Week 10 Studio Journal
For the class presentation, each group introduced their case study building’s section details and the sections were explained with annotations.
Oval Pavilion site visit.
The steps are made of off-faced concrete with rid bass come on top. It normally takes three hours and stripping comes seven days later. There are block walls and horizontal bars, for every 400cm there is a retrial horizontal bar.
The primary structural consists of columns and beams. The beam is hot-rolled steel universal beam and the columns are constructed of timber wood. Connection plates are also welded onto the steel sections to bolt them together.