA
_LONG BEACH, CALIFORNIA METRO TORONTO CONVENTION CENTRE
_PORTLAND, OREGON CHARLOTTE CONVENTION CENTER _MONTEREY, CALIFORNIA PHOENIX CONVENTION CENTER
_ST LOUIS, MISSOURI MIAMI BEACH CONVENTION CENTER _MIAMI BEACH, FLORIDA HENRY B GONZALEZ CONVENTION CENTER
_PHOENIX, ARIZONA MYRTLE BEACH CONVENTION CENTER _MYRTLE BEACH, SOUTH CAROLINA NASHVILLE MUSIC CITY CENTER _NASHVILLE, TENNESSEE
_SAN DIEGO, CALIFORNIA PENNSYVANIA CONVENTION CENTER
_ONTARIO, TORONTO AMERICA’S CENTER CONVENTION COMPLEX
_VANCOUVER, BRITISH COLUMBIA PALM SPRING CONVENTION CENTER
SAN DIEGO CONVENTION CENTER
_CLEVELAND, OHIO
_MONTEREY, CALIFORNIA GAYLORD TEXAN CONVENTION CENTER
LONG BEACH CIVIC CENTER
_SAN ANTONIO, TEXAS SALT PALACE CONVENTION CENTER _SALT LAKE CITY, UTAH
_PHILADELPHIA, PENNSYLVANIA MOSCONE CENTER _SAN FRANCISCO, CALIFORNIA LOS ANGELES CONVENTION CENTER _LOS ANGELES, CALIFORNIA GEORGE R BROWN CONVENTION CENTER _HOUSTON, TEXAS KAY BAILEY HUTCHISON CONVENTION CENTER _DALLAS, TEXAS
DENVER CONVENTION CENTER _DENVER, COLORADO
SECTION 6 APPENDIX_224
BRANSON CONVENTION CENTER
_BRANSON, MISSOURI
IRVING CONVENTION CENTER AT LAS COLINAS
_IRVING, TEXAS
A-36
A-37
Located on the edge of downtown Branson, the north, the site features a small green
The Irving Convention Center is located
While it does not adapt itself to an
Missouri, the Branson Convention Center
space with wider sidewalks. To the east,
two miles outside of the center of Irving,
urban setting, it is part of a growing
(BCC) features meeting space, and one
the BCC is bounded by a rail line which
Texas, and surrounded by undeveloped
entertainment and business district.
exhibit hall attached to a ballroom. BCC
separates it from the rest of the city. It is
land on three of its sides, with the
The center is also located along a DART
does not adapt itself well to an urban
part of a larger cultural district, which
Northwest Highway bounding its fourth.
stop.
setting. It is bounded on the south side by
includes small museums, a flea market,
It has two column free exhibit halls on its
a large parking lot, and on the west by a
and several restaurants within walking
ground floor level.
two lane road which offers little in the way
distance along the White River.
of the urban pedestrian experience. To SIZE OF EACH SPACE
SIZE OF EACH SPACE
EXHIBIT SPACE
47,000
EXHIBIT SPACE
49,000
MEETING SPACE
11,100
MEETING SPACE
11,000
BALLROOM
22,700
BALLROOM
26,000
OVERALL CC BUILDING AREA
220,000
OVERALL CC BUILDING AREA
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
275,000
MONTEREY CONVENTION CENTER
_MONTEREY, CALIFORNIA
GAYLORD TEXAN CONVENTION CENTER
A-38
The Monterey Convention Center (MCC) is
attractions. The MCC features multiple
_GRAPEVINE, TEXAS
A-39
The Gaylord Texan Convention Center
a part of any larger cultural district, and
situated in the heart of Monterey California, discontiguous ballrooms, all of which are
is located on 150 acres on the edge of
does not adapt itself to an urban setting.
surrounded by a single-family residential
column free but located on separate levels
Grapevine, Texas. The site is bounded
This convention center is meant to be a
neighborhood, Brandman University, and
of the building. The building blends in
on its northern/eastern sides by a
destination retreat. The exhibition space
within walking distance of the Municipal
nicely with its urban surroundings, with a
waterfront view of Grapevine Lake, and
here is contiguous but interrupted by a
on its southern/western sides by a single
grid of columns spaced approximately
Wharf, where event-goers can choose from large public plaza in front of the entrance, a variety of restaurants, retail, and local
and wide sidewalks on the street frontages. family residential neighborhood. It is not
SIZE OF EACH SPACE
SIZE OF EACH SPACE
EXHIBIT SPACE
20,000
EXHIBIT SPACE
179,500
MEETING SPACE
50,000
MEETING SPACE
60,000
BALLROOM
41,000
BALLROOM
OVERALL CC BUILDING AREA
forty feet apart.
N/A
OVERALL CC BUILDING AREA
116,000 493,000 SECTION 6 APPENDIX_226
PALM SPRINGS CONVENTION CENTER VANCOUVER CONVENTION CENTRE _VANCOUVER, BRITISH COLUMBIA _PALM SPRINGS, CALIFORNIA
A-40
A-41
Vancouver’s new Convention Centre
transportation hub. To solve a difference in The Palm Springs Convention Center
in the surrounding area. Many of the lots
is a valuable example of the growing
elevation across the site, circulation is split (PSCC) is a resort-style convention center
that are not residential are either parking
desirability of flexible non-exhibit spaces,
into different levels affecting service and
multiple levels, and sustainability. These
location of spaces. There are two buildings It integrates itself into its surroundings
spaces are used for local community
as part of the complex, an east and a west
well, offering generous pedestrian
free exhibit spaces with an associated
events just as they can be used for
building.
sidewalks and shade trees.
array of ballrooms on the same level.
surrounded by suburban levels of density.
convention events. The Centre runs
The PSCC is not a part of any larger
adjacent to a public waterfront trail and is
cultural district, as there are few amenities
within walking distance to the Waterfront SIZE OF EACH SPACE
SIZE OF EACH SPACE
EXHIBIT SPACE
316,000
EXHIBIT SPACE
92,000
MEETING SPACE
84,000
MEETING SPACE
15,800
BALLROOM
69,300
BALLROOM
20,000
OVERALL CC BUILDING AREA
2,120,000
OVERALL CC BUILDING AREA
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
261,000
lots or undeveloped land. The PSCC features five large, contiguous, column-
RALEIGH CONVENTION CENTER
_RALEIGH, NORTH CAROLINA
WASHINGTON STATE CONVENTION CENTRE _SEATTLE, WASHINGTON
A-42
A-43
The Raleigh Convention Center (RCC) is
restaurants, bars, and art galleries. The
The Washington State Convention Center
located in the heart of downtown Raleigh,
RCC contains three contiguous, column
(WSCC) is located in the heart of downtown markets in the United States. The WSCC
North Carolina. The convention center is
free exhibit halls.
Seattle. The convention center is apart of
features four exhibition halls, split into two
surrounded by midrise office, residential,
a larger cultural district, which includes
contiguous groupings.
and hotel and is within walking distance to
shops, theaters, hotels, and a variety of
a couple of local parks. The surrounding
dining options. It is also within walking
cultural district features a number of
distance of Pike Place Market, one of the
SIZE OF EACH SPACE
SIZE OF EACH SPACE
EXHIBIT SPACE
150,000
EXHIBIT SPACE
205,000
MEETING SPACE
29,000
MEETING SPACE
57,000
BALLROOM
32,000
BALLROOM
39,732
OVERALL CC BUILDING AREA
oldest continuously operated farmers’
500,000
OVERALL CC BUILDING AREA
414,722 SECTION 6 APPENDIX_228
HUNTINGTON CONVENTION CENTER OF CLEVELAND OREGON CONVENTION CENTER _CLEVELAND, OHIO
_PORTLAND, OREGON
A-44
Cleveland’s 2013 redevelopment of the
Additional program located around the
A-45
The Oregon Convention Center (OCC) is
options for eating or entertainment in the
Huntington Convention Center strategically edges of the park in a series of connected
located just across the Willamette River
area are sparse. The OCC is accessible via
fits within the historic Daniel Burnham
buildings fit within the massing of the
from downtown Portland, in a low-density
sidewalks on three of its four sides. The
designed Group Plan District. In so doing,
existing buildings. The exhibition halls are commercial area called the Lloyd District.
fourth side, is a dedicated service entryway
it expands the original public park, which
connected to the adjacent Hilton hotel and Similar to the Austin Convention Center,
fronting Highway 5 and is not particularly
is the centerpiece of the project by locating a pre-existing large fixed seat auditorium.
the OCC’s proximity to a river situates it
pedestrian friendly. The OCC offers 255,000
the bulk of the new facility underground.
The exhibition halls are not clear span due within walking distance of an important
square feet of contiguous, column-free
The facility extends under the street
to the required 20-30 foot ceiling heights
cultural and recreational asset. However,
exhibit space, with fifty-two meeting rooms
so as not to interrupt the urban grid.
within much of the facility.
unlike the Austin Convention Center,
and two grand ballrooms.
SIZE OF EACH SPACE
SIZE OF EACH SPACE
EXHIBIT SPACE
225,000
EXHIBIT SPACE
255,000
MEETING SPACE
53,600
MEETING SPACE
53,000
BALLROOM
43,200
BALLROOM
59,400
OVERALL CC BUILDING AREA
410,000
OVERALL CC BUILDING AREA
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
1,000,000
CHARLOTTE CONVENTION CENTER _CHARLOTTE, NORTH CAROLINA
PHOENIX CONVENTION CENTER
_PHOENIX, ARIZONA
A-46
A-47
Like Austin, Charlotte’s downtown is
interior passage from the parking structure The Phoenix Convention Center (PCC)
growing and now has a close relationship
to adjacent attractions. Entrances are
is located in the heart of the Downtown.
approximately 312,500 square feet of
to the convention center. Originally built
designed to face the termination of
The area surrounding the PCC is similar
contiguous exhibition space, while the top
in 1995, the remodel engages the city
vehicular streets and bring visitors into the to the blocks consists of office buildings,
level provides another 190,000 square feet.
streets and is open to the public. An
food court central to exhibition hall access. hotels, restaurants/bars, and a small
The exhibit halls are not column free. The
exhibition space. The bottom level features
internal food court attracts the people
segment of residential program. The PCC
second, smaller building features meeting
who work downtown and serves as an
is split between two separate buildings.
rooms, an Executive Conference Center,
The largest of the two features four levels, and a ballroom on its top floor. with the top and bottom levels dedicated to SIZE OF EACH SPACE
SIZE OF EACH SPACE
EXHIBIT SPACE
280,000
EXHIBIT SPACE
312,500
MEETING SPACE
112,000
MEETING SPACE
213,700
BALLROOM OVERALL CC BUILDING AREA
75,000 1,300,000
BALLROOM OVERALL CC BUILDING AREA
46,000 900,000 SECTION 6 APPENDIX_230
MYRTLE BEACH CONVENTION CENTER MUSIC CITY CENTER _MYRTLE BEACH, SOUTH CAROLINA
_NASHVILLE, TENNESSEE
A-48
A-49
The Myrtle Beach Convention Center
accessible by pedestrians, because North
Nashville is a town known for music and
a new relationship to the community.
(MBCC) is located in Myrtle Beach, South
Kings Highway falls in between the two.
culture. The convention center recognizes
In the single month of June, Music
Carolina. It is within amongst a suburban
On the other side of the highway, there
it’s greatest attraction was the city of
City Center generated $74.9 million in
neighborhood and does not respond to any are also a number of restaurants, cafes
Nashville’s special culture. In 2006,
economic impact for the city Within five
urban conditions. It is located just over a
and retail shopping options. The MBCC
Nashville built an entirely new downtown
years of opening, the MCC reports $1.8
quarter of a mile from the beach, but this
features 108,000 square feet of contiguous, convention center large enough and
cultural and recreational asset is not easily column free exhibit space.
designed to attract 75% of the convention
1000 jobs to the city, internal revenue that
center market. In 2013, the building was
greatly exceeds predictions, and has been
opened in a big local festival, emphasizing
reporting monthly profits.
SIZE OF EACH SPACE
EXHIBIT SPACE MEETING SPACE BALLROOM OVERALL CC BUILDING AREA
SIZE OF EACH SPACE
108,000 8,000 17,000 250,000
Billion in direct economic impact, adding
EXHIBIT SPACE
353,000
MEETING SPACE
82,000
BALLROOM
75,400
OVERALL CC BUILDING AREA
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
2,100,000
LONG BEACH CIVIC CENTER
_LONG BEACH, CALIFORNIA
METRO TORONTO CONVENTION CENTRE
_ONTARIO, TORONTO
A-50
The Long Beach Convention Center is
thirty-four multi-purpose meeting rooms.
located in the heart of Long Beach’s
A-51
The Metro Toronto Convention Centre
center as a whole is serviced from the
(MTCC) is located in the Old Toronto
middle. A sky bridge connects the two
downtown waterfront, in the nation’s
The glass-domed Promenade Atrium, with
District. It is a highly urbanized area, with
buildings. Like the Austin Convention
second largest metro market. The Center
sweeping views of the scenic waterfront
a number of high-rise residential and
Center, the MTCC has a clear front and
features more than 400,000 square feet
and downtown skyline is used for pre-
office buildings in the vicinity. The MTCC
back of house. The MTCC has two clusters
of flexible exhibit and meeting space, two
functions, receptions and special events.
is separated into two distinct buildings,
of exhibit hall space. One cluster of exhibit
one on either side of the city’s main
halls features 250,000 square feet of
transportation line. This creates a unique
contiguous space, and the other, 182,000
servicing strategy, where the convention
square feet.
theaters, four ballrooms, an arena and
SIZE OF EACH SPACE
SIZE OF EACH SPACE
EXHIBIT SPACE
224,000
EXHIBIT SPACE
442,000
MEETING SPACE
41,200
MEETING SPACE
129,900
BALLROOM
86,000
BALLROOM
OVERALL CC BUILDING AREA
572,387
OVERALL CC BUILDING AREA
78,000 600,000 SECTION 6 APPENDIX_232
AMERICA’S CENTER CONVENTION COMPLEX
_ST LOUIS, MISSOURI
MIAMI BEACH CONVENTION CENTER
_MIAMI BEACH, FLORIDA
A-52
A-53
The America’s Center Convention Complex complex’s street frontage is treated as
The Miami Beach Convention Center
“back of house.” Consequently, entire sides
(ACCC) is located on the northern edge
“back of house” service entryways. The
(MBCC) is located in the middle of the
of the MBCC are off-limits to pedestrians,
of downtown St. Louis, Missouri. Like
ACCC features 502,000 square feet of
City Center District. The immediate
making it difficult to navigate around
the Austin Convention Center, the ACCC
contiguous exhibit space (with columns),
surroundings are a mixture of low-rise
the building. The MBCC, a single story
is bounded on one side by a highway,
part of which can be converted into an
apartments, hotels, restaurants, retail,
building, includes 491,651 square feet
and benefits from close proximity to
arena for concerts, speakers, and related
and entertainment, all within walking
of contiguous exhibit space surrounded
a river. Small portions of the ACCC
gatherings. There are also four distinct
distance. As is common with many of the
by meeting rooms, pre-function space,
provide acceptable accommodations
meeting facilities.
older convention centers, there is a clear
administrative offices, and service docks.
for pedestrians, but over 50% of the
distinction between “front of house” and
SIZE OF EACH SPACE
EXHIBIT SPACE MEETING SPACE BALLROOM OVERALL CC BUILDING AREA
SIZE OF EACH SPACE
502,000 _ 28,000 -
EXHIBIT SPACE
492,000
MEETING SPACE
125,900
BALLROOM
125,000
OVERALL CC BUILDING AREA
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
1,400,000
HENRY B. GONZALEZ CONVENTION CENTER _SAN ANTONIO, TEXAS
SALT PALACE CONVENTION CENTER
_SALT LAKE CITY, UTAH
A-54
A-55
San Antonio can be expected to have
The renovation and expansion included the
similar construction costs per square foot
integration of the latest technology and the (SPCC) is located on the northern edge
The Salt Palace Convention Center
as Austin. The 2016 expansion increased
flexibility for future technological updates.
the pedestrian experience. The loading dock area is similar to that of the current
of Downtown Salt Lake City, Utah.
Austin Convention Center; given that there
square footage by 20%. The renovation and Technology and digital connectedness is a
There hotels, shops, restaurants, and
is no possibility for street frontages in this
expansion included demolishing the west
entertainment options within walking
loading area, it creates a dead zone for
wing to make room for the development of but with rising efforts to match or exceed
distance. Tree-lined sidewalks wrap
pedestrians. The SPCC features 515,000
Hemisfair Park and a park connection to
it it will likely not remain a discernible
around the edges of the SPCC, and a
square feet of contiguous exhibit hall
San Antonio’s famous River Walk.
advantage.
couple of public pocket parks enhance
space.
hallmark of the Austin Convention Center,
SIZE OF EACH SPACE
SIZE OF EACH SPACE
EXHIBIT SPACE
497,000
EXHIBIT SPACE
515,000
MEETING SPACE
120,300
MEETING SPACE
164,000
BALLROOM OVERALL CC BUILDING AREA
94,300 1,600,000
BALLROOM OVERALL CC BUILDING AREA
45,400 679,000 SECTION 6 APPENDIX_234
BOSTON CONVENTION AND EXHIBITION CENTER THE COLORADO CONVENTION CENTER _BOSTON, MASSACHUSETTS
A-56
_DENVER, COLORADO
A-57
The Boston Convention and Exhibition
Street, providing visitors with easy public
The Colorado Convention Center (CCC) is
Center (BCEC) is located in the Seaport
transit access to the airport. The BCEC is
located on the southern edge of Downtown create pedestrian dead zones. Loading
District, less than a mile from the
notable for its efficiency more than it is
Denver, positioned within walking distance docks are integrated into the building via
Downtown Financial District. The Seaport
for its response to urban context. There
of a number of shops, restaurants, bars,
a ramp system that shuttles trucks up to
District is more industrial than it is
is little to no pedestrian access on three
and entertainment options. Unlike most
the third floor exhibit hall level. The CCC
urban, and the BCEC is surrounded by an
of the four sides of the BCEC. It features
of the other convention centers included
features 584,000 square feet of contiguous
abundance of undeveloped land, most of
516,000 square feet of column-free,
in this analysis, the CCC has pedestrian
exhibition hall, but this is not column-free
which is currently used for parking. The
contiguous exhibit space, with state of the
accessibility on all four sides. However,
space.
front of the BCEC opens onto Summers
art video technology.
large portions of these outer edges have
SIZE OF EACH SPACE
SIZE OF EACH SPACE
EXHIBIT SPACE
516,000
EXHIBIT SPACE
584,000
MEETING SPACE
152,000
MEETING SPACE
100,000
BALLROOM OVERALL CC BUILDING AREA
41,000 2,100,000
BALLROOM OVERALL CC BUILDING AREA
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
85,000 2,200,000
no retail/restaurant frontage, which can
SAN DIEGO CONVENTION CENTER
PENNSYLVANIA CONVENTION CENTER _SAN DIEGO, CALIFORNIA _PHILADELPHIA, PENNSYLVANIA
A-58
A-59
The San Diego Convention Center (SDCC) is there is a clear “front of house/back of
The Pennsylvania Convention Center
however, in this case the highway is
located on the southern edge of Downtown house” relationship between the SDCC
(PCC) is located on the north side of the
buried. Bridges at each block allow for
San Diego, California, with a waterfront
and its surroundings. The loading dock
Center City District. This area, along
easy access into the neighborhood of
view of the bay. The sides of the building
creates an especially uninviting pedestrian with neighboring Chinatown, is highly
Callowhill, just beyond. North 13th Street
that face Downtown are pedestrian friendly, experience on the side facing the San Diego urbanized and offers numerous options
cuts through the PCC, creating a dark
with large shade awnings extending over
Bay, arguably the SDCC’s second greatest
for shopping, and entertainment. Like
tunnel for vehicular access. The PCC
the sidewalks. However, there is no retail/
asset behind the Downtown District. The
the Austin Convention Center, the PCC
features 528,000 square feet of contiguous
restaurant frontage, creating dead zone
SDCC features 525,000 square feet of
is located a couple of blocks from a busy
exhibit space.
areas. Like the Austin Convention Center,
contiguous exhibit hall, with columns.
highway (the Vine Street Expressway),
SIZE OF EACH SPACE
SIZE OF EACH SPACE
EXHIBIT SPACE
525,000
EXHIBIT SPACE
679,000
MEETING SPACE
96,000
MEETING SPACE
204,000
BALLROOM
81,670
BALLROOM
OVERALL CC BUILDING AREA
2,600,000
OVERALL CC BUILDING AREA
87,400 2,600,000 SECTION 6 APPENDIX_236
MOSCONE CENTER
_SAN FRANCISCO, CALIFORNIA
LOS ANGELES CONVENTION CENTER
_LOS ANGELES, CALIFORNIA
A-60
A-61
The Moscone Center (MC) is located just
three distinct buildings via sky bridges
The Los Angeles Convention Center
highways have no pedestrian accessibility.
south of the Financial District in San
or underground levels. The location of
(LACC) is located southeast of Downtown
The LACC could benefit greatly from an
Francisco, California. The most recent
the center provides a close connection to
Los Angeles, and is bounded on the
active retail/restaurant scene on the
update and addition was completed in
downtown attractions and many public
southwestern side by highways, on the
ground level, in order to improve the
2017. All additions, renovations, and
transportation options such as Powell
northern side by Staples Center, and
pedestrian experience and prevent a
rebuilds after the original 1980’s center
Street Station, two blocks away. The exhibit eastern side by a low rise office and
aimed to preserve the existing block size
halls are underground and include multiple residential neighborhood. Two sides of the separate exhibition halls, one with 346,000
- two times that of Austin’s blocks - and
adjacent halls that connect in a column
LACC provide adequate sidewalk space for square feet and the other with 210,000
street right-of-ways by connecting the
free space spanning many city blocks.
pedestrians, however, the sides facing the
SIZE OF EACH SPACE
deadzone area. The LACC features two
SIZE OF EACH SPACE
EXHIBIT SPACE
504,000
EXHIBIT SPACE
720,000
MEETING SPACE
256,225
MEETING SPACE
147,000
BALLROOM OVERALL CC BUILDING AREA
92,700 2,000,000
BALLROOM OVERALL CC BUILDING AREA
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
740,520
square feet. There is no ballroom.
