Your Tailored Sourcing Approach to LCC Sourcing
Water Treatment Solution Service Sourcing Indonesia Sourcing Project Case Study Sep 2014 1
Agenda 1. Indonesia Background 2. Service Sourcing (Water Treatment Solution) Case Study 1. Background & Project Approach 2. Approach & Schedule 3. Demand Analysis 4. Supplier Sourcing Response 5. RFI/RFQ Analysis 6. Supplier Scorecard 7. Recommendations and Next steps 3. Chemical Sourcing (Defoamer) Case Study 1. Background & Project Approach 2. Approach & Schedule 3. Demand Analysis 4. Supplier Sourcing Response 5. RFI/RFQ Analysis 6. Supplier Scorecard 7. Recommendations and Next steps 4. Results
Š 2016 Dragon Sourcing. All rights reserved.
2
1. Background: Indonesia Overview 350
USD/ Month in 2014
303.8
318
300 236
250 200 150
131
145
100 50 0 HCM, Vietnam Jakarta, Indonesia
KL, Malaysia
Shenzhen, China
Manila, Philippines
Indonesia has a population of 50 Million with 10M concentrated in the capital city of Jakarta Indonesia’s workforce is observed to be one of the cheapest labors forces in in the emerging markets of South East Asia with a GDP of 1,925 USD lower than China, Philippines, & Malaysia Majority of the workforce is employed in the Primary Sector including Agriculture, Fishery and Forestry. Pro-growth policies during the years 2006-2011, secondary sectors (construction, Trade, Manufacturing) to reach over 40% of GDP.
Growth (2015)
Gross Domestic Product
4.8%
Exports Foreign Direct Investments © 2016 Dragon Sourcing. All rights reserved.
3
Value (2015) 890 Billion USD
-3.5% YoY
176 Billion USD
3% YoY
26 Billion USD
Sources: Key Indicators of Indonesia-2011 Asian development Bank-ADB
1. Background - Indonesian Chemicals Suppliers Organic Chemicals Supplier Locations
© 2016 Dragon Sourcing. All rights reserved.
4
1,500 Organic chemicals factories are in: • Riau (Sumatra) • Banten • Jambi (Sumatra) • Sumatra • Lampung (Sumatra) • Kalimantan • Papua
Source: International Trade Centre & Dragon Sourcing Supplier Survey
1. Background: Overview of Indonesia Demand Analysis
Commodity
Annual Vol (Tons)
Annual Spend (K Euros)
Sulfur
77,500
9,588
CS2
24,000
13,400
Zinc Ingot
1,160
1,770
Defoamer
373
1,080
TIO2
478
1,050
18,000
1,450
170
480
5,471
910
Filters
NA
700
Pumps
NA
300
Transmission Products
NA
427
Pipes & Fittings
NA
828
Standard Tools & Parts
NA
256
Packaging
NA
1,814
Automation & Switches
NA
379
Service Contract
NA
4,600
127 K Tons
39,032 K Euros
Quicklime Water Solutions Commodity H2O Chems
Total Š 2016 Dragon Sourcing. All rights reserved.
5
Agenda 1. Indonesia Background 2. Service Sourcing (Water Treatment Solution) Case Study 1. Background & Project Approach 2. Approach & Schedule 3. Demand Analysis 4. Supplier Sourcing Response 5. RFI/RFQ Analysis 6. Supplier Scorecard 7. Recommendations and Next steps 3. Chemical Sourcing (Defoamer) Case Study 1. Background & Project Approach 2. Approach & Schedule 3. Demand Analysis 4. Supplier Sourcing Response 5. RFI/RFQ Analysis 6. Supplier Scorecard 7. Recommendations and Next steps 4. Results
Š 2016 Dragon Sourcing. All rights reserved.
