Work experience at Coop-Himmelb(L)au

Page 1

architectural Work experienceat coop-hiMMelb(l)au 2019-2021

WORK sample

Content: pg. 1-4 HigHrise bank office building project

pg. 5-10 opera tHeatre cultural building project

high-rise - bank office building

project under construction site area: 33,200.00 M2

gross floor area: 67,981.00 M2

height toWer: 163.80 M

project info: https://coop-hiMMelblau.at/projects/central-bank-azerbaijan/

role - architect:

On this project I was mainly responsible and produced the build-ups brochure, where I created details for wall build-ups, floor build-ups and so on. Also, I have produced the material brochure for insulation, walls, floors and ceiling materials. In addition, I worked on the drawing and updates on different floor plans both of tower and basement. For the production on details I was working along side with the consultants of the project, on issues that they arise. Examples: fire proofing (after fire concept) and basement basement insulation system to soil and exterior environment.

1*
yeni inzibat WALLS DIVARLAR AO399 E1.1E1.2 AO399 Central Bank Azerbaijan Azərbaycan Mərkəzi Bankı 100% Design Developement 27 of June 2019 125 Floor Plan 01 Mərtəbə Plani 01 50m 100 20 30 40 |1:1000 37,5m 7,50 22,530 1:750 *2 pHotorealistic image drawing plans
Basement Wall adjacent to AirThermal Insulation VERTICAL SECTION CONCRETE/ MASONRY WALL - Waterproofed reinforced concrete (weisse wanne)* Thermal insulation composite system - A2 - 120mm Protein-foamed and Hydrophobized mineral foam board - Plasterwire - 20 mm plaster / finishing plaster in visible areas; dispersion paint, white colour OUTSIDE AIR OUTSIDE SOIL - Waterproofed reinforced concrete (weisse wanne)* - 80 mm perimeter thermal insulation drainage matexpanded polystyrene (XPS) in λ = 0.035 W/m·K - 10 mm Drainage Mat REQUIREMENTS FIRE CLASSIFICATION: A, A2 s1, d0 FIRE RESISTANCE: EI 120 BUILDING PHYSICS AND ACOUSTIC:CATALOGUE CODE: 'ITA C.P.C.' - 190605 'SS0' HEAT INSULATION: 120 mm, Protein-foamed and Hydrophobized mineral foam board 80 mm, DIN 4108-10 XPS 035 PW dh B1 BULLET RESISTANCE:BURGLAR RESISTANCE:LOCATIONS - Basement Area: Areas to Outside, Rooms against Ground/Soil and Outside Air and Loading Dock DESCRIPTION AND CHARACTERISTICS PRODUCT INFORMATIONCONNECTION DETAILSNOTES Variation in thickness of reinforced concrete according to structural engineers. Waterproofed reinforced concrete (weisse wanne) according to EN 206 and DIN 1045 applies to all wall construction against soil. Thickness varies according to ceiling height. Grade 2 Waterproofing: Type B Construction Structural Integrity System acc. to Engineers 120 10 20 80 10 Ceiling Type: Material: Surface: Structure: Perforation: Raster: Joints: Fixing: For Inspection: CHARACTERISTICS: Specifications: REQUIREMENTS: Acoustic: Hygiene: Cleaning: Cooling/Heating: Moisture: Light Reflection: Manufacturer: Product: Conductivity: Additional Loads: Suspension Height (mm): Fire Protection: Gypsum board stripe to the facade separate suspension system for installations Gypsum board, Mineral fiber, Filling, Primer, Coating White coating, matt, Standard colors,RAL/NCS Around column: 20 mm KNAUF OR EQUIVALENT AND APPROVED Hook-on system ca. 503 mm DIMENSIONS OF GYPSUM STRIPE IS CHANGING ACC. TO COLUMN´S SIZE Class A or A2-s1, d0 FREE-SPANNING CEILING WITH METAL SUBSTRUCTURE: UW 75 PROFILE AS WALL OR RAW CEILING CONNECTION 2xCW 75 AS CEILING PROFILE, HANGERS OF EXPOSED CEILING MUST BE ANCHORED IN THESE PROFILES. GYPSUM BOARD STRIPE ALONG THE FACADE GRID SYSTEM CEILING 851 235 503 110 1400 ca. (L00-04); 1100 ca. (from L05) FAÇADE 1750 ca. (L00-04); 1450 ca. (from L05) CORNER PROTECTION SUSPENSION SYSTEM: FLUSH METAL GRID, CARRING CHANNEL AND CROSS CHANNELS ARE CONNECTED WITH A FLUSH CONNECTOR CROSS CHANNEL SPACING 500MM HANGER SPACING 1000MM GYPSUM BOARD 12,5MM Colour acc. Architects COLUMN 600; 800; 1100 BAND WIDTH 125mm PERFORATED STANDARD GAP 3mm 3 118 HEA600 INTUMESCENT COATING CLASS F120 LAYER-PRIMER LAYER-INT.COATING LAYER TOP COATING HEA340 330 350 >=80MM MMMF MINERAL FIBRE PLATES WEIGHT M2>= 50KG/M3 (EG. ISOVER PROTECT BSP-50) LAYERS OF PLASTER BOARDS, WEIGHT M >= 10 KG/M2 (EG.KNAUF PIANO) LAYERS OF PLASTER BOARDS, WEIGHT M >= 10 KG/M2 (EG.KNAUF PIANO) MMMF MINERAL FIBRE PLATES WEIGHT M >= 30KG/M (EG. ROCKWOOL SONOROCK) CORES: TOWER: LEVEL 00 TO LEVEL 32 BASEMENT: -FF as per Design Specs VERTICAL SECTION 1:10 Open gap, constant width front 2mm, back 15mm app. Hidden Panel Frame, according to static calculations Planar Cladding Freeform Triangulated Cladding Console with depth regulation Primary steel structure, according to static calculations U-SECTION ADJUSTMENT Suspended Ceiling app.15 Gypsum Fibrebroard Double Side VENEERED, solid surface (refer elevations INT.CN1),B1-s1-d0 fire rated U-SECTION ADJUSTMENT SECTION ADJUSTMENT ALUMINIUM SUBSTRUCTURE MAIN STEEL STRUCTURE ALUMINIUM SUBSTRUCTURE MAIN STEEL STRUCTURE GAP DETAIL 1:2 Secondary Structure, according static calculations Panel Suspension Profiles Hidden Dubel (Fischer, Keil similar) Gypsum Fibrebroard Double Side VENEERED, microperforated surface (refer elevations INT.CN1), 19 SECONDARY STRUCTURE, according to static 657 642 614 612 PRIMARY STEEL STRUCTURE, according static calculations quarter slicing similar) INTERIOR ELEVATION PRIMARY STEEL STRUCTURE, according static calculations STRUCTURE, according to static according to static SECONDARY STRUCTURE, according to static *All structural dimensions have to be redesigned according to static calculations. *All structural dimensions have to be redesigned according to static calculations. VAR EDGE CUT RULES, ACCORDING TO ANGLE B/N PANELS: x< 150° -> no cut (18mm edge, 0° inclination) 150<x<160 -> (4mm edge, 10° inclination) 160<x<190 -> (4mm edge, 20° inclination) 190<x<220 -> (4mm edge, 45° inclination) 220<x<250 -> (2mm edge, 35° inclination) 160° 20° 45° 224° 180° 10° BACK OF CLADDING BACK OF CLADDING app. 15 3D Prefab. Wood Panels REQUIREMENTS FIRE CLASSIFICATION: B, B2-s1, d0 FIRE RESISTANCE: EI 120 BUILDING PHYSICS AND ACOUSTIC:ABSORBTION COEFFICIENT: αw ≥ 0.60 (translators' booths) CATALOGUE CODE:HEAT INSULATION:BULLET RESISTANCE:BURGLAR RESISTANCE:LOCATIONS - Conference Theatre Floor Level +05 DESCRIPTION AND CHARACTERISTICS PRODUCT INFORMATION Type, Material, Finish: - Natural wood veneer, Microperforated CONSTRUCTION: - CHBL Perforation: Special 3D prefab customized pattern according to CHBL design CONNECTION DETAILSNOTES Veneer: Acacia, pattern with continuous horizontal strand, matt finish, edges - with solid wood inserts, custom beveled according to gap rules. Arrangement of perforated and non perforated panels according to Room acoustics report and Design Concept. Micro perforated panels with a black fibrous web at the back. Main Conference room: Triangle composite panels made out of wood veneer fixed on a gypsum fiberboard backboard. Panels are arranged in different angles to each other. Visual gap is with constant width 5mm, for the cutting of the edge to see the legend of gap rules. All panels have 40mm acoustic wool with lining at the back. Insulation acc. to absorption value and building physics. 