Cooling Towel Sourcing Project Case Study
© 2020 Dragon Sourcing. All rights reserved.
Agenda
Š 2020 Dragon Sourcing. All rights reserved.
1.
Sourcing Project Introduction
2.
Sourcing Approach
3.
Conclusions
2
Objectives and approach Dragon Sourcing approach in 3 stages:
Context Client Introduction: • Client is leading German Company providing corporate gifting for their clientele in Europe.
Stage 1: Supplier Pre-Qualification Stage 2: Selection & Contracting
Project Objectives: • Shortlist potential suppliers from DS existing supplier database manufacturing microfiber towels.
Stage 3: Procurement Operations Deliverables under stage 1 • RFI-RFQ template • RFI-RFQ analysis report • Manufacturer profiles with rankings including factory and product pictures. • DS Recommendation on next steps
Category Microfiber Cooling towel Geographical scope: China.
© 2020 Dragon Sourcing. All rights reserved.
3
Agenda
Š 2020 Dragon Sourcing. All rights reserved.
1.
Sourcing Project Introduction
2.
Sourcing Approach
3.
Conclusions
4
Following STEPS were covered for end to end sourcing,
Supplier Pre-Qualification •
Key activities
•
Demand analysis to define and understand the product and key requirements Supply analysis to identify list of potential suppliers
•
Telephone pre-screening based on agreed simple criteria
•
Develop RFI/RFQ template
•
Conduct RFI/RFQ administration
•
Analyze RFI/RFQ responses and issue RFI-RFQ report
•
Recommend suppliers for next phase
PHASE 1 © 2020 Dragon Sourcing. All rights reserved.
Procurement Operations
Selection & Contracting
•
Recommend suppliers for sampling
•
Send original samples to the preshortlisted suppliers.
•
•
•
Manage P/O and agree payment terms and details.
•
Check in process production quality
•
Conduct pre-shipment QC
Sample development from final list of suppliers & testing. • Negotiation, contracting and final selection.
PHASE 2
Arrange logistics
•
Manage payments
•
Manage supplier performance
•
Monitor new sourcing opportunities
PHASE 3
Supplier qualification & selection process was completed in 6 weeks, Steps
Week 1
Week 2
Week 3
Week 4
Week 5
Week 6
1. Demand Analysis
2. Supply Market Analysis 3. Telephone Pre-screening 4. Develop RFI/RFQ 5. Administer RFI/RFQ Supplier profiles with recommendations.
6. Analyze RFI/RFQ Responses
1
7. Original sample sent to shortlisted suppliers Samples developed and approved.
8. Sample developed from shortlisted suppliers.
Š 2020 Dragon Sourcing. All rights reserved.
6
2
Demand Analysis, - Quotes were collected based on solid color and printed design with volume as per min 10,000 PCS to maximum 80,000 PCS.
Product name
Product picture
Material
Instant Cooling Microfiber Towel
Material: 55% Polyamide & 45% Polyester and
Solid Colors
Description
• • •
Size 100 x 30 cm, GSM 170 Weight 52 gram of the towel
Estimated pilot order quantity
80,000 PCS
• Packaging: Single packing a in plastic zipper bag. • Instant Cooling Microfiber Towel
Material: 60% Polyamide & 40% Polyester
Overall Digital Print
© 2020 Dragon Sourcing. All rights reserved.
7
Plastic Packaging + Carabiner in towel color with rounded edges and Inlay Card with product information
• Special Function: Loop to hang up the towel and can also be used as care label
80,000 PCS
‒ As a first step, potential suppliers were shortlisted from existing DS database.
Š 2020 Dragon Sourcing. All rights reserved.
8
‒ Pre-screening process was initiated after receiving client validation, ‒ This process was to filter the list of identified suppliers prior moving them to the RFI-RFQ step. Suppliers “Must have” criteria to pass pre-screening.
© 2020 Dragon Sourcing. All rights reserved.
9
Post pre-screening the suppliers, RFI-RFQ process was administered to filter out most capable suppliers.
Š 2020 Dragon Sourcing. All rights reserved.
