Viki Sandor Arbeitsproben 2017

Page 1

VIKI SANDOR

ARBEITSPROBEN 2017


An Martina Rosenmeier Büro des Vizerektors für Lehre Ferstel-Trakt / 2. Stock (Aktsaal) Tel.: +43 1 71133 DW 2042 Oskar Kokoschka-Platz 2, 1010 Wien

Wien, 28.03.2017

RODNAS IKIV

7102

NEBORPSTIEBRA

Viktória Sándor mag. Arch. Anzengrubergasse 7/20 A-1050 Wien Tel.: +43 677 624 290 04 Email: dgke90@gmail.com www.vikisandor.com/ptemporary Erste Bank IBAN: AT08 2011 1295 1141 9700 Bankleitzahl: 20111 BIC: GIBAATWWXXX

2

FLIBRI PROTOYPE ...


Saatsbürgerschaft Ungarisch Geburtsdatum/Ort 13. September 1990/ Budapest, Ungarn Email dgke90@gmail.com

AUSBILDUNG 2010- Abschluss 26.01.2017 University of Applied Arts Vienna, Diplomstudium Entwurfsstudio: Wolf d. Prix, Hani Rashid, Cross over studio Diplom-Berater: Hani Rashid, Abschluss mit Auszeichnung (1,1) Mag. Arch. 2009-2010 University of Applied Arts Sopron 2012 2012-2013 2012 seit 2013 2015 2015 seit 2016

BERUFSPRAXIS Sam - Ottreinisch Architekten _Praktikum Franz Sam Architekt _ Praktikum Gregor Eichinger Architekt _Praktikum Ottreinisch Architekt_ Praktikum (Wettbewerbsarbeit) Delugan Meissl Associated Architect _Praktikum (Wettbewerbsarbeit) Alapkő Kft., Hungary_Praktikum Carl Pruscha Architekt _ Publikationen

LEHRE since 2012 Tutor for Grasshopper, Studio Rashid ,University of Applied Arts Vienna MODEL BAUEN FÄHIGKEITEN CNC-Milling Machine / RhinoCam Trotek laser machine Powder printer Makerbot Formlabs Kuka / Kuka PRC FÄHIGKEITEN Microsoft Word | Excel | Powerpoint Adobe Photoshop | Illustrator | Indesign | Dreamweaver|After Effects Autodesk Autocad | Microstation Rhino | Grasshopper | Karamba | Kangaroo | Galapagos |Volvox etc. Autodesk Maya | 3ds Max Processing - basic |Eclipse Keyshot Unity SPRACHE English - B2 Niveau Hungarian- Muttersprache German -B1 Niveau Oktober 2016 August 2016 May 2016 16 July 2015 5 July 2015 2008 2010-

PUBLIKATIONEN Der Standard FORSCHUNG Nr.1 2016/17_Stadt 4.0-Wie wir leben werden_ Imp Architect Chamber Magazine_ num.247 Architect Chamber Magazine_ num.245 dezeen / 2015 graduate show - Conceptual Cirque du Soleil ArchDaily _ Conceptual Cirque du Soleil Kiss Anna Dr. - Bűnbe esett irodalmi hősök _ illustration Prosecutor’a paper _ illustration

AUSTELLUNGEN 2016 The Essence 2016, Alte Post, Vienna 2012-15 The Essence 2012-15, Künstlerhaus, Vienna 2014 The Essence 2011, MAK Museum of Applied Arts

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

3


4


ARBEITSPROBEN

p7-p35

The PERMANENTLY TEMPORARY2016-17 ...IN THE AGE OF GRAVITY INDEPENDENT ARCHITECTURE DIPLOMARBEIT DIE ANGEWANDTE _ STUDIO RASHID

p37-p47

BITCOIN HEADQUARTERS2014 SUMMER SEMESTER 7. STUDIO_RASHID with E.LENART

p49-p53

ÃœBERPORT2013 WINTER SEMESTER 6. STUDIO_RASHID with L.DIETIKER

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

5


NEBORPSTIEBRA

71-6102

YRAROPMET YLTNENAMREP ehT

53p-7p

E R U T CE T I H CR A T N E D N E P E D N I Y T I VA R G F O E G A E H T N I... T I E B R A M OL P I D D I H S A R O I D U T S _ E TD N AW E G N A E I D