3D RENDER AND MATERIAL IMAGE Shadow gap floor. Angle rail, Stailess Steel profile, Colour range match with colour of placed cladding panels. Size 30x70 mm SHADOW GAP FLOOR 65 LED plantlight min 1000lux, 6500 K according to plant design integrated watering system floor underconstruction has to be protect from sewage water Plant substrate acc. to Sempergeen Vertical systems - B-s1,d0 Plants and Vegetation hangerprofile hanger levelling fixable ventilation OIPE area water and elecricity supply behind wall cladding in substructure VERTICAL SECTION Green Wall Living wall system cladding Pre-cultivated Indoor Panels MOUNTING BRACKET STEEL 300/50/3 CONTINUOUS, transformer for light 100 Cove LIGHTING REQUIREMENTS FIRE CLASSIFICATION: A FIRE RESISTANCE: EI 120 BUILDING PHYSICS AND ACOUSTIC:CATALOGUE CODE: 'ITA C.P.C.' 190605 'CJ0' HEAT INSULATION:BULLET RESISTANCE:BURGLAR RESISTANCE:LOCATIONS - At balconies, where core walls are overlooking in Atrium space. Floor levels: 09 - 11, 13, 16, 19, 20, 22, 24, 26, 29, 30, 31 an indoor vertical garden is foreseen on vertical walls of the cores. DESCRIPTION AND CHARACTERISTICS PRODUCT INFORMATION Type, Material, Finish: - Product: 'Flexipanel Indoor' by 'Sempergreen Vertical Systems' - Standard panel size: 62 cm 52 cm (possibility of variation) - Standard Flexipanel thickness: 6 cm (without vegetation) - Standard System thickness: 10 cm (without vegitation) - Describtion: The plants are installed on a modular system as grown plants. The watering system and the light for the plants is integrated into the green module. Watering and fertilization are automated. The complete system is not inflammable. Euroclass A1/A2 Maintenance of plants, and modules system should take place twice or eight times a year. CONSTRUCTION: - As per 'SEMPERGREEN VERTICAL SYSTEMS' specs for "Flexipanel Indoor" ref. drawing 'SVS ST 06-10' CONNECTION DETAILSNOTES Non visible mounting profile on the sides Construction. Construction flush with adjacent cladding. MATERIAL IMAGE From Interior Space: 1. 60 mm Sempergreen Flexipanel 60-50 2. 100mm (inlcuding the Flexipanel) System Thcikness 3. Concrete wall Variation in thickness Mounting: - Mounting as stipulated by supplier - Sempergreen® omega pro le, mounted onto substructure. Dimensions and material of omega pro le according to supplier instructions - Between stony substructure and omega pro le: vapour-tight foil against substructure; foil to be used in accordance with supplier instructions - Additional horizontal safety strip along the front of the Sempergreen® Flexipanels: stainless steel 30x40 mm, xed by means of stainless steel spacers (steel bush) and stainless steel M8 bolts on underlying steel omega pro les - Fasteners in accordance with supplier instructions Finishing on top: - Aluminium cover pro le Finishing of the side connection: - Aluminium cover pro le Finishing of the lower connection: - Aluminium gutter pro le, tted with a drip catcher - Gutter tted with PVC drain, 40 mm round - Gutter size in accordance with supplier's instructions Adjusting irrigation system: - Irrigation system prescribed by supplier 20 aluminum gutter drip catcher PVC DRAIN 40 MM damp proof foil flexipanel 60-50 omega profile stainless steel M8x75 stainless steel strip 30x40 mm stainless steel 55 mm round15 mm bus stainless steel M8x30 100 3*
Drywall with 'ETERNIT' Panels anchor screw according to requirements VERTICAL SECTION suspended ceiling different ceiling types 30 100 different floor types FF
FIRE CLASSIFICATION: A, A2-S1, d0 FIRE RESISTANCE: EI 120 BUILDING PHYSICS AND ACOUSTIC:CATALOGUE CODE: 'ITA C.P.C.' 190605 'DC1' HEAT INSULATION:BULLET RESISTANCE:BURGLAR RESISTANCE:LOCATIONS - Against Drywall Tower's Core Cladding, Corridors Atrium and Public exposed interior spaces DESCRIPTION AND CHARACTERISTICS PRODUCT INFORMATION Type, Material, Finish: - Material: 'ETERNIT' Fiber Cement Panels for interior use Type of CARAT HR - Dimensions and Thickness: 3040 x 1220 mm and 80 mm - Colour: a. Tower Core and corridors of Board and chairman's offices (1.) b. Tower Core cladding (2.) - Name: a. (1.) Swisspearl CARAT Elfenbain/Ivory 7099 b. (2.) Swisspearl CARAT Elfenbain/Ivory 7091 CONSTRUCTION:CONNECTION DETAILSNOTES *Dimension Panels Vary as per Floor Level and Position Built-in component: All built- in components has to be flush with wall surface When using same or different cladding finishes for both sides of drywall the total thickness should be max. 350 mm (Depending on Drywall's thickness). Insulation acc. to absorption value and building physics. Drywall thickness varies according to fire proofing requirements (use of 2x20mm fireproofed Knauf's boards instead of 2x12.5mm), usage of wall (i.e. pipe cavity) and wall insulation. Additional thickness as per cladding finish. MATERIAL IMAGE grey/ivory white/ivory suspended ceiling different ceiling types L Profile :40/40/2 Aluminium with pin to hang on to substructure Profile :60/60/3 Steel zinc coated joint 2mm, dark/grey background C Profile :100/50/50/ Steel zinc coated 30 100 Cove mounting bracket steel 220x50x3 continuous, anthracite coated 100 From Interior Space: 1. 80 mm Concrete Fiberboard for 'ETERNIT'* 2. 30 mm Metal frame for panel fixing 3. 40 mm Rockwool insulation acc. to BP requirements 4. 2 20 mm Fireproof gypsum boards as per Knauf's construction SF Max. 250 mm Angle rail, Stailess Steel profile, Colour range to match with colour of placed cladding panels. Size of: 30x70 mm different floor types 100 Ceiling Variation 50 Max. 250 mm 100 100 ETERNIT PANELS ON BOTH SIDES OF DRYWALL Ceiling Variation 50 Max. 250 mm 100 100 30 VERTICAL SECTION NO LIGHT FIXING 350 Plasterboard with double framing for noisy rooms 20 15-20 edge protection profile 4x panels packet sliding joint anchor screw according to requirements steel angle 50x35 with RC2 requirements 126 140 351 25 60 metall sheet layer at RC2 class goes to the floor anchor screw according to requirements FLOOR FINISH AS PER DESIGN technial plant/NSHV room CEILING OPTION AS PER DESIGN INSTRUCTIONS under cut skirting aluminium clip-system (flush mounted)powder coated, white matt finish colour range, match with colour range of the wall suspended ceiling different ceiling types adjacent room different floor types FF FF REQUIREMENTS FIRE CLASSIFICATION: A, A2 s1, d0 FIRE RESISTANCE: EI 120 BUILDING PHYSICS AND ACOUSTIC:CATALOGUE CODE:HEAT INSULATION:BULLET RESISTANCE:BURGLAR RESISTANCE: RC2 LOCATIONS - Technical Plant rooms DESCRIPTION AND CHARACTERISTICS PRODUCT INFORMATION Type, Material, Finish: - Surface finish: refer to design specs and to wall buildup DGD CONSTRUCTION: - As per Knauf's product. Manufacture's data for connections, pillar