RLE SURFATECH SALES & SERVICES # 90 Col. Cabreros St., Basak, San Nicolas, Cebu City Telefax: (032) 418.9045 Mobile: +63.922.8268256 3 February 2011
COZO FILTERS CORPORATION Mactan Export Zone, Lapulapu City
Attention:
Ritchil Meca Asst. Maintenance Supervisor
With reference to your requirement, we are pleased to submit our proposal for the supply of materials, labor and technical supervision to completely undertake the production of the following items with their corresponding amount: PARTICULARS
AMOUNT
11 Units Cementing Oven
Php 113,601.60
7 Units Press Machine Table Stand
Php 62,343.68 VAT Inclusive
Php 175,945.28
Note: See attached sheet for estimation details. SUBJECT OUTLINE
AGREEMENT DETAILS
Terms of Payment:
Delivery: Warranty: Validity:
50% Down payment upon approval Outstanding balance will be billed and collected upon completion and delivery 7 to 10 working days after receipt of purchase order and down payment 3 Months under normal operating condition 30 days from date of receipt
Thank you very much for giving us the opportunity to quote on the above mentioned requirement. Should you need any further assistance, please do not hesitate to get in touch with the undersigned.
Very Truly Yours,
_________________
Rudy L. Ellescas Operation Manager
RLE SURFATECH SALES & SERVICES # 90 Col. Cabreros St., Basak, San Nicolas, Cebu City Telefax: (032) 418.9045 Mobile: +63.922.8268256
Labor and Materials Estimates (Fabrication of Press Machine Table Stand) ITEM # 1 3 2 3 4 5 6 7 8 9
DESCRIPTION
¼”, 1 ½” x 1 ½” Angle Bar 3/8” Marine Plywood 2” Φ Swivel Wheel Caster w/ brake and leveler FUJI Welding Rod Body Filler Epoxy Primer Paint Automotive Lacquer Paint Acrylic Thinner Top Coat Clear Miscellaneous Consumables
QTY
UNIT
32 4 28 1 7 7 7 2 7
Lengths Pcs. Pcs. Box Quarts Quarts Quarts Gals. Quarts
UNIT COST
TOTAL AMOUNT
Php 687.50 Php 620.00
Php 22,000.00 Php 2,480.00
Php 720.00 Php 2,800.00 Php 150.00 Php 180.00 Php 240,00 Php 520.00 Php 250.00
Php 4,200.00 Php 2,800.00 Php 1,050.00 Php 1,260.00 Php 1,680.00 Php 1,040.00 Php 1,750.00 Php 1,500.00
SUBTOTAL LABOR/SERVICE FEE
Php 39,760.00 Php 15,904.00 Php 55,664.00 x
VAT INCLUDED
1.12 Php 62,343.68
RLE SURFATECH SALES & SERVICES # 90 Col. Cabreros St., Basak, San Nicolas, Cebu City Telefax: (032) 418.9045 Mobile: +63.922.8268256
MATERIALS NEEDED FOR CEMENTING OVEN ITEM # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
DESCRIPTION
Top Coat Clear ¾” marine plywood ¼” marine plywood Cabinet handle Lacquer paint Lacquer thinner Epoxy Primer Body filler Duplex wire (1.25mm) Tf single wire 0.75mm Fluorescent lamp set 20 wts Staple wire 1 Gang switch carton Terminal block Aluminum foil Male plug Aluminum CaHA UP Aluminum CaHA DOWN Aluminum U-CLIP Roller bearing Acrylic Putty Flat head woodscrew
QTY
UNIT
3 19 4 22 3 7 3 2 1 1 44 2 11 11 11 11 22 11 22 11 2 2
Galn. Pcs. Pcs. Pcs. Galn. Galn. Galn. Galn. Roll Roll Set Boxes Pcs. Pcs. Rolls Pcs. Pcs. Pcs. Pcs. Pcs. Galn. Boxes
UNIT COST
TOTAL AMOUNT
Php 720.00 Php 960.00 Php 380.00 Php 120.00 Php 680.00 Php 480,00 Php 520.00 Php 680.00 Php 3,500.00 Php 3,500.00 Php 380.00 Php 150.00 Php 80.00 Php 65.00 Php 130.00 Php 48.00 Php 160.00 Php 180.00 Php 75.00 Php 165.00 Php 586.00 Php 450.00
Php 2,160.00 Php 18,240.00 Php 1,520.00 Php 2,640.00 Php 2,040.00 Php 3,360.00 Php 1,560.00 Php 1,360.00 Php 3,500.00 Php 3,500.00 Php 16,720.00 Php 300.00 Php 880.00 Php 715.00 Php 1,430.00 Php 528.00 Php 3,520.00 Php 1,980.00 Php 1,650.00 Php 1,815.00 Php 1,172.00 Php 900.00
TOTAL MATERIAL COST LABOR/SERVICE FEE
Php 72,450.00
TOTAL AMOUNT
Php 28,980.00 Php 101,430.00
VAT INCLUDED
Php 113,601.60