Cotton Bags for Luxury Retail Brand Case Study

Page 1

Dragon Sourcing - éž™ ćş? Delivering sustainable sourcing value from emerging markets

Cotton Bags For Luxury Retail Brand

Case Study


Agenda

1.

Sourcing Project Introduction

2.

Sourcing Approach

3.

Conclusions

2


• Client Introduction & Project Objectives, • Dragon Sourcing approach in 4 steps  Client Introduction: Client is a leading French luxury brand selling high end footwear, bags and life style products. Client want to qualify a price competitive supplier from emerging market in a short period of 4 weeks able to offer cotton bags for life style product range.  Project Objectives: Identify and qualify list of potential manufacturers in India by leveraging DS database and finding new suppliers by running Request for Information/Request for Quote (RFI-RFQ) process through procurement and sourcing direct from manufacturers for 11 SKU’s of cotton bags.  Supplier key requirement: Supplier should have experience in developing cotton bags for luxury brands, must be able to offer saving, export capability and able to develop samples.  Quality Management and Social compliance certification will be considered as advantage.

Stage 2 • SUPPLIER PREQUALIFICATION

Stage 1

• SAMPLING

Stage 4 • FACILITY AUDIT

Stage 3

• CONTRACT


- Total 11 SKU’s with and without gusset styles were included for RFI-RFQ process with estimated volume to half a million pieces.

Sizes of Pouches (mm)

100% Soft Cotton - 1 side Brushed - Inside the Dust Bag

Height

Width

Gussets

Estimated Quantities in PCS

150404

650

650

190

37,700

POUCH 2

XX

XX

XX

XX

XX

POUCH 3

XX

XX

XX

XX

XX

POUCH 4

XX

XX

XX

XX

XX

POUCH 13

XX

XX

XX

XX

XX

POUCH 5

XX

580

350

-

XX

POUCH 6

XX

XX

XX

-

XX

POUCH 7

XX

XX

XX

-

XX

POUCH 8

XX

XX

XX

-

XX

POUCH 9

XX

XX

XX

-

XX

POUCH 12

XX

XX

XX

-

XX

Description

Reference#

POUCH 1

Product Pictures


Agenda

1.

Sourcing Project Introduction

2.

Sourcing Approach

3.

Conclusions

5


- Sourcing Approach,

1.

STAGE 1: Supplier pre-qualification

2.

STAGE 2: Sampling

3.

STAGE 3: Facility Audit

4.

STAGE 4: Contract


- Following steps were covered under stage 1: Supplier Pre-Qualification No.

Step

Deliverables

1.

Demand Analysis Work with client to define and understand the Products and requirements (specs, volumes, current unit prices, delivery destinations of delivery/consumption). Collect samples of the products in order to ensure potential suppliers fully understand them

• Kick-Off Report

2.

Supply Market Analysis Identify list of potential manufacturers in India leveraging DS database and finding new suppliers.

• Potential Supplier List

3.

Telephone Pre-screening Selection of manufacturers to be included in the RFI/RFP process by telephone pre-screening based on agreed simple criteria e.g. capability to make the product, can export, quality certifications, interest in participating, etc.

• Shortlist for RFI-RFQ process

4.

Develop RFI/RFQ document Prepare an RFI/RFQ document that has the objective to pre-qualify the competitiveness and capabilities of the manufacturers, including: background, financial, client and product experience, quality certification & processes, social responsibility, manufacturing/technology capability, R&D capability.

• RFI-RFQ Template

5.

Administer RFI/RFQ: The RFI/RFQ is distributed to the relevant manufacturers, with telephone follow-up to push for maximum participation.

• Completed RFI-RFQ’s

6.

Analyze RFI/RFQ Responses: Analysis of RFI/RFQ responses, estimation of logistics costs, and preparation of a report, which profiles & objectively ranks the manufacturers by capability and competitiveness, including a recommendation for those to be audited.

• RFI-RFQ Report • Supplier Profiles • Proposed shortlist for sampling and audit.


- Stage 1: Supplier Pre-Qualification timeframe. - Project was completed within 4 weeks as per schedule.

