Full size assignment 1

Page 1

FULL SIZE ASSIGNMENT 1 LOCATION: Edgewater Topography The building we visit this time is located at a hill which means the topography is not totally tie. So, before the land owner sale the land they have to have some treatment to the land. Such as put the reinforce concrete on the cliff in order to keep the soil can not move. Because the concrete is not good at tension so they put reinforce into the concrete for increase its strength. The house will br built away from the concrete so the building will not get force if the concrete wall will fall to the building.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.