YokeHengNG_Architecture Portfolio_2

Page 1

YOKE HENG NG architecture portfolio - 2012 - 2019 e: yokeheng.ng@gmail.com p: 04 6649 0005



CONTENTS SELECTED WORKS Timez Hotel Malacca, MY

Nest House Malacca, MY

8 Residence Malacca, MY

Acculex Office Malacca, MY

House No. 58 Malacca, MY

Bites Cafe Malacca, MY

Interposition - Transforming Parramatta Wharf Academic, UNSW + SEU Joint Studio

01 09 15 27 33 39 43

OTHERS Sketches

53

Pottery

55

Painting

56

Stage Set-up / Props Making

57


Timez Hotel 2014-2017, Jonker Street, Malacca, MY Responsibilities DESIGN DEVELOPMENT, SUBMISSION, TENDER DOCUMENTATION, CONSTRUCTION DETAIL, COORDINATION, MATERIAL SELECTION, MURAL / CRAFTS, SITE INSPECTION, COMPLETION

Client Privilege Vantage Sdn. Bhd. Site / Built-up Area 202.5 sqm / 790.2 sqm Budget RM 2.5 mil (AUD$ 910,500) Consultants LEAD Engineering C&S City MNE Consultant M&E Goodwaters Engineering Waste Ctrl Contractor Hong Lai Huat Construction Team Fern Tan, Yoke Heng Ng

01

Nestled in the heart of the UNESCO heritage site of Malacca stands a chic venue -- Timez Modern Heritage Hotel. Originally an abandoned apartment block tucked in between a row of double storey shophouses, it is strategically located on Jalan Kasturi, a street perpendicular to the famous Jonker Walk with its lively night markets and other tourist attractions. Creating an “IDENTITY” for it became the focus for this project. Based on Melaka’s rich history and culturally charged background, concepts of Portuguese, Dutch, British, Peranankan and Chinese were drawn to distinguish its 15 suites with tasteful artworks, meticulously crafted and packed with vibrant thematic colours -- namely red, yellow, orange, blue and green. All rooms are naturally ventilated with abundance of natural light. In contrast to the rooms, the hotel’s cafe opted for a minimalist-look with a view to an exposed brick party wall in reminiscence of the historical forts, while the lobby features the client’s “Swatch” collections, neatly displayed in honey-combed frames to enhance the concept of ‘time’.


Sri Poyyatha Kuil

Kg. Kling Mosque

Cheng Hoon Teng Temple

Dutch Square

ng lki a w ins dius m ra 0

1

Jonker Walk Markets

Malacca Sultanate Palace

Proclamation of Independence Memorial

Peranakan Museum

St. Paul’s Hill

UNESCO Core Zone 38.62 hectares Buffer Zone 134.03 hectares Total 172.65 hectares

Malacca River Malacca River (night life)

Maritime Museum

04

Santiago Fort


k ll

k

55

10 10

13 13

jj ss

cc

ii

r

q e 4

DN

99

DN

12 12

DN

15 15 DN

gg

hh

UP

3

ee

88

UP

ee

11

UP

ee

14 14

UP

ee d

cc

m ff

d

m m ff

bb

d

m m

m m

ff

DN

ff

cc

cc

DN

UP

nn

pp

UP

UP

dd 11

2

66

77

oo

aa

Ground Floor Plan

First Floor Plan

Second Floor Plan

Third Floor Plan

Fourth Floor Plan

LEGEND Suites / Art works 1. “Cherki” Card 2. Clog Shoes 3. “Manek” Beads 4. “Azulejos” Tiles 5. Pop Art 6. Afternoon Tea 7. Peranakan Wedding 8. Oriental Beauty 9. Dutch Square 10. Oriental Screen

03

Other spaces 11. 12. 13. 14. 15.

Hundred Peonies Oriental Lattice “Fortaleza” “Kapit” Mould Union Jack

a. b. c. d. e. f. g. h. i. j.

Landscape Reception Utility Existing Staircase New Staircase Elevator Cafe Courtyard Kitchen Powder Room

k. Suction Tank Room l. Meeting Room m. Lift Lobby n. Lounge o. Open Deck p. Office q. Staff ’s Bathroom r. Pump Room s. Services

0

1

2

5


Y

p

s

e

X

p

X

13.487

Y

d tenibaC lacirtcelE gnirewoL ycnegremE

n

13

m

c

10

m

c

5

m

10.386

n

o

6

7.167

f

1

3.912

k

b

j

i

m

b

0.000

Section X-X

Section Y-Y

Front Elevation 80

75

70

65

60

55

50

45

40

35

30

25

20

15

10

5

0

350

10 (gap)

40

85

50

90

85

842

285 15

10 10

110

125

75 85

115

12

31

28

15

35

80 38

626

75

65

10

35 170

10

105

95

timber frame

15

10

75

100

15 15 25

107 105

45

Dutch Square Bedhead Detail

TOTAL 524 302 1637 2382 640 580 636 636

Bead Curtain Design

04


12

2

3

15 hotel suites with unique art pieces highlight their individualities, accentuated by subtle colours conforming to the design concept. The images of each rooms as laid out here corresponds to the brief timeline of important occurrences in Malacca (as set out at the bottom) — since it was founded until the British Colonisation, whereas the numbers indicate the room’s respective sequencing or location in the floor plans and the cross section on the right. 8

11

10

7

Parameswara founded ‘Melaka’

Arrival of Chinese

(1400)

(1405)

1

Peranakan Community


0

1

2

5

15

6

13

4

9

14

5

Conquest by Portuguese

Dutch Reign

British Colonisation

(1511)

(1641)

(1824)


16

07

17


18

19

21

18

20

21

16 Material sourcing & detailing (clockwise from top left): clog shoes, ‘kepit’, moulds, beads, peony teaspoons. 17 643 pieces of beauty powder boxes are used & oriented randomly to portray the word ‘美 ‘ or ‘Beauty’ in Mandarin language. 18 Main lobby with the honeycomb shelves displaying the “Swatch” collection. 19 The main facade’s window design pays tribute to the local timber louvered shutters system that adorns the ‘Straits Ecclectic’ architecture of the olden days. 20 Connection to the fire exit, corridor & hotel rooms. 21 Interior of ‘Super Rabbit’ Cafe. Its logo resembling a rabbit is carved on the new wall to compliment the existing exposed brick party wall.

Photos credit: Mazlan

08


Nest House 2015-2017, No.7, Hillir Alley, Malacca, MY

Inspired by a delicacy which the client enjoyed -- bird nest, a 3 storey guest house is designed in place of a run-down single storey terrace house. The project site is within close proximity to the UNESCO zones, commercial area and other tourist attractions.

Envisioned to be sustainable and minimalist, the spaces are logically positioned and oriented to optimise Responsibilities natural lighting and ventilation, with DESIGN DEVELOPMENT, SUBMISSION, CONSTRUCTION DETAIL, COORDINATION, a layer of vent blocks that acts both as a privacy screen to separate the SITE INSPECTION, COMPLETION bedrooms from the exterior (which overlooks into an existing greenery), and filtering the hot tropical sun. Client Mr. Tong Chye Kiam, Ms. Ee Chwee Hua, In addition, heat-reflecting low-E glass is applied to all windows and Ms. Lee Yok Lan sliding doors to provide additional indoor comfort, while ceiling fans are Site / Built-up Area installed in each room to improve 156.8 sqm / 367.6 sqm natural air circulation. The concrete floors are polished whereas the Budget exposed concrete ceiling retained its RM 1.2 mil (AUD$ 436,000) untreated rawness. Consultants HYJ Engineering C&S Goodwaters Engineering Waste Ctrl Contractor LKM Bina Maju Construction Team Fern Tan, Yoke Heng Ng, Tin Geak Lim Artist Melanie Bayoud (Embee Designs)

09

Ms. Melanie Bayoud, an Australian psychiatric nurse turned artist, was involved in perfecting the interior with her playful art pieces and furniture selections. Her ‘big bird’ mural on the house’s entry facade adds a finishing touch that complements the ‘Nest’.


10


X

X

New Insertion

Addition + Omission

Shading + Privacy


LEGEND

10 9

11

11

5

11

5 8

6

UP

8

UP

5

16

UP

5

6

2

DN

13

8

8 3

8 12

12

13

8 15

6

5 DN

4

1. 2. 3. 4. 5.

