BM TRADA Good Door Bad Door

Page 1

ARE YOUR FIRE DOORS

SAFE AND COMPLIANT?

CLICK HERE


DOOR A

PASS

MITIGATE RISK, PROTECT LIVES AND SAFEGUARD YOUR REPUTATION For those responsible for managing buildings,

BM TRADA is a UKAS-accredited certification

fire safety is critical. With recent changes

body which provides independent third-party

in legislation and more stringent rules set

certification services for manufacturers,

Frame to supporting construction Frame to supporting construction Frame to supporting construction fi re correctly installed Frame to supporting fiFrame re stopping stopping correctlyconstruction installed Frame to supporting construction to supporting fi re stopping correctly installed Frame to supporting construction to BS 8214 fi re stopping correctly installed to BS 8214 correctly ficonstruction reBS stopping correctly installed fire stopping to 8214 fi re stopping installed to BS 8214 to BSminutes) 8214 (60+ correctly installed to BS 8214 to BS 8214 (60+ minutes) (60+ minutes) (60+ minutes) (60+ minutes) 60+ minutes (60+ minutes)

to be enforced in coming years, the serious

installers and maintainers of fire resisting doors

consideration of fire safety is not just a moral

and installers of fire stopping solutions. We also

obligation or a box-ticking exercise, it is law –

offer UKCA/UKNI + CE** marking certification.

No missing intumescent materials No missing intumescent materials No missing intumescent No missing intumescent materials materials No missing intumescent No missing (60+ minutes) No missing intumescent materials materials (60+ minutes) (60+ minutes)materials intumescent (60+ minutes) (60+ minutes) (60+ minutes)

and those who breach the legislation,

Our third-party certification schemes are

could be prosecuted.

provided under the Q-mark brand and aim to provide added assurance that the product will be capable of maintaining the stated level

60+ minutes

Glazing system correctly Glazing system correctly Glazing system correctly specifi ed and installed as Glazing correctly system correctly specifi ed and installed as Glazing system correctly specifi ed and installed as Glazing system correctly per manufacturer’s tested specifi ed and installed specified and installed as per manufacturer’s tested specifi ed and installed as per manufacturer’s tested specifi ed and installed as specifi cation per manufacturer’s tested per manufacturer’s tested specifi cation per manufacturer’s manufacturer’s tested specifi cation per tested specifi cation specification specifiminutes) cation (60+ specifi cation (60+ minutes) (60+ minutes) 60+ minutes (60+ (60+ minutes) minutes) (60+ minutes) Hardware protection correctly Hardware protection correctly Hardware protection correctly Hardware protection correctly specifi ed installed under Hardware protection correctly specifi ed and and installed under Hardware protection correctly specifi ed and installed specified and installed under Hardware protection correctly latch and hinges specifi ed and installed latch and hinges specifiand ed and and installed under under latch hinges specifi ed installed under latch and hinges latch minutes) and hinges hinges (60+ latch and (60+ minutes) 60+ minutes (60+ minutes) (60+ (60+ minutes) minutes) (60+ minutes)

2-4mm 2-4mm 2-4mm

Door Door gaps set correctly Doorgaps gaps set set correctly correctly Door gaps set between 2-4mm Door gaps2-4mm set correctly correctly between Door gaps set correctly between 2-4mm between 2-4mm Door gaps set correctly between 2-4mm 2-4mm between (60+ minutes) 60+ minutes between 2-4mm (60+ minutes) (60+ (60+ minutes) minutes) (60+ (60+ minutes) minutes)

of fire resistance, throughout its life time. Our experience and expertise in testing and certifying construction products is what sets us apart, and, as we can offer the full suite of services required for certifying construction products, customers benefit from overall efficiency in addition to convenient access to

ARE YOUR FIRE DOORS

our expert team.

SAFE AND COMPLIANT? TESTING

2-4mm 2-4mm 2-4mm

DOOR DOOR B B = = PASS PASS

*These times are for illustrative purposes only and may vary.

C LASSURANCE IBUILDING CK H ESOLUTIONS R E FOR A ADVISORY

Building assurance in the minds of our customers and offering solutions for a complex world underpins everything that we do at BM TRADA. To consistently deliver on our promise, we work to three guiding principles, technical excellence, operational excellence and customer excellence.