GEORGE R BROWN CONVENTION CENTER
_HOUSTON, TEXAS
KAY BAILEY HUTCHISON CONVENTION CENTER
_DALLAS, TEXAS
A-62
A-63
The George R. Brown Convention Center
friendly activities. The western facade
The Kay Bailey Hutchinson Convention
(GBCC) is located on the eastern edge of
of the GBCC is pedestrian friendly, with
Center (KBHCC) is located on the southern portions of the convention center, creating
Downtown Houston, Texas. There are a
shade awnings, outdoor eating areas, and
edge of Downtown Dallas, which is a
dark, unpleasant corridors. Furthermore,
number of hotels, restaurants, cafes, and
a number of pedestrian crossing points.
relatively low density area, despite its
there are limited options for dining and
sports arenas in the area. Many of the best Like the current Austin Convention Center,
proximity to the city’s center. Like many
entertainment within a walkable distance,
restaurants and bars, however, are located
of the convention centers from this era,
making the KBHCC highly dependent
on the other side of Highway 59. The GBCC achieving connectivity with the east side of
the KBHCC does little to integrate itself
on the automobile. The KBHCC features
fronts Discovery Green, a large urban park
town. The GBCC features 862,000 square
into the larger urban systems in the area.
724,000 square feet of contiguous
with concerts, concessions, and family
feet of exhibit space, with columns.
There is little in the way of pedestrian
exhibition space, with columns.
the GBCC represents a roadblock toward
SIZE OF EACH SPACE
SIZE OF EACH SPACE
EXHIBIT SPACE
862,000
EXHIBIT SPACE
MEETING SPACE
101,943
MEETING SPACE
98,900
BALLROOM
65,000
BALLROOM OVERALL CC BUILDING AREA
accessibility, roads pass underneath
94,316 1,800,000
OVERALL CC BUILDING AREA
1,000,000
2,000,000 SECTION 6 APPENDIX_238
C_ESTIMATING ECONOMIC IMPACT Note: This appendix was written by Dr. Greg Hallman and Dr. Jake Wegmann, to outline the research team’s methodology to estimating economic impact.
Methodology 1)
We assume that the incremental
economic impact to the City of Austin from the proposed convention center expansion comes from out-of-town visitors spending money in the Austin economy. When outof-town visitors attend convention center activities in Austin, they bring spending to the Austin economy from outside the Austin economy. We therefore view this as truly incremental spending brought to Austin as a result of the presence of the convention center. One of the goals of the proposed convention center expansion is to increase the size of conventions in Austin and therefore the overall number of out-of-town convention attendees. Our spreadsheet model is built to estimate
EE
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
incremental measures of economic impact that are associated with incremental out-of-town convention attendees created through the expansion of the convention center. Convention center activities that attract a local audience, e.g., consumer
events such as boat shows, or auto
data, along with attendance figures at
Austin economy, including direct hotel
shows,or home improvement shows,
peer convention centers in Nashville
and restaurant spending, and indirect or
re-arrange spending by Austin residents
and Denver. Future attendance is not
induced spending throughout the local
5) The first step in our economic
within the Austin economy, but do not
estimated by any kind of statistical model,
Austin economy. IMPLAN is a type of
impact calculation is estimating future
Estimating Model Inputs
provide the incremental economic impact of and the attendance range can be easily
economic model known as an input/output attendance at an expanded Austin
out-of-town convention attendees bringing
adjusted in the model. Using the provided
model. It accounts for the extent to which
convention center. We considered recent
new money into the local Austin economy.
range of attendance figures, the model
spending ripples between various sectors
historical attendance at the current
calculates convention center revenues
of a local or statewide economy, and
Austin Convention Center, the Music
and expenses and Net Operating Income
allows for estimates of job creation and tax City convention center in Nashville,
of operating the proposed expanded
(NOI), direct spending on hotel nights and
revenues that accrue as a result. Originally and the Colorado Convention Center
convention center across a range of
restaurant meals by out of town visitors,
developed in the mid 1970s by the United
in Denver, along with attendance
possible future convention attendance
and associated hotel and restaurant
States Forest Service in partnership with
and overnight figures contained in a
figures, representing a Base Case, an
tax revenue. We believe the range of
the Federal Emergency Management
2017 PricewaterhouseCoopers (PwC)
Upside Case, and a Downside Case. We
projected future attendance used in this
Agency (FEMA), IMPLAN was originally
Convention Center Report (the most
construct and use a basic Microsoft Excel
report–700,000 total annual attendees in
created to model the impacts of natural
recent available version of this industry
spreadsheet model to estimate future
the Base Case, 1,000,000 in the Upside
resource outputs on local economies. In
report). We also considered Visit Austin’s
economic impacts to the City of Austin
Case, and 550,000 in the Downside Case–
2)
We estimate the economic impact
the mid 1980s, IMPLAN was assumed by
Lost Business File, which contains a list
from potential increased convention center provides a reasonably wide view of the
the University of Minnesota and then later
of conventions that inquired about using
attendance, including hotel and restaurant
possible future economics of an expanded
spun off as a private company. Today, it is
the Austin Convention Center but decided
spending and associated city tax revenue,
convention center. Users of the model can
widely used by various public and private
to go to another convention center due to
convention center revenues and expenses,
easily estimate economic impacts for any
entities across the United States and is
space limitations at the Austin Convention
and associated private development and tax projected number of attendees by changing arguably the best-known economic impact Center, and/or an inability to hold larger revenue. 3)
the attendance and overnight figures on the model. Our usage of IMPLAN resulted in
conventions or multiple concurrent
model spreadsheet’s Assumptions tab.
smaller conventions.
Our basic Excel model runs off
a 1.59 multiplier computed for restaurant and hotel spending in Travis County. Travis
estimates of future convention attendees
4)
and overnight guests. We estimate
analysis, we use IMPLAN, a widely-used
attendance and overnight guests based
total economic impact calculator, to
on historical Austin Convention Center
estimate total economic impact to the
To complete the economic impact
County represents the closest available geographic match for the City of Austin.
SECTION 6 APPENDIX_240
6) We used the lost business file and
7) The current Austin Convention
“Large.” By this classification, the Music
in Section 5), we believe there is some
actual room nights to construct a “but
Center contains roughly 367,000 square
City Convention Center in Nashville, with
evidence that future conventions might be
for” room nights figure for 2017. Visit
feet of leasable space (~247,000 sq ft of
353,140 square feet of exhibit space, is
less reliant on very-large exhibits halls,
Austin keeps a record of all inquiries
exhibition space, 64,000 square feet of
in the middle of the “Medium” range,
and more interested in design schemes
from potential conventions and calculates
ballroom space, and 56,000 square feet
and the Colorado Convention Center in
that better incorporate less-spacious
the potential room nights for each piece
of meeting room space). The expansion
Denver, with 584,000 square feet of exhibit exhibit spaces and more mid-sized meeting
of lost business. For each piece of
options presented in the design section
space, as the lower end of the “Large”
rooms. For this reason, we have considered
feasible lost business in 2017 (i.e., the
of this report envision an expanded
range. In terms of design scenarios,
total leasable space when trying to
lost business could be accommodated
Austin Convention Center with between
Scenario 5.2 has only 154,000 square feet
estimate possible future attendance at an
in an expanded convention center), we
532,042 leasable square feet in the
of exhibit space, and would be considered
expanded Austin Convention Center using
recorded the number of lost room nights,
smallest expansion option (Scenario 4.2),
“Medium-Small”, Scenarios 3, 4.1, and
comparable data from other convention
and we summed across all lost events
and 911,220 square feet in the largest
4.2 with exhibit space of 466,808, 399,000,
centers.
and lost room nights for 2017. Our 2017
expansion option (Scenario 5.1). Music
and 282,080, respectively, would be
lost business analysis suggests that room
City Center in Nashville contains 504,740
considered “Medium”, and Scenario 5.1,
9) Based on our comparable convention
nights at an expanded Austin Convention
square feet of leasable space and has
with 507,000 square feet of exhibit space
center data from Nashville and Denver,
Center could have been 730,486, which is
average attendance of 637,938 over the
would be considered “Large” (although
along with historical Austin Convention
462,575 greater than the
last three years, 2015-2017. The Colorado
just barely). The PwC report shows
Center attendance and room night figures,
actual convention center attendee room
Convention Center in Denver contains
Medium-sized convention centers had
and the proposed space available across
nights in 2017 of 267,911.Admittedly our
769,000 square feet of leasable space and
average room nights of 190,000 per year
the design alternatives, we project a Base
analysis provides somewhat of a best
has averaged 955,702 in annual attendance and average annual attendance of 505,900, Case attendance for an expanded Austin
case for attendance and room nights at an over the last three years, 2015-2017.
while Large-sized convention centers
Convention Center of 700,000, with an
expanded Austin Convention Center, but
had average room nights of 805,000
Upside Case projection of 1,000,000 and
the scale of the figures suggests that there 8) The PwC convention center report
and average attendance of 1,315,800,
a Downside Case attendance projection
is additional business and room nights
sizes convention centers based on their
suggesting that larger convention centers
of 550,000. Our base-case projection of
available to the Austin Convention Center
exhibition space and classifies convention
generate significantly more room nights
700,000 is roughly 40% more than the
if it expands to accommodate larger
centers with between 200,000 and
per attendee than smaller centers.
convention center’s current average
conventions.
499,000 square feet of exhibition space
Although PwC sizes convention centers on attendance of 500,000 and is in line with
as “Medium,” and centers with 500,000
exhibition space only, based on our case
the additional space (roughly 40%) in our
or more square feet of exhibit space as
study research of recent state-of-the-art
smaller expansion scenarios. Our Upside
convention center expansions (detailed FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Case attendance figure of 1,000,000
with any design scenario. However, we do
room nights in the Upside Case from the
hotel spending is calculated using the
is double the current average annual
not believe the Downside Case attendance
projected 1,000,000 attendees. Note that
current Austin Hotel Occupancy Tax Rate
attendance, but only slightly more than the
projection is likely, for reasons provided
while the average room nights/attendance of 9%, while taxes on restaurant spending
steady annual attendance at the Colorado
later in this report.
ratio for the Austin Convention Center
are calculated using the 2% local share of
over the last three years is 57%, the room
the 8.25% sales tax.
Convention Center in Denver of roughly 950,000. Our Downside Case projection
11) As previously discussed, out-of-
night/attendance ratio was 61% in 2015
of 550,000 attendees is only slightly more
town convention attendees are the
and 62% in 2016. In our Downside Case we 13) Direct spending on hotels and
(+10%) than the current average attendance true source of incremental spending
used a room night to attendance ratio of
restaurants by out-of-town convention
of 500,000, and essentially equal to the
and benefit to the Austin economy. We
49%, which is the room night/attendance
attendees leads to induced and indirect
actual attendance in 2017 of 546,385. This
estimate convention center room nights
ratio for the Austin Convention Center in
spending throughout the economy. Hotels
Downside Case projection represents a very for out-of-town attendees based on the
the most recent year, 2017, to produce an
and restaurants collect revenue from
bad outcome in which the convention center current convention center’s historical
estimated 269,684 total room nights from
guests and diners and use that revenue
is expanded but no significant additional
attendance and room nights, along with
a projected total attendance of 550,000.
to pay wages to hotel and restaurant
attendance materializes.
room night data presented in the PwC
workers (induced spending) and to buy
convention center report. The average
12) We calculate direct spending by
supplies and services from local suppliers
10) We use this same attendance range,
room nights/attendance ratio for the
out-of-town attendees as the sum of
and businesses (indirect spending). We
550,000 to 1,000,000, across all the design
Austin Convention Center, calculated over
hotel spending and restaurant spending,
use IMPLAN to estimate total economic
scenarios with the idea that the higher
the years 2015-2017, is 57% (average
assuming that every overnight guest
impact including both the direct hotel and
end of the attendance range (closer to
room nights of 285,050 and average
sleeps and eats. We assume an average
restaurant spending estimated by our
the Upside Case projection of 1,000,000
attendance of 500,648). We use this 57%
hotel rate of $175 per night, estimated
Excel model, and indirect and induced
attendance) is more relevant to the larger
room nights/attendance ratio in our Base
by applying a 20% discount to the Austin-
spending driven by the direct spending.
design scenarios, and the Base Case
Case projection to produce an estimated
CBD (Central Business District) ADR of
Specifically, we use the multiplier of
(closer to Base Case projection of 700,000
total 398,554 room nights in the Base
$220, and an average restaurant spend
1.59, computed for hotel and restaurant
attendance) is more applicable to the
Case from a projected 700,000 annual
of $50 per meal (both of these figures are
spending in Travis County, to convert the
smaller design scenarios. The Downside
attendees. The PwC report shows a higher
easily changeable on the Assumptions
direct spending by out-of-town convention
Case with attendance of 550,000 gives a
percentage of room nights per attendee for page of the model), and we assume one
view of the economics of a bad outcome in
larger conventions (61%), and we used this restaurant meal for each room night (i.e.,
terms of additional attendance in the new
61% ratio in our Upside Case projection
# restaurant meals = # room nights). The
space, and could, unfortunately, happen
to produce an estimated total 611,795
associated City of Austin tax revenue from
attendees to total economic impact.
SECTION 6 APPENDIX_242
14) Finally, we consider the value of
additional (incremental) 113,872 out-of-
property taxes on projected private
town convention attendees and hotel room Case calculations assuming 1,000,000
from Downside Case to Upside Case, the
development across each design scenario.
nights and restaurant meals, our model
attendees with an incremental economic
best we can do is consider the relevant
We estimate the value of the private
estimates an additional (incremental)
impact of $109 million per year are likely
evidence available today.
development associated with each design
economic impact to the Austin economy
more relevant. Scenario 3, with about
scenario using Travis County Appraisal
of $40 million per year. The Upside Case,
double (1.98 times) the current space,
19) Convention centers, along with hotels
District (TCAD) figures on comparable
assuming a total of 1,000,000 attendees,
might produce economic results roughly
and restaurants, are all parts of a city’s
buildings, and estimate property taxes
of whom 500,000 are incremental, with
between the Base Case and Upside Case.
overall hospitality industry. Convention
received by the City of Austin on associated over 300,000 incremental hotel room
The Downside Case presents an awful
centers and hotels are both in the business
private development using Austin’s current nights, shows total economic impact
possibility in terms of attendance for all
of attracting and entertaining and serving
share of the property tax rate, which is
to the Austin economy of $109 million
the design alternatives. Although nothing
out-of-town visitors to a city. While
0.4403% of the total 2.1965%.
annually. In the Downside Case, where the is guaranteed, we believe there are
Results of Economic Modeling Analysis
950,000–the results from the Upside
reasons that an expanded center will have conventions that are predominantly local in
in only a small increase in attendance of
a strong chance of increasing attendance
nature, a goal of most convention centers
50,000 per year and an additional 24,517
with an expanded and updated facility.
is to attract conventions that will bring out-
a little less than $9 million per year.
economic impact calculations can be found at the end of this written appendix.
convention centers also host consumer
new convention center expansion results
15) Financial Summary Sheets presenting room nights, the total economic impact is the calculations and results of our various
proposed convention center expansion,
17) Scenarios 4.1 and 4.2 include total leasable space roughly 1.5 times and 1.75
16) The Total Economic Impact
times greater than the current space,
calculations show that in the Base Case,
and the Base Case numbers with an
where the expanded convention center
expected 700,000 attendees are probably
brings in an additional, or incremental,
most relevant, with an economic impact
200,000 attendees a year and an additional of $40 million per year. For the larger 113,872 room nights, the total incremental Scenarios (5.1 and 5.2) with leasable economic impact is a little more than $40
space of roughly 900,000 square feet–
million per year. That is, by expanding
larger than the Colorado Convention
the convention center and bringing in an
Center with a steady attendance of
of-town guests and incremental spending
Austin’s Hospitality Market as an Indicator of Convention Center Performance 18) Predicting the economics of stabilized convention center operations for a proposed future expansion that is still years in the future is difficult, at best. There is no model in economics or statistics that correctly and consistently predicts future economic performance many years in the future. In considering the range of possible outcomes for a
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
to the city. Hotel owners earn room revenue and related hotel-spending (food and beverage) from overnight convention attendees, local restaurants enjoy additional customers, hotel and restaurant employees and service providers earn wages and income, and cities enjoy economic benefits from numerous forms of local spending by out-of-town visitors. 20) A hotel investment, either a purchase of an existing hotel or development and construction of a new one, can be thought
of as a bet on a city’s ability to attract out-
not believe in Austin’s ability to continue to market is performing well and has been
of-town visitors. Likewise, the proposed
attract out-of-town visitors.
Austin Convention Center expansion is in essence a bet on Austin’s ability to
21) To determine the health of the Austin
attract out-of-town visitors to attend
hospitality market and to gauge private
measure of supply for “room nights” over
attracting significant new investment in
a period. Example: 100 rooms in subject
new hotel supply (hotel development).
hotel x 31 days in the month = Room Supply of 3,100 for the month.
