Dragon Sourcing - 龙 源 Your Tailored Sourcing Approach to LCC Sourcing
Panel / Louver and Linear sourcing project in China and India 2015
Agenda
Š 2015 Dragon Sourcing. All rights reserved.
1.
Objectives, Approach and Project Planning
2.
Demand Analysis
3.
Progress to date
4.
China RFI/RFQ analysis
5.
India RFI/RFQ analysis
6.
Next Steps
7.
Appendix
2
Objectives and Approach DS Approach consists in the following work steps:
Context
1.Collect detailed spend information about the nature of the products required (supplier capabilities required, specifications, volumes, drawings, and samples when relevant for all references to be included in the RFI-RFQ process) with all spend data to be provided by Client, 2.Identify list of potential suppliers in Mainland China to include in the RFI process by incorporating existing list of DS potential suppliers, by leveraging the web, external databases and various networks of experts 3.Carry out a phone pre-screening of the suppliers based on maximum 45 screening criteria per category (e.g.: min size, having certain quality certification, experience in relevant industry,…) with these criteria to be provided by Client 4.Develop the RFI-RFQ – jointly with Client– to include all key supplier qualification criteria (e.g.: financial, technology,, corporate responsibility, quality certification, MOQ, client references…)and quotation requirements 5.Administer the RFI / RFQ process to ensure as high a return rate as 6.Analyze responses based on qualitative criteria and use a balance score card together with Client team to rank suppliers and recommend suppliers which Client needs to take through a formal qualification process
Objectives: • To carry sourcing services for Panel / Louver and Linear Geographical scope: • Mainland China • India
Deliverables: • Supplier data base • RFI / RFQ • Score Card • Company profiles • Recommended audit supplier list
© 2015 Dragon Sourcing. All rights reserved.
3
The project is scheduled for a 10 working weeks period before starting suppliers auditing as described below
Steps
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
Sept 14
Sept 21
Sept 28
Oct 5
Oct 12
Oct 19
Oct 26
Nov 2
Nov 9
Nov 16
1. Demand Analysis RFI/RFQ& Score card approved
2. Supply Market Analysis
Shortlist for recommended Audit
3. Telephone Pre-screening
4. Develop RFI /RFQ
1 week Late
5. Conduct RFI / RFQ Administration
6. Develop the Score card and Analyze RFI /RFQ Responses Today Not started
Š 2015 Dragon Sourcing. All rights reserved.
Started
4
Finished
Late
Milestone
Agenda
Š 2015 Dragon Sourcing. All rights reserved.
1.
Objectives, approach and Project Planning
2.
Demand Analysis
3.
Progress to date
4.
China RFI/RFQ analysis
5.
India RFI/RFQ analysis
6.
Next Steps
7.
Appendix
5
China: 4 type of products to be addressed by 1 RFI/RFQ Short Text
Reference Picture
Size (LxWxH)
Forecast(pcs)/year
Target Price
27W OP SL 2 Louver (Square)
597*597mm
36W OP SL 2 Louver (Square)
597*597mm
36W OP SL 2 Louver (Rectangular)
297*1197mm
115 RMB
30W LD Panel (Square)
597*597mm
150 RMB
40W LD Panel (Square)
597*597mm
40W LD Panel (Rectangular)
297*1197mm
43W OP Batten
1170mm
Total (approx.)
100 RMB 50K
30K
110 RMB
170 RMB
5.4M RMB
4.9M RMB
170 RMB 15 USD 50K
12.5USD 8.5 USD
22W OP Batten
585mm
0.73M USD
5K
6.5 USD 20W LD Batten
600mm
40W LD Batten
1200mm
90 RMB 100 RMB 30K
3.3M RMB
60W LD Batten
1500mm
120 RMB
80W LD Batten
1500mm
130 RMB
© 2015 Dragon Sourcing. All rights reserved.
6
India : 3 type of products to be addressed by 1 RFI/RFQ Short Text
Reference Picture
Size (LxWxH)
Forecast(pcs)/year
30w LP DC Panel
595*595mm
40w LP DC Panel
595*595mm
8.5w LP LED DL (Round) 4 Inch
D125mm x H 20mm
12w LP LED DL (Round) 6 Inch
D175mm x H 20mm
15w LP LED DL (Round) 6 Inch
D175mm x H 20mm
18w LP LED DL (Round) 6 Inch
D175mm x H 20mm
25w LP LED DL (Round) 8 Inch
D225mm x H 20mm
30w LP LED DL (Round) 8 Inch
D225mm x H20mm
30 w LP Panel
1200x75x60 ( H<70mm)
60w LP Panel
1200x75x60 ( H<70mm)
© 2015 Dragon Sourcing. All rights reserved.
