ESR Oragadam Project Brochure

Page 1


ABOUT US ESR is the largest Asia-Pacific focused logistics real estate platform by gross floor area (GFA) and by value of the assets owned directly and by the funds and investment vehicles it manages. ESR and its funds and investment vehicles are backed by some of the world’s preeminent investors including APG, SK Holdings, JD.com, Goldman Sachs, CPPIB, OMERS and Ping An. The ESR platform spans across the People’s Republic of China, Japan, South Korea, Singapore, Vietnam, Indonesia, Australia and India. ESR has been listed on the Main Board of The Stock Exchange of Hong Kong Limited since 1 November 2019.

36.3 Billion USD

243 Million SQ. FT.

8 Countries

Assets Under Management (AUM)

Gross Floor Area (GFA)

of Operation

5.5 Billion USD

600+

Development Work-in-Progress

Industry Inhouse Experts


ESR ORAGADAM OVERVIEW A state-of-the-art Industrial & Logistics Park in the heart of Oragadam's industrial belt. Located on SH-48, close to Oragadam junction, this park is well connected by air, road, rail and ports.

USP’s OF THE FACILITY SITE ADDRESS

SECTORS

Located on Oragadam Walajahbad Industrial Growth Corridor adjacent to the 4,500 SIPCOT promoted Industrial Park.

Automobile, Auto-ancillary, Auto component manufacturing, R&D Centres, 3PL's, Electronics, Energy, Aerospace and Defence.

SITE ADVANTAGE

QUALITY

Smart, Sustainable and Human Centered Design.

Grade 'A' rated green buildings. IGBC Gold rated building.

LOCATION

DELIVERY

Oragadam houses over 22 Fortune 500 companies.

BTS buildings to be delivered as per design. Standard buildings can be delivered between 10-12 months.


NH 16

SH

Kortt a

laiyar

50A

ing

Kortta la

SH

iyar R

50

River

iver

ai

n en

Ch

TAMARAIPAKKAM

rR ute

Rd

Ennore Port

O

SH 56

Ennore RS ENNORE

SH

SH

REDHILLS

114

114

di Lake

ana

l

2

mC gha kin

Perambur RS

m

Riv er

ou

Co

um

er Riv

oo

SH

SH

SH

205

206

NH 716

SH 112

POONAMALLEE

T. NAGAR

PARK TOWN

2

Chennai B ypass Rd

r ive ar R Ady

57

TAMBARAM

SH

ST THOMAS

Guindy 49 National Park

PALLAVARAM

SH

SH

109

48

Tambaram RS

Nanmangalam Reserved Forest

PERUMBAKKAM

SH 49

SH

Chennai - 50 kms International Airport - 39 kms Chennai Port - 59 kms

Sriperumbudur SIPCOT - 25 kms

VEL ACHERY

Pallavaram RS

Tamabaram Railway Station - 30 kms

Ennore Port - 96 kms

ADYAR

st Rd

110

Adyar River

GUINDY

St Thomas Mount

TAMBARAM

SH

SAIDAPET

MYL APORE

E a s t Co a

NH 32

Saidapet RS

SH

SH

Rd 113

113

SH

113

Chennai International Airport

SH

SH

SRIPERUMBUDUR

SH

55

Chembarambakkam Lake

Chennai Port

114

PORUR

ing

50B

CHENNAI CENTRAL

Nungambakkam RS

R ter

SH

Chennai Central RS

NUNGAMBAKKAM

i Ou

NH 48

ANNA NAGAR

SH

nna

57

MAPPEDU

Walajabad Railway Station - 10 kms

ROYAPURAM

Che

SH

Royapuram RS

PERAMBUR

Chennai Bypass

50

Rd

Ambattur RS

SH

Oragadam Junction - 08 kms

Buc

NH 716

Korattur Lake

AMBATTUR

50

56

Retteri Lake

NH 48

NH 716

Strategically located on the State Highway connecting Oragadam to Walajabad.

SH

SH

205

AMBAT TUR

HINDU COLLEGE

111

SH

SH

50A

THIRUVALLUR

g Rd

r Rin

Inne

SH

NH 16

Puzhal Lake (Red Hills Lake)

Hindu College RS

CENTRALLY LOCATED

B AY OF BENGAL

SH

48

49A

SH 121

MARAI MAL AI NAGAR

r

57

NH 32

IT Corrido

SH

KAL AMBAKKAM

Google Coordinates


er iv

Mangadu

rR

Mannur

NH 32

SH

50B

SH

50B

Ramapuram

Chembarambakkam Lake

NH 48

Nemili

SH 110

Thandalam Twenty First Century Pharmaceuticals Pvt. Ltd.

