Aluminum Die Casting Sourcing Case Study
Agenda
Š 2016 Dragon Sourcing. All rights reserved.
1.
Objectives
2.
Approach
3.
Result
2
Objectives and approach DS Approach consists in the following work steps:
Context
1. Demand Analysis: Work with the Company to define and understand the products and requirements (specs, volumes, materials, production technology requirements) 2. Supply Market Analysis : Identify long list of potential suppliers in the selected markets by leveraging B2B Websites, DS Database, Fair catalogues, Chamber of Commerce, Magazines, Network, References. 3. Telephone Pre-screening : Selection of suppliers to be included in the RFI/RFP process by telephone pre-screening based on agreed simple criteria (e.g. capability to make the product, minimum company size, interest in participating) 4. Administer the NDA: NDA template authorized by Vossloh that will be distributed to the suppliers who is willing to attend the RFI-RFQ 5. Develop RFI/RFQ : Prepare an RFI/RFQ document, with an aligned Balanced Scorecard that has the objective to pre-qualify the competitiveness and capabilities of the suppliers, including: Background, financial, Client and product experience, Quality certification & processes, Social Responsibility, Manufacturing/technology capability, R&D capability. 6. Conduct RFI/RFQ Administration : The RFI/RFQ is translated to the local languages as relevant, and distributed to the relevant suppliers, with telephone follow-up to push for maximum participation. 7. Analyze RFI/RFQ Responses : Analysis of RFI/RFQ responses, estimation of logistics costs, and preparation of a report which profiles & objectively ranks the suppliers by capability and competitiveness, including a recommendation for those to be audited.
Objectives: • Identify new potential competitive suppliers. Categories: • Aluminum Die Castings Geographical scope: • China, India, Thailand, Poland, Slovenia, Turkey and Italy Deliverables: • Supplier database • RFI-RFQ template • RFI-RFQ analysis report • Supplier Profiles and recommended suppliers for Client to audit
© 2016 Dragon Sourcing. All rights reserved.
3
The project was conducted in a 12 weeks period. Step
Who
0
Kick off
1
Demand Analysis
2
Supply Market Analysis
DS
3
Telephone pre-screening
DS
4
Develop the RFI-RFQ
5
Conduct NDA Administration
DS
6
Conduct RFI/RFQ Administration
DS
7
Analyze RFI/RFQ Responses
Week Week Week Week Week Week Week Week Week Week Week Week Week 0 1 2 3 4 5 6 7 8 9 10 11 12
Client/DS
Client
Client/DS
Client/DS
Today Not started
© 2016 Dragon Sourcing. All rights reserved.
4
Started
Finished
Holiday
Milestone
Agenda
Š 2016 Dragon Sourcing. All rights reserved.
1.
Objectives
2.
Approach
3.
Result
5
434 aluminum die casting suppliers were identified, at the end we collected 29 RFI/RFQs Aluminum Die Casting Step
China
India
Thailand
Poland
Slovenia
Turkey
Italy
Total
187
67
25
48
47
23
37
434
-
-
-
2
-
-
3
5
# DS will contract
187
67
25
46
47
23
34
429
Supplier called
187
67
25
46
47
23
34
429
Shortlisted supplier after call
58
15
2
4
10
4
6
98
NDA sent
58
15
2
4
10
4
6
98
NDA received
29
13
4
10
4
5
64
RFI/RFQ Sent
29
13
4
10
4
5
64
RFI/RFQ received
13
4
2
5
2
3
29
Total number of suppliers # Client contacted before
Š 2016 Dragon Sourcing. All rights reserved.
