The Sh-alter | Community Centre

Page 1

LIM WANJING | 1002058310

AD614_ARCHITECTURE DESIGN STUDIO III

PORTFOLIO JAN - APR 2022 SEMESTER

LECTURED BY: MS. NOR SYAWALLINA AZMAN


CONTENT PROJECT 01

SITE ANALYSIS PROJECT 02

PRECEDENT STUDY LIM WANJING PROJECT 03

THE COMMUNITY CENTRE

1002058310 +601111991138 wanjinglim118@gmail.com


PROJECT 01

SITE ANALYSIS


PROJECT 01 | SITE ANALYSIS ADDRESS: CHOW KIT, 50300 KUALA LUMPUR, FEDERAL TERRITORY OF KUALA LUMPUR

NEARBY BUILDINGS 1. PASAR CHOW KIT

DISTRICT: KUALA LUMPUR

12 MINS - 420M

LOCATION

400m

8 MINS - 420M

1

PROVIDE REASONABLE PRICE FOOD

300m

2 . QUILL CITY MALL 5 MINS - 230M

200m

7 MINS - 230M

2

100m

HM

AN

3

3. KLINIK Y L TAN PAKAR SURGERI

DU L

RA

BP PASAR CHOW KIT HEALTHCARE

PROVIDE JOB OPPOTUNNITY

1 MINS - >100M

AN

KU

AB

CHOWKIT

SULTAN

ISMAIL

JAL

AN

TU

JALAN

JALA

N SULT

AN

2 MINS - >100M

4

QUILL MALL MONORAIL UNIVERSITI STATION KUALA LUMPUR

PROVIDE SURGERY

ISMA

IL

4. DANGWANGI POLICE STATION

PUSAT KHIDMAT GELANDANGAN MEDAN TUANKU

3MINS - 200M

DANG WANGI POLICE STATION

2 MINS - 200M MAINTAIN SECURITY

KEY PLAN

LOCATION PLAN

HOMELESS LOCATION INDICATE THE GATHER POINT AND DISTANCE FROM THE SITE

1.SOGO KUALA LUMPUR 2 MINS - >650M

3

600m 500m 400m 300m

The back of existing building

2

200m 100m

3 MINS - >650M PEDESTRIAN WALKWAY (PEOPLE OFTEN PASSING BY) ENTRANCE OF SOGO EARN SMALL INCOME / DONATION (SELLING TISSUE)

2. INSTITUT ONN JA'AFAR VOLUNTEER CENTRE 5 MINS - >400M 7 MINS - >1.9KM NOT OPERATING SHOPS FRONT (SLEEPING AREA) QUITE PEDESTRIAN WALKWAY

Parking area beside existing building

1

3. JALAN HAJI TAIB, KUALA LUMPUR 12 MINS - >950M 8 MINS - >1.9KM

Interior of existing building

UNAFFORTABLE RENTAL PRICE ABOVE SHOP LOT DOWNSTAIR'S HALLWAY (SLEEPING AREA)


PROJECT 01 | SITE ANALYSIS

DIMENSION OF BOUNDARY LINE AROUND THE SITE

SITE PLAN WITH BUILDABLE AREA

DIMENSION OF SETBACK LINE AROUND THE SITE

PLINTH RATIO = ( BUILDABLE AREA / SITE AREA ) X 100

PLINTH AREA (SITE A) =(

540 SQM 945 SQM

= 0.57 X 100 = 57%

) X 100

PLINTH AREA (SITE B) =(

463 SQM 838 SQM

= 0.55 X 100 = 55%

) X 100


PROJECT 02

PRECEDENT STUDY









PROJECT 03

THE COMMUNITY CENTRE


PROJECT 03 | THE COMMUNITY CENTRE

THE SH-ALTER FIND BACK THE MEANING OF LIFE IT IS A COMMUNITY CENTRE LOCATED AT CHOW KIT, KUALA LUMPUR WHICH IS DESIGNED TO BE HOSPITABLE TO THE HOMELESS COMMUNITY AROUND THE AREA. THIS COMMUNITY CENTRE IS FOCUSING ON PROVIDING THE MAIN PROGRAM, COUNSELING CONDUCTED BY THE GRACE COMMUNITY SERVICES FOLLOWED BY A SERIES OF SELF-DEVELOPMENT PROGRAMS.

CLIENT GRACE COMMUNITY SERVICES

Provide shelter to the homeless Provide counseling program for the distressed

CONCEPT

To build a counseling community center focused on the homeless's mental health issues and self-development to ensure that the homeless can open up their mind and rebuild their bond with society.


DESIGN INTENTION #1 SITE Increase the exposure to public and integrate with the surrounding

DESIGN INTENTION #2 BUILDING TYPOLOGY Provide a multifunctional building to conduct different activities based on the stage of selfdevelopment

COURTYARD Pre-Counseling area Communication & socialize Rebuild bonding between people

DESIGN INTENTION #3 BUILDING PROGRAM Provide a welcoming & comfortable environment to express their mind and thoughts

INVITING & WELCOMING Recessed entrance Leads people into the building Large openings

BREAK INTO SPACES COUNSELING ROOM Private space One-to-one/group counseling Express their thoughts, feelings/problem faced INSTANTLY KNOW THE ENTRANCE welcoming & attractive

INTERGRATE WITH SURROUNDING add trees & bushes

MULTIFUNCTIONAL HALL

NEAR TO PUBLIC TRANSPORT & PEDESTRIAN WALKWAY easily notice by people passing by

Represent different stage of self-development program (counselingactivitiesworkshopconsultant) Gathered around the center point

BRING IN MAX. SUNLIGHT & AIR reduce electricity consumption

Providing different types of programs (individual/group) Focus on self development Choose to attend based on their ability

SPACE PLANNING Public spaces ground floor (group activities) Private spaces first floor (private counseling)


SITE RESPONSES

SITE PLANNING

GROUND FLOOR BUBBLE DIAGRAM

FIRST FLOOR BUBBLE DIAGRAM

LEGEND

LEGEND Y=YES N=NO H=HIGH

M=MODERATE L=LOW

CLOSE PROXIMITY IMMEDIATELY ADJACENT NATURAL LIGHT ENTRANCE PUBLIC SPACE PRIVATE SPACE OUTDOOR SPACE


CONCEPTUAL DIAGRAM

IDEATION DEVELOPMENT

RESET

"S" PATH REPRESENTS THE CONNECTION WITH SURROUNDING

DIFFERENT DIRECTION OF PATHS

FORMS DIFFERENT SHAPES (DIFFERENT ACTIVITIES)

Reset bone with society Reset their mind (find back the meaning of life) SHELL (SECURE)

DIFFERENT VOLUME (HIERARCHY OF SPACES)

GO THROUGH TRANSFORMATION


PROJECT 03

RENDERED DRAWINGS













PROJECT 03

TECHNICAL DRAWINGS











PROJECT 03 | BUILDING SECTIONAL DETAILS


PROJECT 03

PERSPECTIVES


PROJECT 03 | EXTERIOR PERSPECTIVES


PROJECT 03 | INTERIOR PERSPECTIVES


PROJECT 03 | PHYSICAL MODEL


PROJECT 03 | PRESENTATION BOARD & GENESIS EXHIBITION 2022


AD614_ARCHITECTURE DESIGN STUDIO III

PORTFOLIO

LIM WANJING | 1002058310


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.