distance, screw distance, etc. are to observed strictly. - General: high sound insulation is only reachable with careful sealing of all fugues manufacture's data for connections, pillar distance, screw distance - No connection between facing shell and double wall - Wall-element to connect façade-post, evaluated airborne insulation Rw,P >= 52 dB partitioning - Continue the wall to lower edge beam without break, same structure cladding the beam on both sides with double-layer panelled plasterboard, same products as wall,and mineral fibre filling - In case of EI 120 requirements, there has to be additional substructure provided for mounting the door, see related door type detail. subconstruction has to fulfill static and fire requirements CONNECTION DETAILSNOTES Insulation acc. to absorption value and building physics. Drywall thickness varies according to fire proofing requirements (use of 2x20mm fireproofed Knauf's boards instead of 2x12.5mm), usage of wall (i.e. pipe cavity) and wall insulation. Additional thickness as per cladding finish. From Left to Right: 1. 12,5 mm plasterboard optional 0,5 mm sheet steel at RC2 requirements 2. 12,5 mm plasterboard 3. 15 mm airspace CW 75x06 C-profile DIN 18182 with 4. 60 mm mineral fibre layered betw. CW-profiles requirements on standards for mineral fibre acc. to EN 13162 length related flow resistance: AF6 5. 12,5 mm plasterboard Diamant optional 0,5 mm sheet steel at RC2 requirements 6. 12,5 mm plasterboard Diamant 7. 140 mm airspace CW 50x06 C-profile DIN 18182 with 8. 60 mm mineral fibre layered betw. CW-profiles requirements on standards for mineral fibre acc. to EN 13162 length related flow resistance: AF6 9. 12,5 mm plasterboard 10. 12,5 mm plasterboard mounting board 20% perforated (gypsum board) Profile :40/40/2 Aluminium with pin to hang on to substructure L Profile :60/60/3 Steel zinc coated Drywall with Acoustic or dif. Finish panels 100 100 Wood Paneling for fixing the fabric - 18 mm Plywood - Fabric 2 mm - Textile to be desided C Profile :100/50/50/ 4 Steel zinc coated CEILING FINISH AS PER DESIGN 100 30 mounting bracket steel 220x50x3 continuous, anthracite coated suspended ceiling different ceiling types Joint 2mm, dark background VERTICAL SECTION (A) Cladding Panels vary according to design specs. REQUIREMENTS FIRE CLASSIFICATION: B, C-s1, d0 FIRE RESISTANCE: EI 120 BUILDING PHYSICS AND ACOUSTIC: R'w ≥ 42 dB CATALOGUE CODE: 'ITA C.P.C.' 190605 'DF0' HEAT INSULATION:BULLET RESISTANCE:BURGLAR RESISTANCE:LOCATIONS - Against Drywall in Chairman's office and Board offices DESCRIPTION AND CHARACTERISTICS PRODUCT INFORMATION Type, Material, Finish: Material Product: (1.) Spinney Beck Espana (ES) Type (2.) Backhausen Wollbox Collection - Dimensions and Thickness: CHBL Design Specs - Colour: a. Chairman's office (1.) Leather Eskimo b. Board Offices (2.) Wool Beige - Name: a. (1.) Spinneybeck ES 8092 b. (2.) Hubertus MC 809 A20 - Mounting: textile coating on acoustic chipboards panels bolted on a 3D dimensional adjustable substructure, non visible mounting, varied mounting subconstruction by mounting on gypsum board wall, there has to be a preventive support in the gypsum board wall, total construction depth: 100mm CONSTRUCTION: - Fabric to be fixed on 3D prefabricated panels designed by CHBL - Textile cover on acoustic chipboard 19mm CONNECTION DETAILSNOTES *Dimension Panels Vary as per Floor Level and Position Built-in component: All built- in components has to be flush with wall surface Drywall thickness depends by its position - in case of Fire Compartment division drywall: 1. 2 x 12.5 mm 2. 100 mm cavity and 3. 2x20 mm of Knauf boards Insulation acc. to absorption value and building physics. MATERIAL IMAGE HORIZONTAL SECTION FABRIC AND ETERNIT ON DRYWALL 1. FIRE COMPARTMENT (B) 2. NORMAL DIVISION WALL FOR OFFICE (C) 350 (B) 100 (C) 325 100 Ceiling Variation 50 Max. 250 mm 100 100 30 VERTICAL SECTION NO LIGHT FIXING SF Angle rail, Stailess Steel profile, Colour range to match with colour of placed cladding panels. Size of: 30x70 mm different floor types Vary acc. to wall position FABRIC ETERNIT FABRIC ETERNIT Backhausen Wool Beige Spinneybeck Leather Eskimo 40 mm Rockwool insulation acc. to BP Glass system partition EI 60 Fire compartment separation glass Atrium REQUIREMENTS FIRE CLASSIFICATION: A, A2-S1, d0 FIRE RESISTANCE:BUILDING PHYSICS AND ACOUSTIC: R'w ≥ 42 dB CATALOGUE CODE:HEAT INSULATION:BULLET RESISTANCE:BURGLAR RESISTANCE:LOCATIONS - (non fire compartment) - Atrium Fire compartment DESCRIPTION AND CHARACTERISTICS PRODUCT INFORMATION Type, Material, Finish: - Company: Strahle - System Product: TRENNWAND System 3400 - Glazing: VSG-SI 8 (for higher sound proofing) - Dimensions: According to Office Size - Frame Colour: Aluminium Anodised - Frame Size: W 60 mm For information regarding Fire Compartment glass separation, refer to detail CON.G10 CONSTRUCTION: - Acc. to Company's specs - Middle for EI 30 or for EI 60 - Panel width 1.35m on all floors CONNECTION DETAILS Connections flanking components: Floor: installation on double floor on bulkhead evalued standard flanking level difference Dn,f,w >=50 dB Ceiling: padding hollows trapezodial sheet form fully with mineral fibre adapting the plasterboards at carrier profile and padding of fugues with mineral fibre NOTES Extra Venetian blinds in the middle for privacy. Partitioning: plasterboard wall, single layer paneling to lower edge beam without break or raw ceiling if beam, cladding the beam on both sides with single-layer panelled plasterboard, and mineral fibre filling. Insulation acc. to absorption value and building physics. Fire Compartment glass separation, refer to detail CON.G10 MATERIAL IMAGE VERTICAL SECTION Ceiling Finish acc. to design pref. 125mm band perforated 1. mm toughened glass in steel frame 2. 80 mm airspace, splitted frame 3. 10 mm laminated safety glass with sound insulation foil FFL SFL 15 15 Structural glazing complete glass construction for drop security glazing fire resistance EI60 60 100 Filled aluminum profile for fire resistance EI60 PERFORATED ALUPANEL Ceiling connection profile structural glazing fire resistance EI 90 Shadow gap 15 mm Concrete base fire resistance EI60 Stainless steel glass blasted Floor connection profile structural glazing fire resistance EI90 Stainless steel glass blasted invisible attachment Connection seal for fire resistance EI60 VERTICAL SECTIONATRIUM FIRE COMPARTMENT GLASS SEPARATION EI60 REFERENCE TO DETAIL: CON.G10 ATRIUM SIDE Floor Below FLOOR ABOVE OFFICES' SIDE 35 Pressure Resistant bottom edge of Ceiling Telescope connection for tolerance adjustment max. 25mm Surface powder-coated micaceous iron ore shade, e.g. from ral colour system acc. to architects specification 5 100 15 200 100 Floor barrier pre-cast fabricated, porous concrete Leveling layer Elastomeric border Only for R'w=47dB or higher necessity Double glazing toughended safety glass *4
REQUIREMENTS

