VERONICA VELASQUEZ, RA veronicavelasquez.ra@gmail.com | (347) 481-0489 www.vvastudio.com | www.linkedin.com/in/vva-ra
PROFESSIONAL PORTFOLIO CONSTRUCTION MANAGEMENT Assistant Project Manager / Project Manager Worked as Construction Manager for a 1.4 million sf mix-use building in Brooklyn (construction budget of $650MM). Assisted in the bid preparation of several trades amounting to approximately $100MM, as well as full project management of contracts amounting to $60MM, from bid preparation through close out and punchlisting. Responsibilities included: ⬝ Bib preparation and leveling. ⬝ Communication with developers, consultants and contractors, including leading OAC and trade meetings. ⬝ Design and field coordination, managed SKs and RFI, coordinated on-site and off-site testing and mock ups. ⬝ Value engineering, budgetary studies, and auditing of trade requisitions and changed orders. ⬝ Produced and reviewed field reports, punchlists, and close out packages. ⬝ Reviewed, implemented and tracked construction schedules. Managed Contracts: ⬝ Masonry Façade, GFRC and Interior CMU: $34,400,000 ⬝ Storefronts & Entrances: $9,805,000 ⬝ Overhead Doors: $79,000 ⬝ Elevators: $6,750,000 RESIDENTIAL Project Manager / Project Architect Schematic Design, Design Development, Construction documents, Construction Administration ⬝ 24,000 sf building in Hell's kitchen - Building envelope detailing ⬝ 4,000 sf single family residence in the Hamptons ⬝ 5,400 sf apartment renovation in the Upper East Side ⬝ 5,300 sf townhouse gut renovation in the West Village ⬝ 2,800 sf apartment renovation in the Upper West Side ⬝ 2,200 sf pied-a-terre renovation in the Upper West Side ⬝ 1,500 sf apartment renovation in the Upper West Side RETAIL Project Manager / Project Architect 27 J.McLaughlin clothing stores throughout the country ⬝ Schematic Design ⬝ FFE selection and millwork drawings ⬝ Design development and MEP systems coordination ⬝ Historic commission review, awning & signage design and code review ⬝ Construction documents COMMERCIAL Project Manager / Project Architect 12 Douglas Elliman offices throughout New York City and Long Island ⬝ Schematic Design and renderings ⬝ Furniture design and millwork drawings ⬝ Design development, Bid sets and Construction documents ⬝ Construction Administration
CONSTRUCTION MANAGEMENT: BUILDING ENVELOPE AND VERTICAL TRANSPORTATION
CONSTRUCTION MANAGEMENT: BUILDING ENVELOPE AND VERTICAL TRANSPORTATION
MASSING 8 7 6 5 4 3 2
30'
1 0
SECTION SETBACKS
FOOTAGE CALCULATIONS
UNIT TOTALS (#740-738)
UNIT TOTALS (#736)
PROPERTY INFORMATION
A3.5 1
'(1
/,9 &/ %$
352-(&7
526(,167(,1·6 5(6,'(1&( %52$':$< $37 $ 1(: <25. 1<
',1
5(9,6,216 12
%'50 &/
'$7(
'(6&5,37,21
.,7
)2<(5 &/ %'50 6+((7 '(6&5,37,21
*(1(5$/ 3/$1
3:50 : , &
%$
028/',1*6 $1' 75,0 : , &
0 %'50
&URZQ
&DVLQJ &URZQ
3DQHO 0RXOGLQJ
%DVH FDS %DVH
'5$:1 %< 9(521,&$ 9(/$648(= YHURQLFD#DQWKRQ\SHUURWWDGHVLJQ FRP
: , &
:LQGRZ VLOO
$VWUDJDO $VWUDJDO &URZQ
0 %$7+
'$7(
6+((7
$