14 DN

Lobby Reception Pantry / Kitchen Planter Bedroom with En Suite Bathroom 6. Staircase 7. Garden 1 (common) 8. Air Well 9. Garden 2 (private) 10. Access to backlane 11. A/C Ledge 12. Storage / Utility 13. Spiral Staircase 14. Outdoor Deck 15. Upper Roof / Viewing Platform 16. Lower Roof / Water Tank Storage

1 5

20' SETBACK LINE

7

0 1 2

5

main street

Ground Floor Plan

Front Elevation

First & Second Floor Plans

Lower Deck Floor Plan

Rear Elevation

Upper Deck Floor Plan

Right Elevation


01

02

03

04

15

06

07

Photos credit: Client + Yoke

08

01 Light is filtered through the vent blocks & into the lobby / reception area, creating a welcoming gesture. 02 The use of wire-mesh for the pantry echoes the concept of ‘bird nest’ to create a porous effect. 03 Corridor cum gallery space to display more artworks by the artist. 04 The lower deck level is ideal for social gatherings. 05 Another Instagram-worthy ‘Wings’ to commemorate one’s stay at the Nest House. 06 Linear linkage from one bedroom to the other. 07 The roofscape framed by the high window in this suite is another artwork on its own. 08 Located at the back of Ground Floor Level, this is the only suite with a private garden.


Artist Collaboration

The artist, Ms. Melanie Bayoud (as pictured on the right) contributed tremendously for this project. She has been involved in the design of the entry door handle, framed artworks, furnishings and all murals found in this house, notably the iconic ‘Big Bird’.

14


8 Residence 2012- present, Padang Temu, Malacca, MY

This large stratified housing project encompasses several housing types. Separated into 2 parcels, certain rows have extensive view towards the Straits of Malacca. The project is grouped into: Parcel 1: Bungalow L, M, S, or XS Bungalow SU-A Bungalow DB Bungalow BD Semi-D

Responsibilities DESIGN DEVELOPMENT, SUBMISSION, CONSTRUCTION DETAIL, COORDINATION, Parcel 2: SITE INSPECTION, COMPLETION Terrace TA Terrace TB Terrace TC Client Starwatt Realty Sdn. Bhd. Site / Built-up Area 238,814 sqm / 250 - 650 sqm range Budget confidential Consultants LEAD Engineering C&S City MNE Consultant M&E Jurukur Prima Surveyor Century West Engineering Waste Ctrl Chee Brothers Landscaping Landscape Contractor PGS Construction Team (in collaboration with PCL/ IWSB) Yoke Heng Ng, Fern Tan, TIn Geak Lim, Azieazriena, Jovina Ann Lee, Woon San Hau, Alan Goh, Chia Yen Fong

15

- 17 units - 1 unit - 17 units - 3 units - 210 units

- 10 units - 46 units - 50 units

The first parcel facing seaward originally consisted of 3-storey bungalows, but was later redesigned to include semi-Detached houses and 2-storey bungalows due to market demands. Hence, the building plans had to be resubmitted to obtain local council’s further approvals. The land is divided into phases to better manage the project & delivery upon completion. The other parcel includes 3-storey super-link houses & 2-storey terraces without direct access to the seafront. Both parcels are gated-guarded properties equipped with a club house and a shared swimming pool.

01


3

Parcel 1

2

13 12

4 5

Str aits

Parcel 2 11

6 7 8 of M

9

ala

cca

Location Plan & Phase Allocation Scale 1:20 000

Site Plan Scale 1:4500

10

Malacca River

1

Pad ang Tem u In dah St.


02

01 Image on Page 15: Bungalow types L & M as viewed from the swimming pool. 02 Entrance to 8 Residence. 03 Aerial view showing the completion of 1st to 3rd phases.

17

03


04

04 Entrance to Super Link 8 Residence. 05 Perspective view of the completed 3 storey terraces (type TB). 05

18


Club house

Bungalow L

Bungalow M



Bungalow S

Bungalow XS

Semi-D (bare unit)


Photos credit: Mazlan + Client + Yoke


SU-A

Building Typology SD - B

SD - B2

PRODUCED BY AN AUTODESK STUDENT VERSION

SD - B1

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

L

M

S

XS

TB

DB

TC

BD


PRODUCED BY AN AUTODESK STUDENT VERSION

B B1

C

C1

D

C1

C

9144 [30'] 3657 [12']

5487 [18']

2134 [7']

B1 B

A1

A

9144 [30']

5486 [18'] 1524 [5']

5487 [18'] 2743 [9'] 3963 [13']

2743 [9'] 3963 [13']

A 3048 [10']

2134 [7']

2134 [7']

3048 [10']

INSPECTION CHAMBER POSITION & NO. TO BE DETERMINED ON SITE.

R dp 150 (approx.)

dp 150 (approx.)

UTILITY 2 TILES

5

dp 100 (approx.)

5

dp 100 (approx.)

4572 [15'] 2843 [9'-4"]

dp 100 (approx.)

UPVC SOIL & VENT PIPE.

A/C LEDGE

115mm THK. BRICK WALL WITH 19mm THK. CEMENT PLASTERING ON BOTSIDES.

dp 25 (approx.)

BEDROOM 2

dp 50 (approx.)

BEDROOM 2

TILES

TILES

BEDROOM 4

dp 25 (approx.)

dp 50 (approx.)

TILES

UP

ALUMN. FRAME SLIDING DOOR TO MANUF'S DETAIL.

dp 150 (approx.)

UP

dp 150 (approx.)

DINING

TILES

DINING

TILES

3b

R.C. STAIRCASE TO ENGR'S DETAIL.

dp 150 (approx.)

PATIO

3c

BEDROOM 3

RC FLOOR SLAB TO ENGR'S DETAIL.

TILES

TILES

BATH 2 BATH 2 TILES

dp 25 (approx.)

BEDROOM 4

dp 50 (approx.)

TILES

PATIO

TILES

TILES

UTILITY

UTILITY

TILES

Q

TILES

GREEN

GREEN

FOYER

LIVING TILES

FOYER

TILES

610

3 PARTY WALL 115mm THK. BRICK WALL WITH 19mm THK. CEMENT PLASTERING ON BOTHSIDES UP TO 225mm ABOVE ROOF LEVEL.

LIVING

TILES

TILES

METAL FRAME TIMBER DOOR TO MANUF'S DETAIL.

dp 150 (approx.)

DN

FAMILY HALL

TILES

ALUMN. FRAME SLIDING DOOR TO MANUF'S DETAIL.

BALCONY

TILES

TILES

dp 100 (approx.)

dp 100 (approx.)

R.C. STAIRCASE TO ENGR'S DETAIL

MASTER BATH

Q

TILES

dp 50 (approx.)

MASTER BATH

dp 50 (approx.)

dp 25 (approx.)

dp 25 (approx.)

MASTER BEDROOM

MASTER BEDROOM

TILES

TILES

Q

TILES

PARTY WALL 115mm THK. BRICK WALL WITH 19mm THK. CEMENT PLASTERING ON BOTHSIDES UP TO 225mm ABOVE ROOF LEVEL.

6096 [20']

2a

dp 150 (approx.)

dp 150 (approx.)

TILES

TILES

3a Q

DN

FAMILY HALL

BALCONY

2 1b 1524 [5']

2134 [7']

ALUMN. FRAME WINDOW TO MANUF'S DETAIL.

CAR PORCH

CAR PORCH GREEN dp 150 (approx.)

DISCHARGE TO NEAREST SEWER LINE.

1 1524 [5']

P.O. / WM M

P.O. / WM M

R

RC

FROM SAMB WATER SUPPLY.