6
2.1 Background: Client and Project Approach DS Strategic Sourcing Approach
Context •
Water Treatment Solutions Sourcing Objectives • Our client a large Chemical Company in Indonesia spends 1.4M Euros on Water Treatment with 480K Euros on Water Treatment Solutions with a single supplier (including Providing Specialty Chemicals, Consulting Services, & Day to day management of Water systems) • To Address the 1.4M Euros in spend DS on Water Treatment the project was split into two projects 1.Water Treatment Solutions – 480K Euros Service Scouring 2.Commodity Water treatment – 918K Euros Chemical Sourcing
•
•
•
•
• DS will preform a standard RFI/RFQ process to identify high quality suppliers worldwide with local Indonesian support to expand / challenge the supply base
• •
Geographical scope: Target Countries of sourcing: • World wide, China, Japan, USA, Indonesia, Singapore, etc.
•
Deliverables: • RFI / RFQ and Score Card • Supplier profiles • Audit reports
•
© 2016 Dragon Sourcing. All rights reserved.
• •
7
Demand Analysis Jointly develop with Client clear understand of requirements, spend, volume, specs, etc. Identify list of potential suppliers globally to include in the RFI / RFQ process by leveraging the web, external databases and various networks of experts Develop the RFI/RFQ – jointly with Client to include all key supplier qualification criteria (e.g.: financial, technology, manufacturing and services capability, corporate responsibility, quality, etc.) and quotation requirements Administer the RFI/RFQ process to ensure as high return rate as possible including quotation, and credentials’ visible outlets from supplier Analyze responses and use balance score card developed together with Client management team to rank and recommend suppliers which Client needs to take through a formal qualification process Jointly develop with Client the structure of the audit report Jointly develop or modify contract contents based on needs (when it is needed). Carry out audits (when relevant) (either alone or jointly with Client auditors or buyers) of the suppliers that appear attractive and competitive based on the RFI/RFQ process Issue audit reports (when relevant) and rank suppliers based on audit and price competitiveness Recommend which suppliers to move for sampling (when relevant) Based on samples quality (when relevant), select suppliers with who to enter into final contract negotiations and provide support to the contract negotiation process
2.2 Demand Analysis: Water Treatment Solution (1/5) Do to the complexity of the service the requirements must be clearly defined by.. .
• Build a multi discipline Project Team since no 1 department or person has full knowledge of requirements • Collet Data Collection documents from global Water Treatment Solution providers using this collection process to shortlist Suppliers that can provide local support in Indonesia, Merge Data collection documents to ensure that all key details are provided to all suppliers • Full Technical Diagrams of all water Systems (Boilers, Cooling Towers, Waste Water Boilers)
• Full Technical Specs of Boilers, Cooling Towers, etc • Details of Water Chemicals Usage, Function, Quantity, Input Points, etc. • Requirements on Incoming & outgoing Water/Steam from each system • Details of Water testing regime, Key reports, and data required by production
© 2016 Dragon Sourcing. All rights reserved.
8
2.2 Demand Analysis: Data Collection Documents(2/5) Boiler X Page 1 of 3
Boiler X Page 2 of 3
Boiler X Page 3 of 3
Fully defined Specs and Requirements were 100+ pages
Š 2016 Dragon Sourcing. All rights reserved.
9
2.2 Demand Analysis: Water System Diagrams (3/5) Waste Heat Boiler
Diagram Plant Boiler House
COOLING TOWER
Boiler # B9 B5, B6, B7 B8 B1, B2, B3 B4 B waste gas B waste gas B waste gas B waste gas Š 2016 Dragon Sourcing. All rights reserved.
10
# Bar dege C 1 3 1 3 1 1 1 1 1
75 45 45 10 22 22 22 22 55
490 450 450 200 240 240 240 240 450
Steam ton/hr 130 22 45 70 28 10 14 12 40
Location
Dearator 1
Power plant Boiler House
Chemical Plant
1 1 1 1 1 1 1
2.2 Demand Analysis: Spend & Chemical Details (4/5)
Chemical 1 Chemical 2 Chemical 3
Kg Kg Kg
2013 Cons ( Ton ) 4.01 3.52 0.92
Chemical 4
Kg
7.14
15,882
Chemical 5 Chemical 6
Kg ??
