Dragon Sourcing - éž™ ćş? Delivering sustainable sourcing value from emerging markets
Apparels sourcing from emerging markets
Case Study
Agenda
1.
Sourcing Project Introduction
2.
Sourcing Approach
3.
Conclusions
2
Client Introduction & Project Objectives, Dragon Sourcing approach in 2 stages
Client Introduction: Client is a hip French ready-towear label for women's, men's and children's fashions owns and operates apparel retail stores that sell apparel and clothing accessories.
Stage 1: Supplier Pre-Qualification 1. Demand Analysis 2. Supply Market Analysis 3. Develop RFI/RFQ 4. Administer RFI/RFQ 5. Analyse RFI/RFQ Responses
Project Objectives: Primary objective is to identify and qualify potential suppliers by running Request for Information/Request for Quote (RFI-RFQ) process through procurement and sourcing direct from manufacturers in 11 emerging markets category wise for 6 categories:
Deliverables: Stage 1 - Supplier database - RFI-RFQ template & analysis report - Supplier profiles including factory and product pictures, suppliers location, price analysis, supplier ranking & recommendation.
Geographical scope: 11 countries in scope: 6 apparel categories in scope,
Stage 2: Audits, Selection & Contracting to be finalised post stage 1 completion. - Audit Report - Samples - Contract(s) 3
- Following 11 Countries and 6 apparel categories were shortlisted under the project scope, Categories Region East Asia
Countries
T-shirts
Denim
• China
X
• Bangladesh
X
X
• Pakistan
X
X
Sweaters
Jackets
Flou
X
X
X
X
X
Suits
# of categories / country 4
X
5
South Asia
2
• Vietnam South East Asia • Cambodia • Myanmar Indian Ocean
Balkan: Southeastern Europe
•
X X
X
X X X
• Macedoine
X
• Bulgaria • Serbia
Number of Countries per category
2 X
Madagascar
• Romania
1
2 X
2
X
X
3
X
X
X
4
X
X
X
X
4
X
X
X
X
4
6
5
9
2
7
4
Note: Bulgaria & Serbia has been added additionally by Dragon Sourcing for sweater category. 4
- Some of the Images of the 6 apparel categories shortlisted under the project scope No.
T-shirts
Denim
Sweaters
Jackets
1
2
3
4
5
Flou
Suits
Agenda
1.
Sourcing Project Introduction
2.
Sourcing Approach
3.
Conclusions
6
Following steps were covered under stage 1: Supplier Pre-Qualification No.
Step
Deliverables
1.
Demand Analysis Work with client to define and understand the Products and requirements (specs, volumes, current unit prices, delivery destinations of delivery/consumption). Collect samples of the products in order to ensure potential suppliers fully understand them
• Kick-Off Report
2.
Supply Market Analysis Identify long list of potential manufacturers in countries in scope by leveraging B2B websites, DS database, fair catalogues, Chamber of Commerce, magazines, network, references.
• Supplier Long List
3.
Telephone Pre-screening Selection of manufacturers to be included in the RFI/RFP process by telephone pre-screening based on agreed simple criteria (e.g. capability to make the product, can export, quality certifications, interest in participating, etc.
• Shortlist for RFI-RFQ process
4.
Develop RFI/RFQ document Prepare an RFI/RFQ document, with an aligned balanced scorecard that has the objective to pre-qualify the competitiveness and capabilities of the manufacturers, including: background, financial, client and product experience, quality certification & processes, social responsibility, manufacturing/technology capability, R&D capability.
• RFI-RFQ Template • Balanced Scorecard
5.
Administer RFI/RFQ: The RFI/RFQ is translated to the local languages as relevant, and distributed to the relevant manufacturers, with telephone follow-up to push for maximum participation.
• Completed RFI-RFQ’s
6.
Analyze RFI/RFQ Responses: Analysis of RFI/RFQ responses, estimation of logistics costs, and preparation of a report, which profiles & objectively ranks the manufacturers by capability and competitiveness, including a recommendation for those to be audited.
• RFI-RFQ Report • Supplier Profiles • Proposed Shortlist for Audit.
7
Approximate yearly volumes and spend was collected at the project kick off stage,
Number of styles to be included for Estimated Yearly Volumes RFQ process In K - PCS
Estimated Yearly Spend in M (in Euro)
#
Category
1
T-shirts
• Adult : 3 • Kid : 3
units
Adult : 560 KID : 600
2
Denim
• Adult : 2 • Kid : 2
units
Adult : 275 KID : 380
3
Sweaters
• Adult : 2 • Kid : 2
units
Adult : 410 KID : 390
ADULT: XXX KID: XXX
• • • •
units
Adult : 170 KID : 350
ADULT: XXX KID: 4,7
units
Adult : 315 KID : 140
ADULT: XXX KID: XXX
Units
Adult : 170
ADULT: XXX
Total:
EUR XXX M
4
Jackets
Adult doudoune : 1 Adult coat : 2 Adult Parka : 1 Kid jacket : 4
5
Flou
• Adult dress : 2 • Adult shirt : 2 • Adult blouse : 2
6
Suits
• Adult women jacket : 2 • Adult men jacket : 2 Total 34 styles for costing 8
ADULT : xx KID : xx ADULT: XXX KID : XXX
- Stage 1: Supplier Pre-Qualification timeframe. - Project was delivered within 12 weeks as per schedule.
Steps
Week Week Week Week Week Week 1 2 3 4 5 6 Jan 15
Jan 22
Jan 29
Feb 5
Feb 12
Feb 19
Week Week 7 8 Feb 26
Week Week 9 10
Week 11
Week 12
March March March March 5 12 19 26
April 2
1. Demand Analysis
2. Supply Market Analysis Extended Week
3. Telephone Pre-screening
4. Develop RFI/RFQ
RFI/RFQ approved
1
5. Administer RFI/RFQ
Extended week
6. Analyze RFI/RFQ Responses
Supplier profiles with recommendations.
Couple of steps were extended by a week to receive maximum response from the suppliers. 9
2
Not started
Done
In process
Delay
Documentation progress was fully tracked to ensure on-time progress,
#
Category
Kick off
Supplier database validation by client
Client data collection
PreData screening Client clarify questions questions draft
Client validation
RFI/RFQ template draft
Client validation
1
T-shirts
Sent on Jan 30th, Received for Sent with Validated on Feb adults Jan 26, kick off 5th, Kids: Feb 12
2
Denim
Sent on Jan 30th, Received for Sent with Validated on Feb adults Jan 26, kick off 5th Kids: Feb 12
Received Jan 26
Sent with kick off
Validated Jan 26
RFI-RFQ sent on Feb 9
Feb 16
Sweaters
Sent on Jan 30th, Received for Sent with Validated on Feb adults Jan 26, kick off th 5 Kids: Feb 12
Received Jan 26
Sent with kick off
Validated Jan 26
RFI-RFQ sent on Feb 9
Feb 16
Jackets
Sent on Jan 30th, Received for Validated on Feb adults Feb 8, 5th kids: Feb 12
Sent with kick off
Received Jan 26
Sent with kick off
Validated Jan 26
RFI-RFQ sent on Feb 9
Feb 16
Flou
Sent on Jan 30th, Received on Validated on Feb Feb 8 & 12. 5th
Sent with kick off
Received Jan 26
Sent with kick off
Validated Jan 26
RFI-RFQ sent on Feb 16
Feb 19
Suits
Sent on Jan 30th, Received on Validated on Feb Feb 12 th 5
Sent with kick off
Received Jan 26
Sent with kick off
Validated Jan 26
RFI-RFQ sent on Feb 16
Feb 19
3
4
5
6
Received Jan 26
Sent with kick off
Validated Jan 26
RFI-RFQ sent on Feb 9
Feb 16
10
Not-started
Score card draft
Started
Client validation
Finished
-
As a first step, Supplier database was identified category wise and added in each target Country. An extensive supplier data base was built leveraging multiple sources of information & from existing DS database.
11
- Pre-screening process was initiated after receiving client validation, - This process was to filter the long list of suppliers prior moving them to the RFI-RFQ step
12
- Supply Market Analysis: Process metrics follow up for all categories / countries. - Weekly progress reports was sent to the client for review and validations. • •
1228
Pre-screening process completed RFI-RFQ doc sent to all the suppliers passed pre-screening.
124 254 690 223 538
59 130
177
65
99
124
149
351
74 79 38
98 61
158
193
Passed pre-screening
Failed pre-screening
Identified Suppliers
T-shirts
Denim
Sweaters 13
RFI-RFQ Received
Jackets
Flou
RFI-RFQ Rejected
Suits
Supplier Profile example
• •
Post pre-screening the suppliers, RFI process was administered to filter out most capable suppliers,
14
Supplier Profile example
RFI process was administered to filter out most capable suppliers
Supplier Profile example few slides
15
Supplier Profile example
-
Category specific technical questions were added in the RFI to understand supplier capability and capacity.
16
RFQ process, - Total 4 styles were selected for sweater RFQ, 2 adult and 2 kids styles.
Line
Age Group
Category
Pilot/Average Order Quantity in (Pcs)
XXX
Women
Adult
Sweater
XXX
2
XXX
Women
Adult
Sweater
XXX
3
XXX
Girls
Kids
Sweater
XXX
4
XXX
Girls
Kids
Sweater
XXX
No.
