Hilltop Private School - Methods of Documentation & Measured Drawing

Page 1

BACHELOR OFSCI ENCE( HONOURS)I N ARCHI TECTURE METHODSOFDOCUMENTATI ON AND MEASURED DRAWI NGS( ARC60305) PROJECT2:REPORT SUBMI SSI ON DATE:28FEBRUARY 2019 BUI LDI NG:HI LL TOP PRI VATESCHOOL,JOHOR LECTURER:MR.AZI M SULAI MAN ADRI ANA CHANG WEN QI AI ESYA BI NTIMAHAMAD YUSOP AZEERAH BI NTIMUBARAKH ALI CHEOK KAH YI NG CHONG MI N DAREN LAIKAM FEI EI SYAH FARI DAH BI NTIAHMAD NAZARI GAVI N TI O KANG HUI MOHD HAFI ZBI N MASRIONN NANG AYEMYATMON NG GUO YI K NG ZI EN LOON PRI SCI LLA HUONG YUNN RI TCHI EMATTHEW GONZALESRETI TA VI KTOR ZEI DLER LI M WANSA ALI CE

0332960 0328328 0328906 0328560 0333339 0332570 0328624 0333373 0334944 0328627 0332551 0328565 0332599 0333479 1006AH79876 0324984


DECLARATION OF SUBMISSION

: Hilltop Private School : No. 4, Jalan Hassan Alatas 80100 Johor Bahru

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


ACKNOWLEDGEMENT

.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CONTENT

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CONTENT

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


LIST OF FIGURES

Figure 1

View of Johor Bahru

1

Figure 11

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 2

Johor location

Johor Bahru location

5

Figure 12

Hilltop Private School location

5

Figure 13

Figure 6

5

Figure 14

JBCC Logo Source: Portal Rasmi Majlis Bandaraya Johor Bahru.

6

Sun Path diagram

7

Average temperature and precipitation

Figure 15

Wind rose diagram

Figure 16

Wind speed diagram

7

Figure 17

Map of landmarks

10

View of Jalan Wong Ah Fook Plaza from a bridge.

11

Chinese historical shophouse at Jalan Tan Hiok Nee

11

Majlis Bandaraya Johor Bahru Headquarters

11

Source: Taylor’s University 2019 Measured Drawing Group 1

8

Figure 18

Entrance gate to The Great Palace of Johor

11

Source: Taylor’s University 2019 Measured Drawing Group 1

8

Figure 19

Source: meteoblue.com

Figure 10

KTMB Museum, Jalan Tun Abdul Razak

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: meteoblue.com

Figure 9

10

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: meteoblue.com

Figure 8

Persada Convention Centre at Jalan Abdullah Ibrahim

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: andrewmarsh.com

Figure 7

10

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 5

Front view of Penjara Raman Johor, Jalan Ayer Molek Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 4

10

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 3

Entrance of SK St Joseph at Jalan Abdul Rahman Andak

Bangunan Dato Jaafar

12

Source: super325 via wordpress.com

9

Source: Taylor’s University 2019 Measured Drawing Group 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 20

Johor Jetty Source: super325 via wordpress.com

12


LIST OF FIGURES

Figure 21

Maktab Sultan Abu Bakar (English College)

12

Figure 31

Source: super325 via wordpress.com

Figure 22

Johor Main Street

Istana Besar circa 1866

12

Figure 32

Johor Bahru Railway Station

13

Figure 33

Istana Bukit Serene

13

Figure 34

Jalan Wong Ah Fook Plaza

13

Figure 35

Kahying and Gavin measuring the length of the School

13

Figure 36

Gantt Chart

14

Figure 37

Measuring Tape

15

Figure 38

Metre Linen Tape Source: Google Images

Eisyah taking a photo of the Window Interior

18

Videographing the Interview Session with Mr Dev

18

Kahying sketching the Storage Hut

19

Viktor sketching an Elevation of the Main Building

19

Source: Taylor’s University 2019 Measured Drawing Group 1

16

Figure 39

Source: Google Images

Figure 30

17

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 29

Interview session with the Hilltop building owner

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 28

17

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: super325 via wordpress.com

Figure 27

Ms Jennifer and us in the Children’s Library

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Peggy Loh via ppunlimited.blogspot.com

Figure 26

16

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Johornow.com

Figure 25

Foldable Ladder Source: Google Images

Source: kesultananjohor.blogspot.com

Figure 24

16

Source: Google Images

Source: siapamoyanganda.com

Figure 23

Digital Measuring Laser

Kahying measuring the detail of the Vent Blocks

20

Source: Taylor’s University 2019 Measured Drawing Group 1

16

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 40

Zien Loon measuring the height of the Beam Source: Taylor’s University 2019 Measured Drawing Group 1

20


LIST OF FIGURES

Figure 41

Ritchie doing an inventory check on the data collected

21

Figure 51

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 42

Gavin checking and refining the collected data

Gavin referring to the data inventory for the Revit model

21

Figure 52

Zien Loon working on the Revit model

22

Figure 53

Group briefing on site before beginning tasks

22

Figure 54

Data inventory after site visit at hotel meeting room

23

Figure 55

Parents fetching children at Hilltop (Jalan Hassan Alatas)

23

Figure 56

Map of road accessibility

24

Figure 57

Map of vehicular circulation

25

Figure 58

Map of land use zoning Source: Taylor’s University 2019 Measured Drawing Group 1

Front view of House B

30

Back view of House B

30

Example of a Traditional Malay House.

30

House C along Lorong 2

31

Source: Taylor’s University 2019 Measured Drawing Group 1

26

Figure 59

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 50

29

Source: Wikipedia.com

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 49

Back of house where there used to be a village

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 48

29

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 47

Perspective view of House A

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 46

29

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 45

Front view of House A Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 44

28

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 43

Map of historical residences around Hilltop Private School

Interior of House C

31

Source: Taylor’s University 2019 Measured Drawing Group 1

27

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 60

Hj. Mohamad Khalid and wife Source: Taylor’s University 2019 Measured Drawing Group 1

31


LIST OF FIGURES

Figure 61

Interior of House C

32

Figure 71

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 62

House C along Lorong 2

Map activities in micro site

32

Figure 72

Shop lot along Jalan Yahya Awal

33

Figure 73

Sekolah Rendah Islam at Jalan Hassan Alatas

34

Figure 74

Sekolah Kebangsaan Infant Jesus Convent

34

Figure 75

Students at Restoran Jamilah opposite SKIJ Convent

34

Figure 76

Map of landmarks in micro site

34

Figure 77

Wisma TNB at Jalan Yahya Awal

35

Figure 78

Wisma Hokkien and Petron at Jalan Yahya Awal Source: Taylor’s University 2019 Measured Drawing Group 1

View B, Wisma Hokkien in the far distance

37

View C, Wisma TNB in the far distance from playground

37

View E, Front house neighbour

38

View F, Corporate building in the far distance

38

Source: Taylor’s University 2019 Measured Drawing Group 1

36

Figure 79

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 70

37

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 69

View A, Abandoned house directly from playground

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 68

37

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 67

Map of Views from Site

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 66

36

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 65

Ayer Molek Police Station at Jalan Seri Lalang Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 64

36

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 63

Sekolah Kebangsaan Infant Jesus Convent

View G, Convent School classrooms block from playground 38 Source: Taylor’s University 2019 Measured Drawing Group 1

36

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 80

View from A, Backyard of house in Lorong 2 Source: Taylor’s University 2019 Measured Drawing Group 1

39


LIST OF FIGURES

Figure 81

Map of Views to site

39

Figure 91

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 82

View from A, Backyard of house in Lorong 2

View from B, Empty lot in Lorong 1

39

Figure 92

View of Hilltop Private School

39

Figure 93

Hilltop Private School’s main building

40

Figure 94

School and Music Room extension buildings

41

Figure 95

Annex extension building

41

Figure 96

Hilltop in 1940

41

Figure 97

Hilltop in Jalan Muhammad Amin in the 1940s

42

Hilltop in Jalan Hassan Alatas Source: Hilltop Private School brochure

Ms Jennifer Ho during the interview

45

Classroom on Ground Floor level of the main building

46

Computer lab in the annex building

46

Figure 98

Playroom in the annex building

46

Source: Taylor’s University 2019 Measured Drawing Group 1

42

Source: Hilltop Private School brochure

Figure 90

44

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Hilltop Private School brochure

Figure 89

Mr. Dev Chellam during the interview

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 88

43

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 87

Computer labs located in the annex building

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 86

43

Source: Hilltop Private School brochure

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 85

Children playing in the playground of Hilltop Source: Hilltop Private School brochure

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 84

43

Source: Hilltop Private School brochure

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 83

Jennifer Ho and a group of teachers in 1973

Figure 99

Library in the annex building

46

Source: Taylor’s University 2019 Measured Drawing Group 1

42

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 100 Playground behind the school Source: Taylor’s University 2019 Measured Drawing Group 1

47


LIST OF FIGURES

Figure 101 A teacher guiding a student along the blue doubleline

47

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 102 Toys and DIY interactive wall decor on the Annex wall

47

47

48

48

48

48

49

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 115 Annex Floor Plan

52

Figure 116 School Building First Floor Plan

53

Figure 117 School Building Ground Floor Plan

53

Figure 118 Diagram highlighting the Porches

54

Source: Taylor’s University 2019 Measured Drawing Group 1

49

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 110 A nursery level class in session

51

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 109 Children enjoying their packed lunch during recess

Figure 114 Main Building Ground Floor Plan

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 108 Children dancing happily in the playground

51

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 107 Children singing in the music room with their teachers

Figure 113 Main Building First Floor Plan

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 106 Students assembly in Music Room

50

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 105 Children getting their temperature checked

Figure 112 Site Plan Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 104 Picking up the children from their parent’s car

49

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 103 Children playing hopscotch

Figure 111 Parents picking up their children after school

Figure 119 A perspective of the Entrance Porch

54

Source: Taylor’s University 2019 Measured Drawing Group 1

49

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 120 Diagram highlighting the Admin Office Source: Taylor’s University 2019 Measured Drawing Group 1

55


LIST OF FIGURES

Figure 121 The interior perspective of Admin Office

55

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 122 Diagram highlighting the Staff Room

56

56

57

57

58

58

59

Figure 135 Circulation path of Ground Floor (Main Building)

62

Figure 136 Spatial hierarchy of First Floor (Main Building)

63

Figure 137 Spatial hierarchy of Ground Floor (Main Building)

63

Figure 138 Ventilation path through section (Main building)

64

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 129 The walkway of Classroom 2 linking to the other classrooms 59 Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

62

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 130 Diagram highlighting the Covered Walkway

Figure 134 Circulation path of First Floor (Main Building)

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 128 Diagram highlighting Classrooms on the First Floor

61

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 127 Exterior perspective of the Storage Spaces

Figure 133 Spatial organisation of Ground Floor (Main Building)

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 126 Diagram highlighting Storage Spaces of the Main Building

61

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 125 An interior perspective of Classroom 1

Figure 132 Spatial organisation of First Floor (Main Building) Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 124 Diagram highlighting Classroom 1

60

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 123 An interior perspective of Staff Room

Figure 131 The Covered Walkway from Porch to the Playground

Figure 139 Ventilation path at First Floor (Main building)

64

Source: Taylor’s University 2019 Measured Drawing Group 1

60

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 140 Ventilation path at Ground Floor (Main building) Source: Taylor’s University 2019 Measured Drawing Group 1

64


LIST OF FIGURES

Figure 141 Natural lighting path of Ground Floor at 10am

65

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 142 Natural lighting path at Ground Floor at 3pm

65

66

66

67

67

68

68

Figure 155 Natural ventilation path of Annex in section

72

Figure 156 Natural lighting path of Annex at 10am

73

Figure 157 Natural lighting path of Annex at 3pm

73

Figure 158 Arches of the Entrance Porch

74

Source: Taylor’s University 2019 Measured Drawing Group 1

69

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 150 The interior perspective of Computer Lab 1

72

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 149 Diagram highlighting the Computer Labs

Figure 154 Natural ventilation path of Annex in floor plan

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 148 Interior perspective of the playroom

71

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 147 Diagram highlighting the playroom

Figure 153 Hierarchy of Annex

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 146 The interior perspective of the library

70

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 145 Diagram highlighting the library

Figure 152 Circulation path of Annex Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 144 Natural lighting path of First Floor at 3pm

70

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 143 Natural lighting path of First Floor at 10am

Figure 151 Spatial organisation of Annex

Figure 159 Exterior elevation of Hilltop Private School

75

Source: Taylor’s University 2019 Measured Drawing Group 1

69

Source: Taylor’s University 2019 Measured Drawing Group 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 160 Exterior elevation of a British Colonial Building Source: Taylor’s University 2019 Measured Drawing Group 1

75


LIST OF FIGURES

Figure 161 Exterior perspective of Hilltop Private School

76

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 162 Exterior perspective of the Black & White Bungalow

76

77

77

78

78

79

79

Figure 175 Types of columns on the first floor of the main building

82

Figure 176 Square Column

83

Figure 177 Circular Column (Traditional Tuscan Order)

83

Figure 178 Types of Capital

83

Source: Taylor’s University 2019 Measured Drawing Group 1

80

Figure 179 Types of Base

83

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 170 Timber framing of the Black & White Bungalow