2.65 ??
5,696 ???
Product Name UoM
Chemical 7
Kg
1.30
Yearly Spend (K Euros) 7,982 7,640 3,221
2,970
DESCRIPTION
MICROCIDE FOR COOLING TOWER ALGAECIDE FOR COOLING TOWER BACTERICIDE FOR CLOSED SYSTEM CORROSION & SCALE PREVENTIVE FOR COOLING TOWER CORROSION INHIBITOR FOR CLOSE SYSTEM FUEL OIL ADDITIVE
Program / Solution Utility Area Program Utility Area Program Utility Area Program Utility Area Program Utility Area Program Utility Area Program
Condensate Treatments, A Neutralizing amine effective in the initial and extended areas of complex condensate system
I. CHEMICAL PROGRAM
Condensate Treatments, A Neutralizing amine effective in the initial and extended areas of complex condensate system
I. CHEMICAL PROGRAM
Chemical 8
Kg
1.68
1,619
PH adjustment, low freeze alkalinity source
I. CHEMICAL PROGRAM
Chemical 9
Kg
2.58
3,452
Internal treatments, can be used as a residual phosphate programs
I. CHEMICAL PROGRAM
Organic corrosion inhibitor used for scavenging oxygen and passivating metal surfaces
I. CHEMICAL PROGRAM
Chemical 11
Kg
0.33
1,172
Organic corrosion inhibitor used for scavenging oxygen and passivating metal surfaces Organic corrosion inhibitor used for scavenging oxygen and passivating metal surfaces organic, film-forming, liquid copper corrosion inhibitor
Chemical 12
Kg
1.00
2,108
Non oxidizing Biocide
Chemical 10
Kg
1.55
4,282
© 2016 Dragon Sourcing. All rights reserved.
I. CHEMICAL PROGRAM
i. Boiler Chemical Program ii. Cooling Tower Chemical Program ii. Cooling Tower Chemical Program
11
2.2 Demand Analysis: Spend & Chemical Details (5/5) Product Name Chemical 13
Chemical 14
UoM
2013 Cons ( Ton )
Yearly Spend (K Euros)
Kg
0.25
2,246
Kg
4.65
12,917
Chemical 15
Kg
5.57
13,065
Chemical 16
Kg
13.88
43,682
Chemical 17
Kg
0.53
818
Chemical 18
Kg
5.65
17,325
Chemical 19
Kg
30.74
116,689
Chemical 20
Kg
0.94
5,098
Chemical 21 Chemical 22 Chemical 23
Kg Kg Kg
56.28 11.27 13.57
PAC
Kg
NaCl
DESCRIPTION non-ionic surfactant/dispersant for removing and dispersing microbiological slime deposits All organic scale and corrosion inhibitor designed for use in systems with recirculating water calcium concentrations greater than 300 ppm (as CaCO3) at the targeted cycles when the pH is typically greater than 8.7 Corrosion and scale inhibitors designed for use in open recirculating water systems. All organic scale and corrosion inhibitor designed for use in systems with recirculating water calcium concentrations greater than 300 ppm (as CaCO3) at the targeted cycles when the pH is typically greater than 8.7 Coordinated phosphate program for boiler internal treatment for scaling inhibitor and pH Buffer Neutralizing, Condensate Treatment Program
Program / Solution ii. Cooling Tower Chemical Program
ii. Cooling Tower Chemical Program
ii. Cooling Tower Chemical Program
F. V Department Program
i. Boiler Chemical Program i. Boiler Chemical Program
Scale inhibitor, particulate & sludge dispersant is a corrosion inhibitor that contains a blend of low and high volatility amines designed for use in steam and condensate systems
i. Boiler Chemical Program
low charge, cationic, dry flocculant designed as a dewatering polymer
ii. Cooling Tower Chemical Program
Coagulant - Water Treatment
Unclear
136,401 26,739 49,035
AntiFoam - Waste Water Treatment Coagulant (Pos) - Waste Water Treatment Coagulant (Neg) - Waste Water Treatment
Unclear
462.62
67,667
Coagulant - Water Treatment
Commodity Water treatment Chemicals Project
Kg
3,214.00
265,381
Resin (Add Ions to water) - Water Treatment
Commodity Water treatment Chemicals Project
TSP
Kg
828.00
296,055
Nutrients - (Feeding Bacteria) - Waste Water Treatment
Commodity Water treatment Chemicals Project
UREA
Kg
966.90
288,885
Nutrients - (Feeding Bacteria) - Waste Water Treatment
Commodity Water treatment Chemicals Project
Total;
1,398,028
Š 2016 Dragon Sourcing. All rights reserved.