Style #
1
Product Pictures
17
Price Analysis Minimum Below Average
- Price analysis was done for the 30 suppliers responded to the RFQ. China 14, Bangladesh 12, Serbia 2, Bulgaria 1 & Madagascar 1. Chinese suppliers were not invited to offer price for kids style. Sr.no 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Supplier Name Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx Supplier xxx
Country xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx
Category Line RFI score 76 75 75 71 71 70 68 68 67 66 66 66 66 65 65 64 62 62 61 60 60 60 59 59 55 54 53 49 39 35 Average Price
Sweater Women Style # xxx € 12.55 € 6.70 € 6.28 € 8.75 € 6.05 € 3.95 € 6.70 € 7.70 € 6.30 € 11.12 € 5.29 € 6.35 € 5.00 € 4.58 € 5.80 € 6.10 € 5.35 € 7.40 € 6.80 € 15.50 € 4.60 € 5.75 € 12.00 € 5.15 € 9.59 € 5.05 € 17.90 €
7.57
Sweater Women Style # xxx € 17.63 € 6.80 € 11.43 € 23.50 € 11.50 € 4.05 € 6.80 € 7.70 € 6.75 € 18.30 € 9.75 € 6.75 € 5.00 € 5.47 € 7.95 € 6.35 € 9.20 € 5.60 € 6.40 € 24.00 € 19.40 € 8.26 € 13.35 € 13.00 € 14.00 € 11.75 € 22.65 € 5.50 € 17.00 € 19.90 €
11.52
€ €
€ €
Above Average Maximum
Sweater Sweater Girls Girls Style # xxx Style # xxx Not in Scope Not in Scope Not in Scope Not in Scope 5.50 € 5.67 Not in Scope Not in Scope 5.40 € 5.65 Not in Scope 6.15 € 6.15 5.15 € 5.25 Not in Scope Not in Scope Not in Scope Not in Scope Not in Scope -
€
€
9 -
9 -
Not in Scope Not in Scope €
6.24
€
6.34
- Price analysis was done for each of the styles, - 27 suppliers offered price for style # XXX - FOB price in Euro per PC.
Women Sweater - Style # XXX FOB Price and spend in Euro
35800
Above average price € 7.57
31000
24000
25100
22240 19180 17500
7900
9160 9200
10000 10100 10300 10580 10700
11500 11600 12100 12200
12560 12600 12700
13400 13400 13600
14800 15400
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
China
XXX
XXX
XXX
XXX
Bangladesh
€ 3.95€ 4.58 € 4.60 € 5.00 € 5.05 € 5.15 € 5.29 € 5.35 € 5.75 € 5.80 € 6.05 € 6.10 € 6.28 € 6.30 € 6.35 € 6.70 € 6.70 € 6.80 € 7.40 € 7.70 € 8.75 € 9.59 € 11.12€ 12.00€ 12.55€ 15.50€ 17.90
Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir Suppleir 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
FOB Price in Euro 19
Spend in Euro
- Supply market analysis category wise was shared in the weekly progress and final RFI reports,
Process
Supplier Identification
Prescreening
RFI-RFQ Administration
Steps
China
Bangladesh
Cambodia
Madagascar
Macedonia
Bulgaria
Serbia
Total
• Suppliers identified
55
68
17
8
3
1
25
177
• Supplier passed prescreening
XXX
XXX
XXX
XXX
XXX
XXX
XXX
79
• Suppliers failed Prescreening
XXX
XXX
XXX
XXX
XXX
XXX
XXX
98
• Number of RFI-RFQ sent
XXX
XXX
XXX
XXX
XXX
XXX
XXX
79
• RFI-RFQ rejected
XXX
XXX
XXX
XXX
XXX
XXX
XXX
46
• Number of only RFI received
XXX
XXX
XXX
XXX
XXX
XXX
XXX
3
• Number of both RFI-RFQ received
XXX
XXX
XXX
XXX
XXX
XXX
XXX
30
20
Supply Market Analysis, Supplier rejection analysis were shared to client for each step, Pre-screening & RFI -RFQ administration. Example for Pre-screening rejection analysis
7 3 10 14 35
12 17
11 2
Example for RFI-RFQ rejection analysis
1
3 4 25 9
Traders/distributors or Importers only, Not certified with any of the social compliance certification Not interested / produce CMT basis / only for in-house production Unable to contact them/ Company shutdown Discarded by client Do not produce sweater or stop producing Duplicate supplier from same group
Cannot meet the technical specification as doing very basic styles Consider themselves small for this project Capacity full Produce CMT basis / only for in-house production Traders/distributors or Importers only, Not certified with any of the social compliance certification Previously have worked with client and the order volumes are very small Cannot meet blended yarn requirement 21
Shortlisted Could be considered Not shortlisted
Suppliers location – CHINA. Manufacturer locations’ of all the suppliers as per category/Country wise were highlighted in the map, Sr.no
Supplier Name
City
Province
1
XXX
XXX
Guangdong
2
XXX
XXX
Guangdong
3
XXX
XXX
Guangdong
4
XXX
XXX
Guangdong
5
XXX
XXX
Guangdong
6
XXX
XXX
Zhejiang
7
XXX
XXX
Zhejiang
8
XXX
XXX
Zhejiang
9
XXX
XXX
Zhejiang
10
XXX
XXX
Zhejiang
11
XXX
XXX
Zhejiang
12
XXX
XXX
Hebei
13
XXX
XXX
Anhui
14
XXX
XXX
Shanghai
15
XXX
XXX
Shandong
Suppliers with only RFI received 22
Suppliers Assessment, - Suppliers were assessed and ranked based on the Company profile, - Scoring and ranking of the suppliers are done on the GSP,
23
RFI Score
76
RFI Ranking
1
- Suppliers company profiles as per ranking wise were shared in the final report.