82

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 169 Timber roof truss in Hilltop Private School

Figure 174 Types of columns on the ground floor of the main building

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 168 Pitched roof of the Black & White Bungalow

82

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 167 Pitched roof of Hilltop Private School

Figure 173 Columns at the Side Porch

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 166 Timber flooring on upper floor of Black & White Bungalow

81

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 165 Timber flooring on the upper floor of Hilltop Private School

Figure 172 Overhanging eaves of the Black & White of bungalow Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 164 The tiled flooring of the Black & White Bungalow

81

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 163 The clay tile flooring of the Black & White Bungalow

Figure 171 Overhanging eaves of the open corridor

80

Source: Taylor’s University 2019 Measured Drawing Group 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 180 Capital A With Necking Source: Taylor’s University 2019 Measured Drawing Group 1

84


LIST OF FIGURES

Figure 181 Capital B without Necking & Astragal

84

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 182 Capital C

84

84

84

84

84

84

85

Figure 195 D1.1 Staff Room

87

Figure 196 D1.2 Teachers’ Room & Classroom

87

Figure 197 D1.3 Classroom 3, Staff Room & Utility Room

87

Figure 198 D1.4 Classroom 2, Activity 1 and Classroom 4

87

Source: Taylor’s University 2019 Measured Drawing Group 1

85

Figure 199 D1.5 Entrance Porch

87

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 190 Base 3 Round Shaft

86

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 189 Base 2 Without Scotia

Figure 194 Storage 1 & 2, Ground Floor

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 188 Base 1 Traditional Base

85

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 187 Ground Floor Columns Plan

Figure 193 Base 6 Shape Base

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 186 First Floor Columns Plan

85

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 185 Capital F Half Capital

Figure 192 Base 5 Only Plinth Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 184 Capital E Without Necking & Astragal

85

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 183 Capital D Round Shaft

Figure 191 Base 4

85

Source: Taylor’s University 2019 Measured Drawing Group 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 200 D2.1 Classroom 1 Source: Taylor’s University 2019 Measured Drawing Group 1

88


LIST OF FIGURES

Figure 201 D3.1 Toilets, Ground Floor & First Floor

88

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 202 D4.1 Utility Room

88

88

89

89

89

90

92

Figure 215 W2.4 Exterior, Teachers’ Room

92

Figure 216 W2.2 Exterior Classroom 2

92

Figure 217 W2.3 Exterior, Teachers’ Room

92

Source: Taylor’s University 2019 Measured Drawing Group 1

90

Figure 218 W2.2 at Classroom 2

92

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 209 Ground Floor Window Plan

Figure 214 W2.1 Exterior, Activity Room 2

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 208 First Floor Window Plan

91

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 207 W.12 Exterior Classroom1, Ground Floor

Figure 213 W1.2 Interior, Classroom 1, Ground Floor

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 206 D8.1 Storage 3

91

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 205 D7.1 Toilet, Ground Floor

Figure 212 W1.3 Exterior, Admin Office Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 204 D6.1 Storage 1, Storage 2

91

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 203 D5.1 Toilet, Ground Floor

Figure 211 W1.2 Exterior, Classroom 1

90

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 210 W1.1 Exterior, Entrance Porch, Staff Room & Admin Office 91 Source: Taylor’s University 2019 Measured Drawing Group 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 219 W3.1&W3.2 Exterior, Activity Room 1, Male & Female Toilet 92 Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 220 W3.3 Exterior, Activity Room 1, Male & Female Toilet Source: Taylor’s University 2019 Measured Drawing Group 1

93


LIST OF FIGURES

Figure 221 W4.1 Exterior, Storage 1 & 2

93

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 222 W5.1 Interior, Staff Room

94

94

94

94

95

95

95

Figure 235 Ground Floor Ventilation Plan

97

Figure 236 V10 (5 Bars), Classroom 1

98

Figure 237 V13 (7 Bars), Classroom 2

98

Figure 238 V10 (5 Bars), Classroom 1

98

Source: Taylor’s University 2019 Measured Drawing Group 1

96

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 230 W7.2 Exterior, Storage 3 & Toilet

97

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 229 W.7.1 Exterior, Admin Office & Toilet 1

Figure 234 First Floor Ventilation Plan

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 228 W6.2 Exterior, Toilet 1

97

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group

Figure 227 W6.1 Exterior, Utility Room

Figure 233 V12 Exterior, Above Casement Window (W1.3)

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 226 W6.1 Exterior, Utility Room

96

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 225 W5.3 Exterior, Classroom 1

Figure 232 W9.1 Male & Female Toilet Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 224 W5.2 Exterior, Staff Room

96

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 223 W5.3 Exterior Classroom 1

Figure 231 W8.1 Exterior, Storage 4

Figure 239 V2 (3 Bars), Classroom 1

98

Source: Taylor’s University 2019 Measured Drawing Group 1

96

Source: Taylor’s University 2019 Measured Drawing Group 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 240 V14, Toilet Source: Taylor’s University 2019 Measured Drawing Group 1

99


LIST OF FIGURES

Figure 241 V19 Classroom 2, Teachers’ Room

99

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 242 V14 Exterior, Toilet, Ground Floor

99

99

100

100

100

100

101

Figure 255 Perspective view of Admin Office staircase

103

Figure 256 Front view of Admin Office staircase

103

Figure 257 Staircase, Admin Office

104

Figure 258 Staircase, Utility Room

104

Source: Taylor’s University 2019 Measured Drawing Group 1

101

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 250 V17 Interior, Balcony, First Floor

103

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 249 V17 Exterior

Figure 254 Staircase Components

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 248 V17 Balcony, First Floor

102

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group

Figure 247 V16 Exterior Balcony/ Toilets, First Floor

Figure 253 View B: Arch at Entrance Porch

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 246 V17 Interior, Balcony

102

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 245 V16 Female & Male Toilets

Figure 252 View A: Arch at Entrance Porch Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 244 V17 Balcony

102

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 243 V19 Exterior, Classroom 2, Teachers’ Room

Figure 251 Diagram highlighting Arches on Ground Floor Plan

Figure 259 Staircase on Ground Floor Plan

104

Source: Taylor’s University 2019 Measured Drawing Group 1

101

Source: Taylor’s University 2019 Measured Drawing Group 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 260 Newel Post Components Source: Taylor’s University 2019 Measured Drawing Group 1

105


LIST OF FIGURES

Figure 261 Detail of a baluster located at Admin Office

105

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 262 Balusters and Newel Post of Staircase, Admin Office

105

106

106

106

107

107

107

Figure 275 Perspective view of staircase with vinyl finish

110

Figure 276 Timber floors and First Floor Plan

111

Figure 277 Perspective view of Classroom 2, with timber flooring

111

Figure 278 Close up of timber flooring

111

Source: Taylor’s University 2019 Measured Drawing Group 1

107

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 270 Baluster C located at the Balcony

110

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 269 Baluster B located at Classroom 2

Figure 274 Front view of staircase with vinyl finish

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 268 Baluster A located at Side Porch

109

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group

Figure 267 Highlighting balusters on Ground Floor

Figure 273 Cement plaster finishing on back exterior wall

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 266 Highlighting balusters on First floor

109

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 265 Front view of Side Porch balusters

Figure 272 Cement plaster finishing on exterior front wall Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 264 Perspective of Side Porch balusters

108

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 263 Balcony Baluster Components

Figure 271 Roof Structure Detail

Figure 279 Cement flooring at Balcony, First Floor

112

Source: Taylor’s University 2019 Measured Drawing Group 1

107

Source: Taylor’s University 2019 Measured Drawing Group 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 280 Cement flooring on First Floor Plan Source: Taylor’s University 2019 Measured Drawing Group 1

112


LIST OF FIGURES

Figure 281 Cement flooring on Ground Floor Plan

112

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 282 Roughened clay tiles on Ground Floor Plan

113

113

113

114

114

114

115

Figure 295 Ceramic floor tiles, Exterior Toilet, Ground Floor

117

Figure 296 Ceramic wall tiles, Exterior Toilet, Ground Floor

117

Figure 297 Ceramic wall tiles on Ground Floor Plan

118

Figure 298 Ceramic wall tile, Toilet, Ground Floor

118

Source: Taylor’s University 2019 Measured Drawing Group 1

115

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 290 Stretcher Bond Arrangement, Utility Room

117

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 289 Teracotta tiles, Utility Room

Figure 294 Ceramic tiles on Ground Floor Plan

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 288 Clay floor tiles on Ground Floor Plan

116

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group

Figure 287 Stack Bond Arrangement, Toilet, First Floor

Figure 293 Stack Bonding Arrangement, Toilet, Ground Floor

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 286 Teracotta tiles, Toilet, First Floor

116

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 285 Clay floor tiles on First Floor Plan

Figure 292 Painted Mosaic Tiles, Toilet, Ground Floor Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 284 Diagonal Tiles Arrangement, Entrance Porch

116

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 283 Roughened clay tiles, Entrance Porch

Figure 291 Painted Mosaic Tiles on Ground Floor Plan

Figure 299 Ceramic wall tiles, Storage 1, Ground Floor

118

Source: Taylor’s University 2019 Measured Drawing Group 1

115

Source: Taylor’s University 2019 Measured Drawing Group 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 300 Plywood ceiling in Classroom 3, First Floor Source: Taylor’s University 2019 Measured Drawing Group 1

119


LIST OF FIGURES

Figure 301 Roof Materials on Roof Plan

120

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 302 Corrugated Asbestos Cement Sheets on Roof

120

120

121

121

121

122

123

Figure 315 Chipped tiles on Ground Floor Plan

128

Figure 316 Chipped tiles on steps un utility room, ground floor

128

Figure 317 Mould growth on walls on Ground Floor Plan

129

Figure 318 Mould growth on exterior walls behind main building

129

Source: Taylor’s University 2019 Measured Drawing Group 1

124

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 310 Rear perspective of Hilltop

127

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 309 Exploded Axonometric of Roof Components

Figure 314 Slab settlement, Building Apron, Ground Floor

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 308 Exploded Axonometric of Timber Floor Components

127

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group

Figure 307 Columns & Beams on Axonometric Ground Floor Plan

Figure 313 Slab settlement within building apron, Ground Floor Plan

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 306 Structure of Metal Roof Awning

126

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 305 Top view of Metal Roof Awning

Figure 312 Paint flaking on wall, Storage Room, Ground Floor Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 304 Metal Roof Awning on Roof Plan

126

Source: Taylor’s University 2019 Measured Drawing Group 1

Source: Taylor’s University 2019 Measured Drawing Group 1

Figure 303 Corrugated Asbestos Cement Awning

Figure 311 Paint flaking of walls on Ground Floor Plan

Figure 319 Windows with rotten trim on Ground Floor Plan

130

Source: Taylor’s University 2019 Measured Drawing Group 1

125

Source: Taylor’s University 2019 Measured Drawing Group 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 320 Rotten trim on window frames, Ground Floor Source: Taylor’s University 2019 Measured Drawing Group 1

130


ABSTRACT

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 1 INTRODUCTION

Figure 1: View of Johor Bahru.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 1: INTRODUCTION

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 1: INTRODUCTION

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 1: INTRODUCTION

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 1: INTRODUCTION

Figure 2: Johor Location

Figure 3: Johor Bahru Location

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 4: Hilltop Private School Location


CHAPTER 1: INTRODUCTION

Figure 5: JBCC Logo

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 1: INTRODUCTION

Figure 6: Sun Path diagram

Figure 7: Average temperature and precipitation

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 1: INTRODUCTION

Figure 8: Wind rose diagram

Figure 9: Wind speed diagram METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 1: INTRODUCTION

[See pictures pg.10-11]

Figure 10: Map of landmarks.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 1: INTRODUCTION

Figure 11: Entrance of SK St Joseph at Jalan Abdul Rahman Andak

Figure 12: Front view of Penjara Reman Johor, Jalan Ayer Molek

Figure 13: Persada Convention Centre at Jalan Abdullah Ibrahim

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 14: KTMB Museum, Jalan Tun Abdul Razak


CHAPTER 1: INTRODUCTION

Figure 15: View of Jalan Wong Ah Fook Plaza from a bridge.

Figure 16: Chinese historical shophouse at Jalan Tan Hiok Nee.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 17: Majlis Bandaraya Johor Bahru Headquarters from the ICT garden.

Figure 18: Entrance gate to The Great Palace of Johor.


HILLTOP PRIVATE SCHOOL | 12

CHAPTER 1: INTRODUCTION 1.4 About Johor 1.4.5 Historical Timeline 1824

1855

1858

1862

A treaty was signed by the

Official authority of Johor was

Originally named Tanjung Puteri,

Johor rapidly modernised from a

British and the Netherlands in

passed on to Temenggung

what is now known as Johor

village to a town as a result of

which Netherlands ceded the

Raja Daeng Ibrahim through a

Bahru was renamed to Iskandar

Sultan Abu Bakar’s reign.

mainland territories of Johor to

treaty signed between Johor’s

Puteri. (Loh, 2016)

the British. (“World History at

Sultan

KMLA”, 2013)

(“Johor History”, 2014.)