0
6
Finished
In process
Not started
2 suppliers quote all 38 items in the RFI/RFQ. #
Supplier name
Country
1st BU
2nd BU
3rd BU
4th BU
Total
1 2 3 4 5 6 7 8
Client Status Supplier 1 Supplier 2 Supplier 3 Supplier 4 Supplier 5 Supplier 6 Supplier 7 Supplier 8
China China China China Poland China Poland China
25 25 25 25 24 25 25 22 23
2 2 2 2 2 0 2 2 2
9 9 9 6 4 3 1 3 0
2 2 2 2 2 2 2 2 2
38 38 38 35 32 30 30 29 26
9
Supplier 9
Italy
10
0
9
2
21
10 11
Supplier 10 Supplier 11
Italy China
13 13
0 2
6 0
0 2
19 17
12
Supplier 12
Slovenia
7
1
7
0
15
13 14 15 16
Supplier 13 Supplier 14 Supplier 15 Supplier 16
India China India China
9 3 8 8
0 1 0 0
0 5 1 0
2 0 0 0
11 9 9 8
For items not quoted
Need 3D drawing for the other 3 items. Need 3d drawing for the other 6 items. can't produce the other 8 items. For France items need 3D drawing to quote. can't produce the other 9 items. can't produce the other 12 items. Price doesn’t include machining. Supply to Client indirectly. Can produce most of remaining items. Can produce more, but at this phase only quote 17 items. can't produce the other 21 items. can‘t produce the other 23 items currently, supply to Client indirectly through Hidria. can't produce the other 27 items. Can produce all, but at this phase only quote 9 items. Can produce all, but at this phase only quote 9 items. Can produce all, but at this phase only quote 8 items
17
Supplier 17
Slovenia
0
0
6
2
8
can't produce the other 30 items.
18
Supplier 18
China
1
0
6
0
7
can't produce the other 31 items.
19
Supplier 19
India
0
0
6
0
6
can't produce the other 32 items.
20 21 22
Supplier 20 Supplier 21 Supplier 22
Turkey China China
4 5 4
0 0 0
2 0 0
0 0 0
6 5 4
Can produce all, but at this phase only quote 6 items. Can’t produce the other 33 items. Can produce all, but at this phase only quote 4 items.
23
Supplier 23
Slovenia
1
0
2
1
4
Can produce 17 items but need feedback on offer
24
Supplier 24
Slovenia
0
0
4
0
4
Can’t produce other 34 items
25
Supplier 25
Slovenia
0
0
2
2
4
Can produce 15 items but need feedback on offer
26
Supplier 26
Italy
2
0
1
0
3
27 28 29
Supplier 27 Supplier 28 Supplier 29
India China Turkey
0 0 1
0 0 0
3 0 1
0 2 0
3 2 2
Eventually some tolerances have to be discussed, but on a first analysis all items can be produced. can‘t produce the other 35 items. Can produce all, but at this phase only quote 2 items. Can produce all, but at this phase only quote 2 items.
© 2016 Dragon Sourcing. All rights reserved.
7
Details reason
Can’t meet the machining requirement. Can’t meet the machining requirement. The design is too complicated for them to produce. Need more clarification and missing information on the 3D drawings Can’t meet the machining requirement. Need 0,5 mio machine investment . If comes to realization for offered items they could invest with contract The product is too large to their current capacity.
Small items (0,5kg) and small quantites (5.000) not possbile to produce because of too big machines. Electroindustry items are not possible to produce at the begining due lack of experience. They could add to offer large and heavy aprox 12 items but need feedback on qouted items. We are invited to visit company. The design is too complicated for them to produce The product are too large and complicated for their equipment to produce. The product design is difficult for their equipment to produce. Other items are too big for their machines (max.850t-6.000gr). Have only aluminium die castings and dont have gravity/iron casting. Too busy on many inquiries, need feedback of existing quotation provided. If acceptable they can offer other items except co-casting items as they have no experience and production on machines 1500-1700t as they are occupied. Their focus is on items 0,5-4kg and productionseries of 50.000-500.000 items
The material used to cast products is not under their range.
18 suppliers provide detailed cost breakdown: material, casting, coating, packaging, overhead and profit. Suppliers material price and cost breakdown summary #
Supplier name
Country
Material price/pc
Casting cost / pc
Machining cost/pc
Coating cost/pc
Packaging/pc
Overhead and Profit/pc
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Supplier 1 Supplier 2 Supplier 3 Supplier 4 Supplier 5 Supplier 6 Supplier 7 Supplier 8 Supplier 9 Supplier 10 Supplier 11 Supplier 12 Supplier 13 Supplier 14 Supplier 15 Supplier 16 Supplier 17 Supplier 18 Supplier 19 Supplier 20 Supplier 21 Supplier 22 Supplier 23 Supplier 24 Supplier 25 Supplier 26 Supplier 27 Supplier 28 Supplier 29
China China China China Poland China Poland China Italy Italy China Slovenia India China India China Slovenia China India Turkey China China Slovenia Slovenia Slovenia Italy India China Turkey
v v v v v v v v v v v v v v v v v v v v v v v v -
v v v v v v v v v v v v v v v v v v v v v v v v v -
v v v v v v v v v v v v v v v v v v v v v v v v
v v v v v v v v v v v v v v v v v v v v v v v v v
v v v v v v v v v v v v v v v v v v v v v v v
v v v v v v v v v v v v v v v v v v v
Š 2016 Dragon Sourcing. All rights reserved.
8
Saving range from € 0.78-2.06M ( 23%-42%) . 3rd BU suppliers DDP spend & items quoted Total spend(M EURO)
Items quoted
10
10
9
9
9
9
8.71
9
9
9 9
9
8
8
7
7
7
M EURO
6 5
6
6
4.77
6
6
5.36 5
3.99 4 3
6
3.70 3.85
3.36
2.71
2.93
5
4.59
3.57 3.56 4
4
4
3.28
3.18 2.74
3
3
3.05 3
2.46 2.31
2.01 2
1.63
2 0.50
3 2
2 1.55 2 1.04
0.87
1
6
0.31
1 0.62 1
1
1
1
0
0
Current supplier Suppliers with saving
© 2016 Dragon Sourcing. All rights reserved.
9
Suppliers without saving Suppliers don’t quote all items
The high variability in €/KG between suppliers is indicative of both difference is relative cost positions but probably also of differences in the understanding of the specs 0
1
2
3
4
5
6
7
8
9
10
11
12
13
Product KG cost ( €/KG) 14 15 16 17
18
19
China China China China China China China China China China China China China China China India India India India
20 21 22 23 24 25 26 Turke Turke Slov Slov Slov Slov Slov y y
27
28
29
Italy
Italy
Italy
30
Divisi # on
Part no
Client
Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl Suppl 1st ier 1 ier 2 ier 3 ier 4 ier 5 ier 6 ier 7 ier 8 ier 9 ier 10 ier 11 ier 12 ier 13 ier 14 ier 15 ier 16 ier 17 ier 18 ier 19 ier 20 ier 21 ier 22 ier 23 ier 24 ier 25 ier 26 ier 27 ier 28 ier 29 best