COMPLEX WORLD CER

TIFIC ATIO N

F O R M O R E I N F O R M AT I O N , V I S I T B M T R A D A . C O M

INSPECTIO N

Perimeter intumescent intumescent Perimeter Perimeter intumescent Perimeter intumescent specification correctas asper specifi cation correct Perimeter intumescent specifi cation correct as per Perimeter intumescent specifi cation as per Perimeter intumescent per manufacturer’s tested manufacturer’s tested specifi specifi cation correct correct asspecifi per cation manufacturer’s tested specifi cation correct as per manufacturer’s tested specifi cation specifi cation correct as per cation specification manufacturer’s tested tested specifi specifi cation manufacturer’s (60+ minutes) manufacturer’s tested specification cation (60+ minutes) (60+ minutes) 60+ minutes (60+ minutes) minutes) (60+ (60+ minutes)


DOOR A

PASS

BM TRADA is a UKAS-accredited certification

fire safety is critical. With recent changes

body which provides independent third-party

in legislation and more stringent rules set

certification services for manufacturers,

Frame to supporting construction Frame to supporting construction Frame to supporting construction fi re correctly installed Frame to supporting fiFrame re stopping stopping correctlyconstruction installed Frame to supporting construction to supporting fi re stopping correctly installed Frame to supporting construction to BS 8214 fi re stopping correctly installed to BS 8214 correctly ficonstruction reBS stopping correctly installed fire stopping to 8214 fi re stopping installed to BS 8214 to BSminutes) 8214 (60+ correctly installed to BS 8214 to BS 8214 (60+ minutes) (60+ minutes) (60+ minutes) (60+ minutes) 60+ minutes (60+ minutes)

to be enforced in coming years, the serious

installers and maintainers of fire resisting doors

consideration of fire safety is not just a moral

and installers of fire stopping solutions. We also

obligation or a box-ticking exercise, it is law –

offer UKCA/UKNI + CE** marking certification.

No missing intumescent materials No missing intumescent materials No missing intumescent No missing intumescent materials materials No missing intumescent No missing (60+ minutes) No missing intumescent materials materials (60+ minutes) (60+ minutes)materials intumescent (60+ minutes) (60+ minutes) (60+ minutes)

and those who breach the legislation,

Our third-party certification schemes are

could be prosecuted.

provided under the Q-mark brand and aim

Glazing system correctly Glazing system correctly Glazing system correctly specifi ed and installed as Glazing correctly system correctly specifi ed and installed as Glazing system correctly specifi ed and installed as Glazing system correctly per manufacturer’s tested specifi ed and installed specified and installed as per manufacturer’s tested specifi ed and installed as per manufacturer’s tested specifi ed and installed as specifi cation per manufacturer’s tested per manufacturer’s tested specifi cation per manufacturer’s manufacturer’s tested specifi cation per tested specifi cation specification specifiminutes) cation (60+ specifi cation (60+ minutes) (60+ minutes) 60+ minutes (60+ (60+ minutes) minutes) (60+ minutes) Hardware protection correctly Hardware protection correctly Hardware protection correctly Hardware protection correctly specifi ed installed under Hardware protection correctly specifi ed and and installed under Hardware protection correctly specifi ed and installed specified and installed under Hardware protection correctly latch and hinges specifi ed and installed latch and hinges specifiand ed and and installed under under latch hinges specifi ed installed under latch and hinges latch minutes) and hinges hinges (60+ latch and (60+ minutes) 60+ minutes (60+ minutes) (60+ (60+ minutes) minutes) (60+ minutes)

2-4mm 2-4mm

FAIL

*

For those responsible for managing buildings,

60+ minutes

2-4mm

DOOR B

MITIGATE RISK, PROTECT LIVES AND SAFEGUARD YOUR REPUTATION

Frame to supporting Frame to supporting construction construction Frame to construction fi re stopping detail not installed Frame to supporting supporting construction

Frame to supporting supporting construction fi re stopping detail not installed fi detail installed construction Frame to fire re stopping stopping detail not not installed fi detail not (15 minutes) fire re stopping stopping detail not installed installed construction fire stopping (15 minutes) (15 minutes) (15 minutes) minutes) detail not installed (15 (15 minutes) 15 minutes

Missing intumescent at bottom Missing Missing intumescent intumescent at at bottom bottom

closing Missingcorner intumescent at at bottom Missing intumescent closing corner Missing perimeter closing corner Missing intumescent at bottom bottom closing corner closing corner intumescent (30 minutes) closing cornerat bottom (30 minutes) (30 closing corner (30 minutes) minutes)

to provide added assurance that the product will be capable of maintaining the stated level

(30 (30 minutes) minutes) 30 minutes

of fire resistance, throughout its life time.