Ali

and

the

The Sultan kept friendly relations

British This decision was made by the

with the British, allowing the

late Temenggung Raja Daeng

development of the city and

Ibrahim

introducing more shop lots with

when

he

gained

This was the start of the heavy

During

influence of colonial architecture

buildings with traditional Malay

sovereignty over the state and

a

in Johor which is evident in

architecture showed up, which

territory of Johor.

architecture and british colonial

some architectural features of

can be seen in the old houses

architecture.

Hilltop such as its arches and

surrounding the

History

columns.

Hilltop.

Figure 19: Bangunan Dato Jaafar

this

period,

more

area around

Figure 20: Johor Jetty

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

mix

of

traditional

Facts

(“Johor and

malay

Bahru

Timeline”,

2016)

Figure 21: Maktab Sultan Abu Bakar (English College)

Figure 22: Johor Main Street


HILLTOP PRIVATE SCHOOL | 13

CHAPTER 1: INTRODUCTION 1.4 About Johor 1.4.5 Historical Timeline 1866

1924

1941

1866

To officiate the opening of the

The opening of the

Johor -

When Johor was invaded by

Johor

famous landmark, Istana Besar,

Singapore

was

a

the Japanese army, the existing

recognised as a city and rapid

as

major

rapid

buildings like the Istana Bukit

urbanisation took place. (“The

appointment of Temenggung

modernisation of Johor. (“Johor

Serene were taken over by the

Short Yet Unique History of

Raja Daim Ibrahim as Sultan

Bahru

Japanese military to be used as

Johor Bahru”, 2016)

Abu Bakar, the state’s capital

Timeline”, 2016)

well

as

the

official

causeway

factor

History

to

the

Facts

and

was renamed to Johor Bahru. (Loh, 2016)

their Bahru

In this period of time, many of

headquarters. History

Bahru

was

officially

(“Johor

Facts

and

Timeline”, 2016)

The

city

centre

grew

to

accommodate the increase in

the old colonial buildings and

business opportunities, making

houses were demolished for

Some houses around Hilltop

way for shoplots, office buildings

newer buildings to be put in

were

and housing development to

place but Hilltop was spared.

Japanese armed forces.

also

used

by

the

accommodate

the

influx

of

people moving to Johor Bahru.

Figure 23: Istana Besar circa 1866

FIgure 24: Johor Bahru Railway Station

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 25: Istana Bukit Serene

Figure 26: Jalan Wong Ah Fook Plaza


CHAPTER 2 METHODOLOGY

Figure 27: Kahying and Gavin measuring the length of the School

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 2: METHODOLOGY

PROJECT LOCATION HILLTOP PRIVATE SCHOOL, JOHOR

UNIVERSITY TAYLOR'S UNIVERSITY LAKESIDE CAMPUS

LECTURER MR. AZIM SULAIMAN

DATE 7 JANUARY 2019 - 28 FEBRUARY 2019 PHASE ONE

NUMBER 1

TASK TITLE

TASK OWNER

START DATE

DUE DATE

DURATION

PCT OF TASK COMPLETE

Measured Drawings

Zien Loon

1.1

Mansion Revit

Zien Loon

22/1/19

28/2/19

36

100%

1.2

Annex Revit

Daren Lai

22/1/19

28/2/19

36

100%

1.3

School & Playground Revit

Gavin Tio

24/1/19

28/2/19

34

100%

1.4

Floor Plans

Zien Loon

22/1/19

28/2/19

36

100% 100%

1.5

Elevations

Gavin Tio

7/2/19

28/2/19

21

1.6

Sections

Daren Lai

7/2/19

28/2/19

21

100%

1.7

Key Plan, Location Plan, Site Plan

Guo Yik

22/1/19

28/2/19

36

100%

Ritchie

25/2/19

28/2/19

3

100%

4.2

Printing

2

Physical Model

2.1

Materials Preparation

Viktor

11/2/19

28/2/19

17

100%

Autocad File Preparation

Hafiz

11/2/19

28/2/19

17

100%

2.3

Lasercut

Kahying

13/2/19

28/2/19

15

100%

2.4

Assemble Model

Adriana

15/2/19

28/2/19

13

100%

3

Report

Azeerah

3.1

Chapter 1: Introduction

Azeerah

7/1/19

25/2/19

48

100%

3.2

Chapter 2: Methodology

Azeerah

7/1/19

25/2/19

48

100%

3.3

Chapter 3: Site Analysis

Priscilla

7/1/19

25/2/19

48

100%

3.4

Chapter 4: Hilltop Private School

Eisyah

7/1/19

25/2/19

48

100%

3.5

Chapter 5: Architectural Elements Chapter 6: Spatial Analysis

WEEK 2 (14/1-18/1) WEEK 3 (21/1-25/1)

WEEK 4 (28/1-1/2)

M

M

M

T

W

T

F

T

W

T

F

Kahying

2.2

3.6

PHASE TWO

WEEK 1 (7/1-11/1)

Alice

7/1/19

25/2/19

48

100%

Aiesya

7/1/19

25/2/19

48

100%

3.7

Chapter 7: Building Construction

Azeerah

7/1/19

25/2/19

48

100%

3.8

Chapter 8: Building Condition

Priscilla

7/1/19

25/2/19

48

100%

3.9

Chapter 9: Conclusion

Angel

17/2/19

25/2/19

8

100%

4

Chapter 10: References and Appendices

Cadence

10/2/19

25/2/19

15

100%

4.1

Others (Declaration, Glossary etc.)

Azeerah

10/2/19

25/2/19

15

100%

4.2

Printing

Ritchie

25/2/19

28/2/19

3

100%

Figure 28: Gantt Chart

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

M

T

W

T

F

T

W

T

F

PHASE THREE

CNY (4/2-8/2) M

T

W

T

F

WEEK 5 (11/2-15/2) WEEK 6 (18/2-22/2)

WEEK 7 (25/2-1/3)

M

M

T

W

T

F

M

T

W

T

F

T

W

T

F


CHAPTER 2: METHODOLOGY

Figure 29: Measuring Tape

Figure 30: Metre Linen Tape

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 31: Digital Measuring Laser

Figure 32: Foldable Ladder


CHAPTER 2: METHODOLOGY

Figure 33: Ms. Jennifer and us in the children’s Library.

Figure 34: Interview session with the building owner and principal.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 2: METHODOLOGY

Figure 35: Eisyah taking a photo of the window from interior.

Figure 36: Videographing the interview session with Mr. Dev

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 2: METHODOLOGY

Figure 37: Kahying sketching the storage hut

Figure 38: Viktor sketching the elevation of the main building.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 2: METHODOLOGY

Figure 39: Kahying measuring the detail of the vent blocks.

Figure 40: Zien Loon measuring the height of the beam.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 2: METHODOLOGY

Figure 41: Ritchie doing an inventory check on the data collected.

Figure 42: Gavin checking and refining the collected data.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 1: INTRODUCTION

Figure 43: Gavin referring to the data inventory for the Revit Model.

Figure 44: Zien Loon working on the Revit Model.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 2: METHODOLOGY

Figure 45: Group briefing on site before beginning tasks.

Figure 46: Data Inventory after site visit at hotel meeting room.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 3 HILLTOP SITE ANALYSIS

Figure 47: Parents fetching children at Hilltop [Jalan Hassan Alatas]

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 3: HILLTOP SITE ANALYSIS

Figure 48: Map of road accessibility METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 3: HILLTOP SITE ANALYSIS

Figure 20: Traffic at Jalan Yahya Awal at 12 PM.

Figure 49: Map of vehicular circulation METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 3: HILLTOP SITE ANALYSIS

Figure 50: Map of land use zoning

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 3: HILLTOP SITE ANALYSIS

[See pictures pg. 29-32]

Figure 51: Map of Historical Residences

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 3: HILLTOP SITE ANALYSIS

Figure 52: Front view of House A.

Figure 53: Perspective view of House A.

Figure 54: Back of house where there used to be a village.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 3: HILLTOP SITE ANALYSIS

Figure 55: Front view of House B.

Figure 56: Back view of House B.

Figure 57: Example of a Traditional Malay House. Retrieved from Wikipedia.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 3: HILLTOP SITE ANALYSIS

Figure 58: House C along Lorong 2

Figure 59: Interior of House C.

Figure 60: Hj. Mohamad Khalid and wife.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 3: HILLTOP SITE ANALYSIS

Figure 61: Interior of House C.

Figure 62: House C along Lorong 2

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 3: HILLTOP SITE ANALYSIS

[See pictures pg. 34]

Figure 63: Map of activities in micro site.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 3: HILLTOP SITE ANALYSIS

Figure 64: Shop lot along Jalan Yahya Awal

Figure 65: Sekolah Rendah Islam at Jalan Hassan Alatas

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 66: Sekolah Kebangsaan Infant Jesus Convent

Figure 67: Students at Restoran Jamilah opposite SKI.J Convent


CHAPTER 3: HILLTOP SITE ANALYSIS

[See pictures pg. 36]

Figure 68: Map of landmarks in micro site METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 3: HILLTOP SITE ANALYSIS

Figure 69: Wisma TNB at Jalan Yahya Awal

Figure 70: Wisma Hokkien and Petron at Jalan Yahya Awal

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 71: Sekolah Kebangsaan Infant Jesus Convent

Figure 72: Ayer Molek Police Station at Jalan Seri Lalang


CHAPTER 3: HILLTOP SITE ANALYSIS

Figure 74: View A, Abandoned house directly from playground.

Figure 75: View B, Wisma Hokkien in the far distance.

Figure 73: Map of views from site

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 76: View C, Wisma TNB in the far distance from playground.


CHAPTER 3: HILLTOP SITE ANALYSIS

Figure 78: View E, Front house neighbour.

Figure 79: View F, Corporate building in the far distance.

Figure 77: Map of views from site

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 80: View G, Convent School classrooms block from playground.


CHAPTER 3: HILLTOP SITE ANALYSIS

Figure 82: View from A, Backyard of house in Lorong 2.

Figure 83: View from B, Empty lot in Lorong 1.

Figure 81: Map of views to site

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4 HILLTOP PRIVATE SCHOOL

Figure 84: View of Hilltop Private School.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 85: Hilltop Private School’s main building.

Figure 86: School and Music Room extension buildings.

Figure 87: Annex extension building.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


HILLTOP PRIVATE SCHOOL | 42

CHAPTER 4: HILLTOP PRIVATE SCHOOL 4.2 Historical Timeline

1940

1945

Hilltop is a private school that was

Hilltop relocated to another building,

Hilltop shifted once more to the current

established in Jalan Skudai by British

located on top of a hill. They moved from

house, rented from Dato V.V. Chellam. It

officials who stayed in Johor at the time. It

Jalan Skudai to a street called Jalan

was located at a road called Jalan

was attended by primarily British children

Muhammad Amin where they settled for

Saujana which is now known as Jalan

rather than the local children.

a few years.

Hassan Alatas.

Figure 88: Hilltop in the 1940s. Retrieved from Hilltop Private School brochure

Figure 89: Hilltop in Jalan Muhammad Amin in the 1940s. Retrieved from Hilltop Private School brochure

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

1963

Figure 90: Hilltop in Jalan Hassan Alatas. Retrieved from Hilltop Private School brochure


HILLTOP PRIVATE SCHOOL | 43

CHAPTER 4: HILLTOP PRIVATE SCHOOL 4.2 Historical Timeline

1973

1975

1980

Ms. Jennifer Ho came to the school

Music room was constructed, followed

The annex building was rented by the

after the British officials pulled out and

by a double storey building used as

school and used for computer class

was made the principal, a post she has

classrooms for the older children A

and a library, as well as classroom

held up until today.

playground area was also constructed

areas for the younger children.

later.

Figure 91: Ms. Jennifer Ho and a group of teachers in 1973.

Figure 92: Children playing in the playground of Hilltop.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 93: Computer labs located in the annex building.


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 94: Mr. Dev Chellam during the interview.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 95: Ms. Jennifer Ho during the interview.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 96: Classroom on Ground Floor level of main building.

Figure 97: Computer lab in the Annex building.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 98: Playroom in the Annex building.

Figure 99: Library in the Annex building.


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 100: Playground behind the school.

Figure 101: A teacher guiding a student along the blue doubleline.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 102: Toys and DIY interactive wall decor on the annex wall.

Figure 103: Children playing hopscotch.


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 104: Picking up the children from their parents car.

Figure 105: Children getting their temperature checked.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 106: Students assembly in music room.

Figure 107: Children singing in the music room with their teachers.


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 108: Children dancing happily in the playground.

Figure 109: Children enjoying their packed lunch during recess.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 110: A nursery level class in session.

Figure 111: Parents picking up their children after school.


