The Design School Bachelor Of Arts (Hons) In Interior Architecture Chong Yi Qing | 0348905 | Semester 4 Lecturer: Ms. Nor Aziah Hassan | Ms. Norji Nasir
Module Synopsis
Module Learning Outcome (MLO)
This module concentrates on the integration of design process and its documentation. Students will undertake building research using field notes, digital photography and sketch drawings. Students will then prepare measured drawings using the conventions of architectural representation in an appropriate media. The module establishes students’ fundamental knowledge of technical drawings, the significance of services in buildings, the regulatory frameworks and codes of practice that guide building construction such as UBBL as well as the importance of an integrated approach to service provision. The module covers the processes of design approval until the production of working drawing.
The objectives of the module are translated into a number of Module Learning Outcomes (MLO), mapped to Programme Learning Outcomes (PLO) and Taylor’s Graduate Capabilities (TGC). No.
MLO
PLO
TGC
1
Demonstrate comprehensive knowledge and technical skills with complete materials specification to represent the technical construction of interior detailing in order achieve the design intention.
1
8
2
Describe and analyze existing condition of site regulated by laws and prepare measured drawing as means of translating ideas based on observation and site measurements.
9
7
3
Integrate the various services system and technology into design proposal and produce series of working drawings in reference to building by-laws.
2
6
Bachelor Of Arts (Hons) In Interior Architecture
Assignment 3: Working Drawings and System Integration Assignment 2: Precedent Studies – A Bureau Assignment 1: Work From Home + Door or Window
Lecturer: Ms. Nor Aziah Hassan | Ms. Norji Nasir
Bachelor Of Arts (Hons) In Interior Architecture
Lecturer: Ms. Nor Aziah Hassan | Ms. Norji Nasir
Assignment 3: Working Drawings And System Integration
Drawing List Setting Out Plan Furniture Layout Plan Base
This assignment requires students to produce a series of working drawings integrating the Interior Architecture Design IV module. The objective is to allow students demonstrate skills and ability to produce working drawings and detailing commensurate with the industry standard practice. The drawings produce are based on the office design of May Air Sdn Bhd. proposed on 3rd floor of TEG Assets Block A building that will locate at Jalan Taylors.
Furniture Layout Plan Mezzanine Floor Finishes Plan Reflected Ceiling Plan Lighting Electrical Plan Section Drawings Be-spoke Elevation and 3D View Be-spoke Plan Be-spoke Elevation Be-spoke Sections Be-spoke Blow Up Details Be-spoke Blow Up Details Bill of Quantity Furniture, Fixture and Equipment (FF&E)
Schedule of Accommodation Schedule of Finishes Reflection Lecturer: Ms. Nor Aziah Hassan | Ms. Norji Nasir
MAYAIR SDN BHD PROPOSED OFFICE INTERIOR CURRENT REVISION
DATE
DESCRIPTION
ISSUED
INTRODUCTION
1
16 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_SOP_01
SETTING OUT PLAN
2
16 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_FL_02A
FURNITURE LAYOUT PLAN BASE
2
16 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_FL_02B
FURNITURE LAYOUT PLAN MEZZANINE
2
16 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_FF_03
FLOOR FINISHES PLAN
2
16 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_RCP_04
REFLECTED CEILING PLAN
1
16 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_LEP_05
LIGHTING ELECTRICAL PLAN
1
16 NOV 2021
FOR CONSTRUCTION
NO
SECTION A-A
1
23 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_BES_07A
BESPOKE ELEVATION AND 3D VIEW
1
23 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_BES_07B
BESPOKE PLAN
1
23 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_BES_07C
BESPOKE ELEVATION
1
23 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_BES_07D
BESPOKE SECTION
1
23 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_BES_07E
BESPOKE BLOW UP DETAIL
1
23 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_BQ_3D
GARDEN PANTRY 3D PERSPECTIVE
1
23 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_BQ_08
BILL OF QUANTITY
1
23 NOV 2021
FOR CONSTRUCTION
NO
FIXTURES & EQUIPMENT (FF&E)
1
16 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_SOA_10
SCHEDULE OF ACCOMMODATION
1
16 NOV 2021
FOR CONSTRUCTION
NO
MER_DWD_YQ_SOF_11
SCHEDULE OF FINISHES
1
23 NOV 2021
FOR CONSTRUCTION
NO
DRAWING LIST NO.
SHEET NAME
DWG_DWD_YQ_INTRO_1
NOTES FOR REMARKS
1 PLAN
2 SECTION MER_DWD_YQ_SEC_06
3 BESPOKE
4 EXPENDITURES
5 SPECIFICATIONS MER_DWD_YQ_FF&E_09
6 SCHEDULES
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
DRAWING LIST
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:50
DATE: 23 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_DWG
REV NO.: 01
1
2
3
5000 860
A
975
WD3
5000 1935
800
WD3
WD3
5
5000
4035
2360
4250
4820
1570
EMERGENCY STAIRCASE 1
1975
2075
4000
5525
D3
D3
D3
D4
D3
2165
EMERGENCY STAIRCASE 2
SHOWCASING ASPHALT 14.14M2 FFL=+20
D7 WASHROOM CERAMIC TILES 23.04M2
SERVICES
BOMBA LIFT
3
UVC RADIATION POLISHED CONCRETE 2.52M2
LIFT
05
FEMALE TOILET
R2
WD2
5740
D6
D9
515
200 R1
2575
3100
6
1130
25
1265
D
285
1455
1410
0
1210
R WD1
50MM THK ALUMINUM ALLOY LINING
C-SHAPE 30MM P.E MONOFILAMENT YELLOW GREEN ARTIFICIAL GRASS
1280
SOLVING AROMA POD TERRAZZO EPOXY 7.55M2 FFL=+15
MEETING POD POLISHED CONCRETE 5.71M2
1600MM(W) X 3000MM(L) X 150MM THK BROWN FURNISH STEEL WELD MESH PANEL
750 R810
1805
39 5 1300
2370 WD1
WD1
3515
R1
PROPOSED NEW CONCRETE WALL
WD1
GARDEN PANTRY POLISHED CONCRETE 39.53M2 FFL=+180
DOOR LEGEND CODE
RELAX TERRAZZO 16.52M2
WALL LEGEND SYMBOL
D3
DESCRIPTION
D4
FFL=+180
D5 EXISTING BRICK WALL
WD1
575
D6 1180
13 40
1605
R30 50 R3 15 0
SUNNY SIDE GRASS 14.09M2
D2
68
WD1
0
WD1
1000
R1
0
55 R1
93
WD1
BOOSTING AROMA POD TERRAZZO EPOXY 7.55M2 FFL=+15
300MM X 300MM X 40MM THK OFF-WHITE TACTILE PAVING TILES FINISHED BRICK WALL
90
470
1635
2360
65
R1
PROPOSED NEW GLASS WALL
2350
1890
1600
1890
2810
R9
15 50
2530
2505
D1
R4
COLLAB ASPHALT 27.86M2 FFL=+30
1165
DESCRIPTION
QUANTITY
2665
R1550
WD1
20
R1 9
0
0
R
510 WD1
3110
5
R1
R
1500
1470
187
2950MM X 3900MM (H) FIXED WINDOW C/W 20MM THK TEMPERED GLASS AND 50MM THK ALUMINUM FRAME
22
00
180
0
3 R2 00 R24
R44
00
3 R1
R1 440
R1
0
R2
R17 4
2436
1450
FFL=+50
WD1
00
2640
R5 50 HANGING DUAL POD GRASS 2.38M2
335
FFL=+50
1910
82
3 13
R5 50
55
2250
5 57
780
2190
R5 50 R
R5
FFL=+50
R1
C
2002
1900 0
2400
FFL=+180 WD1
435
R985
2390
1698
25
187
1830 1500
13
R
50
R
4 60
0 55
1680
R400
R 1870
2466
2265
180
R8 4
RELAX TERRAZZO 16.52M2
1335
FILING & AUTOMATION ASPHALT 7.94M2 FFL=+20
FFL=+5
1065 1900
540
10
450
1230 75
1090
1240
1570
R 11 0 980 0
50
1025
3515
R725
WD1
0 17
1055
1555
R2
UV DUSTY ASPHALT 10.26M2 FFL=+30
90 R9 040 R1
0 99
1040
1620
R9 R10 90 40
R1257
R1
90 R9 40 1 R 0
180 WELCOMING POLISHED CONCRETE 8.39M2
640
BUBBLES GRASS 2.36M2
D1
R492
52
1875
R2
R2
D2
13 R7
R815
65
2255 1780
980
R285
D1 BULAT POLISHED CONCRETE 13.72M2
855
D5
R815
170
D8 D9
D5
3600
MALE TOILET
490 1670
WD2
R605
5000 4730
5000
8
WD3
B
5000 3375
7
OKU TOILET D9
D9
1340
6
5000
5475
SELF TEST KIT POLISHED CONCRETE 6.66M2
D9
5000 1570
4
D7 EXISTING CONCRETE WALL D8 D9 PROPOSED NEW BRICK WALL
2
1200MM(L) x 210MM(H) 100MM THK STAINLESS STEEL ELEVATOR DOOR 600MM(L) X 2100MM(H) 50MM THK SINGLE LEAF SOLID TIMBER DOOR IN WHITE LAMINATED FINISH 400MM(L) X 2100MM(H) 40MM THK SINGLE LEAF PARTICLE CORE WOOD DOOR PANEL 400MM(L) X 2100MM(H) 40MM THK DOUBLE LEAF PARTICLE CORE WOOD DOOR PANEL 900MM(L) X 2100MM(H) 50MM THK SINGLE LEAF SOLID TIMBER DOOR IN WHITE LAMNIATED FINISH 800MM(L) X 2100MM(H) 50MM THK SINGLE LEAF SOLID TIMBER DOOR IN WHITE LAMINATED FINISH 1000MM(L) X 2100MM(H) 40MM THK SLIDING DOOR FOR DISABLED TOILET 600MM(L) X 2100MM(H) 40MM THK SINGLE LEAF PARTICLE CORE WOOD DOOR IN WHITE LAMINATED FINISH 600MM(L) X 2100MM(H) 40MM THK SINGLE LEAF PARTICLE CORE WOOD DOOR IN BLACK LAMINATED FINISH
1 4 1 2 1 1 2 5
WINDOW LEGEND CODE
DESCRIPTION
QUANTITY
PROPOSED NEW CONCRETE WALL
SOP 01
SETTING OUT PLAN
NO.