23) The basic metrics presented in the
conventions in Austin, or more specifically, capital market sentiment regarding hotel
STR report to measure hotel performance, e) Demand – The number of rooms sold in
to attract conventions that bring in out-
investment in Austin, we considered (1)
along with STR’s definitions, are:
a specified time period.
of-town visitors to Austin. One way to
recent historical and current performance
judge the economic attractiveness and
of the hotel industry in the Austin
a) Occupancy – Percentage of available
We present charts from the STR Austin -
potential success or viability of Austin’s
Central Business District (CBD), and (2)
rooms sold during a specified time period. CBD report, along with brief commentary,
proposed investment in a convention center private capital market investment and
Occupancy is calculated by dividing the
for each of these metrics in the following
expansion is to look at the hotel industry
development in the Austin hotel market. In number of rooms sold by rooms available. paragraphs.
here in Austin, both in terms of recent
addition to studying the hospitality market
performance and in terms of investment
in Austin, we also considered demographic Available]
and new development. Hotel investments
and economic statistics for Austin at the
[Occupancy = Rooms Sold / Rooms
are expensive bets typically made by private time of the original convention center
b) ADR – Average Daily Rate – A measure
investors, and these investors typically
design and construction and Austin today,
of the average rate paid for rooms sold,
have many cities to choose from. If private
with an emphasis on Austin’s tech-city
calculated by dividing room revenue by
capital is investing in hotel assets in Austin character and the agglomeration benefits
rooms sold. [ADR = Room Revenue /
either through purchase or development,
related to continued growth enjoyed by tech Rooms Sold]
that is a sign that private capital believes
cities.
Austin, and, basically, in Austin’s ability to continue to attract out-of-town visitors. If private capital is not investing in hotels in Austin, and no new development is taking place and investors are divesting hotel assets at lower and lower prices, that would be a sign that private capital does
c) RevPAR – Revenue per Available Room – Total room revenue divided by the total
in the future of the hospitality business in
Austin Hotel Market Performance 22) We purchased a “Trend Report” on the Austin CBD from Smith Travel Research (STR), one of the leading data providers for hotel industry performance statistics. The STR report shows that Austin’s hotel
number of available rooms. [RevPAR = Room Revenue / Rooms Available] d) Supply (Rooms Available) – Number of rooms in a hotel or set of hotels; may also be multiplied by the number of days in a specified time period to produce a SECTION 6 APPENDIX_244
Austin CBD Hotels - Occupancy % (ttmavg) 1988 - 2018 : STR data 24) Occupancy in Austin CBD hotels
90.0
has been very strong over the past 10 years, with most time periods showing
80.0
healthy market occupancy above 70%, and occupancy approaching 80% in 2014 and
70.0
2015 just prior to the opening of the JW Marriott and the Fairmont. This consistent
60.0
occupancy performance is impressive given the strong increase in supply the Austin CBD market has experienced in recent years.
50.0
40.0
30.0
20.0
10.0
Jan 88 Aug 88 Mar 89 Oct 89 May 90 Dec 90 Jul 91 Feb 92 Sep 92 Apr 93 Nov 93 Jun 94 Jan 95 Aug 95 Mar 96 Oct 96 May 97 Dec 97 Jul 98 Feb 99 Sep 99 Apr 00 Nov 00 Jun 01 Jan 02 Aug 02 Mar 03 Oct 03 May 04 Dec 04 Jul 05 Feb 06 Sep 06 Apr 07 Nov 07 Jun 08 Jan 09 Aug 09 Mar 10 Oct 10 May 11 Dec 11 Jul 12 Feb 13 Sep 13 Apr 14 Nov 14 Jun 15 Jan 16 Aug 16 Mar 17 Oct 17 May 18
0.0
Occupancy This Year
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Austin CBD hotels - Average Daily Rate $/room (ADR) (ttmavg) 1988 - 2018 : STR data 250.00
25) Average Daily Rate (ADR) – The average daily rate for rooms in the Austin CBD has increased by roughly 50% in the years since the financial crisis ended,
200.00
with 2009/10 ADR of roughly $150 and current market ADR of roughly $225. The current pause in the trajectory of ADR is in large part due to the large supply
150.00
deliveries the market has seen recently. Overall, however, the chart shows that the favorable occupancy rates in the Austin CBD hotel market have not been driven by
100.00
low or decreasing room prices. This is an indicator of basic health in the market in recent years. 50.00
Jan 88 Aug 88 Mar 89 Oct 89 May 90 Dec 90 Jul 91 Feb 92 Sep 92 Apr 93 Nov 93 Jun 94 Jan 95 Aug 95 Mar 96 Oct 96 May 97 Dec 97 Jul 98 Feb 99 Sep 99 Apr 00 Nov 00 Jun 01 Jan 02 Aug 02 Mar 03 Oct 03 May 04 Dec 04 Jul 05 Feb 06 Sep 06 Apr 07 Nov 07 Jun 08 Jan 09 Aug 09 Mar 10 Oct 10 May 11 Dec 11 Jul 12 Feb 13 Sep 13 Apr 14 Nov 14 Jun 15 Jan 16 Aug 16 Mar 17 Oct 17 May 18
0.00
ADR This Year
SECTION 6 APPENDIX_246
Austin CBD hotels - RevPar $/room (ttmavag) 1988 - 2018 : STR data 26) Revenue Per Available Room – RevPAR differs from ADR in the denominator; ADR is room revenue divided by rooms sold, and RevPAR is room revenue divided by the number of rooms in the market available. RevPAR takes overall supply– sold or not–into account while ADR only uses rooms sold and ignores any supply of unsold rooms, so RevPAR is lower than ADR whenever occupancy is less than 100% (i.e., there are unsold rooms in the market). In overbuilt markets with excess supply it is possible to see acceptable ADR performance but bad RevPAR. That is not the case in the Austin CBD market. The RevPAR chart shows growth at virtually the
200.00
180.00
160.00
140.00
120.00
100.00
80.00
60.00
40.00
same rate as the ADR chart (~75% increase from 2010 to today), evidence of very strong
20.00
growth in overall Austin CBD hotel room Austin CBD increased dramatically. Recent very large supply additions including
0.00
Jan 88 Aug 88 Mar 89 Oct 89 May 90 Dec 90 Jul 91 Feb 92 Sep 92 Apr 93 Nov 93 Jun 94 Jan 95 Aug 95 Mar 96 Oct 96 May 97 Dec 97 Jul 98 Feb 99 Sep 99 Apr 00 Nov 00 Jun 01 Jan 02 Aug 02 Mar 03 Oct 03 May 04 Dec 04 Jul 05 Feb 06 Sep 06 Apr 07 Nov 07 Jun 08 Jan 09 Aug 09 Mar 10 Oct 10 May 11 Dec 11 Jul 12 Feb 13 Sep 13 Apr 14 Nov 14 Jun 15 Jan 16 Aug 16 Mar 17 Oct 17 May 18
revenue even as the supply of rooms in the
the JW Marriott and the Fairmont have flattened and slightly decreased RevPAR over the last couple of years.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
RevPar This Year
Austin CBD hotels - Total Rooms 1988 - 2018 : STR data
27) Supply (hotel rooms in the Austin CBD) – For the first ten years of the chart,
12,000
1987-1997, the Austin CBD market contained just under 4,000 rooms. Over the next 10 years, up through 2007, the Austin
10,000
CBD market increased by 50% to a room count of roughly 6,000 rooms. Since 2010, the growth has been even stronger, and
8,000
the current Austin CBD hotel market contains a little over 10,000 rooms (STR shows a total Austin CBD room count of 10,660), a
6,000
67% increase from the 6,000-room market in 2008. This strong growth in room supply represents hundreds of millions of dollars
4,000
in hotel development investment by private market hotel developers and investors in the Austin CBD market.
2,000
Jan 87 Sep 87 Mar 88 Nov 88 May 89 Nov YTD 1989 Jul 90 Jan 91 Sep 91 Mar 92 Nov 92 May 93 Nov YTD 1993 Jul 94 Jan 95 Sep 95 Mar 96 Nov 96 May 97 Nov YTD 1997 Jul 98 Jan 99 Sep 99 Mar 00 Nov 00 May 01 Nov YTD 2001 Jul 02 Jan 03 Sep 03 Mar 04 Nov 04 May 05 Nov YTD 2005 Jul 06 Jan 07 Sep 07 Mar 08 Nov 08 May 09 Nov YTD 2009 Jul 10 Jan 11 Sep 11 Mar 12 Nov 12 May 13 Nov YTD 2013 Jul 14 Jan 15 Sep 15 Mar 16 Nov 16 May 17 Nov YTD 2017 Jul 18
0
Census & Sample % Census Rooms
SECTION 6 APPENDIX_248
Austin CBD hotels - Supply this year (rooms x 365 days) (ttmavg) 1988 - 2018 : STR data 28) Supply – rooms available multiplied by
4,000,000
days available – In addition to presenting basic room counts as a measure of
3,500,000
market supply, STR also provides data on room supply in terms of roomsXdays available for the past year, presented in
3,000,000
a twelve-month moving average chart. Similar to the previous supply chart with
2,500,000
simply rooms available, the supply chart for the Austin CBD displaying supply as roomsXdays also shows strong growth,
2,000,000
with very steep growth around 2015 and 2016 as the JW Marriott and the Fairmont
1,500,000
came online in the Austin CBD. 1,000,000
500,000
Jan 88 Aug 88 Mar 89 Oct 89 May 90 Dec 90 Jul 91 Feb 92 Sep 92 Apr 93 Nov 93 Jun 94 Jan 95 Aug 95 Mar 96 Oct 96 May 97 Dec 97 Jul 98 Feb 99 Sep 99 Apr 00 Nov 00 Jun 01 Jan 02 Aug 02 Mar 03 Oct 03 May 04 Dec 04 Jul 05 Feb 06 Sep 06 Apr 07 Nov 07 Jun 08 Jan 09 Aug 09 Mar 10 Oct 10 May 11 Dec 11 Jul 12 Feb 13 Sep 13 Apr 14 Nov 14 Jun 15 Jan 16 Aug 16 Mar 17 Oct 17 May 18
0
Supply This Year
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Austin CBD hotels - Demand (rooms sold) (ttmavg) 1988 - 2018 : STR data 3,000,000
29) Demand – Rooms sold over the past twelve months – the Austin CBD hotel demand chart, representing rooms sold
2,500,000
in Austin CBD hotels, has increased year after year since 2010. Austin-CBD demand (rooms sold) has kept up with supply (rooms available), producing the
2,000,000
stable occupancy and ADR support for the market even as supply grew dramatically. The ability of owners to fill new rooms as
1,500,000
they come to market is an indicator of a healthy hotel market, and this is the reality we see in the Austin CBD hotel data; even
1,000,000
as supply has increased dramatically the Austin CBD market has produced demand to match the new supply.
500,000
Jan 88 Aug 88 Mar 89 Oct 89 May 90 Dec 90 Jul 91 Feb 92 Sep 92 Apr 93 Nov 93 Jun 94 Jan 95 Aug 95 Mar 96 Oct 96 May 97 Dec 97 Jul 98 Feb 99 Sep 99 Apr 00 Nov 00 Jun 01 Jan 02 Aug 02 Mar 03 Oct 03 May 04 Dec 04 Jul 05 Feb 06 Sep 06 Apr 07 Nov 07 Jun 08 Jan 09 Aug 09 Mar 10 Oct 10 May 11 Dec 11 Jul 12 Feb 13 Sep 13 Apr 14 Nov 14 Jun 15 Jan 16 Aug 16 Mar 17 Oct 17 May 18
0
Demand This Year
SECTION 6 APPENDIX_250
30) The Austin CBD hotel market has
Yiankes, president and chief executive of
significantly increasing its investment in
strong occupancy (>70%), healthy ADR
White Lodging’s investment and devel-
the Austin market with two new Marriott
and RevPAR levels (although recently
opment division, developer and owner
hotel developments, one beside the Austin
flattening), and sufficient new demand to
of the JW Marriott, and with Mr. Douglas
Convention Center (613 rooms planned)
meet the fast-growing supply. Overall, the
Manchester, President, Manchester Texas
and another adjacent to University of
STR data indicates that the Austin CBD
Financial Group, and owner of the Fair-
Texas (347 rooms planned) Commenting
hotel market is a healthy hotel market.
mont Austin, about their decision to make
on White Lodging’s new Austin projects in
major investments in the Austin-CBD
a newswire release dated September 20,
market. Both Mr. Yiankes and Mr. Man-
2018, Mr. Yiankes stated,
Austin Hotel Market Investment by Private Market Participants
chester referenced the strong Austin CBD occupancy rates (>70%, even in the face of rising supply), and the increasing ADR and
31) Over just the past few years Austin
RevPAR figures (both growing in the 2012-
has seen the JW Marriott (34 stories, 1,012 2013 time frame when these investments guestrooms, 112,000 square feet of event
were first being considered) for the Austin
space, 42 meeting rooms) and the Fairmont market as important considerations in (37 stories, 1,048 guestrooms, 140,000
their investments. Both Mr. Yiankes and
square feet of meeting space) added to the Mr. Manchester also referenced the overall
“We remain bullish on Austin as it remains one of the most sought-after destinations in the United States and thrilled to be developing these two unique hotels adjacent to the worldclass University of Texas and steps from downtown Austin.”
Austin-CBD hotel market. The impres-
strong growth in Austin’s economy and
sion from such significant investments
population. Mr. Manchester expressed an
32) We researched hotel investment
from 2013, the JW Marriott construction
opinion that major hotel markets, with the by private capital using data from Real capacity and ability to attract larger meet- Capital Analytics (RCA), one of the leading
cost was estimated at $300 million, and
ings and conventions, contained at least
real estate transaction and investment
that private capital market investors have
three large hotels with 800+ rooms, and he data providers. RCA gathers real estate considered the Fairmont as completing the transaction data through publicly available
a positive view of the Austin hospitality
big hotel market picture in Austin along-
financial and legal filings and is widely
market. As part of our research on private
side the JW Marriott and the Austin Con-
investor sentiment regarding Austin’s
vention Center Hilton. Mr. Yiankes pointed
— according to a New York Times article
roughly $350 million for the Fairmont—is
used in both professional and academic research.
hospitality market, we spoke with Mr. Deno out that White Lodging is continuing and
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Austin Hotel investments each point shows trailing 12-mo (ttm) transaction value total 2005 - 2018 : quarterly : RCA
33) RCA measures the dollar value of transactions in a defined market, for a
$1,000,000,000
defined property type. The transaction totals show transactions, or purchases of
$900,000,000
existing hotel assets, but do not capture new investment in the form of new
$800,000,000
development. We obtained RCA data on Austin hotel purchases for the time period,
$700,000,000
2005-2018. The chart presents the dollar volume of hotel transactions in the Austin
$600,000,000
market presented as a trailing twelve$500,000,000
month total (i.e., each point represents the dollar amount of hotel sales in the Austin
$400,000,000
market over the past year, or trailing twelve months (ttm)).
$300,000,000
$200,000,000
$100,000,000
7/1/2018
3/1/2018
7/1/2017
11/1/2017
3/1/2017
7/1/2016
11/1/2016
3/1/2016
7/1/2015
11/1/2015
3/1/2015
7/1/2014
11/1/2014
3/1/2014
7/1/2013
11/1/2013
3/1/2013
7/1/2012
11/1/2012
3/1/2012
7/1/2011
11/1/2011
3/1/2011
7/1/2010
11/1/2010
3/1/2010
7/1/2009
11/1/2009
3/1/2009
7/1/2008
11/1/2008
3/1/2008
7/1/2007
11/1/2007
3/1/2007
7/1/2006
11/1/2006
3/1/2006
7/1/2005
11/1/2005
3/1/2005
$0
SECTION 6 APPENDIX_252
Austin, Nashville, San Antonio hotel investments each point shows trailing 12-mo (ttm) transaction value total 2005 - 2018 : quarterly : RCA
34) As a way to judge the scale of investor interest in the Austin market relative to other cities, we also obtained hotel transaction data over the same time
$1,000,000,000 $900,000,000
period for San Antonio and Nashville, two metropolitan areas that are reasonably comparable to Austin, and both of which have recently invested in their own convention center expansion projects. The three-city chart shows that more private capital has flowed into the Austin
$800,000,000 $700,000,000 $600,000,000 $500,000,000
hotel market than either San Antonio or Nashville.
$400,000,000 $300,000,000 $200,000,000 $100,000,000
Austin Hotel Domestic Volume ($)
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Nashville Hotel Domestic Volume ($)
San Antonio Hotel Domestic Volume ($)
7/1/2018
3/1/2018
7/1/2017
11/1/2017
3/1/2017
7/1/2016
11/1/2016
3/1/2016
7/1/2015
11/1/2015
3/1/2015
7/1/2014
11/1/2014
3/1/2014
7/1/2013
11/1/2013
3/1/2013
7/1/2012
11/1/2012
3/1/2012
7/1/2011
11/1/2011
3/1/2011
7/1/2010
11/1/2010
3/1/2010
7/1/2009
11/1/2009
3/1/2009
7/1/2008
11/1/2008
3/1/2008
7/1/2007
11/1/2007
3/1/2007
7/1/2006
11/1/2006
3/1/2006
7/1/2005
11/1/2005
3/1/2005
$0
35) Some notable big-dollar Austin CBD
hotel and hospitality market in Austin.
Strategies senior vice president Paul
that Austin’s hotel market is currently
hotel transactions in the last few years,
a) In March 2017, Jones Lang LaSalle
Vaughn said.
healthy and strong, and investor interest in
where a new investor purchased an existing
(JLL) prepared a report on the state
hotel asset in the Austin market, include:
of theTexas hotel market in 2016. It
37) The Smith Travel Research data on
the City of Austin considers the proposed
the Austin hotel market is also robust. As
contains statewide hotel figures along
the Austin-CBD market indicates strong
convention center expansion, it can be
a)
Driskill Hotel, March 2013, $85
with metro area-specific performance
performance for the Austin CBD hotel
assured that the Austin hospitality market
million, or $449,735/room;
measures for the major Texas hotel
industry in terms of all the major industry
it is investing in is currently healthy and
markets, including Austin. In terms of
metrics, except for the recently flattened
growing, and the Austin hospitality market
b)
Hyatt Place Austin Downtown,
private investment, the report states
RevPAR, which at least did not really
is apparently attractive as a destination for
April 2014, $87 million, or
“Austin has become a highly sought-
decline even in the face of the significant
private hotel investment capital.
$293,919/room;
after market from a hotel investment
supply additions in the form of the JW
perspective and boasts the most
Marriot and the Fairmont. Experienced
c)
Sheraton Austin, May 2014, $99
valuable hotel sale in the state. The
and successful hotel groups continue
million, or $271,233/room;
Austin Four Seasons, which sold for
to invest hundreds of millions of dollars
d)
Four Seasons, May 2015, $197
$677,000 per room in 2015, highlights
in new development that has added
million, or $676,976/room (a
a healthy valuation for trophy assets.”
significant new supply to the Austin
Texas record);
CBD market. Austin CBD room demand b) An article from July 5, 2018 in the
has kept up with the new supply, and
e)
Block 21, September 2015, $107
Austin American Statesman reports
occupancy and pricing in terms of ADR
million, or $426,295/room;
that “By pretty much every metric
and RevPAR have remained solid, although
available, Austin’s hotel market is the
they are currently not growing at the
Austin Then, Austin Now, and Austin in the Future 38) The current Austin Convention Center opened in 1992, with additions made to the facility in 2002. Austin has changed significantly since the original facility was designed and constructed in the late 1980s and early 1990s. 39)
Data from the US Census shows
strongest in all of Texas –and one of the recent pace as new supply is absorbed.
that Austin’s population in 1990 was
2016, $130 million, or $314,770/
most robust in the entire nation,” citing Real Capital Analytics data, along with
465,622, and in 2016 Austin’s population
room.
a report from Source Strategies, a San
additional recent research reports on the
was 926,426, for a gain of 460,804, or 99%
Antonio based hotel consulting firm.