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Item 7 Item 8 Item 9 Item 10 Item 11 Item 12 Item 13 Item 14 Item 15 Item 16 Item 17 Item 18 Item 19 Item 20 Item 21 Item 22 Item 23 Item 24 Item 25 Item 26 Item 27 Item 28 Item 29 Item 30 Item 31 Item 32 Item 33 Item 34 Item 35 Item 36 Item 37 Item 38
4.11 6.34 5.71 3.67 3.31 5.23 11.37 4.53 3.80 3.24 3.67 12.55 6.54 10.62 4.79 7.42 2.43 2.16 2.44 3.16 2.09 2.97 2.18 2.70 7.77 10.57 11.65 29.00 21.07 21.07 4.49 4.72 9.93 9.56 10.55 8.88 6.26 6.26
9.46 11.09 7.29 5.03 4.89 4.70 3.41 14.89 5.91 7.25 6.16 6.59 13.21 18.31 9.47 13.92 4.91 5.35 7.27 9.52 6.42 8.51 5.44 7.10 5.63 6.80 7.79 7.68 11.32 11.32 4.49 4.72 9.93 3.75 4.46 4.14 5.53 5.53
1st BU
2nd BU
rd
3 BU
4th BU
4.02 5.88 4.77 6.13 4.14 4.11 5.20 7.14 5.90 7.38 6.51 6.33 4.67 7.02 5.02 7.46 4.37 4.08 4.20 6.30 4.09 6.48 3.80 5.76 4.55 4.37 4.95 21.32 9.75 9.75
3.95 6.76 3.70 3.93 3.49 3.54 4.29 3.89 4.10 6.38 6.97 5.00 11.56 10.08 6.99 8.71 4.48 3.97 4.81 4.45 3.92 4.93 3.89 5.36 4.32
9.92
3.62 4.42 3.77 3.54 3.46 3.44 3.57 3.58
3.37 5.39 4.64 4.47 4.00 3.88 6.63 4.57 15.53 8.99 5.11 6.66 7.02 7.02 7.42 5.99 3.99 3.99 4.26 4.26 3.79 3.79
5.05 14.26 8.42 7.38 5.87 6.72 9.06 6.65 9.77 10.79 7.68 10.76 10.76 8.05 8.05 11.76 9.24 7.81 7.81 10.68 10.68 7.68 7.68
4.31 8.19 6.11 8.30 7.77 6.47 7.61 7.04 8.65 7.76 9.15 8.27 10.62 14.28 9.78 11.95 10.21 8.71 6.40 7.87 6.67 8.12 6.52 7.51
4.19 4.32 4.90 6.62 4.95 5.96 4.48 4.43
10.57 9.71 22.00 21.00 12.37 24.54 19.31 15.54 20.32 57.01 34.51 34.86
4.40 4.76 4.06 4.40 9.16 5.17 5.38
4.55 5.70 5.54 7.48 5.31 6.07 5.58 5.53 5.23 6.24 5.45 6.85 5.69 7.73 6.76 5.88 6.52 7.90 10.52 13.33 5.42 6.31 6.13 7.14 6.49 7.62 6.05 6.89 6.08 7.89 7.15 18.25
7.09 6.30 5.81 6.09 4.74 6.66 6.81 6.66 6.81
7.86 15.76 4.58 7.86 15.76 3.56 6.87 8.65 4.33 9.83 5.69 3.72 4.13 4.33 5.78 3.72 4.13
© 2016 Dragon Sourcing. All rights reserved.
6.63 6.63
9.06 10.67 5.45
11.12 9.81
2.97 7.31 5.79 6.34 3.65 2.72 2.42 3.18 3.92 3.09 2.77 4.50 5.29 3.45 7.41 11.41 4.84 9.22 4.06 3.19 6.09 3.77 3.77 3.26 4.03 3.24 3.83 3.21 29.30 4.72 5.54 7.46 9.75 10.50 5.40 1.58 4.96 1.26 11.14 2.29 7.40 3.12 8.24 3.81 3.58 4.38 4.38
10
4.93 5.41 4.17 6.36 3.55
4.67 9.11
5.49 6.94 4.54 8.41 4.49
6.92 8.36
6.24
15.96
6.67
11.02
3.32
3.78 9.31 4.19 3.87 10.11 4.33
6.93 3.64 7.45 7.52
6.27 15.06 20.85 20.95
9.05
31.50 4.89 4.74 4.45 7.47 5.70 5.70
12.31 23.00 19.55 10.55 8.27 8.27 4.71 6.15 2.91 3.77 3.08 6.00 6.09 16.74 6.27 7.01 7.03 10.56 9.01 7.93 4.60 4.65 6.66 6.21 6.84
46.51 26.38 21.00 11.00 8.42 3.06
7.05 7.05