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 112: Site Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 113: Main Building First Floor Plan

Figure 114: Main Building Ground Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 115: Annex Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 116: School Building Ground Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 117: School Building First Floor Plan


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 119: A perspective of the Entrance Porch

Figure 118: Diagram highlighting the porches

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 121: An interior perspective of Admin Office

Figure 120: Diagram highlighting the Admin Office

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 123: An interior perspective of Staff Room

Figure 122: Diagram highlighting the Staff Room

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 125: An interior perspective of the Classroom 1

Figure 124: Diagram highlighting Classroom 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 127: Exterior view of the storage spaces

Figure 126: Diagram highlighting storage spaces of the main building

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 129: The walkway of Classroom 2 linking to the other classrooms

Figure 128: Diagram highlighting Classrooms on the First Floor

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 131: The covered walkway from porch to the playground

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 130: Shaded walkway on Site Plan


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 132: Spatial organisation of the First Floor

Figure 133: Spatial organisation of the Ground Floor

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 134: Circulation path of First Floor

Figure 135: Circulation path of Ground Floor

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 136: Spatial hierarchy of First Floor

Figure 137: Spatial hierarchy of Ground Floor

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 139: Ventilation path of First Floor

Figure 138: Ventilation path of main building through section

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 140: Ventilation path of Ground Floor


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 141: Natural lighting diagram of Ground Floor at 10am

Figure 142: Natural lighting diagram of Ground Floor at 3pm

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 143: Natural lighting diagram of First Floor at 10am

Figure 144: Natural lighting diagram of First Floor at 3pm METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 146: The interior perspective of the library

Figure 145: Diagram highlighting the Library

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 148: The interior perspective of the playroom

Figure 147: Diagram highlighting the playroom

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 150: The interior perspective of the computer lab

Figure 149: Diagram highlighting computer labs

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 151: Spatial Organisation of Annex

Figure 152: Circulation path of Annex

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 153: Hierarchy of Annex

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 154: Natural Ventilation path of Annex in floor plan

Figure 155: Natural Ventilation path of Annex in section

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 4: HILLTOP PRIVATE SCHOOL

Figure 156: Natural lighting path of Annex at 10am

Figure 157: Natural lighting path of Annex at 3pm METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5 ARCHITECTURAL ELEMENTS

Figure 158: Arches of Porch at the Entrance.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 159: Exterior Elevation of Hilltop Private School

Figure 160: Exterior of a British Colonial Building

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 161: Exterior perspective of Hilltop Private School

Figure 162: Exterior perspective of the Black & White Bungalow.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 163: The clay tile flooring of Hilltop Private School

Figure 164: The tiled flooring of the Black & White Bungalow

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 165: Timber flooring on the upper floor of Hilltop Private School

Figure 166: Timber flooring on the upper floor of a Black & White Bungalow

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 167: Pitched roof of Hilltop Private School

Figure 168: Pitched roof of the Black & White Bungalow

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 169: Timber roof truss in Hilltop Private School

Figure 170: Timber framing of the Black & White Bungalow

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 171: Overhanging eaves of the open corridor

Figure 172: Overhanging eaves of the Black & White Bungalow

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 174: Types of columns on the ground floor of the main building

Figure 173: Columns at the Side Porch Figure 175: Types of columns on the first floor of the main building

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 176: Square Column

Figure 177: Circular Column (Traditional Tuscan Order)

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 178: Types of Capital

Figure 179: Types of Base


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 180: Capital A With Necking

Figure 181: Capital B Without Necking & Astragal

Figure 182: Capital C

Figure 186: First Floor Columns Plan

Figure 183: Capital D Round Shaft

Figure 184: Capital E Without Necking & Astragal

Figure 185: Capital F Half Capital

Figure 187: Ground Floor Columns Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 188: Base 1 Traditional Base

Figure 189: Base 2 Without Scotia

Figure 190: Base 3 Round Shaft

Figure 186: First Floor Columns Plan

Figure 191: Base 4

Figure 192: Base 5 Only Plinth

Figure 193: Base 6 Shape Base

Figure 187: Ground Floor Columns Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 186: First Floor Columns Plan

Figure 194: Storage 1 & 2, Ground Floor

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 187: Ground Floor Columns Plan


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 204: D1.3 Classroom 3, Staff Room and Utility Room.

Figure 195: D1.1 Staff Room

Figure 196: D1.2 Teachers’ Room and Classroom 4

Figure 197: D1.3 Classroom 3, Staff Room and Utility Room

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 198: D1.4 Classroom 2, Activity 1 and Classroom 4

Figure 199: D1.5 Entrance Porch


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 200: D2.1 Classroom 1

Figure 201: D3.1 Toilets, Ground Floor & First Floor

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 202: D4.1 Utility Room

Figure 203: D5.1 Toilet, Ground Floor


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 204: D6.1 Storage 1, Storage 2.

Figure 205: D7.1 Toilet, Ground Floor

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 206: D8.1 Storage 3


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 208: First Floor Window Plan

Figure 207: W.12 Exterior Classroom 1, Ground Floor

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 209: Ground Floor Window Plan


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 213: W1.2 Interior Classroom 1, Ground Floor

Figure 210: W1.1 Exterior Entrance Porch,Staff Room & Admin Office

Figure 211: W1.2 Exterior Classroom 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 212: W1.3 Exterior Admin Office


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 218: W2.2 at Classroom 2

Figure 214: W2.1 Exterior Activity Room 2

Figure 215: W2.4 Exterior Teachers’ Room

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 216: W2.2 Exterior Classroom 2

Figure 217: W2.3 Exterior Teachers’ Room


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 219: W3.1 & W3.2 Exterior Activity Room 1

Figure 220: W3.3 Exterior Activity Room 1, Male & Female Toilet

Figure 221: W4 Exterior Storage 1 & 2

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 225: W5.3 Exterior Classroom 1

Figure 222: W5.1 Interior Staff Room

Figure 223: W5.3 Exterior Classroom 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 224: W5.2 Exterior Staff Room


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 227: W6.1 Exterior, Utility Room

Figure 226: W6.1 Exterior, Utility Room

Figure 228: W6.2 Exterior Toilet 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 229: W7.1 Exterior Admin Office & Toilet 1

Figure 230: W7.2 Exterior Storage 3 & Toilet

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 231: W8.1 Exterior Storage 4

Figure 232: W9.1 Male & Female toilet


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 234: First Floor Ventilation Plan

Figure 233: V12 Exterior above Casement Window (W1.3) Admin Office Figure 235: Ground Floor Ventilation Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 237: V13 (7 Bars), Classroom 2

Figure 238: V10 (5 Bars), Classroom 1

Figure 239: V2 (3 Bars), Admin Office & Utility Room

Figure 236: V10 (5 Bars), Classroom 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 242: V14 Exterior, Toilet, Ground Floor

Figure 240: V14, Toilet

Figure 241: V19 Classroom 2, Teachers’ Room

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 243: V19 Exterior Classroom 2, Teachers’ Room


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 246: V17 Interior, Balcony

Figure 244: V17 Balcony

Figure 245: V16 Female & Male Toilets

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 247: V16 Exterior Balcony / Toilets, First Floor


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 249: V17 Exterior

Figure 248: V17 Balcony, First Floor

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 250: V17 Interior Balcony, First Floor


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 252: View A: Arch at Entrance Porch

B

Figure 253: View B: Arch at Entrance Porch A Figure 251: Diagram highlighting arches on ground floor plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 255: Perspective view of Admin Office staircase

Figure 254: Staircase Components

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 256: Front view of Admin Office staircase


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 259: Staircase on Ground Floor Plan

Figure 257: Staircase Admin Office

Figure 258: Staircase Utility Room

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 262: Balusters and newel post of staircase, Admin Office

Figure 260: Newel post components

Figure 261: Detail of a baluster located at Admin Office

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 5: ARCHITECTURAL ELEMENTS

Figure 264: Perspective of Side Porch balusters

Figure 265: Front view of Side Porch balusters

Figure 263: Balcony Baluster components

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


HILLTOP PRIVATE SCHOOL | 107

CHAPTER 5: ARCHITECTURAL ELEMENTS 5.2 Architectural Elements 5.2.7 Fencing Balusters

B Figure 268: Baluster A located at Side porch

C

Figure 267: Highlighting balusters on first floor

A Figure 269: Baluster B located at Classroom 2

Figure 266: Highlighting balusters on ground floor

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 270: Baluster C located at the Balcony


CHAPTER 6 STRUCTURAL ELEMENTS

Figure 271: Roof Structure Detail

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 272: Cement plaster finishing on exterior front wall

Figure 273: Cement plaster finishing on back exterior wall

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 274: Front view of staircase with vinyl finish

Figure 275: Perspective view of staircase with vinyl finish

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 277: Perspective view of Classroom 2, with timber flooring

Figure 278: Close up of timber flooring

Figure 276: Timber Floors on First Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 280: Cement flooring on First Floor Plan

Figure 279: Cement flooring at balcony, First Floor

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 281: Cement flooring on Ground Floor Plan


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 283: Roughened clay tiles, Entrance Porch

Figure 282: Roughened clay tiles on Ground Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 284: Diagonal Tiles Arrangement, Entrance Porch


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 286: Teracotta tiles Toilet, First Floor.

Figure 285: Clay floor tiles on First Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 287: Stack Bond Arrangement Toilet, First Floor


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 289: Teracotta tiles Utility Room

Figure 288: Clay floor tiles on Ground Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 290: Stretcher Bond Arrangement, Utility Room


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 292: Painted Mosaic Tiles Toilet, Ground Floor

Figure 293: Stack Bonding Arrangement, Toilet, Ground Floor

Figure 291: Painted Mosaic Tiles on Ground Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 295: Ceramic floor tiles Exterior Toilet, Ground Floor

Figure 294: Ceramic tiles on Ground Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Figure 296: Ceramic wall tiles Exterior Toilet, Ground Floor


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 298: Ceramic wall tiles Toilet, Ground Floor

Figure 299: Ceramic wall tiles Storage 1, Ground Floor Figure 297: Ceramic wall tiles on Ground Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 300: Plywood ceiling in Classroom 3 First Floor

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 302: Corrugated Asbestos Cement Sheets on Roof

Figure 303: Corrugated Asbestos Cement Awning Figure 301: Roof Materials on Roof Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 305: Top view of Metal Roof Awning

Figure 306: Structure of Metal Roof Awning

Figure 304: Metal Roof Awning on Roof Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 307: Columns & Beams on Axonometric Ground Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 308: Exploded Axonometric of Timber Floor Components

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 6: STRUCTURAL ELEMENTS

Figure 309: Exploded Axonometric of Roof Components METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 7 BUILDING CONDITION

Figure 310: Rear Perspective of Hilltop.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 7: BUILDING CONDITION

Figure 312: Paint flaking on wall Storage Room, Ground Floor

Figure 311: Paint flaking of walls on Ground Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 7: BUILDING CONDITION

Figure 3.14: Slab settlement Building Apron, Ground Floor

Figure 313: Slab settlement within building apron on Ground Floor Plan METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 7: BUILDING CONDITION

Figure 316: Chipped tiles on steps in utility room, ground floor.

Figure 315: Chipped tiles on Ground Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 7: BUILDING CONDITION

。

Figure 318: Mould growth on exterior walls behind main building

Figure 317: Mould growth on walls on Ground Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 7: BUILDING CONDITION

Figure 320: Rotten trim on window frames Ground Floor

Figure 319: Windows with rotten trim on Ground Floor Plan

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 8 CONCLUSION

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 8: CONCLUSION

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9 REFERENCES & APPENDICES

Figure 331: Interview session with Hilltop owner.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

En. Zainal: Sure, please come in.

En. Zainal: Sure, go ahead.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES 9.3 Glossary Abacus [84] A flat slab forming the uppermost member or division of the capital or a column. Adhesion [126] The action or process of adhering to a surface or an object. Adjacent [31, 41, 63, 67, 141] Next to or adjoining something else. Amenity [47] A Desirable or useful feature or facility of a building or a place. Annex [3, 20, 40, 41, 43, 46, 47, 52, 60, 67, 133] Added as an extra or subordinate part, especially to a document. Antique [10, 31] A collectable object that has a high value because of its age and quality. Artefacts [11] An object made by a human being, typically one of cultural or historical interest. Baluster [103, 106] A short decorative pillar forming part of a series of supporting a rail or coping.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 259

Beams [57, 76, 122, 123] A long, sturdy piece of squared timber or metal used to support the roof or floor of a building. Capital [83, 84] The uppermost elements of a column. Causeway [5,13] A raised road or track across low or wet ground. Column [12, 20, 82, 83, 122 ] An upright pillar supporting an arch, entablature, or other structure or standing alone as a monument. Corrugated [120] A material or surface shaped into a series of parallel ridges or grooves to give added rigidity or strength.. Colonial [10, 12, 13, 28, 29, 51, 75, 76, 82, 86, 90, 96, 104, 122] A neoclassical style of architecture characteristic of the period of the British colonies across the world before independence. Commerce [6] The activity of buying or selling, especially on a large scale. Convent [34, 36, 44, 134] A school attached to or run by a convent.


CHAPTER 9: REFERENCES & APPENDICES 9.3 Glossary Decoupled [130] Separate, disengage or dissociate (something) from something else. Deleterious [120] Causing harm or damage. Demolish [30] Pull or knock down a building. Digitising [22] Convert (pictures or sound) into a digital form that can be processed by a computer. Durable [112, 114, 120, 124] Able to withstand wear, pressure, or damage; hard-wearing. Eaves [47, 58, 79, 81, 124] The part of a roof that meets or overhangs the walls of a building. Eclectic [82] Deriving ideas, style or taste from a broad and diverse range of Sources. Egress [103] The action of going out or leaving a place.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 260

Enamel [116] An opaque or semi transparent glossy substance that is a type of glass, applied by vitrification to hard surfaces for ornament or as protective coating. Expansion [123] The action of becoming larger or more extensive. Friction [116] The resistance that one surface or object encounters when moving over another. Gothic Architecture [90] the style of architecture prevalent in western Europe in the 12th–16th centuries characterized by pointed arches, rib vaults, and flying buttresses, together with large windows and elaborate tracery. Grout [114] A mortar or paste for filling crevices, especially the gaps between wall or floor tiles. Gypsum [119] A soft white or grey mineral consisting of hydrated calcium sulphate.


