The Diesel Loco Shed Vatva was opened on 09.11.1981 as a Maintenance and Repair Centre for Broad Gauge Diesel Locomotives. Since then, there has been periodical enhancement in the facilities commensurate with the additional needs due to change in the maintenance practices and number and class of locomotives. Diesel Loco shed vatva having holding of both Diesel and Electric locomotives. Diesel shed vatva is certified in QMS ISO 9001:2015, EMS 14001:2015, OHSMS 18001:2007, EnMS :50001:2011 and 5 S Work place management system.

Implementation of GreenCo Rating System in our Organization was a good journey as well as provide an opportunity to make healthy and fresh environment. Diesel Locomotive shed Vatva (western railway) in Indian Railway has achieved new milestone with GreenCo Gold Certification. Sumant Prasad Gupta, Sr. DME (Diesel)

Key Achievements

1. Diesel loco shed vatva saved 40% paper in last 3 year After adopting e-Tender, IREPS.IMMS, E-Office and single side used paper is in practice to re-use. 2. Diesel loco shed vatva saved 21% Electricity in last 3 year. 3. Reduction in fresh water consumption by awareness of staff and close monitoring & providing efficient water pump. 4. ETP Recycled treated water is being used for gardening. 5. Diesel shed vatva has installed solar plant of 20kWp for Loco Battery charging and other assets & reduced purchase of electricity. 6. Art sculptures developed by the shed staff from different type of scrap materials. 7. Shed has installed a big LED screen for display of slogan and maintenance related activity videos and for awareness to staff on environment saving etc. 8. Installation of Rain water harvesting system for recharge ground water capacity approx. 20 lakh litres. 9. Shed roof 30% has been replaced by Translucent sheet for natural light to reach direct in working area for better work environment.

Energy Efficiency

y Diesel Loco Shed Vatva has achieved specific energy consumption in last 3 years through its innovative approach and GreenCo initiatives by implementing following measures. y Monitoring of energy performance by installing energy meter at critical machines and equipment in sections. y Replacing all lights/Fans to efficient LED light/Fan and maximum machines are energy efficient. y Overall electricity saved 21% and 3% saved after installing 20kWp solar plant. y Shed roof 30% has been replaced by Translucent sheet for natural light to reach direct in working area for better work environment.

Water Conservation

y Diesel shed vatva is committed to conserve water with various innovative effort and able to achieve 40% specific fresh water consumption, the steps includes. y 100% recycling of water for gardening in ETP. y Monitoring of water consumption by installing water flowmeters. y Regular monitoring of water pump efficiency and leakages of water pipelines if any. y Replacing water pump by efficient water pump, using of water jet for component cleaning, Loco washing and sprinkle system in garden.

Green Supply Chain

y Adopting e-Tender, IREPS.IMMS, E-Office as paperless working and single side used paper is in practice to re-use. y Vendor development programme for creating awareness regarding environment sustainability, GHG emission mitigation and reduction in wood-based packing material. y Scrap disposal is initiated ‘as is where is’ basis and reduced transportation of vehicles. y Centralisation of Stock Items procurement.

Waste management

y Segregation of ferrous and nonferrous waste in scrap yard. y Use of classified dust bin RED for Hazardous, GREEN for Bio degradable and WHITE for Non- bio degradable as Iron etc. y Use of unsuitable Low viscosity lube oil for flushing of engine lube oil system before disposal of oil. y Art sculptures and innovation of test bench by unused material.

Contact: mr. Shiva Kant Singh, Senior Section Engineer, ISO Diesel Loco Shed Vatva, Western Railway, Ahmedabad - 382445, GUJARAT Phone: 9724044940 | E-mail: shksing@gmail.com

SIlVer COACh rehABILITATIOn wOrkshOp BhOpAL, mAdhyA prAdesh

About the workshop

Coach Rehabilitation Workshop (CRWS), located at Nishatpura, Bhopal is a unit of Indian Railways functioning under West Central Zone of Indian Railways. Bhopal workshop was built and equipped with the latest technology for carrying out MID LIFE REHABILITATION OF COACHES in the year 1989. CRWS/BPL was the first workshop over IR engaged in carrying out the Mid Life Rehabilitation of Indian Railways coaches. The CRWS campus is spread over a total area of 401.03 acres including 190 acres of workshop areas. Due to decision of Railway Board, MLR work of ICF coaches at CRWS, BPL has been discontinued w.e.f. 01.04.2020 and POH of ICF coaches and SSII of LHB coaches has been started while gearing up for carrying out SSIII of LHB coaches including NMGH coach conversion and camping coach conversion. The workshop certified ISO 9001, 14001, 45001, 50001, 3834, 5S & CII GreenCo Silver. The Quality standards maintained by this workshop are benchmark for other IR workshops.

