MIXED USE COMMERCIAL BUILDING
GENERAL NOTICE THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS SHOWN ON THE DRAWINGS AT THE JOB SITE AND NOTIFY THE ARCHITECT OF ALL DISCREPANCIES, OMISSIONS AND CONFLICTS BEFORE BIDDING. THE CONTRACTOR SHALL VISIT THE SITE AND BE KNOWLEDGEABLE OF CONDITIONS THEREON. HE OR SHE SHALL INVESTIGATE, VERIFY, AND BE RESPONSIBLE FOR ALL CONDITIONS OF THE PROJECT AND SHALL NOTIFY THE ARCHITECT OF ANY SITE CONDITIONS REQUIRING MODIFICATION BEFORE PROCEEDING WITH THE WORK.
RESTAURANT, ARCHITECTURE, INTERIOR DESIGN & STRUCTURE FIRM 1 E High St B, Oxford,
PROJECT TYPE
DESIGN PARTNERS
LIST OF DRAWINGS
ZERIN PROMEE
DRAWING TITLE GENERAL INFORMATION
ARCHITECTURE CONSULTANT(M.ARCH) Z-STUDIO ,OXFORD,OHIO
CONSTRUCTION DRAWING
MR. X STRUCTURE CONSULTANT (M.ENG) Z-STUDIO ,OXFORD,OHIO
MR. Y
ARCHITECTURAL DRAWING
ELECTRICAL CONSULTANT (M.ENG) VELOCITY ENG. LTD ,OXFORD,OHIO
CLIENT AR. W PRINCIPAL ARCHITECT (AIA) URBANA ARCHITECTS ,OXFORD,OHIO
MECHANICAL DRAWING
ELECTRICAL FIXTURE DRAWING
PLUMBING FIXTURE DRAWING
LIFE SAFETY LAYOUT
GENERAL NOTES 1. THE PROJECT CONSISTS OF AN ADDITION TO AN EXISTING COMMERCIAL SPACE. THE SPACE HAS APPROXIMATELY 5625 SF OF CONDITIONED FLOOR AREA. 2. THE STRUCTURE IS CLASSIFIED AS A COMMERCIAL BUILDING AND IS THEREFORE REGULATED BY CHAPTER 4 OF THE 2015 IECC COMMERCIAL PROVISIONS AS AMENDED. 3. A PERMANENT CERTIFICATE SHALL BE COMPLETED BY ANNUNZIATA AND ZERIN DESIGN CONSULTANTS AND POSTED ON SITE AS REQUIRED BY SECTION R401.3 OF THE 2015 IECC. 4. INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING LOAD CALCULATIONS SHALL BE A MAXIMUM OF 72 DEGREES FOR HEATING AND A MINIMUM OF 75 DEGREES FOR COOLING. 5. ALL INSULATION WHICH IS CAPABLE OF ABSORBING WATER SHALL BE PROTECTED BY A VAPOR BARRIER LOCATED ON THE WINTER WARM SIDE OFTHE INSULATION. INSULATION SHALL BE INSTALLED IN A MANNER THAT PROVIDES CONTINUITY OF INSTALLATION AT PLATE LINES, SILL LINES AN CORNERS. 6. LOCAL ENERGY CONSERVATION CONSTRUCTION CODE ENERGY CONSERVATION CNSTRUCTION CODES THAT ARE MORE STRINGENT IN THEIR REQUIREMENTS THAN THE 2015 INTERNATIONAL ENERGY CONSERVATION CODE SHALL APPLY AND BE IMPLEMENTED WHEREVER REQUIRED. 7. EXTERIOR JOINTS AROUND WINDOWS AND DOOR FRAME, OPENINGS BETWEEN WALL AND ROOF/CEILING, FLOORS AND ROOFS, AND ALL OTHER SUCH OPENINGS IN THE BUILDING ENVELOPE SHALL BE CAULKED, GASKETED, WEATHERSTRIPPED OR OTHERWISE SEALED. 8. DESIGN PROFESSIONAL STATES THAT TO THE BEST OF HIS KNOWLEDGE AND PROFESSIONAL JUDGEMENT, THE DESIGN HAS BEEN MADE IN CONFORMANCE WITH THE ENERGY CODE. THE DESIGN PROFESSIONAL MUST PROVIDE SUPPORTING DATA AS REQUIRED IN THE ENERGY CONSERVATION CONSTRUCTION CODE SECTION 104.1. 9. THIS DESIGN ANALYSIS IS NOT TO BE USED AS THE DETERMINING FACTOR IN COMPUTING THE DESIGN OF THE HEATING AND/OR VENTILATING EQUIPMENT TO BE INSTALLED IN THE BUILDING. TO DO SO WILL BE AT THE BUILDER AND/OR CONTRACTOR'S RISK. THE ENGINEER SHALL BE HELD BLAMELESS FOR ANY HEATING OR VENTILATING EQUIPMENT INSTALLED AT THE JOB SITE.