7
Target Price
Total (approx.)
The approved RFI/RFQ overview and the main differences between China and India version Differences
India
• Payment Term
• Can you accept payment terms 75 days end of month after invoice?
• Can you accept payment terms 60 days end of month after invoice?
• Product Certification
• Do you have 3C/CE/CB?
• What products approbation do you have?
• Product datasheet
• 4 types of product
• 3 types of product
• RMB@ DAP Guangzhou/Shanghai domestic warehouse
• C&F Gurgaon domestic warehouse
• USD@ DAP Guangzhou Bonded Warehouse
• C&F Mumbai domestic warehouse
• 165K
• 70K
RFI
RFQ
China
• Delivery Term
• Total demand/year
© 2015 Dragon Sourcing. All rights reserved.
8
Agenda
Š 2015 Dragon Sourcing. All rights reserved.
1.
Objectives, approach and Project Planning
2.
Demand Analysis
3.
Progress to date
4.
China RFI/RFQ analysis
5.
India RFI/RFQ analysis
6.
Next Steps
7.
Appendix
9
Telephone Pre-Screening Criteria 1.
What concrete products you are making? Do you have office lighting luminaires such as linear/panel/louver lights?
2.
How many production experience do you have to make LED lights ? (MUST >3 years)
3.
Do you have experience on merchandising and ODM business ?
4.
Do you have business license for both domestic & export business ? (India no need export license)
5.
Do you have ISO9001 certificate and ROHS compliance ? (India no need)
6.
How about your company annual turnover ? (China suppliers must >10million Euro and India must>3million Euro but not public company)
7.
Are you 3C qualified factory ? (India no need)
8.
SMT and Assembly line in house or not ?
9.
LED Driver design in house or not ?(power<=50w)
10. Thermal, Optical, mechanical design in house or not ? © 2015 Dragon Sourcing. All rights reserved.
10
39 LED Luminaries suppliers in China have passed the pre screening phase
Heilongjiang
Short List Suppliers Location
Nb Jilin Liaoning
Guangdong
19
Zhejiang
7
Jiangsu
5
Shanghai
5
Xinjiang
Beijing
1
Hunan
1
Shanxi
1
Total
39
Gansu
Tianjin
Shanxi
Ningxia Qinghai
Beijing
Inner Mongolia
Gansu
Shaanxi
Jiangsu
Henan Anhui
Xizang Sichuan Sichuan
Hubei
Shanghai Zhejiang
Jiangxi Hunan Guizhou Yunan
Guangxi
Guangdong
Taiwan
Hong Kong
Š 2015 Dragon Sourcing. All rights reserved.
11
Location of the suppliers passed
14 LED Luminaries suppliers in India have passed the pre screening phase
Short List Suppliers Location
Nb
Maharashtra
6
Andra Pradesh
2
West Bengal
1
Tamil Nadu
1
Rajasthan
1
Karnataka
1
Haryana
1
Gujarat
1
Total
14
Š 2015 Dragon Sourcing. All rights reserved.
Pradesh
12
Location of the suppliers passed
Pre-screening rejection reason analysis China #
Pre-screening failure reason
1
India No of suppliers
%
#
Pre-screening failure reason
No similar products
19
26%
1
2
Turnover is less than 10 Million Euro
13
18%
3
No interest
10
4
No ISO certificate
5
No of suppliers
%
Turnover is less than 3 Million Euro
17
29%
2
No responding
11
19%
14%
3
Not a manufacturer
6
10%
10
14%
4
Discarded by the client
5
8%
Not responding
8
11% 5
Production experience less than 3 years
5
8%
6
No export licence
5
7%
7
Single product line
2
3%
6
No in house SMT and assembly line
5
8%
8
Public company
2
3%
7
Not interested
4
7%
9
Lacking for inhouse design capability
1
1% 8
No experience in Merchandising &ODM business
3
5%
10
11 12
No flexibility on small volumn order
1
1%
Not a manufacturer
1
1%
9
Capacity full for this year
1
2%
No ODM and merchandise experience
1
1%
10
Duplicate supplier
1
2%
TOTAL
73
100%
TOTAL
58
100%
Š 2015 Dragon Sourcing. All rights reserved.