Hyundai Motor India Limited

Malayambakkam

Pennalur

Thirumudivakkam Kavanur

SH 110

Keeranallur Flex India NH 48

Santhavellore

Nissan Motor India

SIPCOT ORAGADAM INDUSTRIAL PARK

SH

Vallakkottai

Marudham

48

VRL Logistics

d ad R

b

ja Wala Walajabad RS

Nathanallur

SH

Devariyambakkam

KM Seats

Global Automotive Research Centre Royal Enfield

r

Nattarasanpattu

Hiranandani Parks

POTHERI

iver

Accenture

Sundar Nagar

Guruvanmedu

Vengambakkam

SINGAPERUMAL KOIL

Arungal

Mambakkam Siruseri

SH 121

d

Nallambakkam

MARAI MALAI NAGAR

Kayar

Kannivakkam Karambur

Kalavakkam

Villiambakkam

SH

Ch

e

a yy

r

National Highway State Highway Ring Road Railway Station

SH 58

49A

Chettipunyam Kalvoy

Bank of India - 2 kms

Lord Ayyappa College of Engineering - 10 kms

Madurapakkam

MARAI MALAI

Thalimangalam

APN Vidyalaya Matriculation School - 1 kms

Sithalapakkam

Vengadamangalam

Kayarambedu

Oragadam Police Station - 11 kms

Varanavasi Bus Stop - 2 kms

Nandivaram Lake

Potheri RS

Kattankulathur Marai malai Nagar RS Panangottur

SH

MALUR

Tirumukkudal

Ro a

Guduvanchery

SCHOOLS

CRK Super Market - 11 kms

Selaiyur

SH 121

Potheri

Malur RS

Rive

Accenture

NH 48

Kandigai

WALAJABAD

Pal ar

Medavakkam

Urapakkam

NH 32

120

Avalur

Urapakkam RS

URAPAKKAM

Daimler

Ezhichur Sintex BAPL

S.V. Sugar Mills Limited

Madura Mettur

Renault Nissan

Kosei Mind Aluminium Company Ltd.

TAMBARAM

Vandalur Zoo

Apollo Tyres

57

SH 58

Perungalathur

VANDALUR

SH 48

Essar Steel Theneri Lake

ic h

Perinjambakkam

57

Autocrat Automotive Stamping SIPCOT ORAGADAM INDUSTRIAL PARK Allisons Transmissions Komatsu SH

Mud

SERVICES Fire Station - Maraimalai Nagar - 22 kms

Tambaram RS

TAMBARAM

d ur R

Irumbuliyur Manimangalam

Vallam SH

120

FM City

Pallur Alagoor

Araneri

SH 109

Kovilambakkam

te r R SH 110

SIPCOT Dell SRIPERUMBUDUR SamsungINDUSTRIAL PARK

Meenambakkam RS

Ankaputhur

i Ou

Foxconn

Jeppiaar Institute of Technology

Neervalur

Amarambedu

Wheels India Limited Vengadu

nna

Saint Gobain Caparo India Motorola

Pillai Chattiram

Axles India Ltd.

NH 48

Sogandi

SH 48

Vettri Theatres 4K 3D

ing

SRIPERUMBUDUR

Che

Maduramangalam

ST. THOMAS

MEENABAKKAM

Pammal

LOCATION ADVANTAGE

St Thomas Mount RS

Pallavaram

SIPCOT SRIPERUMBUDUR Essar Industries INDUSTRIAL PARK Somangalam

Shri Perumbudur Lake

Chennai International Airport

Chennai By pass Rd

Ulundai

SH

120

Ady ar R

Kallambedu

SH 2

ya

Sengadu Mappedu

Ad

Keelachery

Ammapettai

The Great Salt Lake

HOSPITALS

WORKFORCE

Hoscons Medical Centre / VIBA Hospital - 10 kms

Availability of labour from neighbouring villages.