2

3

4

5

FLOOR AREA CALCULATION FOR 2 STOREY SEMI-D ( TYPE A )

10

unit

COVERED AREA

level

SQ.M

SQ.FT

SQ.M

SQ.FT

GROUND FLOOR

134.30

1445.60

72.60

781.50

FIRST FLOOR

156.30

1682.40

9.10

98.00

TOTAL

290.60

3128.00

81.70

879.50

TOTAL BUILT-UP

:

331.45 SQ.M / 3567.70 SQ.FT

18 UNIT 15 UNIT 1 UNIT 1 UNIT 2 UNIT 1 UNIT 1 UNIT 1 UNIT 14 UNIT 28 UNIT 24 UNIT 24 UNIT 32 UNIT 1 UNIT 34 UNIT 3 UNIT 30 UNIT 24 UNIT

DAN PEMBANGUNAN PERUMAHAN DI ATAS SEBAHAGIAN LOT 1171, SEBAHAGIAN LOT 1172 DAN SEBAHAGIAN PT 1771, MUKIM PADANG TEMU,DAERAH MELAKA TENGAH, MELAKA. YANG MENGANDUNGI:FASA 13: RUMAH TERES 2 TINGKAT (22' X 70')

-- 39 UNIT

TETUAN STARWATT REALTY SDN BHD

ARKITEK

P LARCHITECT

10% vent. req. 5% vent. req. 10% vent. prov. 5% vent. prov. adjustable adjustable fixed (sq.m) fixed (sq.m) (sq.m) (sq.m)

sq.m

FOYER LIVING

67.30

( 737072-T )

NAMA : DATUK POH GEOK SENG (DIRECTOR) NO.2 JALAN IMJ 1, TAMAN INDUSTRI MALIM JAYA, 75250 MELAKA. TEL : 06 - 337 3333 / 012-7916553 FAX : 06 - 336 5678

R

AREA

OPEN COVERED AREA

-------------------

R.C. FLAT ROOF TO ENGR'S DETAIL.

NO 23-3, 2nd Floor, Jalan SS 23/11, Taman SEA, 47400 Petaling Jaya, Selangor Darul Ehsan.

VENTILATION CALCULATION FOR 2 STOREY SEMI-D ( TYPE A ) GROUND FLOOR

1

RC FLAT ROOF

FIRST FLOOR PLAN

GROUND FLOOR PLAN 0

RC FLAT ROOF

1

R.C. COLUMN TO ENGR'S DETAIL. RC

YANG MENGANDUNGI:FASA 1: - RUMAH BANGLO 3 TINGKAT - RUMAH BANGLO 2 TINGKAT - DEWAN SERBAGUNA - PONDOK PENGAWAL - PENCAWANG ELEKTRIK - RUMAH SAMPAH - BANGUNAN UTILITI FASA 2: - RUMAH BANGLO 2 TINGKAT - RUMAH BERKEMBAR 2 TINGKAT FASA 3: - RUMAH BERKEMBAR 2 TINGKAT FASA 4: - RUMAH BERKEMBAR 2 TINGKAT FASA 5: - RUMAH BERKEMBAR 2 TINGKAT FASA 6: - RUMAH BERKEMBAR 2 TINGKAT FASA 7: - RUMAH BANGLO 2 TINGKAT - RUMAH BERKEMBAR 2 TINGKAT FASA 8: - RUMAH BANGLO 2 TINGKAT - RUMAH BERKEMBAR 2 TINGKAT FASA 9: - RUMAH BERKEMBAR 2 TINGKAT

TANDATANGAN TUAN TANAH & TUAN BANGUNAN

TILES

dp 150 (approx.)

CADANGAN PEMBANGUNAN PERUMAHAN BERPAGAR & BERPENGAWAL DI ATAS LOT 1160-1164, 1166, 1167, 1169, 1170, SEBAHAGIAN LOT 1171, PT 1770 & SEBAHAGIAN PT 1771, MUKIM PADANG TEMU,DAERAH MELAKA TENGAH, MELAKA.

TETUAN STARWATT REALTY SDN BHD ( 737072-T )

6.73

3.37

11.10

5.55

DINING WET KITCHEN

18.10

1.81

0.91

2.50

1.25

BEDROOM 5

16.70

1.67

0.84

1.70

0.85

BATH 4

4.30

0.43

0.22

UTILITY 1

5.90

0.59

0.30

UTILITY 2

8.90

0.89

0.45

0.25

FIRST FLOOR

7011 [23'] 3353 [11']

TILES

GREEN

TAJUK PELAN PINDAAN KEPADA PELAN YANG TELAH DILULUSKAN DALAM FAIL NO: MBMB/JKB. 03060-10-2011 PADA TARIKH 21SEPTEMBER 2012 BAGI:-

UNTUK

1a

1139

1a

Tel : 03 - 78808127 / 28 sq.m

FAMILY HALL

23.40

2.34

1.17

7.00

3.50

MASTER BEDROOM

46.40

4.64

2.34

4.90

2.45

BEDROOM 2

23.60

2.36

1.18

2.80

BEDROOM 3

13.40

1.34

0.67

1.70

0.85

BEDROOM 4

12.30

1.23

0.62

1.70

0.85

5.60

0.56

0.28

MASTER BATH

0.80

10% vent. req. 5% vent. req. 10% vent. prov. 5% vent. prov. adjustable adjustable fixed (sq.m) fixed (sq.m) (sq.m) (sq.m)

AREA

Fax : 03 - 78808130

TANDATANGAN ARKITEK :Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan bersetuyu menerima tanggungjawab penuh dengan sewajarnya.

1.40 LEMBAGA ARKITEK MALAYSIA

Ar. Lim Pay Chye

ARKITEK PROFESIONAL No. Pendaftaran LAM : A/L 162

0.30

BATH 2

4.20

0.42

0.21

0.30

BATH 3

4.20

0.42

0.21

0.25

DESIGN CONSULTANT

idea workshop sdn bhd ( 676351 - P )

NO. 85, JALAN TENGKERA, 75200 MELAKA. 3c A 3048 [10']

A1

B B1

C

9144 [30'] 5486 [18']

C1

D 2743 [9']

C1 2743 [9']

C

B1 B

A1

A

9144 [30'] 5486 [18']

1 3048 [10'] 1524 [5']

1a 7011 [23'] 3353 [11']

1b 2 2a 2134 [7'] 610

3 4419 [14'-6"] 3809 [12'-6"]

3a

3b

4a 4b

4

17373 [57'] 4297 [14'-1"] 1647 [5'-5"] 5944 [19'-6"]

4c

5

6

4572 [15']

R.C. BEAM & SLAB TO ENGR'S DETAIL.

4419 [14'-6"] 3345 [11']

Lower Roof Lev.

2438 [8']

ALUMN. FRAME WINDOW TO MANUF'S DETAIL. MASTER BATH

MASTER BATH

PARTY WALL 115mm THK. BRICK WALL WITH 19mm THK. CEMENT PLASTERING ON BOTHSIDES UP TO 225mm ABOVE ROOF LEVEL.

1st Flr. Lev.

DINING

UTILITY

UTILITY

DINING

PATIO

115mm THK. BRICK WALL WITH 19mm THK. CEMENT PLASTERING ON BOTHSIDES.

Grd. Flr. Lev.

METAL ROOFING CONSTRUCTION TO ENGR'S DETAIL.

FAMILY HALL

MASTER BEDROOM

BATH 2

115mm THK. BRICK WALL WITH 19mm THK. CEMENT PLASTERING ON BOTHSIDES.

BEDROOM 2

R.C. BEAM & SLAB TO ENGR'S DETAIL. R.C. STAIRCASE TO ENGR'S DETAIL.

RC STAIRCASE TO ENGR'S DETAIL.

PATIO

PARAPET WALL WITH CEMENT PLASTERING ON BOTSIDES.

1st Flr. Lev.

4125 [13'-6"]

4125 [13'-6"]

150 GALLONS RAINWATER HARVESTING TANK ON SUPPORT TO ENGR'S DETAIL.

Lower Roof Lev.

ALUMN. FRAME WINDOW TO MANUF'S DETAIL. CAR PORCH

FOYER

UTILITY

DINING

WET KITCHEN

YARD

M.S. FRAME TIMBER DOOR TO MANUF'S DETAIL.

Grd. Flr. Lev.

SECTION Q-Q

Email : ideawork.mlk@gmail.com

NOTES:-

5486 [18']

Upper Roof Lev.

4419 [14'-6"] 3345 [11']

TOTAL 400 GALLONS WATER STORAGE TANK ON SUPPORT TO ENGR'S DETAIL.

Upper Roof Lev.

Tel : 06 - 292 1456 Fax : 06 - 281 6496 3048 [10']

1524 [5']

METAL ROOFING CONSTRUCTION TO ENGR'S DETAIL.