4.74 4.53 2.73 2.73 6.19 7.10 3.75 3.75 5.50 3.16 3.16 8.59 2.72 7.05 2.42 3.18 3.41 15.86 2.83 2.83 8.80 2.77 3.20 3.20 3.24 3.24 3.45 11.48 4.67 18.16 6.62 7.73 4.84 11.62 5.96 8.50 4.06 6.92 3.19 3.32 3.77 3.29 3.26 3.29 3.29 3.04 3.04 3.04 3.04 3.21 4.37 4.95 31.34 31.70 6.80 6.80 23.54 6.65 6.65 23.54 6.60 6.60 6.84 4.78 1.58 5.89 3.83 1.26 6.46 5.93 2.29 3.34 3.12 3.34 3.34 2.92 2.92 3.23 3.23 3.23 3.23
31
32
2nd Avera best ge 2.97 4.57 4.17 6.93 3.55 5.24 3.54 5.57 3.46 4.86 3.44 4.59 3.57 5.11 3.09 7.10 4.10 5.89 4.19 7.23 4.32 7.15 5.00 5.98 4.90 9.17 7.02 11.62 4.95 7.67 7.02 9.72 4.37 6.98 3.97 6.18 3.77 5.57 3.99 6.20 3.29 5.47 4.03 6.20 3.24 4.75 3.79 5.72 4.32 6.22 4.72 12.60 5.38 12.02 7.46 21.65 8.27 16.17 8.27 17.04 2.91 5.44 3.06 4.55 5.93 6.96 3.34 7.28 3.81 7.43 3.56 4.86 3.72 5.74 3.72 5.50
33
Max 9.46 14.26 8.42 8.59 7.77 6.72 7.61 15.86 8.80 15.53 10.79 8.27 15.96 18.31 11.02 13.92 11.76 9.81 9.31 9.52 10.68 10.68 7.68 7.68 10.57 29.30 24.54 57.01 34.51 34.86 11.00 8.42 11.14 16.74 15.76 8.65 9.83 7.05
Product price €/KG variation chart. Supplier quotation per KG in EURO
60.00 50.00 40.00 30.00 20.00 Supplier 28
10.00
Supplier 24
0.00
Supplier 20 Supplier 16 Supplier 12 Supplier 8 Supplier 4 Client current
0.00 -10.00
© 2016 Dragon Sourcing. All rights reserved.
10.00 -20.00
20.00 -30.00
30.00 -40.00
11
40.00 -50.00
50.00 -60.00
Score card used to rank suppliers Business information
Year Founded
Weight of criteria
10%
Turnover in 2015 in USD
10%
Number of employees
10%
Export experience
10%
Handle DDP quote Supply to Automotive industry
10% 10%
Client in Denmark, France, Finland, China
10%
Profile of Top Customers
10%
Provide company presentation
10%
Cooperation during RFI/RFQ
5%
Completeness of RFI/RFQ
5% Subtotal
Production Experience of EN AC 44300 Experience of EN AB 44300 Number of 350T-550T casting machines Number of 750T-1200T casting machines Number of 1250T-1600T casting machines Number of 2000T casting machines Number of CNC 3 axes
Number of CNC 4 axes
Scoring 1=After 2010 2=Between 2006 to 2010 3=Between 2000 to 2005 4=Between 1995 and 1999 5=Before 1995 1=Less than 5M 2=5-10M 3=10-20M 4=above 20M 1= < 100 2=100-200 3=201-500 4=>500 1=Less than 5 years 2=5-10 years 3=More than 10 years 0=No,1=Yes 0=No,1=Yes 0=No 1=1 country 2=2-3 countries 3=All 4 0=Not provided 1=Local customers 2=National customers 3=International customers as Client 0=No,1=Yes 1= Poor 2= Satisfactory 3= Excellent 1= Poor 2= Satisfactory 3= Excellent
100% Weight of Scoring criteria 4% 0=No,1=Yes 3% 0=No,1=Yes 0=0 , 1=1-5 , 2=6-10 , 3=11-20 , 10% 4=>20 10% 0=0, 1=1-2 , 2=2-5 , 3=>5 5% 0=0 , 1=1-2 , 2=2-5 , 3=>5 5% 0=0 , 1=1-2 , 2=2-5 , 3=>5 0=0 1=1-2 6% 2=2-5 3=>5 0=0 1=1-2 6% 2=2-5 3=>5
Š 2016 Dragon Sourcing. All rights reserved.