DESCRIPTION
3900MM (H) x 20MM THK FIXED TEMPERED GLASS
WD2
700MM(L) X 400MM(H) AWNING WINDOW W 10MM THK TEMPERED GLASS
6
WD3
600MM(L) X 400MM(H) AWNING WINDOW W 10MM THK TEMPERED GLASS
4
PROPOSED NEW GLASS WALL
SCALE 1:100
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
30
WD1
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
SETTING OUT PLAN
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:100
DATE: 16 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.: MER_DWD_YQ_SOP_01
REV NO.: 02
1
2
3
5000 860
975
4
5000
800
1935
2065
5
5000
1970
6
5000
5000
2360
5475
7
4820
2075
8
4250
5740
4000
5525
SELF TEST KIT POLISHED CONCRETE 6.66M2
BF13
EMERGENCY STAIRCASE 1
EMERGENCY STAIRCASE 2
LF8 BF2
OKU TOILET
2050
1570
A
BF3
2125
UVC RADIATION POLISHED CONCRETE 2.52M2
BOMBA LIFT
LIFT
SERVICES
MALE TOILET
590
FILING & AUTOMATION ASPHALT 7.94M2
R6
1025
BF10
R6
00
BF1
1955
0
0 R6
2090
0
635 1250
00
BF5
R9 9
1060
1055
695 265 525
UV DUSTY ASPHALT 10.26M2
WELCOMING POLISHED CONCRETE 8.39M2
35 710
3465
00
225 805 355
1040
R6
690
555
BUBBLES GRASS 2.36M2
20
BF12
20
LF6
20
870
BF4
3815
2120
R350 875
490 1080
LF7
1730
1570
B
695
BF11
BULAT POLISHED CONCRETE 13.72M2
BF15 BF14
SHOWCASING ASPHALT 14.14M2
720
WASHROOM CERAMIC TILES 23.04M2
100
1570
5000
FEMALE TOILET
265
BF6
R855
LF1
R1305
LF8
4730
5000
LF2 LF3
RELAX TERRAZZO 16.52M2
2290
FFL=+180 LF8
186
1930
0
R100
2435
2500
BF9
1715
BF8
LF5
BF7
LF8 BF16
5 R49
50 606
R3
LF10
SOLO 0.64M2
COLLAB ASPHALT 27.86M2
300MM X 300MM X 40MM THK OFF-WHITE TACTILE PAVING TILES FINISHED BRICK WALL
C-SHAPE 30MM P.E MONOFILAMENT YELLOW GREEN ARTIFICIAL GRASS
CODE
DESCRIPTION
LOOSE FURNITURE QUANTITY
1405
DESCRIPTION
QUANTITY
LF1
HOURGLASS-LIKE CUSTOMADE SILVER GRAY ALUMINUM COATING CHAIR
14
RELAX TERRAZZO 16.52M2
BF2
430MM(W) X 450MM(L) BUILT IN SEATING W BUS STOP LIKE ALUMINUM STRUCTURE DESIGN
7
LF2
HOURGLASS-LIKE CUSTOMADE SILVER GRAY ALUMINUM TOP TABLE
5
FFL=+180
BF3
CUSTOMADE CATLOGUE SHELF
1
LF3
SEMI HEAVY-DUTY NYLON AND PP BASE OFFICE CHAIR W/O HEADREST
4
BF4
ALUMINUM COATING METAL RECEPTION
1 LF4
ALUMINUM TOP ROUND SHAPE CONFERENCE TABLE
1
LF5
MPC3000 COPY PRINT SCAN FAX 3 IN 1 MULTIFUNCTION PHOTOCOPIER
1
LF6
SLOUCHER SOFA LINER BEAN BAG
6
LF7
POLYESTER POWDER COATING YNGVAR BAR STOOL
8
LF8
STENSELE BAR HEIGHT OFFICE TABLE
2
R495 BF5
WALL-MOUNTED CAPSULE LIKE COFFEE CONTAINER
1
BF6
CURVY ALUMINUM COATING DRY BAR
1
LF8
SCALE 1:100
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
BF7
ALUMINUM PLANTER
1
BF8
STAINLESS STEEL CUSTOMADE AROMA DIFFUSER
1
DUCTING DESIGNED AROMA DIFFUSER
1
BF10
GRENADE LIKE SANITIZING BUBBLES
7
BF11
INTERACTIVE CIRCLES
1
BF12
PNEUMATIC ELEVATOR WITH UV LIGHT RAY
3
BF13
BUILT IN SEATS WITH PIPING
1
BF14
TERRAZZO TOILET SINK COUNTERTOP
1
BF15
CUSTOMADE PILL DESIGNED SHELF
1
BF16
DUAL WORKING POD
4
BF17
700MM(W) 500MM(L) X 2000MM(H) SINGLE MAN WORKING POD
3
BF18
1000MM X 750MM(H) FLOOR MOUNTED 4 PERSON WORKING SET W DESK AND CHAIRS
3
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
FURNITURE LAYOUT PLAN BASE FLOOR
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
CODE
1
FURNITURE LAYOUT PLAN BASE FLOOR
DESCRIPTION
GARDEN PANTRY POLISHED CONCRETE 39.53M2
PERFORATED METAL PARTITION WALL
BF9
NO.
SOLVING AROMA POD 7.55M2
BF1
D
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
50MM THK ALUMINUM ALLOY LINING
FFL=+180
800
LF10
1330
1340
R495
MEETING POD POLISHED CONCRETE 5.71M2
BUILT-IN FURNITURE 2950MM X 3900MM (H) FIXED WINDOW C/W 20MM THK TEMPERED GLASS AND 50MM THK ALUMINUM FRAME
2310
ASH WHITE PAINT LINING
LF9
FLP 02A
2370
2360
2350 BOOSTING AROMA POD 7.55M2
2395
2105 BF17
HANGING DUAL POD GRASS 2.38M2
LF8
50
3375
LF9
5000
2350
SOLO 0.64M2
2010
BF17 SOLO2 0.64M
1245
SUNNY SIDE GRASS 14.09M2
BF17
BF18
R3
1245
C
2350
2350
LF4
SCALE :
1:100
DATE: 16 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_FLP_02A
REV NO.: 02
1
2
3
5000 860
975
800
4
5000 1935
2065
5
5000
1970
5000
5000
2360
5475
6
4820
2075
7
8
4260
5740
4000
5525
1570
BF23
BF24
1570
BF25
00
R2
1055
180
00
BF22
20
1040
20
B
R6
50
1025
R6
20
00
R6
20
5000
1570
A
BF19
FOCUS AROMA POD 7.81M2
4730
5000
BF27
FFL=+2000
BF26
BF29
C
BF21
BF20
BF28
180 GARDEN IN THE AIR 17.94M2
STRINGY 5.68M2
BOOSTING AROMA POD 7.55M2
FFL=+2000
FFL=+2000
O2 WAY 17.91M2
220V LED STRIP LIGHT
SOLVING AROMA POD 7.55M2
FFL=+2000
ø260MM X 600MM(H) SEMI CAPSULE SHAPED TEMPERED GLASS
FFL=+2000
3375
2950MM X 3900MM (H) FIXED WINDOW C/W 20MM THK TEMPERED GLASS AND 50MM THK ALUMINUM FRAME
300MM X 300MM X 40MM THK OFF-WHITE TACTILE PAVING TILES FINISHED BRICK WALL
C-SHAPE 30MM P.E MONOFILAMENT YELLOW GREEN ARTIFICIAL GRASS
ASH WHITE PAINT LINING
BUILT-IN FURNITURE CODE
DESCRIPTION
QUANTITY
BF19
ø260MM X 600MM(H) SEMI CAPSULE SHAPED TEMPERED GLASS
BF20
ø940MM PLANTER BOX C/W SUPERELASTIC PVC PIPING
BF21
ARCH FRAME FILTER LAYER HOLDER STRUCTURE
4
14
1
BF30
1340
5000
FFL=+2000
RECHARGE AROMA POD 4.06M2
BF22
CURVY LIGHTING STRUCTURE
1
BF23
BUILT IN PIPING DESIGN SEATS
1
BF24
ø20MM X 1200MM(L) UV FLUORESCENT LIGHTING
1
BF25
LED STRIP LIGHT DESIGN
1
BF26
1500MM(W) X 11950MM(L) STAINLESS STEEL BRIDGE CONNECTED TO CEILING
1
BF27
3050MM X 2360MM PLATFORM C/W LED STRIP FLOOR LIGHT
1
BF28
1500MM(W) X 4730MM(L) STAINLESS STEEL BRIDGE CONNECTED TO CEILING
1
BF29
ø650MM HANGING CEILING FIXTURE
5
BF30
2500MM X 2000MM PLATFORM C/W LED STRIP FLOOR LIGHT
1
FFL=+2000
D
FLP 02B
FURNITURE LAYOUT PLAN MEZZANINE FLOOR SCALE 1:100
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
FURNITURE LAYOUT PLAN MEZZANINE FLOOR
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:100
DATE: 16 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_FLP_02B
REV NO.: 02
1
2
3
5000 860
975
4
5000 1935
800
5
5000
4035
5000
7
5000
2360
5475
6
4820
2075
8
4250
5740
4000
5525
1570
A T2
PC1
SELF TEST KIT POLISHED CONCRETE 6.66M2
T1
EMERGENCY STAIRCASE 1
OKU TOILET
PC1
1570
5000
T2
EMERGENCY STAIRCASE 2
A1
PC1
PC1
UVC RADIATION POLISHED CONCRETE 2.52M2
FEMALE TOILET
SHOWCASING ASPHALT 14.14M2
BOMBA LIFT
LIFT
SERVICES
MALE TOILET T2
1570
WASHROOM CERAMIC TILES 23.04M2
T2
PC1 PC1 BULAT POLISHED CONCRETE 13.72M2
FILING & AUTOMATION ASPHALT 7.94M2
WELCOMING POLISHED CONCRETE 8.39M2
A1
B
A1
P1
FFL=+180
BUBBLES GRASS 2.36M2
UV DUSTY ASPHALT 10.26M2
A1
GARDEN PANTRY POLISHED CONCRETE 39.53M2
P1
FF4 PC1
TR1
TR2
TR1
AL1
TR2
AL1
P1 P1
PC1 P1
A1
TR2
4730
5000
PC1 RELAX TERRAZZO 16.52M2
AG1
AG1
AG1
E1
PC1
AG1
E1
A1
FFL=+180
AG1
PC1 SOLO 0.64M2
C
P1 TR1
A1
TR2
AL1
HANGING DUAL POD GRASS 2.38M2
3375
AG1
2950MM X 3900MM (H) FIXED WINDOW C/W 20MM THK TEMPERED GLASS AND 50MM THK ALUMINUM FRAME
5000
COLLAB ASPHALT 27.86M2
MEETING POD POLISHED CONCRETE 5.71M2
BOOSTING AROMA POD TERRAZZO EPOXY 7.55M2
300MM X 300MM X 40MM THK OFF-WHITE TACTILE PAVING TILES FINISHED BRICK WALL
50MM THK ALUMINUM ALLOY LINING
1600MM(W) X 3000MM(L) X 150MM THK BROWN FURNISH STEEL WELD MESH PANEL
SUNNY SIDE GRASS 14.09M2
ASH WHITE PAINT LINING
FLOOR FINISHES LEGEND
E1
DESCRIPTION
AREA (M2)
DULL MATTE POLISHED CONCRETE
144.5
P1
ASH WHITE PAINT
14.99
A1
20MM SINGLE COAT MASTIC ASPHALT
57.02
C-SHAPE 30MM P.E MONOFILAMENT YELLOW GREEN ARTIFICIAL GRASS
39.41
MEDIUM SHEEN WHITE EPOXY FINISH
9.39
CODE
P1
SYMBOL
PC1
1340
A1
TR2
PC1
RELAX TERRAZZO 16.52M2 FFL=+180
AG1
D
E1 RECHARGE AROMA POD TERRAZZO EPOXY 7.55M2
FF 03
TR1
002NS WHITE SAND 2 TERRAZZO
28.22
TR2
006GN WHITE ORNAMENT TERRAZZO
8.22
AL1
ALUMINUM ALLOY LINING
2.13
T1
150MM X 1200MM X 10.5MM THK WOOD GLAZED PORCELAIN TILES
3.65
T2
400MM X 400MM X 8MM THK CREMA SERIES WHITE CERAMIC TILES
21.17
FLOOR FINISHES PLAN SCALE 1:100
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
SOLVING AROMA POD TERRAZZO EPOXY 7.55M2
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
FLOOR FINISHES LAYOUT PLAN
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:100
DATE: 16 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_FF_03
REV NO.: 02
1
2
3
5000 860
975
800
4
5000 1935
2065
5
5000
1970
6
5000
5000
2360
5475
7
4820
2075
8
4250
5740
4000
5525
1570
A DL
DL
DL
DL
DL
DL
E
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL DL
DL
CTX DL
1570
5000
DL
DL
CT1
DL
CH=±3200
DL
DL
CH=±4000
DL
DL
DL
E
DL
DL
CT1
DL DL
DL
CH=±3200
DL
DL
EXIT DL
EXIT
E
DL
DL
DL
1570
180 DL
DL
DL
DL
E
DL
DL
DL
E
DL
DL
DL
E
DL
DL
DL
DL
DL
DL
DL
B CTX
180
E
4730
5000
RELAX TERRAZZO 16.52M2
E
E
E
E
CH=±4000
CT2
SUNNY SIDE GRASS 14.09M2
C HANGING DUAL POD GRASS 2.38M2 CH=±2000
180
COLLAB ASPHALT 27.86M2 CH=±4000
CODE
SOLVING AROMA POD 7.55M2 CH=±4000
MEETING POD POLISHED CONCRETE 5.71M2 CH=±2000
DESCRIPTION
SYMBOL
CTX
EXISTING EXPOSED CEILING TO BE REMAINED
RELAX TERRAZZO 16.52M2
CT1
TO SUPPLY AND INSTALL 12.5MM THK FLAT PLASTERBOARD CEILING
CH=±4000
CT2
TO SUPPLY AND INSTALL 6PCS STEEL METAL WIRE MESH PANEL AT ABOVE FLOOR HEIGHT 3200MM AND 3600MM
E EXIT
QUANTITY
PENDANT LIGHT 01
2
1200MM(L) X 100M(W) LED PANEL
1