R E M M U S 4102

SR E T R AU Q D A E H N I O CT I B

74p-73p

.7 R E T SE M E S D I H S A R_O I D U T S TRANEL.E htiw

R E T N I W 3102

TR O P R EBÜ .6 R E T SE M E S

D I H S A R_O I D U T S REKITEID.L htiw

35p-94p


IN THE AGE OF GRAVITY-INDEPENDENT ARCHITECTURE

The PERMANENTLY TEMPORARY 2017_Thesis project studio_Rashid


1.0 THE PERMANENTLY TEMPORARY

I. THE BASICS

FLIBRI SYSTEM

FLYING NATURE

FLIBRI

URBAN HARDSCAPE

VIENNA TODAY

in the age of gravity-independent architecture

URBAN SOFTSCAPE

The project investigates the future of urban

While taking all fact, statistics and predictions into

environments using Vienna (Austria) as case study.

consideration it is easy to build up a dystopian

...

image of the future.

It proposes a new ephemeral infrastructure

THERE IS A NEED FOR THE PRODUCTION OF AN

which can be integrated with the existing urban

“UTOPIAN” image which visualises together with

hardscape (urban-fabric) in order to increase the

the facts also the platforms which can provide

city’s dynamism and adaptivity and by that also its

place for social excitement.

capacity.

8

2040

2030

2020

timeline


Continual refinement of parameters and reciprocal adaptation between the environment and the new “FLIBRI” system causes an EVOLUTION in our perception

IV. THE NEW ROUND 2060

2050

II. THE EVENT

III. THE PLAYGROUND

of time and space.

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

9


1.1 TODAY -

the urban environment

not dynamic enough

URBAN ISSUES: 1_ BY 2050 URBAN POPULATION WILL INCREASE WITH 20 % 2_ New strategies for inner-urban DENSIFICATION has to be investigated in regard to the persistent global population growth and significant mass migration which is likely to occur also in response to climate change.

‘IF ARCHITECTURE COULD BE EPHEMERAL and adaptive ...

VIENNA TODAY urban analyses

URBAN HARDSCAPE

... the existing city volume could be programmed more efficiently by the activation of the time depending deadzones. The resulting shift in the urban pattern would support the intensification of the city and the establishment of a new social contract.’

10

URBAN SOFTSCAPE

2040

2030

2020

timeline


RESIDENTIAL BUILDINGS

COMMERICAL BUILDINGS

MIXED-USED BUILDINGS

WIND PATTERN

2060

STREET HIERARCHY

2050

NOISE PATTERN

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

11


1.2 TOMORROW flibri

-

to modify environmental conditions

FLIBRI: the unmanned omnicopter which can generate and

produce energy, fly, reflect, radiate and shade they

store energy, radiate heat, supply and reflect light...

use opaque- and transparent solarcells, reflective

... and by that create certain micro climates in order

panels and for each unit 8 propellers.

to allow new functions to appear at locations it could not happen before.

The flybries are able to detect highly radiated surfaces and optimize their positions for efficient

//The FLIBRI design is inspired by an ETH ZĂźrich

charging. For energy production, other than the

research project, the OMNICOPTER (By Raffaello

solarcells they could

D’Andrea) which by being highly symmetric, with

mill technology which is still under development

its 8 propellers is ambivalent to orientation.

at the Columbia University (Ozgur Sahin, Ph.D.,

The new design maximises the usable surface

an associate professor of biological sciences and

area within the cubic frame while it still allows

physics). The technology derives power directly

air to move through the diagonal axises to let the

from evaporation. //

potentially use moisture

VIENNA TODAY

URBAN HARDSCAPE

FLIBRI the drone of tomorrow

propellers function. In order to make it able to to

12

URBAN SOFTSCAPE

2040

2030

2020

timeline


FLIBRI CORE FLIGHT CONTROLLER

CARBON FIBER CHASE

POWER DISTRIBUTION BOARD

8 SOLAR CELL (LIPO) POWER MODULE CF PROPELLERS ESC

FLIBRI

FLIBRI CORE

ASSEMBLY + SPECIFICATIONS

PANEL TYPES: OPAQUE PV TRANSPARENT PV REFLECTIVE ILLUMINATIVE

MAGNETIC STRIPS MAGFIELD

FLIGHT CONTROLLER F4 ADVANCED FC (MPU6000, STM32F405) GPS + MAGNETOMETER MODULE GLONASS MODULE TELEMETRY RADIO RECIEVER SENSOR CHIPS FIRMWARE TGY--SIMONK FIRMWARE OPEN SOURCE FIRMWARE FOR ATM GA-BASED BRUSHLESS ESCS POWER DISTRIBUTION BOARD (PDB) ATAS PRO MINI PDB POWER LEVEL MONITOR

2060

MAIN BODY 4 IDENTICAL UNIBODY MOUNTING SHELL CF CHASES - 8 BOOMS RETRACTABLE DOCKING MECH FLIBRI DIMENSIONS: 150mm x 150mm x 150mm WEIGHT: 600g PROPELLERS DUEL BLADE CARBON FIBER 1804 DC OUTRUNNER BRUSH MOTOR RCX H1306-8 3100KV 8 ELECTRONIC SPEED CONTROLLERS (ESC) 4 TRACTOR PROPELLERS 4 PUSHER PROPELLERS 8 BRUSHLESS MOTOR CF MOTOR MOUNT RETRACTABLE DOCKING MECH

CF PROPELLERS ESC

POWER MODULE 8 SOLAR CELL (LIPO) 4xDUEL-CELL LITHIUM POLYMER VENT AND CIRCUITRY CHAMBER CARBON FIBER CASING

2050

MAGNETIC STRIPS 6 SIDED MAGFIELD FLIBRI ASSEMBLY MECHANISM INDUCTION POWER TRANSFER CF UNIBODY MOUNTING SHELL FLIBRI CORE CAMERA + SENSOR

PROPELLERS DUEL BLADE CARBON FIBER 1804 DC OUTRUNNER BRUSH MOTOR RCX H1306-8 3100KV EMBEDDED MAGNETIC STRIPS MAGFIELD CAMERA + SENSOR

13

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18


14

2030

2020

URBAN SOFTSCAPE

2040

FLIBRI ATTACHMENT WITH EMBEDDED MAGNETIC STIPRS

FLIBRI the drone of tomorrow

VIENNA TODAY

URBAN HARDSCAPE

timeline


VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

15

2060

2050

PLA PRINT _ FLIBRI PARTS

FLIBRI WALL


1.3 AFTER TOMORROW

FLYING NATURE research

FLIBRI

URBAN HARDSCAPE

VIENNA TODAY

research areas

16

URBAN SOFTSCAPE

2040

2030

2020

timeline


By taking more inspirations from nature in the field of aerodynamics we can assume that in the future, our machines will be able to have extended flying periods, reduce their noise, be more responsive and collaborative etc. and so would be able to become a new urban infrastructure which creates permanently

2060

2050

temporary spatial micro-climates and increase the level of urban dynamism.

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

17


1.4 AFTER TOMORROW the flibri system

=

softscape

_

vocabulary

_ EPHEMERAL SPATIAL INFRASTRUCTURE

| gravity independent _ REACTIVE SOFTSCAPE

| flows and hardenings * _ NEW BEHAVIOR LOGIC

| independent from existing urban fabric, hybrid state (local + global) > _ ADAPTS TO , REDEFENES AND CREATES NEW ...

FLIBRI SYSTEM

FLYING NATURE

FLIBRI

URBAN HARDSCAPE

VIENNA TODAY

softscape introduction

...ENVIRONMENTAL CONDITIONS!

18

URBAN SOFTSCAPE

2040

2030

2020

timeline


SYSTEM VOCABULARY

DPC = Designed Point Cloud

ADSO = Attractive Decentralised Self Organisation

VoMCoG = Volumetric Micro Condition Generator SUN

WIND

USER

2060

2050

ReDSO = Repulsive Decentralised Self Organisation

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

19


1.5 THE BASICS evolution

-

interior and exterior quality improvements

SCENE 01: Densifying by intensifying. By the integration of the “flibri system� the project

During the micro-climatization of the exterior ,

is aiming to re-qualify exterior snoozed zones by

flibries could also improve the qualities of the

providing temporary microclimatic conditions for

neighbouring interiors.

certain functions to appear.

