2
is balanced by a simpler fenestration to the north Elevation massing diagram
Citygate church - Beckenham Alan Camp Architects, 2018
- The taller glass volume in entrance to the scheme between the two brick vo
A - Full height brick recess detail
3
B - GRC panels with window detail gives definition to predominant facade
- Large church & community building in south London
C - Slender aluminium mullions bring verticality to glass curtain wall
- Under director supervision I acted as main designer - Produced all drawings, D&A statement
D - Light brown brickwork chosen to blend with surrounding context
Key achievement: Achieved planning permission in August 2018
- We have also incorpora along the northern most f a three storey volume Elevation massing diagram
A
4
C
- GRC panels create visua facing curve of the audit recesses bring order to th
E D
E - Brick parapet helps conceal roof
- By using a light coloured minimised the “monumen
5 B
6 Site location plan - Croydon Road, Beckenham
Aerial perspective - North East
Alan Camp Architects LLP, 88 Union Street, London, SE1 0NW tel: 020 7593 1000. fax 020 7593 1001. mail@alancamp.com job: drawn: Croydon Road drawing: General Arrangement Ground Floor Plan
N AN L P
ING
note: all dimensions to be checked on site before commencement of the work. if this drawing exceeds the quantities in any way the architects are to be informed before the work is commenced. this drawing is copyright.
Grey buff brick with light coloured mortor source: EHSmith Architectural Clay Products
Facade details 28/02/18
scale: 1:100 @ A0 1:200 @ A2
job no: 2674
drawing no. GA-P-L00-1.100
rev. 1
38 Croydon Road, Beckenham BR3 4BJ
revisions rev
date
description
drawn by
checked
1
28.02.18
Planning Submission
ZS
AW
Facade materials pallette
Elev Scale
7
date:
ZS
GRC Panel source: Architonic
8
Grey buff brick with light coloured mortor source: EHSmith Architectural Clay Products
Recessed Brick Detail
Auditorium
KITCHEN 20.0 m²
Due to the length of the Croydon incorporated a number of strateg soften the visual impact:
GRC Panel source: Architonic
- The Croydon Road elevation rea volumes, as indicated in the adja
Recesssed top floor
Tall, seperating entrance volume
- The sculptural form of the audito is balanced by a simpler volume fenestration to the north
38 Croydon Road, Beckenham BR3 4BJ
WC 12.7 m²
LOUNGE 154.3 m²
33.6
- The taller glass volume in the mid entrance to the scheme and pro between the two brick volumes 33.6
33.6
Aerial view looking from the north east - proposed OPENED UP CHAFFINCH BROOK
- We have also incorporated a re along the northern most facade a three storey volume
Site location Plan NTS
COVERED WALKWAY
FIRE ESCAPE
- GRC panels create visual anima facing curve of the auditorium an recesses bring order to this volum
Elevation massing diagram
East elevation massing diagram
RAGE BICYCLE STO STORAGE 71.2 m²
38 Croydon Road, Beckenham BR3 4BJ
WC 35.3 m²
CR
GREEN ROOM 17.0 m²
33
MAIN AUDITORIUM 644.3 m²
- By using a light coloured materia minimised the “monumental” imp
DO OY
WC 4.0 m²
STAGE
1:7 RAMP
33.6 OPEN LOBBY 363.8 m²
GREEN ROOM 16.7 m²
WC 56.1 m²
N AD
RAMP TO B01
RO
465 SEATS
CRECHE 52.2 m²
Alan Camp Architects LLP, 88 Union Street, London, SE1 0NW tel: 020 7593 1000. fax 020 7593 1001. mail@alancamp.com job: drawn:
1:20 RAMP
Croydon Road drawing:
Hall
General Arrangement b St a
Section AA
El
Su
PRE APP FACADE LINE
note: all dimensions to be checked on site before commencement of the work. if this drawing exceeds the quantities in any way the architects are to be informed before the work is commenced. this drawing is copyright.