20W CREE LED TRACK LIGHT
4
2W EDISON VINTAGE FILAMENT BULB LIGHT
1
75MM 1W RECESSED PLINTH LED SPOTLIGHT
2
150MM 18W ROUND LED DOWNLIGHT
1
220V LED STRIP LIGHT
2
2.0 HP CASSETTE AC
12
LEP EMERGENCY LAMP C/W 3HOUR RATING NICKEL CADMIUM BATTERY
13
LEP EXIT SIGN C/W 3HOUR RATING NICKEL CADMIUM BATTERY
2
EXHAUST FAN
8
REFLECTED CEILING PLAN SCALE 1:100
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
DESCRIPTION
CTX
E
D
RCP 04
GARDEN PANTRY POLISHED CONCRETE 39.53M2 CH=±4000
LIGHTING AND ELECTRICAL FITTING LEGEND
CEILING FINISHES LEGEND
CTX
3375
BOOSTING AROMA POD 7.55M2 CH=±4000
1340
5000
E
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
REFLECTED CEILING PLAN
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:100
DATE: 23 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_SOP_RCP_04
REV NO.: 01
1
2
3
5000 860
975
800
4
5000 1935
2065
5
5000
1970
6
5000
5000
2360
5475
7
4820
2075
8
4250
5740
4000
5525
1570
A DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
DL
2
DL
DL DL
2
DL
1570
5000
DL
DL
DL
DL
DL
E
DL
DL
DL
DL DL
DL
DL
DL
EXIT DL DL
DL
DL
DL
2
DL
EXIT
E 2
DL
2
1570
DL
DL
DL
DL
DL
E
DL
DL
E
DL
DL
DL
DL
E
DL
DL
DL
DL
DL
DL
DL
B
E
4730
5000
E E
E
E
2
C
2
2
HANGING DUAL POD GRASS 2.38M2
E
BOOSTING AROMA POD 7.55M2
SOLVING AROMA POD 7.55M2
MEETING POD POLISHED CONCRETE 5.71M2
GARDEN PANTRY POLISHED CONCRETE 39.53M2
3375
5000
FFL=+180 ø15MM THK BLACK POWDER COATED ALUMINUM TRACK LIGHT SYSTEM
SOCKET AND DATA OUTLET 825MM FROM FLOOR TO BE MOUNT ON 900 MM KICKER
LIGHTING AND ELECTRICAL FITTING LEGEND
2.0 HP CASSETTE AIR CONDITIONER UNIT
SYMBOL
E
1340
ELECTRICAL OUTLET LEGEND SYMBOL 2
2
1200MM(L) X 100M(W) LED PANEL
1
20W CREE LED TRACK LIGHT
4
2W EDISON VINTAGE FILAMENT BULB LIGHT
1
1 GANG LIGHT SWITCH 800MM ABOVE FLOOR LEVEL
21
75MM 1W RECESSED PLINTH LED SPOTLIGHT
2
2 GANG LIGHT SWITCH 800MM ABOVE FLOOR LEVEL
1
150MM 18W ROUND LED DOWNLIGHT
1
2
1 GANG 2 WAY LIGHT SWITCH 800MM ABOVE FLOOR LEVEL
5
220V LED STRIP LIGHT
2
2
2 GANG 2 WAY LIGHT SWITCH 800MM ABOVE FLOOR LEVEL
4
2.0 HP CASSETTE AC
1500MM HT. POWER OUTLET
22
E
WALL MOUNT DATA OUTLET
10
EXIT
WALL MOUNT TEL. OUTLET
10
12
LEP EMERGENCY LAMP C/W 3HOUR RATING NICKEL CADMIUM BATTERY
2
LEP EXIT SIGN C/W 3HOUR RATING NICKEL CADMIUM BATTERY
8
EXHAUST FAN
2
LIGHTING ELECTRICAL PLAN SCALE 1:100
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
QUANTITY
QUANTITY
PENDANT LIGHT 01
2
D
LEP 05
DESCRIPTION
DESCRIPTION
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
LIGHTING ELECTRICAL PLAN
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:100
DATE: 23 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_LEP_05
REV NO.: 01
1320MM(D) X 12MM THK SEMISPHERICAL POLY CARBONATE 220V PVE CONTROL PANEL POWER SUPPLY HEAD UNIT VACUUM PUMP SYSTEM POLY CARBONATE CYLINDRICAL TRACK SILVER POWDER COATED ALUMINUM STRUCTURE 35MM THK POLYPROPYLENE PLASTIC PANELS 2000MM(H) SEAL ON CABIN 1075MM(W) AIRTIGHT POLY CARBONATE PRESSURE DOOR SILVER POWDER COATED ALUMINUM SUPPORTING COLUMN
5MM THK LOW CARBON STEEL L BRACKET PERSPECTIVE FOR ILLUSTRATION PURPOSE ONLY UDPE UV DUSTY ELV SCALE 1:25
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
DESCRIPTION
PNEUMATIC ELEVATOR ELEVATION
UDPE UV DUSTY 3D SCALE 1:25
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
PNEUMATIC ELEVATOR 3D VIEW
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
UV DUSTY PNEUMATIC ELEVATOR FRONT ELEVATION & 3D VIEW
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:25
DATE: 23 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_BES_07A
REV NO.: 00
3880
Ø840
5 R74
R6
1915
60 R725 00 8 R
& AUTOMATION 7.94M2
BUBBLES 2.36M2
DESCRIPTION
ELEVATION A
PNEUMATIC ELEVATOR PLAN VIEW
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
R662
Ø500
A
UDPE UV DUSTY PL SCALE 1:25
BULAT 13.72M2
R940 R R890 82 0
1915
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
UV DUSTY PNEUMATIC ELEVATOR PLAN VIEW
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
N/A
DATE: 23 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_BES_07B
REV NO.: 00
6900 1830
1025
4045
750
SL CL
4750 4000 3935
500
FL UDPE UV DUSTY ELV-A SCALE 1:25
PNEUMATIC ELEVATOR ELEVATION A
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
UV DUSTY PNEUMATIC ELEVATOR ELEVATION VIEW
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:25
DATE: 23 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_BES_07C
REV NO.: 00
640
1600 1325
SEAL ON CABIN
X
465
X
PP1 35MM THK POLYPROPYLENE PLASTIC PANELS
R725 5 R62
PC1 12MM THK CURVED POLYCARBONATE SHEETS
2000MM(H) SEAL ON CABIN SILVER POWDER COATED ALUMINUM STRUCTURE
MAX. OPENING OF DOOR 90 DEGREES
UVPE UV DUSTY PL SCALE 1:25
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
1755
950
1075MM(W) AIRTIGHT POLY CARBONATE PRESSURE DOOR
DESCRIPTION
DETAIL "1"
FL
PNEUMATIC ELEVATOR PLAN
UVPE UV DUSTY 07A SCALE 1:25
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
PNEUMATIC ELEVATOR SECTION X-X
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
UV DUSTY PNEUMATIC ELEVATOR PLAN VIEW & SECTION VIEW
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
265
1606
AL1 SILVER POWDER COATED ALUMINUM SUPPORTING COLUMN
3935
1600
465 340
1320MM(D) X 12MM THK SEMISPHERICAL POLY CARBONATE
SCALE :
N/A
DATE: 23 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_BES_07D
REV NO.: 00
50
25
SIDE VIEW
60
40 15 30
25
COLUMN
50 FRONT VIEW
50 50
50
25 20
5 L BRACKET SCALE 1:1
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. DESCRIPTION
25 35
Ø10
DT LB
NO.
L BRACKET
DT 1
DETAIL "1" SCALE 1:2
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
UV DUSTY PNEUMATIC ELEVATOR BLOW-UP DETAIL
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
BOLT Ø10MM
SCALE :
1:1 , 1:2
DATE: 23 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_BES_07E
REV NO.: 00
CTX
CT2
L1
REMAINING EXISTING CEILING
W3 OFF-WHITE PAINT PLASTER FINISHED PLYWOOD PANEL
RECTANGLE CEILING LIGHT FIXTURE
W1 ANTI STATIC THERMAL INSULATION TACTILE PAVING TILES
WD1
W2
E5
STEEL METAL WIRE MESH PANEL SEMI CAPSULE SHAPED GREEN TEMPERED GLASS OXYGEN SUPPLY MECHANISM
E3
CAPSULE SHAPED WALL MOUNT COFFEE HOLDER
TEMPERED CURTAIN GLASS FACADE OFF-WHITE PAINT PLASTER FINISHED PLYWOOD PANEL
D5
E1
1W PANASONIC BREAD TOASTER PSN-NTGP
E2 W4 OFF-WHITE PAINT PLASTER FINISHED PLYWOOD PANEL
E4
NESPRESSO ESSENZA ESPRESSO MAKER C30MEGR
ARCH SHAPED DTS FIRE RATED DOOR C-SHAPE 30MM P.E MONOFILAMENT YELLOW GREEN ARTIFICIAL GRASS
BQ 3D
GARDEN PANTRY 3D VIEW SCALE 1:100
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
GARDEN PANTRY 3D VIEW
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
N/A
DATE: 23 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_BQ_3D
REV NO.: 00
TERMS & CONDITION
BILL OF QUANTITIES MAYAIR OFFICE
QUOTATION
1, JALAN TAYLOR'S 47500 SUBANG JAYA, SELANGOR ATTENTION RE: RENOVATION WORKS FOR AWAM OFFICE, TOWER A 4TH FLOOR
DATE: QUOTE NO:
NO
23 NOVEMBER 2021 MER_DWD_YQ_BQ_08
TERMS: UNIT
DESCRIPTION
C.O.D QTY
RATE(RM)
1
Validity: 14 days
2
Period if completed: 60 days (refer of down payment upon confirmation of order)
3
All Dimension subject to Final site measurement
4
4 Variation Order: Any alteration not specified in the quotation will be issued under variation order follow with an invoice
TOTAL(RM)
WALL
Variation order (VO) 5
TO SUPPLY 300MM X 300MM X 7.5MM THK ANTI STATIC THERMAL INSULATION TACTILE PAVING TILES AND CUT W1
PCS
2000
2.09
TO SUPPLY DIMENSION 1825MM(W) X 4000MM(H) X 50MM THK PREFABRICATED OFF-WHITE PAINT PLASTER PCS
3
134.50
403.50
FINISHED PLYWOOD PANEL WITH 1200MM(D) CIRCLE CUT IN CENTER AND PROVIDE LABOR FOR INSTALLATION TO SUPPLY DIMENSION 3350MM(W) X 4000MM(H) X 50MM THK PREFABRICATED OFF-WHITE PAINT PLASTER W3
PCS
5
134.50
672.5
PCS
4
134.50
538.00
Percentage
-THE CONTRACT SUM RM
4,180.00
TILES TO FIT PARTICULAR WALL DIMENSION AS IN DWG W2
Payment Terms :-
Stage I Upon confirmation of project/service
50%=RM
Stage II Progress Claim (Installation of fixtures & fittings)
20%=RM
Stage III Progress Claim (Completion of fixtures & fittings)
20%=RM
Stage IV Final payment (Full completion of all works)
10%=RM
FINISHED PLYWOOD PANEL WITH 1200MM(D) CIRCLE CUT IN CENTER AND PROVIDE LABOR FOR INSTALLATION -Services/works shall commence upon receipt of payment of each phase except for final phase. Time frame of work has
TO SUPPLY DIMENSION 2750MM(W) X 4000MM(H) X 50MM THK PREFABRICATED OFF-WHITE PAINT PLASTER W4
been agreed by both.
FINISHED PLYWOOD PANEL WITH 1200MM(D) CIRCLE CUT IN CENTER AND PROVIDE LABOR FOR INSTALLATION
-All outstanding amounts must be paid within ten (10) working days after the handover of site (exclude V.O.period). Shall
CEILING CTX
EXISTING EXPOSED CEILING TO BE REMAINED
-
-
-
PCS
6
125.00
there be any delay of, Turn Design do not hold any reponsibilities in delay of work from the agreed Time frame that
-
is resulted by payment issues.