By the use of specific materials and surfaces in the design of the flying units (reflective panels, pvs,

Using the noise maps of Vienna,exterior areas

sound isolator materials etc.) there is a potential for

were detected in the inner districts where the

natural sunlight supplimentation, sound isolation

daily activity is minimum and could be used as

and also energy production.

potential locations (sites) for the flibries to spatially operate. These areas - snoozed zones - could be re-inhabited by various functions, once a certain micro-climate is provided. The gross floor area of certain mobile programs could be minimized in the current interior spaces and if there is need SOUND ISOLATION

for it ,extend them towards the public and semipublic volumes. The exterior would turn into a semi-interior space while keeping the advantages of being exterior. Pop-up functions appearing

STREET COVER

FLIBRI SYSTEM

FLYING NATURE

FLIBRI

URBAN HARDSCAPE

VIENNA TODAY

STREET-COURTYARD MERGE

I. THE BASICS

also enhance neighbouring building qualities.

scene

01

on the streets could improve safetyfactors and

20

URBAN SOFTSCAPE

2040

2030

2020

timeline


By the use of specific materials and surfaces in the design of the flying units (reflective panels, pvs, sound isolator materials etc.) there is a potential for natural sunlight supplimentation, sound isolation and also energy production.

FACADES

VIENNA - NORTH-FACED FACADES

SNOOZED STREET ACTIVITION

NOISE PROTECTION

2050

LIGHT SUPPLIMENATATION

FACADE

TRANSFORMATION

FACADE

TRANSFORMATION

2060

VIENNA - NOICE-EXPOSED

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

21


1.6 THE EVENT evolution

-

space activation

SCENE 02: The flibri system is attracted by the event, happening at an exterior auditorium. The designed point cloud turns into an adaptive micro condition generator and provides comfort for the audience while reconfigures according to climatic

I. THE BASICS

FLIBRI SYSTEM

FLYING NATURE

FLIBRI

URBAN HARDSCAPE

VIENNA TODAY

and functional needs.

22

URBAN SOFTSCAPE

2040

2030

2020

timeline


VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

23

2060

2050

II. THE EVENT scene 02

URBAN FOOTAGE FRAMES


24

2030

2020

2040

URBAN SOFTSCAPE

I. THE BASICS

FLIBRI SYSTEM

FLYING NATURE

FLIBRI

VIENNA TODAY

URBAN HARDSCAPE

timeline

1:300

N

+10.35

PPL paths

1

26 28 28 27

L K J I

1

1

+10.35

69 73 77 78 81 84

87

90

I L K J O N M P Q S R

58 61 60 60 61 58 59 58 57 57 55 59 62 61 61 62 59 60 59 58 56 58

19 19 21 23 25 27 29 29 28

13 15 18 18

1

20 22 S R Q 24 P O N 14 16 M

1

1

1

1

1 1

3

2

4 4

3

1 1

5

1

5

4

3

1

5

1

7

4

4

1

6

1

8

5

6

1

7 9

6

7

1 1

86

73 72

72

69

10

71

8

7

8

1 1

68

11

67

8

7

9

1

1 1

66

9

8

10

1

80

76

75 67 68 69 74 72 70 76 71 73 73 73 76 78 71 77 79 81 81 73 82 78 79 82 81 85 85 79

81

THE EVENT ~2060 - day scene

89

80

76

75

42 42 41 41 41 41 40 40

43 43 41 41 40 40 38 38

H G F E D C B A

42 42 40 40 39 39 37 37

41 41 40 40 40 40 39 39

+4.95

91

1

AUDITORIUM

+2.70

TOP VIEW

STAGE

HARDSCAPE TOP VIEW

0.00

STANDING AREA

0.00


VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

25

2060

2050

II. THE EVENT scene 02

SOFTSCAPE DYNAMICS_ 4D DRAWINGS


1.7 THE PLAYGROUND evolution

-

space for behavior experiments

SCENE 03: The visitors are attracted by the flibri show where without predesigned point clouds flibries are experimenting with their collective intelligence and by collaging depicted memories from the past

I. THE BASICS

FLIBRI SYSTEM

FLYING NATURE

FLIBRI

URBAN HARDSCAPE

VIENNA TODAY

they create new spatial configurations.