Key Achievements

1. Replacing all lights to efficient LED lights using solar street light in factory boundary. 2. Utilization of recycle water from STP is under construction, capacity – 5MLD. 3. Reduction in average specific water consumption in last 3 years is 15.43%. 4. Specific water consumption is reduced by 3% over 2020-21. 5. Utilization of recycle water from STP capacity- 500 KLD (182500 KL per Year). 6. During year 2020-21, 23.78% less hazardous waste generated as compared to 2019-20. 7. 691.25kwp rooftop solar power plants working successfully. 8. Plantation of 620 no’s in workshop & “Jayant

Sinha Park” at CRWS colony. 9. 100% plastic waste is recycled with help of

Sarthak Bhopal (Authorised by Nagar Nigam

Bhopal & MPPCB). We are committed to preserve our environment through excellence in working methods and safe work practices. We ensure 100% compliance of all statutory and legal laws. Preventing pollution through proper waste management, use of alternative material and to promote use of green energy etc. It is our goal to ensure safe work culture in all employees through continuous education and training.

Parinay Gupta

Chief Workshop Manager

Unique Initiatives

Changed Press Machine to hanger testing Machine:

y A press machine has been converted into a hanger testing machine for bogie hanger testing, it is easy to use. y The old draw bar testing machine is fitted with a 27 kw motor. 5kw motor is installed in this machine. So 22kw energy is being saved.

UV sanitization Machine

y UV Sanitization Machine has been manufactured to disinfect the letter and file received from outside in the factory. By keeping the files and letters in this machine in the touch of ultra violet rays, the viruses on the surface of the file and letter are inactivated. This machine can be protected from the danger caused by the virus.

Energy Efficiency

y 500kWp & 191.25 kWp rooftop solar power plants were commissioned on 27.06.2018. y Generation of solar energy from Apr-2021 up to Oct’21 is 4,84,317 kWH and saving is Rs. 38,74,239/-. y Generation since commissioning of 27.06.2018 up to Oct’21 is 24,64,845 kWH and saving is Rs. 1,56,99,877/-. y Installation of EPFC capacitor bank of 25 KVAR (8 no’s) in sub-station 1, 2, 3 and 4. The power factor has improved from 0.94 to 0.96. y SCADA monitoring system installed in CRWS/BPL for electric power. y 20 energy savers are provided on existing AC, each energy saver saves 0.3 units /hrs. y Installation of 140 watt LED high bay light for shed - 150

Nos. y Replacement of existing wall mounted bracket fan with

BLDC fan – 35 Nos. y Provision of solar street light & procurement of energy efficiency (5-Star) Air-conditioner. y Electrically operated actuator with butterfly valve in comp. pipe line - 14 Nos. y Trans vector nozzles for comp. air system–06 Nos. y Provision of level based auto drain valve on each compressor– 02 Nos.

Waste management

y This workshop has made organic compost plant in house by using empty PVC drums and scrap bins. M/s Sarthak Sanstha (Approved by Nagar Nigam, Bhopal) gave technical guidance in making this plant. y In this plant, residue of food staff of staff canteen and plants leaf etc are being used for making organic manure. y Implementing scientific approach towards waste disposal at all stages, segregations of the wastes and disposed in eco-friendly manner. y Industrial waste (FRP, foam rexine, recron) disposed in scientific manner through co-processing (waste to electricity generation).

Green Supply Chain

y Introduced e-tendering, decision making, Issue of PO’s and submission of vendor bills online platform resulting paperless working with transparency. y Vendor development program for creating awareness regarding environment sustainability. y Enabling other users to use store items as and when required. y User Depot Module (UDM) – More transparency in tracking of material usage.

Contact: Mr. Parinay Gupta, Chief Workshop Manager Coach Rehabilitation Workshop, Bhopal, MADHYA PRADESH Phone: 0755 - 2742785 | Email: crwsbpl@gmail.com

Water Conservation

y Rain water harvesting of administrative building (Area of roof top- 11,900 sq feets) harvesting potential = 676.14 KL/year. y Provision of sewage treatment plant for treating coach bio tank’s effluent (Capacity-10MLD). y Monitoring of water consumption by installation of puddle type flow meter suitable for pipe Dia-50mm, Qty-02 Nos. &

Dia-250mm, Qty-01. y Sewage treatment plant work completed and working. y

Development of garden in administration building, bogie shop &

ETL shop y Augmentation of ground water beyond fence i.e. water harvesting surrounding workshop by three ponds (Pond backside of BBPS- 8400 Kls, pond behind CRWS factory - 7350 Kls & Pond in mango garden - 675 Kls) which is regularly charged with storm water total capacity - 16425Kls.