13
Total 53 suppliers were shortlisted for China/India and 14 RFIRFQ received Step
China
India
Total
Total number of suppliers
112
72
184
Supplier called
112
72
184
Shortlisted supplier after call
39
19
58
Suppliers discarded by Client
0
5
5
Final Shortlisted Suppliers
39
14
53
RFI/RFQ Sent
39
14
53
Intend to respond
8
6
14
RFI/RFQ received from potential suppliers
8
6
14
RFI received for Client existing suppliers
4
2
6
Š 2015 Dragon Sourcing. All rights reserved.
14
Reason Analysis for short listed suppliers not intending to respond RFIRFQ China #
Reason of "not intending to feedback on RFIRFQ"
1
Big spec differences
India No of suppliers
%
11
35%
2
No interest without providing specific reasons
10
32%
3
Not willing to give any company information at this stage
4
13%
4
No ISO
2
6%
5
Contract with the second biggest distributor in Germany
1
3%
6
No interest unless knowing customer name
1
3%
7
Prepared to be launched
1
3%
8
No in house assembly line and no ODM experience
1
3%
TOTAL
31
100%
Š 2015 Dragon Sourcing. All rights reserved.
#
15
Reason of "not intending to feedback No of on RFIRFQ" suppliers
%
1
Not willing to give any company information at this stage
3
37%
2
Capacity Full
2
25%
3
Not interested in this project
2
25%
4
Supplier named "MF Electricals Pvt. Ltd " is Client's existing supplier
1
13%
TOTAL
8
100%
For China and India, very similar RFI Scoring Criteria were selected measuring existing and potential suppliers’ maturity
Score card weight of each section of the RFI measuring the maturity
Scoring Area
Weight
• Business Information
15%
• Design Capability
25%
• Technology & Process
20%
• Material Supply Management
15%
• Quality System and Testing
25%
Total
© 2015 Dragon Sourcing. All rights reserved.
100%
16
Agenda
Š 2015 Dragon Sourcing. All rights reserved.
1.
Objectives, approach and Project Planning
2.
Demand Analysis
3.
Progress to date
4.
China RFI/RFQ analysis
5.
India RFI/RFQ analysis
6.
Next Steps
7.
Appendix
17
China: RFI Score from the 8 potential suppliers seems in line with existing Client suppliers
Total RFI score 100
96
95
94
94
93
93
91
90
90
Average: 90 87
83 73
Score
75
50
25
0 ZJ YANKON
SH CH
SZ PEPNICE
NJ Handson
Nexus JX
Kindwin SZ
SZ Syhdee
JZ DotLighting
SZ HENSEL
NB longer
Potential Suppliers
© 2015 Dragon Sourcing. All rights reserved.
SZ SNC
ZJ Mingyang
Client Existing Suppliers
China: Specification Variation Analysis highlight that although looking for “on the shelf” products, most of the criteria are “NOGO”
RFI Score
83
93
91
93
73
95
94
87
S2
S3
S4
S5
S6
S7
S8
# of Criteria
# of NO GO Criteria
Supplier 1
OP SL 2
35
20 (57%)
• Not quoted
• 4 variations out of 35
• 6 variations out of 35
• 9 variations out of 35
• 5 variations out of 35
• 2 variations out of 35
• 1 variation out of 35
• Not quoted
LD Panel
37
19 (50%)
• 9 variations out of 37
• 5 variations out of 37
• 7 variations out of 37
• 10 variations out of 37
• 10 variations out of 37
• 2 variations out of 37
• 2 variations out of 37
• 6 variations out of 37
30
Not Provided
• Not quoted
• 3 variations out of 30
• Not quoted
• 4 variations out of 30
• Not quoted
• Quoted but not the exact product as required
22 (63%)
• Quoted but not the exact product as we required
• 2 variations out of 35
• 6 variations out of 35
• 7 variations out of 35
• Not quoted
• Quoted but not the exact product as required
Product
OP Batten
LD Batten
35
© 2015 Dragon Sourcing. All rights reserved.