TO SUPPLY AND INSTALL 3500MM(L) X 1200MM(W) X 40MM THK STEEL METAL WIRE MESH PANEL AT ABOVE CT2 FLOOR HEIGHT 3200MM AND 3600MM ACCORDING TO DETAILINGS DWG GIVEN
750.00 -Payment not made with above mentioned period will carry interest at the rate of 2% per month (30 days) until full payment is made.
FLOOR PROVIDING, BORING, INSTALLING CAST IN-SITU USING CONCRETE DESIGN MIX OF M30 GRADE AS DIRECTED BY PC1 ENGINEER IN-CHARGE AND DRIVING OF WELDED REINFORCEMENT CAGES THROUGH FRESHLY LAID CONCRETE
M2
-Cheque should be crossed *A/C Payee* & Made Payable to 203
26.37
5,353.11 -Turn Design Sdn Bhd shall not in any circumstances or for any reason whatsoever be liable for any losses, damages,
LIGHTING L1
cost, expenses, including, without limitation, direct, indirect, special or consequential damages or economic losses arise TO SUPPLY MATERIAL AND LABOR TO INSTALL 900MM(L) X 300MM(W) 48W RECTANGLE CEILING LIGHT FIXTURE
PCS
41
125.68
5,152.88
6
-Turn Design cannot be held responsible for designs/works/service that may later be undesirable or cause inconvenience
DOOR & WINDOW
TO PROVIDE MATERIAL AND INSTALL PREFABRICATED ARCH SHAPED DTS FIRE RATED DOOR, COMPLETE W ALL
The Client understands that all designer/contractor interprets the Client's requirements and wishes.However any design/ PCS
D5
1
376.70
376.70
NECESSARY IRONMONGERY AND ACCESSORIES, ALL ACCORDANCE TO MANUFACTURER'S DETAILS AND DWG
works that are not done according to agreed as per quoted shall be retified accordingly by Turn Design.
TO DESIGN, SUPPLY, FABRICATE, DELIVER AND INSTALL APPROVED FACADE SYSTEM COMPLETE W APPROVED WD1
M2
20.68
63.64
1316.08
8
TO SUPPLY 1W PANASONIC BREAD TOASTER PSN-NTGP DIMENSION 294MM(W) X 188MM(D) X 175MM(H)
PCS
1
149.00
149.00
E2
TO SUPPLY NESPRESSO ESSENZA ESPRESSO MAKER C30MEGR W DIMENSION 110MM(W) x 325MM(D) x 205MM(H)
PCS
1
399.00
399.00
E3
TO DESIGN, SUPPLY, FABRICATE AND INSTALL CAPSULE SHAPED WALL MOUNT COFFEE HOLDER ALL SET
1
2500.00
2500.00
TO DESIGN, SUPPLY, FABRICATE AND INSTALL HOURGLASS SHAPED ALUMINUM AND CHRONIC GLASS TABLE AND
SET A: 3
350.00
1050.00
SET B: 2
450.00
900.00
14
300
4,200.00
SUPPLY MECHANISM W DIMENSION 500MM(D) X 600MM(H) ALL ACCORDANCE TO DESIGNER DETAILING DWG
PCS
SUBTOTAL:
DESCRIPTION
PROJECT TIME FRAME & EXTRA SERVICE
SITE VISIT, INSPECTION & TRAVELLING -Site visit or inspection services that requires to travel by air )overseas, Sabah & Sarawak) are subject to claim. ACKNOWLEDGEMENT OF QUOTED FEES, TERMS & CONDITION -Upon receiving payment according to the percentage stated above, we will acknowledge that you have read & agreed on our scope of design/works/services, fees, terms & conditions. This quotation shall be treated as a contract legally
TO DESIGN, SUPPLY, FABRICATE AND INSTALL SEMI CAPSULE SHAPED GREEN TEMPERED GLASS OXYGEN
NO.
9
11
SET
SET B: 1TABLE 4CHAIRS
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
-Turn Design has the right to terminate or suspend All works/services, upon written notice if the Client fails to pay.
10
CHAIR SET W DIMENSION 800MM(D) X 750MM(H) AND 400MM(D) X 400MM(H) ALL ACCORDANCE TO DESIGNER DWG
TERMINATION OF SERVICE
-Estimated time frame for entire project inclusive of revision period will be maximum of TWO (2) MONTHS.
ACCORDANCE TO DESIGNER DETAILING DRAWINGS
SET A: 1TABLE 2CHAIR
PROJECT ACCESS -Client will provide Turn Design with acces to the project and all information that may be required to complete the project.
E1
E5
7
GLASS, SPANDREL GLASS, POWDER COATED ALUMINUM BACKPAN
EQUIPMENTS
E4
DESIGN/WORKS/SERVICE DISCLAMER
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
27,940.77
binding once being signed. ISSUE BY
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
BILL OF QUANTITIES
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
ACKNOWLEDGE & AGREE BY
SCALE :
1:50
DATE: 23 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_BQ_08
REV NO.: 00
SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENT FOR MAYAIR SDN BHD PROPOSED OFFICE INTERIOR CODE
IMAGE
DESCRIPTION
SIZE
BRAND
QUANTITY
GARDEN PANTRY
LF1
HOURGLASS-LIKE CUSTOMADE SILVER GRAY ALUMINUM COATING CHAIR
ø800MM X 750MM(H)
14
CUSTOMADE
LF2
HOURGLASS-LIKE CUSTOMADE SILVER GRAY ALUMINUM TOP TABLE
ø400MM X 400MM(H)
5
CUSTOMADE
MEETING POD
LF3
SEMI HEAVY-DUTY NYLON AND PP BASE OFFICE CHAIR W/O HEADREST
LF4
ALUMINUM TOP ROUND SHAPE CONFERENCE TABLE
LF5
4
ALTERSEAT
ø900MM X 750MM(H)
1
QUINN
D300MM xH160MM D230MM xH410MM D220MM xH260MM
1
GARSH
MODERN HANDMADE WICKER RATTAN BAMBOO PENDANT LAMP
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
640MM(W) X 600MM(L) X 450MM(H)
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENT
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:50
DATE: 16 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_FF&E_09A
REV NO.: 01
SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENT FOR MAYAIR SDN BHD PROPOSED OFFICE INTERIOR CODE
IMAGE
BRAND
DESCRIPTION
SIZE
QUANTITY
MPC3000 COPY PRINT SCAN FAX 3 IN 1 MULTIFUNCTION PHOTOCOPIER
565MM(W) x 680MM(L) x 806MM(H)
1
ALUMINUM FOLDING LIBRARY LADDER
600MM(L) X 180MM(W) X 1600MM(H) 790MM EXTENSION X 15MM(D) TUBE
1
650MM(W) x650MM(L) x430MM(H)
6
OEM
8
IKEA
FILING AND AUTOMATION
LF6
LF7
RICOH AFICIO
GAO BUILTER
RELAX
SLOUCHER SOFA LINER BEAN BAG
LF8
COLLAB
LF9
STENSELE BAR HEIGHT OFFICE TABLE
LF10
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
ø400MM X 600MM(H)
POLYESTER POWDER COATING YNGVAR BAR STOOL
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
ø900MM X 1100MM(H)
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENT
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
IKEA
2
SCALE :
1:50
DATE: 16 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_FF&E_09B
REV NO.: 01
SCHEDULE OF ACCOMMODATION FOR MAYAIR SDN BHD PROPOSED OFFICE INTERIOR NO.
SPACES
AIR-CONDITIONING
NO. OF OCCUPANTS
NO. OF ROOM
AREA OF 1 ROOM (M2)
TOTAL AREA OF ROOMS (M2)
BLOCK A LEVEL 3 BASE 1
WELCOMING
Y
10
1
8.39
8.39
2
BUBBLES
Y
5
1
2.36
2.36
3
SHOWCASING
Y
10
1
14.14
14.14
4
GARDEN PANTRY
Y
14
1
39.53
39.53
5
FREESTYLE
Y
3
1
7.55
7.55
6
SUNNY SIDE
Y
6
1
14.09
14.09
7
MEETING POD
Y
4
1
5.71
5.71
8
UV DUSTY
Y
3
1
3.42
10.26
9
HANGING DUAL POD
Y
8
4
2.38
9.52
10
RELAX
Y
10
2
16.52
33.04
11
SOLO
Y
3
3
0.64
1.92
12
COLLAB
Y
20
1
27.86
27.86
13
FILING & AUTOMATION
Y
5
1
7.94
7.94
14
BULAT
Y
6
1
13.72
13.72
15
UVC RADIATION
Y
2
1
2.51
2.51
16
SELF TEST KIT
Y
1
1
6.66
6.66
17
WASHROOM
N
10
1
23.04
23.04
SUBTOTAL:
228.24
BLOCK A LEVEL 3 MEZZANINE 18
SOLVING AROMA POD
Y
4
1
7.55
7.55
19
O2 WAY
Y
6
1
17.91
17.91
20
BOOSTING AROMA POD
Y
5
1
7.55
7.55
21
GARDEN IN THE AIR
Y
10
1
17.94
17.94
22
FOCUS AROMA POD
Y
4
1
7.81
7.81
23
STRINGY
Y
4
1
5.68
5.68
24
RECHARGE AROMA POD
Y
4
1
4.06
4.06
SUBTOTAL:
68.9
GRAND TOTAL:
297.14
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
SCHEDULE OF ACCOMMODATION BLOCK A LEVEL 3
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:50
DATE: 16 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_SOA_10A
REV NO.: 01
SCHEDULE OF ACCOMMODATION FOR BLOCK A GROUND FLOOR NO.
SPACES
AIR-CONDITIONING
NO. OF OCCUPANTS
NO. OF ROOM
AREA OF 1 ROOM (M2)
TOTAL AREA OF ROOMS (M2)
BLOCK A GROUND FLOOR 1
RECEPTION
Y
3
1
42.10
42.10
2
LOUNGE AREA
Y
20
1
37.75
37.75
3
SYNTHAETIC OBJECT AREA
Y
10
1
69.56
69.56
4
CAFE COUNTER
Y
6
1
64.70
64.70
5
CAFE INDOOR DINING AREA
Y
20
1
41.83
41.83
6
BREATHIFY OBJECT AREA
Y
10
1
30.32
30.32
7
MEZZANINE MEETING AREA
Y
20
1
58.35
58.35
8
LIFT
Y
6
1
4.78
4.78
9
BOMBA LIFT
Y
6
1
5.49
5.49
10
EMERGENCY STAIRCASE 1
N
-
1
14.34
14.34
11
EMERGENCY STAIRCASE 2
N
-
1
14.34
14.34
12
WASHROOM
N
10
1
23.04
23.04
13
SERVICES
N
-
1
12.21
12.21
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
SCHEDULE OF ACCOMMODATION BLOCK A GROUND FLOOR
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:50
DATE: 16 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_SOA_10B
REV NO.: 01
SCHEDULE OF FINISHES FOR MAYAIR SDN BHD PROPOSED OFFICE INTERIOR CODE
MATERIALS
AREA (M2)
DESCRIPTION
LOCATION
FLOOR FINISHES
144.5
DULL MATTE POLISHED CONCRETE
P1
ODORLESS PREMIUM ASH WHITE ALL IN 1 PAINT BRAND: NIPPON PAINT
14.99
ODORLESS PREMIUM ASH WHITE ALL IN 1 PAINT BRAND: NIPPON PAINT
A1
20MM SINGLE COAT MASTIC ASPHALT
57.02
20MM SINGLE COAT MASTIC ASPHALT
AG1
C-SHAPE 30MM P.E MONOFILAMENT YELLOW GREEN ARTIFICIAL GRASS BRAND: KONZEPT GARDEN
39.41
C-SHAPE 30MM P.E MONOFILAMENT YELLOW GREEN ARTIFICIAL GRASS BRAND: KONZEPT GARDEN
E1
MEDIUM SHEEN WHITE EPOXY FINISH
9.39
MEDIUM SHEEN WHITE EPOXY FINISH
TR1
006GN WHITE ORNAMENT TERRAZZO
8.22
006GN WHITE ORNAMENT TERRAZZO
TR2
002NS WHITE SAND 2 TERRAZZO
28.22
002NS WHITE SAND 2 TERRAZZO
AL1
ALUMINUM ALLOY SHEET
2.13
ALUMINUM ALLOY SHEET
T1
150MM X 1200MM X 10.5MM THK NATURALE WOOD GLAZED PORCELAIN TILES BRAND: FERUNI
3.65
150MM X 1200MM X 10.5MM THK NATURALE WOOD GLAZED PORCELAIN TILES BRAND: FERUNI
T2
400MM X 400MM X 8MM THK CREMA SERIES WHITE CERAMIC TILES BRAND: WHITE HORSE CERAMIC
21.17
400MM X 400MM X 8MM THK CREMA SERIES WHITE CERAMIC TILES BRAND: WHITE HORSE CERAMIC
PC1
DULL MATTE POLISHED CONCRETE
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
SCHEDULE OF FINISHES
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:50
DATE: 23 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_SOF_11A
REV NO.: 00
SCHEDULE OF FINISHES FOR MAYAIR SDN BHD PROPOSED OFFICE INTERIOR CODE
DESCRIPTION
AREA (M2)
POLYURETHANE RESIN WHITE TACTILE PAVING
SFDSF
MATERIALS
LOCATION
WALL FINISHES
W1
SHOWCASING AREA, COLLAB AREA, RELAX AREA, UVC RADIATION
W2
ODORLESS PREMIUM ASH WHITE ALL IN 1 PAINT BRAND: NIPPON PAINT
W3
0.5MM MATTE CORRUGATED STAINLESS STEEL SHEET
43.12
WALL ALONG SERVICES
1220MM(W) X 2440MM(L) X 9MM THK IVORY FACE PAPER OVERLAY GYPSUM BOARD
23.29
WASHROOM
SAFDSFD
ALL THE WALLS
CEILING FINISHES
C1
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING. NO.