Steps

Week 1

Week 2

Week 3

Week 4

1. Demand Analysis

2. Supply Market Analysis

3. Telephone Pre-screening RFI/RFQ approved

1 4. Develop RFI/RFQ

5. Administer RFI/RFQ

6. Analyze RFI/RFQ Responses

Supplier profiles with recommendations.

2

Not started

Done

In process

Delay


- Stage 1- Supply Market Analysis: - Process metrics follow up as per Country wise. 1. Selected list of potential suppliers were added according to the category specific information, 2. Pre-screening was performed to filter the list of suppliers’ with the specific key requirement on this project. 3. RFI-RFQ process was run with selected suppliers qualifying to the client requirement.

STEPS

India

Potential suppliers added to the project

20

Suppliers passed pre-screen process based on must have criteria’s

5

RFI/RFQ Sent

5

Intend to respond

5

RFI/RFQ Received

5


RFI Score

90

RFI Ranking

1/5

- Stage 1 - Supplier profile’s were shared with the client with our ranking,

HUMAN RESOURCES Quality Control Technical Staff Sales & staff / R&D Engineer Management 20 10 20

COMPANY INFORMATION Company Name

DS/SY/003

Factory Address

XX

City

XX

Province

XX

Country

India

Company Website

XX

Employee No.

Business Type: Manufacturer, or trader ? Printiingin-house / outsource Number of sewing machines Monthly production capacity for cotton bags

Others

47

ANNUAL TURNOVER Total sales turnover (in M USD)

2018

2017

USD XX M

USD XX M

MAIN MARKET

COMPANY BACKGROUND

Year Founded

Factory Workers 450

1999

% of Sales

Europe (%)

US (%)

Asia (%)

Domestic (%)

45

XX

XX

XX

TOP 3 CUSTOMER

Manufacturer Customer Name

In house 300 Machines

0.5 M pcs of cotton bags

Rest of the world (%) XX

Top 3 Customers

Industry

Country

% of Sales

Type of Product

XX

Luxury Retail

USA

18

Table Linen

XX

Luxury Retail

US & France

5

Cotton bags

XX

Retail

NL

9

Dust bags

CERTIFICATIONS

Export License ? (Y/N)

Yes

Certificate

Y/N

Date of Certificate

Date of Expire

Be able to export to Europe? (Y/N)

Yes

ISO 9001:2008 Quality management systems

Yes

07.09.2018

12.07.2021

XX

XX

Export Experience (Years) Work Floor Size ( Square meters) Total Employee Number

20 Years 15,000 Sqm 547

Ccorporate Social Responsibility Yes SA 8000

QUALITY CONTROL MANAGEMENT General Production Defective Rate (% rejected)? Accept 3rd party QC? (Y/N)

1.2 % Yes


- Stage 1 - Supplier factory picture were shared with the client for overview of the supplier facility. FACTORY PHOTOS Factory overview

Inside the factory floor

Production floor

Sewing Workshop

Printing Workshop

Lab & Testing

Warehouse

Showroom


- Price analysis was done for all the 5 suppliers,

Descriptio n POUCH 1 POUCH 2 POUCH 3 POUCH 4 POUCH 13 POUCH 5 POUCH 6 POUCH 7 POUCH 8 POUCH 9 POUCH 12

1 2 3 4 5 Supplier name DS/TH/001 DS/EZ/002 DS/SY/003 DS/MA/004 DS/PP/005 FOB Client FOB Price in Difference FOB Price in Difference FOB Price in Difference FOB Price in Difference FOB Price in Difference Ref # Buying Price $US (%) $US (%) $US (%) $US (%) $US (%) ($) 150404 XX $ 1.71 27% $ 2.28 2% 13% - 16 % - 31 % $ 2.02 $ 2.70 $ 3.05 XX XX $ XX XX $ XX XX XX XX XX $ XX $ XX $ XX XX XX $ XX XX $ XX XX XX XX XX $ XX $ XX $ XX XX XX $ XX XX $ XX XX XX XX XX $ XX $ XX $ XX XX XX $ XX XX $ XX XX XX XX XX $ XX $ XX $ XX XX XX $ XX XX $ XX XX XX XX XX $ XX $ XX $ XX XX XX $ XX XX $ XX XX XX XX XX $ XX $ XX $ XX XX XX $ XX XX $ XX XX XX XX XX $ XX $ XX $ XX XX XX $ XX XX $ XX XX XX XX XX $ XX $ XX $ XX XX XX $ XX XX $ XX XX XX XX XX $ XX $ XX $ XX XX XX $ XX XX $ XX XX XX XX XX $ XX $ XX $ XX

Descriptio Client spend Quantities n in $US POUCH 1 POUCH 2 POUCH 3 POUCH 4 POUCH 13 POUCH 5 POUCH 6 POUCH 7 POUCH 8 POUCH 9 POUCH 12

Shortlisted for sampling.