19
• Not quoted
• Not quoted
• Not quoted
• Not quoted
China: Unit Price Comparison – OP SL2. None of the suppliers quoted price is in line with target price
¥500
100
100
93
93
91
¥450
95
¥500
100 100
94 90
83 73
¥350
367
¥300 ¥250
221
80
¥400
70
¥350
60
¥300
50
¥250
¥500
100
94
93
91
¥450
90
87
83 73
381
230 189
¥200
100
95
93
87 80
¥400
70
¥350
60
¥300
50
¥250
40
¥200
30
¥150
83
80 73
388
70 60
230
213 40
Score
RMB
36W OP SL 2 Louver (Rectangular)
94 90
50
217
195
40
151
149 ¥150
30 100
95
93
91
198
189
¥200
93
¥450
87 ¥400
Score
36W OP SL 2 Louver (Square)
RMB
Score
RMB
27W OP SL 2 Louver (Square)
¥150
112
119
110
115
122
30
¥100
20
¥100
20
¥100
20
¥50
10
¥50
10
¥50
10
¥-
0
¥-
0
RFI Score
© 2015 Dragon Sourcing. All rights reserved.
20
Potential Suppliers Price
¥-
0
Supplier with better price than target
Client Target Price
China: Unit Price Comparison – LD Panel. Two suppliers quoted price is close to the target price
¥500
100 100
93 93
91
¥450
95
90
73
¥300
93
¥450 ¥400
70
¥350
60
¥300
222
¥200
50
231
221 170
40
178
150 ¥150 ¥100 ¥50 ¥-
77
90
83 73
170
Score
RMB
93
¥450
95
93
91
94 90
80
¥400
70
¥350
60
¥300
87
83
80 73
50
60
180
191
40
¥200
30
¥150
254
241
¥250
165
70
279
250
241
50 191
170
203 40
171 144
30
¥150
20
¥100
20
¥100
20
10
¥50
10
¥50
10
0
126
¥-
0
RFI Score
© 2015 Dragon Sourcing. All rights reserved.
100 465
87
¥250 ¥200
¥500
94
409 80
40W LD Panel (Rectangular)
100
95
93
91
248 ¥250
Score 100
100
87
395
¥350
¥500
94
83
¥400
40W LD Panel (Square)
RMB
Score
RMB
30W LD Panel (Square)
21
¥-
Potential Suppliers Price
30
0
Supplier with better price than target
Client Target Price
China: Dragon sourcing consider prices as coherent when Sigma ([(Max-Min)/Average] for best 3 prices) is below 35% – OP SL 2 Average: 153.13 Sigma: 46%
¥200
91 94
90
¥180
80
¥160
70
¥140
189.04
94
91
100
36W OP SL 2 Louver (Rectangular)
RMB
RMB
RMB
100
Score
36W OP SL 2 Louver (Square)
¥200 ¥180
Average: 178 Sigma: 54%
Score
27W OP SL 2 Louver (Square) Score
Average:150.06 Sigma: 51%
¥250 94
95
100
217.15
90
91
90
189.04 ¥160
73
¥140
70
¥120
60
¥100
50
¥100
50
¥80
40
¥80
40
¥60
30
¥60
30
¥40
20
¥40
20
¥20
10
¥20
10
¥0
0
¥0
0
© 2015 Dragon Sourcing. All rights reserved.
80 70
118.94 60
112.33
195.14
¥200
151.40
148.80 ¥120
80
73
22
¥150
60 121.73
¥100
50 40 30
¥50
20 10
¥0
0
RFI Score
Minimum Three Unit Price
China: Minimum Three Unit Price Analysis – LD Panel
87
¥250 ¥200 91
91 90
180.40 90
¥160
80
100
100
90
169.80
Score
RMB
100 94
¥180
40W LD Panel (Rectangular)
RMB
RMB ¥200
Average:168.28 Sigma: 28%
40W LD Panel (Square)
Score
Average:157.02 Sigma: 35%
30W LD Panel (Square) Score
Average:141.67 Sigma: 71%
87 ¥200
87
190.60
80
80 ¥140
73
177.80
70
170.74
¥150 73 164.66
126.00 ¥120
73
70
70
60
¥150
143.50
60
60 ¥100
¥80
50 77.40
¥100
50
50
40
40
¥60
30
¥40
20
20
¥20
10
10
¥0
0
¥100
40
30
30 ¥50
© 2015 Dragon Sourcing. All rights reserved.