12
ii. Cooling Tower Chemical Program
Unclear Unclear
2.3 Approach & Schedule Not started In process Project Activity Week No.
Done Note that the schedule maybe impacted by the time taken to collect category specifications, gain deliverable Delay validation, short list suppliers, produce samples & test samples. July, 2014
August,2014
September 2014
1. Demand Analysis 2. Supply Market Analysis 3. Telephone Prescreening 4. Develop RFI/RFQ and Scorecard 5. Conduct RFI/RFQ Administration
Ramadan Holiday
RFI/RFQ & Scorecard approved
(HARI RAYA PUASA & CURI BERSAMA)
1
6. Analyze RFI /RFQ Responses 7. RFI /RFQ Report & Recommendations
RFI/RFQ Analysis Report Finished
13 Š 2016 Dragon Sourcing. All rights reserved.
2
Today
2.4 Supplier Sourcing Response: Water Treatment Solutions 60
54
54
50
7
7
40
12
12
30
2 3 4
2 3 4
20 26
26
10
14
14
1 0 1 1
1 0 1 1
11
11
6 1 1 3
Passed Phone Interviews
Sent RFI/RFQ
Replied to RFI/RFQ
0 Suppliers Identified
Phone interview completed Indonesia
Š 2016 Dragon Sourcing. All rights reserved.
China
Singapore 14
Japan
USA
Others
Visited/ Audited
2.5 RFI/RFQ Analysis:
64.1 % 170.9 K
Current
Supplier 1
Š 2016 Dragon Sourcing. All rights reserved.
64.1% 170.7 K
Supplier 2
63.9% 170.4 K
Supplier 3
15
52.3% 139.4K
Supplier 4
44.3% 118.K
Supplier 5
10.6% 28.2K
Supplier 6
2.6 Balanced Scorecard Location in RFI/RFQ
Weight of criteria
Manufacturer or distributor/trader/agent
1-1
20%
1= distributor/trader/agent 2= Manufacturer
2
Years of foundation
2-1
20%
1< 5years 2 = 5 -10 years 3= 11-20years 4= >20 years
4
Ownership (State Owned/ Private/Foreign Investment)
2-2
15%
1= Private owned 2= State owned 3= Foreign investment
3
How many employees do you have?
2-3
20%
1< 10 2= 10 – 20 3= 20-50 4= > 50-100 5=>100
5
Turnover in 2013 in Million USD
2-4
25%
1= <1M 2= 1M-5M 3= >5M-20M 4=>20M-50M 5=>50M
5
Do you have an export license? (Y/N)
3-1
15%
0= No 1= Yes
1
How many years of export experience do you have?
3-2
20%
0=0 1=< 5 2= 5-10 3=11-20 4= > 20
4
Have you exported or sold to Indonesia before?
3-3
15%
0= No 1= Yes
1
Do you have office/branch In Indonesia?
3-4
15%
0= No 1= Yes
1
15%
0= No 1= Yes 2= Yes , listed
2
3-6
20%
0= No/NA 1= Yes 2= Yes , listed
2
Total supply of Automation & Switch (pcs / year) in 2013.
