Trigger points

Page 1

Trigger Points: Trigger point is an Object which is assigned to the Operation in routing in order to perform certain function. We can trigger the certain business functionality using the trigger point when Operation or production order status are getting changed. For an example we can trigger workflow to production manager incase scrap is recorded in the production or we can create another order or operation when rework is recorded etc. We can only trigger production order relevant functions based on production order status(system/User) only. Here status is when every business functions is performed like Create Order, Release Order/Operation, and Confirm Operation are executed by the business user system set the status to the operations and order. These are called “System Status”.i.e Status set for the Operations/Order automatically by the System based on function executed for the operation or Order. Apart from this “System status” we can also define our own status which is called “User status” and it based on the business process.

Example for Production Status: Order Creation -> Order Releases -> Raw material consumed->Operation confirmed-> Goods receipts for FG performed. This is standard Production order sequences. For this sequence there will be corresponding Order status. CRTD -> REL -> GMPS-> CNF->DLV Below example narrate that, Succeeding Operations are released when preceding operation is confirmed. Steps involved in the trigger point process: 1. Create Trigger Point 2. Define trigger point functions 3. Assign trigger point to Routing Operation.


Creation trigger point:

Trigger Point access menu


Trigger point Detail screen

Usage: We can group the similar function trigger points using “Trigger point� usage Trigger Point group: we can group the trigger points which has different functionality into one group and assigned it to routing operations. This field is optional. User status Profile: It is only required when you want to execute/trigger functionality by user status instead of system status. Trigger point Function definition: 1. Release Succeeding operations: Let say you have operation sequences OP01->OP02->OP03->OP04 As per Production process operation OP02-OP04 should not be started unless OP01 is completely done. In that case we can define the trigger point as below.


When system status of an first operation (OP-01) is changed as CNF (fully confirmed) this function as once

can by system or manual .

trigger

.Here function is releasing the succeeding operations (OP02 to OP04) which

This can be activated only by system or only by manual or by both


Assign Trigger Point to Operations: Goto CA02 (Change Routing) and access menu operation overview by selecting the operation for which you want to assign a trigger point Menu ---ďƒ Goto -> Trigger point overview. Enter the usage and/or a description and also enter the function of the trigger point . Then Save the routing.


Routing Operation overview


Trigger Point assignment to Operation

Select the operation to which you want to assign the Trigger point


Trigger Point for Operation.

Click on

to copy the trigger point created previously.


Copying standard trigger point to Operation


Operation trigger point. We can see the details of function defined in this trigger point


Trigger point in Routing operation


Trigger point detail function

Now save the routing

How this trigger point will be triggered in Production order execution is explained here. The detailed Production order execution process will be explained in forthcoming tutorials. The Idea of this below example is how trigger point is used in production order based on its status. For time being ,don’t worry about its transaction codes and menu path.


Production Order Operation view you can find trigger point is assigned with operation ‘0010’

Production Order Operation view

By clicking icon

we can see its functionality


Trigger point in Order Operation


Look at the system status of each operation which is as “CRTD” i.e. created.

Operation status in Order

Operation status after first operation released. Now Releasing first operation where trigger point is assigned. Here you can find that except first operation all other operation status are still “CRTD”. Only first operation is having status “REL”


Order Confirmation screen for first operation.

When we save the first operation


Confirmation of first operation

Now you can observe the second operation status in Order which is released automatically by trigger point and status “REL� is set for it.


Operation status in Order