34.4m
GRC Panel source: Architonic YD
ON
A RO
rev 1
(Ch
AD
28/02/18
scale: 1:100 @ A1 1:200 @ A3
job no: 2674
drawing no. GA-S-01
rev. 1
date 28.02.18
description Planning Submission
drawn by ZS
checked AW
D
.2m 37
O CR
date:
ZS
revisions
RO ARD
Grey buff brick with light coloured mortor source: EHSmith Architectural Clay Products
GODD
33.3
AN L P
G NIN
El Sub Sta
Superstore
Street looking north on Croydon Road - proposed
LAYBY - 2500mm X 12000mm
Ground floor plan - 1:100 @ A1
Alan Camp Architects LLP, 88 Union Street, London, SE1 0NW tel: 020 7593 1000. fax 020 7593 1001. mail@alancamp.com job: drawn: Croydon Road
5
drawing: General Arrangement First Floor Plan
AN L P
G NIN
note: all dimensions to be checked on site before commencement of the work. if this drawing exceeds the quantities in any way the architects are to be informed before the work is commenced. this drawing is copyright.
N
Ground Floor Plan
SCALE BAR 0
GA-P-L00-1.100
Approach along Croydon Road showing massing relationship to context date:
ZS
28/02/18
scale: 1:100 @ A0 1:200 @ A2
job no: 2674
drawing no. GA-P-L01-1.100
rev. 1
revisions rev
date
description
drawn by
checked
11
28.02.18 2
Planning Submission
ZS 10m
AW
5
Site location Plan NTS
KEY PLAN 1 : 2000
38 Croydon Road, Beckenham BR3 4BJ
38 Croydon Road, Beckenham BR3 4BJ
NOT FOR CONSTRUCTION OFFICE 20.0 m²
WC 12.7 m²
OFFICES 154.3 m²
11350
L03 Alan Camp Architects LLP, 88 Union Street, London, SE1 0NW tel: 020 7593 1000. fax 020 7593 1001. mail@alancamp.com job: drawn:
Material Key Material: Description 8200
L02
El
Su
b St
a
Hall
34.4m
BOH GODD
L01
RO ARD
4100
AD
(Ch
WC 40.4 m²
L00
0
EXTERNAL GROUND LEVEL
-3200
CAR PARK LEVEL
-4600
YOUTH HALL LEVEL
STAGE
drawing: General Arrangement South Elevation
N AN L P
note: all dimensions to be checked on site before commencement of the work. if this drawing exceeds the quantities in any way the architects are to be informed before the work is commenced. this drawing is copyright.
LOBBY
28/02/18
scale: 1:100 @ A1 1:200 @ A3
job no: 2674
drawing no. GA-E-06
rev. 1
revisions rev 1
date 28.02.18
description Planning Submission
drawn by ZS
W.C.
VEHICULAR RAMP CARPARK
KEY PLAN 1 : 2000
CR
SCALE BAR 0
DO OY
GA-S-01
1
2
5
10m
NOT FOR CONSTRUCTION
VOID LOBBY 71.4 m²
N RO
AUDITORIUM BELOW
MAT 1
AD
KIDS AREA 406.0 m²
11350
L03
8200
L02
4100
L01
300
L00
0
EXTERNAL GROUND LEVEL
MAT 3
MAT 4
MAT 7
MAT 2
MAT 8
MAT 6
MAT 3
MAT 9
PRE APP FACADE LINE
South elevation - 1:100 @ A1
First floor plan - 1:100 @ A1
SCALE BAR
44
South Elevation GA-E-06
45
date:
ZS
El Sub Sta
Section AA
Storage 10.0 m²
1 2 3 4 5 6 7 8 9
ING
Superstore
Section AA - 1:100 @ A1
BACK OF HOUSE 48.9 m²
Croydon Road
OAD NR .2m
WC 35.4 m²
300
O YD
37
O CR
BOH
Smoked Brown Brick (Flemish Bond) Beige GRC Panel (RAL 9001) Glazing Frosted Glazing PPC Aluminium Mullion Light Grey PPC Aluminium RWP (RAL 9003) PPC Aluminium Door (RAL 9007) Single Ply Membrane Roof System Green Roof System
Material: Mark
0
1
2
5
10m
NOT FOR CONSTRUCTION
checked AW
5
Durham Uni student halls, Durham FaulknerBrowns Architects, 2017
3
- Large student residential scheme with 1000 bedrooms & 3 events “hubs”
4
ity
ers
iv Un
b
Hu
- Modular construction using shipping containers - Designed flat layouts, produced drawings for team meetings & planning application
5
Key achievement: Achieved planning permission in September 2017
6 7
e lleg
e2
g olle
ub
C
1H
b
Hu
Co
8
Scale and Massing Street View
Masterplan NTS
We have responded to this with our choice of materials. The scheme is largely finished in a grey buff brick with GRC detailing in areas to maintain a restrained and subtle colour palette that responds to the surrounding Site location Plan NTS environment.
