CONSTRUCTING ENVIRONMENTS
ENVS10003
NAME
WEEK 3. ACTIVITY_CASE STUDY SITE VISIT INTRO Construction type_ frame construction
ASSIGNED CASE STUDY GROUP MEMBERS
Structural System(s)_ Steel structure
1_EASTERN PRECINT STUDENT CENTRE (LINK BETWEEN BUILDINGS)
Materials_ steel, concrete
Other relevant comments_
Potential construction constraints_ Difficult of moving materials
Links to other buildings_ Frank Tate
CONSTRUCTING ENVIRONMENTS
ENVS10003
WEEK 3. ACTIVITY_CASE STUDY SITE VISIT INTRO
2_MSLE BUILDING (LINK BETWEEN BUILDINGS)
Potential construction constraints_ copper will be eroded easily
Links to other buildings_ the link between two buildings
Construction type_ frame construction
Structural System(s) _ steel cantilever structure
Materials_ Zinc (cladding), copper, and timber, brick (interior wall)
Other relevant comments_
CONSTRUCTING ENVIRONMENTS 3_QUEENS COLLEGE EXTENTION
ENVS10003
WEEK 3. ACTIVITY_CASE STUDY SITE VISIT INTRO Construction type_ frame construction
Structural System(s)_ concrete structure
Materials_ concrete, timber stratum, PVC, bricks
Other relevant comments_ will finish in 2 weeks
Potential construction constraints_ the light is not sufficiency
Links to other buildings_ Queen’s college
CONSTRUCTING ENVIRONMENTS
ENVS10003
4_ORMOND THEOLOGY CENTRE RECEPTION
Potential construction constraints: because of the glasses, light and hot gather in one place, so the temperature of inside become very high.
Links to other buildings_ The Dalton McCaughey Library
Construction type_ frame construction
Structural System(s)_ concrete structure
Materials_ copper, zinc, steel (roof), PVC (tube), aluminum (door)
WEEK 3. ACTIVITY_CASE STUDY SITE VISIT INTRO Other relevant comments_