Glazing Glazing system system incorrectly incorrectly

Our experience and expertise in testing and

Glazing system incorrectly specifi ed and installed Glazing system incorrectly Glazing system Glazing system incorrectly specifi ed and installed specifi ed and installed Glazing system incorrectly specifi ed and installed incorrectly specified specifi ed and installed (40 minutes) specifi ed and installed (40 minutes) and installed (40 minutes) (40 minutes)

certifying construction products is what sets

(40 minutes) minutes) (40 40 minutes

us apart, and, as we can offer the full suite of services required for certifying construction

Hardware protection missing

Hardware protection missing protection missing Hardware protection from latch and hinges Hardware protection missing Hardware protection missing from latch and hinges from latch and hinges Hardware protection missing missing from latch from latch and hinges fromminutes) latch and and hinges hinges (45 from latch and hinges (45 (45 minutes) minutes)

products, customers benefit from overall efficiency in addition to convenient access to

(45 minutes) (45 minutes) 45 minutes (45 minutes)

our expert team.

Door Door gaps set correctly Doorgaps gaps set set correctly correctly Door gaps set between 2-4mm Door gaps2-4mm set correctly correctly between Door gaps set correctly between 2-4mm between 2-4mm Door gaps set correctly between 2-4mm 2-4mm between (60+ minutes) 60+ minutes between 2-4mm (60+ minutes) (60+ (60+ minutes) minutes) (60+ (60+ minutes) minutes)

Door gaps gaps too too big on closing edge edge Door too big big on on closing Door too Door gaps gaps too big big on on closing closing edge edge Door gaps too closing edge (50 Doorminutes) gaps too big big on on closing closing edge edge (50 minutes) (50 minutes) (50 minutes) 50 minutes (50 (50 minutes) minutes)

TESTING

Too big Too big Too big Too big

2-4mm

Too big Too big

DOOR DOOR B B = = PASS PASS

*These times are for illustrative purposes only and may vary.

Building assurance in the minds of our customers and offering solutions for a complex world underpins everything that we do at BM TRADA. To consistently deliver on our promise, we work to three guiding principles, technical excellence, operational excellence and customer excellence.

BUILDING ASSURANCE SOLUTIONS FOR A COMPLEX WORLD CER

TIFIC ATIO N

F O R M O R E I N F O R M AT I O N , V I S I T B M T R A D A . C O M

INSPECTIO N

Perimeter intumescent intumescent Perimeter Perimeter intumescent Perimeter intumescent specification correctas asper specifi cation correct Perimeter intumescent specifi cation correct as per Perimeter intumescent specifi cation as per Perimeter intumescent per manufacturer’s tested manufacturer’s tested specifi specifi cation correct correct asspecifi per cation manufacturer’s tested specifi cation correct as per manufacturer’s tested specifi cation specifi cation correct as per cation specification manufacturer’s tested tested specifi specifi cation manufacturer’s (60+ minutes) manufacturer’s tested specification cation (60+ minutes) (60+ minutes) 60+ minutes (60+ minutes) minutes) (60+ (60+ minutes)

ADVISORY

2-4mm 2-4mm

Perimeter intumescent intumescent Perimeter intumescent Perimeter intumescent specifi cation incorrect Perimeter intumescent specification incorrectagainst Perimeter intumescent specifi cation incorrect against specifi cation incorrect against Perimeter intumescent manufacturer’s tested specifi cation specifi cation incorrect against against manufacturer’s specifi cation incorrect against manufacturer’s tested specifi cation manufacturer’s tested specifi cation specifi cation incorrect against manufacturer’s tested specifi cation tested specification manufacturer’s (55 minutes) tested specification manufacturer’s tested specification (55 minutes) (55 minutes) 55 minutes (55 minutes) (55 (55 minutes) minutes)

DOOR DOOR A A = = FAIL FAIL

**CE marking is provided by Element Materials Technology Rotterdam B.V.


P RO U D TO B E PA RT O F

G LO B A L L E A D E R S I N T E ST I N G , I N S P E C T I O N & C E R T I F I C AT I O N

The Element Materials Technology Group is one of the world’s leading global providers of testing, inspection and certification services for a diverse range of materials, products and technologies in advanced industrial supply chains where failure is not an option. Headquartered in London, UK, Element’s team of more than 6,000 expert scientists, engineers and technicians operate from around 200 locations across five continents, delivering an extensive range of solutions to customers in critical industries including Aerospace, Connected Technologies, Construction, Defense, Energy, Environmental, Life Sciences and Transportation. Everything we do is designed to help our customers to develop better products, get them to market on time, save time and money, and to minimize the risk to their business from their materials and product development and production activities.

W W W. B M T R A D A . C O M

+44 (0) 1494 569 745


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.