10
Post pre-screening the suppliers, RFI-RFQ process was administered to filter out most capable suppliers.
Š 2020 Dragon Sourcing. All rights reserved.
11
‒ Category specific technical questions were added in the RFI relevant to the to understand supplier production capability and capacity.
Š 2020 Dragon Sourcing. All rights reserved.
12
Suppliers Assessment, Suppliers were assessed and ranked based on the Company profile, Scoring and ranking of the suppliers are done on the GSP,
Shortlisted
Could be considered Not shortlisted
RFI Result chart: All markets, All sections 100
RFI score
80
100% 79% 80
69% 78
69%
67%
67%
61%
58%
71
RFI filling rate
75% 61
60
53 50%
40
33
28 25%
20
0
0% China Supplier 4
China Supplier 1
China Supplier 3
China Supplier 9
China Supplier 2
China Supplier 6
China Supplier 10
Certificate,documents and pictures
Social responsibility
Quality management
Production
Business information
RFI Score
RFI filling rate
Š 2020 Dragon Sourcing. All rights reserved.
13
Manufacturer locations were highlighted in the map No
Supplier name
City
Province
Country
1 2 3 4 5 6 7 8 9 10
Supplier 1 Supplier 2 Supplier 3 Supplier 4 Supplier 5 Supplier 6 Supplier 7 Supplier 8 Supplier 9 Supplier 10
XX XX XX XX XX XX XX XX XX XX
XX XX XX XX XX XX XX XX XX XX
China China China China China China China China China China
Shortlisted Could be considered Not shortlisted
Location of the Suppliers Marked
© 2020 Dragon Sourcing. All rights reserved.
14
Shortlisted Could be considered
RFQ – Price Analysis - Price were collected based on min 10,000 PCS and maximum 80,000 PCS.
Not shortlisted
#
1
2
3
4
5
6
7
8
9
10
Supplier name
Supplier 1
Supplier 2
Supplier 3
Supplier 4
Supplier 5
Supplier 6
Supplier 7
Supplier 8
Supplier 9
Supplier 10
Country
China
China
China
China
China
China
China
China
China
China
Product name
Dimension in cm (L x W) & Weight
Order qty in PCS
FOB Price in $US/PC
10,000 PCS
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
80,000 PCS
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
10,000 PCS
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
80,000 PCS
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
Instant Cooling Microfiber Towel Solid Colors 100 x 30 cm. Net weight 52 gram 170 GSM Instant Cooling Microfiber Towel Overall Printed
Recommended suppliers
© 2020 Dragon Sourcing. All rights reserved.
15
RFI Score
69
RFI Ranking
2
Supplier company profiles as per ranking wise was shared in the final RFQ report with recommended suppliers for moving them to next phase of sampling.
Š 2020 Dragon Sourcing. All rights reserved.
16
Phase 2: Suppliers were selected for sampling process.
Supplier Pre-Qualification •
Key activities
•
Demand analysis to define and understand the product and key requirements Supply analysis to identify list of potential suppliers
•
Telephone pre-screening based on agreed simple criteria
•
Develop RFI/RFQ template
•
Conduct RFI/RFQ administration
•
Analyze RFI/RFQ responses and issue RFI-RFQ report
•
PHASE 1 for next Recommend suppliers phase
© 2020 Dragon Sourcing. All rights reserved.
Procurement Operations
Selection & Contracting
•
Recommend suppliers for sampling
•
Send original samples to the preshortlisted suppliers.
•
•
•
Manage P/O and agree payment terms and details.
•
Check in process production quality
•
Conduct pre-shipment QC
Sample development from final list of suppliers & testing. • Negotiation, contracting and final selection.
PHASE 2
Arrange logistics
•
Manage payments
•
Manage supplier performance
•
Monitor new sourcing opportunities
PHASE 3
- High quality printed samples were developed from the shortlisted suppliers within short period of time, - Contract was awarded to the supplier with sample approved and after final negotiation.
Š 2020 Dragon Sourcing. All rights reserved.
18
Phase 3: Post PO management was agreed with the client.