BUILDING AREAS

7.2 M

W

ID E 56 RO 56. AD 8.86 6M M

RG-5

W

ID

(1

7.2

M

19

17

75 B05 .8 8 SQ

71. 9 867 M

5

W

ID

E

RO

AD

.8 6

M

RG-4

.M

)

RG-3 7.2M WIDE ROAD IL

ID

E

IT

Y

RO

AD

STP

M OF EZZ FIC . E

TRAILER PARKING 4 WHEELER PARKING

RG-2

168.86M 168.86M

7.2M WIDE ROAD

UT

W

7.2M WIDE ROAD

M

136.86M 136.86M

15

7.2M WIDE ROAD

4

B04 (23110.18 SQ.M)

MEZZ. OFFICE

MEZZ. OFFICE

RG-6 UP

UP

UTILITY

RO

AD

W

RG-5

ID

E

ID

E

RO

AD

ME OF ZZ. FIC E

RO

AD

15

M

MEZZ. OFFICE

80.86M 80.86M

WID

ER

UTILITY

32.00M

M

3

W

RO

12

M

ID

UT ILIT Y

15

AD

1122 88. 8.86 6MM B 65 03 .90 SQ .M )

(52

E

RG-1

DE

W

WI

M

M

RG-5

7.2

15 15M WIDE ROAD

4400 ..86 6MM

OA

D

TRUCK PARKING FUTURE 10 NOS

UTILITY

80.00M 80.00M

RG-4

MEZZ. OFFICE

B02 16882.66 SQ.M

88.86M 88.86M

2

15M WIDE ROAD

1 2 0 .8 6 M

7.2 M WIDE ROAD

UP

120.86M

WATER

RG-3

TANK STP

160.86M 160.86M 7.2 M WIDE ROAD MEZZ. OFFICE PU

RG-2

60.86M

136.86M 136.86M

1

15M WIDE ROAD

B01 8330.09 SQM

UP

12M WIDE ROAD

60.86M

TRUCK PARKING FUTURE 9 NOS

M

UP

7.2

E TR RO PA AI AD RK LER IN G

MEZZ. OFFICE

15M WIDE ROAD

7.2 M WIDE ROAD

PHASE 1 - 35 ACRES

SECURITY

RG-1

RMG

RMG

RMG

RMG

RMG

RMG

BUILDING 1

BUILDING 2

BUILDING 3

BUILDING 4

BUILDING 5

1,08,000 SQ.FT.

2,13,761 SQ. FT.

68,124 SQ. FT.

2,92,529 SQ. FT.

2,17,384 SQ. FT.


Building Features

Description

PEB Structure Design Code Standard Roof Collateral Load

Building Features

Description

Building Utilities Design, fabrication & erection of structural steel to comply with AISC (American Institute of Steel Construction)/ IS code. All welding work shall be as per AWS (American Welding Society). 30 ggs/ sq. mt collateral load considered on the roof to install sprinklers, electrical system & other utility services/ additional 20kg/ sq mt design load on the roof for solar panel installation.

Internal Sprinkler System

Roof sprinkler system of K115 std as per local norms/ NBC 2016.

Fire Water Tank And Pump

Fire water tank of required capacity to be considered in the central UG tank. Fire tank capacity and fire pump shall be as per NBC norms.

Building Aspect Ratio

Provision of wet block at both the end of building. Male to female toilet ratio to be as per building norms. Tap off in the Mezzanine/ Office area for Toilets.

Water Supply

One water tap-off point shall be provided; Flushing water shall be supplied from the STP recycle water.

Building Aspect Ratio

Building length to the width ratio to be 2:1.

Building Height at Eave

Standard building clear height of 10 m.

Roofing Type

Standing seam roof system (Screw less roof system), Bare Galvalume (no paint).

Power Load

1 KVA per 1000 sq. ft.

Skylight

3%-4% roof area shall be provided with skylight for natural daylight. Approx. one skylight at each bay on either side. Skylight panel will be of polycarbonate sheet fixed to avoid water leakage.

DG and Transformer Yard

Provision of area allocation for DG and Transformer, equipment and MEP in tenants scope.

Parking

Provision of 5 car parking spaces & 10 two wheeler parking spaces will be provided for 1.0 lac sqft built up area. No dedicated space for truck parking except dock area.

Air Changes

3-6 Air changes/ 8 air changes for Industrial buildings with windows.

Canopy Width

4m from the PEB wall cladding.

Canopy Height

Canopy at 5.2 m height from the corresponding road level.