Austin hotel market, shows significant
(essentially doubling in size over the last
“Austin is the most vibrant lodging
private investor interest in the Austin hotel 25 years). Over the past ten years Austin’s
36) Two recent reports, one from 2017
market in the state, with revenue per
market. STR and RCA represent the best
population growth has placed it
and another from 2018, present additional
available room $30 higher than any
data available on the hotel market, and
on numerous lists of the fastest growing
commentary and evidence on the strong
other major Texas metro,” Source
the data from both of these sources shows large cities in the United States.
f)
Radisson Hotel & Suites, May
SECTION 6 APPENDIX_254
40) In terms of economics and
significant additions were made to the
employment, Austin’s growth since
facility.
the early 1990s has also been strong, and Austin has been among the best
41) The population, employment, and
performing regional economies in the
GDP numbers for Austin over time tell
country. Data from the Bureau of Labor
a dramatic story of growth. Popular
Statistics shows that in January 1990
skyline comparisons of Austin’s CBD
Greater Austin had a labor force of 469,118, present another view of Austin’s striking and employment of 446,124. By September transformation from a minor college and 2018 the Austin region’s labor force had
government town to one of the fastest
grown to over a million, at 1,193,565 (a
growing cities in America. One of these
154% increase), with employment of
popular, online then-and-now pictures of
1,158,937. In terms of economic output,
the Austin skyline is presented above, with
data from the Federal Reserve Bank
the prominent Frost Bank tower pictured
of St. Louis (FRED), shows total Gross
in 2005 almost disappearing into the 2017
Domestic Product (GDP) for Austin-Round
skyline.
Rock,TX (i.e., the five-county Metropolitan Statistical Area that includes Austin) of
42) Over the past 10 years major
roughly $56 billion in 2001, growing to
technology companies such as Apple,
$149 billion in 2017, representing an
Google, Facebook, and Oracle, to name
increase in annual area economic output
a few, have established significant
of almost $100 billion dollars, and a
operations in Austin and have employed
attract technology firms and technology
describe how positive shocks from one
percentage GDP growth between 2001
thousands of engineers, designers,
workers. “Agglomeration” is a term in
firm can spread through the local economy
and 2017 of 166%. In terms of population,
project managers, and sales and support
economics that refers to the tendency of
to other local firms, likely diffused
employment, and economic output, Austin
employees. The technology industry is very industries to concentrate in geographic
through the interaction of local workers
today is significantly bigger than Austin in
reliant on specialized human capital, and
areas, and where the concentration often
living in the city. Technology firms appear
1990, when the current convention center
now that Austin has a core of technology
increases the productivity of employees
to understand these potential positive
was designed and built, and significantly
companies and significant technology
and the profitability of firms. “Spillover”
spillover effects and have tended to
bigger than Austin in 2002, when the last
human capital, it is likely to continue to
is another term used by economists to
concentrate their new locations outside
A-64
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
of Silicon Valley and Seattle into just
in the area. Austin’s place on the short list
a few select cities. A New York Times
of favored technology locations bodes well
article from December 2018, reporting on
for Austin’s continued growth.
Apple’s announcement to build a $1 billion A-65Austin,Tex.
campus in Austin, discussed the tendency
43) Austin has experienced tremendous
of big technology firms to concentrate
growth over the 25 years since the current
in just a few cities. The article reported
convention center opened in 1992, and
that,“From 2015 to 2017, only nine metro
the technology sector advantages that
areas increased their share of the nation’s Austin enjoys make it likely that Austin will tech work force, including the West Coast
continue to grow. It seems unlikely that the
tech hubs, as well as Austin and Denver.”
current convention center, designed and
The article quotes Amy Liu, director
constructed at a time when Austin was a
of the Metropolitan Policy Program at
significantly smaller and slower-growing
the Brookings Institute as stating,“The
city, is the optimal convention center for
tech industry concentrates in very few
Austin today, or the even bigger Austin
markets.” A recent Brookings Institute
most observers expect to see in the future.
article on tech employment concentration, commenting on similar data, stated that five metro areas–San Francisco, Seattle, San Jose, Los Angeles, and Austin– captured 34% of all new digital services job growth in the 2015–2017 time period and increased their share of the nation’s core tech employment by 1.2 percentage points. Austin has an established base of technology human capital and a large university supplying more technology human capital every year, along with numerous tech firms already established SECTION 6 APPENDIX_256
Schedule A
Assumptions and Driver sheet Austin Convention Center historical performance
2017
2016
546,385
486,740
468,820
500,648 <a>
Room Nights
267,911
299,444
287,796
285,050 <a>
Room Nights / Attendee
49%
62%
40,196,000 59,969,000 (19,773,000) $
33,221,000 48,401,000 (15,180,000) $
Revenue/Attendee $ Cost/Attendee $ NOI/Attendee $
73.57 $ 109.76 $ (36.19) $
68.25 $ 99.44 $ (31.19) $
Austin-CBD Hotel Average Daily Rate (ADR)
Sensitivity Attendance Inputs
Base Case Upside Downside
$
500,648
Round to
220
est. discount %
Projected Annual Attendees
34,024,667 <b> 52,793,000 <b> (18,768,333)
28,657,000 50,009,000 (21,352,000) 61.13 $ 106.67 $ (45.54) $ 500,000
67.96 105.45 (37.49)
for incremental analysis
20% $
176 estimated hotel rate
<c> Overnight % on Attendees
Hotel Rate / room night
Restaurant Spend / meal
Total Proj room nights
700,000
57% $
175
$
50
398,554
1,000,000
61% $
175
$
50
611,795
550,000
49% $
175
$
50
269,684
1.00 1.00 1.98 1.74 1.45 2.48 2.41
sq ft 366,720 366,720 366,720 726,850 639,220 532,042 911,220 882,000
Model Tax Rates City of Austin Hotel Occ Tax
9.00%
City of Austin Share of Sales Tax
2.00%
City of Austin share of Property Tax
0.4403%
IMPLAN Total Impact Spending Multiplier
57%
61%
ACC Revenue ACC Operating Expenses bf Depr ACC Net Operating Income (Loss) $
Average Annual Attendance 2015, 2016, 2017
<a> <b> <c>
Average 2015 2016 2017
2015
Annual Attendees
1.59
sourced from ConvCtr Activity Reports; 2015 2016 2017 ConvCtr revenues and expenses from City of Austin published, audited, financial reports - notes Based on discussion with Christine Cramer, Visit Austin
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
Current ACC Scenario 1 Scenario 2 Scenario 3 Scenario 4.1 Scenario 4.2 Scenario 5.1 Scenario 5.2
New Space Multiples
Schedule EI City of Austin Incremental Economic Impact Calculations Upsi de
Base Case
Downsi de
Average Annual Attendance 2015, 2016, 2017
500,000
500,000
500,000
Total Expected Annual Future Attendance
700,000
1,000,000
550,000
Incremental annual attendance over 2015 2016 2017 average
200,000
500,000
50,000
Overnight %
57%
Incremental Hotel Nights Expected $ per room night Incremental Hotel Spend
113,872 $
49%
305,898
24,517
175
$
175
$
175
$ 19,927,684
$
53,532,072
$
4,290,420
$
4,817,886
$
386,138
City of Austin Hotel Occupancy tax rate Incremental City of Austin Hotel Tax Revenue
61%
9% $
Incremental Restaurant Meals (n=room nights)
1,793,492
9%
113,872
9%
305,898
24,517
Expected Restaurant $ Spend
$
50
$
50
$
50
Incremental Restaurant Spend
$
5,693,624
$
15,294,878
$
1,225,834
$
113,872
$
305,898
$
24,517
Total Direct Spending on Hotel and Restaurant
$ 25,621,308
$
68,826,949
$
5,516,255
IMPLAN Spending Multiplier on Hotel + Restaurant Spending
1.59
1.59
Ci ty of Austi n Total Economi c Impact (Spendi ng)
$ 40,737,879
$ 109,434,850
$
8,770,845
Expected Incremental Convention Ctr Revenue
$ 13,592,242
$
33,980,605
$
3,398,061
Expected Incremental Convention Ctr Operating Expenses
$ 21,089,853
$
52,724,634
$
5,272,463
$
$
(18,744,029)
City of Austin Local Sales Tax on Restaurant Spend City of Austin Sales Tax $ on Incremental Restaurant Spend
2%
2%
2%
1.59
Estimated Incremental Convention Center Revenue and Expenses
Expected Incremental Conv Ctr Net Operating Income (NOI)
(7,497,611)
$ (1,874,403)
SECTION 6 APPENDIX_258
Schedule PDV Private Development Valuation with Comparable Properties: 2018 Appraised Value Data from TCAD Projected Private Development Sq Ft
Scenario 2
Scenario 3
Residential
750,720
201,960
Office
1,243,546
Scenario 4.1
Scenario 4.2
Scenario 5.1
Scenario 5.2
234,482
568,000
974,560
Retail
37,401
110,200
156,370
98,325
800,000 185,725
Parking spaces
1,000
846
1,827
168
1,341
Estimated Private Development Value Residential $
350,088,063
Office $
659,800,591
Retail $ Total Private Development Value $ City of Austin Property Tax Rate
Residential Northshore Whitley Apartments The Ashton Average of three Austin-CBD Res Comps Office 500 West 2nd Street 5th+Colorado Chase Tower
1,009,888,655
94,181,300
4,446,540
address
$
-
-
-
$
-
-
124,411,279
$
301,369,516
$
517,082,175
$
$
424,464,107
12,228,589
$
36,031,301
$
51,127,174
$
32,148,618
$
60,725,167
$
230,821,167
$
337,400,817
$
568,209,349
$
32,148,618
$
485,189,274
0.4403% $
1,016,306
2018 appraised value
0.4403% $
1,485,576
0.4403% $
sq feet
2,501,826
value/sq ft
118 Nueces 301 Brazos 101 Colorado St
$ $ $
241,948,951 100,970,000 144,000,000
461,591 222,358 342,239
$ $ $ $
524.16 454.09 420.76 466.34
500 W 2nd St 201 W 5th St 221 W 6th St
$ $ $
307,578,287 117,600,875 183,280,000
500,511 205,970 451,150
$ $ $
614.53 570.96 406.25
$
530.58
$ $
313.84 340.08
$
326.96
320 Congress 220 South Congress
$
$
Average of three Austin-CBD Office Comps Retail Koppel Building Yeti HQ bldg
$
$
0.4403%
Est. City of Austin Annual Property Tax Revenue $
Comparable Properties to Calculate TCAD $/sq ft
-
$
$ $
4,708,886 8,639,483
Average of two Austin-CBD+ Retail Comps
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
15,004 25,404
0.4403% $
141,550
0.4403% $
2,136,288
Schedule DC Comparable Convention Center attendance statistics + PwC Convention Center Industry Report (2017)
Austin Convention Center
Attendance (annual)
Music City - Nashville
Colorado Conv Ctr - Denver
2015
468,820
670,060
952,682
2016
486,740
685,884
967,543
2017
546,385
557,870
946,881
Average
500,648
637,938
955,702
exhibition hall
247,000
353,140
584,000
ballroom
63,920
70,250
85,000
meeting
55,800
81,350
100,000
total leasable space
366,720
504,740
769,000
Facility breakout (sq ft)
average attendance/sq ft
1.37
1.26
1.24
medium large
events 261 193
gateway national
204 220
PwC Convention Center Industry Report - 2017 PwC page 18 - event volume, all events
PwC page 20 - Average Total Room nights all events
1,058,200 529,800 room nights 190,000 805,000
medium large gateway national
PwC implied ratios using averages (calculated)
attendance 505,900 1,315,800
620,000 133,000
room nights / attendance room nights / attendance
medium large
38% 61%
room nights / attendance room nights / attendance
gateway national
59% 25%
SECTION 6 APPENDIX_260
Factor Year 7 Labor & Material Premium Factor
1.013 1.025
Great Streets Cost/Block Face Guide for Gensler Proposal (Scenario 3) Square Feet by Space Type Price/SF Phase 1 247,000 $ 63,920 $ 55,800 $ 39,369 $ 293,000 $ 237,600 $ 669,853 $ 460,800 $ 127,316 $
comparable convention center projects including San Antonio and Nashville, averaged and adjusted to 2018.
$
298 315 350 500 450 450 438 53 80
287,000
Exhibition Space Ballroom Meeting Rooms Retail Office Residential C.S.S. Space Above-Grade Parking Rooftop Park
All costs in Gensler tab taken from sources above except C.S.S. Space (Circulation, Service, and Support) which was taken from the Gensler 2015 master plan
Source: Cudney 2018.
All costs in Scenario 3 taken from sources at top of page except C.S.S. Space (Circulation, Service, and Support) which was taken from the Gensler 2015 master plan
Area Modification Factors Austin San Antonio Nashville Chicago San Francisco Houston San Diego
0.05 0 0.02 0.15 0.27 0.15 0.08
Fremont Street Experience Length Width Expenditure Year built
1400 ft 110 ft 70000000 USD 1994
RS Means adjustment factor (time)
2.24 for 2019 construction as multiple of 1993 construction https://www.rsmeansonline.com/references/unit/refpdf/hci.pdf https://www.rsmeansonline.com/References/CCI/10.79 Unit%20Cost%20(MasterFormat%202010)/3-
RS Means adjustment (Austin-Las Vegas) Original cost per square foot Adjusted cost per square foot
455 817
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
SCENARIO 3 DEVELOPMENT COSTS 2018 Dollars In Thousands Project year Convention Center Exhibition Space Ballroom Meeting Rooms Circulation, Service & Support Soft Costs Convention Center Total
FY2019 Purchase
0
FY2020 Construction
1
FY2021 Construction
2
FY2022 Construction
3
FY2023
4
FY2024
5
FY2025
6
FY2026
7
FY2027
8
FY2028
9
FY2029
10
TOTAL
$ $ $ $ $ $
22,331 6,119 5,935 89,061 37,034 160,481
$ $ $ $ $ $
26,053 7,139 6,924 103,905 43,206 187,227
$ $ $ $ $ $
26,053 7,139 6,924 103,905 43,206 187,227
$ $ $ $ $ $
74,438 20,397 19,784 296,870 123,447 534,935
PPP Development Retail Office Residential Above Grade Parking + Soft Costs PPP Total
$ $ $ $ $
5,982 40,069 32,493 9,565 88,109
$ $ $ $ $
6,979 46,747 37,908 11,159 102,794
$ $ $ $ $
6,979 46,747 37,908 11,159 102,794
$ $ $ $ $
19,940 133,564 108,310 31,883 293,697
Community Amenities Rooftop Park Soft Costs Community Amenities Total
$ $ $
3,095 929 4,024
$ $ $
3,611 1,083 4,695
$ $ $
3,611 1,083 4,695
$ $ $
10,318 3,095 13,413
$
75,194
$
4,959
$
922,199
Land Acquisition
$
75,194
Demolition Total Ex penditures Construction cost allocation by year
$
75,194
$
4,959
$
253,549 30%
$
290,021 35%
$
290,021 35%
SECTION 6 APPENDIX_262
Assumptions for Scenarios 4.1 and 4.2 Square Feet by Space Type Scenario 4.1
152,000 63,920 55,800 710,000 174,579 50,421 116,000 27,500 160,800 261,360 213,000 23,800 477,700
Scenario 4.2 161,000 19,000 40,510 28,952 508,200 174,579 158,421 48,600 440,000 150,000 553,200
Price/SF $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $
Labor premium for year 7 Year 3 Labor & Material Premium Factor Year 7 Labor & Material Premium Factor Great Streets Cost/Block Face
297.50 376.25 350.00 402.50 450.00 450.00 112.20 112.20 500.00 350.00 80.00 150.00 18.07 52.54 817.15 472.50 1.012 1.013 1.025
$
Exhibition Auditorium Ballroom Meeting Office Residential Underground loading Underground parking Retail Music Venue Rooftop Park Woonerf Cost/SF Demolition Above Grade Parking Galleria CS&S
Space Factor Benchmark Price $ 350 Space types in green are adjusted from the 0.85 0.9 benchmark price using estimated factors designed to ccapture the increase and 1 1.15
Cost of underground service and parking
1.35
0.9 Music venue costs estimates from Moody Theatre project in Austin, TX and from proposed m Rooftop park casts taken from Levy Park revamp in Houston and Transbay Terminal Woonerf street cost data gathered from Demolition cost data gathered from the San
Benchmark price for space by type derived from comparable convention center projects including San Antonio and Nashville, averaged and adjusted to 2018.
287,000
Guide for Gensler Proposal (Scenario 3) Square Feet by Space Type Price/SF Phase 1 247,000 $ 298 Exhibition Space All costs in Gensler tab taken from sources above except C.S.S. 63,920 $ 315 Ballroom Space (Circulation, Service, and Support) which was taken from 55,800 $ 350 Meeting Rooms the Gensler 2015 master plan 39,369 $ 500 Retail 293,000 $ 450 Office 237,600 $ 450 Residential 669,853 $ 438 C.S.S. Space FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES THE AUSTINParking CONVENTION DISTRICT 460,800 $ 53 FOR Above-Grade Source: Cudney 2018. 127,316 $ 80 Rooftop Park
SCENARIO 4.1 DEVELOPMENT COSTS 2018 Dollars In Thousands Project year Convention Center Exhibition Space Meeting Space Ballroom(s) Auditorium Circulation, Service & Support Underground parking Underground loading Soft Costs Convention Center Total
FY2019 Purchase
0
FY2020
1
Demo/Construction
FY2021 Construction
2
FY2022 Construction
3
4,959
$
986,646
$ $ $ $
20,564 113,279 5,158 139,001
Community Amenities Festival Street/Promenade Rooftop Park Galleria Soft Costs Community Amenities Total
$ $ $ $ $
7,330 669 5,910 4,173 18,082
$ $ $ $ $
8,552 780 6,895 4,868 21,095
75,194
35%
TOTAL
$
17,626 97,096 4,421 119,143
30%
Operations
10
75,194
$ $ $ $
Construction cost allocation by year
FY2029
$
PPP Development Retail Office Above Grade Parking + Soft Costs PPP Total
317,273
Operations
9
24,434 2,229 19,701 13,909 60,272
$ $ $ $ $
$
FY2028
$ $ $ $ $
80,027 2,006 6,945 36,272 157,177
276,907
Operations
8
8,552 780 6,895 4,868 21,095
$ $ $ $ $
$
FY2027
$ $ $ $ $
68,594 1,719 5,953 31,090 134,723
75,194
Operations
7
58,754 323,654 14,737 397,145
$ $ $ $ $
$
FY2026
$ $ $ $
16,033 7,963 7,932
Total Ex penditures
Operations
6
20,564 113,279 5,158 139,001
$ $ $
4,959
FY2025
$ $ $ $
16,033 7,963 7,932
$
Operations
5
80,027 2,006 6,945 36,272 157,177
$ $ $
Demolition
FY2024
45,808 22,751 22,663 228,648 5,731 19,842 103,633 449,076
13,742 6,825 6,799
$
Operations
4
$ $ $ $ $ $ $ $ $
$ $ $
Land Acquisition
FY2023
$
317,273 35%
SECTION 6 APPENDIX_264
SCENARIO 4.2 DEVELOPMENT COSTS 2018 Dollars In Thousands Project year Convention Center Exhibition Space Meeting Space Ballroom(s) Auditorium Circulation, Service & Support Underground parking Underground loading Soft Costs Convention Center Total
FY2019 Purchase
0
FY2020
1
Demo/Construction
PHASE ONE FY2021 Construction
2
FY2022 Construction
3
Construction
7
FY2027
8
Ph 1+2 operations
FY2028
9
Ph 1+2 operations
FY2029
10
Ph 1+2 operations
80,027 2,006 6,945 36,272 157,177
45,808 22,751 22,663 228,648 5,731 19,842 103,633 449,076
$ $ $ $ $ $ $ $ $
48,520 11,805 14,363 7,242 264,785 18,006 19,842 115,369 499,931
$ $ $ $ $ $ $ $ $
94,328 34,556 37,026 7,242 493,433 23,737 39,685 219,002 949,007
$ $ $ $
20,564 113,279 5,158 139,001
$ $ $ $
7,385 69,499 3,114 379,956
$ $ $ $
8,616 81,082 3,632 93,330
$ $ $ $
8,616 81,082 3,632 93,330
$ $ $ $
58,754 323,654 14,737 397,145
$ $ $ $
24,616 231,663 10,378 266,657
$ $ $ $
83,370 555,316 25,116 663,802
$ $ $ $ $
8,552 780 6,895 4,868 21,095
$ $ $ $ $
24,434 2,229 19,701 13,909 60,272
$ $ $ $ $
24,434 2,229 19,701 13,909 60,272
$
75,194
$
75,194
$
4,959
$
8,348
$
13,307
$
986,646
$
774,937
$
1,761,584
68,594 1,719 5,953 31,090 134,723
$ $ $ $ $
80,027 2,006 6,945 36,272 157,177
$ $ $ $ $
PPP Development Retail Office Above Grade Parking + Soft Costs PPP Total
$ $ $ $
17,626 97,096 4,421 119,143
$ $ $ $
20,564 113,279 5,158 139,001
Community Amenities Festival Street/Promenade Rooftop Park Galleria Soft Costs Community Amenities Total
$ $ $ $ $
7,330 669 5,910 4,173 18,082
$ $ $ $ $
8,552 780 6,895 4,868 21,095
$
4,959
$
276,907
75,194
30%
$
317,273 35%
GRAND TOTAL
$ $ $ $ $ $ $ $ $
$ $ $ $ $
75,194
PHASE 2 TOTAL
16,982 4,132 5,027 2,535 92,675 6,302 6,945 40,379 174,976
16,033 7,963 7,932
Demolition
PHASE 1 TOTAL
$ $ $ $ $ $ $ $ $
$ $ $
Construction cost allocation by year
Construction
FY2026
16,982 4,132 5,027 2,535 92,675 6,302 6,945 40,379 174,976
16,033 7,963 7,932
$
Demo/Construction
6
$ $ $ $ $ $ $ $ $
$ $ $
Total Ex penditures
5
PHASE TWO FY2025
14,556 3,541 4,309 2,173 79,436 5,402 5,953 34,611 149,979
13,742 6,825 6,799
$
Ph 1 operations
4
FY2024
$ $ $ $ $ $ $ $ $
$ $ $
Land Acquisition
FY2023
$
317,273 35%
$
-
$
8,348
$
538,284 30%
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
$
268,306 35%
$
268,306 35%
$
-
$
-
$
-
Assumptions for Scenarios 5.1 and 5.2 Square Feet by Space Type Scenario 5.1
Price/SF Scenario 5.2 260000 154000 $ $ 75000 93500 $ 209500 90000 $ 1000000 $ $ 174,579 174,579 $ 50421 85842 $ 103500 92000 $ 127000 $ $ 45,000 40,000 $ 253000 $ 881,000 $ 300,000 $ 709300 397100 $
Labor premium for year 7 Year 3 Labor & Material Premium Factor Year 7 Labor & Material Premium Factor
1.012 1.013 1.025
Great Streets Cost/Block Face Area Modification Factors Austin San Antonio Nashville Chicago San Francisco Houston San Diego
297.50 376.25 350.00 402.50 200.00 286.50 112.20 112.20 315.00 350.00 80.00 80.00 150.00 18.07 52.54 472.50
$
Space Factor Benchmark Price $ 350 Exhibition 0.85 Space types in green are adjusted from the Auditorium 0.9 benchmark price using estimated factors Ballroom 1 designed to ccapture the increase and Meeting 1.15 Office Office and Residential space prices are for Residential Tower construction estimates only and are Underground loading 1.35 Underground parking Cost of underground service and parking 0.9 Retail Community venue Music venue costs estimates from Moody Theatre project in Austin, TX and from proposed mu Park Rooftop park casts taken from Levy Park Rooftop park revamp in Houston and Transbay Terminal Festival street/promenade Woonerf street cost data gathered from Demolition Demolition cost data gathered from the San Above Grade Parking Source: Cudney 2018. CS&S Benchmark price for space by type derived from comparable convention center projects including San Antonio and Nashville, averaged and adjusted to 2018.