1. Dimensions and specifications are merely indicative and subject to construction requirements and allowable tolerance. 2. All groove lines and mouldings are merely indicative and subject to confirmation by the Architect. 3. All dimensions of drops and risers are mere estimate and may vary according to fall / slope and subject to Architect's confirmation. 4. All roof trusses outlook are merely indicative and subject to Engineer's design. 5. All mechanical and electrical provisions to follow the details and specifications of the M&E Engineer and subject to M&E Engineer's final on-site adjustments. 6. All civil and structural provisions to follow the details and specifications of the C&S Engineer and subject to C&S Engineer's final on-site adjustments. 7. Any discrepancy and / or divergence is / are allowable as determined by the Architect. 8. All green areas / landscape, if any, is / are to follow the approval of the authorities.

TAJUK LUKISAN

2 STOREY SEMI-D (TYPE A) GROUND FLOOR PLAN FIRST FLOOR PLAN SECTION Q-Q SECTION R-R DRAWING STATUS BUILDING SUBMISSION BOMBA SUBMISSION AMENDMENT SUBMISSION TARIKH

: SEP 2016

TENDER DRAWING CONSTRUCTION DRAWING AS - BUILT DRAWING SCALE

1:100

DILUKIS OLEH : Zy Lim

SECTION R-R

DISEMAK OLEH : YOKE NO. PROJEK

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

1b

2134 [7']

: HSG - SRSB/2013 (12)002 - BP 25 34

PRODUCED BY AN AUTODESK STUDENT VERSION

2

4b

BEDROOM 5

dp 50 (approx.)

17373 [57'] 4268 [14'] 5944 [19'-6"]

dp 150 (approx.)

dp 150 (approx.)

2a

RUANGAN UNTUK KELULUSAN DARI PIHAK MAJLIS

3048 [10']

4

3809 [12'-6"]

3

DALAM FAIL NO : NO. PELAN :

A

TILES

TILES

1676 [5'-6"]

3a

4a

TILES

A1

BATH 3

dp 50 (approx.)

BEDROOM 3

5029 [16'-6"] 4419 [14'-6"]

3b

TILES

WET KITCHEN

TILES

dp 50 (approx.)

3963 [13'] 2743 [9']

dp 25 (approx.)

7011 [23'] 3353 [11']

3c

TILES

WET KITCHEN BEDROOM 5

RC FLOOR SLAB TO ENGR'S DETAIL.

BATH 4

TILES

B1 B

9144 [30'] 1524 [5'] 3657 [12'] 5486 [18'] 2134 [7'] 3352 [11']

R

1524 [5']

4

dp 25 (approx.)

BATH 4

1729 [5'-8"]

4b

3963 [13'] 2743 [9']

C

4c

dp 25 (approx.)

17373 [57'] 10363 [34'] 4297 [14'-1"] 1647 [5'-5"] 3048 [10']

4a

BRICKWALL FENCING.

dp 100 (approx.)

dp 50 (approx.)

dp 50 (approx.)

C1

610

4c

3657 [12'] 2742 [9']

dp 75 (approx.)

TILES

TILES

D

BATH 3

3353 [11'] 4572 [15']

2438 [8']

YARD

TILES

UTILITY 2

C1

CERAMIC TILES

1524 [5']

YARD

dp 75 (approx.)

115mm THK. BRICK WALL WITH 19mm THK. CEMENT PLASTERING ON BOTHSIDES.

C

A/C LEDGE

6

5486 [18']

6

B B1

9144 [30'] 3657 [12'] 1524 [5'] 5486 [18'] 3352 [11'] 2134 [7']

3657 [12'] 5486 [18'] 1524 [5']

GREEN

GREEN

A1

3048 [10']

3048 [10']

A1

304 [1']

A 3048 [10']


PRODUCED BY AN AUTODESK STUDENT VERSION

A

A1

B B1

3048 [10']

C

C1

D

C1

C

9144 [30'] 6401 [21'] 5486 [18']

2134 [7']

B1 B

A1

A

A

9144 [30'] 2743 [9']

2743 [9']

3048 [10']

6401 [21'] 5486 [18']

A1

C1

3963 [13']

D

C1

8229 [27']

A1 8229 [27']

RUANGAN UNTUK KELULUSAN DARI PIHAK MAJLIS 3963 [13']

915

2134 [7']

DALAM FAIL NO : NO. PELAN :

A

915

3048 [10']

Upper Roof Lev.

Lower Roof Lev.

A/C LEDGE BELOW

4419 [14'-6"] 3345 [11']

R A/C LEDGE BELOW

6

4c

METAL ROOFING

1st Flr. Lev.

4125 [13'-6"]

7010 [23'] 5486 [18']

PARAPET WALL WITH CEMENT PLASTERING ON BOTSIDES.

5

METAL ROOFING

G.I. UTTER TO MANUF'S DETAIL.

4b

Grd. Flr. Lev.

1524 [5']

4a

METAL ROOFING

RC FLAT ROOF

FRONT ELEVATION

RC FLAT ROOF

6

RC FLAT ROOF

3a

1b

17983 [59'] 17373 [57']

1a

1 6401 [21']

610

Q

5029 [16'-6"]

6705 [22']

TOTAL 400 GALLONS WATER STORAGE TANK ON SUPPORT TO ENGR'S DETAIL.

Q RC FLAT ROOF

RC FLAT ROOF

METAL ROOFING

150 GALLONS RAINWATER HARVESTING TANK ON SUPPORT TO ENGR'S DETAIL.

METAL ROOFING

METAL ROOFING CONSTRUCTION TO ENGR'S DETAIL.

610

1b

1st Flr. Lev.

1a

YANG MENGANDUNGI:FASA 13: RUMAH TERES 2 TINGKAT (22' X 70')

7011 [23']

TANDATANGAN TUAN TANAH & TUAN BANGUNAN

LEFT ELEVATION A

1

A1

C1

3048 [10']

D

C1

9144 [30']

A1 9144 [30']

A

TETUAN STARWATT REALTY SDN BHD

ROOF PLAN COLOUR

ROOF LEV

1ST FLR LEV

shower

tap

wc

13mm Ø PIPE

shower

shower

basin

wc

BATH 2

tap

25mm Ø DROPPER PIPE

basin

basin

25mmØ RISING PIPE

MASTER BATH

25mmØ INCOMING PIPE

150 GALLONS RAINWATER HARVESTING TANK ON SUPPORT TO ENGR'S DTL.

20mm Ø PIPE

32mmØ SCOUR PIPE DISCHARGE TO NEAREST DRAIN

wc

32mmØ SCOUR PIPE DISCHARGE TO NEAREST DRAIN

tap

BATH 3

13mm Ø PIPE STOP COCK TO BE FIXED AT 1800mm HT. FROM FLOOR LEV.

DETAIL 'A'

STOP COCK

tap

GRD FLR LEV

shower sink basin

CAR PORCH

KITCHEN

wc

tap

tap

tap

BATH 4

YARD

RED

25mm Ø ( 1"Ø )

GREEN

32mm Ø ( 1 1/4"Ø )

GREEN

NO 23-3, 2nd Floor, Jalan SS 23/11, Taman SEA, 47400 Petaling Jaya, Selangor Darul Ehsan. Tel : 03 - 78808127 / 28

1st Flr. Lev.

LEMBAGA ARKITEK MALAYSIA

DESIGN CONSULTANT

idea workshop sdn bhd ( 676351 - P )

NO. 85, JALAN TENGKERA, 75200 MELAKA.

REAR ELEVATION

FROM SAMB WATER SUPPLY MAIN PIPE

DIAGRAMMATIC WATER SUPPLY LAYOUT

1

0

1

2

3

4

5

10

1a

Tel : 06 - 292 1456 Fax : 06 - 281 6496 1b 2

6401 [21'] 610

15 X 20 mm Ø angle valve

basin

b.t wc

shower basin

b.t

20 mm Ø to 13 mm poly reducer nipple

basin

b.t

wc

100MM Ø SOIL & VENT PIPE

wc

32MM Ø WASTE PIPE min 3 Ø

32MM Ø WASTE PIPE

YARD

100MM Ø OUTLET PIPE DISCHARGE TO SEWERAGE LINE

shower

450 max.

wc

GRD FLR LEV

existing ground lev.

225

100MM Ø WASTE PIPE 38MM Ø WASTE PIPE

MANHOLE

MANHOLE

MANHOLE

MANHOLE

DIAGRAMMATIC PLUMBING LAYOUT (PER UNIT) 2 STOREY SEMI-D (TYPE A)

not to scale

NOTES:-

6 3048 [10']

1. Dimensions and specifications are merely indicative and subject to construction requirements and allowable tolerance. 2. All groove lines and mouldings are merely indicative and subject to confirmation by the Architect. 3. All dimensions of drops and risers are mere estimate and may vary according to fall / slope and subject to Architect's confirmation. 4. All roof trusses outlook are merely indicative and subject to Engineer's design. 5. All mechanical and electrical provisions to follow the details and specifications of the M&E Engineer and subject to M&E Engineer's final on-site adjustments. 6. All civil and structural provisions to follow the details and specifications of the C&S Engineer and subject to C&S Engineer's final on-site adjustments. 7. Any discrepancy and / or divergence is / are allowable as determined by the Architect. 8. All green areas / landscape, if any, is / are to follow the approval of the authorities.

DRAWING STATUS

ROOF PLAN FRONT & LEFT ELEVATION REAR & RIGHT ELEVATION

600 x 350 x 75 thick cast in-situ /precast slab

150

basin

b.t

Email : ideawork.mlk@gmail.com

2 STOREY SEMI-D (TYPE A)

1st Flr. Lev.

300

MANHOLE

DETAIL 'A'

not to scale

25 mm poly

BUILDING SUBMISSION BOMBA SUBMISSION AMENDMENT SUBMISSION

Grd. Flr. Lev.

TARIKH

: SEP 2016

TENDER DRAWING CONSTRUCTION DRAWING AS - BUILT DRAWING SCALE

1:100

DILUKIS OLEH : Zy Lim

20 mm poly below

RIGHT ELEVATION

STAINLESS STEEL STAND WATER METER

DISEMAK OLEH : YOKE NO. PROJEK

PRODUCED BY AN AUTODESK STUDENT VERSION

b.t

450

BATH 4

WET KITCHEN

20 mm Ø (3/4") stainless steel

4 17983 [59'] 17373 [57']

TAJUK LUKISAN

min 2 Ø

100MM Ø WASTE PIPE

sink

GRD LEV

Lower Roof Lev.

20 mm Ø (3/4") stop cock 20 mm Ø to 13 mm poly reducer nipple

shower

100MM Ø WASTE PIPE

100MM Ø SOIL & VENT PIPE

13 mm water meter

3a

4419 [14'-6"] 3345 [11']

shower

1ST FLR LEV

MASTER BATH

BATH 2

Upper Roof Lev.

3

4125 [13'-6"]

BATH 3

293

293

293

ROOF LEV

Ar. Lim Pay Chye

ARKITEK PROFESIONAL No. Pendaftaran LAM : A/L 162

Grd. Flr. Lev.

INTERGRATED LOCKAGE VALVE

not to scale

Fax : 03 - 78808130

TANDATANGAN ARKITEK :Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan bersetuyu menerima tanggungjawab penuh dengan sewajarnya.

SYARAT - SYARAT :~ A) Paip dari 'tap off point' ke tiang meter perlu samada paip jenis 'Poly / UPVC'. B) Paip untuk tiang meter dari jenis 'Poly / UPVC'. C) Paip dari tiang meter ke Dapur dan Tangki perlu dari jenis 'Poly / UPVC'. D) Paip dari tangki ke Tandas dan Bilik Air perlu dari jenis samada UPVC kelas D / UPVC. E) 'Garden Tap' perlu diambil daripada Tangki Air. F) Tangki simpanan air hendaklah jenis yang diluluskan dan ditutup.

20mm Ø PIPE

WATER METER (STAINLESS STEEL)

13mm Ø ( 1/2"Ø ) 20mm Ø ( 3/4"Ø )

4125 [13'-6"]

25mm Ø DROPPER PIPE

20mm Ø PIPE

SAIZ

YELLOW BLUE

4419 [14'-6"] 3345 [11']

BALL VALVE

P LARCHITECT

Lower Roof Lev.

WATER SUPPLY LAYOUT LEGEND

TOTAL 400 GALLONS WATER STORAGE TANK ON SUPPORT TO ENGR'S DETAIL

13mm Ø PIPE

ARKITEK

Upper Roof Lev.

2 STOREY SEMI-D (TYPE A )

( 737072-T )

NAMA : DATUK POH GEOK SENG (DIRECTOR) NO.2 JALAN IMJ 1, TAMAN INDUSTRI MALIM JAYA, 75250 MELAKA. TEL : 06 - 337 3333 / 012-7916553 FAX : 06 - 336 5678

3048 [10']

R

25mm Ø DROPPER PIPE

-- 39 UNIT

UNTUK

TETUAN STARWATT REALTY SDN BHD ( 737072-T )

RC FLAT ROOF BELOW

32mmØ OVERFLOW PIPE TO BE 25mm BELOW INLET PIPE

18 UNIT 15 UNIT 1 UNIT 1 UNIT 2 UNIT 1 UNIT 1 UNIT 1 UNIT 14 UNIT 28 UNIT 24 UNIT 24 UNIT 32 UNIT 1 UNIT 34 UNIT 3 UNIT 30 UNIT 24 UNIT

DAN PEMBANGUNAN PERUMAHAN DI ATAS SEBAHAGIAN LOT 1171, SEBAHAGIAN LOT 1172 DAN SEBAHAGIAN PT 1771, MUKIM PADANG TEMU,DAERAH MELAKA TENGAH, MELAKA.

Grd. Flr. Lev.

RC FLAT ROOF BELOW

-------------------

: HSG - SRSB/2013 (12)002 - BP 26 35

PRODUCED BY AN AUTODESK STUDENT VERSION

2a 2

Lower Roof Lev.

4419 [14'-6"] 3345 [11']

10363 [34']

3

CADANGAN PEMBANGUNAN PERUMAHAN BERPAGAR & BERPENGAWAL DI ATAS LOT 1160-1164, 1166, 1167, 1169, 1170, SEBAHAGIAN LOT 1171, PT 1770 & SEBAHAGIAN PT 1771, MUKIM PADANG TEMU,DAERAH MELAKA TENGAH, MELAKA. YANG MENGANDUNGI:FASA 1: - RUMAH BANGLO 3 TINGKAT - RUMAH BANGLO 2 TINGKAT - DEWAN SERBAGUNA - PONDOK PENGAWAL - PENCAWANG ELEKTRIK - RUMAH SAMPAH - BANGUNAN UTILITI FASA 2: - RUMAH BANGLO 2 TINGKAT - RUMAH BERKEMBAR 2 TINGKAT FASA 3: - RUMAH BERKEMBAR 2 TINGKAT FASA 4: - RUMAH BERKEMBAR 2 TINGKAT FASA 5: - RUMAH BERKEMBAR 2 TINGKAT FASA 6: - RUMAH BERKEMBAR 2 TINGKAT FASA 7: - RUMAH BANGLO 2 TINGKAT - RUMAH BERKEMBAR 2 TINGKAT FASA 8: - RUMAH BANGLO 2 TINGKAT - RUMAH BERKEMBAR 2 TINGKAT FASA 9: - RUMAH BERKEMBAR 2 TINGKAT

Upper Roof Lev.

3a

PRODUCED BY AN AUTODESK STUDENT VERSION

4

3048 [10']

4125 [13'-6"]

3b

17373 [57'] 4268 [14']

R.C. FLAT ROOF TO ENGR'S DETAIL.

3c

TAJUK PELAN PINDAAN KEPADA PELAN YANG TELAH DILULUSKAN DALAM FAIL NO: MBMB/JKB. 03060-10-2011 PADA TARIKH 21SEPTEMBER 2012 BAGI:-

METAL ROOFING

RC FLAT ROOF

4


Acculex office 2014-2016, Lots 23-24, FTZ Batu Berendam, Malacca, MY Responsibilities DESIGN DEVELOPMENT, SUBMISSION, CONSTRUCTION DETAIL, COORDINATION, SITE INSPECTION, COMPLETION

Client Mr. Kim Boon Koh Site / Built-up Area 8714 sqm / 797 sqm Budget RM 2.1 mil (AUD$ 765,000) Consultants GNL Engineering Consultancy C&S Contractor Multi Tech Electrical Construction Team Fern Tan, Yoke Heng Ng, Fahizal bin Mohd

The client’s brief is to design a double storey office block with a separate space for large meetings. Being an Arowana enthusiast, he had several of his pet fish kept in a pond which he had dug and desires the pond be visible from the new buildings. The initial proposal was to span the building blocks across the pond, like a ship anchored on an existing mound in the center of the pond, with a futuristic appearance clad in Alucobond shell.