1-4
40%
1= <1000 2=1000-3,000 3= 3,001-10,000 4>10,000
4
Main supplying brands listed
1-5
30%
0= No 1= Yes, local 2= Yes, international
2
Do you have your own storage house?
2-5
30%
0= No 1= Yes
1
Do you have ISO9001?
4-1
20%
0= No 1= Yes
1
Do you have ISO14001?
4-2
20%
0= No 1= Yes
1
Do you have any other industrial certificates ?
4-3
20%
0= No 1= Yes 2= Yes , listed
2
Quality guarantee policy described
4-4
20%
0= No 1= Yes
1
4-5
20%
0= No 1= Yes
1
RFQ
100%
0= <0% 1= <6% savings 2=6%-15% savings 3= 16%-30% Savings 4= >30%
4
100%
0= Poor 1= Satisfactory 2= Excellent
2
Company background
Scoring
Max Score per criteria
Weight of the section
20%
Export Experience
3-5
Do you have customers in textile industry? (Y/N) Do you supply to multi-national companies? (Y/N)
20%
Supply capabilities
15%
Quality Control
After-sale services described
10%
Saving Potential Savings Potential
30%
Cooperation Cooperation during RFI/RFQ
N/A
Total scoring
© 2016 Dragon Sourcing. All rights reserved.
5% 100%
16
2.6 Supplier Scorecard â&#x20AC;&#x201C; Results Shortlisted
Country Rank
Germany 1
Indonesia 2
Indonesia 3
Indonesia 4
Indonesia 5
Indonesia 6
Supplier
Supplier 1
Supplier 2
Supplier 3
Supplier 4
Supplier 5
Supplier 6
Company background
14.0
15.3
16.0
20.0
13.3
9.3
Export Experience
20.0
19.5
18.0
13.8
20.0
18.0
Supply capabilities
15.0
15.0
10.5
13.8
10.5
8.3
Quality Control
15.0
12.0
15.0
15.0
13.5
12.0
Corporate Responsibility
5.0
5.0
5.0
5.0
5.0
5.0
Saving Potential Cooperation Total
20.0 5.0 94.0
20.0 5.0 91.8
20.0 5.0 89.5
15.0 5.0 87.5
Š 2016 Dragon Sourcing. All rights reserved.
17 17
20.0 10.0 5.0 5.0 87.3 67.5 Note: Supplier Profiles in Appendix
2.7 Recommendations and Next step Recommendations for Water Treatment Solutionďź&#x161; We recommend that we move forward with arranging 5 suppliers visit to Client with shortlisted Suppliers to review Client equipment, clarify any questions, and update final proposals for selection for trails.
Next Steps 1. 2. 3.
Arrange 5 supplier visits to Client with shortlisted Suppliers Suppliers to review and send updated proposals Arranged plant trials with selected suppliers
Š 2016 Dragon Sourcing. All rights reserved.
18 18
Agenda 1. Indonesia Background 2. Service Sourcing (Water Treatment Solution) Case Study 1. Background & Project Approach 2. Approach & Schedule 3. Demand Analysis 4. Supplier Sourcing Response 5. RFI/RFQ Analysis 6. Supplier Scorecard 7. Recommendations and Next steps 3. Chemical Sourcing (Defoamer) Case Study 1. Background & Project Approach 2. Approach & Schedule 3. Demand Analysis 4. Supplier Sourcing Response 5. RFI/RFQ Analysis 6. Supplier Scorecard 7. Recommendations and Next steps 4. Results
Š 2016 Dragon Sourcing. All rights reserved.
19
3.1 Executive Summary: • Project Objectives & Scope - To identify, evaluate high quality and competitive suppliers globally for Defoamer / Antifoam to achieve a cost saving and expanding the supplier base to increase the monthly bidding competition for Client business. • We preformed a prescreening process of potential suppliers by telephone interview, RFI/RFQ, and Balanced Scorecard to fully understand to the market situation of production : • Defoamer : From the initial 53 Suppliers identified, 4 supplier were shortlisted with a potential cost savings of up to 35.7% (380K Euros) vs. the current cost and scoring above 60 on the balance scorecard • We recommend that Client to collect sample for lab test for the 4 to check the product feasibility first.