¥0
0
23
¥50
20
10
¥0
0
RFI Score
Minimum Three Unit Price
Total Spend - OP SL 2 100
Millions RMB
100
94 91 9.55
¥10
¥6
90 ¥5
80
60 5.88
5.42
50 40
¥4
30 20
¥2
100
100 87
4.90
5.41
90 80
73
70
¥8 ¥6
Total Spend - LD Panel
Millions RMB
¥12
Score
Score
China: Total Spend per supplier when quoted all the products in a group with best 3 prices
¥4
70
3.47
60
¥3
50 40
¥2
30 20
¥1
10
100
93
93
100 2.63
¥12
70 1.63
$1.5
60 50 40
$1.0 0.58 $0.5
100
90
30 20
93
© 2015 Dragon Sourcing. All rights reserved.
RFI Score
24
90 80 70
¥8
60 ¥6
50 40
¥4
3.30
30 20
¥2
10 ¥0
0
100 11.27
10 $0.0
93
10.26
¥10
80
$2.0
0
Total Spend - LD Batten
Millions RMB
Millions USD
$2.5
¥0
Score
Total Spend - OP Batten $3.0
10
0
Score
¥0
Potential Suppliers Spend
0
Suppliers with spend savings
Client Target Spend per year
Agenda
Š 2015 Dragon Sourcing. All rights reserved.
1.
Objectives, approach and Project Planning
2.
Demand Analysis
3.
Progress to date
4.
China RFI/RFQ analysis
5.
India RFI/RFQ analysis
6.
Next Steps
7.
Appendix
25
India: RFI Score from the 6 potential suppliers seems in line with existing Client suppliers
100
94
Total RFI score 86
84
82
Average: 79 77
75
74 70
Score
65
50
25
0
Potential Suppliers
Š 2015 Dragon Sourcing. All rights reserved.
Client Existing Suppliers
India: Specification Variation Analysis
RFI Score
86
84
82
77
74
65
S2
S3
S4
S5
S6
# of Criteria
# of NO GO Criteria
S1
LP LED DL
35
Not Provided
• 6 variations out of 35
• 4 variations out of 35
• 5 variations out of 35
• 16 variations out of 35
• 4 variations out of 35
• 17 variations out of 35
LP DC Panel
35
• 5 variations out of 35
• 3 variations out of 35
• 2 variations out of 35
• 13 variations out of 35
• 3 variations out of 35
• 13 variations out of 35
LP Panel
35
• 5 variations out of 35
• 3 variations out of 35
• 3 variations out of 35
• 15 variations out of 35
• 4 variations out of 35
• Not quoted
Product
Not Provided
Not Provided
© 2015 Dragon Sourcing. All rights reserved.
27
India: Unit Price Comparison – LP DC Panel. None of the suppliers quoted price is in line with target price
100
100 11,287
₹ 11,700 86
₹ 10,400
84
90
82 77
₹ 9,100
100
100
12,187 90 86
84
82
₹ 10,500
70
77
80 74
₹ 9,000
65 ₹ 7,800
₹ 13,500 ₹ 12,000
80 74
Prices confirmed
Score
Score
INR ₹ 13,000
40w LP DC Panel
Prices confirmed
INR
30w LP DC Panel
70 65
60
6,950
60 ₹ 7,500
₹ 6,500
6,950
50
50 ₹ 6,000
₹ 5,200
4,840
40
4,320
₹ 3,900
₹ 4,500
30 2,695
2,730 2,111
₹ 2,600
₹-
30
3,030 2,246
20
1,500 ₹ 1,500
10 0
10
₹-
RFI Score
© 2015 Dragon Sourcing. All rights reserved.
2,935
₹ 3,000
20
1,300 ₹ 1,300
40
0
Potential Suppliers Price
28
Supplier with better price than target
Client Target Price
India: Unit Price Comparison – LP LED DL (8.5W and 12W). None of the suppliers quoted price is in line with target price
12w LP LED DL (6 Inch)
₹ 800
100
750 700
₹ 700 86
82
84
₹ 600
74 65
₹ 500 405
₹ 400
100
₹ 3,600
90
₹ 3,200
425
471
100
Score 90
82
84
₹ 2,800
70
100
3,312 86
80
77
Prices confirmed
INR
INR
Score
8.5w LP LED DL (4 Inch)
80
77
74 65
₹ 2,400
60
60 ₹ 2,000
50
50
320 ₹ 300
₹ 1,600 40
40 ₹ 1,200
30 ₹ 200
₹-
30 875
400
645 472
₹ 400
10 0
20
0
Potential Suppliers Price
29
700
10
₹-
RFI Score
© 2015 Dragon Sourcing. All rights reserved.