machining accuracy (IT level)
5%
1=IT 6 2=IT 5 3=IT 4
3
Assemble for client
5%
0=No,1=Yes
1
Coating in house
3%
0=No,1=Yes
1
Chroming in house
3%
0=No,1=Yes
1
pattern making / Mold fabrication in house
5%
0=No,1=Yes
1
offer the support of product design and engineering
5%
0=No,1=Yes
1
Be able to provide Process Flow Charts
3%
0=No,1=Yes
1
Be able to provide Computerized records for statistical process contro
3%
0=No,1=Yes
1
Be able to provide Capability Studie
3%
0=No,1=Yes
1
Be able to provide Tooling Maintenance and Contro
3%
0=No,1=Yes
1
Be able to provide Production management techniques to make the process as cost-effective as possible
3%
0=No,1=Yes
1
Number of items quoted
10%
1= Less than 10 items 2= 11-20 items 3=21-30 items 4=>=31 items
4
Max Score per criteria
5
4
4
3 1 1 3
3
1
Subtotal
100%
Quality system
Weight of criteria
Scoring
Max Score per criteria
ISO 9001
10%
0=No,1=Yes
1
ISO 14001
5%
0=No,1=Yes
1
TS 16949
15%
0=No,1=Yes
1
Coordinate Measuring Machine (CMM) in house
6%
0=No,1=Yes
1
Optical Comparator in house
6%
0=No,1=Yes
1
Max Score per criteria
Hardness Testing in house
6%
0=No,1=Yes
1
1 1
Pressure Testing in house
5%
0=No,1=Yes
1
Tensile Testing in house
5%
0=No,1=Yes
1
Spectrometer Chemical Analysis in house
6%
0=No,1=Yes
1
X-Ray detection in house
6%
0=No,1=Yes
1
Incoming material inspection record
6%
0=No,1=Yes
1
online inspection record
6%
0=No,1=Yes
1
final inspection record
6%
0=No,1=Yes
1
Non-destructive test records
6%
0=No,1=Yes
1
Can your company trace casting, machining and coating ?
6%
0=No,1=Yes
1
3
3
4 3 3 3 3
3
Subtotal
12
100%
RFI Score
90
RFI Ranking
1
Supplier profile example COMPANY INFORMATION Company Name
xxx
Address
xxx
Town
xxx
Province
Štajerska
Country
Slovenia
Company Website
Can you handle DDP quote?
Yes
What‘s the percentage of aluminum casting production in your company?
75%
Does your company supply aluminum die casting part to right listed industry?
xxx Does your company have client in right listed countries?
CONTACT PERSON INFORMATION Contact Person
xxx
Title
Sales manager
xxx
Tel
xxx
Mobile phone
xxx
Automotive
Motor
Compressor
Refrigerator & air conditioner
Yes
No
Yes
Yes
Denmark
France
Finland
China
Yes
Yes
No
No
2015
2014
2013
2012
36
32
Domestic
Europe
Turnover (in Million USD)
% Sales exports to the main markets (US, Europe)
1
98
34 North America 0
Company Background What date was your company founded?
Customers
1924
Ownership (State Owned/ Private/Foreign Investments/Joint venture)
xxx
Registration capital (USD) What is the workfloor size (m²)? How many employees do you have?
Who are your top 3 Customers?
11.312.275 71411 520 Sales & Management
R&D Staff
Quality Control
Factory workers
How many people do you have in these positions?
7
14
22
351
How many people can speak English in each department?
7
Do you have export license ?
8
11
60
Do you have capacity to support documentation and special requirements for overseas shipping?
Yes
© 2016 Dragon Sourcing. All rights reserved.
Country
1 Product type of end usage
Automotive Sweden, Italy
-
xxx
Automotive
-
xxx
Automotive
Germany Germany, Czech
Do you have policy to cover environment and conservation?
Yes
Do you have policy to cover health and safety?
Yes
Do you have policy to cover human rights?
Yes
Do you have policy to cover business ethics and antiBribery?
Yes
50
13
Rest of the World
xxx
Corporate Responsibility
Yes
How many years of export experience do you have?
Industry
47
-
Supplier profile example (continued) Technolgy & Process What's your company's main products? EN AC 44300
Housing, Wabco hauba EN 1706 AC-Al EN AB 44300 Si9Cu3Fe
EN 1706 AS9U3Y40
Do you have experience of casting right listed material? (Yes/No)
Yes
Yes
No
No
Actual annual casting production in 2015 by right listed material?
900t
900t
0t
0t
1250T-1600T
2000T
350T-550T 750T-1200T How many right listed pressure aluminum die casting machines does your company have?
5
6
5
0
The aluminum casting machine brand
Bühler, OMS
Bühler
Bühler, Idra
-
Max casting weight of the machine(g)
3.000
5.000
9.000
-
CNC 4 axes
Vertical CNC machine with turning rotative plate
CNC turned CNC 3 axes machine How many CNC machining center does your company have? machining accuracy (IT level) The CNC machining center brand
Can you do the right listed test equipment in house?
