Covance Bangalore Environment Branding PHASE II
FLOOR WISE PRISM BREAKUP
5th FLOOR (WALLS & PILLARS)
5th FLOOR
RECEPTION GLASS (LEFT SIDE)
RECEPTION GLASS (RIGHT SIDE)
PILLAR (RIGHT)
PILLAR (FRONT + RIGHT)
PILLAR (FRONT + LEFT)
PRINTER ZONE
PRINTER ZONE
7th FLOOR (WALLS & PILLARS)
7th FLOOR
RECEPTION GLASS (LEFT SIDE)
RECEPTION GLASS (RIGHT SIDE)
PILLAR (RIGHT)
PILLAR (FRONT + RIGHT)
PILLAR (FRONT + LEFT)
PRINTER ZONE
PRINTER ZONE
8th FLOOR (WALLS & PILLARS)
8th FLOOR
RECEPTION GLASS (LEFT SIDE)
RECEPTION GLASS (LEFT SIDE)
RECEPTION GLASS (RIGHT SIDE)
RECEPTION GLASS (RIGHT SIDE)
PILLAR (RIGHT)
PILLAR (FRONT + RIGHT)
PILLAR (FRONT + LEFT)
PRINTER ZONE
PRINTER ZONE
9th FLOOR (WALLS & PILLARS)
9th FLOOR
RECEPTION GLASS (LEFT SIDE)
RECEPTION GLASS (RIGHT SIDE)
PILLAR (RIGHT)
PILLAR (FRONT + RIGHT)
PILLAR (FRONT + LEFT)
PRINTER ZONE
PRINTER ZONE
Thank You