287,000
0.05 0 0.02 0.15 0.27 0.15 0.08
SECTION 6 APPENDIX_266
SCENARIO 5.1 DEVELOPMENT COSTS 2018 Dollars In Thousands Project year Convention Center Exhibition Space Meeting Space Ballroom(s) Circulation, Service & Support Underground parking Underground loading Soft Costs Convention Center Total
FY2019 Purchase
0
FY2020
1
Demo/Construction
FY2021 Construction
2
FY2022 Construction
3
FY2023 Operations
4
FY2024 Operations
5
FY2025 Operations
6
FY2026 Operations
7
FY2027 Operations
8
FY2028 Operations
9
FY2029 Operations
10
TOTAL
$ $ $ $ $ $ $ $
23,507 25,626 7,977 101,850 1,719 5,953 49,990 216,622
$ $ $ $ $ $ $ $
27,424 29,897 9,307 118,825 2,006 6,945 58,321 252,726
$ $ $ $ $ $ $ $
27,424 29,897 9,307 118,825 2,006 6,945 58,321 252,726
$ $ $ $ $ $ $ $
78,356 85,420 26,591 339,501 5,731 19,842 166,632 722,073
PPP Development Retail Office Above Grade Parking + Soft Costs PPP Total
$ $ $ $
9,908 9,908
$ $ $ $
11,559 11,559
$ $ $ $
11,559 11,559
$ $ $ $
33,026 33,026
Community Amenities Festival Street/Promenade Rooftop Park Community Venue Soft Costs Community Amenities Total
$ $ $ $ $
1,094 328 1,422
$ $ $ $ $
1,276 383 1,659
$ $ $ $ $
1,276 383 1,659
$ $ $ $ $
3,647 1,094 4,741
$
75,194
$
4,959
$
839,994
Land Acquisition
$
75,194
Demolition Total Ex penditures
$
Construction cost allocation by year
75,194
$
4,959
$
232,911
30%
$
265,944
35%
$
265,944
35%
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
SCENARIO 5.2 DEVELOPMENT COSTS 2018 Dollars In Thousands Project year Convention Center Exhibition Space Meeting Space Ballroom(s) Circulation, Service & Support Underground parking Underground loading Soft Costs Convention Center Total
FY2019 Purchase
0
FY2020
1
Demo/Construction
PHASE ONE FY2021 Construction
2
FY2022 Construction
3
FY2023 Ph 1 operations
4
FY2024
5
Demo/Construction
PHASE TWO FY2025 Construction
6
FY2026 Construction
7
FY2027
8
Ph 1+2 operations
FY2028
9
Ph 1+2 operations
FY2029
10
PHASE 1 TOTAL
PHASE 2 TOTAL
GRAND TOTAL
Ph 1+2 operations
$ $ $ $ $ $ $ $
23,507 25,626 7,977 101,850 1,719 5,953 49,990 216,622
$ $ $ $ $ $ $ $
27,424 29,897 9,307 118,825 2,006 6,945 58,321 252,726
$ $ $ $ $ $ $ $
27,424 29,897 9,307 118,825 2,006 6,945 58,321 252,726
$ $ $ $ $ $ $ $
14,088 11,139 10,063 57,696 2,962 6,023 30,591 132,563
$ $ $ $ $ $ $ $
16,436 12,996 11,740 67,312 3,455 7,027 35,690 154,656
$ $ $ $ $ $ $ $
16,436 12,996 11,740 67,312 3,455 7,027 35,690 154,656
$ $ $ $ $ $ $ $
78,356 85,420 26,591 339,501 5,731 19,842 166,632 722,073
$ $ $ $ $ $ $ $
46,960 37,131 33,543 192,320 9,872 20,077 101,971 441,876
$ $ $ $ $ $ $ $
125,316 122,551 60,134 531,822 15,603 39,920 268,604 1,163,949
PPP Development Retail Office Above Grade Parking + Soft Costs PPP Total
$ $ $ $
9,908 9,908
$ $ $ $
11,559 11,559
$ $ $ $
11,559 11,559
$ $ $ $
8,911 61,500 6,301 76,712
$ $ $ $
10,397 71,750 7,351 89,498
$ $ $ $
10,397 71,750 7,351 89,498
$ $ $ $
33,026 33,026
$ $ $ $
29,705 205,000 21,003 255,707
$ $ $ $
62,731 205,000 21,003 288,734
Community Amenities Festival Street/Promenade Rooftop Park Community Venue Soft Costs Community Amenities Total
$ $ $ $ $
1,094 328 1,422
$ $ $ $ $
1,276 383 1,659
$ $ $ $ $
1,276 383 1,659
$ $ $ $ $
11,670 984 13,668 7,897 34,219
$ $ $ $ $
13,615 1,148 15,946 9,213 39,922
$ $ $ $ $
13,615 1,148 15,946 9,213 39,922
$ $ $ $ $
3,647 1,094 4,741
$ $ $ $ $
38,899 3,280 45,561 26,322 114,062
$ $ $ $ $
38,899 6,927 45,561 27,416 118,803
$
75,194
$
-
$
75,194
$
4,959
$
16,716
$
21,675
$
839,994
$
828,361
$
1,668,355
Land Acquisition
$
75,194
Demolition Total Ex penditures
$
Construction cost allocation by year
75,194
$
4,959
$
232,911 30%
$
265,944 35%
$
265,944 35%
$
-
$
16,716
$
260,209 30%
$
284,076 35%
$
284,076
$
-
$
-
$
-
35%
SECTION 6 APPENDIX_268
Financing Convention Facilities
The economic impact analysis shows that
revenue that is restricted to tourism-
an expanded convention center could bring related assets and programs.
spending, and the City of Austin intends to apply this additional 2% tax.
between $40 and $100 million in additional annual spending to Austin’s economy in
The roughly $400-$700 million of
I have reviewed recent historical data on
the form of hotel and restaurant spending,
estimated construction costs for an
City of Austin hotel tax revenues collected
including associated induced and indirect
expanded convention center will be paid
under Ch351, along with projections of
spending driven by visitor spending
for with a bond issue made possible
future hotel tax revenues including the
on Austin hotels and restaurants. The
by State of Texas tax statute - Subtitle
additional 2% made possible by Chapter
additional hotel and restaurant spending
D, Chapter 351 - that allows cities to
351.1065. There appears to be sufficient
also helps create additional hospitality
tax hotels and use hotel taxes to fund
projected hotel tax revenue to support a
and service jobs in the Austin economy,
tourism related assets such as convention bond issue to raise the necessary funds
which can provide good opportunities for
centers. Chapter 351 (“Ch351”) contains
to pay for the construction costs and
professional employment and careers not
provisions for cities to use hotel taxes
operations of the proposed convention
directly associated with technology firms.
to fund tourism related assets and
center expansion. However, regardless of
programs either through direct spending
my opinion, the ultimate test of whether
or by pledging hotel tax revenues for the
the city has sufficient expected future
The economic impact of between $40 and
$100 million in extra spending in the Austin payment of bonds issued for the purpose
hotel tax revenue to make full and timely
economy could be a significant benefit
of operating or constructing or expanding
payments on a bond issue to finance the
from expanding the convention center,
tourism related assets. The City of Austin
proposed convention center expansion is
but this estimated benefit to the city must
intends to pledge proceeds from hotel
the bond market itself. If bond buyers are
be weighed against the cost to the City of
taxes collected under Ch351 to sell a
confident that the City of Austin will have
Austin to receive these incremental cash
bond issue to raise the funds to pay for
sufficient Ch351 hotel tax revenues to
flows. In short, the City of Austin will not
the construction costs and operations
make full and timely payments on a newly
be paying for the convention center with
of an expanded convention center. In
issued bond, then they will buy the bond.
general city funds that could be used in
addition to the city’s current Ch351 hotel
If bond buyers are not confident that the
other areas (e.g., parks and libraries) but
tax revenue, a subsection of Ch351 allows
City of Austin will have sufficient Ch351
will finance the construction and operation cities to increase the hotel tax rate by 2%
hotel tax revenues to make full and timely
of a convention center expansion with a
as an additional incentive to build tourism
payments on the bond, then they will not
bond issue paid for by the city’s hotel tax
related assets and compete for tourist
buy the bond.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
There are numerous benefits and positive
convention center. The cost of a proposed
City of Austin to increase spending on arts result of operating the convention center,
considerations from paying for an expanded expansion will not be paid by City of Austin
and historic preservation. Texas state tax
which include millions of dollars in Ch351
convention center with Ch351 city hotel tax
taxpayers with funds that could be used in
law allows for cities to use 15% of hotel
hotel tax revenue that can only be spent on
revenue.
other parts of the city budget.
taxes collected under Ch351 to fund arts
tourism related assets.
programming in the city, and the City of 1) The opportunity cost of using hotel tax 3) By selling a bond the city raises the
Austin is already spending the entire 15%
revenue collected by the city through Ch351 necessary money for construction and
allowed from the current Ch351 hotel
to pay for an expansion of the convention
operation of an expanded convention
tax revenue stream. A convention center
center is virtually zero, because hotel tax
center, and bondholders take the risk that
expansion would allow the city to increase
revenue raised through Ch351 is tightly
future hotel tax revenue will be insufficient hotel taxes from 15% to 17%, and the city
limited to spending on tourism related
to make the scheduled bond payments.
assets. In the case of Ch351 hotel tax
Bondholders will only have access to Ch351 new 2% stream to increase spending on
revenue, there is no issue or decision to be
hotel tax revenue receipts and do not have
made regarding whether the City of Austin
access to City of Austin general funds, even
should spend hotel tax revenue (or the
in the event of a shortfall.
proceeds from bond sales backed by hotel
would then be able to access 15% of this arts and historic preservation. It is also important to note that Ch351 hotel tax revenue is available to cover any
tax revenue) on an expanded convention
4) Given the ability of the City of Austin
financial shortfall generated by operating
center OR on parks and libraries, because
to tax all the hotels in Austin to pay for
the convention center. City of Austin
Ch351 hotel tax revenue cannot be used
a convention center expansion, bond
financial statements show an operating
for non-tourism purposes like parks
payback is a function of the financial health deficit for the current Austin Convention
and libraries. In other words, spending
of the overall Austin hotel market and
Center (i.e., convention center operating
hotel tax revenue on a convention center
is not dependent on the future financial
expenses are greater than revenues
expansion does not deprive other areas of
performance of an expanded convention
collected by the convention center), but
the city budget from available funds.
center.
expanding the convention center is not
2) Using hotel tax revenue to pay for
5) Expanding the convention center and
construction and operation of an expanded
utilizing the additional 2% hotel tax allowed on the City of Austin’s financial statements
convention center essentially has Austin’s
under Ch351 (i.e., increasing Austin’s hotel is just a small part of the overall cash
hotels paying for Austin’s expanded
tax rate from 15% to 17%) would allow the
akin to expanding a money-losing business because convention center revenue shown
flows enjoyed by the City of Austin as a SECTION 6 APPENDIX_270
D_ACKNOWLEDGEMENTS AND EXTERNAL FEEDBACK This report supports the effort to
organizations who provided input into this
provide City Council and City staff with
study is included in this section. In addition,
information to assist in assessing options
a short, Web-based portal was opened for
for a Convention Center renovation or
broad public comment from individuals
expansion that meets the City’s longer-
and groups to draw attention to concerns
term social and economic goals. As stated they have and to call our attention to any previously, our task is to evaluate the
materials they thought the research team
“whether” and the “how” of expanding the should consider. Participants were given Austin Convention Center as it relates to
the option to remain anonymous. City
broader placemaking and urban planning
Council members and the Mayor received
in the Southeast Quadrant of Downtown
the online link for distribution,also posted
Austin. Provided within these pages are
on the University of Texas at Austin Center
our efforts to synthesize and summarize
for Sustainable Development website.
information that already exists, and
Participants were asked the following
create new information through several
questions:
analyzed scenarios. Our hope is that this information can allow for members of the
Question 1: Are there any resources you
public and elected officials to base their
believe the research team should consult?
opinions and positions on analysis that is reasoned, thorough, and digestible. In
Question 2: Do you have any thoughts about
order to address this charge, fact-finding
how the convention center district should
information sessions with relevant experts contribute to downtown? and stakeholders took place throughout
F
the project timeline. External feedback,
The specific responses received from these
collected via meetings, phone calls and
questions are listed in the Feedback Table
emails, comes from a diverse group of
on the following pages.
both individual and local organizations that represent a broad range of stakeholder interests. A detailed list of individuals and
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
The University of Texas at Austin School
Others (alphabetical order)
of Architecture Center for Sustainable Development would like to thank the
American Hotel and Lodging Association
following individuals and organizations for
Asakura Robinson staff (Brush Park Consultants)
their time and/or input into this study:
Austin Convention Center Austin Independent Business Alliance Black + Vernooy Architecture and Urban Design Brush Square Park Plan Partner focus group
Austin City Council* Mayor Steve Adler Council Member Ora Houston, District 1 Council Member Delia Garza, District 2 Council Member Sabino â&#x20AC;&#x153;Pioâ&#x20AC;? Renteria, District 3 Council Member Greg Casar, District 4 Council Member Ann Kitchen, District 5 Council Member Jimmy Flannigan, District 6 Council Member Leslie Pool, District 7 Council Member Ellen Troxclair, District 8 Mayor Pro Tem Tovo, District 9 Council Member Alison Alter, District 10
Brush Square Park consultant team Capital City Innovation District Capital Metro City of Austin staff City of Austin Parks and Recreation Department Downtown Austin Alliance Downtown land owners Gensler & Associates - Austin Convention Center Long-Range Master Plan project design team International Alliance of Theatrical Stage Employees (IATSE) Kinney & Associates Architecture McCann Adams staff Music Venues Alliance Reconnect Austin Save our Springs Alliance
City of Austin Staff
SXSW Visit Austin
Greg Canally, Deputy Chief Financial Officer
Visitor Impact Task Force Chair
Carla Steffen, Deputy Director, Convention Center
Waller Creek Conservancy
*Denotes the 2017-2018 City Council that passed the resolution to conduct this study SECTION 6 APPENDIX_272
Individual or Organization
Date
Individual
4/2/18
Individual
3/26/18
Public office share space with free WiFi and desk space. Maybe a ups store with P.O. boxes and small presentation rooms available to citizens to use during down times. Let's spark innovation and help foster young business ideas born right out of the convention center
Individual
3/26/18
I support the mayor's proposal to use hotel taxes to pay for improvements in the way homeless folks are sheltered and housed.
Individual
3/10/18
Adding housing and ample retail at the ground level will enhance the area which is currently somewhat devoid of life when there isn't an event at the convention center.
Individual
3/8/18
The City of Austin must build a sustainable vibrant Convention District in order to complete Downtown as a whole.
Individual
3/8/18
Any of the major Austin DMC (destination management companies) in town would be a good resource; any of the meeting planners that plan large conventions like Keller Williams, National Instruments, even Texas Women's Conference.
I definitely would like to see a thoughtful expansion of the convention center as I'm a small business owner, and I benefit from the events that come through the convention center.
Individual
3/7/18
When this has been in the news, the (negative) angle has been to say that the attendance numbers aren't what was projected. That is the wrong angle. Look at the $ - it's evident that the Convention Center is far exceeding expectations. Sometimes fewer numbers can bring in more $, while larger numbers can bring in less $. In this case it's quality ($) over quantity (number of attendees).
The Center IS the downtown of the hospitality industry for Austin! Without it, there is a huge gap - hotels wouldn't fill up with conventioneers, restaurants wouldn't be full when events are in town, so many people would not be employed, and much more. It used to be that there were not enough hotels to accommodate event sizes, and not it's the opposite. The Center does not have enough space to accommodate the larger events who WANT to come to Austin but can't solely because of lack of center space. This is about the 4th+ study that has been done on this issue and the outcome is the same - we need to expand! It baffles my mind how Council doesn't 'get it' - word on the street is that they are opposed because they want $ diverted to their pet projects instead of what is necessary for Austin as a whole to continue prospering. STOP doing studies. BUILD and they will come.
Individual
3/6/18
Individual
3/6/18
Are there any resources you believe the research team should consult?
Do you have any thoughts about how the convention center district should contribute to downtown?