HILLTOP PRIVATE SCHOOL | 261

CHAPTER 9: REFERENCES & APPENDICES 9.3 Glossary Heirloom [11] A valuable object that has belonged to a family for several years.

Load [102, 122, 124] A weight or source of pressure borne by something or someone.

Impose [124] Put a restriction in place.

Louvre [94, 95, 99] Each of a set of angled slats fixed or hung at regular intervals in a door, shutter, or screen to allow air or light to pass through.

Incarcerate [10] Imprison or confine. Institutional [27] Of, in or like an institution or institutions. Integrate [47] Combine one thing with another to form a whole. Inventory [12, 21, 23] Make a complete list of. Joists [123, 124] A length of timber or steel supporting part of the structure of a building, typically arranged in parallel series to support a floor or ceiling. Landmarks [5, 9, 10, 11, 35, 36]] A feature of a landscape or town that is easily recognized from a distance.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Monsoon [8] A seasonal prevailing wind in the region of South and SE Asia, blowing from the south-west between May and September and bringing rain (the wet monsoon) or from the north-east between October and April (the dry monsoon). Necking [84] A continuation of the shaft of a column, but is set off from it visually by one or more narrow grooves. Nosing [110] A rounded edge of a step or moulding. Oblique [70] Acute or obtuse. Overhang [79, 81] A part of something that extends or hangs over something else.


HILLTOP PRIVATE SCHOOL | 262

CHAPTER 9: REFERENCES & APPENDICES 9.3 Glossary Pitched Roof [79] A roof with sloping surfaces. Plinth [85] The lowest part of the base of a column or pedestal. Precipitation [7] Rain, snow, sleet or hail that falls to or condenses on the Ground. Predominant [76] Present as the strongest or main element. Premier [41] First in importance, order, or position; leading. Protruding [118] Sticking out; projecting. Purlin [124] A horizontal beam along the length of the roof, resting on principals and supporting the common rafters or boards. Reverberation [112] Prolongation of a sound; resonance.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

Rumah Papan [30, 143] Traditional dwellings, originating before the arrival of foreign modern influences and constructed by the indigenous ethnic Malay of the Malay Peninsula, Sumatra and Borneo. Scotia [85] A concave moulding between two fillets of a column. Slab [127] A large, thick, flat piece of stone or concrete, typically square or rectangular in shape. Sovereignty [12] Supreme power or authority. Spearhead [6] Lead (an attack or movement) Sticking [87, 88, 89] A profile machined into the edges of stiles and rails, providing character and definition to the door. Synthesise [23] Combine a number of things into a coherent whole.


CHAPTER 9: REFERENCES & APPENDICES 9.3 Glossary Temenggung [12, 13] An old Malay title of nobility, usually given to the chief of public Security. Township [6] A new area being developed for residential and industrial use by Speculators. Urbanisation [13] The process of making an area more urban. Unglazed [113] Not overlaid or covered with a smooth, shiny coating or finish. Unseasoned [123] Used to describe timber that has not been treated or matured. Veranda [81] A roofed platform along the outside of a house level with the ground floor. Wind Rose [8] A graphic tool used by meteorologists to give a succinct view of how wind speed and direction are typically distributed at a particular location.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 263


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


HILLTOP PRIVATE SCHOOL | 270

CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Front elevation of House located at Lorong 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


HILLTOP PRIVATE SCHOOL | 271

CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Front elevation of House A located at Lorong 2.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Perspective view of House A located at Lorong 2.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 272


HILLTOP PRIVATE SCHOOL | 273

CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Back elevations of Houses located at Lorong 2.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Perspective view of House C located at Lorong 2.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 274


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Hj. Mohamad Khalid and wife, house owners located at Lorong 2.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 275


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Interior of House C at Lorong 2, decorated with antiques collected by the house owners.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 276


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Interior of House C living room, decorated with antiques.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 277


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

HILLTOP PRIVATE SCHOOL | 278

Perspective view of Sekolah Kebangsaan Infant Jesus Convent, located between Jalan Yahya Awal and Jalan Alatas.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Perspective view of Sekolah Kebangsaan Infant Jesus Convent’s main entrance.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 279


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Front elevation view of Ayer Molek Police Station located at Jalan Seri Lalang.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 280


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Perspective view of Ayer Molek Police Station and Jalan Seri Lalang.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 281


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Front Elevation view of the abandoned Penjara Reman Johor Bahru.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 282


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.1 Hilltop Neighbourhood

Perspective of back view of school from Jalan Hassan Alatas.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 283


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Perspective view of Hilltop Private School located at Jalan Hassan Alatas.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 284


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Cheerful students and their parents during dismissal time at Hilltop Private School.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 285


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Parents picking up their children with their cars parked at the side of the road at Jalan Hassan Alatas.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 286


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Parents and students happily greeting each other during dismissal time at Hilltop Private School.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 287


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Students obediently sitting with their classmates in the designated waiting area.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 288


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Kahying interacting with students while they waited for their teachers.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 289


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Children of Hilltop Private School enjoying themselves in the playground.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 290


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Hilltop Private School students waiting patiently for their parents at the designated waiting area.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 291


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Hilltop Private School students enthusiastically gathering at the entrance porch during dismissal.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 292


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Formal interview session with the building owner, Mr. Dev Chellam.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 293


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Formal interview with Mr. Dev Chellam with all the group members and Ms. Jennifer in attendance.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 294


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Close up shot of Mr. Dev Chellam and Ms. Jennifer during our interview session.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 295


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Mr. Dev Chellam, Ms. Jennifer and our group members during the interview session.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 296


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Close up view of framed pictures of the royal family of Johor located at the Admin Office.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 297


HILLTOP PRIVATE SCHOOL | 298

CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Perspective view of Classroom 2.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


HILLTOP PRIVATE SCHOOL | 299

CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Elevation view of Classroom 2.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


HILLTOP PRIVATE SCHOOL | 300

CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Elevation view of Classroom 2.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Perspective view of the playground and neighboring houses.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 301


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Close up view of staircases and slides located at the playground.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 302


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Perspective view of the playground from the music room.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 303


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Elevation view of the school and the playground.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 304


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

View of the playground and the school from Lorong 1

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 305


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Close up view of some of the recreational facilities located at the playground.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 306


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Close up view of the roofing details of one of the structures located at the playground.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 307


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Kahying and Gavin enjoying some of the recreational facilities located at the playground.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 308


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Perspective view of the playground and the school.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 309


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Perspective view of the playground, music room and school.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 310


HILLTOP PRIVATE SCHOOL | 311

CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Front elevation of the Music Room.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Close up view of the Music Room door and shading devices.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 312


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Elevation view of the Music Room main entrance.

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 313


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Elevation view of the entrance to the Admin Office & Uncle Richard, Caretaker

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 314


HILLTOP PRIVATE SCHOOL | 315

CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Group photo in front of Hilltop Private School

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019


CHAPTER 9: REFERENCES & APPENDICES 9.5 Appendices 9.5.2 Hilltop Private School

Perspective view of Hilltop Private School from empty lot at Lorong 2

METHODS OF DOCUMENTATION AND MEASURED DRAWINGS | ARC60305 | JANUARY 2019

HILLTOP PRIVATE SCHOOL | 316



A

C

B

E

D

G

F

H

J

I

L

K

28270 975

1535

3355

3235

1870

950

1750

990

3660

4510

5440

3680

1

CLASSROOM 1

2

3625

SIDE PORCH

1795

15835

3

INACCESSIBLE

4 1900

TOILET ENTRANCE PORCH

5 CORRIDOR ADMIN OFFICE

2400

STAFF ROOM

UTILITY ROOM

6

STORAGE 2

1210

TOILET INACCESSIBLE

1225

7

STORAGE 1

STORAGE 3

8 LEGEND

WATER DISCHARGE DIRECTION

ADMIN OFFICE

MAIN BUILDING GROUND FLOOR PLAN SCALE 1:150

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

MAIN BUILDING GROUND FLOOR PLAN

21 JANUARY 2019 28 FEBRUARY 2019 1:150 NG ZIEN LOON MR. AZIM SULAIMAN GROUP 1

HPS / MB / 01

02 47


A

C

B

E

D

G

F

H

J

I

L

K

28270 975

1535

3355

3235

1870

950

1750

990

3660

4510

5440

1

3680

ACTIVITY ROOM 2

2

3625

STORAGE 4

TEACHERS' ROOM

CLASSROOM 4

FEMALE TOILET

1795

15835

3

4 1900

MALE TOILET CLASSROOM 2

5

2400

CLASSROOM 3

ACTIVITY ROOM 1

BALCONY

7

1225

1210

6

8

LEGEND

ADMIN OFFICE

MAIN BUILDING FIRST FLOOR PLAN SCALE 1:150

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

MAIN BUILDING FIRST FLOOR PLAN

21 JANUARY 2019 28 FEBRUARY 2019 1:150 NG ZIEN LOON MR. AZIM SULAIMAN GROUP 1

HPS / MB / 02

03 47


A

C

B

E

D

G

F

H

L

K

J

I 28270

975

1535

3355

3235

1870

950

1750

990

3660

4510

5440

3680

1

3625

2

1795

15835

3

1900

4

2400

5

7

1225

1210

6

8

MAIN BUILDING ROOF PLAN SCALE 1:150

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

MAIN BUILDING ROOF PLAN

21 JANUARY 2019 28 FEBRUARY 2019 1:150 NG ZIEN LOON MR. AZIM SULAIMAN GROUP 1

HPS / MB / 03

04 47


A

C

B

E

D

G

F

H

L

K

J

I 28270

975

1535

3355

3235

1870

950

1750

990

3660

4510

5440

3680

1

3625

2

CLASSROOM 1

SIDE PORCH

1795

15835

3

1900

4

TOILET ENTRANCE PORCH

5 ADMIN OFFICE

2400

STAFF ROOM

6 1210

UTILITY ROOM STORAGE 3

STORAGE 2

STORAGE 1

1225

TOILET

7

INACCESSIBLE

8 LEGEND

ADMIN OFFICE

MAIN BUILDING GROUND FLOOR CEILING PLAN SCALE 1:150

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

MAIN BUILDING GROUND FLOOR CEILING PLAN

21 JANUARY 2019 28 FEBRUARY 2019 1:150 NG ZIEN LOON MR. AZIM SULAIMAN GROUP 1

HPS / MB / 04

05 47


A

C

B

E

D

G

F

H

J

I

L

K

28270 975

1535

3355

3235

1870

950

1750

990

3660

4510

5440

3680

1

ACTIVITY ROOM 2

2

3625

STORAGE 4

TEACHERS' ROOM

MALE TOILET CLASSROOM 4

1795

15835

3

CLASSROOM 2

1900

4

FEMALE TOILET

5

2400

CLASSROOM 3

1210

6 ACTIVITY ROOM 1

1225

7

BALCONY

8

LEGEND

ADMIN OFFICE

MAIN BUILDING FIRST FLOOR CEILING PLAN SCALE 1:150

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

MAIN BUILDING FIRST FLOOR CEILING PLAN

21 JANUARY 2019 28 FEBRUARY 2019 1:150 NG ZIEN LOON MR. AZIM SULAIMAN GROUP 1

HPS / MB / 05

06 47


8

7

6

5

3

4

2

1

15765 1155

1210

2400

1900

1795

3625

3680

Top of Roof Level

2955

10545

Roof Level

3765

7590

First Floor

3825

3825

Ground Floor 0

MAIN BUILDING FRONT ELEVATION SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

MAIN BUILDING FRONT ELEVATION

21 JANUARY 2019 28 FEBRUARY 2019 1:150 HAFIZMASRI MR. AZIM SULAIMAN GROUP 1

HPS / MB / 06

07

47


2

1

3

6

5

4

7

8

15763 3678

3627

1793

1900

2400

1212

1153

Top of Roof Level

2955

10545

Roof Level

3765

7590

First Floor

3825

3825

Ground Floor 0

MAIN BUILDING REAR ELEVATION SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

MAIN BUILDING REAR ELEVATION

21 JANUARY 2019 28 FEBRUARY 2019 1:150 HAFIZMASRI MR. AZIM SULAIMAN GROUP 1

HPS / MB / 07

08

47


L

K

J

G

H

I

E

F

C

D

A

B

28270 5441

4508

3660

990

1750

953

1872

3234

3353

1535

977

Top of Roof Level

2955

10545

Roof Level

3765

7590

First Floor

3825

3825

VOID

Ground Floor 0

MAIN BUILDING RIGHT ELEVATION SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

MAIN BUILDING RIGHT ELEVATION

21 JANUARY 2019 28 FEBRUARY 2019 1:150 HAFIZMASRI MR. AZIM SULAIMAN GROUP 1

HPS / MB / 08

09

47


A

C

B

E

D

G

F

H

L

K

J

I

28270 977

1535

3353

3234

1872

953

1750

990

3660

4508

5441

Top of Roof Level

2955

10545

Roof Level

3765

7590

First Floor

3825

3825

VOID

Ground Floor 0

MAIN BUILDING LEFT ELEVATION SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

