1 minute read

Site survey

1. Polygonal survey of position on site

In the process of survey, our group attemped to get the position of the single building in the whole campus by treasuring the distance between the four corners of the building and edges of surrounding buildings, on the map, we choose the polygonal geometry survey to confirm relative correct position and relationship with surrounding buildings on the site.

Advertisement

2. Dimention survey of outlines for building

From larger scale to smaller scale, the large group was divided into 4 groups to meature the outlines of the building from 4 facades. In order to get more accurate dimensions, two different groups make two treasurements on the same facade, then we compared the datas with original plans provideds by professors.

3. Plants and Trees position

The last step of site survey is to record the position of trees on the site, which is important for the next design process to decide what to remain.

This article is from: