NEWS
2
Investigation of flying sink continues
SPORTS
Women’s hockey season comes to a close
LIFE
12
Vermont Roller Derby gets serious
C YNIC THE VERMONT
7
The University of Vermont’s independent voice since 1883
w w w . v e r m o n t c y n i c . c o m | Tu e s d a y , M a r c h 2 , 2 0 1 0 – Vo l u m e 1 2 6 I s s u e 2 0 | B u r l i n g t o n , Ve r m o n t
Dudley H. Davis Center 590 Main Street Burlington, VT 05405 Ph. 802-376-4769 | E-mail: cynicalads@gmail.com | www.vermontcynic.com
Monkey House hosts Phantogram, optical illusion The Vermont Cynic is the student-run weekly newspaper at thean University of Vermont. Each of week The Vermont Cynic distributes 5,000 copies to local businesses in Burlington and across campus. sound - Page 8 Advertise in our print edition or our online publication www.vermontcynic.com
Publication Dates September 1, 8, 15, 22, 29 October 6, 13, 20, 27 November 3, 10, 17
December 1*, 8 January 19, 26 February 2, 9, 16, 23
March 1, 15, 22, 29 April 5, 12, 19, 26 May 3
Modular Advertising
*Winter issue Check back for Best of Burlington’s date in the spring
*Full Page Package (3 ads) $415 each (Club), $550 each (UVM), $800 each (Local)
Full Page* Half Page
Club $536 $269
UVM $715 $358
Local $954 $477
National $1113 $557
1/4 Page 1/5 Page
$162 $108
$215 $143
$286 $190
$334 $227
Coupon
$45 Vt. nuclear $60 power plant $75 gets shut $90down for good
BAILEY CUMMINGS | The Vermont Cynic
Half Page Ad Senate says “no” to Vermont Yankee 10” x 7.5” By Patrick Tyler Staff Writer
looking for long-term power agreements and contingency plans that don’t involve any electricity from Vermont Yankee, Lyons said. The federal government has already provided capital for the state to invest in renewable energy generation, she said. Incentives for alternative energy will be provided by the clean energy development fund, Lyons said. The fund has already begun to invest in wind and solar energy in Vermont. However, while the legislature voted not to relicense Vermont Yankee and the plant appears to be on track to be decommissioned, the plant could try to bypass the senate altogether, Senator Tim Ashe said. “They could attempt to take court action to challenge the ability of the legislature to have
Back Page Advertising Rates Amid cries from students and Vermonters alike, Vermont Yankee will not be relicensed, leaving the future for energy in Vermont uncertain. The Vermont state Senate rejected Vermont Yankee’s bid for relicensing by a vote of 264. The nuclear power plant will close in 2012 in accordance with its original agreement, so long as the plant doesn’t appeal the decision in court. 7KH QH[W VWHS ZLOO EH ¿QGLQJ alternative sources of energy WR ¿OO WKH JDS OHIW E\ <DQNHH¶V absence, state senator Ginny Lyons said. “As the chair of natural resources I’ve been working on energy legislation for eight years,” Lyons said. The legislature has been
any role at all in what normally is a nuclear regulatory commission process,” Ashe said. Entergy Louisiana, Vermont Yankee’s parent company, will probably now sue or take some sort of legal action, Ashe said. An agreement signed by the plant in 2006 required them to bring any renewed operation bill before the Senate with a condition that allows Vermont Yankee to resubmit the bill before they’re required to shut down in 2012, Lyons said. “A legislature in the future could certainly put another bill out or the same bill out and it could be a different outcome,” she said. Either way, Lyons said, Vermonters should not worry about losing power. “The lights are going to stay on,” she said.
The Cynic is now offering advertising space on the back page of the paper. This space is always in color, and the ads are subject to the discretion of the Advertising Manager. Below are the rates for the back page advertisements.
Ads will be sold in these three sizes only. Questions regarding back page advertising should be directed to the ad manager.
Full Page Half Page
Club UVM Local National INDEX NEWS 1-3 — OPINION 4-5 — FEATURE 6 — LIFE $914.60 Want to work$1281 $1615.60 $1838.20 for The Cynic? No experience necessary. Contact cynic@uvm.edu $457.30 $608.60 $810.90 $946.90
1/4 Page
$275.40
$365.50
$486.20
$567.80
Coupon 4” x 3” Full Page Ad
10” x 14”
1/5 Page Ad 1/4BASIL Page Ad Greenpeace TSIMOYIANIS A sign is displayed outside the Statehouse in Montpelier on Feb. 24 during an historic vote by the Vermont Senate to shut 4” x 7.5” 6” x 7.5” down the Vermont Yankee nuclear plant. |
7 — ARTS 8 — DISTRACTIONS 9 — COMICS 10 — SPORTS 11-12 WE’RE ONLINE TOO! www.vermontcynic.com
Color
Preferred Placement
Price of advertisement plus $200 or 30 percent of advertisement, whichever total is lower.
Second Page For second page placement, add 35% of the advertisement cost to the total price (i.e. A local, half page ad costs $477. 35% of $477 is $166.95. $477+$166.95 = 643.95 for the total ad cost).
Preferred Section For preferred section placement, add 10% of the advertisement cost to the total price. Sections available are: News, Arts, Life and Sports. To determine consult with ad rep (i.e. A quarter page national ad costs $344. 10% of $344 is $34.40. $344+$34.40 = $378.40 for the total ad cost).
Online Advertising Box Textlink
Bailey Cummings The Vermont Cynic
Week $65 $20
Month $200
Semester $700
$70
$250
Classified 1 ad: $15 3 or more ads: $10/issue
Deadline Advertisements need to be in by 5 p.m. on Friday. Please email a PDF formatted to the size of the advertisement that will be printed to cynicadvertising@gmail.com. Include in the subject line of the email the advertiser and the run date.
Minimum 10 words and maximum 50 words. Phone numbers count as one word. Check your ad the first issue it runs; The Vermont Cynic will only assume responsibility for any errors the first day an ad runs. Teersheets or proofs are not supplied for classified adds. No refunds are given for cancelled ads. Payment by cash or check only.
Discounts
Pre-Printed Inserts
Frequency
Standard price for inserts: $420 for 5000 inserts. Inserts need to be at the printers by noon the Wednesday before the run date.
3 -5 times: 10% off 6 - 9 times: 15% off 10 - 14 times: 25% off
Prepayment Save 5% if payment is received by 5p.m. Friday before the run date.
Inserts are to be sent to: Attn Inserts for the VT Cynic 14 Hand Ave. Elizabethtown, NY 12932