Carl Hirsch, UT Athletics, SXSW, Visit Austin, Spurs Sports and Entertainment, USA Basketball, It would be awesome if the convention center district included a mid-sized arena for esports, Austin Spurs, Huston-Tillotson, international competitions, concerts and special events. FIBA, USOC, USA Volleyball, NCAA There should be a reconcerted effort to promote and highlight the indigenous tribes of this region. One if the main reasons Maribu Lamar recommended this region as the geography best suited for the Capital was the Buffalo....the climate....the resources. All of which was sanctified and sacrificed for by the natives of the region. With the archeological site recently founded in Salado, and the entirety of the footprint of these forebearers of resource conservation, in both agriculture and ecosystems....these recognitions are long overdue...thank you. Have an emergency center of resources for the people who are not from here.
Minimum parking requirements and futurists models on lack of parking needs in the future
The Convention Center District is a vital part of Downtown Austin which generates millions of dollars annually to the city's economy. As such, the City of Austin must invest the resources needed to expand and update the current space. The district should also be more than just the Convention Center and neighboring hotels. New additions should be designed where music and entertainment venues front the streets to bring in street interaction closer to 24 hours with the convention center space enclosed. If possible, the existing space should also incorporate more daily use options around the periphery. The Convention Center should both seamlessly blend in with the surrounding districts while also acting as gateway between Waller Creek, Rainey Street District and the rest of Downtown. Incorporating new music/ entertainment venues as well as retail and restaurant space surrounding new additions to the Convention center will go a long way in creating a walkable and active district. Reduce blank walls and empty spaces around the existing convention center which deters pedestrians from the area when there are no conventions going on or at night. Currently the District creates a hole in DT with little to no street activity except during Conventions. Even then, people are simply going into or out of the Convention Center coming from or going to other areas of DT.
This is tough because now that we have enough hotel space, they have boxed in the center so that having a contiguous expansion is almost impossible. But downtown is a good place for the center since there is a lot to do downtown.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
The Center is one of the key economic pistons that make the Austin engine run. The bottom line is if we do not continue to invest in a long term plan, even beyond this one, with respect to the downtown center
New additions should be designed where music and entertainment venues front the streets to bring in street interaction closer to 24 hours with the convention center space enclosed. If possible, the existing space should also incorporate more daily use options around the periphery. The Convention Center should both seamlessly blend in with the surrounding districts while also acting as gateway between Waller Creek, Rainey Street District and the rest of Downtown. Incorporating new music/ entertainment venues as well as retail and restaurant space surrounding new additions to the Convention center will go a long way in creating a walkable and active district. Reduce blank walls and empty spaces around the existing convention center which deters pedestrians from the area when there are no conventions going on or at night. Currently the District creates a hole in DT with little to no street activity except during Conventions. Even then, people are simply going into or out of the Convention Center coming from or going to other areas of DT.
Are there any resources you believe the research team should consult?
Do you have any thoughts about how the convention center district should contribute to The City of Austin must build a sustainable vibrant Convention District in order to complete Downtown as a downtown?
Individual or Organization
Date
Individual
3/8/18
It would be awesome if the convention center district included a mid-sized arena for esports, Austin Spurs, I definitely would international like to see a thoughtful expansion of and the special convention center as I'm a small business owner, Huston-Tillotson, competitions, concerts events. and I benefit from the events that come through the convention center.
Individual Individual
4/2/18 3/7/18
whole.
Any of the major Austin DMC (destination management companies) in town would a good Carl Hirsch, UT Athletics, SXSW, Visit Austin, Spurs Sports and Entertainment, USA be Basketball, resource; anyUSA of the meetingNCAA planners that plan large conventions like Keller Williams, FIBA, USOC, Volleyball, National Instruments, even Texas Women's Conference. There should be a reconcerted effort to promote and highlight the indigenous tribes of this region. One if the main reasons Maribu Lamar recommended this region as the geography best suited for the Capital was the Buffalo....the climate....the resources. All of which was sanctified and sacrificed for by the natives of the region. With the archeological site recently founded in Salado, and the entirety of the footprint of these forebearers of resource conservation, in both agriculture and ecosystems....these recognitions are long overdue...thank you.in the news, the (negative) angle has been to say that the attendance When this has been numbers aren't what was projected. That is the wrong angle. Look at the $ - it's evident that the Convention Center is far exceeding expectations. Sometimes fewer numbers can bring in more $, while larger numbers can bring in less $. In this case it's quality ($) over quantity (number of attendees). Minimum parking requirements and futurists models on lack of parking needs in the future
The Center IS the downtown of the hospitality industry for Austin! Without it, there is a huge gap - hotels wouldn't fill up with conventioneers, restaurants wouldn't be full when events are in town, so many people would not be employed, and much more. It used to be that there were not enough hotels to accommodate event sizes, and not it's the opposite. The Center does not have enough space to accommodate the larger events who WANT to come to Austin but can't solely because of lack of center space. This is about the 4th+ Have emergency resources forthe theoutcome people who aresame not from study an that has been center done onofthis issue and is the - we here. need to expand! It baffles my mind Individual how Council doesn't 'get it' - word on the street is that they are opposed because they want $ diverted to their pet projects of what necessary forspace. Austin Maybe as a whole continue prospering. Public office shareinstead space with freeisWiFi and desk a upstostore with P.O. boxes and small STOP doing studies. BUILD and will to come. presentation rooms available tothey citizens use during down times. Let's spark innovation and help foster Individual Individual young business ideas born right out of the convention center is tough now thatto weuse have enough space, they have boxed in the so that IThis support the because mayor's proposal hotel taxeshotel to pay for improvements in the waycenter homeless folkshaving are a contiguousand expansion sheltered housed.is almost impossible. But downtown is a good place for the center since there is a lot to do downtown.
The Visit Austin and ACC teams have done their due diligence on this topic and have extensive data and resources that I assume you have access to. They also have data on the business that we are now losing due to the slow pace at which this process is going.
Individual Individual
Adding housing and ample retail at the ground level will enhance the area which is currently somewhat Individual devoid of life isn'teconomic an eventpistons at the convention center. The Center is when one ofthere the key that make the Austin engine run. The bottom line is if we do not continue to invest in a long term plan, even beyond this one, with respect to the downtown center The Convention Center District is a vital part of Downtown Austin which generates millions of dollars annually facility, Austin will no longer be the thriving city we are so proud of today. When you travel, there is not a to the city's economy. As such, the City of Austin must invest the resources needed to expand and update the major airport in the world that is not under construction constantly. The same is probably true of convention current space. The district should also be more than just the Convention Center and neighboring hotels. centers. They are critical for business (both for and non-profits) to succeed.
New additions should be designed where music and entertainment venues front the streets to bring in street As a corporation, National Instruments has been hosting NIWeek, our annual users conference, in Austin for interaction closer to 24 hours with the convention center space enclosed. If possible, the existing space the past 23 years. NIWeek has increased significantly, with 43% growth in the last 10 yrs. As we have grown, should also incorporate more daily use options around the periphery. the ACC has worked diligently to ensure a positive experience for our customers. Even with past I have served on numerous committees helping to determine the long range plan for the improvements, the ACC is less than half the size of centers with which it now competes, including Dallas The Convention Center should both seamlessly blend in with the surrounding districts while also acting as Center and am glad to assist this committee as well. I have put my name on this form in case (currently considering an expansion project) and San Antonio (just completed their latest expansion project). gateway between Waller Creek, Rainey Street District and the rest of Downtown. Incorporating new music/ We have looked at both cities as possible options to host NIWeek; but our preference is to remain in Austin. you wish to reach out to me for further engagement. entertainment venues as well as retail and restaurant space surrounding new additions to the Convention center will go a long way in creating a walkable and active district. Reduce blank walls and empty spaces Visit Austin, Greater Austin Restaurant Association, International Live Events Association around the existing convention center which deters pedestrians from the area when there are no conventions Austin Chapter, Meeting Planner International - Hill Country Chapter, The Hospitality Sales going on or at night. Currently District a hole withtolittle to economically. no street activity except during The Convention Center District the should helpcreates all of the City in of DT Austin thrive Positive fiscal and Marketing Association International - Austin Chapter, City of Austin - Austin Center for Conventions. Even then, people are simply going into or out of the Convention Center coming from or going Events impact on hospitality & tourism. to other areas ofhas DT.two conflicting visions for downtown. One idea of "downtown" is an area that's attractive Austin currently to Austin residents, and the other is devoted primarily to visitors. In my opinion, the city has focused too The build a sustainable vibrant Expanding Conventionthe District in order to complete Downtown as a muchCity on of theAustin lattermust and not enough on the former. convention center will overrun downtown, whole. and make its focus even more for visitors/conventioneers and less for the people (taxpayers) of Austin. I used to work downtown, and now that I no longer do, I rarely go there, except for special events. I would like to Any of the major Austin DMC (destination management companies) in town would be a good go to downtown more often, but don't find it very inviting or accessible. Because I'd like to see a more and inclusive vision downtown Austin, I of don't that thecenter convention takeowner, up any Ibalanced definitely would like to see afor thoughtful expansion thefeel convention as I'mcenter a smallshould business resource; any of the meeting planners that plan large conventions like Keller Williams, moreI benefit space. Itfrom already has a very andconvention to let it sprawl even more would be a shame. I wish the and the events thatlarge comefootprint, through the center. National Instruments, even Texas Women's Conference. money brought in by the CC could be used for historic preservation, parks, or cultural resources. Instead, CC revenues benefit the CC itself, and it has spent lots of money on unnecessary items that don't benefit Austin The IS thestained downtown of thesidewalks, hospitalityexterior industrytouch for Austin! it, there etc.). is a huge hotels as a Center whole (i.e., concrete screensWithout on the building, Thegap CC -should wouldn't fill downtown, up with conventioneers, wouldn't be full when events are in town, so many people compliment not overtake restaurants it. would not be employed, and much more. It used to be that there were not enough hotels to accommodate event sizes, and not it's the opposite. The Center does not have enough space to accommodate the larger I like the mayor's idea of getting some extra funding to support improvements in Eastern downtown. The When this has been in the news, the (negative) angle has been to say that the attendance events who WANT to come to Austin but can't solely because of lack of center space. This is about the 4th+ ULI Austin put together a paper on this a few years ago at the request of the City. delay by council felt political coming up on an election year. numbers aren't what was projected. That is the wrong angle. Look at the $ - it's evident study that has been done on this issue and the outcome is the same - we need to expand! It baffles my mind that the Convention Center is far exceeding expectations. Sometimes fewer numbers can how Council doesn't 'get it' - word on the street is that they are opposed because they want $ diverted to bring in other more $, while larger can center bring inisless $. of In this case it's over their pet projects instead of what is necessary forgood, Austinnot as aa tourist whole to continue Look at cities where thenumbers convention a part the fabric of quality the city($) like The convention center needs to become a public good. Put a prospering. park on top; integrate quantity (number and of attendees). STOP doing into studies. BUILD and theynow willit's come. Seattle, Portland San Francisco rather than large spaces that don't integrate well with storefronts the building. Right a dead space for residents and it's surrounded by Rainey st., the city like Denver, Fort Worth and Chicago. downtown and sixth street. It needs to connect the city, not separate it. There is a wealth of research showing that downtown convention centers never return on This is tough because now that we have enough hotel space, they have boxed in the center so that having a community investment and often become drains on municipal budgets. The entire convening contiguous is center almost site impossible. downtownredeveloped. is a good place for the center there is should a lot The currentexpansion convention should beBut completely Convention spacesince and services industry has been in decline for 20 years. In Austin's case, our convention center has been to downtown. be do provided by the private sector hotels who are the only true beneficiaries of public subsidies for soaking up over 70% of Hotel Tax revenue while contributing less than 2% of visitors (with convention centers and services. It is long past the point when this transfer of wealth from the public to a SXSW alone constituting 33% of center attendance). Our current convention convention specific industry ended. Hotel tax that revenue must invested in run. localThe arts, music,line culture anddo center has fallen for short of performance projections made 20 years ago. The business The Center is oneshould of thehave key economic pistons make the be Austin engine bottom is if we preservation, the attractions that, according to the Statethis of one, Texaswith are the trueto drivers of Austin tourism. case does not exist for an expansion. not continue to invest in a long term plan, even beyond respect the downtown center
3/26/18
3/6/18 3/26/18 3/10/18 3/6/18 3/8/18
Individual
3/6/18
Individual
3/5/18
Individual
3/8/18
Individual
3/7/18
Individual
3/5/18
Individual
3/5/18
Individual Individual
3/6/18 2/27/18
Individual
3/6/18
Individual
2/28/18
SECTION 6 APPENDIX_274
you wish to reach out to me for further engagement. Visit Austin, Greater Austin Restaurant Association, International Live Events Association Austin Chapter, Meeting Planner International - Hill Country Chapter, The Hospitality Sales and Marketing Association International - Austin Chapter, City of Austin - Austin Center for Events
Are there any resources you believe the research team should consult?
Carl Hirsch, UT Athletics, SXSW, Visit Austin, Spurs Sports and Entertainment, USA Basketball, FIBA, USOC, USA Volleyball, NCAA ULI Austin put together a paper on this a few years ago at the request of the City. There should be a reconcerted effort to promote and highlight the indigenous tribes of this region. One if the main reasons Maribu Lamar recommended this region as the geography best forcities the Capital was convention the Buffalo....the climate....the Allcity of which Look suited at other where the center is a part of theresources. fabric of the like was sanctified and sacrificed by the natives of the region. With the archeological site with Seattle, Portland and Sanfor Francisco rather than large spaces that don't integrate well recently founded in Salado, and the entirety of the footprint of these forebearers of the city like Denver, Fort Worth and Chicago. resource in bothshowing agriculture ecosystems....these recognitions are long There is aconservation, wealth of research that and downtown convention centers never return on overdue...thank you. and often become drains on municipal budgets. The entire convening community investment industry has been in decline for 20 years. In Austin's case, our convention center has been soaking up over 70% of Hotel Tax revenue while contributing less than 2% of visitors (with SXSW alone constituting 33% of center attendance). Our current convention convention center has fallen for short of performance projections made 20 years ago. The business case doesparking not exist for an expansion. Minimum requirements and futurists models on lack of parking needs in the future
The work force and working class who live and work here.
Visit Austin, Greater Austin Restaurant Association, International Live Events Association Austin Chapter, Meeting Planner International - Hill Country Chapter, The Hospitality Sales and Marketing Association International - Austin Chapter
Any of the major Austin DMC (destination management companies) in town would be a good resource; any of the meeting planners that plan large conventions like Keller Williams, Visitor Impact Task Force, Red River Cultural District, Visit Austin National Instruments, even Texas Women's Conference.
When this has been in the news, the (negative) angle has been to say that the attendance numbers aren't what was projected. That is the wrong angle. Look at the $ - it's evident that the Convention Center is far exceeding expectations. Sometimes fewer numbers can bring in more $, while larger numbers can bring in less $. In this case it's quality ($) over quantity (number of attendees).
Convention Center Follies by Heywood Sanders, Center for Exhibition Research, Convention Center Bookings data, Tourism office of the Governor, Visitor Impact Task Force - Austin Business Journal, Stephen Hacker report for the City of Austin
We have looked at both cities as possible options to host NIWeek; but our preference is to remain in Austin.
The Convention Center District should help all of the City of Austin to thrive economically. Positive fiscal impact on hospitality & tourism. Austin currently has two conflicting visions for downtown. One idea of "downtown" is an area that's attractive to Austin residents, and the other is devoted primarily to visitors. In my opinion, the city has focused too much on the latter and not enough on the former. Expanding the convention center will overrun downtown, and make its focus even more for visitors/conventioneers and less for the people (taxpayers) of Austin. I used to work downtown, and now that I no longer do, I rarely go there, except for special events. I would like to go to downtown more often, but don't find it very inviting or accessible. Because I'd like to see a more balanced and inclusive vision for downtown Austin, I don't feel that the convention center should take up any more space. It already has a very large footprint, and to let it sprawl even more would be a shame. I wish the money in bythoughts the CC could be how used the for historic preservation, or should cultural contribute resources. Instead, CC Do youbrought have any about convention center parks, district to revenues benefit the CC itself, and it has spent lots of money on unnecessary items that don't benefit Austin downtown? as a whole (i.e., stained concrete sidewalks, exterior touch screens on the building, etc.). The CC should compliment downtown, not overtake it.
Individual
3/6/18
Individual
3/5/18
Individual or Organization
Date
Individual
3/5/18
It would be awesome if the convention center district included a mid-sized arena for esports, Austin Spurs, I like the mayor's idea of gettingcompetitions, some extra funding toand support improvements in Eastern downtown. The Huston-Tillotson, international concerts special events. delay by council felt political coming up on an election year.
Individual Individual
4/2/18 3/5/18
The convention center needs to become a public good, not a tourist good. Put a park on top; integrate storefronts into the building. Right now it's a dead space for residents and it's surrounded by Rainey st., downtown and sixth street. It needs to connect the city, not separate it.
Individual
2/27/18
Have an emergency center of resources forbe the people who are not fromConvention here. The current convention center site should completely redeveloped. space and services should Individual be provided by the private sector hotels who are the only true beneficiaries of public subsidies for convention and services. is long pointMaybe when athis of wealth fromand thesmall public to a Public officecenters share space with freeItWiFi andpast deskthe space. upstransfer store with P.O. boxes specific industry should have ended. Hotel musttimes. be invested in local arts, music, culture and presentation rooms available to citizens to tax use revenue during down Let's spark innovation and help foster preservation, attractions that, to the State of Texas are the true drivers of Austin tourism. Individual Individual young businessthe ideas born right outaccording of the convention center The Convention Center should have a larger exhibit floor. We have plenty of hotel space to accommodate I support the mayor's proposal to use hotel taxes to pay for improvements in the way homeless folks are much larger conventions we don't have floor space for them. Individual Individual sheltered and housed. Brings new work to Austin which benefits the working class here. It would be good if there was more of that Adding housing and ample retail at the ground level will enhance the area which is currently somewhat on a consistent basis. Individual Individual devoid of life when there isn't an event at the convention center. Increasing the capacity of the Convention Center should also include temporary and permanent staff parking, The Convention Centergarage, Districtorisan a vital partparking of Downtown which generates dollars annually which means another off-site facility.Austin At present, Conventionmillions Center of permanent and to the city'sstaff economy. such, in thefor City Austinand must invest theofresources to expandCenter, and update the temporary (those As brought theofset-up facilitation events atneeded the Convention including current space. The district should also be more than just the Convention Center and neighboring hotels. stage hands and subcontractors) must pay dearly for parking either on the street or in a garage, the costs of which often equal or exceed the hourly wage of a worker. Individual New additions should be designed where music and entertainment venues front the streets to bring in street interaction closer to 24 hours with the convention center space enclosed. If possible, the existing space should also incorporate more daily use options around the periphery. I think it should help provide some relief to our homeless population. Individual Our current convention center both does seamlessly not have the capacity or the design to host events that would otherwise The Convention Center should blend in with surrounding districts while also acting asbe held in Austin. Even someCreek, Austin-based haveand to hold events in other cities, because our center is gateway between Waller Rainey businesses Street District the rest of Downtown. Incorporating new music/ insufficient. This loss of meansand a lost opportunity forsurrounding conventioneers to experience culture entertainment venues asbusiness well as retail restaurant space new additions to theAustin’s Convention throughlive music in our venues. A renewed and expanded center could provide much needed space for center will go a long way in creating a walkable and active district. Reduce blank walls and empty spaces creativethe businesses, facing an affordability Bypedestrians designing the ground floorwhen in a way that could around existing convention center whichcrisis. deters from the area there arelocals no conventions utilize, could reopen an area of downtown serveactivity Austinites or during going onthe or renovation at night. Currently the District creates a hole inthat DT currently with littledoes to nonot street except travelers not associated a convention. and or workspace onConvention top of the Center convention center add Conventions. Even then,with people are simply Office going into out of the coming fromcould or going to other the taxareas roles, revenue for the City. Many music businesses are run by entrepreneurs, who tend to to of creating DT. work individually, or in small groups. If some of this workspace could be allocated for the music sector, it would provide a centrally located area for leaders the industry to connect and A sharable The City of Austin must build a sustainable vibrant in Convention District in order to collaborate. complete Downtown as a conference room would be extraordinarily beneficial. The convention center expansion would unlock a raise Individual whole. in hotel tax percentage, otherwise not available, per state statute. The increase in HOT revenue could be directed to currently underfunded programs in Austin, without raising taxes on residents. MVA is dedicated to Music Venues Alliance working with Visit Austin on novel ways of educating conventioneers about all of the venues and genres I definitely would like to see a thoughtful expansion of the convention center as I'm a small business owner, available to them, and creating sponsored shows and transportation tailored for convention visitors. - Austin Individual and I benefit from the events that come through the convention center.