External Infra at Park Level

Lightening Arrestor Arrangement

Lightening arrestor at the roof ridge to be installed as per NBC 2016.

STP

Park level central STP shall be provided as per NBC norms.

Docking Apron Size

16.5 m wide docking apron provided for the 40ft vehicular movement. Concrete road shall be provided at the docking area with reversed slope towards the building.

Water Supply

Local source for domestic water for flushing treated water from STP shall be recycled. WTP, if required to be considered as tenants scope.

Boundary Wall

Dock Door Size

2.4m (W) x 3m (H), numbers shall be one rolling shutter per 12000 sq. ft. of building area/ one in each bay. one knockout panel in each bay shall be provided.

7' height boundary to be provided at park level. Boundary wall shall be masonry/ precast wall up to 5' height from ground level and 2' height concertina wire.

RCC & Civil Structure Building Plinth Height

1.2m plinth height from the finish docking road level.

Flooring Type

Industrial FM-2 compliant floor, racking compliant, floor thickness as per the design load, M30 grade concrete floor.

Floor Load

5 Ton UDL floor design load to withstand racking load and MHE movement.

Fire Door Size

1.2m (W) x 2.1m (H) fire door shall be provided with panic bar as per NBC fire norms.

Gate House/ Security Cabin Gate house shall be provided with sliding gate for entry and exit. Width of the sliding gate to be of 4.5m/ 6m wide. Area Allocation

Space/ Location to be marked out for Scrap yard, LT, DG, Compressor, Utility area etc for each Building on Master plan.

Signages

Park Level signages like Emergency, Directional etc. will be provided only for fire exit.

Drivers Rest Area/ Toilets

Driver's toilet shall be provided at park level and as per layout.

Truck Parking Area

Truck holding area can be provided at park level and would be available as per layout.


WORLD-CLASS FACILITY MANAGEMENT SERVICE ESR parks are managed by a specialized facility management team experienced in global standards. We take utmost care to upkeep and maintain common park infrastructure, amenities, plant and machinery and to assist you with incident management, improvements, modifications and fit outs.

FACILITY MANAGEMENT SERVICES HIGHLIGHT Incident Management

Park Security

One click incident management system through ESR Smart App.

24x7 security with frequent patrolling and surveillance through AI based cameras.

Landscaping

Waste Management

Regular maintenance of garden and green areas.

Responsible waste management through organic composting and waste segregation on site.

Engineering Services

Park Disaster Management

Technical staff available on site for maintenance of all MEP equipment.

The team is well equipped to handle any unforeseen incidents including evacuation and assembly.

Facility Manager Dedicated facility manager for overall park management and client queries.


SMART, SUSTAINABLE AND HUMAN-CENTRIC DESIGN Spaces and solutions for the future. We believe that spaces need to be aligned with businesses and people. Our parks are technology enabled, designed around people, and keeps environment at the forefront.

ESR APP The first Indian developer to introduce Smart Industrial & Logistics Park.

Creating Smart Solutions for Smart Businesses Responsive features for Covid-19 prevention Contact less visitor entry with health declaration.

smart. intuitive. human-centric. sustainable.

Covid-19 hotline for emergencies. SOP's & FAQ's for safer parks. Manage social distancing. Digital tracking & management of service requests.

Smart Security

Polls

Way Finding

Amenities Booking

Smart Cafe

Live Feed


SUSTAINABILITY Guided by our beliefs and our commitment towards sustainability, we have actively sought to align our business strategies, policies and practices with value creation for our stakeholders.

ESR India’s Industrial and logistics parks are IGBC (Indian Green Building Council) Gold Rated RECYCLED AND RECYCLABLE MATERIALS

Amongst the first real estate companies to adopt progressive sustainable practices

Committed to minimising our environmental footprint to being an active contributor to society

Exceptional Environmental Social and Governance (ESG) performance

• Locally sourced • Constructed with highly recyclable materials

OPTIMISING THE USE OF NATURAL LIGHT • Daylight integration reduces dependence on artificial lighting

ENERGY EFFICIENT PARK • • • •

Energy efficient building Limited WWR Energy saving glass Insulation in roofs to reduce heat gain • Smart energy meters to monitor energy consumption • Solar PVs are proposed to be integrated across all ESR parks

REDUCING WATER USAGE • Low flow fixtures reduce water usage by 35% • Park level rainwater harvesting is used across all non-potable applications