Capability Studies
Yes
Drawing and Specification Control
Yes
Tooling Maintenance and Control
Yes
Production management techniques to make the process as cost-effective as possible
Yes
Yes
Do you have equipment list? (Yes/No) Quality Control and Testing Equipment
Yes / No Date of Certificate Certifying Org. What quality and environmental registrations do you have?
ISO 9001
Yes
25.3.2015
Bureau Veritas
ISO 14001
Yes
16.9.2014
Bureau Veritas
TS 16949
Yes
28.5.2015
Bureau Veritas
Test
Yes / No Yes
7
2
16
1
Coordinate Measuring Machine (CMM)
0,001
0,001
0,001
0,001
Optical Comparator
Yes
Nakamura, Traub, Romi
Chiron, EMAG, SW, SAS, Makino
Hardness Testing
Yes
Young
EMAG
Pressure Testing
Yes
Can you do the right listed test equipment in house?
What's the annual machining capacity ( pcs )?
more than 5 mio pcs
Tensile Testing
Yes
Can your company assemble parts for client? Can your company do coating in house? Can your company do chroming in house? Does your company make mould in house? How many employees in your company is qualified for CAD?
Yes Yes Yes Yes
Spectrometer Chemical Analysis
Yes
X-Ray detection
Yes
6
Can your company offer the support of product design and engineering? Can you do the right listed test equipment in house?
Yes Process Process Flow Charts Computerized records for statistical process control
© 2016 Dragon Sourcing. All rights reserved.
Yes/No Yes Yes
Do you do incoming material inspection? Do you keep written record? Do you do online inspection? Do you keep written record? Do you conduct final inspection? Do you keep written record? Can your company provide Non-destructive test records? Can your company trace casting, machining and coating ? If yes, please describe your process. Do you accept 3rd party QC or testing?
14
Yes Yes Yes Yes
Casting and Machining YES, Coating NO No
Supplier profile example (continued) FACTORY OVERVIEW AND WORKSHOP PICTURES
© 2016 Dragon Sourcing. All rights reserved.
15
Total 29 suppliers are scored and ranked with an average score of 72. No.
Supplier name
Country
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Supplier 1 Supplier 2 Supplier 3 Supplier 4 Supplier 5 Supplier 6 Supplier 7 Supplier 8 Supplier 9 Supplier 10 Supplier 11 Supplier 12 Supplier 13 Supplier 14 Supplier 15 Supplier 16 Supplier 17 Supplier 18 Supplier 19 Supplier 20 Supplier 21 Supplier 22 Supplier 23 Supplier 24 Supplier 25 Supplier 26 Supplier 27 Supplier 28 Supplier 29
Slovenia China China India China Slovenia Slovenia China China Turkey India China China China India China China India Turkey China China Slovenia China Italy Slovenia Italy Italy China China
Š 2016 Dragon Sourcing. All rights reserved.
Business Production information 19 17 16 18 15 18 19 14 15 19 20 15 14 18 14 16 13 13 16 14 15 15 14 14 16 11 9 13 7
31 32 33 28 34 29 24 31 25 23 25 25 29 29 26 23 26 24 20 27 20 20 22 20 19 17 20 20 8
Quality system
Score
Rank by score
1st BU
2nd BU
3rd BU
4th BU
Total items quoted
40 40 38 40 36 38 40 36 38 38 33 38 33 28 34 34 34 36 36 30 30 27 25 26 22 27 23 14 18
90 90 87 86 85 85 83 81 80 79 78 77 76 74 74 73 73 72 72 71 65 62 61 59 57 55 52 46 32
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
0 3 23 0 25 0 0 25 13 1 8 24 25 25 0 4 8 9 4 22 1 7 25 2 1 10 13 5 0
0 1 2 0 2 0 0 2 2 0 0 2 2 2 0 0 0 2 0 2 0 1 0 0 0 0 0 0 0
2 5 0 3 9 4 6 1 0 1 1 4 6 9 6 0 0 0 2 3 6 7 3 1 2 9 6 0 0
2 0 1 0 2 0 2 2 2 0 0 2 2 2 0 0 0 2 0 2 0 0 2 0 1 2 0 0 2
4 9 26 3 38 4 8 30 17 2 9 32 35 38 6 4 8 13 6 29 7 15 30 3 4 21 19 5 2
16
29 suppliers are score and ranked with an average score of 72, 19 suppliers are above the average. Suppliers RFI score and items quoted Score
Total items quoted
100
40 90
38
90
87
86
85
38 85
35
35
83
81
80
80
79
78
77 32 76
74
30
74
73
73
72
72
71
30
30
29 65
62
26
61
60
59
25
57
55 21
52 19
46
20
17
40
15
15
13 9
20
10
9
8
8 6
4
3
4
4
2
0
Š 2016 Dragon Sourcing. All rights reserved.