970
₹ 800
20 ₹ 100
70
Supplier with better price than target
Client Target Price
India: Unit Price Comparison – LP LED DL (15W and 18W). None of the suppliers quoted price is in line with target price
100
₹ 1,500
90
86 82
84 1,140
74
65
950
₹ 1,200
579
728
1,260
82
84
80
77
74
1,050
70
65
60 680
90
86
80
77
₹ 900
₹ 600
100
100
₹ 900
60
50
656
40
₹ 600
70
530
787
710
50 Score
100
₹ 1,200
INR
Score
₹ 1,500
Score
18w LP LED DL (6 Inch)
INR
15w LP LED DL (6 Inch)
40
460 30 ₹ 300
30
20
₹ 300
20
10
₹-
10
0
₹-
RFI Score
© 2015 Dragon Sourcing. All rights reserved.
0
Potential Suppliers Price
30
Supplier with better price than target
Client Target Price
India Dragon sourcing consider prices as coherent when Sigma ([(Max-Min)/Average] for best 3 prices) is below 35%– LP DC Panel
Average: 2,737 Sigma: 29%
30w LP DC Panel INR
INR ₹ 3,000
100 2,695
Score
40w LP DC Panel Score
Average: 2,512 Sigma: 25%
₹ 3,500
100
2,730 2,935
90
3,030
90
₹ 3,000
₹ 2,500
80
82 2,111 ₹ 2,000 65 ₹ 1,500
74
₹ 2,500
70 60
₹ 2,000
₹ 500
74
2,246
50 ₹ 1,500
30
40 30
₹ 1,000
20
20 ₹ 500
10 ₹0
© 2015 Dragon Sourcing. All rights reserved.
70 60
65
50 40
₹ 1,000
80
82
10
0
₹0
31
0
RFI Score
Minimum Three Unit Price
India: Minimum Three Unit Price Analysis – LP LED DL (8.5W and 12W)
Average: 606 Sigma: 38%
471
₹ 450 405
INR
INR ₹ 500
100
₹ 800
₹ 400
₹ 700
80 82
₹ 350 ₹ 300
100 700
90
425
₹ 600 65
₹ 250
50
₹ 200
40
₹ 150
30
80
82 74
₹ 500
60
90
645
70
74
12w LP LED DL (6 Inch) Score
8.5w LP LED DL (4 Inch) Score
Average: 434 Sigma: 15%
70 65
472
₹ 400
60 50 40
₹ 300
30 ₹ 200
₹ 100
20
₹ 50
10
₹0
0
© 2015 Dragon Sourcing. All rights reserved.
20 ₹ 100
10
₹0
32
0
RFI Score
Minimum Three Unit Price
India: Minimum Three Unit Price Analysis – LP LED DL (15W and 18W)
Average: 683 Sigma: 8%
INR
INR ₹ 800
100
787
₹ 800
728 680
₹ 700
82
₹ 600
579
18w LP LED DL (6 Inch) Score
15w LP LED DL (6 Inch) Score
Average: 662 Sigma: 23%
710
90
₹ 700
90
656
80
₹ 500 ₹ 400 ₹ 300
80 ₹ 600
70
74 65
82
₹ 500
60 50
65
₹ 400
40
40
₹ 300
30 ₹ 200
20
© 2015 Dragon Sourcing. All rights reserved.
60 50
30
₹0
70
74
₹ 200 ₹ 100
100
20 ₹ 100
10 0
10
₹0
33
0
RFI Score
Minimum Three Unit Price
India: Minimum Three Unit Price Analysis – LP LED DL ( 25W and 30W)
INR
INR ₹ 1,400
100
1,400 ₹ 1,400
90
₹ 1,000
1,092
₹ 1,200
1,111
82
70
82 ₹ 1,000
60
65
₹ 800
90
1,222
80 74
100
1,305
1,280 ₹ 1,200
30w LP LED DL (8 Inch) Score
Average: 1,264 Sigma: 7%
25w LP LED DL (8 Inch) Score
Average: 1,161 Sigma: 16%
65
70
74
60
₹ 800
50 ₹ 600
50 ₹ 600
40 30
₹ 400
80
40 30
₹ 400
20
20
₹ 200
₹ 200 10
₹0
10
0 Ready
Leo
© 2015 Dragon Sourcing. All rights reserved.