DESCRIPTION
CLIENT:
ARCHITECT:
INTERIOR DESIGN CONSULTANT:
MAYAIR SDN BHD
CG INTERIORS SDN BHD.
SLDESIGNIA
QUANTITY SURVEYOR:
PROJECT NAME:
DRAWING TITLE:
PERUNDING KOS T & K SDN BHD (PKT)
PROPOSED OFFICE INTERIOR DESIGN FOR MAYAIR SDN BHD AT TEG ASSETS SDN BHD OFFICE BUILDING COMPLEX AT LOT 1, BANDAR SUBANG JAYA, JALAN TAYLOR'S, 47500 SUBANG JAYA, SELANGOR.
SCHEDULE OF FINISHES
CGI@CGSBID.COM T : +60 8070 1111 F : +60 8075 1021
DATE
SCALE :
1:50
DATE: 23 NOV 2021
(390061-D)
35, JALAN P4/6, SEKSYEN 4, BANDAR TEKNOLOGI KAJANG, 43500 SEMENYIH, SELANGOR, MALAYSIA.
LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
CHECKED BY: MS. AZIAH
DRAWN BY : YIQING.C
[SA 0000153-X]
LOT 9, JALAN CJ1/1, KAWASAN PERINDUSTRIAN CHERAS JAYA, 43200 CHERAS, SELANGOR, MALAYSIA.
SUITE E-11-05 & E-11-06, PLAZA MONT KIARA, 2, JALAN KIARA, MONT KIARA, 50480 WILAYAH PERSEKUTUAN KUALA LUMPUR.
DWG NO.:
MER_DWD_YQ_SOF_11B
REV NO.: 00
Assignment 3: Working Drawings And System Integration
My Interior Architecture Design IV project has a more biophilic design that increase occupant connectivity to the natural environment using direct nature, indirect nature, and space and place conditions. The elements and considerations contribute to SUSTAINABILITY of the surrounding site. I learned to describe and analyze existing condition of site with the compliance of UBBL Selangor. Referring building layout drawings produced by the architect teams, some UBBL statements are complied throughout the design. For instance, emergency exits signs “KELUAR” illuminated continuously during periods of occupancy and exit doors openable from inside without keys and locks according to Law 172 and 173. For fire requirements wise, the office is provided with portable extinguishers sited in prominent positions on exit routes to be visible from all directions regulating by law 227. By Law 228 , the sprinkler system in the building is electricity connected to nearest fire station with automatic relay of alarm when activated. As for restriction of flame by Law 205, since the office is installed with a complete standard system of automatic sprinklers, the interior finishes with flame spread rating not over Class 2 where Class 1 is normally specified.
In this project, I completed the materials specification to represent the technical construction of interior detailing
in order achieve the design intention and handed in to the quantity surveyor team to do some cost calculation.
Main materials used in the steel, concrete and polypropylene. Steel, as a permanent resource because it is 100% recyclable without loss of quality and has a potentially endless life cycle. Also, the concrete flooring minimizes the effects that produce urban heat islands. Light-colored concrete pavements absorb less heat and reflect more solar radiation reducing air conditioning demands in the summer. Walls are mostly in white to improve the reflectivity of light and encourages energy saving. Dulux interior paint which are water-based with low VOC are used throughout the building. Polypropylene, much more sustainable than other types of plastic, as it is more quickly biodegradable, has a lighter carbon footprint and isn't threatening to our health. Flexible lighting controls and auto-sensor controlled lighting are provided in conjunction with daylighting strategy for all perimeter zones and daylit areas to optimize energy savings. This assignment allows me to integrate the various services system and technology into design proposal and produce series of working drawings in reference to building by-laws before joining the industry.
Lecturer: Ms. Nor Aziah Hassan | Ms. Norji Nasir
Bachelor Of Arts (Hons) In Interior Architecture
Lecturer: Ms. Nor Aziah Hassan | Ms. Norji Nasir
Assignment 2: Precedent Studies - A Bureau
Individual Precedent Study IHI Innovation Center [I-Base]
Furniture Layout Plan
This assignment requires student to research on a related co-working concept precedence study for Interior Architecture Design module. This project allows students to work in a group and develop the knowledge and understanding related to the production of working drawings for construction, including their understanding on UBBL application through observation and investigation perceiving and recording the built environment.
Schedule of Accommodation Section Section Blow-Up Bespoke Details Door Schedule UBBL Compilation UBBL Analysis Reflection
Lecturer: Ms. Nor Aziah Hassan | Ms. Norji Nasir
TABLE OF CONTENT NO.
DRAWING TITLE
DRAWING NUMBER
1
INDIVIDUAL / CHOSEN PRECEDENCE STUDIES
-
2
LAYOUT PLAN
MER_DWD_YQ_FLP_01
3
SCHEDULE OF ACCOMODATION
MER_DWD_YQ_SOA_02
4
LONG SECTION
MER_DWD_YQ_SC_03A MER_DWD_YQ_SC_03B
5
BE-SPOKE DETAIL
MER_DWD_YQ_BS2_04A MER_DWD_YQ_BS2_04B
6
DOORS SCHEDULE
MER_DWD_YQ_DS_05
7
SCHEDULE OF FINISHES
MER_DWD_YQ_SOF_06A MER_DWD_YQ_SOF_06B MER_DWD_YQ_SOF_06C
8
UBBL DIAGRAM IN PLAN
MER_DWD_YQ_UBBL_07
9
UBBL ANALYSIS
MER_DWD_YQ_UBBL_08
A-A
B-B
C-C 75520
8635
3020
2575
2900
1800
3815
9585
3200
1455 2510
3330
2980
4440
4470
6250
5185
3100
5250
D1
D4
D4
D4
D4
D4
D4
D4
8800
D1
D2
D2 D2
D2
27560
D1
D2
D4
D4 MALL STREET MATTE POLISHED CONCRETE 120.15SQM
D1
D1 D1 D5 D5 D5
D-D
13320
D-D
BLANC MATTE POLISHED CONCRETE FLOOR 272.07SQM
E-E
2340
E-E
DOCK MATTE POLISHED CONCRETE 90.69SQM
CO-LAB MATTE POLISHED CONCRETE 90.69SQM
GARAGE MATTE POLISHED CONCRETE 90.69SQM
6300
6250
6250
DRY BAR MATTE POLISHED CONCRETE 90.69SQM
6250
RELAX WOOD DECKING 47.65SQM
GARDEN MATTE POLISHED CONCRETEFLOOR FIN 119.53SQM
6250
6250
6250
6250
6250
6250
18750
6250
7620
24310 76420
A-A
01 FLP
FURNITURE LAYOUT PLAN
Description
Client :
C-C PROJECT ROOM GLOSSY POLISHED CONCRETE FLOOR FIN 190.48sqm
SCALE 1 : 200
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
B-B
Architect :
Interior Design Consultant :
Quantity Surveyor :
Date IHI INNOVATON CENTER [i-Base], 1ST FLOOR, YOKOHAMA ENGINEERING CENTER 2 BUILDING, 1 SHIN-NAKAHARA-CHO, ISOGO-KU, YOKOHAMA, KANAGAWA, 235-8501 JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
2-3-4 DAIBA, MINATO-KU, TOKYO 135-8622, JAPAN.
PROJECT ROOM GLOSSY POLISHED CONCRETE FLOOR FIN 190.48sqm
PROJECT ROOM GLOSSY POLISHED CONCRETE FLOOR FIN 190.48sqm
PROJECT ROOM GLOSSY POLISHED CONCRETE FLOOR FIN 190.48sqm
SOLO 300MM X 300MM X 10MM THK MATTE POLISHED CONCRETE TILES 30.75sqm
Project Name :
Drawing Title :
PROPOSED INTERIOR DESIGN FOR IHI INNOVATION CENTER AT YOKOHAMA, KANAGAWA, JAPAN
FURNITURE LAYOUT PLAN FOR IHI INNOVATION CENTER
Scale :
1 : 200
Checked by : Ms. Norji
Date : 12 OCT 2021 Drawn by : YiQing.C
Dwg No. :
Rev No. :
MER_DWD_YQ_FLP_01
02
SCHEDULE OF ACCOMMODATION FOR IHI INNOVATION CENTER [i-Base] YOKOHAMA JAPAN NO.
SPACES
AIR-CONDITIONING
NO. OF OCCUPANTS NO. OF ROOM AREA OF 1 ROOM (M^2) TOTAL AREA OF ROOMS (M^2)
1
DOCK
Y
10
1
90.69
90.69
2
CO-LAB
Y
20
1
90.69
90.69
3
GARAGE
Y
24
1
90.69
90.69
4
DRY BAR
Y
20
1
90.69
90.69
5
BLANC
Y
35
1
272.07
272.07
6
PROJECT ROOM
Y
10 pax per room
4
47.62
190.48
7
GARDEN
Y
12
1
119.53
119.53
8
RELAX
Y
15 - 20
1
47.65
47.65
9
SOLO
Y
10
1
30.75
30.75
10
MALL STREET
Y
20
1
120.15
120.15
27.67 27.86 11
MEETING ROOM
Y
8 pax per room
4
133.03 39.35 38.15 1276.42
TOTAL:
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
Client :
Architect :
Interior Design Consultant :
Quantity Surveyor :
Date IHI INNOVATON CENTER [i-Base], 1ST FLOOR, YOKOHAMA ENGINEERING CENTER 2 BUILDING, 1 SHIN-NAKAHARA-CHO, ISOGO-KU, YOKOHAMA, KANAGAWA, 235-8501 JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
2-3-4 DAIBA, MINATO-KU, TOKYO 135-8622, JAPAN.