Street looking north on Croydon Road - proposed
1
2
1
3
= Structure = Loading points
m
roo bed
2925mm
2
Perspective - South East approach
ite n su mm E 45 or rrid m 53 o C m om 1500 o r bed ite u s En 5mm 534
mm
90 121 270 0
mm
38 Croydon Road, Beckenham BR3 4BJ
3
Modular construction
45
4
1 - 10 person dining table
6 - Oak effect vinyl flooring
11 - 4 no. 50 litre waste bins
16 - 1 no. Writeboard/noticeboard
2 - 10 no. dining chairs
7 - Brushed stainless steel handles
17 - 3 no. pinboard
53 -1 no. A1 hung picture
8 - Brushed stainless steel kickplate
12 - Sofa system in cleanable upholstery
4 - Kitchen units in anthracite grey
9 - Diamond white emulsion wall finish
5 - Matt grey tile splashback
10 - Stainless steel inset sink
6 7
17
14 - A+ rated appliances
19 - Walls, ceilings in white skimmed plaster
15 - 1 no. coffee table
20 - 1 no. fire blanket & extinguisher
16
12
8
19
8
Scale and Massing Street View
13 - LED lighting
18 - 1 no. 500mm wall & base units per bedroom
11
4
14
7 2
15
6
13
1
9
1 Street looking south on Croydon Road- proposed
Site location Plan NTS
2
3
5
20
Perspective - North West 120
Perspective - North East approach
10
18
2440
Bedroom to Bedroom Partitions:
+2300
Acoustic Requirement: 43dB Dntw + Ctr
3
38 Croydon Road, Beckenham BR3 4BJ
NOTE: Container Walls Drawn at 130mm wide - Includes 10mm outer air gap. Actual wall build up 120mm as per CMIC Standard Spec.(Upgrade to CIMC standard build possibly required to meet acoustic requirements.)
En Suite 9.5 m²
+2600
4865
4865
41
En Suite 9.5 m²
En Suite 9.5 m²
4
Bedroom to Ensuite Bathroom Partitions: Acoustic Requirement: 43dB Dntw + Ctr
Ensuite Bathroom 2.1 m²
Ensuite Bathroom 2.1 m²
Doors to Ensuite:
200
'zip up' zones - Partitions and Doors to Risers to be constructed on site
300
5
+2300
710mm x 2100mm - Heavy duty plastic laminate faced doorset. Heavy duty solid timber core. Colour: T.B.C Acoustic Requirement: 35 dB Rw
'zip up' zones CFC Floor Sheeting to be finished on site.
6
1800
Bedroom/Bathroom to Corridor Partitions:
200
350
1117
543
Corridor
Fireproof plasterboards and architraves to be finished on site. Corridor walls to be painted on site
1210mm x 2100mm - Pas 24 Compliant Heavy duty paint quality doorset. - Factory sprayed finish Colour: T.B.C Acoustic Requirement: 35 dB Rw
682
+2300 Doors to Bedroom:
Ensuite Bathroom 2.1 m² Ensuite Bathroom 2.1 m²
910mm x 2100mm - Pas 24 Compliant Heavy duty plastic laminate faced doorset. Heavy duty solid timber core. Colour: T.B.C Acoustic Requirement: 35 dB Rw
Ensuite Bathroom 2.1 m²
97
1000
97
1903
97
1100
417
923
4865
8
'zip up' zones Partitions and Doors to Risers to be constructed on site
'zip up' zones Plasterboard Ceilings to be finished on site.
Ceilings in corridor to be painted on site.
1065
7
Floor Finish to be fitted on site
Doors to Risers:
840
+2242
Corridor
Corridor
Acoustic Requirement: 43dB DnTw +Ctr
Corridor
+2367
+2600 En Suite 9.5 m²
En Suite 9.5 m²
2800
En Suite 9.5 m²
+2300
Windows to Bedroom:
120
900mm x 1200mm - Openable to provide natural ventilation requirements - T.B.C by M+E Consultant. Opening lights to ground floor locations to be Pas 24 Compliant.