37,700 XX XX XX XX XX XX XX XX XX XX

Total spend in $US Saving Value

$ XX XX XX XX XX XX XX XX XX XX XX Current spend $ XX

Supplier 1: Spend in $US XX XX XX XX XX XX XX XX XX XX XX

Savings in $US $ 23,299 XX XX XX XX XX XX XX XX XX XX

Supplier 2: Spend in $US $ 85,956 XX XX XX XX XX XX XX XX XX XX

Savings in $US $ 1,810 XX XX XX XX XX XX XX XX XX XX

Supplier 3: Spend in $US $ 76,116 XX XX XX XX XX XX XX XX XX XX

Savings in $US $ 11,649 XX XX XX XX XX XX XX XX XX XX

Supplier 4: Spend in $US $ 101,790 XX XX XX XX XX XX XX XX XX XX

Savings in $US - $ 14,024 XX XX XX XX XX XX XX XX XX XX

Supplier 5: Spend in $US $ 114,985 XX XX XX XX XX XX XX XX XX XX

Savings in $US - $ 27,219 XX XX XX XX XX XX XX XX XX XX

Supplier 1 Total saving Supplier 2 Total saving Supplier 3 Total saving Supplier 4 Total saving Supplier 5 Total saving total spend % total spend % total spend % total spend % total spend % $ XX 28.6% $ XX 6.2% $ XX 18% $ XX - 15. 8% $ XX - 23 % $ XX

$ XX

$ XX

$ XX

$ XX


- Sourcing Approach,

1.

STAGE 1: Supplier pre-qualification

2.

STAGE 2: Sampling

3.

STAGE 3: Facility Audit

4.

STAGE 4: Contract


- High quality samples were developed from the shortlisted suppliers within short period of time,

DS/TH/001

DS/EZ/002

DS/SY/003

Samples were developed for selected styles with and without gusset, Example of the developed sample from one the style.


- Sourcing Approach,

1.

STAGE 1: Supplier pre-qualification

2.

STAGE 2: Sampling

3.

STAGE 3: Facility Audit

4.

STAGE 4: Contract


- Post sample development, plan was framed to audit the recommended supplier. - Following sections were covered in the hybrid model of audit process,

** Dragon Sourcing has experienced team for performing Technical and Social Corporate Responsibility (CSR) audit or hybrid model combing both.


- Supplier business license and certification’s were collected during the audit process and shared with the client,


- Supplier scoring with overall comments and corrective action plan was shared with the client,


- Sourcing Approach,

1.

STAGE 1: Supplier pre-qualification

2.

STAGE 2: Sampling

3.

STAGE 3: Facility Audit

4.

STAGE 4: Contract


- Recommended supplier was passed in the audit, - Proforma Invoice was raised to the client under buy/resell model,


- Purchase order was awarded to the shortlisted supplier post negotiation,


Agenda

1.

Sourcing Project Introduction

2.

Sourcing Approach

3.

Conclusions

22


Conclusions  Whole project was carried out in 8 weeks (4 week for supplier qualification and another 4 weeks for sampling, supplier facility audit and contract)  Shortlisted suppliers for sampling were credential with the certification and production capability as per client mandatory requirement.  High quality samples were developed following original sample within a short period of time.

 Client was happy with the quality and workmanship of the samples developed and finalized one supplier for next step.  Audit was immediately planned and the supplier facility was approved based on the audit results.  Audited supplier was awarded with the contract post price negotiation, production lead time, payment terms and others.  Overall based on DS strategic sourcing process, It helped client to place order on time with high savings and samples to showcase.

24


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.