24
-
Process metrics follow up for all categories / countries was sent to the client in progress and final reports.
1400
1228 1200
1000
124 These suppliers need original samples to submit RFQ and Balkan: South-eastern Europe suppliers have also requested client to visit them first.
254
690
800
223
59
538 600
177 400
200
130
65
99
124
149
351
74 79 38
98 61
117
28
193
158
393 54 101 57 46 18 117
0
Identified Suppliers
T-shirts
Passed prescreening
Denim
RFI-RFQ Received Ony RFI received
Sweaters 25
Jackets
Failed prescreening
Flou
RFI-RFQ Rejected
Suits
Agenda
1.
Sourcing Project Introduction
2.
Sourcing Approach
3.
Conclusions
26
- Global view on the number of suppliers shortlisted and could be considered per category and country wise. - Total 88 suppliers were recommended for the next steps. T-shirts
Region
East Asia
South Asia
Denim
Sweaters
Jackets
China
#
#
Bangladesh
#
#
#
0
Pakistan
#
0
#
5
#
#
#
#
#
#
#
0
0
South Cambodia East Asia
#
0
Myanmar
#
0
Balkan: Southeastern Europe
Suits
# of # of suppliers suppliers Countries Could be Could be Could be Could be Could be Could be per per Shortlisted Shortlisted Shortlisted Shortlisted Shortlisted Shortlisted considered considered considered considered considered considered country country
Vietnam
East Africa
Flou
0
0
# 3
0
#
0 0
Madagascar
#
0
#
#
#
#
#
#
#
0
#
#
0
#
0
0
#
0
#
#
#
#
#
#
#
Romania
#
0
Macedonia
#
0
0
0
0
#
#
0
#
#
Bulgaria
#
#
0
0
#
#
#
#
#
#
Serbia
0
#
0
#
0
0
0
0
0
#
30
10
18
12
8
15
8
3
88
52
Number of Suppliers per category
15
5
9 27
7
Countries not in scope
Result & Recommendation - Executive summary Please note, The sorting of suppliers was done based on following criteria’s, .
Shortlisted
Could be considered Not shortlisted
• • •
Green (Shortlisted): These suppliers are certified with Social Compliance certificate, and in addition, their scoring are high or above average and/or they are vertical integrated mills. Price competitiveness was not a criteria used for the recommendation
•
Orange (Could be considered): Most of these suppliers hold social compliance certification in the past but not currently certified. These suppliers may be high score ranking but does not fulfil the must have criteria for holding social compliance certificate.
•
Red (not shortlisted): They are not certified with any social compliance certification as well no other quality certification and very low RFI scoring. Only handful of suppliers in each category are marked in red as they seem to be least potential for client.
28
Suppliers location – China for example, - 23 suppliers are shortlisted from 4 categories, - 11 suppliers are from Guangdong, 4 from Fujian, 4 from Zhejiang & 4 from others.
1
Sr. No.
Category name
No. of suppliers shortlisted
1 1
1
T-Shirts
2
2
Sweaters
8
3
Jackets
8
4
Flou
5
1
4
4
11
29
Conclusions Whole project was carried out in 12 weeks with 1228 suppliers identified with 117 complete RFI-RFQ received and 28 suppliers responded with only RFI document.
All the recommended suppliers are certified with social compliance and quality management certification. Most of the recommended suppliers are vertical integrated mails having all the production process in house.
Procurement Intelligence report was shared with the client giving insight on the logistic cost and import duties based on the HS codes. DS recommended # of suppliers for sample development & supplier visit/auditing as a next step. As a successful completion of stage 1 – supplier qualification, client awarded DS with stage 2 process, a. On-site audit to verify their production capability, quality and management b. Sample making to ensure supplier meet client requirements. Overall based on the DS Report, It helped client to shortlist and possibly partner with most potential suppliers from the emerging markets. 15