Project Name :
Drawing Title :
PROPOSED INTERIOR DESIGN FOR IHI INNOVATION CENTER AT YOKOHAMA, KANAGAWA, JAPAN
SCHEDULE OF ACCOMMODATION FOR IHI INNOVATION CENTER
Scale :
N/A
Checked by : Ms. Norji
Date : 12 OCT 2021 Drawn by : YiQing.C
Dwg No. :
Rev No. :
MER_DWD_YQ_SOA_02
02
32250 5750
6250
6250
6250
6800
MER_DWD_YQ_SC_03B 5200
5150
5150
1575
990
990
1575
5150
1000
SL
2500
3500
CL
FL
F1
W3 5100MM X 2325MM X 6MM THK CLEAR FIXED GLASS
03A SC-E
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
F4
MATTE POLISHED CONCRETE
D1
300MM X 300MM X 10MM THK MATTE POLISHED CONCRETE TILES W BLUE AND WHITE PAINT FINISHING
2200MM X 1015MM X 5MM THK TEMPERED CLEAR GLASS STEEL HINGE DOUBLE LEAF DOOR
SECTION E-E SCALE 1 : 100
Client :
Architect :
Interior Design Consultant :
Quantity Surveyor :
Date IHI INNOVATON CENTER [i-Base], 1ST FLOOR, YOKOHAMA ENGINEERING CENTER 2 BUILDING, 1 SHIN-NAKAHARA-CHO, ISOGO-KU, YOKOHAMA, KANAGAWA, 235-8501 JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
2-3-4 DAIBA, MINATO-KU, TOKYO 135-8622, JAPAN.
Project Name :
Drawing Title :
PROPOSED INTERIOR DESIGN FOR IHI INNOVATION CENTER AT YOKOHAMA, KANAGAWA, JAPAN
SECTION E-E FOR IHI INNOVATION CENTER
Scale :
1 : 100
Checked by : Ms. Norji
Date : 12 OCT 2021 Drawn by : YiQing.C
Dwg No. :
Rev No. :
MER_DWD_YQ_SC_03A
02
7350 1100
5150
1100
1000
SL
2500
3500
CL
FL
03B SECTION SC-E SCALE 1 : 25
BLOW UP
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
F1
W3
MATTE POLISHED CONCRETE
Client :
Architect :
F4 300MM X 300MM X 10MM THK MATTE POLISHED CONCRETE TILES W BLUE AND WHITE PAINT FINISHING
6MM THK CLEAR FIXED GLASS
Interior Design Consultant :
Quantity Surveyor :
Date IHI INNOVATON CENTER [i-Base], 1ST FLOOR, YOKOHAMA ENGINEERING CENTER 2 BUILDING, 1 SHIN-NAKAHARA-CHO, ISOGO-KU, YOKOHAMA, KANAGAWA, 235-8501 JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
W4
2-3-4 DAIBA, MINATO-KU, TOKYO 135-8622, JAPAN.
MATTE BLACK FINISH SUS304 STAINLESS STEEL
Project Name :
Drawing Title :
PROPOSED INTERIOR DESIGN FOR IHI INNOVATION CENTER AT YOKOHAMA, KANAGAWA, JAPAN
SECTION E-E FOR IHI INNOVATION CENTER
Scale :
1 : 25
Checked by : Ms. Norji
Date : 12 OCT 2021 Drawn by : YiQing.C
Dwg No. :
Rev No. :
MER_DWD_YQ_SC_03B
02
CSS1 GALVANIZED CORRUGATED ALUMINUM SHEET ZINC COATED
C1
1000
IS: 383 CONCRETE
AL1
100
BLACK POWDER COATED ALUMINUM DETAIL "2"
IC BS2
INFORMATION COUNTER FRONT ELEVATION SCALE 1:25 CSS1
4500
GALVANIZED CORRUGATED ALUMINUM SHEET ZINC COATED
4290 400 225225
X C1 IS: 383 CONCRETE
AL1
X IC BS2
INFORMATION COUNTER PLAN VIEW SCALE 1:25
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
BLACK POWDER COATED ALUMINUM
Client :
Architect :
Interior Design Consultant :
Quantity Surveyor :
Date IHI INNOVATON CENTER [i-Base], 1ST FLOOR, YOKOHAMA ENGINEERING CENTER 2 BUILDING, 1 SHIN-NAKAHARA-CHO, ISOGO-KU, YOKOHAMA, KANAGAWA, 235-8501 JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
2-3-4 DAIBA, MINATO-KU, TOKYO 135-8622, JAPAN.
Project Name :
Drawing Title :
PROPOSED INTERIOR DESIGN FOR IHI INNOVATION CENTER AT YOKOHAMA, KANAGAWA, JAPAN
BUILT IN INFORMATION COUNTER PLAN VIEW FOR IHI INNOVATION CENTER
Scale :
1 : 25
Checked by : Ms. Norji
Date : 12 OCT 2021 Drawn by : YiQing.C
Dwg No. :
Rev No. :
MER_DWD_YQ_BS2_04A
01
60
C1
25 40
IS: 383 CONCRETE
625 CSS1 GALVANIZED CORRUGATED ALUMINUM SHEET ZINC COATED
400
AL1
DETAIL "1"
DETAIL "1"
DT 2
DETAIL "2"
SCALE 1:5
100
25
750
1100
BLACK POWDER COATED ALUMINUM HEAVY DUTY I BEAM
DT 1
BJ1 HEAVY DUTY ALUMINUM ALLOY DOUBLE RIVETED BUTT JOINT
IC SC-X
INFORMATION COUNTER SECTION X-X SCALE 1:10
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
Client :
Architect :
Interior Design Consultant :
Quantity Surveyor :
Date IHI INNOVATON CENTER [i-Base], 1ST FLOOR, YOKOHAMA ENGINEERING CENTER 2 BUILDING, 1 SHIN-NAKAHARA-CHO, ISOGO-KU, YOKOHAMA, KANAGAWA, 235-8501 JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
2-3-4 DAIBA, MINATO-KU, TOKYO 135-8622, JAPAN.
SCALE 1:5
Project Name :
Drawing Title :
PROPOSED INTERIOR DESIGN FOR IHI INNOVATION CENTER AT YOKOHAMA, KANAGAWA, JAPAN
BUILT IN BESPOKE FURNITURE SECTION AND BLOW UP DETAIL FOR IHI INNOVATION CENTER 1:10 / 1:5
Date : 12 OCT 2021
Checked by : Ms. Norji
Drawn by : YiQing.C
Scale :
Dwg No. :
Rev No. :
MER_DWD_YQ_BS2_04B
01
DOOR SCHEDULE LEGEND: TEMPERED GLASS WOODEN DOOR
1015
1015
665
665
2100
2200
2550
300 50
1330
FFL DOOR NO.
DESCRIPTION
D3
D1 STEEL HINGE DOUBLE DOOR
TYPE FRAME
STEEL HINGE DOUBLE DOOR
25MM THICK MATTE PAINT FINISH ALUMINUM FRAME
DOOR LEAF
25MM THICK MATTE PAINT FINISH ALUMINUM FRAME
2200MM X 1015MM X 5MM THK TEMPERED CLEAR GLASS
2100MM X 665MM X 25MM THK WOODEN DOOR WITH MATTE BLACK FINISH
MATTE BLACK FINISH SUS304 STAINLESS STEEL HEAVY DUTY HINGE 12MM FLOOR HINGE 10MM WALL HINGE
HINGES IRONMONGERY
MATTE BLACK FINISH SUS304 STAINLESS STEEL HEAVY DUTY HINGE 12MM FLOOR HINGE 10MM WALL HINGE
1000MM X 50MM SUS304 BAR IN MATTE BLACK FINISH
LOCKS, BOLTS STOP PULLS LOCATION
1000MM X 50MM SUS304 BAR IN MATTE BLACK FINISH
MATTE BLACK FINISH
MATTE BLACK FINISH
OFFICE ENTRANCE
STORAGE ROOM ENTRANCE
DOOR SCHEDULE
6050 1550
1550
2950
2100
2300
900
FFL DOOR NO.
D4 TYPE
DESCRIPTION
STAINLESS STEEL BUTT HINGE
SOFT CLOSING SLIDING DOOR ROLLER GEAR A6 32MM NA ALUMINIUM DOOR LOCK IN MATTE BLACK FINISH
STAINLESS STEEL LEVER TYPE HANDLE
LOCKS, BOLTS
MATTE BLACK FINISH
STAINLESS STEEL
STOP PULLS LOCATION
MEETING ROOM ENTRANCE
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
Description
2175MM X 1500MM X 12MM THK, 2200MM X 1425MM X 12MM THK TEMPERED CLEAR GLASS
2100MM X 900MM X 50MM THK ALUMINUM ALLOY
HINGES
No.
50MM THICK MATTE PAINT FINISH ALUMINUM FRAME
POWDER COATING FINISH
FRAME DOOR LEAF
IRONMONGERY
D5 ALUMINUM SLIDING DOOR
SINGLE SWING FIBRE GLASS DOOR
Client :
Architect :
PROJECT ROOMS
Interior Design Consultant :
Quantity Surveyor :
Date IHI INNOVATON CENTER [i-Base], 1ST FLOOR, YOKOHAMA ENGINEERING CENTER 2 BUILDING, 1 SHIN-NAKAHARA-CHO, ISOGO-KU, YOKOHAMA, KANAGAWA, 235-8501 JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
2-3-4 DAIBA, MINATO-KU, TOKYO 135-8622, JAPAN.
Project Name :
Drawing Title :
PROPOSED INTERIOR DESIGN FOR IHI INNOVATION CENTER AT YOKOHAMA, KANAGAWA, JAPAN
DOOR SCHEDULE FOR IHI INNOVATION CENTER
Scale :
1:50
Checked by : Ms. Norji
Date : 12 OCT 2021 Drawn by : YiQing.C
Dwg No. :
Rev No. :
MER_DWD_YQ_DS_05
01
SCHEDULE OF FINISHES FOR IHI INNOVATION CENTER [i-Base] YOKOHAMA JAPAN CODE
IMAGE
DESCRIPTION
SIZE
LOCATION
FLOOR FINISHES
SUZUKA KCT-704 GRANITE GREY LOW SHEEN MATTE POLISHED CONCRETE
F1
-
DOCK
BLANC
CO-LAB
GARDEN
DRY BAR
F2
GLOSSY POLISHED CONCRETE
F3
GOODHILL AW-23140 AGE WALNUT WOOD DECKING FLOORING
FERUNI NR02MCN MATTE POLISHED CONCRETE TILES
F4
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
Client :
Architect :
Interior Design Consultant :
-
IHI INNOVATON CENTER [i-Base], 1ST FLOOR, YOKOHAMA ENGINEERING CENTER 2 BUILDING, 1 SHIN-NAKAHARA-CHO, ISOGO-KU, YOKOHAMA, KANAGAWA, 235-8501 JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
PROJECT ROOM
RELAX
300MM X 300MM X 10MM THK
SOLO
Date 2-3-4 DAIBA, MINATO-KU, TOKYO 135-8622, JAPAN.
STORAGE ROOM
MALLSTREET
140MM x 2400MM X 23MM THK
Quantity Surveyor :
MEETING ROOM
Project Name :
Drawing Title :
PROPOSED INTERIOR DESIGN FOR IHI INNOVATION CENTER AT YOKOHAMA, KANAGAWA, JAPAN
SCHEDULE OF FINISHES FOR IHI INNOVATION CENTER
Scale :
1:50
Checked by : Ms. Norji
Date : 12 OCT 2021 Drawn by : YiQing.C
Dwg No. :
Rev No. :
MER_DWD_YQ_SOF_06A
02
CODE
IMAGE
DESCRIPTION
SIZE
LOCATION
WALL FINISHES
NIPPON PAINT SUPER MATEX WHITE PAINT
W1
TEMPERED CLEAR GLASS
W2
DOCK
SOLO
MEETING ROOM
STORAGE ROOM
CO-LAB
GARDEN
DRY BAR
RELAX
-
15MM THK
BLANC
W3
W4
TEMPERED CLEAR GLASS
6MM THK
MEETING ROOM
MILD IRON STEEL H BEAM
150MM X 150MM X 7MM THK
PROJECT ROOM
EXPOSED CEILING
-
WHOLE FLOOR
CEILING FINISHES
NA
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
Client :
Architect :
Interior Design Consultant :
Quantity Surveyor :
Date IHI INNOVATON CENTER [i-Base], 1ST FLOOR, YOKOHAMA ENGINEERING CENTER 2 BUILDING, 1 SHIN-NAKAHARA-CHO, ISOGO-KU, YOKOHAMA, KANAGAWA, 235-8501 JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
2-3-4 DAIBA, MINATO-KU, TOKYO 135-8622, JAPAN.