SITE GENERAL INFORMATIONS : THE EXISTING SITE IS A THREE STOREYED BRICK COMMERCIAL BUILDING, WHICH IS SITUATED IN THE HISTORIC UPTOWN AREA OF OXFORD UHIO. THE CLIENT IS AN ARCHITECTURAL FIRM,WHO HAS A REQUIREMENT TO DESIGN A RESTAURANT IN THE 1ST LEVEL AND DESIGN AN ARCHITECTUAL,STRUCTURAL AND INTERIOR DESIGN FIRM FOR THE UPPER FLOORS.THE SITE HAS A HEIGHT RESTRICTION TO 48’
UNIVERSAL ACCESS DESIGN
DETAIL DRAWINGS
COST ESTIMATION 3D VIEW
SHEET NUMBER
DRAWING LIST
G 0.0.0
COVER PAGE
G 1.1.1
SITE ANALYSIS 01
G 1.1.2
SITE ANALYSIS 02
G 1.2.0
SITE PLAN
C 1.1.1
FOUNDATION PLAN
C 1.1.2
BASEMENT COLUMN LAYOUT
C 1.1.3
LEVEL 2 COLUMN LAYOUT
A 1.1.1
BASEMENT FURNITURE LAYOUT
A 1.1.2
LEVEL 1 FURNITURE LAYOUT
A 1.1.3
LEVEL 2 FURNITURE LAYOUT
A 1.1.4
LEVEL 3 FURNITURE LAYOUT
A 1.2.1
ROOF EQUIPMENT LAYOUT
A 2.1.1
BASEMENT DIMENTION LAYOUT
A 2.1.2
LEVEL 1 DIMENTION LAYOUT
A 2.1.3
LEVEL 2 DIMENTION LAYOUT
A 2.1.4
LEVEL 3 DIMENTION LAYOUT
A 2.1.5
ROOF DIMENTION LAYOUT
A 3.1.1
BASEMENT DIMENTION LAYOUT
A 3.1.2
LEVEL 1 FLOOR FINISH LAYOUT
A 3.1.3
LEVEL 2 FLOOR FINISH LAYOUT
A 3.1.4
LEVEL 3 FLOOR FINISH LAYOUT
A 4.1.1
BASEMENT REFLECTED CEILING PLAN
A 4.1.2
LEVEL 1 REFLECTED CEILING PLAN
A 4.1.3
LEVEL 2 REFLECTED CEILING PLAN
A 4.1.4
LEVEL 3 REFLECTED CEILING PLAN
A 5.1.1
NORTH ELEVATION
A 5.1.2
WEST ELEVATION
A 5.1.3
SOUTH ELEVATION
A 5.2.1
SECTION AA’
A 5.2.2
SECTION BB’
M 1.1.1
BASEMENT HVAC LAYOUT
M 1.1.2
LEVEL 1 HVAC LAYOUT
M 1.1.3
LEVEL 2 HVAC LAYOUT
M 1.1.4
LEVEL 3 HVAC LAYOUT
E 1.1.1
BASEMENT ELECTRICAL FIXTURE LAYOUT
E 1.1.2
LEVEL 1 ELECTRICAL FIXTURE LAYOUT
E 1.1.3
LEVEL 2 ELECTRICAL FIXTURE LAYOUT
E 1.1.4
LEVEL 3 ELECTRICAL FIXTURE LAYOUT
P 1.1.1
LEVEL 1 PLUMBING FIXTURE LAYOUT
P 1.1.2
LEVEL 2 PLUMBING FIXTURE LAYOUT
L 1.1.1
BASEMENT LIFE SAFETY LAYOUT
L 1.1.2
LEVEL 1 LIFE SAFETY LAYOUT
L 1.1.3
LEVEL 2 LIFE SAFETY LAYOUT
L 1.1.4
LEVEL 3 LIFE SAFETY LAYOUT
UD 1.1.1
LEVEL 2 ACCESS TO LARGE MEETING ROOM
UD 1.1.2
LEVEL 2 LARGE MEETING ROOM ELEVATION
DD 1.1.1
FIRE STAIR DETAIL
DD 1.1.2
STAIR 01 DETAIL
DD 1.2.1
LEVEL 1 TOILET ZONE
DD 1.2.2
LEVEL 2 TOILET ZONE
DD 1.3.1
SECTIONAL DETAIL 01
DD 1.3.2
SECTIONAL DETAIL 02
DD 1.3.1
SECTIONAL DETAIL 03
DD 1.4.1
DOOR WINDOW DETAIL 01
CE 1.1.1
GENERAL COST ESTIMATION
V 1.1.1
PERSPECTIVE VIEW 01
V 1.1.2
PERSPECTIVE VIEW 02
MIXED USE BUILDING PROJECT DESCRIPTION
RESTAUTANT AND ARCHITECTURE, INTEIOR DESIGN & BUILD FIRM LOCATION
1 E High St B, Oxford, OH 45056 CLIENT
City of Oxford DRAWING TITLE
COVER PAGE DRAWING No.
G.0.0.0 PREPARED BY
ZERIN PROMEE DATE : 05/08/2023
ZERIN PROMEE
SUPERVISED BY : NODAS PAPDIMUS