COST EFFECTIVE

• High-quality materials • Sustainable initiatives • Reduced operating costs

RESPONSIBLE WASTE MANAGEMENT

• Organic composting • Waste water segregation • Sewage Treatment Plants


LEADERS IN APAC

OUR APAC PRESENCE

#1

PRC

SOUTH KOREA JAPAN

INDIA

#1

Ecommerce landlord in China

Owner of logistics stock in South Korea

#1

#1

Development pipeline in Seoul Metropolitan area

SINGAPORE

Non Temasek affiliated REIT in Singapore

#1

AUSTRALIA

Development pipeline in Greater Tokyo and Osaka region


INDIA SNAPSHOT

MUMBAI

ESR Bhiwandi 1 43 Acres 1.3 MN SQ. FT.

Asia Pacific’s Industrial Real Estate Leader, now empowering India’s Industrial & Logistics Ecosystem.

PUNE

ESR India at a glance

ESR Chakan 1 53 Acres 1.3 MN SQ. FT.

ESR Bhiwandi 2

ESR Lodha 88 Acres 1.9 MN SQ. FT.

ESR Chakan 2 36 Acres 1 MN SQ. FT.

ESR Global Ranjangaon 1 25 Acres 0.6 MN SQ. FT.

49 Acres 1 MN SQ. FT.

ESR Global Ranjangaon 2 18 Acres 0.4 MN SQ. FT.

Kolkata

DELHI NCR

Rajpura Delhi NCR

ESR Sohna Road 76.4 Acres 1.7 MN SQ. FT.

ESR Jhajjar 21 Acres 0.5 MN SQ. FT.

KOLKATA

ESR Uluberia 58 Acres 1.5 MN SQ. FT.

Nagpur Hyderabad

Ahmedabad Mumbai

Pune Bengaluru

Chennai

NAGPUR

RAJPURA

CHENNAI

BENGALURU

HYDERABAD

AHMEDABAD

ESR Nagpur 1 55 Acres 0.8 MN SQ. FT.

ESR Oragadam 80 Acres 1.7 MN SQ. FT.

Portfolio

18 MN SQ. FT.

ESR-GMR Shamshabad 66 Acres 1.6 MN SQ. FT.

ESR Rajpura 22 Acres 0.5 MN SQ. FT.

ESR Hoskote 1 Coming Soon

ESR Jalisana

37 Acres 1 MN SQ. FT.

ESR Uluberia 35 Acres 0.7 MN SQ. FT.


GLOBAL PORTFOLIO

INDIA PORTFOLIO

China

Singapore

23 major cities 8.4 m sqm GFA

3 major cities 1.8 m sqm GFA

Japan

South Korea

3 major cities 3.6 m sqm GFA

3 major cities 3.4 m sqm GFA

Australia 5 major cities 1.4 m sqm GFA


ORAGADAM PARK IMAGES


Harish Kumar hkumar@in.esr.com +91 9994 154 280

MUMBAI Unit 201, Level 2, The Capital, B- Wing, Plot No C-70, G Block Bandra Kurla Complex, Bandra (East), Mumbai 400051, India T +91 22 6280 0000

HONG KONG (Group Headquarters) 2406-07 Man Yee Building 68 Des Voeux Road Central, Hong Kong T +852 2376 9600 esrgroup@esr.com

SINGAPORE 8 Marina View, #14-07 Asia Square Tower 1 Singapore 018960 T +65 6850 0440

SEOUL 35F Three IFC, 10 Gukjegeumyung-ro Seoul 07326, South Korea T +82 2 6137 9354

SHANGHAI Floor 26, Block B, No. 391, Guiping Road, Shanghai, 200233, P.R. China T +86 21 2409 9566

OSAKA Level 19, Hilton Plaza West Office Tower 2-2-2 Umeda, Kita-ku Osaka 530-0001, Japan T +81 6 6133 5643

BEIJING Room 08, 1/F, Block 1, SOHO 3Q, No. 9, Guanghua Road, Chaoyang District, Beijing, P.R. China

TOKYO Kamiyacho Prime Place Bldg. 3rd Floor 4-1-17 Toranomon, Minato-ku Tokyo 105-0001, Japan T +81 3 4578 7121

GUANGZHOU Room 1502, Tower A, Center Plaza, 161 Linhexi Rd, Tianhe District, Guangzhou, P.R. China T +86 20 2881 6780

www.esr.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.