Project Name :
Drawing Title :
PROPOSED INTERIOR DESIGN FOR IHI INNOVATION CENTER AT YOKOHAMA, KANAGAWA, JAPAN
SCHEDULE OF FINISHES FOR IHI INNOVATION CENTER
Scale :
1:50
Checked by : Ms. Norji
Date : 12 OCT 2021 Drawn by : YiQing.C
Dwg No. :
Rev No. :
MER_DWD_YQ_SOF_06B
02
CODE
IMAGE
DESCRIPTION
SIZE
LOCATION
DOOR FINISHES
D1
TEMPERED CLEAR GLASS
MATTE BLACK FINISH WOOD
D2
D3
ALUMINUM ALLOY
2200MM X 1015MM X 5MM THK
BALCONY EXIT
2100MM X 665MM X 25MM THK
STORAGE ROOM
2100MM X 900MM X 50MM THK
STORAGE ROOM
2140MM X 1400MM X 5MM THK TEMPERED CLEAR GLASS
D4
2140MM X 1500MM X 5MM THK
PROJECT ROOM
2180MM X 1400MM X 5MM THK WINDOW FINISHES
TEMPERED CLEAR GLASS
WD1
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
Client :
Architect :
Interior Design Consultant :
15MM THK
Quantity Surveyor :
Date IHI INNOVATON CENTER [i-Base], 1ST FLOOR, YOKOHAMA ENGINEERING CENTER 2 BUILDING, 1 SHIN-NAKAHARA-CHO, ISOGO-KU, YOKOHAMA, KANAGAWA, 235-8501 JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
2-3-4 DAIBA, MINATO-KU, TOKYO 135-8622, JAPAN.
FACADE
Project Name :
Drawing Title :
PROPOSED INTERIOR DESIGN FOR IHI INNOVATION CENTER AT YOKOHAMA, KANAGAWA, JAPAN
SCHEDULE OF FINISHES FOR IHI INNOVATION CENTER
Scale :
1:50
Checked by : Ms. Norji
Date : 12 OCT 2021 Drawn by : YiQing.C
Dwg No. :
Rev No. :
MER_DWD_YQ_SOF_06C
02
F I R ER E Q U I R E ME N T SA C C O R D I N GT OU B B L
I HI I nnov aonCe nt e r[ i Ba s e ]ha v eaf e wfir efig h ngr e g ul aonsi nt he i rde s i g n. aon” l l a t ns I l e eRe Hos “ aons. t e pr r e nt I 133: UBBL s nt me e r qui e dUBBLr e i Appl *
ns g i tS i x yE nc e g r me E 172: UBBL s nt me e r qui e dUBBLr e i Appl *
n si l e e er ndhos pumpsa , s nk a t r e t wa , s pe aonofpi l l a t ns hei T n a tc ha rt e t tofwa e nsaj a dyme a e dear i ov tpr ngmus di l hbui c a e . h ng efig htoffir g i nl ngi di l hebui toft r nypa oa dt e r e v i l bede
be l l ha ss t i x oe st s e c c nda ta i x ye e or t hs c a 1]E [ notbe l l ha nds nsa g i es bl i s i yv l di a e dbyr e k r ma . s ng hi s ni ur aonsorf or c nyde dbya e ur c obs UAR” L KE d“ hewor et v ha l l ha ns g i ts i x ye r e v 2]E [ h t hwi g n150mmhi ha st s e snotl r ee el bl i g e nl i . de n18mmwi ha st s e snotl r ee sofl e ok r t s . y l on nous dc e t na umi l l bei l l ha nss g i ts i x e l 3]Al [ wo ht t dwi de i ov bepr l l ha nss g i ds e t na umi l l 4]I [ h. c a se nwa e e nfi e ha st s e mpsofnotl a ocl r t c e l e
s e obbi il orl sf or t c e t ede mok S 153: UBBL s nt me e r qui e dUBBLr e i NotAppl *
ng ni ope e Doorr . s e obbi il l l l na ei bl a l i a v da houl ss or t c e t ede mok S d houl ss or t c e t de omorphot a htbe g i dbyl e l ol r ont sc e c i v de . obby el mok oas nt ngi ni snotope ti ha it nal di e notbeus
s t i x oe et nc a t s di l e v a r ntoft me e ur s a Me 165: UBBL s nt me e r qui e dUBBLr e i Appl * s t s i x oe et nc a t s hedi st a e r na eofope s a hec nt I ntof epoi mot e tr hemos om t r df e ur s a lbeme l ha s not l l ha es nc a t s tdi c e r hedi tt ha dt de i ov ypr nc upa c oc . e nc a t s di l e v a r dt mie r hepe dst r hi t wodt e e c x e
. me doffla a e pr conofs i r t s Re 203: UBBL s nt me e r qui e dUBBLr e i Appl * UBBL162: F i r eDoor si nCompa r t me ntWa l l sa ndS e pa r angWa l l s . * Appl i e dUBBLr e qui r e me nt s F i r edoor si nCompa r t me ntWa l l sa r epr ov i de dt ohe l pc ont a i nt hes pr e a doffir e f orapr e de t e r mi ne da mountof me . I tus e dt odi v i debui l di ng si nt oma na g e a bl e r i s ka r e a s , pr ot e cngt hebui l di ngf a br i ca ndg i v i ngpe opl ei not he ra r e a soft he bui l di ngbe e rc ha nc e sofe s c a pi ng . J oi nt sbe t we e nfir e s e pa r ange l e me nt s , s uc ha sc ompa r t me ntwa l l sorfloor s , s houl dbefir e s t oppe dt oma i nt a i nr e s i s t a nc e c on nui t y ; a ndope ni ng sf or mbe rbe a ms , j oi s t s , pur l i ns , a ndr ae r s , a swe l l a spi pe s , duc t s , c ondui t s , orc a bl e st ha tpa s st hr oug ha nypa r tofafir e s e pa r ange l e me nt , s houl dbek e pta sf e wa spos s i bl e , k e pta ss ma l l a spr a cc a bl e , a ndfir e s t oppe d.
e t a i opr ppr na nga i y nf de ni ori t c a ntf a t mpor ni oa s l sa hefloori oft l a i r e t hema -T nd ea nc a t s i s e er offir l e v e orl i r upe sas r ngoffe i efloor t e r Conc u on. ol ngs oppi t s e fir nd ea t i ompos sofc pe y nt i a t r e sc a e r whe con, e ot pr l ddiona da e snotne ndoe oe oang ntc e c s ume nt ni ea r qui e r l l ngwi i floor l e e t s e nc ma or f r epe ndfir a l a ur t uc r t rs a l mi i hs t dwi e t uc r t ons ec r sa yfloor onr s ema t e r Conc . e doffir a e pr hes tt ns i a g ya t i ur c e rs ngowne di l hebui rt ndoffe a , s l l ewa sfir sa ie l bi pa a c d e t a l e r e ngafir i edur mok nds sa me doffla a e pr hes tt mi i ndl nga i ntfloor a t s i s e r e r i F n ori t c a saf da ope l e v yde l ng i s a e r nc ei v sha ng i r e ov oorc l F . ng di l nabui hi t ntwi de i nc i efloor l pi pe ousde i r a oduconofv r nt hei ht t ywi l l a i c pe s e , s e ntoffir opme l e v hede t . l nua sma hi opeoft c hes ondt y sbe ngi i r e ov safloorc ta pe r a sngofc e het T . s t pe r a c . t oduc ficpr i c pe maononas or nf ori rf e ur t c a nuf hema tt c a Cont
. e ngfir hi s ui xng nde nga ni r wa , cng e t De 225: UBBL s nt me e r qui e dUBBLr e i Appl * e v tha ngmus di l ybui r e v e , e dul he c hS nt e heT nt di fie i c pe Ass . e ngfir hi s ui xng nde nga ni r wa , cng e t nde si nt me e r qui e r ng di l hbui c a e 1489, hMS t ewi nc da or c c na i l l a t ns ndi na g i s De s e r t snot90me e t a oc tl ha ntt a dr ehy eonefir v tha s a e tl da houl s . s s e c c dea a g i ebr hefir omt r yf wa sa e r t n45me hi t tbutwi r pa a he dbyt e r qui e fr di de i ov dbepr houl nts a dr ehy fir l Addiona ng di l hebui aonoft oc ndl ea z i hes ndont pe butde R. . F G. D. . s e nc a i ppl ea orfir sf s e c c onofa i s i ov ndpr a
UBBL CONSTRUCTIONAL AND FIRE REQUIREMENTS FIRE RATING MATERIALS, LIFT LOBBIES AND SMOKE DETECTOR 75520
8635
3020
2575
2900
1800
3815
9585
3200
1455 2510
3330
2980
4440
4470
6250
5185
8800
3100
5250
23M 29M 46M
2340
13320
27560
33M
6300
6250
6250
6250
6250
6250
6250
6250
6250
18750
6250
6250
7620
24310 76420
FIRE RATING MATERIALS
2310
Lift lobby to be constructed with 2 hour fire rating materials. For example the Fire Retardant Intumescent can be considered as a coating in this building full of steel. Non-combustible materials are encouraged to use, such as
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
Client :
Architect :
LIFT LOBBIES
SMOKE DETECTOR AT LIFT LOBBY
Applied UBBL requirements The lift lobby available exceeds 2300mm is large enough to accommodate traffic that move in two directions. The lift is sited in the central area of the building to minimize the horizontal travel distance.
Not Applied UBBL requirements According to UBBL Clause 153, a smoke detector should be provided at the lift lobby. Sprinkler valves shall be in a safe and enclosed position on the exterior wall and shall be readily accessible to the Fire Authority. All sprinkler systems shall be electricity connected to the nearest fire station to provide immediate and automatic relay of the alarm when activated. In this case no sprinkler system ad smoke detectors are found in the building.
Under Section 165 UBBL the minimum walking distance to the lift exceeds 45m but do complied the maximum standard of travel distance of 30m two-thirds the permitted travel distance 45m, to the nearest fire door escape staircase. Maximum travel distance from left to lift lobby exceeds 45m but within 30m to reach the exit staircase is acceptable. Traveling distance from right to lift lobby within the range 45M is complied with UBBL.
Interior Design Consultant :
SPINKLER SYSTEM To be added on in the whole floor
Quantity Surveyor :
Date IHI INNOVATON CENTER [i-Base], 1ST FLOOR, YOKOHAMA ENGINEERING CENTER 2 BUILDING, 1 SHIN-NAKAHARA-CHO, ISOGO-KU, YOKOHAMA, KANAGAWA, 235-8501 JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
NIKKEN SEKKEI 2-18-3 LIDABASHI, CHIYODA-KU, TOKYO, JAPAN.
2-3-4 DAIBA, MINATO-KU, TOKYO 135-8622, JAPAN.
Under UBBL 225, detecting, warming and extinguishing fire, every building shall be served at least one fire hydrant located not exceed 45M from the nearest point of fire brigade access. The size and location of the building and the provision of access for fire appliances decide for any additional fire hydrant shall be provided.
Project Name :
Drawing Title :
PROPOSED INTERIOR DESIGN FOR IHI INNOVATION CENTER AT YOKOHAMA, KANAGAWA, JAPAN
UBBL REFLECTION FOR IHI INNOVATION CENTER
Scale :
NA
Checked by : Ms. Norji
Date : 12 OCT 2021 Drawn by : YiQing.C
Dwg No. :
Rev No. :
MER_DWD_YQ_UBBL_08
02
Assignment 2: Precedent Studies - A Bureau
GROUP WORK is a form of voluntary association of members benefiting from cooperative learning that enhances the total output of the activity than when done individually. We came to choose different real-life projects with their built environment having a similar concept with our design architecture module for Ministry of Environment and Resources office design. After looking through the presentation and infographic proposal, we choose the IHI Innovation Center office as the office implement outdoor design and created an open environment like a park or city takes shape and goes far beyond the conventional interior scale. The IHI Innovation Center’s space design ensures that the routine acts of noticing and discovering become starting points for innovation.
By incorporating full-scale manufacturing industry products such as H-beams into space, a miniature “everyday scene" was created to make it easier, to the craftsman's mind, to discover new perspectives. We went through some challenges in determining the dimensions and areas for the areas of the office only based on photographs found. Mostly the structures are custom-made design using the H beam and I beam. Thus, we must estimate and reproduce the drawings through division of task.