26

URBAN SOFTSCAPE

2040

2030

2020

timeline


VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

27

2060

2050

III. THE PLAYGROUND scene 03

II. THE EVENT

URBAN FOOTAGE FRAMES


28

2040

URBAN SOFTSCAPE

I. THE BASICS

+20.12

7

G

TOP VIEW

+26.1

6

F

THE PLAYGROUND ~2060 - day scene

+5.30

5

E

1:300

N

+00.00

+14.12

4

D

FLIBRI SYSTEM

+00.00

3

C

FLYING NATURE

FLIBRI

2

B

2030

2020

URBAN HARDSCAPE

VIENNA TODAY

1

HARDSCAPE TOP VIEW

A H

timeline


VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

29

2060

2050

III. THE PLAYGROUND scene 03

II. THE EVENT

SOFTSCAPE DYNAMICS_ 4D DRAWINGS


1.8 THE NEW GROUND evolution

-

space for behavior experiments

SCENE 04: The flibries are attracted by the new ground which provides space for new functions to appear on the exterior hardscape. After detecting active areas, flibries are supplying natural sunlight and by that create optimal environmental condition for the newly designed public landscape

I. THE BASICS

FLIBRI SYSTEM

FLYING NATURE

FLIBRI

URBAN HARDSCAPE

VIENNA TODAY

above the Wien Fluss.

30

URBAN SOFTSCAPE

2040

2030

2020

timeline


VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

31

2060

2050

IV. THE NEW ROUND scene 04

III. THE PLAYGROUND

II. THE EVENT

URBAN FOOTAGE FRAMES


32

2030

2020

2040

URBAN SOFTSCAPE

I. THE BASICS

FLIBRI SYSTEM

FLYING NATURE

FLIBRI

VIENNA TODAY

URBAN HARDSCAPE

timeline

N

1:300

0.00

-6.70

THE NEW GROUND ~2070 - day scene

0.00

+0.30

TOP VIEW

HARDSCAPE TOP VIEW

-3.85


VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

33

2060

2050

IV. THE NEW ROUND scene 04

III. THE PLAYGROUND

II. THE EVENT

SOFTSCAPE DYNAMICS_ 4D DRAWINGS


34

2030

2020

2040

URBAN SOFTSCAPE

I. THE BASICS

FLIBRI SYSTEM

FLYING NATURE

FLIBRI

VIENNA TODAY

URBAN HARDSCAPE

timeline


VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

35

2060

2050

IV. THE NEW ROUND

III. THE PLAYGROUND

II. THE EVENT


FO EGA EHT NI ERUTCETIHCRA TNEDNEPEDNI-YTIVARG

YLTNENAMREP ehT YRAROPMET tcejorp sisehT_7102 dihsaR_oiduts


PARK AVENUE, NYC

BITCOINheadquarters 2014_summerSemester studio_Rashid


2.0 VIRTUAL BLUR creating bitcoin avenue

The studio task was to design a new HQ for virtual companies which in our case BITCOIN was. Since BITCOIN is not a company but a virtual currency the idea of a usual HQ did not work. The inventor(s) is anonym. The system is open-source and also anonym. Bitcoin does not need space neither personal advertisement. The more users the system include the higher the bitcoin value becomes. That makes the only benefit.

38

Our idea was to create a new type of a “physical� market where while the legal currency is virtual(bitcoin), the products stay physical. On one hand with the design we tried to communicate with the UBS bank which was located on the site and on the other hand we also tried to express the idea of being open-source , accessible for everyone, which is one of the basic elements of the bitcoin system.


VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

39


2.1 CONCEPT DIAGRAM object vs image

DIGITAL TRANSLATION

= translation of the physical = mutation transformation change

CONVERGING LENS TYPE1

DIVERGIN

CONVERGING LENS TYPE 2

O 2F

F

F

2F

2F

F

F

2F

2F

LIGHTCONE

F7 F6 F1

P.2 P.3P.4 P.5P.6

40

LENS TYPE 3

LENS TYPE 3

F3

LENS TYPE 3

LENS TYPE 2

LENS TYPE 1

F2

LENS TYPE 2

P.1

F5

F4


After the analyses of markets, shopping centers, shopping streets etc. with the focus on storefronts we had to come up with an idea which makes our vertical tower function as a market and expresses the difference between physical and digital reality. We used the storefront as an analog-medium which translates for the pedestrians the inner physical products into “digital images”. The medium is a lens - an analog tool which digitalizing (transforming, translating, mutating) the physical. According to the lens type ( converging, diverging) ,the diopter and the distance, the image varies. While the pedestrians move along Park Avenue they experience different distortions from the product which are exhibited inside.