MAIN BUILDING LEFT ELEVATION

21 JANUARY 2019 28 FEBRUARY 2019 1:150 HAFIZMASRI MR. AZIM SULAIMAN GROUP 1

HPS / MB / 09

10

47


A

B

C

E

D

G

F

J

I

H

L

K

28270

975

1535

3355

3235

1870

950

1750

990

3660

4510

5440

Top of Roof Level

2955

10545

INACCESSIBLE

Roof Level

3765

7590

VOID

First Floor 3825

3825

INACCESSIBLE

VOID INACCESSIBLE

Ground Floor 0

MAIN BUILDING SECTION X-X' SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

MAIN BUILDING SECTION X-X'

21 JANUARY 2019 28 FEBRUARY 2019 1:150 NG ZIEN LOON MR. AZIM SULAIMAN GROUP 1

HPS / MB / 10

11 47


1

2

3

4

5

6

7

8

15765 3680

3625

1795

1900

2400

1210

1155

Top of Roof Level

2955

10545

INACCESSIBLE

DETAIL 1

DETAIL 1

Roof Level

SCALE 1:30

3765

7590

DETAIL 2

First Floor

3825

3825

465

Ground Floor 0

DETAIL 2

MAIN BUILDING SECTION Y-Y'

SCALE 1:30

SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

MAIN BUILDING SECTION Y-Y' DETAIL 1 DETAIL 2

21 JANURARY 2019 28 FEBRUARY 2019 1:150 NG ZIEN LOON MR. AZIM SULAIMAN GROUP 1

HPS / MB / 11

12 47


8

7

6

5

4

2

3

12085 1155

1210

2400

1900

1795

3625

Roof Level

3765

7590

First Floor 3825

3825

INACCESSIBLE

Ground Floor 0

MAIN BUILDING SECTION Z-Z' SCALE 1:150 LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

MAIN BUILDING SECTION Z-Z'

21 JANUARY 2019 28 FEBRUARY 2019 1:150 NG ZIEN LOON MR. AZIM SULAIMAN GROUP 1

HPS / MB / 12

13 47


ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

SCALE 1:200

MAIN BUILDING EXPLODED ISOMETRIC

MAIN BUILDING EXPLODED ISOMETRIC

GROUP 1

MR. AZIM SULAIMAN

NG ZIEN LOON

1:200

28 FEBRUARY 2019

21 JANUARY 2019

HPS / MB / 13

GROUND FLOOR

FIRST FLOOR

ROOF

14 47


A.1

B.1

C.1

D.1

E.1

F.1

G.1

H.1

J.1

I.1

K.1

L.1

M.1

23200 2450

550

1550

1700

2550

2800

2800

2550

1550

1700

550

2450

1725

1.1 TOILET

STORAGE 1

TOILET

FOYER

FOYER

STORAGE 2

2.1 1575

TOILET

TOILET

COMPUTER LAB 1

3350

12100

3.1

TEACHERS' ROOM 1

LIBRARY

1850

4.1 TOILET

5.1

TOILET

3600

CHILDREN PLAYROOM 1

CHILDREN PLAYROOM 2

COMPUTER LAB 2

TEACHERS' ROOM 2

6.1

WATER DISCHARGE DIRECTION

LEGEND

ADMIN OFFICE

ANNEX BUILDING GROUND FLOOR PLAN SCALE 1:150

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

ANNEX BUILDING GROUND FLOOR PLAN

21 JANUARY 2019 28 FEBRUARY 2019 1:150 DAREN LAI KAM FEI MR. AZIM SULAIMAN GROUP 1

HPS / AB / 01

15 47


A.1

B.1

C.1

D.1

E.1

F.1

G.1

H.1

J.1

I.1

K.1

L.1

M.1

23200 2450

550

1550

1700

2550

2800

2800

2550

1700

1550

550

2450

1725

1.1

1575

2.1

3350

12100

3.1

1850

4.1

3600

5.1

6.1

ANNEX BUILDING ROOF PLAN SCALE 1:150

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

ANNEX BUILDING ROOF PLAN

21 JANUARY 2019 28 FEBRUARY 2019 1:150 DAREN LAI KAM FEI MR. AZIM SULAIMAN GROUP 1

HPS / AB / 02

16 47


A.1

B.1

C.1

D.1

E.1

F.1

G.1

H.1

J.1

I.1

K.1

L.1

M.1

23200 2450

550

1550

1700

2550

2800

2800

2550

1700

1550

550

2450

1725

1.1 TOILET

STORAGE 1

TOILET

FOYER

STORAGE 2

FOYER

2.1 1575

TOILET

TOILET

3.1

TEACHERS' ROOM 1

LIBRARY

3350

12100

COMPUTER LAB 1

1850

4.1 TOILET

5.1

TOILET

3600

CHILDREN PLAYROOM 1

CHILDREN PLAYROOM 2

COMPUTER LAB 2

TEACHERS' ROOM 2

6.1

LEGEND

ADMIN OFFICE

ANNEX BUILDING REFLECTED CEILING PLAN SCALE 1:150

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

ANNEX BUILDING REFLECTED CEILING PLAN

21 JANUARY 2019 28 FEBRUARY 2019 1:150 DAREN LAI KAM FEI MR. AZIM SULAIMAN GROUP 1

HPS / AB / 03

17 47


M.1

L.1

K.1

J.1

I.1

H.1

G.1

F.1

E.1

D.1

C.1

B.1

A.1

23200 2450

550

1550

1700

2550

2800

2800

2550

1700

1550

550

2450

Top of Roof Level

2900

6745

Roof Level

3845

3845

Ground Floor 0

ANNEX BUILDING FRONT ELEVATION SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

ANNEX BUILDING FRONT ELEVATION

21 JANUARY 2019 28 FEBRUARY 2019 1:150 DAREN LAI KAM FEI MR. AZIM SULAIMAN GROUP 1

HPS / AB / 04

18 47


1.1

2.1

3.1

4.1

5.1

6.1

6.1

5.1

4.1

1575

3350

2.1

1.1

12100

12100 1725

3.1

1850

3600

3600

1850

3350

1575

1725

Top of Roof Level

2900

6745

Roof Level

3845

3845

Ground Floor 0

ANNEX BUILDING LEFT ELEVATION

ANNEX BUILDING RIGHT ELEVATION

SCALE 1:150

SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

ANNEX BUILDING LEFT ELEVATION ANNEX BUILDING RIGHT ELEVATION

21 JANUARY 2019 28 FEBRUARY 2019 1:150 DAREN LAI KAM FEI MR. AZIM SULAIMAN GROUP 1

HPS / AB / 05

19 47


A.1

B.1

C.1

D.1

E.1

F.1

G.1

H.1

I.1

J.1

K.1

L.1

M.1

23200 2450

550

1550

1700

2550

2800

2800

2550

1700

1550

550

2450

Top of Roof Level

2900

6745

Roof Level

3845

3845

Ground Floor 0

ANNEX BUILDING REAR ELEVATION SCALE 1:150

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

ANNEX BUILDING REAR ELEVATION

21 JANUARY 2019 28 FEBRUARY 2019 1:150 DAREN LAI KAM FEI MR. AZIM SULAIMAN GROUP 1

HPS / AB / 06

20 47


6.1

5.1

4.1

3.1

2.1

1.1

12100

3600

1850

3350

1575

1725

Top of Roof Level

2900

6745

Roof Level

3845

3845

VOID

Ground Floor 0

ANNEX BUILDING SECTION X1-X1' SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

ANNEX BUILDING SECTION X1-X1'

21 JANUARY 2019 28 FEBRUARY 2019 1:150 DAREN LAI KAM FEI MR. AZIM SULAIMAN GROUP 1

HPS / AB / 07

21 47


M.1

L.1

K.1

J.1

I.1

H.1

G.1

F.1

E.1

D.1

C.1

B.1

A.1

23200 2450

550

1550

1700

2550

2800

2800

2550

1700

1550

550

2450

Top of Roof Level

2900

6745

Roof Level

3845

3845

Ground Floor 0

ANNEX BUILDING SECTION Y1-Y1' SCALE 1:150 LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

ANNEX BUILDING SECTION Y1-Y1'

21 JANUARY 2019 28 FEBRUARY 2019 1:150 DAREN LAI KAM FEI MR. AZIM SULAIMAN GROUP 1

HPS / AB / 08

22 47


ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

SCALE 1:300

ANNEX BUILDING EXPLODED ISOMETRIC

ANNEX BUILDING EXPLODED ISOMETRIC

GROUP 1

MR. AZIM SULAIMAN

DAREN LAI KAM FEI

1:300

28 FEBRUARY 2019

21 JANUARY 2019

GROUND FLOOR

HPS / AB / 09

CEILING AND ROOF STRUCTURE

ROOF STRUCTURE

ROOF

23 47


1.2

2.2

1470

3.2

3040

4.2

3040

5.2

3040

6.2 27400 3040 3040

7.2

8.2 9.2

4220

10.2

1430 1755

11.2

3325

1.2 2.2 1470

A2

3040

4.2 3040

5.2 3040

6.2 27400 3040 3040

7.2

8.2 9.2 4220

10.2

1430 1755

11.2 3325

3480

3480

A2 STORAGE 1

TOILET

B2

3730

3730

B2

C2

C2 3770

3770

MUSIC ROOM

TOILET

STORAGE 2

CLASSROOM 3

CLASSROOM 2

CLASSROOM 1

TOILET

CLASSROOM 5

CLASSROOM 4

CLASSROOM 6

24200 2415

D2 24200 2415

D2

3.2

E2

E2

STORAGE 3

CORRIDOR

7000

7000

MUSIC ROOM

3805

3805

F2

F2 PORCH

G2

G2

SCHOOL BUILDING GROUND FLOOR PLAN

SCHOOL BUILDING FIRST FLOOR PLAN

SCALE 1:300

SCALE 1:300

LEGEND

ADMIN OFFICE

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

SCHOOL BUILDING GROUND FLOOR PLAN SCHOOL BUILDING FIRST FLOOR PLAN

21 JANUARY 2019 28 FEBRUARY 2019 1:300 HAFIZMASRI MR. AZIM SULAIMAN GROUP 1

HPS / SB / 01

24 47


1.2 2.2

1470

3.2

3040

4.2

3040

5.2

3040

6.2

3040

27400 3040

7.2

8.2 9.2

4220

10.2

1430 1755

11.2

3325

3480

A2

3730

B2

3770

C2

24200 2415

D2

7000

E2

3805

F2

G2

SCHOOL BUILDING ROOF PLAN SCALE 1:300

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

SCHOOL BUILDING ROOF PLAN

21 JANUARY 2019 28 FEBRUARY 2019 1:300 HAFIZMASRI MR. AZIM SULAIMAN GROUP 1

HPS / SB / 02

25 47


1.2

2.2

1470

3.2

3040

4.2

3040

5.2

3040

6.2

3040

7.2

27400 3040

8.2 9.2

4220

10.2

1430 1755

1.2

11.2

1470

3325

A2

2.2

3.2

3040

4.2

3040

5.2

3040

6.2

7.2

27400 3040 3040

8.2 9.2

4220

10.2

1430 1755

11.2

3325

3480

3480

A2

STORAGE 1

TOILET

B2

3730

3730

B2

C2

C2

CLASSROOM 3 TOILET

CLASSROOM 2

CLASSROOM 1

CLASSROOM 4

CLASSROOM 5

CLASSROOM 6

TOILET

STORAGE 2

24200 2415

D2 24200 2415

D2

3770

3770

MUSIC ROOM

E2

E2

CORRIDOR

CORRIDOR

STORAGE 3

7000

7000

MUSIC ROOM

3805

3805

F2

F2

PORCH

G2

G2

SCHOOL BUILDING GROUND FLOOR REFLECTED CEILING PLAN

SCHOOL BUILDING FIRST FLOOR REFLECTED CEILING PLAN

SCALE 1:300

SCALE 1:300

LEGEND

ADMIN OFFICE

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

SCHOOL BUILDING GROUND FLOOR REFLECTED CEILING PLAN SCHOOL BUILDING FIRST FLOOR REFLECTED CEILING PLAN

21 JANUARY 2019 28 FEBRUARY 2019 1:300 HAFIZMASRI MR. AZIM SULAIMAN GROUP 1

HPS / SB / 03

26 47


1.2

2.2

3.2

4.2

5.2

6.2

7.2

8.2

9.2

10.2

11.2

27400 1470

3040

3040

3040

3040

3040

4220

1430

1755

3325

Top of Roof

5700

5675

-25

1740

First Floor

Mezzanine Floor 1830

-1766 Ground Floor -3595

SCHOOL BUILDING FRONT ELEVATION SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

SCHOOL BUILDING FRONT ELEVATION

21 JANUARY 2019 28 FEBRUARY 2019 1:150 VIKTOR MR. AZIM SULAIMAN GROUP 1

HPS / SB / 04

27 47


11.2

10.2

9.2

8.2

7.2

6.2

5.2

4.2

3.2

2.2

1.2

27400 3325

1755

1430

4220

3040

3040

3040

3040

3040

1470

Top of Roof

5700

5675

1740

First Floor -25

Mezzanine Floor 1830

-1766 Ground Floor -3595

SCHOOL BUILDING REAR ELEVATION SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