But not least, through this assignment, I have learned to identify the application of UBBL Malaysia in office interior spaces, especially the Fire Requirement in planning the office layout and materiality of the finishes providing not only comfortability but also safety considerations.
Lecturer: Ms. Nor Aziah Hassan | Ms. Norji Nasir
Bachelor Of Arts (Hons) In Interior Architecture
Lecturer: Ms. Nor Aziah Hassan | Ms. Norji Nasir
Assignment 1: Work From Home + Door Or Window
Furniture Layout Plan
This assignment requires students to choose, observe and measure personal workspace within the current living condition that have an opening either; a door or a window. The objective is to expose the students to the relevance and significance of drawing convention and construction detailing through capturing the level of detailing of opening sizes, frames, installation method, materiality and finishes considerations in proper 2D drawing format.
Section Drawing
Detailed Opening Plan
Detailed Opening Section and Blow-up
Window Schedule
Schedule of Finishes
Reflection
Lecturer: Ms. Nor Aziah Hassan | Ms. Norji Nasir
CABINET SECTION A-A
SECTION A-A
STUDY DESK
W01
SHELF
FG1
STUDY ROOM GLAZED PORCELAIN TILES 8.9 SQ. MTR
PRW_DWD_YQ_WP_03
1240MM(H) X 1200MM(W) LOUVRE WINDOW IN 3MM THK FROSTED GLASS C/W ALUMINUM FRAME IN WHITE PAINT FINISH
CABINET
SHELVING
GP1 300MM X 300MM X 7MM THK WHITE GLAZED PORCELAIN TILE FLOORING
WP1 STUDY DESK
EXISTING BRICK WALL IN GREEN PLASTER PAINT FINISH
D01
FLP SR
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
Date
Client :
FURNITURE LAYOUT PLAN FOR STUDY ROOM SCALE 1:25
Architect :
CG INTERIORS SDN BHD.
Interior Design Consultant :
Quantity Surveyor :
CHONG YI QING DOUBLE STOREY TERRACE HOUSE 44, PERSIARAN HALAMAN AMPANG 15, TAMAN HALAMAN AMPANG JAYA, 31350 IPOH, PERAK, MALAYSIA.
Project Name :
Drawing Title :
PROPOSED REFURBISHMENT WORK FOR CHONG YI QING AT IPOH PERAK MALAYSIA
FURNITURE LAYOUT PLAN FOR STUDY ROOM Scale :
(390061-D)
1 : 25
Checked by : Ms. Norji LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
Date : 11 Sept 2021 Drawn by : YiQing.C
CGI@CGSBID.COM [SA 0000153-X]
T : +60 8070 1111 F : +60 8075 1021
[SA 0000153-X]
Dwg No. :
Rev No. :
PRW_DWD_YQ_FLP_01
02
1ST FLOOR
CL
CP1 PRW_DWD_YQ_DT_04
10MM THK PLASTER CEILING W SELECTED WHITE PAINT FINISH
WP1 EXISTING BRICK WALL IN GREEN PLASTER PAINT FINISH
FG1
OPEN
1200MM X 1240MM LOUVRE WINDOW IN 6MM THK FROSTED GLASS C/W ALUMINUM FRAME IN WHITE PAINT FINISH
OPEN
GP1 OPEN
300MM X 300MM x 6MM THK WHITE GLAZED PORCELAIN TILE FLOORING
FFL
SC A NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
Date
SECTION A - A SCALE 1:25
Client :
Architect :
CG INTERIORS SDN BHD.
Interior Design Consultant :
Quantity Surveyor :
CHONG YI QING DOUBLE STOREY TERRACE HOUSE 44, PERSIARAN HALAMAN AMPANG 15, TAMAN HALAMAN AMPANG JAYA, 31350 IPOH, PERAK, MALAYSIA.
Project Name :
Drawing Title :
PROPOSED REFURBISHMENT WORK FOR CHONG YI QING AT IPOH PERAK MALAYSIA
STUDY ROOM SECTION A-A Scale :
(390061-D)
1 : 25
Checked by : Ms. Norji LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
Date : 11 Sept 2021 Drawn by : YiQing.C
CGI@CGSBID.COM [SA 0000153-X]
T : +60 8070 1111 F : +60 8075 1021
[SA 0000153-X]
Dwg No. :
Rev No. :
PRW_DWD_YQ_SC_02
02
OUT
IN
DETAIL "1"
6'' GALVANIZED ALUMINUM CLIPS IN MILL FINISH GRAY SILVER
500MM x 150MM 3MM THK FROSTED GLASS PANEL
GALVANIZED ALUMINUM BEARING IN MILL FINISH GRAY SILVER
Ø 20MM GALVANIZED ALUMINUM SAFETY BARS GALVANIZED ALUMINUM MULLION IN MILL FINISH GRAY SILVER GALVANIZED
WP LW
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
Date
LOUVRE WINDOW LAYOUT PLAN SCALE 1:5
Client :
Architect :
CG INTERIORS SDN BHD.
Interior Design Consultant :
Quantity Surveyor :
CHONG YI QING DOUBLE STOREY TERRACE HOUSE 44, PERSIARAN HALAMAN AMPANG 15, TAMAN HALAMAN AMPANG JAYA, 31350 IPOH, PERAK, MALAYSIA.
Project Name :
Drawing Title :
PROPOSED REFURBISHMENT WORK FOR CHONG YI QING AT IPOH PERAK MALAYSIA
STUDY ROOM LOUVRE WINDOW LAYOUT PLAN Scale :
(390061-D)
1:5
Checked by : Ms. Norji LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
Date : 11 SEPT 2021 Drawn by : YiQing.C
CGI@CGSBID.COM [SA 0000153-X]
T : +60 8070 1111 F : +60 8075 1021
[SA 0000153-X]
Dwg No. :
Rev No. :
PRW_DWD_YQ_WP_03
01
2100MM
DETAIL "2" GALVANIZED ALUMINUM MULLION IN MILL FINISH GRAY SILVER Ø 20MM GALVANIZED ALUMINUM SAFETY BARS GALVANIZED ALUMINUM FINISH MULLION 500MM X 150MM 3MM THK FROSTED GLASS PANEL HOLD ONTO 6" GALVANIZED ALUMINUM CLIPS IN MILL FINISH GRAY SILVER
LW DT1
IN
OUT
DETAIL "1" SCALE 1:5
GALVANIZED ALUMINUM BEARING IN MILL FINISH GRAY SILVER 110MM GALVANIZED ALUMINUM FLAT HANDLE IN MILL FINISH GRAY SILVER 860MM
SILL
LW SC
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
Date
LOUVRE WINDOW SECTION
LW DT2
SCALE 1:10
Client :
Architect :
CG INTERIORS SDN BHD.
Interior Design Consultant :
Quantity Surveyor :
CHONG YI QING DOUBLE STOREY TERRACE HOUSE 44, PERSIARAN HALAMAN AMPANG 15, TAMAN HALAMAN AMPANG JAYA, 31350 IPOH, PERAK, MALAYSIA.
DETAIL "2" SCALE 1:5
Project Name :
Drawing Title :
PROPOSED REFURBISHMENT WORK FOR CHONG YI QING AT IPOH PERAK MALAYSIA
STUDY ROOM LOUVRE WINDOW SECTION AND BLOW UP DETAILS Scale :
(390061-D)
REFER TO DWG
Checked by : Ms. Norji LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
Date : 11 SEPT 2021 Drawn by : YiQing.C
CGI@CGSBID.COM [SA 0000153-X]
T : +60 8070 1111 F : +60 8075 1021
[SA 0000153-X]
Dwg No. :
Rev No. :
PRW_DWD_YQ_DT_04
01
WINDOW SCHEDULE
860MM
FFL
W01
WINDOW NO.
DESCRIPTION
TYPE
LOUVRE WINDOWS
FRAME
1200MM X 1240MM X 50MM THICK WHITE PAINTED ALUMINIUM FRAME
WINDOW LEAF
IRONMONGERY
500MM X 150MM X 3MM THK FROSTED GLASS
HINGES
MILL FINISH GRAY SILVER GALVANIZED ALUMINUM
LOCKS, BOLTS
MILL FINISH GRAY SILVER GALVANIZED ALUMINUM
STOP PULLS
MILL FINISH GRAY SILVER GALVANIZED ALUMINUM STUDY ROOM
LOCATION
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
Date
Client :
Architect :
CG INTERIORS SDN BHD.
Interior Design Consultant :
Quantity Surveyor :
CHONG YI QING DOUBLE STOREY TERRACE HOUSE 44, PERSIARAN HALAMAN AMPANG 15, TAMAN HALAMAN AMPANG JAYA, 31350 IPOH, PERAK, MALAYSIA.
Project Name :
Drawing Title :
PROPOSED REFURBISHMENT WORK FOR CHONG YI QING AT IPOH PERAK MALAYSIA
WINDOW SCHEDULE
Scale :
(390061-D)
1 : 20
Checked by : Ms. Norji LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
Date : 11 SEPT 2021 Drawn by : YiQing.C
CGI@CGSBID.COM [SA 0000153-X]
T : +60 8070 1111 F : +60 8075 1021
[SA 0000153-X]
Dwg No. :
Rev No. :
PRW_DWD_YQ_WS_05
01
AREA
WALL
FLOOR
STUDY ROOM
CEILING
DOOR
CODE: GP1
CODE: WP1
CODE: CP1
300MM(L) x 300MM(W) 7MM THK WHITE GLAZED PORCELAIN TILES
10MM PLASTER WALL W SELECTED GREEN PAINT
PLASTER CEILING W SELECTED WHITE PAINT FINISH
BRAND: JOTUN PAINT
WINDOW
CODE: V1
CODE: FG1
SIZE: 2000MM(H) X 820MM(W) 35MM THK PARTICLE CORE WOOD DOOR W WHITE PAINTED BRAND: JOTUN PAINT VENEER FINISH
SIZE: 420MM(L) X 150MM(W) X 6MM THK FROSTED GLASS C/W ALUMINUM FRAME IN WHITE PAINT FINISH
BRAND: WHITE HORSE CERAMIC
NOTE : THIS DRAWING IS COPYRIGHT DRAWING. THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO DESIGNER BEFORE PROCEEDING.
No.
Description
Date
Client :
Architect :
CG INTERIORS SDN BHD.
Interior Design Consultant :
Quantity Surveyor :
CHONG YI QING DOUBLE STOREY TERRACE HOUSE 44, PERSIARAN HALAMAN AMPANG 15, TAMAN HALAMAN AMPANG JAYA, 31350 IPOH, PERAK, MALAYSIA.
Project Name :
Drawing Title :
PROPOSED REFURBISHMENT WORK FOR CHONG YI QING AT IPOH PERAK MALAYSIA
SCHEDULE OF FINISHES
Scale :
(390061-D)
1 : 25
Checked by : Ms. Norji LOT 9, JALAN SATU (JALAN CJ1/1 ), KAWASAN PERUSAHAAN CHERAS JAYA, OFF JALAN BALAKONG, 43200 CHERAS, SELANGOR DARUL EHSAN, MALAYSIA.
Date : 11 SEPT 2021 Drawn by : YiQing.C
CGI@CGSBID.COM [SA 0000153-X]
T : +60 8070 1111 F : +60 8075 1021
[SA 0000153-X]
Dwg No. :
Rev No. :
PRW_DWD_YQ_SF_06
01
Assignment 1: Work From Home + Door Or Window
OBSERVATION is a method to help understanding the users, working environment, how users behave in the space and how the product is being used. Louvre window is an opening that I choose to analyze in this assignment. This window is often seen in the kampung houses in Malaysia, wooden made. Traditional louvres were used in homes to allow for ventilation into the home without letting in the rain. The practical design of louvres has since evolved with modern architecture to become an attractive feature in any home. I have also seen an automated louvre window *blank*
design when I flipped through a collection of Tropical Malaysian Houses. This makes me eagerly in discovering its practicality and affordability. Also, I did research on the ironmongeries of the window in understanding the functions and installation method. Through sketches and research, I managed to capture the interesting and beautiful constructional details of this louvre window and this assignment helps me in understanding the difference and improvements in application of a same design in different era.