Now--at a time of unprecedented skepticism over whether a bigger convention center is the best possible way Center to spend tax of dollars--the city wants to fund anotherWithout huge Convention-Center The IS 600 the million downtown the hospitality industry for Austin! it, there is a hugeexpansion gap - hotels without convening Austin voters. Consultants whowouldn't are paidbe to full overstate convention wouldn't fill up with conventioneers, restaurants when events are incenter town,benefits so manydownplay people their costs. The proposedand Convention Centerexpansion unlikely spawn to justify its would not be employed, much more. It used to be isthat thereto were notanother enough SXSW hotelsfestival to accommodate existence. Instead event sizes, and not it's the opposite. The Center does not have enough space to accommodate the larger of spending $600 million ontoanother Center expansion, should promote events who WANT to come Austin Convention but can't solely because of lackAustin of center space. Thistourism is aboutby the 4th+ investing thebeen assets thatonmake it special. Theoutcome Convention Center not make Statesman social media study thatinhas done this issue and the is the samedid - we need to aexpand! It baffles my mind reporter’s recent unscientific list of topisattractions. Cultural tourism is a they morewant dynamic growthto how Council doesn't 'get it' - word onAustin’s the street that they are opposed because $ diverted industry conventions. Austin invest for theAustin legal maximum hotel taxes collectedunder the Tax their petthan projects instead of whatshould is necessary as a wholeoftoits continue prospering. Code doing in bothstudies. culturalBUILD arts and preservation (15% of that revenue in each). These grants should be STOP andhistoric they will come. administered by expert community boards—not by Visit Austin. Austin should invest heavily in art and artists, Individual preserving existing music venues and building venues that can be used for artistic performances or sporting This is tough because now Austin that we enoughperformances hotel space, they havemusicians, boxed in the thattickets havingto a events. It should promote byhave promoting by Austin notcenter giving so away contiguous almost impossible. But downtown is aAustin. good place for the center since there is a such lot Save Our Springs out-of-townexpansion shows by is musicians that have nothing to do with It should invest in cultural districts Individual to do downtown. Alliance as those along Red River and Sixth Streets, as well as the Mexican American Cultural Center.
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
I question the need to expand the Convention Center at all, including a District. As Executive Director of The is one of local the key economichuge pistons that the Austin engine run. Theand bottom linewho is ifcome we do AIBA,Center my focus is on business—a draw formake tourism. As a city, our citizens tourists not to invest in a from long term plan, many even beyond thisover one,town, with respect to the center herecontinue would better benefit enhancing venues all supporting the downtown things tourist
3/26/18
2/28/18 3/26/18 10/9/18 3/10/18 10/9/18 3/8/18
10/12/18
10/18/18
3/8/18
9/18/18 3/7/18
3/6/18
3/6/18 10/14/18
Austin Chapter, Meeting Planner International - Hill Country Chapter, The Hospitality Sales and Marketing Association International - Austin Chapter
Individual
10/18/18
Individual or Organization
Date
Individual
4/2/18
Individual
3/26/18
Save Our Springs Individual Alliance
3/26/18 10/14/18
Individual
3/10/18
Individual
3/8/18
Austin Independent Business Alliance
1/7/19
The City of Austin must build a sustainable vibrant Convention District in order to complete Downtown as a whole.
Individual
3/8/18
Any of the major Austin DMC (destination management companies) in town would be a good resource; any of the meeting planners that plan large conventions like Keller Williams, National Instruments, even Texas Women's Conference.
I definitely would like to see a thoughtful expansion of the convention center as I'm a small business owner, and I benefit from the events that come through the convention center.
Individual
3/7/18
When this has been in the news, the (negative) angle has been to say that the attendance numbers aren't what was projected. That is the wrong angle. Look at the $ - it's evident that the Convention Center is far exceeding expectations. Sometimes fewer numbers can bring in more $, while larger numbers can bring in less $. In this case it's quality ($) over quantity (number of attendees).
The Center IS the downtown of the hospitality industry for Austin! Without it, there is a huge gap - hotels wouldn't fill up with conventioneers, restaurants wouldn't be full when events are in town, so many people would not be employed, and much more. It used to be that there were not enough hotels to accommodate event sizes, and not it's the opposite. The Center does not have enough space to accommodate the larger events who WANT to come to Austin but can't solely because of lack of center space. This is about the 4th+ study that has been done on this issue and the outcome is the same - we need to expand! It baffles my mind how Council doesn't 'get it' - word on the street is that they are opposed because they want $ diverted to their pet projects instead of what is necessary for Austin as a whole to continue prospering. STOP doing studies. BUILD and they will come.
Individual
3/6/18
Individual
3/6/18
Are there any resources you believe the research team should consult? Visitor Impact Task Force, Red River Cultural District, Visit Austin Carl Hirsch, UT Athletics, SXSW, Visit Austin, Spurs Sports and Entertainment, USA Basketball, FIBA, USOC, USA Volleyball, NCAA There should be a reconcerted effort to promote and highlight the indigenous tribes of this region. One if the main reasons Maribu Lamar recommended this region as the geography best suited for the Capital was the Buffalo....the climate....the resources. All of which was sanctified and sacrificed for by the natives of the region. With the archeological site recently founded in Salado, and the entirety of the footprint of these forebearers of resource conservation, in both agriculture and ecosystems....these recognitions are long overdue...thank you.
Convention Center Follies by Heywood Sanders, Center for Exhibition Research, Convention Center Bookings Tourism office of the Governor, Task Force Austin Minimum parkingdata, requirements and futurists models onVisitor lack ofImpact parking needs in -the future Business Journal, Stephen Hacker report for the City of Austin
Visit Austin
I think it should help provide some relief to our homeless population. Our current convention center does not have the capacity or design to host events that would otherwise be held in Austin. Even some Austin-based businesses have to hold events in other cities, because our center is insufficient. This loss of business means a lost opportunity for conventioneers to experience Austin’s culture throughlive music in our venues. A renewed and expanded center could provide much needed space for creative businesses, facing an affordability crisis. By designing the ground floor in a way that locals could utilize, the renovation could reopen an area of downtown that currently does not serve Austinites or travelers not associated with a convention. Office and workspace on top of the convention center could add to the tax roles, creating revenue for the City. Many music businesses are run by entrepreneurs, who tend to work individually, or in small groups. If some of this workspace could be allocated for the music sector, it would provide a centrally located area for leaders in the industry to connect and collaborate. A sharable conference room would be extraordinarily beneficial. The convention center expansion would unlock a raise in hotel percentage, otherwise not available, per state statute. increase in HOT revenue could Do you tax have any thoughts about how the convention center The district should contribute to be directed to currently underfunded programs in Austin, without raising taxes on residents. MVA is dedicated to downtown? working with Visit Austin on novel ways of educating conventioneers about all of the venues and genres available to them, and creating sponsored shows and transportation tailored for convention visitors. It would be awesome if the convention center district included a mid-sized arena for esports, Austin Spurs, Now--at a time of unprecedented skepticism over whether a bigger convention center is the best possible Huston-Tillotson, international competitions, concerts and special events. way to spend 600 million tax dollars--the city wants to fund another huge Convention-Center expansion without convening Austin voters. Consultants who are paid to overstate convention center benefits downplay their costs. The proposed Convention Centerexpansion is unlikely to spawn another SXSW festival to justify its existence. Instead of spending $600 million on another Convention Center expansion, Austin should promote tourism by investing in the assets that make it special. The Convention Center did not make a Statesman social media reporter’s recent unscientific list of Austin’s top attractions. Cultural tourism is a more dynamic growth industry than conventions. Austin should invest the legal maximum of its hotel taxes collectedunder the Tax Have emergency of resources for the people who are not from here. Code an in both culturalcenter arts and historic preservation (15% of that revenue in each). These grants should be administered by expert community boards—not by Visit Austin. Austin should invest heavily in art and artists, preserving existing music venues and building venues that can be used for performances or sporting Public office share space with free WiFi and desk space. Maybe a ups storeartistic with P.O. boxes and small events. It should promote Austin by promoting by Austin not giving presentation rooms available to citizens to use performances during down times. Let'smusicians, spark innovation andaway help tickets foster to out-of-town shows byborn musicians thatofhave nothing to do with Austin. It should invest in cultural districts such young business ideas right out the convention center as those along Red River and Sixth Streets, as well as the Mexican American Cultural Center. I support the mayor's proposal to use hotel taxes to pay for improvements in the way homeless folks are I questionand thehoused. need to expand the Convention Center at all, including a District. As Executive Director of sheltered AIBA, my focus is on local business—a huge draw for tourism. As a city, our citizens and tourists who come here would better many venues over town, supporting things tourist Adding housing andbenefit ample from retailenhancing at the ground level will all enhance the area which isthe currently somewhat participate in when when there they come here( music, arts, parks andcenter. local business), and creating a larger vibrant devoid of life isn't an event at the convention cultural community that benefits everyone. By Visit Austin’s own reports, only 2% of the visitors who come to Austin go to the Center Convention Center. We’re talking about spending upwards of a billion dollars expansion of The Convention District is a vital part of Downtown Austin which generates millions of on dollars annually a facility that even if we 50% (a near impossible number)needed would to addexpand only 1% more to the city's economy. As increase such, thevisitors City ofby Austin must invest the resources and update the visitors. space. What else we do in Austin increases visitors far more than 1%and andneighboring benefits ourhotels. residents. current Thecan district should also that be more than just the by Convention Center That is the question. New additions should be designed where music and entertainment venues front the streets to bring in street interaction closer to 24 hours with the convention center space enclosed. If possible, the existing space should also incorporate more daily use options around the periphery.
Music Venues Alliance 9/18/18 - Austin
The Convention Center should both seamlessly blend in with the surrounding districts while also acting as gateway between Waller Creek, Rainey Street District and the rest of Downtown. Incorporating new music/ entertainment venues as well as retail and restaurant space surrounding new additions to the Convention center will go a long way in creating a walkable and active district. Reduce blank walls and empty spaces around the existing convention center which deters pedestrians from the area when there are no conventions going on or at night. Currently the District creates a hole in DT with little to no street activity except during Conventions. Even then, people are simply going into or out of the Convention Center coming from or going to other areas of DT.
This is tough because now that we have enough hotel space, they have boxed in the center so that having a contiguous expansion is almost impossible. But downtown is a good place for the center since there is a lot to do downtown. The Center is one of the key economic pistons that make the Austin engine run. The bottom line is if we do not continue to invest in a long term plan, even beyond this one, with respect to the downtown center
SECTION 6 APPENDIX_276
E_REFERENCES _WEB LINKS
R
www.atxwatersheds.com/findyourwatershed/ www.austintexas.gov/ecodistricts www.austintexas.gov/esbmacc www.austintexas.gov/department/hotel-occupancy-taxes www.bicycleaustin.info/getaround/routes.html www.bokapowell.com/project/hotel-mirabeau/ www.bransoncc.com/ www.capitolhillecodistrict.org/projects/washington-state-convention-center-expansion/ www.capmetro.org/projectconnect/ www.cbre.us/tcc/projects/central/austin/austin-proper www.connect.media/block-36-coming-downtown/ www.dallasconventioncenter.com/planners/floorplans-erg www.denverconvention.com/plan-your-event/venue-directory-map/ www.discoverphl.com/meet/floorplans/?utm_ source=paconvention.com&utm_medium=referral&utm_campaign=meeting+planner www.downtownaustin.com/business/emergingprojects www.downtownaustin.com/experience/bike-downtown www.ecodistricts.org/protocol/ www.explorestlouis.com/wp-content/uploads/2018/10/ Americas-Center-Brochure-10-16-18.pdf www.flintco.com/projects/v/1801/70-rainey-street-residences-tower www.frontsteps.org/what-we-do/arch/ www.grbhouston.com/planners/floor-plans/ www.implan.com www.miamibeachconvention.com/assets/files/partials/ core_filebuttongroup/Floor_Plans www.irvingconventioncenter.com/ www.kbge-eng.com/portfolio-items/waller-parkplace/ www.lacclink.com/planners www.marriott.com/hotel-info/dalgt-gaylord-texan-resort-and-convention-center/entertainment/xlzol9y/ seasonal.mi www.montereyconferencecenter.com/ www.mtccc.com/imapdata/mtcc.html www.musicvenueallianceaustin.com/ www.myrtlebeachconventioncenter.com/pdf/myrtlebeachconventioncenterfloorplan.pdf www.oregoncc.org/sites/default/files/2017/09/22/Facility_floor_plans_and_specifications.pdf www.palmspringscc.com/meeting-oasis-planners www.phoenixconventioncenter.com/pdf/PCC%20
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
North%20and%20West%20Floor%20Plans%20.pdf www.raleighconvention.com/ www.rcanalytics.com/ www.seton.net/locations/dell-seton/faqs/building-facts/ www.signatureboston.com/plan www.strglobal.com/product/Trend/CustomTrend www.thirdandshoal.com/building/features.html www.traviscad.org/property-search/ www.vancouverconventioncentre.com/facility/floorplans-and-specs www.visitsaltlake.com/meetings/why-salt-lake/amazing-venues/ www.visitsandiego.com/sites/default/files/FloorplansBooklet.pdf www.wallercreek.org/ www.wallercreek.org/archive/110m-in-new-city-funding-for-waller-creek-park/ www.wscc.com/
SOURCES_BACKGROUND DOCUMENTS Anderson, W. “From ‘parking lot central’ to architectural oasis: Behind the design of Austin’s Dell Medical School.” Austin Business Journal, 7 November 2017, www.bizjournals.com/austin/news/2017/11/07/ from-parking-lot-central-to-architectural-oasis.html.
Seaholm EcoDistrict Final Report: Benchmarks and Goal Setting. Austin: City of Austin, 2013.
--. “Work starts on $64M Waterloo Park restoration, key to greener downtown Austin.” Austin Business Journal, 20 September 2017, www.bizjournals.com/austin/ news/2017/09/20/work-starts-on-64m-waterloo-parkrestoration-key.html.
City of Austin. Austin City Council Agenda Recommendation for Council Action. Austin: City of Austin, 26 April 2018, www.austintexas.gov/edims/document. cfm?id=296672.
Asakura Robinson. South Central Waterfront Vision Framework Plan. Austin: City of Austin, 2016. Austin Collaborative Venture. Austin Convention Center District Design Guidelines. Austin, 1990. Austin Convention Center. Facility Overview. Austin: Austin Convention Center Department, 2016. Bass, A. and R. Bass. Assessing Your Innovation District: A How-To Guide. Brookings, 2018, www.brookings.edu/ wp-content/uploads/2018/02/audit-handbook.pdf. Big Red Dog Engineering and Consulting. Rainey Neighborhood Mobility Study & Plan. Austin: Rainey Street Neighborhood Group, 2017. Black & Vernooy and Kinney & Associates. Downtown Great Streets Master Plan. Austin: City of Austin, 2001. Cantu, T. “Austin Mayor Proposes Hotel Tax Increase To Raise $30M For Homeless Housing.” Patch [Austin] 17 July 2017. Capital Metro. “Capital Metro Project Connect Gateway Metrorail Downtown Multimodal Station Stakeholder Workshop.” City of Austin, 2014, www.austintexas.gov/ edims/document.cfm?id=217239. Casselman, B. “Nashville’s star rises as midsize cities break into winners and losers.” New York Times [New York] 16 December 2018. CB Richard Ellis. Trends in the Hotel Industry, USA Edition 2018. Atlanta: CBRE Hotels’ Americas Research, 2018. Center for Maximum Potential Building Systems.
Citi Arts. Austin Alive: Mapping Place through Art and Culture. Austin, 2007.
City of San Antonio. Comprehensive Annual Financial Report and Other Reports. San Antonio: City of San Antonio, 2014, 2015, 2016.
Centers Are Changing To Stay Relevant: Successful Meetings.” Successful Meetings 4 June 2014, www. successfulmeetings.com/Strategy/Meeting-Strategies/ Defying-Convention--7-Ways-Convention-Centers-AreChanging-to-Stay-Relevant/.
City and County of Denver. Comprehensive Annual Financial Report. Denver: City and County of Denver, Endeavor Real Estate Group. Whole Foods Anchored 2014, 2015, 2016. Mixed-Use TOD in East Austin. Austin, 2017. Clark-Madison, M. “I Plan, Therefore I Am.” The Austin Chronicle [Austin] 30 January 1998. Expo Research and Consulting. Convention Center Design & Requirements Study. San Diego: San --. Austin, Texas Bike Map. Austin: City of Austin, 2017, Clarke, R. “Commentary: Austin transit upgrade is Diego Convention Center Corporation, 2013, www. austintexas.gov/sites/default/files/files/Transportamultigenerational investment.” Austin-American voiceofsandiego.org/wp-content/uploads/2015/06/ tion/2017_Austin_Bike_Map_-_Side_2.pdf. Statesman [Austin] 13 April 2018. Convention-Center-Requirements-Contiguous-Space-Study-Report-with-SDCCC-clients-pros--. Capital View Corridors. Austin: City of Austin, ftp. Cobler, N. “With Apple’s big bet, Austin’s rep as a tech pects-breakout.pdf. austintexas.gov/LURTraining/Capitol%20View%20Cor- hub grows.” Austin American-Statesman [Austin] 13 ridors.pdf. December 2018. Findell, E. “Adler: Hotel tax plan would help homeless and Austin Convention Center.” Austin Ameri--. Comprehensive Annual Financial Report. Austin: City Crompton, J.L., S. Lee, and T.J. Shuster. “A guide for can-Statesman [Austin] 18 July 2017. of Austin, 2012, 2013, 2014, 2015, 2016. undertaking economic impact studies: The Springfest example.” Journal of Travel Research, 40.August Freer, E. “Downtown Austin development update: --. Legal Framework for Funding Venues Under the Tex- (2001): 79-87. affordable senior housing, luxury office move in.” Comas Local Government Code Chapter 334. Austin, www. munity Impact Newspaper [Austin] 16 August 2018. austintexas.gov/edims/document.cfm?id=271689. Cudney, G. Parking Structure Cost Outlook for 2018. WGI, 2017, wginc.com/wp-content/uploads/2018/07/ Galligan, J. “First Look at 48 East: Rainey Street’s --. Plaza Saltillo TOD Station Area Plan. Austin, 2013. Parking-Construction-Cost-Article-17x11-8.5x11-Pag- Newest Tower.” Austin Towers, 15 September 2015, es.pdf. austin.towers.net/first-look-at-48-east-rainey-streets--. Regulating Plan for the Plaza Saltillo TOD Station newest-tower/. Area Plan. Austin, 2008. Dean Runyon Associates. The Economic Impact of Gensler. Austin Convention Center Long-Range Master Travel on Texas, 1994-2016. Austin: Texas Tourism, Plan. Austin: Austin Convention Center, 2015. --.”Title 11, Chapter 11-2. - Hotel Occupancy Tax.” The Office of the Governor, Texas Economic Development Code of the City of Austin. Austin, 2013. and Tourism, 2017, travel.texas.gov/tti/media/PDFs/ --. Central Health Brackenridge Campus Master Plan. TXImp16p_1.pdf. Austin: Central Health, 2016. --.”Update On Revision To Waller Creek Tax Increment Reinvestment Zone (TIRZ) #17.” Austin, 2018, http:// Dinges, G. “Austin hotel market is state’s strongest.” Grado, S. et al. “Economic Impacts Of Conferences www.austintexas.gov/edims/document.cfm?id=293908. Austin American-Statesman [Austin] 25 July 2018. And Conventions.” Journal Of Convention & Exhibition Management 1.1 (1997): 19-33. --. Waller Creek Local Government Corporation ProgDowntown Austin Alliance. Downtown Austin Vision ress Report. Austin, 2017, www.austintexas.gov/edims/ Report. Austin 2018 Greater Phoenix Convention & Visitors Bureau. How document.cfm?id=282874. the Visitor Industry Contributes to the Local Economy: Downtown Austin Alliance. Austin Innovation Zone The An Analysis of Phoenix Hotels’ Property and Visitor-Re--. Waller Creek Watershed Summary Sheet. Austin, lated Taxes. Phoenix, 2009. New Economic Geography. Austin, 2014. 2011, austintexas.gov/sites/default/files/files/Watershed/eii/Waller_EII_ph1_2009.pdf. --. “Press Release: Third + Shoal joins Downtown Pub- Hacker, S. Review Of The Austin Convention Center lic Improvement District.” Downtown Austin Alliance, 7 Long-Range Master Plan. Austin: Bravo Management Group, n.d, 2017. January 2019. City of Houston. Comprehensive Annual Financial Report Houston: City of Houston, 2014, 2015, 2016, 2017. Doyle, A. “Defying Convention: 7 Ways Convention
SECTION 6 APPENDIX_278
_BACKGROUND DOCUMENTS How Great Streets Revitalized Downtown Austin, Texas.” The Next Turn, 7 April 2017, thenextturn.com/ how-great-streets-revitalized-downtown-austin-texas/. Huber, M. “Mayor suggests hotel occupancy tax hike to tackle Austin homelessness.” Austin American-Statesman [Austin] 17 July 2017.