120
320
900
1220
120
Floor Finish Types
60 Minute Fire Line 30 Minute Fire Line
Ceiling Finish Types
Broadloom Nylon Carpet Tiles
Note: Acoustic Requirements to be confirmed by Balfour Beatty
Non Slip Vinyl : Forbo Surestep Lagunia Non Slip Vinyl Flooring : Forbo Surestep Aqua
0m
0.5m
1m
2m
Entrance Matting Floor Sealer
Street looking east on Tesco’s private road next to the car park - proposed
Site location Plan NTS
Perspective - North West
Washable Matt Emulsion - Dulux Diamond Matt Colour: White
Altro Whiterock Satin Cladding (Welded joints) Colour: Colour T.B.C
Painted Plasterboard Ceiling - Washable Eggshell (Dulux Diamond Eggshell)
Washable Matt Emulsion - Dulux Diamond Matt Colour: Feature Colour T.B.C
Altro Whiterock Satin Cladding (Welded joints) Colour: Feature Colour T.B.C
Painted Plasterboard bulkhead - Washable Matt Emulsion (Dulux Diamond Matt)
Eggshell - Dulux Diamond Eggshell Colour: White
500mm high Altro Whiterock Satin Splashback (Welded joints) Colour: Feature Colour T.B.C
Note: +2242 ceiling height area in corridor for services crossovers
DRAWING FireNUMBER safety and DUMO-FB-A-DR-GEN-FF&E(35)0011 internal finishes plans
46
TITLE
FF&E ENSUITE BEDROOM FINISHES
SCALE
As Indicated
SIZE
A1
DURHAM UNIVERSITY MOUNT OSWALD REVISION Rev 1
47
Wall Finish Types
Painted Plasterboard Ceiling - Washable Matt Emulsion (Dulux Diamond Matt)
Note: [01] 100mm high timber skirtings required generally. [02] 100mm Integral covered skirtings required to all Bathrooms and Accessible WC's
600mm x 500mm Stainless Steel Sheet behind hobs.
NUMBER
Cleaners
Cleaners En Suite En Suite
Corridor
En Suite
Corridor
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
Stair
Stair
Corridor
En Suite
En Suite En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite En Suite
Kitchen
En Suite
Corridor
Kitchen
Kitchen
En Suite
Corridor
Corridor
Kitchen
En Suite
Store Cleaners En Suite
En Suite
1 : 100
Corridor
En Suite
Corridor
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
Cleaners
En Suite Stair
Stair
En Suite
En Suite
Corridor
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
Corridor
En Suite
En Suite
En Suite En Suite
En Suite En Suite
En Suite En Suite
Store
BLOCK 1A+1B LEVEL 01-03
En Suite
En Suite
Kitchen
Kitchen
Corridor
Corridor
En Suite En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite Store
En Suite
En Suite
En Suite
En Suite
En Suite
Kitchen
Store Kitchen
Cleaners
Cleaners En Suite En Suite
BLOCK 1A+1B LEVEL 01-03
En Suite
Corridor
1 : 100
Kitchen
Corridor
Kitchen
Cleaners Corridor
Corridor
En Suite
En Suite
Stair
En Suite
En Suite
Accessible Bathroom
En Suite
Accessible Bathroom En Suite
En Suite
En Suite
Corridor
En Suite
En Suite
En Suite
En Suite
Stair
En Suite
Corridor
En Suite
Circulation Kitchen
En Suite Store
1A
En Suite
En Suite
En Suite
En Suite
1B
Cleaners
Accessible Bedroom En Suite
En Suite
Ancillary Bedroom Ensuite
Accessible Bathroom
Store
En Suite
Corridor
En Suite
Stair
Corridor
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite Stair