© 2016 Dragon Sourcing. All rights reserved.
20
3.1 Background: Client and Project Approach DS Strategic Project Approach
Context •
Sulfur Sourcing Objectives • Client spends 1.08 M Euros on quicklime powder annually and currently has 2 source suppliers • DS will preform a standard RFI/RFQ process to identify high quality suppliers in Asia to expand the supply base
•
•
•
•
Geographical scope: Target Countries of sourcing: • China, India, Indonesia, UK etc • US Suppliers Excluded
• • •
Deliverables: • RFI / RFQ and Score Card • Supplier profiles • Audit reports
© 2016 Dragon Sourcing. All rights reserved.
•
• •
21
Demand Analysis Jointly develop with Client clear understand of requirements, spend, volume, specs, etc. Identify list of potential suppliers globally to include in the RFI / RFQ process by leveraging the web, external databases and various networks of experts Develop the RFI/RFQ – jointly with – to include all key supplier qualification criteria (e.g.: financial, technology, manufacturing and services capability, corporate responsibility, quality, etc.) and quotation requirements Administer the RFI/RFQ process to ensure as high return rate as possible including quotation, and credentials’ visible outlets from supplier Analyze responses and use balance score card developed together with Client management team to rank and recommend suppliers which Client needs to take through a formal qualification process Jointly develop with Client the structure of the audit report Jointly develop or modify contract contents based on needs (when it is needed). Carry out audits (when relevant) (either alone or jointly with Client auditors or buyers) of the suppliers that appear attractive and competitive based on the RFI/RFQ process Issue audit reports (when relevant) and rank suppliers based on audit and price competitiveness Recommend which suppliers to move for sampling (when relevant) Based on samples quality (when relevant), select suppliers with who to enter into final contract negotiations and provide support to the contract negotiation process
3.2. Approach & Schedule: Defoamer Sourcing Project Not started In process
Done Note that the schedule maybe impacted by the time taken to collect category specifications, gain deliverable Delay validation, short list suppliers, produce samples & test samples.
Project Activity Week No.
June, 2014
July, 2014
August,2014
1. Demand Analysis 2. Supply Market Analysis 3. Telephone Prescreening
Ramadan Holiday
4. Develop RFI/RFQ and Scorecard
1
RFI/RFQ & scorecard Approved
(HARI RAYA PUASA & CURI BERSAMA)
5. Conduct RFI/RFQ Administration 6. Analyze RFI /RFQ Responses 7. RFI /RFQ Report & Recommendations Š 2016 Dragon Sourcing. All rights reserved.
RFI/RFQ Analysis Report Finished
5
2
Today
3.3 Demand Analysis: Defoamer Sourcing Project (based on 2013 spend)
Defoamer Technical Requirement: • Non-Silicon Defoamer / Antifoam • Water based • Aspect: Liquid • Color: Yellow – Light • Density: 0.98~1.02 g/cm3 • Viscosity at 20 degrees : 10~60 • PH: 7.0~9.0 Packaging Requirements: • Intermediate Bulk Container (IBC) 1000KG.
Production Chemicals\
2013 (average) Price Euro/MT
2013 Annual Volume(T)
2013 Annual Spend (M Euro)
Current 2014 Price (Euro/MT)
Delivery Terms
Defoamer
Euro2912
373
Euro1.08M
Euro 2879
CIF Jakarta
Supplier #
Name of vendor
Country
Order Qty/KG
Euro/KG (on average)
Total Value / Euro
1
Current Supplier 1
Indonesia
301,000
2.918
881,030
2
Current Supplier 2
Holland
71,000
2.886
205,628
© 2016 Dragon Sourcing. All rights reserved.