6
7 3
4
5 5
0
17
10 suppliers are recommended for 3rd BU auditing based on (1) RFI score above average, (2) price/KG below average of â&#x201A;Ź12,3 (3) their ability to produce most items and (4) supply to Client 1st tier supplier. 3rd BU supplier recommendation considering RFI score, average KG cost and items quoted Score
Items quoted
Average KG cost (EURO/KG)
100 90
90 86
85
31.7
85
83
30
81
79
80
78
77
76
74
27.8
74
72
73
71
25
70
65
23.1
62
61
59
60
57
55
20
52 18.3
50
16.8
16.7
16.3
15
40 10.7
30 7.4
20
10
9.6
9.0
3
6.6
5.3 9 4
Š 2016 Dragon Sourcing. All rights reserved.
5
4.9
9
5
7.8
6.9
10 2
8.5
7.9
7.1 4.8
0
12.3
12.3
12.0
6
4 1
1
EURO/KG
90
35
6
6
6 2
1
18
3
9
7
6 3
1
2
0
Recommended supplier
Agenda
Š 2016 Dragon Sourcing. All rights reserved.
1.
Objectives
2.
Approach
3.
Result
19
Total 17 suppliers from China, India, Slovenia, Poland, Turkey and Italy are recommended for next steps with potential savings up to €4.83M or 34% Potential saving (M €)
Items quoted
No.
Supplier name
Score
Rank by score
1st BU
2nd BU
3rd BU
4th BU
Total items quoted
1st BU
2nd BU
3rd BU
4th BU
Total
1
Supplier 1
90
1
0
0
2
2
4
0.00
0.00
0.12
0.00
0.12
2
Supplier 2
90
2
3
1
5
0
9
0.00
0.00
0.18
0.00
0.18
3
Supplier 3
85
5
25
2
9
2
38
2.14
0.26
2.07
0.36
4.83
4
Supplier 4
83
7
0
0
6
2
8
0.00
0.00
0.74
0.00
0.74
5
Supplier 5
81
8
25
2
1
2
30
0.41
0.11
0.00
0.00
0.52
6
Supplier 6
80
9
13
2
0
2
17
0.02
0.24
0.00
0.42
0.68
7
Supplier 7
78
11
8
0
1
0
9
0.67
0.00
0.18
0.00
0.85
8
Supplier 8
77
12
24
2
4
2
32
0.25
0.00
0.00
0.04
0.29
9
Supplier 9
76
13
25
2
6
2
35
0.91
0.28
0.14
0.00
1.33
10
Supplier 10
74
14
25
2
9
2
38
0.62
0.16
0.88
0.09
1.76
11
Supplier 11
73
16
4
0
0
0
4
0.20
0.00
0.00
0.00
0.20
12
Supplier 12
73
17
8
0
0
0
8
1.39
0.00
0.00
0.00
1.39
13
Supplier 13
72
18
9
2
0
2
13
0.19
0.00
0.00
0.08
0.27
14
Supplier 14
72
19
4
0
2
0
6
0.00
0.00
0.00
0.00
0.00
15
Supplier 15
71
20
22
2
3
2
29
1.00
0.03
0.49
0.38
1.89
16
Supplier 16
62
22
7
1
7
0
15
0.05
0.00
0.11
0.00
0.16
17
Supplier 17
55
26
10
0
9
2
21
1.27
0.00
1.85
0.70
3.81
© 2016 Dragon Sourcing. All rights reserved.
20