MacCrossan, G. and J. Jauer. “The Hotel Occupancy Tax.” Fiscal Notes, Texas Comptroller of Public Accounts, June 2016, comptroller.texas.gov/economy/ fiscal-notes/2016/june-july/hotel-tax.php.
Novak, S. “Downtown Austin hotel moving forward — tion-hotel-preps-opening-82073. without Trump affiliation.” Austin-American Statesman [Austin] 22 March 2017. Remmert, M. “Just Opened: Hyatt House Hotel.” Big Red Dog, WGI, 25 May 2017, bigreddog.com/justPage Southerland Page. 2016 Texas Capitol Complex opened-hyatt-house-hotel/. Madanogly, M. and O. Ozdemir. “Is more better? The Master Plan. Austin: Texas Facilities Commission, relationship between meeting space capacity and 2016. Sahlins, E. Global hospitality: Focus on hotel construcHVS (Hospitality Valuation Services). Hotel Valuation hotel operating performance.” Tourism Management, tion costs 2018. Cushman and Wakefield, 2018. Index (HVI)—United States—Austin. 2018. 52.February (2016): 74-81. “Past Planning Efforts.” The Austin Chronicle [Austin] 16 July 1999. Sanders, H.T. Convention Center Follies: Politics, PowInternational Association of Congress Centres. “Confer- Matheney, B. “11 Towers That Will Reshape the Downer, and Public Investment in American Cities. University ence Centre Evaluation Criteria.” Brussels: Association town Austin Skyline in 2019.” Aquila Commercial. Pesquera, A. “Hyatt House Gets Nod From Austin Plan- of Pennsylvania Press, 2014. Internationale Des Palais De Congres, 2007, www.aipc. ning Commission.” Virtual Builders Exchange, 24 April org/join/eval_crit.pdf. McCann Adams Studio. Downtown Austin Plan. Austin, 2015, www.virtualbx.com/construction-preview/hyatt- Sechler, B. “Apple plans new $1 billion campus, 5,000 2012. house-gets-nod-from-austin-planning-commission/. more jobs.” Austin American-Statesman [Austin] 12 Jones Lang Lasalle. Texas Hotel Performance ReDecember 2018. search. Austin: Texas Tourism, Office of the Governor, Moselle, B. National Building Cost Manual. California: PricewaterhouseCoopers LLC. Economic Significance Economic Development and Tourism, 2017, travel.texas. Craftsman Book Company, 2017. of Meetings to the US Economy. Convention Industry Sersland, M. “Austin’s Hotel Inventory is Changing With gov/tti/media/PDFs/JLL-Report_Texas-Tourism-HoCouncil, 2018. Additions and Renovations.” Texas Meetings and Events, tel-Performance-Report-2016_3.pdf. Muro, M. and J. Whiton. “Tech is (still) concentrating 2016, tx.meetingsmags.com/austins-hotel-inventoin the Bay Area: An update on America’s winner-take- --. PwC Convention Center Report, Annual Volume 33. ry-changing-additions-and-renovations. King, M. “Putting Together the Downtown Puzzle.” The most economic phenomenon.” Brookings Institution, 2017. Austin Chronicle [Austin] 22 September 2017. 17 December 2018, www.brookings.edu/blog/the-aveShevory, K. “Austin, Texas stands out in hotel recovery nue/2018/12/17/tech-is-still-concentrating-in-the-bay- Rambin, J. “34-Story Office Tower Plan at 300 Colorado that has hugged coasts.” New York Times [New York] 1 Kelley, J. “Convention center hotels boost both supply, area-an-update-on-americas-winner-take-most-eco- Gets a New Look.” Austin Towers, 4 April 2018, austin. October 2013. demand.” Hotel Online 28 June 2017, hotelnewsnow. nomic-phenomenon/. towers.net/34-story-office-tower-plan-at-300-coloracom/Articles/148007/Convention-center-hodo-gets-a-new-look/. Shoup, D. “The High cost of minimum parking requiretels-boost-both-supply-demand. Murphy, J. “Artifically Natural: On the Transformation ments.” Transport and Sustainability, 5 (2014): 87-113. of Austin’s Waller Creek.” OffCite, Rice Design Alliance, --. “51-Story Rainey Street District Condo Tower AnLane, J. and B. Edgerton. “If you build it, will they 24 March 2017, http://offcite.org/artificially-natunounced at 44 East Avenue.” Austin Towers, 3 October Titman, S. “Urban land prices under uncertainty.” The come? Convention center and expanded hotel capacity ral-on-the-transformation-of-austins-waller-creek/. 2018, austin.towers.net/51-story-rainey-street-district- American Economic Review, 75.3 (1985): 505-514. induce positive changes to the Downtown Nashville condo-tower-announced-at-44-east-avenue/. hotel market.” CB Richard Ellis 2015, www.cbrehotels. Music City Center. Annual Report, Fiscal Year 2016, --. “Checking out Progress at Waterloo Park.” Austin Wear, B. “$3.4 million Sabine promenade could anchor com/EN/Research/Pages/Convention-Center-and-Ex2017. Nashville, 2016, 2017. Towers, 30 May 2018, austin.towers.net/checking-out- Waller Creek district.” Austin-American Statesman panded-Hotel-Capacity-Induce-Positive-Changprogress-at-waterloo-park/. [Austin] 6 January 2012. es-in-Downtown-Nashville.aspx. MVVA Inc. Waller Creek District Palm Park Concept Design Phase Plan. Austin: Waller Creek Conservancy, --. “Fun Facts on Downtown’s Upcoming Alexan Capitol Webner, R. “Convention center costs remain under Lloyd EcoDistrict. Lloyd EcoDistrict Energy Action Plan. 2015. Apartment Tower.” Austin Towers, 1 May 2018, austin. budget, officials say.” San Antonio Express-News [San Portland: City of Portland, 2014. towers.net/fun-facts-on-downtowns-upcoming-alexAntonio] 12 February 2016, www.expressnews.com/ Nicas, J. and K. Weise, “Chase for talent pushes tech an-capitol-apartment-tower/. business/local/article/Convention-Center-costs-reLuck, M. “Developer seeks partners for $1 billion giants far beyond West Coast.” New York Times [New main-under-budget-6827797.php. downtown project near Rainey Street, Austin Convention York] 13 December 2018. --. “Taking A Closer Look At Downtown Austin’s New Center.” Austin Business Journal, 7 July 2018, www. Metrorail Station.” Austin Towers, 21 December 2017, Widner, C. “Austin Proper hotel-condo development bizjournals.com/austin/news/2018/07/07/developNichols, M. “Why timing is everything for convention austin.towers.net/taking-a-closer-look-at-downtown- breaks ground.” Curbed Austin, Vox Media, 15 Seper-seeks-partners-for-1-billion-downtown.html. center hotels.” JLL (Jones Lang Lasalle 21 July 2016, austins-new-metrorail-station/. tember 2016, austin.curbed.com/2016/9/15/12929134/ www.us.jll.com/en/trends-and-insights/investor/ Reeves, K. “Austin falls behind San Antonio in conven- development-austin-proper-hotel-construction. https://www.austinchamber.com/economic-developwhy-timing-is-everything-for-convention-center-hotion center game.” Bisnow 29 November 2017, www. ment/business-climate/the-economy tels. bisnow.com/austin-san-antonio/news/hotel/convention-center-expansion-in-limbo-as-third-conven-
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
IMAGES_PHOTO REFERENCES chorus_image/image/60177893/70_Rainey_ Construction_Progress_June_2018_2.0.jpg
Executive Summary / Introduction 1 https-//austin.towers.net/wp-contentuploadssites/19/40590207275_8c99c682ce_o-e1544733023695.jpg
15
Austin Convention Center, Strategic Master Plan Report, 2015
16
Austin Convention Center, Strategic Master Plan Report, 2015
17
Austin Convention Center, Strategic Master Plan Report, 2015
2 https://pagethink.com/media/uploads/project-gallery-images/lg_5.jpg
Cultural Considerations 3 https://www.glassdoor.co.in/Photos/Jasmine-Engineering-Office-Photos-IMG610665. htm
2 https://www.austinmonitor.com/stories/2017/05/task-force-endorses-plan-expand-convention-center/
1 https://fm.cnbc.com/applications/ cnbc.com/resources/img/editorial/2017/03/08/104329501-GettyImages-467158500.1910x1000.jpg
Austin_The Evolving City
2 https://lostinaustin.org/red-river-district/
4 https://austin.towers.net/for-you-for-austin-a- 18 convention-center-history-part-one/
Austin Convention Center, Strategic Master Plan Report, 2015
1 https-//www.unjourdeplusaparis.com/wp-content/uploads/2016/03/les-halles-paris-pavillons-baltard.jpg
3 https://tshaonline.org/handbook/online/articles/lbe03
5 VCC-1.jpghttps-::www.constructioncanada. net:wp-content:uploads:2014:07:VCC-1.jpg
19
Austin Convention Center, Strategic Master Plan Report, 2015
4 https://journeymanco.com/project/austin-resource-center-for-the-homeless/
6 https://www.charlottemeetings.com/charlotte-convention-center
20
Google Maps, Street View
2 1920px-Memorial_Hall_Philahttps-//en.wikipedia.org/wiki/Memorial_Hall_(Philadelphia)#/ media/File-Memorial_Hall_Phila.jpg 3
4
5
5 https://network.thehighline.org/content/uploads/sites/3/2017/01/02_Waller-Creek-web. jpg Source: http://www.austintexas.gov/edims/document.cfm?id=286658 6 https://en.wikipedia.org/wiki/Red_River_Cultural_District_(Austin,_Texas)#/media/ Austin Creeks, Austin Bicentennial Commission, File:Stubbs_bbq_austin_tx_2014.jpg Horizons â&#x20AC;&#x2DC;76 Committee. Morehead, S. 1976 Austin History Center
The Southeast Quadrant 1
City of Austin, Aerial, 1995
2 https://cmga360arts.files.wordpress. com/2015/11/jwj-creek-show-0686.jpg 3 https://www.pagethink.com/media/uploads/ project-gallery-images/lg_1_2ndst.jpg 4 https://www.google.com/ search?q=light+rail+austin&source=lnms&tbm=isch&sa=X&ved=0ahUKEwiwmLayhOvfAhVC4qwKHUJ1AlcQ_AUIECgD&biw=1882&bih=950#imgrc=r4veJQHd2n6rDM:
1 https://www.austinconventioncenter.com/ plan/photos/#&gid=iKjCtUMGS42QcoAUoaskG&pid=null 2 https://www.marriott.com/hotels/travel/ausjwjw-marriott-austin/?scid=45f93f1b-bd77-45c98dab-83b6a417f6fe Expansion Scenarios
21 https-:williamcorneli.files.wordpress. com:2013:02:galleria-lower-closed-day Appendix
8 http://www.urbanash.com/wp-content/uploads/2017/10/WSCC2.jpg
9 https://marmonmok.com/content/uploads/2017/08/HBGCC_e2_web_0x0_acf_ 7 https://www.brookings.edu/essay/rise-of-innocropped.jpg vation-districts/ 10 http://www.nashvillemusiccitycenter.com/ 8 https://ecodistricts.org/protocol/ sites/default/files/styles/hero/public/portal-hero/mccafternoon041513_181.jpg?iFinancial Considerations tok=3iD-Iro5
1 5 https://cdn.vox-cdn.com/thumbor/ TbiUCFZSqzqfcsqPoiACKyfAMU8=/0x0:5472x3648/1200x800/filters:focal(2299x1387:3173x2261)/cdn.vox-cdn.com/uploads/
7 http://hlblighting.com/project/cleveland-convention-center/
11 https://www.hok.com/uploads/2013/03/28/ moscone01.jpg
1 http://austin.culturemap.com/news/citylife/05-10-18-waller-creek-austin-centralpark-under-new-multimillion-dollar-plan/ slideshow/#slide=2 2 https://austinenergy.com/ae/about/better-austin/district-cooling 3 https://austin.towers.net/at-last-heres-ourfirst-look-at-the-block-185-office-tower/ 4 https://austin.towers.net/condos/austin-proper-hotel/#jp-carousel-3482
5 http://cielopropertygroup.com/portfolio_page/ 12 http://24heuresactu.com/wp-content/upthird-and-shoal/ loads/2015/10/Walter_E._Washington_Convention_Center_-_Ballroom_C.jpg 6 https://austin.towers.net/downtown-austinsrepublic-office-tower-gets-a-surprise-height13 http://www.moscone.com/uploads/multimediincrease/ aphoto/245/lowRes/MSABCScreen3LoRes.jpg
https://assets.simpleviewcms.com/simpleview/ 14 http://meet.austintexas.org/sites/default/ image/upload/c_limit,h_1200,q_75,w_1200/v1/ master/files/styles/listing_large/public/mmg_ clients/austin/Dell_World_2016_Courtesy_of_ lfef_images/austin-convention-center-17-460. Austin_Convention_Center_2__4e8d4ee1-6e06jpg?itok=LTioZEyK 4671-8e78-6724159619eb.jpg
7 https://austin.towers.net/heres-our-first-lookat-the-redesigned-300-colorado-office-tower/ 8 https://austin.towers.net/new-views-of-31story-marriott-hotel-planned-downtown/
SECTION 6 APPENDIX_280
_PHOTO REFERENCES east-austin-hotel-breaks-ground-renderings/
9 https://dellmed.utexas.edu/support/priorities/ buildings 10 https://www.seton.net/locations/dell-seton/ 11 https://communityimpact.com/austin/ northwest-austin/healthcare/2018/02/27/ breaking-news-university-texas-board-regents-approves-lease-section-brackenridge-campus-central-health/
25 https://www.endeavor-re.com/properties/ saltillo-retail/ (Same source for all Saltillo photos) 26 27
14 https://austin.towers.net/fun-facts-on-downtowns-upcoming-alexan-capitol-apartment-tower/ 15 https://bigreddog.com/just-opened-hyatthouse-hotel/
29
https://archpaper.com/2016/08/studio-visit-lmn-architects/
41
http://www.destination360.com/ north-america/us/california/palm-springs/ palm-springs-convention-center
42
https://www.raleighconvention.com/
43
https://www.kuow.org/stories/big-expensiveproject-downtown-seattle-were-not-talkingabout
Same as above
Same as above
30 https://austin.towers.net/condos/waller-parkplace/
44
31 https://www.bizjournals.com/austin/ news/2018/09/24/rainey-rising-plans-emerge- 45 for-30-stories-of.html 32 https://70rainey.com/ 46
16 https://austin.towers.net/micro-housing-finally-heads-downtown/ 17 https://www.bizjournals.com/austin/ news/2017/04/24/episcopal-church-awardskey-mixed-use-project-to.html
33 https://www.stgdesign.com/48-east/ 34 https://austin.towers.net/51-story-raineystreet-district-condo-tower-announced-at-44- 47 east-avenue/
35 http://www.mvvainc.com/project. php?id=99&c=urban_design 18 http://downtownaustinblog.org/category/down town-austin-districts/6th-street/page/2/ 19 https://www.capmetro.org/downtownstation/
https://www.exhibitdeal.com/Salt-Lake-CityUtah-Trade-Show-Information-s/1932.htm
56
https://bostonparking.org/boston-convention-center-parking-guide/
57
https://www.meetingsnet.com/mountain/ colorado-convention-center-offers-free-wi-fismart-city-networks
https://www.bransoncc.com/floor-plansspecs/
50
http://mrbelltravels.com/2015/12/26/mr-bellin-california-a-day-off-in-long-beach/
51
https://www.cvent.com/venues/toronto/convention-center/metro-toronto-convention-centre/venue-f9aa90e9-6430-4432-8d02-d13ea0bb5349
52
https://nextstl.com/2014/02/50m-ballroom-facilities-expansion-planned-americas-center/
53
https://www.miamiandbeaches.com/busi-
22
38
https://www.seemonterey.com/listings/monterey-conference-center/2329/
39
http://www.thebesthotels.org/room-photo-gaylord-texan-resort-convention-center-ID3225711.htm
FRAMEWORKS FOR PLACEMAKING _ ALTERNATIVE FUTURES FOR THE AUSTIN CONVENTION DISTRICT
59
https://en.wikipedia.org/wiki/Phoenix_Convention_Center#/media/File:Phoenix_Convention_ 62 Center_-_South_on_3rd_St_-_2009-07-06.jpg
https://www.youtube.com/watch?v=tScFolf83t4
http://irri-tech.com/portfolio/irving-convention-center-at-las-colinas/
24 http://buildingatx.bigreddog.com/2017/06/15m-
55
60 https://www.charlottemeetings.com/charlotte-convention-center/convention-event-cal61 endar
49
37
23 http://downtownaustin.com/business/emergingprojects
https://en.wikipedia.org/wiki/Oregon_Convention_Center#/media/File:Oregon_Convention_Center_Aerial_Shot_(33643203853).jpg
https://www.myrtlebeachconventioncenter. com/gallery-aerial.php
21 https://austin.towers.net/east-sixth-mappingthe-future-of-austins-favorite-mile/ Same as above
54 https://marmonmok.com/projects/henry-b-gonzalez-convention-center-expansion/
http://www.turnerconstruction.com/experience/project/6402/global-center-for-health-in58 novation-and-cleveland-convention-center
48
Best Practices Appendix Image References:
20 https://austin.towers.net/the-once-and-future- 36 block-36/
ness-resources/detail/miami-beach-convention-center/fa3c28a6-7981-4745-a1ed-12b5b67c8d48
Same as above
28 https://reconnectaustin.com/ 12 https://do512.com/p/waterloo-park-new-ampitheater 13 http://downtownaustin.com/business/emergingprojects
40
63
https://www.hospitalityonline.com/sd-convention-center https://www.paconvention.com/ http://www.dlrgroup.com/work/moscone-center-west/ https://www.lacclink.com/about/lacc-quickfacts https://www.visithoustontexas.com/listings/ george-r-brown-convention-center/22562/ http://www.dallascitynews.net/ kay-bailey-hutchison-convention-center-recognized-sustainable-practicessites/19/40590207275_8c99c682ce_o-e1544733023695.jpg
64 http://blog.cushwake.com/austin/what-a-difference-a-decade-makes.html
SECTION 6 APPENDIX_282