opera buildings

project type opera theater - cultural project info: https://coop-hiMMelblau.at/projects/sevastopol-opera-and-ballet-theater/

role - architect:

On this project I was mainly responsible for the production of Sections and Level Drawing Plans (for arrangement of spaces according to consultant) and typical detail package for the final submission of the project. I have worked on the project from early stages until completion. I have produced Concept stage, Schematic Design and CC and CD details and drawings for the office’s client.

In addition, I worked on the drawing and updates on different floor plans.

For the production of details I was working along side with the consultants of the project, on issues that they arise for example glass facade, louver/shaders’ system and GFRC Panelling system.

From this project, I continued on a new opera building and worked on the production of concept stage diagrammatic section drawings.

5*
Cultural District Sevastopol Opera/Ballet TheatreDD | 1st of September 2020 22.497 (=52.497) 19.567 (=49.567) 18.786 (=48.786) 19.567 (=49.567) 22.497 (=52.497) 37.70 (=+67.70) 37.30 (=+67.30) MIN SLOPE MIN SLOPE SLOPE MIN SLOPE SLOPE SLOPE MIN SLOPE MAIN GUTTER MAINGUTTER GUTTER MAINGUTTER MAIN GUTTER MIN SLOPE MIN SLOPE MIN SLOPE SLOPE MIN SLOPE A.1 B.1 C.1 D.1 E.1 F.1 G.1 H.1 1.1 2.1 3.1 4.1 5.1 6.1 7.1 8.1 9.1 10.1 11.1 A.1 B.1 C.1 G.1 D.1 6 7 5900 4100 5350 2150 19350 8000 44850 3600 5800 5700 4750 3050 3300 20150 4300 7900 7550 66100 5900 5350 21500 36850 M D-D D-D 41.08 7-7 MP-1468 -00-АР = = SHEET 33 1:200 37,5m 7, 5 0 15 22, 53 0 1:750 Floor 1 64 Cultural District Sevastopol | Opera/Ballet TheatreDD | 1st of September 2020 +09.00 (=+39.00) +05.10 (=+35.10) CORE 02 CORE 03 TENTIAL +04.95 (=+34.95) A.1 B.1 C.1 D.1 E.1 F.1 G.1 H.1 1.1 2.1 3.1 4.1 5.1 6.1 7.1 8.1 9.1 10.1 11.1 A B C D E F G H A.1 B.1 C.1 G.1 D.1 K L G 4100 19350 44850 3600 5700 3050 3300 20150 4300 7900 7550 66100 5900 4100 5350 21500 36850 M M D-D A-A 5-5 5-5 N Explication premises level +02 MP-1468П-00-АР2 = = 1:200 37,5m 7, 5 0 15 22, 53 0 | 1:750 Floor 1 54 *6 plans
SOLO SINGER F (10) 4.20 3.60 4.05 4.95 5.85 2.85 4.95 6.00 7.05 5.05 5.95 1.20 9.94 6.00 3.00 1.62 5.39 10.31 4.81 13.65 GRAND FOYER MAIN ENTRANCE VIP BALCONY VIP PARKING VENTILATION SMALL HALL SMALL HALL AUDITORIUM RESTAURANT OUTSIDE PATIO SMALL HALL FOYER VENTILATION ADMINISTRATION ROOMS (AT LEVEL +04.5 and LEVEL +05) HOT AND COLD MEAL PREPARATION ROOF ROOF ROOF CORRIDOR STORAGE EMERGENCY ESCAPE CORRIDOR 3.75 3.60 CIRCULATION VENT. REST. FOYER VENTILATION TRANSFORMERS 02 VENTILATION TRANSFORMERS COOLING CENTRE CONNECTION FIRE FIGHTING PUMP SHAFT 10.10 7.60 3.15 17.25 5.85 20.70 2.50 18.04 18.00 20.40 AUDITORIUM STAGE TOWER BACKSTAGE FLOOR STAGE STORAGE PARKING DELIVERY AREA AUDITORIUM CEILING MAIN STAGE ORCHESTRA FRONT STAGE STORAGE BALLET FLOOR STORAGE VIP PARKING TECHNICAL ROOM 2.36 BACKDROP STORAGE 19.19 TECHNICAL ELEVATOR ELEVATOR SHAFT BACKSTAGE CIRCUL- ATION DIMMER ROOM 2 CIRCULATION 0.74 C-C C-C GREENROOM ORCHESTRA ORCHESTRA PROJECTON ROOM -8.70 -5.85 2.20 21.25 18.50 19.30 12.30 5.40 LOBBY RECORD. INTERPR. CABINS DIMMER ROOM 7.40 28.00 39.00 30.27 CLEANING AND SANITARY ROOM LOCKERS 2.50 18.76 1x10cm LOCKERS STORAGE EQUIPMENT STORAGE ORCHESTRA DRESSING 3.67 MECHANICAL SMOKE EXHAUSTS ACCESS TO ROOF FAN FAN FAN FAN FAN FAN FAN FAN FAN FAN SWITCHBOARD SMALL HALL SPACE TBD VENTILATION (CAFE + TICKETS) TOILETS AND GARDEROBE DUCT DUCT DUCT DUCT DUCT DUCT HANDICAP PARKING LANDSCAPE ACCESS TO ROOF ACCESS TO ROOF ACCESS TO ROOF 0.20 0.20 0.80 0.10 1.30 0.20 0.80 0.80 3.00 0.50 0.30 0.20 0.30 0.20 +27.60 STAGE ARTIST PREPARATION -7.80 (=+22.20) BALLET & SEATING STORAGE LVL -02 -13.65 (= +16.35) SMALL HALL -4.95 (=+25.05) ORCHESTRA PIT LVL 00 +0.00 (=+30.00) MAIN LVL -03 -19.65 (= +10.35) PARKING LVL 01 +4.95 (=+34.95) RESTAURANT TERRACE LVL 01 +4.50 (=+34.50) 1st BALCONY VIP LVL 02 +9.00 (=+39.00) 2nd BALCONY/ CHOIR PREP. LVL 03 +13.50 (=+43.50) 3rd