SCHOOL BUILDING REAR ELEVATION

21 JANUARY 2019 28 FEBRUARY 2019 1:150 VIKTOR MR. AZIM SULAIMAN GROUP 1

HPS / SB / 05

28 47


G2

F2

E2

D2

C2

B2

A2

24200 3805

7000

2415

3770

3730

3480

Top of Roof

5700

5675

First Floor VOID

1740

-25 Mezzanine Floor -1766

SCHOOL BUILDING RIGHT ELEVATION SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

SCHOOL BUILDING RIGHT ELEVATION

21 JANUARY 2019 28 FEBRUARY 2019 1:150 VIKTOR MR. AZIM SULAIMAN GROUP 1

HPS / SB / 06

29 47


A2

B2

C2

D2

E2

F2

G2

24200 3480

3730

3770

2415

7000

3805

Top of Roof

5700

5675

First Floor VOID

1740

-25 Mezzanine Floor

1830

-1766 Ground Floor -3595

SCHOOL BUILDING LEFT ELEVATION SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

SCHOOL BUILDING LEFT ELEVATION

21 JANUARY 2019 28 FEBRUARY 2019 1:150 VIKTOR MR. AZIM SULAIMAN GROUP 1

HPS / SB / 07

30 47


1.2

2.2

3.2

4.2

5.2

6.2

7.2

8.2

9.2

10.2

11.2

27400 1470

3040

3040

3040

3040

3040

4220

1430

1755

3325

INACCESSIBLE

Ceiling Level

3550

3525

First Floor

3550

-25

Ground Floor -3575

SCHOOL BUILDING SECTION X2-X2 SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

SCHOOL BUILDING SECTION X2-X2

21 JANUARY 2019 28 FEBRUARY 2019 1:50 HAFIZMASRI MR. AZIM SULAIMAN GROUP 1

HPS / SB / 08

31 47


G2

F2

E2

D2

C2

B2

A2

24200 3805

7000

2415

3770

3730

3481

Ceiling Level 3525

5270

INACCESSIBLE

VOID

Mezzanine Floor -1766

SCHOOL BUILDING SECTION Y2-Y2 SCALE 1:150

LEGEND

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

SCHOOL BUILDING SECTION Y2-Y2

21 JANUARY 2019 28 FEBRUARY 2019 1:150 HAFIZMASRI MR. AZIM SULAIMAN GROUP 1

HPS / SB / 09

32 47


ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

SCHOOL BUILDING EXPLODED ISOMETRIC

SCALE 1:200

GROUP 1

MR. AZIM SULAIMAN

NG ZIEN LOON

1:200

28 FEBRUARY 2019

21 JANUARY 2019

SCHOOL BUILDING EXPLODED ISOMETRIC

HPS / SB / 10

33

GROUND FLOOR

MEZZANINE FLOOR

FIRST FLOOR

ROOF

47


625

625

625

625

625

625

Exterior Exterior Exterior

Interior

Interior

D1.3 PLAN

D1.1 PLAN

Interior

D1.2 PLAN

576 584

416

416

1250 574

1900

145

145

145

950

950

70

70

70

1900

1900

1900

950

950

500

500

500

416

D1.1 INTERIOR ELEVATION

D1.1 SECTION

D1.2 INTERIOR ELEVATION

FEATURES

D1.2 SECTION

D1.3 EXTERIOR ELEVATION

D1.2 EXTERIOR ELEVATION

FEATURES

FEATURES

LOCATION

LOCATION

LOCATION

CONDITION QUANTITY

CONDITION QUANTITY

CONDITION QUANTITY 575

625

D1.3 SECTION

D1.3 INTERIOR ELEVATION

D1.1 EXTERIOR ELEVATION

625 564

575

564

Exterior

140

Exterior

Interior

Interior

D2 PLAN

D1.5 PLAN

D1.4 PLAN

506 516

1128

415

1128

145

970

950

70

1900

1940

2255

70

970

950

500

500

625

625

366

356

D1.4 INTERIOR ELEVATION

D1.4 SECTION

D1.4 EXTERIOR ELEVATION

D1.5 INTERIOR ELEVATION

D1.5 SECTION

D1.5 EXTERIOR ELEVATION

FEATURES

FEATURES

FEATURES

LOCATION

LOCATION

LOCATION

CONDITION QUANTITY

CONDITION QUANTITY

CONDITION QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

DOOR SCHEDULE

D2.1 SECTION

D2.1 INTERIOR ELEVATION

D2.1 EXTERIOR ELEVATION

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN & CHONG MIN MR. AZIM SULAIMAN GROUP 1

HPS / DD / 01

34 47


870

870 870

830

500

880

830

2195

435

500

642

435

295

2292

300

1900

1900

415

2195

430 2292

430

415

Exterior

Exterior Exterior

Interior

Interior

Interior

D3.1 PLAN

D3.1 INTERIOR ELEVATION

D3.1 SECTION

D4.1 PLAN

D3.1 EXTERIOR ELEVATION

FEATURES

D4.1 INTERIOR ELEVATION

D4.1SECTION

D5.1 PLAN

D4.1EXTERIOR ELEVATION

D5.1 INTERIOR ELEVATION

D5 EXTERIOR ELEVATION

FEATURES

FEATURES

LOCATION

LOCATION

LOCATION

CONDITION QUANTITY

CONDITION QUANTITY

CONDITION QUANTITY

915

D5.1 SECTION

880

880

915

805

2207

440

458

Exterior 640

458

3120

3120 440

403 2040

403

1730

570

2845

3095

3095

570

805

Exterior Exterior Interior

Interior

Interior D6.1 PLAN

D6.1 INTERIOR ELEVATION

D6.1 SECTION

D6.1 EXTERIOR ELEVATION

FEATURES

D7.1 PLAN

FEATURES

D7.1 INTERIOR ELEVATION

D7.1 SECTION

D7.1 EXTERIOR ELEVATION

D8.1 PLAN

LOCATION

LOCATION

CONDITION QUANTITY

CONDITION QUANTITY

DOOR SCHEDULE

D8.1 SECTION

D8.1 EXTERIOR ELEVATION

FEATURES

LOCATION CONDITION QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

D8.1 INTERIOR ELEVATION

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN & CHONG MIN MR. AZIM SULAIMAN GROUP 1

HPS / DD / 02

35 47


425

425

900

1050

1050

Exterior

900

Interior 110

D9.1 PLAN

900

900

850

850

2100

730

730

125

2100

125

450

125

450

2100

900

1050

Exterior

155

730

Exterior

Interior

Interior

D9.3 PLAN D9.2 PLAN D9.1 INTERIOR ELEVATION

D9.1 SECTION

D9.2 SECTION

D9.2 INTERIOR ELEVATION

D9.3 INTERIOR ELEVATION

D9.2 EXTERIOR ELEVATION

D9.3 SECTION

D9.3 EXTERIOR ELEVATION

D9.1 EXTERIOR ELEVATION

FEATURES

FEATURES

FEATURES

LOCATION

LOCATION

LOCATION

CONDITION QUANTITY

CONDITION QUANTITY

CONDITION QUANTITY

850

1180

Exterior

Interior

D10 PLAN 1050

790

2840

2100

2100

2100

1180

Exterior Exterior

Interior Interior 1050

D10.1 INTERIOR ELEVATION

D10.1 SECTION

D10.1 EXTERIOR ELEVATION

FEATURES

D11.1 PLAN

FEATURES

D11.1 INTERIOR ELEVATION

D11.1 SECTION

D11.1 EXTERIOR ELEVATION

D12.1 PLAN

LOCATION

LOCATION

CONDITION QUANTITY

CONDITION QUANTITY

DOOR SCHEDULE

D12.1 SECTION

D12.1 EXTERIOR ELEVATION

FEATURES

LOCATION CONDITION QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

D12.1 INTERIOR ELEVATION

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN & CHONG MIN MR. AZIM SULAIMAN GROUP 1

HPS / DD / 03

36 47


400

995

880

870

3420

1346

673

2145

2010

1630

673

Exterior

Exterior 870 Interior

Interior 995

D14.1 PLAN D13.1 PLAN

D13.1INTERIOR ELEVATION

D13.1 SECTION

D15.1 PLAN

D13.1 EXTERIOR ELEVATION D14.1 INTERIOR ELEVATION

FEATURES

D14.1 SECTION

D14.1 EXTERIOR ELEVATION

D15.1 INTERIOR ELEVATION

FEATURES

D15.1SECTION

D15.1 EXTERIOR ELEVATION

FEATURES

LOCATION

LOCATION

LOCATION

CONDITION QUANTITY

CONDITION QUANTITY

CONDITION QUANTITY

4650 Exterior

Interior

D16.1 PLAN 4650

870

1018

1018

2480

2010

700

700

558

64

630

Exterior

Interior

D17.1 SECTION

870

D17.1 PLAN D16.1 INTERIOR ELEVATION

D16.1 SECTION

FEATURES

FEATURES

LOCATION

LOCATION CONDITION QUANTITY

CONDITION QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

D17.1 INTERIOR ELEVATION

D17.1 EXTERIOR ELEVATION

D16.1 EXTERIOR ELEVATION

DOOR SCHEDULE

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN & CHONG MIN MR. AZIM SULAIMAN GROUP 1