En Suite
En Suite
En Suite
Corridor
En Suite
En Suite
En Suite
En Suite
En Suite
1C
En Suite
En Suite
1H
En Suite
En Suite
Kitchen
1G
1D
Kitchen
Ancillary Bedroom Ensuite
En Suite
En Suite
En Suite
Kitchen
Corridor
Kitchen
Corridor
Corridor
En Suite
En Suite
Accessible Bathroom
Store
BLOCK 1A+1B LEVEL 01-03
Cleaners Corridor
En Suite Corridor
En Suite
Stair
En Suite
Accessible Bathroom
Accessible Bathroom
Circulation
0m
Kitchen
En Suite
En Suite
En Suite
En Suite Stair
Corridor
1
2
3
4
5
1A
1B
7.5
10m
1C
En Suite
En Suite
En Suite
Kitchen
N
Cleaners
Accessible Bedroom
1E
En Suite
Store
1 : 100
Kitchen
En Suite
1F
En Suite
1H
En Suite
BLOCK 1A+1B LEVEL 00
1G
1D
1 : 100
DUMO-FB-A-DR-Block1AB-GA(00)1100-ZZ
En Suite
BLOCK 1A + B FLOOR PLANS 1:100
SIZE
En Suite
En Suite En Suite Durham University Mount Oswald En Suite
REVISION Rev 1
A1
En Suite
En Suite
En Suite
En Suite
En Suite
1F
En Suite
0m
Kitchen
1E
Kitchen
1
En Suite
En Suite
En Suite 2
3
4
5
7.5
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
10m
N Ancillary Bedroom Ensuite
En Suite
Kitchen
Corridor
Corridor
Kitchen
Corridor
En Suite
Circulation
BLOCK 1A+1B LEVEL 00
Kitchen
1 : 100
En Suite
DRAWING NUMBER
DUMO-FB-A-DR-Block1AB-GA(00)1100-ZZ
TITLE
BLOCK 1A + B FLOOR PLANS
SCALE
1:100
SIZE
A1
Store
Durham University Mount Oswald REVISION Rev 1
Cleaners Corridor
En Suite Corridor
En Suite
Stair
En Suite
En Suite
Accessible Bathroom Accessible Bathroom
Accessible Bathroom
Store
1A
1B
Cleaners
Accessible Bedroom
En Suite
En Suite
En Suite
En Suite Stair
Corridor En Suite
En Suite
1C
En Suite
1H
En Suite
1G
En Suite En Suite College 1 typical floor plan, section & elevation - 1:100 @ A1
En Suite
1F
En Suite 0m
Kitchen
Kitchen
1D
1
1E 2
3
4
5
7.5
10m
N
BLOCK 1A+1B LEVEL 00 1 : 100
DRAWING NUMBER
DUMO-FB-A-DR-Block1AB-GA(00)1100-ZZ
TITLE
BLOCK 1A + B FLOOR PLANS
SCALE
1:100
SIZE
A1
Durham University Mount Oswald REVISION Rev 1
Perspective - College 1 Hub common room
Perspective - College 1 quad
College 1 typical strip section & elevation - 1:20 @ A1 48
49
RWO
Kitchen
Kitchen
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
Corridor
En Suite
Corridor
RWG
2°
En Suite
RWO RWO
Stair
Stair Plant
Plant
Cleaners
Roof Access Hatch
Cleaners
Key
1 : 1000
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
En Suite
2A
2C 2°
RWG
2D En Suite
En Suite
En Suite
Corridor
En Suite
En Suite
Corridor
En Suite
En Suite
2B 2H
En Suite
2E
65sqm REQUIRED ACTIVE AREA FOR PV TO MEET BREEAM EXCELLENT EPC B En Suite
En Suite
En Suite
En Suite Ancillary Bedroom Ensuite
Kitchen
Kitchen
Circulation Kitchen
RWO 0m
BLOCK 2A LEVEL 00
BLOCK 2A LEVEL 01-03
1 : 100
BLOCK 2A LEVEL 04
1 : 100
1 : 100
1
2
3
4
5
7.5
10m
N
College 2 typical block plans - 1:100 @ A1 DRAWING NUMBER
DUMO-FB-A-DR-Block2A-GA(00)2100-ZZ
TITLE
BLOCK 2A LEVEL 00-04
SCALE
1:100
SIZE
DURHAM UNIVERSITY MOUNT OSWALD A1
REVISION Rev 1
Perspective - College 2 Hub common room
Perspective - College 2 quad
College 2 typical strip section & elevation - 1:20 @ A1 50
51