₹0
Laaj
0 Leo
34
Laaj
RFI Score
Ready
Minimum Three Unit Price
India: Minimum Three Unit Price Analysis – LP Panel
4,200
90
₹ 4,000 3,520
₹ 3,000
100
3,430 74
86
Score 6,140
₹ 6,400 ₹ 5,600
70 60
100 90
82
80
₹ 4,800 82
60w LP Panel
INR
INR ₹ 4,500
₹ 3,500
Average: 5,207 Sigma: 27%
30w LP Panel Score
Average: 3,717 Sigma: 21%
4,730
86 4,750 74
₹ 4,000
80 70 60
₹ 2,500 50
₹ 3,200
50
₹ 2,000 40 ₹ 1,500 ₹ 1,000 ₹ 500 ₹0
© 2015 Dragon Sourcing. All rights reserved.
40
₹ 2,400
30
30 ₹ 1,600
20 10
20 ₹ 800
0
10
₹0
35
0
RFI Score
Minimum Three Unit Price
Sigma ([(Max-Min)/Average] for best 3 prices) overview for both China and India Country
Product Name
Sigma
27W OP SL 2 Louver (Square)
51%
36W OP SL 2 Louver (Square)
46%
36W OP SL 2 Louver (Rectangular)
54%
30W LD Panel (Square)
71%
40W LD Panel (Square)
35%
40W LD Panel (Rectangular)
28%
43W OP Batten 1
45%
43W OP Batten 2
45%
22W OP Batten 1
51%
22W OP Batten 2
51%
20W LD Batten
115%
40W LD Batten
64%
60W LD Batten
5%
80W LD Batten
4%
30w LP DC Panel
25%
40w LP DC Panel
29%
8.5w LP LED DL (4 Inch)
15%
12w LP LED DL (6 Inch)
38%
15w LP LED DL (6 Inch)
23%
18w LP LED DL (6 Inch)
8%
25w LP LED DL (8 Inch)
16%
30w LP LED DL (8 Inch)
7%
30w LP Panel
21%
60w LP Panel
27%
China
India
© 2015 Dragon Sourcing. All rights reserved.
India: Total Spend per suppliers when quoted all the products in a group with best 3 prices
100
100
₹ 45
100
100 41.82
₹ 30
₹ 40
80
₹ 35
90
₹ 50
70
65
86 82
80
₹ 30
74
60 ₹ 20
65
51.70
70
70 41.25
₹ 40
28.17
28.15
80
74
82
74
₹ 25
100
90
28.80
82
100
42.04
38.37 90
₹ 60
Score
Score
Millions INR
Score
Millions INR ₹ 35
Total Spend - LP Panel Millions INR
Total Spend - LP LED DL
Total Spend - LP DC Panel
60
40.90
60
₹ 25
21.79
50
50
₹ 30
50
₹ 20 ₹ 15
14.00
40
40 ₹ 15
₹ 10
₹ 20 30
30 ₹ 10
© 2015 Dragon Sourcing. All rights reserved.
0
20 ₹ 10
₹5
10
₹0
0
10
₹0
30
20
20 ₹5
40 19.50
RFI Score
Potential Suppliers Spend
37
10
₹0
Suppliers with spend savings
0
Client Target Spend per year
Agenda
Š 2015 Dragon Sourcing. All rights reserved.
1.
Objectives, approach and Project Planning
2.
Demand Analysis
3.
Progress to date
4.
China RFI/RFQ analysis
5.
India RFI/RFQ analysis
6.
Next Steps
7.
Appendix
38
Next Steps Below are the proposed next steps with responsibilities and deadlines. Actions
Responsible
Deadline
1. Suppliers Audit
DS/Client
TBD
2. Samples Test
DS/Client
TBD
3. Review the BOM with potential suppliers to understand their quotation structure and methodology
Client
TBD
4. Provide contact person who will be copied in the email communication with potential suppliers
Client
TBD
Š 2015 Dragon Sourcing. All rights reserved.
39
Remarks