HPS / DD / 04

37 47


2180 1110

EXTERIOR

558

533

1090

EXTERIOR INTERIOR 555

555 INTERIOR

2180

W1.1 PLAN

W1.2 PLAN

1110

1090

555

1090

1340

1340

1340

1340

1340

555

910

1090 Sill Height

770

Sill Height

1090

130 1110

W1.1 INTERIOR ELEVATION

W1.1 EXTERIOR ELEVATION

W1.1 SECTION

W1.2 EXTERIOR ELEVATION

W1.2 SECTION

W1.2 INTERIOR ELEVATION

1.1 CASEMENT WINDOW

1.2 CASEMENT WINDOW

FEATURE

FEATURE

LOCATION

LOCATION

CONDITION

CONDITION

QUANTITY

2250

518

EXTERIOR

490

EXTERIOR

INTERIOR

INTERIOR

580

1125

3000

W2.1 PLAN

700

W1.3 PLAN 3000

910

Sill Height

1500

910

3000

855

1500 Sill Height

1500

1555

1555

1530

700

855

1530

1125

1500

W1.3 SECTION W1.3 INTERIOR ELEVATION

W2.1 INTERIOR ELEVATION

W2.1 EXTERIOR ELEVATION

W2.1 SECTION

W1.3 EXTERIOR ELEVATION

1.3 CASEMENT WINDOW

2.1 LOUVERED CASEMENT WINDOW

FEATURE

FEATURE LOCATION

LOCATION CONDITION

QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

CONDITION

WINDOW SCHEDULE

QUANTITY

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN MR. AZIM SULAIMAN GROUP 1

HPS / WD / 01

38 47


3330

EXTERIOR

1150

EXTERIOR 1150 113

INTERIOR

W2.3 PLAN 1115

INTERIOR

1085

1130

W2.2 PLAN

1130

W2.2 INTERIOR ELEVATION

535

W2.3 EXTERIOR ELEVATION

W2.3 SECTION

2.3 LOUVERED CASEMENT WINDOW

2.2 LOUVERED CASEMENT WINDOW FEATURE

FEATURE

LOCATION

LOCATION

CONDITION

1555

W2.3 INTERIOR ELEVATION

550

W2.2 EXTERIOR ELEVATION

W2.2 SECTION

380

910

Sill Height

107

910

Sill Height

3330

1555

1555

1555

1555

50

CONDITION

QUANTITY

QUANTITY

2250

EXTERIOR

EXTERIOR

1060

INTERIOR

INTERIOR

576

130

549

1125

W3.1 PLAN

W2.4 PLAN

1310

1555

1555

1310

1310

1555

1125

Sill Height

910

Sill Height

910

1060

576

1125

530

130

549

W2.4 INTERIOR ELEVATION W2.4 SECTION

W2.4 EXTERIOR ELEVATION

W3.1 INTERIOR ELEVATION

2.4 LOUVERED CASEMENT WINDOW

W3.1 EXTERIOR ELEVATION

3.1 TRADITIONAL CASEMENT WINDOW

FEATURE

FEATURE LOCATION

LOCATION CONDITION

W3.1 SECTION

QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

QUANTITY

CONDITION

WINDOW SCHEDULE

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN MR. AZIM SULAIMAN GROUP 1

HPS / WD / 02

39 47


385

EXTERIOR

1045 523 375

EXTERIOR

170

523

375

1160 INTERIOR 1180

W4.1 PLAN

W3.2 PLAN INTERIOR

1160

W3.3 PLAN

2185

2185

1520

1400

1430

590

1260

810

510

1520

1430

375

590

310

910

910

473 Sill Height

Sill Height

910

Sill Height

1180

590

W3.2 INTERIOR ELEVATION

W3.2 EXTERIOR ELEVATION W3.2 SECTION

1045

W3.3 EXTERIOR ELEVATION

W3.3 SECTION

W3.3 INTERIOR ELEVATION

W4.1 SECTION

W4.1 INTERIOR ELEVATION

3.2 TRADITIONAL CASEMENT WINDOW

3.3 TRADITIONAL CASEMENT WINDOW

4.1 TRADITIONAL CASEMENT WINDOW

FEATURE

FEATURE

FEATURE

LOCATION

LOCATION

LOCATION

CONDITION

QUANTITY

QUANTITY

CONDITION

W4.1 EXTERIOR ELEVATION

QUANTITY

CONDITION

1130 1765

1190

EXTERIOR 565

595

EXTERIOR

EXTERIOR INTERIOR

INTERIOR

W5.2 PLAN

W5.1 PLAN

INTERIOR

535

910

Sill Height

1765

595

1200

1200 1130 910

Sill Height

910

Sill Height

1190

1200

1200

1200

1200

1200

1200

1200

W5.3 PLAN

W5.2 INTERIOR ELEVATION

1130

130 130

W5.1 INTERIOR ELEVATION

W5.1 SECTION

W5.1 EXTERIOR ELEVATION W5.2 SECTION

W5.3 INTERIOR ELEVATION

5.2 GLASS LOUVERED WINDOW

5.1 GLASS LOUVERED WINDOW

QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

CONDITION

WINDOW SCHEDULE

W5.3 EXTERIOR ELEVATION

FEATURE

LOCATION

LOCATION

W5.3 SECTION

5.3 GLASS LOUVERED WINDOW

FEATURE

FEATURE

CONDITION

W5.2 EXTERIOR ELEVATION

LOCATION QUANTITY

QUANTITY

CONDITION

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN MR. AZIM SULAIMAN GROUP 1

HPS / WD / 03

40 47


990 EXTERIOR

40

40

40

40

EXTERIOR

495

725

495

725

1450 INTERIOR

W8.1 PLAN

INTERIOR

1525 245

1200

905

1200

905

1200

W6.1 PLAN

W6.2 PLAN

495

495

495 495

495

1700

535

785

Sill Height

990

785

495

Sill Height

535

260

W6.1 EXTERIOR ELEVATION

W6.1 SECTION

W6.1 INTERIOR ELEVATION

W6.2 INTERIOR ELEVATION

W6.2 EXTERIOR ELEVATION

W6.2 SECTION

6.1 GLASS LOUVERED WINDOW FEATURE

FEATURE

910

Sill Height

1450 6.2 GLASS LOUVERED WINDOW

LOCATION

LOCATION CONDITION

QUANTITY

QUANTITY

CONDITION

W8.1 INTERIOR ELEVATION EXTERIOR 96

196

196

96

EXTERIOR

920

96

196

196

96

706

INTERIOR

INTERIOR W7.2 PLAN

1700

830

910

353 1430

Sill Height

583

Sill Height

27

830

705

1700

556

27

830

W7.1 PLAN

353 705

1000

96

W7.2 SECTION W7.1 SECTION

W7.1 EXTERIOR ELEVATION

W7.2 EXTERIOR ELEVATION

W7.2 INTERIOR ELEVATION

W8.1 EXTERIOR ELEVATION

W7.1 INTERIOR ELEVATION

7.2 STAINED GLASS WINDOW

7.1 STAINED GLASS WINDOW

FEATURE

LOCATION

LOCATION CONDITION

8.1 SLIDING GLASS WINDOW

FEATURE

FEATURE

QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

CONDITION

WINDOW SCHEDULE

W8.1 SECTION

LOCATION QUANTITY

QUANTITY

CONDITION

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN MR. AZIM SULAIMAN GROUP 1

HPS / WD / 04

41 47


720 550

EXTERIOR

EXTERIOR

EXTERIOR

700

INTERIOR

INTERIOR

640

870

W11.1 PLAN

W10.1 PLAN 720

870

INTERIOR

720

760 318

740

W9.1 PLAN

1200

89

70

570

1200

1200

740

740

1116

442

900

900

785

900

1520

Sill Height

870

W9.1 INTERIOR ELEVATION

W9.1 SECTION

910

Sill Height

910

Sill Height

700

W9.1 EXTERIOR ELEVATION

9.1 Fixed Window

W3.3 EXTERIOR ELEVATION

W10.1 SECTION

W10.1 INTERIOR ELEVATION

10.1 SINGLE GLASS LOUVERED WINDOW

11.1 GLASS LOUVERED WINDOW WITH GRILL

FEATURE

FEATURE

FEATURE

LOCATION

LOCATION

LOCATION

CONDITION

QUANTITY

QUANTITY

CONDITION

W11.1EXTERIOR ELEVATION

W11.1 SECTION

W3.3 INTERIOR ELEVATION

QUANTITY

CONDITION

1200 1200.0000

1820 1708 EXTERIOR

W11.2 PLAN 1200 568

INTERIOR

1200

490

W11.3 PLAN

1820

508

1200

1120

1200

1060

1200

1120

910

Sill Height

1200

1200

1200

564

W11.2 EXTERIOR ELEVATION

910

Sill Height

500

1820

W11.2 INTERIOR ELEVATION W11.2 SECTION

W11.3 INTERIOR ELEVATION

11.2 GLASS LOUVERED WINDOW WITH GRILL

11.3 GLASS LOUVERED WINDOW WITH GRILL FEATURE

FEATURE

LOCATION

LOCATION CONDITION

W11.3 EXTERIOR ELEVATION W11.3 SECTION

CONDITION

QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

WINDOW SCHEDULE

QUANTITY

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN MR. AZIM SULAIMAN GROUP 1

HPS / WD / 05

42 47


1380

EXTERIOR

2035 1200 473

EXTERIOR

EXTERIOR 473

595

INTERIOR

INTERIOR

W13.2 PLAN

595

INTERIOR

W13.3 PLAN W12.1 PLAN 605

121

625

880

1200

1200

1180

880

1200

360

130

400

2035

1200

1110

910

Sill Height

1208

1190

W12.1 EXTERIOR ELEVATION

910

W13.3 INTERIOR ELEVATION

910

W13.2 INTERIOR ELEVATION

FEATURE

Sill Height

12.1 GLASS LOUVERED WINDOW WITH GRILL

Sill Height

W12.1 SECTION

W12.1 INTERIOR ELEVATION

LOCATION CONDITION

QUANTITY

121 126

INTERIOR

126

320

130

360

130

610 130

EXTERIOR

500

610

960

2470 1110

1110

1190

1110

800 132

800

720 955

Sill Height

800

132

880

920

880

W13.1 PLAN

500

610

W13.1 INTERIOR ELEVATION W13.1 EXTERIOR ELEVATION W13.1 SECTION

13.2 LOUVERED GLASS WINDOW

13.1 LOUVERED GLASS WINDOW

FEATURE

LOCATION

LOCATION CONDITION

13.3 SLIDING GLASS WINDOW

FEATURE

FEATURE

QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

CONDITION

WINDOW SCHEDULE

W13.3 EXTERIOR ELEVATION

W13.3 SECTION

W13.2 EXTERIOR ELEVATION

W13.2 SECTION

LOCATION QUANTITY

QUANTITY

CONDITION

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN MR. AZIM SULAIMAN GROUP 1

HPS / WD / 06

43 47


3220 2780

800 523

EXTERIOR

595

523

595

595

484

EXTERIOR 316

INTERIOR

INTERIOR

W13.4 PLAN

484

484

484

484

EXTERIOR

316

INTERIOR

W13.4 PLAN

W14.2 PLAN

3220 800

154

400

588 590

130

2780

890

890

Sill Height

W13.4 INTERIOR ELEVATION

955

Sill Height

W14.1 INTERIOR ELEVATION

Sill Height

1320

1240

1950

1240

2470

590

1950

508

W14.2 INTERIOR ELEVATION 340

154

553

523

595

595

595

670 1320

590

590 1240

1950

78

1280

1280

W14.1 SECTION

523

W14.1 EXTERIOR ELEVATION W14.2 EXTERIOR ELEVATION

3220

W13.4 SECTION

W14.2 SECTION

W13.4 EXTERIOR ELEVATION

14.1 LOUVERED GLASS WINDOW

13.4 LOUVERED GLASS WINDOW

14.2 LOUVERED GLASS WINDOW

FEATURE

FEATURE

FEATURE

LOCATION

LOCATION CONDITION

508

1190

1190

2470

1240

810

1950

70

40

670

590

670

410

130

2780

QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

CONDITION

WINDOW SCHEDULE

LOCATION QUANTITY

QUANTITY

CONDITION

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN MR. AZIM SULAIMAN GROUP 1

HPS / WD / 07

44 47


1880

900 EXTERIOR

366

366

EXTERIOR

396

396

396

396

476

496

496

496

496

496

476

3960 EXTERIOR INTERIOR

INTERIOR

W14.3 PLAN

W14.4 PLAN

INTERIOR

W14.5 PLAN 900 1880 430

420

3960

420

1950

1240

1240

1950

1950

590

590

670

420

W14.5 INTERIOR ELEVATION

890

W14.4 INTERIOR ELEVATION

890

Sill Height

W14.3 INTERIOR ELEVATION

Sill Height

890

Sill Height

390

900

590

670

670

590

420

3960

526

526

526

526

526

506

670

1240

1320

1950

1240

1950

1950

1320

1240

1240

590

670

506

1880

W14.3 SECTION

W14.4 SECTION

W14.3 EXTERIOR ELEVATION

W14.4 EXTERIOR ELEVATION

W14.5 SECTION

14.4 LOUVERED GLASS WINDOW

14.3 LOUVERED GLASS WINDOW FEATURE

FEATURE

QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

14.5 LOUVERED GLASS WINDOW FEATURE

LOCATION

LOCATION CONDITION

W14.5 EXTERIOR ELEVATION

LOCATION

CONDITION

QUANTITY

DOOR AND WINDOW SCHEDULE

QUANTITY

CONDITION

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN MR. AZIM SULAIMAN GROUP 1

HPS / WD / 08

45 47


595 485

265 243 298

195

125

370

240

320

35 70 20 40 15 50

35

25 45 25

95 40 20

60 35 70 20 40 15 50

60 35 70 20 55 50

200

165

40 20

165

40 25

40 25

C1 ELEVATION

C2 ISOMETRIC

C1 ISOMETRIC

C4 ELEVATION

C3 ELEVATION

C2 ELEVATION

C3 ISOMETRIC

C5 ELEVATION

C4 ISOMETRIC

C6 ELEVATION

C5 ISOMETRIC

C6 ISOMETRIC

FEATURES

FEATURES

FEATURES

FEATURES

FEATURES

LOCATION

LOCATION

LOCATION

LOCATION

LOCATION

LOCATION

CONDITION

CONDITION

CONDITION

CONDITION

CONDITION

CONDITION

QUANTITY

QUANTITY

QUANTITY

QUANTITY

QUANTITY

QUANTITY

15

10 25

FEATURES

600

40

48

245

230

240

310

310

303

B1 ELEVATION

195

B3 ELEVATION

B2 ELEVATION

B5 ELEVATION

B4 ELEVATION

1350

B6 ELEVATION

B1 ISOMETRIC

B2 ISOMETRIC

B6 ISOMETRIC

B5 ISOMETRIC

B4 ISOMETRIC

B3 ISOMETRIC

FEATURES

FEATURES

FEATURES

FEATURES

FEATURES

LOCATION

LOCATION

LOCATION

LOCATION

LOCATION

LOCATION

CONDITION

CONDITION

CONDITION

CONDITION

CONDITION

CONDITION

QUANTITY

QUANTITY

QUANTITY

QUANTITY

QUANTITY

QUANTITY

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

COLUMN SCHEDULE

FEATURES

28 JANUARY 2019 28 FEBRUARY 2019 NTS PRISCILLA HUONG YUNN & CHONG MIN MR. AZIM SULAIMAN GROUP 1

HPS / CD / 01

46 47


110 1260

2186 NEWEL

240

240

240

240

240

240

115 HANDRAIL

1270

5

485

5 25 5

951

DETAIL 3

DETAIL 4

17

16

15

14

13

12

11

STRINGER

10

DETAIL 3 (NEWEL)

2107

1180

BALUSTER

240

RISER

8 7

90

6 THREAD

30

5

3

44

4 DETAIL 5

25

2 1

300

2 1

LANDING

190 190 190 190 190 190 190 190

240 240 240

3

240

4

240

6 5

240

7

240

8

240

9

STAIRCASE 1.1 FRONT ELEVATION

STAIRCASE 1.1 ISONOMETRIC

25

55

10

STAIRCASE 1.1 PLAN

1090

730

65

2200

870

220

220 220

220 220

220

220 220

220 220

220

12

11

10

9

8

7

6

5

4

3

2

1

1MM METAL COVER 13

185 185 185 185 185 185 185 185 185 185 185 45

15 16

235 235 235 235

17 18

21 22

235

1.5 MM VINYL SHEET

TIMBER THREAD

60

14

235

235 235 235

235 235

2130

990

DETAIL 4 (BALUSTER)

19 20

23

STAIRCASE 1.2 PLAN

ARC 60305 METHODS OF DOCUMENTATION & MEASURED DRAWINGS

11 10 35

9 8 7 6 5

25

4 3 2 1

STAIRCASE 1.2 FRONT ELEVATION

STAIRCASE DETAILS

DETAIL 5 (THREAD)

STAIRCASE 1.2 ISONOMETRIC

ISSUE DATE 13 FEBRUARY 2019 NTS NANG AYE MYAT MON, AIESYA MR. AZIM SULAIMAN GROUP 1

HPS / SD / 01

47 47


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.