BALCONY LVL 03 +12.60 (=+42.60) BALLET PREPARATION LVL 04 +16.80 (=+46.80) ORCHESTRA PREPARATION LVL 05 +23.85 (=+53.85) TECHNICAL & ADMINISTRATION +37.70 (=+67.70) ROOFTOP LVL 06 +27.60 (=+57.60) TECHNICAL LVL -01 -8.70 (=+21.30) 3.00 FIRST VIOLIN BALLET MEN CHANGING ROOM 50 PEOPLE PRIMA SOLO PERFORMER_R01 (F) SOLO SINGER (07) SOLO SINGER F (08) SOLO SINGER F (09) SOLO SINGER (11) SOLO SINGER F (12) 2.80 STAGE MACHINERY AS PER THEATRE CONSULTANT MBBM 9700 9300 7150 6900 7700 9300 9900 3150 15000 96598 4500 5900 4100 5350 21500 36850 A B C D E F G H M J K L G.1 H.1 A.1 B.1 C.1 D.1 E.1 N 14000 2.60 SOLO SINGER M (07) SOLO SINGER M (08) SINGERS (M) 03 FLUTES CIRCULATION CORRIDOR LVL 04.5 +19.80 (=+49.80) ADMINISTRATION 3.00 4.50 CONTRABASS ARTIST CHOIR_R05 (M) SPACE TBD 0.15 1.10 1.20 1.10 BALLET CLASSROOM 01 6.00 0.70 0.55 0.80 0.57 PERFORATEDPANELS 2.00 STAGE/LOBBY/DELIVERY LOBBY ENTRANCE CIRCULATION CORRIDOR STORAGE CIRCUL- LATION KITCHEN LVL -0.5 -5.85 (=+24.15) ORCHESTRA GREEN ROOM TECHNICAL LVL -0.5 -4.5 (=+25.50) LOWER FOYER 1.30 0.72 3.30 DRAIN FIRE LANE CIRCULATION CLIP CIRCULATION OFFICE OFFICE OFFICE INNER COURTYARD OFFICE ROOF SKYLIGHT 3.00 0.30 8.65 VARY 6.11 VARY 14.33 3.00 3.60 N уч докум Подпись Дата Стадия Лист Листов Инв .No. подл Подп и дата Взам .No. Согласовано Формат A0 MP-1468П-00-АР2 по адресу Российская Федерация Севастополь Разраб Проверил спец Галабурда Пашкевич CONSULTANTS DESIGN ARCHITECT +43 (1) 546 60+43 (1) 546 60- 600 SPENGERGASSE 37 TEL NOTES: envelope geometry and vary; according architectural material and finishes catalogue; products presented require conformity specific approval resistance, bearing capacity, durability, UV resistance, etc. -DIMENSIONS: units = metric system, FLOORPLANS: cut = finished floor SHEET 34 SHEET 35 GWx GWx GLx REINFORCED CONCRETE GYPSUM BOARD GLASS GYPSUM BOARD SHAFT WALL PLASTER BOARD GYPSUM BOARD LEGEND SHAFTS +30.00 BOS= BOTTOM STRUCTURAL SLAB AREA (m2) NAME OF FUNCTION SLAB LEVEL ROOM TAG ROOM NUMBER 4.71 1. STEEL FRAME 400 mm VAPOR AND WATERPROOFING SEAL 10 mm GFRC PANELS 13 mm CHBL FACADE (REF. FACADE BROSCHURE) ENTRANCE AS PER ENGINEER (B+G): FINISH GFRC PANELS13 mm 17.64 5.39 10.31 4.81 13.65 GRAND FOYER MAIN ENTRANCE VIP BALCONY SMALL HALL AUDITORIUM SMALL HALL FOYER ROOF STORAGE EMERGENCY ESCAPE CORRIDOR CIRCULATION SHAFT SWITCHBOARD SMALL HALL SPACE TBD VENTILATION (CAFE TICKETS) TOILETS AND GARDEROBE HANDICAP PARKING ACCESS TO ROOF 0.20 0.20 0.80 0.10 1.30 0.20 0.80 0.80 3.00 SPACE TBD 0.15 1.10 1.20 1.10 1.30 0.72 SKYLIGHTS VENTILATION OPENING PANELS MAIN GUTTER COVERED WITH OPERABLE ROOF PANEL LIFELINE ZONE FALL PROTECTION SYSTEMGRANT FOYER SUBSTRUCTURE 120 W1.B W1.B W1.B W1.B FF LVL 01 +4.50 (=+34.50) 1st BALCONY VIP SF +4.30 (=+34.30) Joint 2mm, dark background, A2 Textile finish according design - textile covering (C-S1, Wood Paneling fixing the fabric - mm Plywood (C-S1, d0) Colour range match with colour placed cladding panels Profile :100/50/50/ Steel zinc coated, VIP BALCONY F2.D W6.A W6.A SHEET R1B SHEET R2B LOBBY BALCONY SECTION Fragment Section 1-1 Grant Foyer Entrance 5900 4100 5350 21500 36850 G.1 H.1 A.1 B.1 C.1 D.1 E.1 -4.95 (=+25.05) LVL +0.00 (=+30.00) LVL -0.5 -5.85 (=+24.15) LVL -0.5 -4.5 (=+25.50) Fragment Section 1-1 Lobby Balcony Detail Section 1:10 Detail Facade Foyer Mullion Vertical Section F1A Detail Facade Foyer Mullion Horizontal Section F2A Detail Facade Foyer Mullion Elevation on the Point Fixing Pad GFRC PANELS AS PER BOLLINGER+GROHMAN FACADE LOUVERS: STEEL COVERED WITH GFRC PENALS 13 mm BALLET CLASSROOM FLOOR 700 mm AS PER THEATRE CONSULTANT (MBBM) AS PER THEATRE CONSULTANT (MBBM) AS PER STRUCTURAL ENGINEER (B+G) CHBL FACADE (REF. FACADE BROSCHURE) LIGHTING AS PER LIGHTING CONSULTANT (AGLICHT) SOLO SINGER F (10) 4.20 3.60 4.05 4.95 5.85 2.85 4.95 7.05 5.95 1.20 9.94 1.62 RESTAURANT OUTSIDE PATIO HOT AND COLD MEAL PREPARATION ROOF 3.75 VENT. REST. FOYER LANDSCAPE ACCESS TO ROOF 0.50 0.30 0.20 +27.60 STAGE ARTIST PREPARATION -7.80 (=+22.20) BALLET & SEATING STORAGE -4.95 (=+25.05) ORCHESTRA PIT LVL 00 +0.00 (=+30.00) MAIN LVL 01 +4.95 (=+34.95) RESTAURANT TERRACE LVL 01 +4.50 (=+34.50) 1st BALCONY VIP LVL 02 +9.00 (=+39.00) 2nd BALCONY/ CHOIR PREP. LVL 03 +13.50 (=+43.50) 3rd BALCONY LVL 03 +12.60 (=+42.60) BALLET PREPARATION LVL 04 +16.80 (=+46.80) ORCHESTRA PREPARATION LVL 05 +23.85 (=+53.85) TECHNICAL & ADMINISTRATION LVL 06 +27.60 (=+57.60) TECHNICAL LVL -01 -8.70 (=+21.30) 3.00 PRIMA SOLO PERFORMER_R01 (F) SOLO SINGER (07) SOLO SINGER (08) SOLO SINGER (09) SOLO SINGER F (11) SOLO SINGER F (12) 2.80 2.60 SOLO SINGER M (07) SOLO SINGER M (08) PRINCIPAL SOLO SINGERS (M) 03 BACKSTAGE CIRCULATION LVL 04.5 +19.80 (=+49.80) ADMINISTRATION 3.00 4.50 CONTRABASS ARTIST CHOIR_R05 (M) BALLET CLASSROOM 01 6.00 0.70 0.55 0.80 0.57 PERFORATEDPANELS 2.00 LOBBY ENTRANCE KITCHEN LVL -0.5 -5.85 (=+24.15) ORCHESTRA GREEN ROOM TECHNICAL LVL -0.5 -4.5 (=+25.50) LOWER FOYER 3.30 DRAIN FIRE LANE CIRCULATION CLIP THERMAL INSULATION 160 mm VAPOR AND WATERPROOFING SEAL mm GFRC PANELS 13 mm FACADE PANELS TO OPEN FOR VENTILATION MAIN GUTTER MAIN GUTTER LIFE ZONE FALL PROTECTION SYSTEM C6A (ii) C6A Fragment Section 1-1 (Restaurant) M 1:100 Detail Facade Connection to Clip C6A (ii) M 1:10 Detail Facade Connection to Clip C6A (i) M 1:5 N M 7* sections and typical details
AUDITORIUM CEILING ORCHESTRA STAGING VIP TOILETS TOILETS TOILETS CIRC 38.58 CHAIR STORAGE MAIN STAGE 18.00 18.12 30.18 20.32 5.25 FOYER STORAGE GENERAL STAGE EQUIPMENT VIP PARKING OFFICE AREA SMALL STAGE ORCHESTRA REHEARSAL SMALL HALL DELIVERY DRESSING (MALE) CIRCULATION CIRCULATION OPERA REHEARSAL VENTILATION FOYER VENTILATION POSSIBLE MEP SPACE 3 4 5 7 8 12600 7050 8000 8000 8000 7050 12600 RECORDING STUDIOS RAMP TO PARKING VIP HALL XH CIRCULATION CIRCULATION OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE DUCT TO AUDITORIUM SHEET 36 SHEET +27.60 STAGE -7.80 (=+22.20) BALLET & SEATING STORAGE LVL -02 -13.65 (= +16.35) SMALL HALL STAGE/LOBBY/DELIVERY -4.95 (=+25.05) ORCHESTRA PIT LVL 00 +0.00 (=+30.00) MAIN LOBBY ENTRANCE LVL -03 -19.65 (= +10.35) PARKING LVL 01 +4.95 (=+34.95) RESTAURANT TERRACE LVL 01 +4.50 (=+34.50) 1st BALCONY VIP LVL 02 +9.00 (=+39.00) 2nd BALCONY OFFICE LVL 03 +13.50 (=+43.50) 3rd BALCONY LVL 03 +12.60 (=+42.60) ARTIST PREPARATION LVL 04 +16.80 (=+46.80) ORCHESTRA PREPARATION LVL 05 +23.85 (=+53.85) TECHNICAL ADMINISTRATION +37.70 (=+67.70) ROOFTOP LVL 06 +27.60 (=+57.60) TECHNICAL LVL 04.5 +19.80 (=+49.80) ADMINISTRATION LVL -01 -8.70 (=+21.30) LVL -0.5 -5.85 (=+24.15) ORCHESTRA GREEN ROOM TECHNICAL LVL -0.5 -4.5 (=+25.50) LOWER FOYER CHOIR_R_06 (F) SOLO PERFORMERS_R_05 (M) PRESSURIZATION 03-04 ARTISTS ENTRANCE LOBBY VENTILATION REHEARSAL REHEARSAL ROOM VOCAL CLASSES_ OPERA_04 CHOIR FOYER RESTAURANT FOYER 6.00 ARTISTIC CHOIR_READY ROOM_(G) VENTILATION REHEARSAL VIP PARKING STAGE TOWER SIDE STAGE LEFT SIDE STAGE RIGHT STAGE STAGE TECHNICAL MIN. 5.00 TECHNICAL 62.80 16.40 16.40 0.55 FAN FAN FAN FAN FAN FAN FAN FAN FAN MECHANICAL SMOKE EXHAUSTS COSTUME UNPACKING AND 1.20 0.45 1 2 4 5 6 7 8 12.60 7.05 8.00 8.00 8.00 7.05 12.60 1.20 1.05 OFFICE ADMIN. ARTIST, STAFF ENTRANCE LAUNDRY ADMINISTRATION AREAFIRE ESCAPE TUNNELS MAIN ROOF EXHAUST MAIN ROOF AIR INTAKE VIP PARKING OFFICE OFFICE ADMIN. SECRE+27.60 STAGE -7.80 (=+22.20) BALLET & SEATING STORAGE LVL -02 -13.65 +16.35) SMALL HALL STAGE/LOBBY/DELIVERY -4.95 (=+25.05) ORCHESTRA PIT LVL 00 +0.00 (=+30.00) MAIN LOBBY ENTRANCE LVL -03 -19.65 +10.35) PARKING LVL 01 +4.95 (=+34.95) RESTAURANT TERRACE LVL +4.50 (=+34.50) 1st BALCONY VIP LVL 02 +9.00 (=+39.00) 2nd BALCONY OFFICE LVL 03 +13.50 (=+43.50) 3rd BALCONY LVL 03 +12.60 (=+42.60) ARTIST PREPARATION LVL 04 +16.80 (=+46.80) ORCHESTRA PREPARATION LVL 05 +23.85 (=+53.85) TECHNICAL ADMINISTRATION +37.70 (=+67.70) ROOFTOP LVL 06 +27.40 (=+57.40) TECHNICAL OPEN TO ROOF LVL 04.5 +19.80 (=+49.80) ADMINISTRATION LVL -01 -8.70 (=+21.30) LVL -0.5 -5.85 (=+24.15) ORCHESTRA GREEN ROOM