23
Note:1 USD = 0.74 Euro
3.4 Supplier Sourcing Response: 53 Defoamer Suppliers identified with 11 RFI/RFQs received
Š 2016 Dragon Sourcing. All rights reserved.
24
3.5 RFI/RFQ Analysis: Defoamer potential saving 35.7% of year spend of EURO 380K Defoamer Aug 2014Price current vs Quotes Current 2014 Defoamer vs Price Suppliers Quotes €4,000 3,271
€3,000
3,367
2,960
2,879
2,693
2,756
6.5% 69K
4.3% 45K
2,516
€2,000
1,850 35.7% 380K
1,998
2,035
2,087
2,109
30.6% 326K
29.3% 312 K
27.5% 293K
26.7% 285 K
12.6% 134 K
-2.8% -30K
-13.6% -145 K
-17% -180K
€1,000
€0
2014 Current ML-Blackburn 1 Price CF546
TW - SINO JAPAN
© 2016 Dragon Sourcing. All rights reserved.
ML-Blackburn 2 DP104
Keyuan
UK - J&W whewell
25
TW - LYSURF
SIXIN
XWC
ML-Blackburn 3 DP906
Suny
GE (DDP)
3.6 Defoamer Scorecard: supplier Scorecard was developed to evaluate suppliers Can you supply the non-silicon Defoamer as Client request? (Y/N)
Go / No Go If supplier cannot meet any one of Client basic requirements supplier should be rejected. Max Score per Weight of the Scoring criteria section 1= distributor/trader/agent 2= Manufacturer 2 1< 5years 2 = 5 -15 years 3= 16-30 years 4= >30 years 4 1= Private owned 2= State owned 3= Foreign investment 3 15% 1< 50 2= 50 – 100 3= 101 -300 4= > 300 4
Location in RFI/RFQ 1-1 2-1 2-2 2-3
Weight of criteria 20% 20% 15% 20%
Turnover in 2013 in Million USD
2-4
25%
1= <10M&NA 2= 10M-50M 3= >50M-150M 4=>150M
4
Export Experience Do you have an export license? (Y/N)
3-1
15%
0= No 1= Yes
1
How many years of export experience do you have?
3-2
15%
0=0 1=< 5 2= 5-10 3=11-20 4= > 20
4
Do you export /sell to Indonesia?
3-3
15%
0= No 1= Yes
1
Do you have office/branch In indonesia?
3-4 3-5 3-6 5-3
15%
0= No 1= Yes
1
25%
0= No 1= Yes 2= Yes , listed
2
15%
0= No/NA 1= Yes 2= Yes , listed
2
Can you guarantee the continuous supply every month? How many metric tons of defoamer you can gurantee to supply every 3 month? Total supply of Defoamer (tons / year) in 2013.
1-3
25%
0=No 1= Yes
1
1-4
25%
1= <200 2= 200-500 3=501-1500 4>1500
4
1-5
25%
1= <1000 2=1000-3,000 3= 3,001-10,000 4>10,000
4
What is your current capacity level (tons) for the 6 next months?
1-6
25%
1= <500 2= 500-1500 3= 1500-5000 4>5,000
4
Quality Control Do you provide COA? Do you have quality control management systerm? Do you have ISO9001? Do you have ISO14001? Do you have any other industrial certificates ? Saving Potential
4-1 4-2 4-3 4-4 4-5
20% 20% 20% 20% 20%
0= No 1= Yes 0= No 1= Yes 2= Yes , listed 0= No 1= Yes 0= No 1= Yes 0= No 1= Yes 2= Yes , listed
1 2 1 1 2
15%
RFQ
100%
0= <0% 1= <6% savings 2=6%-15% savings 3= 16%-30% Savings 4= >30%
4
25%
N/A
100%
0= Poor 1= Satisfactory 2= Excellent
2
5% 100%
Company background Manufacturer or distributor/trader/agent Years of foundation Ownership (State Owned/ Private/Foreign Investment) How many employees do you have?