01

Due to budget cuts, it was later redesigned and simplified without losing the original concept of a ship. Metal portal frames are designed to give shape to the buildings as inspired by its use in the warehouse, while industrial-grade gratings were applied to create see-through deck to the pond below. 02

27


01 Proposal #01 - concept of “ship in pond�. 02 Proposal #02 - the revised version which made it to construction stage. 03 Final completed project as viewed from open deck to office block.

03

Photo credit: Client

28


PRODUCED BY AN AUTODESK STUDENT VERSION

04 Site progress (top to bottom): - Original site with pond; - Construction in progress; & - Building completion. 05 Images on Page 32: Metal frame construction details executed on site.

0 1 2

29

5

04 






LEGEND

1. 2. 3. 4. 5.

Existing Pond Pond Extension Existing Berm New Berm Large Meeting Hall (30 pax) 6. Lab 7. Open Deck with Industrial Grating 8. Toilets

16

Plan Roof

up

up

9. Meeting Pods 10. Office 11. Manager’s Room 12. Muti-purpose Room 13. Lounge 14. Director’s Room 15. Outdoor Deck 16. RC Flat Roof

4

5

n r Pla Floo d n u o er Gr Upp

8 11

11

4

15

16

8 1

7

up

8

12

14 16

12

10

up

14

13

16

dn

up

3

6 9

n r Pla Floo und o r G er Low

9 1 9 9

2

11

11

Ground Floor Plan

First Floor Plan

Roof Plan

16 16

0

1

2

5

Scale 1: 100 @ A0 (green box)

30


Large Meeting Hall

Lab Open Deck

31


203 x 203 mm M.S. I-beam to engr’s specifications.

0 38

0 30

5 19

3 20

0 30

0 30

0 30

Plaster ceiling.

° 30 0 38 0 30

0 30

30°

0 30 0 30

Alumn. frame fixed glass panels to manuf’s detail.

2 26 250

150 x 30mm R.H.S. “DML” box louver system to architect’s selection (code: DML 150x30BL). Drainage mat or gravel backfill.

250mm thk. R.C. wall to engr’s detail.

250mm thk. well compacted hard-core. Vapour retarder.

R.C. footing to engr’s detail.

Section Scale 1:40 05

32


House No.58 2013-2016, No.58, Jalan Kamping Pantai, Malacca, MY Responsibilities DESIGN DEVELOPMENT, CONSTRUCTION DETAIL, COORDINATION, SITE INSPECTION, COMPLETION Client Ar. Pay Chye Lim Site / Built-up Area 101.6 sqm / 216.2 sqm Budget RM 750,000 (AUD$ 275,000) Consultant LSK Engineering C&S Contractor CNS Construction Team Pay Chye Lim, Yoke Heng Ng, Woon San Hau, Jovina Ann Lee

Overcome with nostalgia for his childhood days at house no. 58, the client purchased the traditional “Early Shophouse” situated at Malacca’s UNESCO core zone in the year 2012. The once dilapidated building is restored with new programmes: 3 private bedrooms with en suite bathrooms, an attic, and a family hall on the Upper Level, plus a continuous foyer-living-dining space and a courtyard on the Ground Floor Level. This offers an undisputed view from the main entry door to the Malacca River at the back, which simultaneously cross-ventilates the house. Embracing contemporary industrial chic, the metal R.H.S. columns and I-beams that propped the neighbouring party walls in place during construction became part of a modern feature of the house. New bondeck provides a base for casting RC flooring on the First Floor for structural integrity and better sound insulation, before new timber flooring is laid. As many of the oldstyled houses here, terracotta tiles adorn the Ground Floor, with pebblewash lining along the perimeter of the walls. Timber louvered shutters are replicated as a window statement throughout the project. Since completion, the client stays here during his regular business trips to Malacca, and enjoys a laid-back lifestyle by the Malacca River.

33


6

13

5

9

10

11

4

Malacca River

12

10 3 9 7

Ka mp un gP an tai

9

St.

14 2

8

Proposed Site 1

Location Plan Scale 1:2000

Ground Floor Plan

First Floor Plan

Second Floor Plan

Roof Plan

LEGEND 1. 2. 3. 4. 5. 6. 7.

5 Foot Way (kaki Lima) Foyer / Entry Hall Living Area Courtyard Kitchen / Dining Area Riverside Footpath Powder Room

8. 9. 10. 11. 12. 13. 14.

Master Bedroom Bathroom Bedroom Air Well Corridor / Niche Family Hall Attic / Study

Structural Columns

0

1

2

5

34


Front Elevation (proposal)

35

Rear Elevation (proposal)


Street view (completion)

View across River (completion)

36


01

37

02


01 Materials are proudly exposed to showcase its raw & industrial design (clockwise from top left): - bondek as formwork for RC flooring above; - M.S. R.H.S. juxtaposing with timber & pebble wash finish; - soothing palettes of white, grey & terracotta; - G.I. conduit pipes against bare clay bricks. 02 The central courtyard / air-well for stack ventilation. 03 Continuous space from Foyer to Living & then to Kitchen/ Dining at the rear. Particular attention were given in the design of the staircase railing too. 04 A reclaimed timber window is used in the air-well niche along the corridor. 05 Louvered shutters at Family Hall are modelled after the original windows at the front, & opens to a delightful view of the Malacca River that changes through time.

03

04

05

05

38


Bites Cafe 2013-2014, No.82, Jalan Parameswara, Malacca, MY Responsibilities DESIGN DEVELOPMENT, SUBMISSION, CONSTRUCTION DETAIL Client Ms. Caroline Chin & Mr. Matthew Chua Site / Built-up Area 180 sqm / 222 sqm Budget RM 500,000 (AUD$ 182,500) Consultants LEAD Engineering C&S PKV Consulting Engineers M&E Goodwaters Engineering Waste Ctrl Contractor Hang Ju

As an attempt in urban infill in the historical fabric of Malacca, a modern cafe is sandwiched between two traditional “Straits Chinese” shophouses, where old meets new. The relationships of solid / void, interior / exterior, and surface / structure are explored. Parts of the plastering are removed from an existing party wall to reveal an impressive arrangement of large laterite stones interlaced with small flat clay bricks. This archaeological quality of the exposed party wall juxtaposes with the delicate design and use of modern materials, such as steel structures, glass and concrete slabs, creating a unique architectonic expression throughout.

The cafe caters for ‘event & function’ Team Woon San Hau, Yoke Heng Ng, Alan Goh space capable of accommodating up to 70 people for a sit-down activity, or approximately 90 pax for a standup reception.

39

Photo credit: RGB Pix


01 01 01 01 01

Privilege Vantage Sdn. Bhd. Privilege Vantage Sdn. Bhd. Privilege Vantage Sdn. Bhd. Privilege Vantage Sdn. Bhd. Privilege Vantage Sdn. Bhd.

40


X

Y

CEMT. RENDER FFL 0.30

M.S. I-COLUMNS TO ENGR'S SPECIFICATION.

LOT 5

LOT 77

TURFING / LANDSCAPE TL 0.15

EXISTING 5FT WALKWAY

A2

Y 2719 [8'-11"]

EXISTING ROADSIDE DRAIN.

X

RL 0.00

6096 [20']

LOT 6

A1

1369 [4'-6"]

857 [2'-10"] 7620 [25']

6096 [20'] 1524 [5']

10°

ROOF CONSTRUCTION 2 TEMPERED GLASS ROOF ON GALVANIZED PURLINS TO ENGR'S DETAIL (PITCH 10°).

B

115MM THK BRICK WALL WITH 20MM THK. CEMT. PLASTERING ON BOTH SIDES.

ROOF CONSTRUCTION 3 CORRUGATED METAL ROOFING ON GALVANIZED PURLINS TO ENGR'S DETAIL (PITCH 10°).

1000mm HT., 12MM THK. TEMPERED GLASS RAILING TO MANUF'S DTL.

A

150 dp

FRAMELESS TEMPERED GLASS DOOR TO MANUF'S DETAIL.