TECHNICAL LVL -0.5 -4.5 (=+25.50) LOWER FOYER Section 3-3 (cross section on the stage box) M 1:200 ACCESS TO ROOF A.1 B.1 C.1 D.1 E.1 F.1 G.1 ROOF HANDICAP PARKING CAFE SITTING COMMON PUMP ESCAPE TUNNEL CASH DESK FOYER CAFE CAFE SITTING BAR BAR MEP MEP ACCESS TO CLIP SMALL HALL FOYER +27.60 STAGE -7.80 (=+22.20) BALLET & SEATING STORAGE LVL -02 -13.65 (= +16.35) SMALL HALL STAGE/LOBBY/DELIVERY -4.95 (=+25.05) ORCHESTRA PIT LVL 00 +0.00 (=+30.00) MAIN LOBBY ENTRANCE LVL -03 -19.65 (= +10.35) PARKING LVL 01 +5.10 (=+35.10) CAFE TERRACE LVL 02 +9.00 (=+39.00) 2nd BALCONY OFFICE LVL 03 +13.50 (=+43.50) 3rd BALCONY LVL 03 +12.60 (=+42.60) ARTIST PREPARATION LVL 04 +16.80 (=+46.80) ORCHESTRA PREPARATION LVL 05 +23.30 (=+53.30) TECHNICAL +37.70 (=+67.70) ROOFTOP LVL 06 +27.60 (=+57.60) TECHNICAL SERVER ROOM BAR CAFE FOYER CAFE SMALL HALL FOYER COMMON PUMP PARKING 1.1 2.1 3.1 4.1 5.1 6.1 7.1 LVL -01 -8.70 (=+21.30) LVL -0.5 -5.85 (=+24.15) ORCHESTRA GREEN ROOM TECHNICAL LVL -0.5 -4.5 (=+25.50) LOWER FOYER FIRE TANK 3.95 9.60 Section D-D Foyer Ticket Office/Gift Shop M 1:200 Section E-E Foyer Ticket Office/Gift Shop M 1:200 SHEET F3A SHEET 33 R9A SHEET Canopy Details (E3B, E4B, E5B) SHEET 35 F3A *8 SectionS
FOYER VIP OFFICE AREA VIP HALL 0.46 0.40 ARTISTIC CHOIR_R_06 (F) SOLO PERFORMERS_R_05 (M) CHOIR REHEARSAL CIRCU- LATION FOYER TO RESTAURANT ARTISTIC CHOIR_READY COSTUME ROOM_(G) 14.20 15.90 0.30 CIRCULATION FOR ARTISTIC ROOMS BALLET 2.70 OFFICES 4.20 1.33 6.80 2.50 SHEET 35 C6A SHEET 35 C6A (ii) SHEET C6A (ii) SHEET C6A (ii) SHEET F4A Fragment of Section 3-3 Left Wing Clip M 1:100 Fragment of Section 4-4 Left Wing Clip M 1:100 Entrance +27.60 STAGE ARTIST PREPARATION LVL 00 +0.00 (=+30.00) LVL 01 +4.95 (=+34.95) LVL 01 +4.50 (=+34.50) 1st BALCONY VIP LVL 02 +9.00 (=+39.00) LVL 03 +12.60 (=+42.60) BALLET PREPARATION LVL 04.5 +19.80 (=+49.80) ADMINISTRATION +27.60 LVL 00 +0.00 (=+30.00) LVL 01 +4.95 (=+34.95) LVL 01 +4.50 (=+34.50) LVL 02 +9.00 (=+39.00) LVL 03 +13.50 (=+43.50) 3rd BALCONY LVL 03 +12.60 (=+42.60) BALLET LVL 04 +16.80 (=+46.80) ORCHESTRA PREPARATION LVL 04.5 +19.80 (=+49.80) LVL 05 +23.30 (=+53.30) TECHNICAL LVL 05 +23.85 (=+53.85) 1 SMALL STAGE OPERA REHEARSAL 3.00 EXHAUST ROOF N MA CIRCULATION 5.95 0.39 CIRCULATION OFFICES VOCAL CLASSES_ OPERA_04 BALLET COMPANY DIRECTOR CHOIR INSPECTOR CIRCU- LATION FOYER 1.20 FIRE ESCAPE TUNNELS 2.70 1.40 0.90 7.31 9.09 1.00 SHEET 35 F3A SHEET 35 F3A SHEET 35 C6A SHEET 35 C6A (ii) SHEET 35 C6A (ii) SHEET C6A (ii) STAGE ARTIST PREPARATION LVL 00 +0.00 (=+30.00) MAIN LOBBY ENTRANCE LVL 01 +4.95 (=+34.95) RESTAURANT TERRACE LVL 01 +4.50 (=+34.50) 1st BALCONY VIP LVL 02 +9.00 (=+39.00) 2nd BALCONY/ CHOIR PREP. LVL 03 +13.50 (=+43.50) LVL 03 +12.60 (=+42.60) BALLET PREPARATION LVL 04 +16.80 (=+46.80) -4.95 (=+25.05) ORCHESTRA PIT LVL -05 -5.85 (=+24.15) LVL 05 +23.30 (=+53.30) TECHNICAL TECHNICAL ADMINISTRATION Fragment of Section 3-3 Right Wing Clip M 1:100 Fragment of Section 4-4 Right Wing Clip M 1:100 Perspective View East View Right Wing Clip Perspective View South View Right Wing Clip Entrance 8 8 Room Acoustic Fire resistance Fire classification Burglar resistance Bullet resistance REQUIREMENTS CHARACTERISTICS LOCATIONS 02 Auditorium, WW1.a microperforated WW1.b non perforated Veener: Eucalyptus Arrangement perforated „Room acoustics report“. Auditorium: Triangle backboard. Panels Leather Acoustic panel size: 1000mm material: leather Arrangement sound „Room acoustics report“. Room Acoustic Absorption coefficient Fire resistance Fire classification Burglar resistance Bullet resistance REQUIREMENTS Product CHARACTERISTICS LOCATIONS Soundlock TOILETS TOILETS TOILETS TECH CIRC AUDITORIUM CIRC +3.74 +4.50 -1.50 -1.20 -0.30 +8.45 +8.95 -8.70 PLENUM PLENUM PLENUM 2.43 3.19 2.98 3.48 2.89 3.30 0.80 0.80 0.80 RECORDING STUDIOS CIRCULATION OFFICE OFFICE OFFICE 3.00 0.30 PLENUM AUDITORIUM AUDITORIUM CEILING FRONT STAGE STORAGE SHAFT +0.00 -2.40 -1.50 +16.05 +16.65 +16.20 +14.26 +3.36 +7.47 +11.98 +9.00 +4.50 GREENROOM ORCHESTRA ORCHESTRA CIRCULATION PLENUM PLENUM PROJECTON ROOM TECHNICAL CORRIDOR -8.70 -5.85 +0.00 +4.95 +9.00 +13.50 LOBBY RECORD. ROOM INTERPR. CABINS STORAGE 2.50 3.65 2.51 3.00 3.97 2.44 3.00 4.48 3.17 2.19 0.95 0.95 0.95 28.00 39.00 30.27 7x26cm 5x19cm STORAGE EQUIPMENT STORAGE ORCHESTRA DRESSING MALE PLENUM CIRCULATION OFFICE OFFICE OFFICE INNER COURTYARD 3.00 0.30 8.65 VARY 3.60 Инв .No. подл Подп и дата Взам инв .No. Согласовано Auditorium cladding M 1:10 Auditorium acoustic M 1:10 Fragment of Section 2-2 (cross section on the landing stage) M 1:50 Fragment of Section 1-1 (longitudinal section) M 1:50 A 3 SHEET 31.3 W1.B SHEET 31.3 W6.R 4800 5100 5700 +27.60 STAGE ARTIST PREPARATION -7.80 (=+22.20) BALLET SEATING STORAGE -4.95 (=+25.05) ORCHESTRA PIT LVL 00 +0.00 (=+30.00) MAIN LOBBY ENTRANCE LVL 01 +4.95 (=+34.95) RESTAURANT TERRACE LVL 01 +4.50 (=+34.50) 1st BALCONY VIP LVL 02 +9.00 (=+39.00) 2nd BALCONY/ CHOIR PREP. LVL 03 +13.50 (=+43.50) 3rd BALCONY LVL 03 +12.60 (=+42.60) BALLET PREPARATION LVL 04 +16.80 (=+46.80) ORCHESTRA PREPARATION LVL 05 +23.85 (=+53.85) TECHNICAL ADMINISTRATION LVL 04.5 +19.80 (=+49.80) ADMINISTRATION 6000 LVL -0.5 -5.85 (=+24.15) ORCHESTRA GREEN ROOM LVL -01 -8.70 (=+21.30) TECHNICAL LVL -0.5 -4.5 (=+25.50) LOWER FOYER 9* Scaled FragmentS
FF LVL 03 +12.60 (=+42.60) SF +12.40 (=+42.40) SF +12.05 (=+42.05) LVL 03 +12.60 (=+42.60) VAR. VAR. COVE LIGHT FIXTURE ACC. CIRCULATION CLIP D-111 BALLET ROOM 1 H-010 FLAT STEEL BRACING HILIT AGRAFFEN KEIL TRESPA 13MM STEEL PROFILE HSS 200 MAIN CLIP STRUCTURE AS PER STR. ENGINEER STEEL PROFILE HSS 200 MAIN CLIP STRUCTURE PER STR. ENGINEER FIRE EXTINGUISH SYSTEM (SPRINKLER) WALL MOUNTED BALLET BAR 'Arabesque Single' AND FRAMED SMOOTHED EDGES, RESISTANT AGAINST BALL THROWING F7.A AS PER THEATER PLANNER MBBM C6.A C6.A AS PER THEATRE CONS. GFRC PANELS W4.C _ AS PER THEATRE PLANNER MBBM W8.A GFRC PANELS AS PER 'RIEDER' INSTRUCTIONS AND STRUCTURAL ENGINEERS GFRC PANELS AS PER 'RIEDER' INSTRUCTIONS AND STRUCTURAL ENGINEERS GFRC PANELS AS PER 'RIEDER' INSTRUCTIONS AND STRUCTURAL ENGINEERS GFRC PANELS AS PER 'RIEDER' INSTRUCTIONS AND STRUCTURAL ENGINEERS GFRC PANELS AS PER 'RIEDER' INSTRUCTIONS AND STRUCTURAL ENGINEERS GFRC PANELS VAR. MAX 1300 MM VAR. MAX 1300 MM VAR. MAX 1300 MM 0.01 0.60 0.10 0.12 0.02 0.12 0.10 1.54 6.10 6.85 1.05 1.00 2.09 0.15 0.17 VAR. MIN. 2500 MM VAR. MIN. 2500 MM 0.28 0.28 0.40 0.40 7.55 0.03 0.01 0.11 0.55 VAR. VAR. .RAV 0.89 0.27 2.38 1.73 6.44 1.20 0.01 0.01 VAR. MAX. 100MM 0.53 VAR. MAX 1300 MM OPTIONAL SPACE FOR DUCTS VAR. < 400 MM -'HARLEQUIN' SPRUNG FLOOR WHITE PAINT ON PLASTER BOARD WHITE PAINT ON PLASTER BOARD WHITE PAINT ON PLASTERBOARD HAIRLINE JOINT ALL AROUND ACCESS PANEL THREAD METAL HOUSING L-PROFILE STEEL 30/40/0,8 CONTINUOUS SHADOW GAP FOR COVE LIGHTING COVE LIGHT FIXTURE ACC. TO LIGHT STRATEGY LIGHT POS 65 ACC. 200 ALL AROUND LIGHT BOX CLOSED ON BOTH SIDES OPAQUE C6.A - AS PER THEATRE CONS. 1.00 FF LVL 03 +12.60 (=+42.60) SF +12.40 (=+42.40) FLAT STEEL BRACING GFRC OR UHPC FLAT PANELS HILIT AGRAFFEN KEIL TRESPA 13MM FIRE EXTINGUISH SYSTEM (SPRINKLER) STEEL PROFILE HSS 200 GFRC PANELS AS PER 'RIEDER' INSTRUCTIONS AND STRUCTURAL ENGINEERS GFRC PANELS AS PER 'RIEDER' INSTRUCTIONS AND STRUCTURAL ENGINEERS VAR. MAX 1300 MM VAR. MAX 1300 MM 0.28 37.1 1.20 35.0 0031 XAM .RAV SF +12.05 (=+42.05) LVL 03 +12.60 (=+42.60) AS PER THEATER PLANNER MBBM W8.A 0.60 0.10 0.12 0.02 0.12 1.05 0.11 WOOD SPRING BALLET FLOOR -'HARLEQUIN' SPRUNG FLOOR LINOLEUM FINISH DETAIL DETAIL 2 DETAIL 3 Fragment of Section 1-1 Clip Corridor Ballet Room M 1:25 Detail 2 - Clip Corridor - Ballet room division (Floor) M 1:10 Detail 3 - Clip Corridor Edge (Interior) M 1:10 Detail 1 - Clip Corridor - Ballet room division (Ceiling) M 1:10 Perspective View 1 - Clip Corridor - Ballet room (East View) Perspective View 2 - Clip Corridor - Ballet room (Top View) *10 typical details

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.