Supplier Pre-Qualification •
Key activities
•
Demand analysis to define and understand the product and key requirements Supply analysis to identify list of potential suppliers
•
Telephone pre-screening based on agreed simple criteria
•
Develop RFI/RFQ template
•
Conduct RFI/RFQ administration
•
Analyze RFI/RFQ responses and issue RFI-RFQ report
•
PHASE 1 for next Recommend suppliers phase
© 2020 Dragon Sourcing. All rights reserved.
Procurement Operations
Selection & Contracting
•
Recommend suppliers for sampling
•
Send original samples to the preshortlisted suppliers.
•
•
•
Manage P/O and agree payment terms and details.
•
Check in process production quality
•
Conduct pre-shipment QC
Sample development from final list of suppliers & testing. • Negotiation, contracting and final selection.
PHASE 2
Arrange logistics
•
Manage payments
•
Manage supplier performance
•
Monitor new sourcing opportunities
PHASE 3
- Proforma Invoice was raised to the client under buy/resell model, - Purchase order was awarded to the shortlisted supplier post negotiation, Proforma Invoice
Š 2020 Dragon Sourcing. All rights reserved.
Purchase Order
20
- Production schedule was shared with the client with regular update on each of process and sample validation. TOTAL ORDER QTY: 80,000 PCS Production Schedule follow up Activity Name
Process dates
Purchase Order Received Date Fabric / Yarn Purchase Start Fabric / Yarn Purchase End PP sample QC Raw Materials Production Start Date Colour Approval First Piece Approval - Fabric Knitting End dt Fabric Cutting Start Date Cutting End date Trims- wash care label Start date Trims- wash care label complete date Zipper bag - Start date Zipper bag - complete date Carabiner Start date Carabiner complete date Trims & Accessories Approval Submission to Buyer Trims & Accessories - Approved Date from Buyer Trims & Accessories Bulk Order Date(Stitching and Packing) Trims & Accessories Bulk Order Received Date
XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX
Process
Projected Completion Actual Completion date date
Fabric knitting
XX
XX
Submit for approval
XX XX XX
XX XX XX
Kniting
XX
XX
Fabric cutting
XX
Trims & Accessories
XX
XX
XX
XX
Sample testing
XX
XX
Stitching process
XX
Already approved XX XX
Production Inspection at 20% (16,000 PCS)
XX
Test Sample Submission to Int.LAB Testing Report From Int LAB Stitching Start Stitching 1 st pcs Stitching end Packing Start Packing End Final Inspection
XX XX XX XX XX XX XX XX
Packing List Information
Packing
XX
Final Inspection
XX
XX
Packing List Information
XX
Shipment date (80000 PCS)
XX
Ex-factory shipment date
XX
Container loading Supervision
XX
Inspection
Billing/Documentation
Documents sending date
ETD Date by Train ETA Germany
© 2020 Dragon Sourcing. All rights reserved.
XX XX
21
Cut-off delivery date
XX XX
XX
- Bulk fabric was tested to check several parameters including colour fastness & composition percentage.
Š 2020 Dragon Sourcing. All rights reserved.
22
- Final QC inspection and container loading supervision with third party was arranged by Dragon Sourcing and results were PASSED.
Š 2020 Dragon Sourcing. All rights reserved.
23
Agenda
Š 2020 Dragon Sourcing. All rights reserved.
1.
Sourcing Project Introduction
2.
Sourcing Approach
3.
Conclusions
24
Conclusions Supplier qualification and sampling process was completed within 6 weeks. High quality samples were developed following original sample within a short period of time. Shortlisted suppliers for sampling were credential with the Oeko-tex certification and production capability as per client mandatory requirement. Shortlisted supplier was awarded with the contract post price negotiation, production lead time, payment terms and others. Overall based on DS strategic sourcing process, It helped client to place order on time with high savings and samples to showcase.
•
Dragon Sourcing provide and end-to-end service from Procurement Intelligence through to Procurement Operations
• A business model which ensures that we work exclusively for the benefit of the buyer © 2020 Dragon Sourcing. All rights reserved.