150 dp

B

FRAMELESS TEMPERED GLASS DOOR TO MANUF'S DETAIL.

2290 [7'-6"]

ALUMN. FRAME FIXED GLASS WINDOWS TO MANUF'S DTL.

ENTRY

RAMP

C

RC STAIRCASE TO ENGR'S DTL. ( T: 300mm + 25mm NOSING, R: 178mm)

4209 [13'-10"]

4209 [13'-10"] 6096 [20']

1219 [4'] 1071 [3'-6"]

150 dp

RC FLOOR SLAB TO ENGR'S DTL.

FFL 4.717

RC STAIRCASE TO ENGR'S DTL. ( T: 300mm + 25mm NOSING, R: 178mm)

D

ROOF CONSTRUCTION 1 RC FLAT ROOF TO ENGR'S DETAIL.

1 HR. FIRE-RATED DOOR TO MANUF'S DTL.

CEMT. RENDER

115MM THK BRICK WALL WITH 20MM THK. CEMT. PLASTERING ON BOTH SIDES.

1601 [5'-3"]

115MM THK BRICK INFILL BETWEEN I-COLUMNS & TO BE 20MM THK. CEMT. PLASTERED ON BOTH SIDES (WHERE APPLICABLE).

2 NOS. 300GALS (TOTAL) POLY WATER TANK TO MANUF'S DETAIL.

I-COLUMNS TO ENGR'S DETAIL (PITCH 60°).

A

BALCONY TIMBER FLOOR BOARD FFL 4.567

H.W. COUNTER TOP TO DETAIL.

A1

ALUMN. FRAME FIXED GLASS PANELS TO MANUF'S DETAIL. TEMPERED GLASS EXTERNAL LAYER WITH PERFORATED METAL SHEETS BELOW (PITCH 60°).

A2

Y

MAIN ROAD 994 [3'-3"] 1444 [4'-9"] 1500 [4'-11"] 6657 [21'-10"]

2719 [8'-11"]

TEMPERED GLASS EXTERNAL LAYER WITH PERFORATED METAL SHEETS BELOW (PITCH 60°).

ROOF CONSTRUCTION 4 TEMPERED GLASS ROOF ON GALVANIZED PURLINS TO ENGR'S DETAIL (PITCH 2°).

A2

X

PRODUCED BY AN AUTODESK STUDENT VERSION

FFL 0.45

M.S. I-COLUMNS TO ENGR'S SPECIFICATION.

150 dp

DINING AREA

12628 [41'-5"]

4209 [13'-10"]

12628 [41'-5"]

CEMT. RENDER

B

FFL 4.517

GOODS LIFT

C

EXISTING LATERITE STONE WALL OF LOT 77 TO BE PRESERVED.

DINING AREA

TOILET CERM. TILES

D2 D1

12628 [41'-5"]

1050MM HT LOW WALL WITH COUNTER TOP TO DETAIL.

SANITARY WARE TO ARCHITECT'S SELECTION.

2 NOS. 400GALS (TOTAL) STAINLESS STEEL STORAGE WATER TANK TO MANUF'S DETAIL.

ALUMN. RHS STRUCTURE TO MANUF'S DETAIL.

2290 [7'-6"]

FFL 0.45

RC FLOOR SLAB TO ENGR'S DETAIL.

3806 [12'-6"]

857 [2'-10"]

BAR

CEMT. RENDER

C

A1

D

1 HR. FIRE-RATED DOOR TO MANUF'S DTL.

FFL 4.717

6096 [20']

4209 [13'-10"]

115MM THK BRICK INFILL BETWEEN I-COLUMNS & TO BE 20MM CEMT. PLASTERED ON BOTH SIDES (WHERE APPLICABLE).

D2 D1

1524 [5']

SANITARY WARE TO ARCHITECT'S SELECTION.

FFL 0.25

FFL 4.567

1425 [4'-8"]

TOILET

CERM. TILES

GOODS LIFT

CEMT. RENDER

2134 [7']

2286 [7'-6"]

115MM THK. BRICK WALL WITH 20MM THK. CEMT. PLASTERING ON BOTH SIDES. OUTDOOR DECK

4209 [13'-10"]

610 [2']

3005 [9'-10"]

5486 [18']

7620 [25']

FFL 0.30

4209 [13'-10"]

1369 [4'-6"] CERM. TILES

150 dp

A

RC STAIRCASE TO ENGR'S DTL. ( T: 255mm + 25mm NOSING, R: 178mm)

KITCHEN

GOODS LIFT / DUMB WAITER TO MANUF'S DETAIL.

X 765MM HIGH PARAPET WALL ABOVE ROOF LEVEL TO ENGR'S DETAIL.

F E

3806 [12'-6"]

857 [2'-10"]

RC STAIRCASE TO ENGR'S DTL. ( T: 255mm + 25mm NOSING, R: 178mm)

F E

PROPOSED 10 P.E. SEPTIC TANK TO MANUF'S DETAIL.

5486 [18']

7620 [25']

50 dp

50 dp

D

Y ALUMN. FRAME TOP-HUNG WINDOWS TO MANUF'S DTL.

50 dp

D2 D1

50 dp

1524 [5']

F E

X

M.S. SWING DOOR TO MANUF'S DETAIL.

100 dp

3806 [12'-6"]

Y

Y

994 [3'-3"] 1500 [4'-11"] 1444 [4'-9"] 6657 [21'-10"]

2719 [8'-11"]

X 994 [3'-3"] 1500 [4'-11"] 1444 [4'-9"] 6657 [21'-10"]

SCALE: 1 : 150 @ A3

3a 3

 2

5

3a 2b

Ground Floor Plan

41

2a 2

1

3

3a 2b

2a 2

1

Mezzanine Floor Plan

3

2b Roof Plan

2a 2

1 0

1

2

5

0

PRODUCED BY AN AUTODESK STUDENT VERSION

SCALE: 1 : 75 @ A1

1


3

2c 2b

2a 2

1

A2

6657 [21'-10"] 2719 [8'-11"] 1881 [6'-2"]

A

B

C

6096 [20']

3938 [12'-11"]

839 1500 [4'-11"] 994

A1 3806 [12'-6"]

1444 [4'-9"]

D2 D1

D

12628 [41'-5"] 2290 [7'-6"]

4209 [13'-10"]

4209 [13'-10"]

TEMPERED GLASS EXTERNAL LAYER WITH PERFORATED SHEETS BELOW (PITCH 60°).

2563 [8'-5"]

E F 857 [2'-10"]

7620 [25'] 4209 [13'-10"]

2134 [7']

5486 [18']

1647 [5'-5"]

ALUMN. LOUVERS @ 150MM CENTER TO CENTER TO ARCHITECT'S SELECTION.

10°

ROOF CONSTRUCTION 1 RC FLAT ROOF TO ENGR'S DETAIL. 1417 [4'-8"]

ROOF CONSTRUCTION 4 TEMPERED GLASS ROOF ON GALVANIZED PURLINS TO ENGR'S DETAIL (PITCH 2°).

1 HR. FIRE-RATED DOOR TO MANUF'S DETAIL.

2743 [9']

2400 [7'-11"]

H.W. COUNTER TOP TO MANUF'S DETAIL.

10 X 50MM THK. M.S. FLAT BAR BALUSTER @ 125MM SPACING TO DETAIL.

OPEN DECK

ALUMN. FRAME TOP-HUNG WINDOWS TO MANUF'S DETAIL.

TOILET

DINING AREA

RC STAIRCASE TO ENGR'S DTL. ( T: 255mm + 25mm NOSING, R: 178mm)

60 °

300 [1']

4267 [14'] 1567 [5'-2"] 2400 [7'-11"]

765MM HIGH PARAPET WALL ABOVE ROOF LEVEL TO ENGR'S DETAIL.

° 60

PRODUCED BY AN AUTODESK STUDENT VERSION

4.717

9971 [32'-9"]

8.534

3817 [12'-6"]

1887 [6'-2"]

10.421 I-COLUMNS TO ENGR'S DETAIL (PITCH 60°).

ROOF CONSTRUCTION 2 TEMPERED GLASS ROOF ON GALVANIZED PURLINS TO ENGR'S DETAIL (PITCH 10°).

M.S. I-BEAM STRUCTURE TO ENGR'S SPECIFICATION.