Do you have customers in Viscous Fiber /textile industry? (Y/N) Do you supply to multi-national companies? (Y/N)
20%
Supply capabilities
Savings Potential
20%
Cooperation
Cooperation during RFI/RFQ
Subtotal
© 2016 Dragon Sourcing. All rights reserved.
26
3.6 Defoamer Supplier Scorecard: Scoring 100
Company background Export Experience Supply capabilities Quality Control
Short Listed
80 60
40 20 0
Supplier 1 Supplier 2 Supplier 3 Supplier 4 Supplier 5 Supplier 6 Supplier 7 Supplier 8 Supplier 9 Supplier 10
Blackburn SINO-JAPAN Country Rank Supplier Company background Export Experience Supply capabilities Quality Control Saving Potential Cooperation Total
Sixin
Keyuan
GE Water
Hefei XWC
Suny
Rongqiang
J&W
Supplier 11
TW - LYSURF Huaxing
Malaysia 1 Supplier 1
China - TW 2 Supplier 1
China 3 Supplier 1
China 4 Supplier 1
Indonesia 5 Supplier 1
China 6 Supplier 1
China 7 Supplier 1
China 8 Supplier 1
UK 9 Supplier 1
China - TW 10 Supplier 1
China 11 Supplier 1
11.1
11.8
10.1
7.9
15.0
9.4
7.5
9.2
0.0
0.0
0.0
14.0
14.5
11.5
11.0
19.3
9.3
14.8
6.3
0.0
0.0
0.0
17.5
10.0
12.5
11.0
5.0
20.0
12.5
6.3
0.0
0.0
0.0
7.5
12.0
10.5
7.5
15.0
6.0
10.5
4.5
0.0
0.0
0.0
25.0
25.0
12.5
18.8
0.0
6.3
0.0
0.0
18.8
12.5
0.0
5.0 80.1
2.5 75.8
5.0 62.1
5.0 61.1
5.0 59.3
5.0 55.9
2.5 47.8
2.5 28.7
2.5 21.3
2.5 15.0
0.0 0.0
Š 2016 Dragon Sourcing. All rights reserved.
27 27
3.7 Defoamer Recommendations and Next step Recommendations
â&#x20AC;˘
We recommend that we move forward with collecting samples from the 4 Defoamer Suppliers
Next Steps 1. 2. 3. 4. 5. 6. 7.
Ask the 4 potential suppliers to send samples to Client to do lab test. Base on lab test results agree on suppliers to audit (or go directly to #7 plant trials) Prepare Audit Documents Send Supplier Audit document for self assessment Plan and conduct Audit Analyze Audit results Approve Samples and select suppliers for final negotiation and do trial order
Š 2016 Dragon Sourcing. All rights reserved.
28 28
4. Results: Sourcing projects generated up to 60% savings Indonesia Commodity Sulfur NaOH CS2 ZnSO4 Zinc Ingot Defoamer (Chemical Case Study) TIO2 Quicklime Water Solutions (Service Case Study) Commodity H2O Chems (PAC & Urea) Filters Pumps Transmission Products Pipes & Fittings Standard Tools & Parts Packaging Automation & Switches Service Contract MRO (Bearings & Gears) Transportation & Customs Clearance
Total © 2016 Dragon Sourcing. All rights reserved.
Spend (K Euros)
Savings (%)
Savings (K Euros)
9,588 13,400 1,770 1,080 1,050 1,450 480 910 700 300 427 828 256 1,814 379 4,600 -
3.0% 3.6% 1.3% 35.7% 34.9% 6.3% 44.3 - 64.3% 4.5% 2.1% 27.7% 8.3% 18.5% 29.9% 2.0% 6.4% 8.7% -
288 482 23 386 366 91 309 41 15 83 35 153 77 36 24 400 -
39.0M €
7.1%
2.8M €
29