DIVERGING LENS TYPE 1

2F

F

2F

2F

F

F

2F

LIGHTCONE

F7 F5 F8

P.8 LENS TYPE 1

P.7 LENS TYPE 4

LENS TYPE 3

P.5P.6

LENS TYPE 3

F

CONVERGING LENS TYPE 3

LENS TYPE 1 IMAGE: magnified inverted

LENS TYPE 2 IMAGE: magnified upright

LENS TYPE 3 IMAGE: demagnified upright

LENS TYPE 4 IMAGE: equal size inverted

(2F > P.1, P.8 > F

(P.2,P.3 < F)

(P.4,P.5,P.6 > 2F)

(P.7 = 2F)

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

41


2.2 DESIGN PROCESS component definition

LENS DESIGN

double lens positioning

R1 - r1 > R2 - r2

DOUBLE-LENS COMPONTENT

lens functions

LIGHT - CONE

CAPTURE ZONE

STOREFRONT - CONE

COMPONENT COMBINATIONS

exposed

42

orientation, arrangement

semi-encolsed

semi-exposed

enclosed


SHOWROOM

section diagram

STRUCTURAL CONCEPT

_core reduction --- 50 % _moduls are attached to the core _cones trim the columns

PARK AVENUE

49TH STREET

48TH STREET

PARK

AVEN

UE

PARK

EXISTING STRUCTURE perspective

AVEN

UE PROPOSAL plan

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

43


1.3 PLANS +15 M

+80 M

+160 M

12.5

44

25

50


1.4 SECTION A

A’

+160 M

+80 M

+15 M

PARK AVENUE

12.5

25

50

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

45


3D print - double-lens

3D print - double-lens

3D print - lens and cone

3D print - lens and cone

MEDIUM,

46

translation

-

physical

,

digital


3D print - structure

3D print - structure

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

47


CYN ,EUNEVA KRAP

sretrauqdaeh

NIOCTIB

retsemeSremmus_4102 dihsaR_oiduts


SINGAPORE

ĂœBERPORTdeepFutures 2013_winterSemester studio_Rashid


MALAYSIA

SINGAPORE

3.0 ÜBERPORTsingapore

project descroption/site condition MALAYSIA

We think that in the future keeping the balance between the different speed levels will become SINGAPORE an important issue in architecure and urban planning. While many developments support high speed movements we also have to take care of the opposit by creating space for “low-speed”. The project investigates the differences between fast and slow architecture while focusing on keywords: DIRECTED, ENCLOSED-REOPENED and SEPERATEDRECONNECTED. The new transport hub replaces the existing Johor earth tongue with an elevated and an underground connection and uses the hub’s generated energy for sea water desalination. As a result, the project proposes a prototype for transporthubs of the future and also tries to find solutions for current issues in Singapore (land-shortage, water-shortage, conflict with neighbours etc.).

ore ap sia g Sin alay M s

ait

tr rS

o

Joh

Site plan

Singapore’s subway network 2009

50

Singapore’s subway network 2013

Singapore’s subway network 2040


view from Johor Straight west side SINGAPOREAN TERRITORY

view from Johor straight east side SINGAPOREAN TERRITORY

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

51


3.1 FORMAL STUDIES

component design by using predefined keywords: underground-fuzzy

component evolution

step_1

step_2

step_3

step_4

step_5

intersection variations main terminal prototype view 1

52

prototype view 2

prototype view 3


r aine cont

ship

path

PLAN 0

MALAYSIA

50m

100m

parking zone

TERMINAL 1 A AYSI MAL ORE P A SING

th ry pa

fer

TION Y STA R R E F

ait

Str ohor

J

TERMINAL 1

artificial pond system + fresh water storage desalination plant area

SINGAPORE

VIKI SANDOR_ARBEITSSTIPENDEIN 2017/18

53



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.