115MM THK. BRICK WALL WITH 20MM THK. CEMT. PLASTERING ON BOTH SIDES.

ALUMN. FRAME FIXED GLASS PANELS TO MANUF'S DETAIL. DINING AREA

RC FLOOR SLAB TO ENGR'S DTL.

KITCHEN

TOILET

RC BEAM & FLOOR SLAB TO ENGR'S DETAIL.

0.450 EXISTING PARTY WALL TO BE MAINTAINED & MAKE GOOD.

Front Elevation

1

2 2a

2b 2c

Section X - X

3

F E 857 [2'-10"]

6657 [21'-10"] 1444 [4'-9"]

D1

D

C

7620 [25'] 6096 [20']

1524 [5']

4209 [13'-10"]

1887 [6'-2"]

4209 [13'-10"] 1647 [5'-5"]

10°

8.534

ROOF CONSTRUCTION 2 TEMPERED GLASS ROOF ON GALVANIZED PURLINS TO ENGR'S DETAIL (PITCH 10°).

A1

12628 [41'-5"]

ROOF CONSTRUCTION 3 CORRUGATED METAL ROOFING ON GALVANIZED PURLINS TO ENGR'S DETAIL (PITCH 10°).

10.421

D2 A

B 2563 [8'-5"]

4209 [13'-10"]

1219 [4']

3806 [12'-6"]

1071 [3'-6"] TEMPERED GLASS EXTERNAL LAYER WITH PERFORATED SHEETS BELOW (PITCH 60°).

RC FLAT ROOF TO ENGR'S DETAIL. ALUMN. LOUVERS @ 150MM CENTER TO CENTER TO ARCHITECT'S SELECTION.

3817 [12'-6"]

DASHED LINE SHOW POSITION OF WATER TANK (REFER ROOF PLAN).

ALUMN. FRAME TOP-HUNG WINDOWS TO MANUF'S DETAIL.

ALUMN. FRAME FIXED GLASS PANELS TO MANUF'S DETAIL.

M.S. I-COLUMNS TO ENGR'S DTL. OPEN DECK

60 °

9971 [32'-9"]

ALUMN. RHS STRUCTURE TO MANUF'S DETAIL.

4.717

° 60

4267 [14']

ALUMN. FRAME TOP-HUNG WINDOWS TO MANUF'S DETAIL.

M.S. SWING DOOR TO MANUF'S DETAIL.

115MM THK. BRICK WALL WITH 20MM THK. CEMT. PLASTERING ON BOTH SIDES. RC STAIRCASE TO ENGR'S DTL. ( T: 300mm + 25mm NOSING, R: 178mm)

115MM THK. BRICK WALL WITH 20MM THK. CEMT. PLASTERING ON BOTH SIDES.

0.450

A2

6096 [20']

1 HR. FIRE-RATED DOOR TO MANUF'S DETAIL.

GOODS LIFT

KITCHEN

BAR

FRAMELESS TEMPERED GLASS DOOR TO MANUF'S DETAIL.

SCALE: 1 : 150 @ A3

Rear Elevation

SCALE: 1 : 75 @ A1

42

5

PRODUCED BY AN AUTODESK STUDENT VERSION

2

Section Y - Y


In.terposition 2010 - 2011, UNSW + SEU joint studio Award: THE MARGOT & NEVILLE GRUZMAN AWARD IN URBAN DESIGN (2011)

Site ‘Rivermark’ & Parramatta Ferry Wharf Lecturers / Course Coordinators Yinong Xu UNSW Gong Kai SEU Team Ruochen Cheng, Yoke Heng Ng, Laura Abbey

Based on the concept of ‘FLOW’, the project is a creative exploration of architectural adaptive-reuse and integration with the wider urban landscape through a cross-cultural and interdisciplinary study of the ‘Rivermark’ and Parramatta Ferry Wharf. Reinforcing its image as the ‘Gateway to Parramatta City’, an inviting meeting place centred on various needs of the community is designed to encourage people to interact, learn and share their unique cultural differences — achieved by means of passive recreational spaces, viewing platforms, landscaped path- ways and thoroughfare, info centre, exhibition hall, gym, childcare facilities, interactive audio-visual centre, café, bar and restaurant. Green architectural systems, such as water collection and distribution, is integrated and also play on this idea of ‘flow’. To enhance the river-site relationship, a series of landscaping interventions have created a consistent ‘flow’ across the landscape to re-link the disrupted greenbelt along the river. Besides the technical, architectural, spatial and sensory dimensions, the connection between indoor / outdoor is another topic of interest, which are explored through a range of harmonious spatial ‘flows’ within the building, between neigbouring lots and the surrounding landscapes.

43


Sydney waterways

悉尼水路

CBD+Wharf Transitions

中心区变迁

“从河上的皇后码头开始,走向帕拉马塔公园, 你将会看见这城镇设计背后的逻辑。 ” - 彼得・韦斯特, 帕拉马塔之历史

Discontinued Green Belt

断开的绿带

Reconnecting the Green Belt

重塑连接的绿带

Icon in Parramatta

Determining the Flow 确定横向和纵向的流动线

标志性

Linking the Pathways

建立绿带道路和建筑的联系

44


012

4

10

Scale 1:500

Programs: Before 原有建筑功能

45

Basement: Carpark + Sunken Garden / Cafe 地下室: 停车场 + 下沉式花园 / 咖啡厅

Programs: After 改建后建筑功能

Existing Circulation 现状建筑流线

Ground Level: Info Centre + Plant Room 地面层平面: 信息咨询中心+ 设备机房

Reformed Path (Primary) 改造后的主要流线

Reformed Path (Secondary) 改造后的次要流线


Level 1: Lobby + Thoroughfare 一层平面: 大堂 + 通道

Level 5: Gym + Childcare Centre 五层平面: 健身房 + 育儿中心

Level 2: Library + Audio Visual Zone 二层平面: 图书馆 + 视听区

Level 3: Multipurpose Space 三层平面: 多功能空间

Level 4: Exhibition + Gym 四层平面: 展览厅 + 健身房

Level 6: Exhibition + Childcare Centre 六层平面: 展览厅 + 育儿中心

Level 7: Bar + Community Garden 七层平面: 酒吧 + 社区花园

Level 8: Restaurant 八层平面: 餐厅

46


Rainwater Collection 雨水收集处

Restaurant + Kitchen 餐厅 + 厨房

Community Garden + Bar 社区花园 + 酒吧

Circulation & Accessibility 流线和可达性 Gym 健身房

Restrooms 卫生间

Views 视线 Water System & Uses 水系统及其用途 Vertical Circulation 垂直流线

Machinery Cooling 机械制冷设备

Vehicular Access 交通进出 Horizontal Path 横行路径 Water Sytem 水系统

Water Feature + Storage + Recycling + Irrigation 水景 + 贮藏 + 水再 循环 + 灌溉

Water Flow & Meeting Points 水流方向及结合点

Landscape Proposal


48


Reconnected Green Belt with New Spaces 重塑连接性绿带及其新连带的空间

Sectional Perspectives Scale 1:200 剖面透视图

49


A

B

D C A

B

C

D

3D Physical Model - Elevations 3维实体模型 - 立面

‘Flow’ in building & river 河流及建筑物之流动联系性

50


51

10


Banner Design

52


01 The Point apartments, Pyrmont (pen sketch).

53

Sketches


02 Sydney CBD skyline, Royal Botanical Garden (pen sketch).

54


55

03

05

04

06

Pottery


03 04 05 06 07

Clay tea pot (front). Clay tea pot (back). Clay pen holder. Untitled. Betta fish acrylic painting.

07

Painting


Krate . Space for Creatives 08 Experimenting with dark light against brightly coloured petals for ‘The Adventures of Coraline’ play (2019). 09 The making of the Other Mother in ‘Coraline’ using black PE foam & glow-in-the-dark tapes. 10 Cardboard cutouts of cogs & wheels for the backdrop of ‘Pico’(2018). The cage is made of PVC pipes, plastic food cover, PE strip & cable tie. 11 Life-size astronaut for a TEDx event in Malacca (2018). 12 Cardboard boat and PE foam waves for the very first play of Krate — ‘Darios’ (2017).

09

57

09

10

08

12

10

11

Stage Set-up / Props Making


end thank you



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.