Becontree Urban Room - Dagenham
Site Axo -1:2500 @ A4
London Metropolitan University, 2020 - MArch second year thesis project - Planning museum & exhibition centre in heart of the Becontree estate - Part of wider masterplan & festival to mark 100 years of the estate Key achievement: Executing an ambitious form with technical complexity in a skillful & playful manner
G.F. Plan -1:500 @ A4 New cycle lanes
West Elevation -1:500 @ A4
New green space
New bus routes
18
15
15
17 17
1 - Entrance foyer 2 - Becontree timeline exhibition part 1 (1921-1941) 3 - Becontree timeline exhibition part 2 (1942-1961) 4 - Cafe seating 5 - Cafe servery 6 - Reception desk 7 - 1:5000 interactive site model 8 - Kitchen 9 - Cold food store 10 - Bin store 11 - Staff changing room 12 - Female W.C. 13 - Male W.C 14 - Accessible W.C. 15 - Store 16 - Shop 17 - Main exhibition hall/ community rooms 18 - Climbing wall
17
16
Rotunda Technical Section - 1:100 @ A4
13
12
N
11 8 10
9 4
5 6
2 1
6
1 7
5
3
7
4
4
4
14
14 15
East Street Market Hall - Barking London Metropolitan University, 2019 1
- MArch first year project - Extensive masterplan with public space, retail sheds and new market hall - Adaptation of high street market into 1a 2 more formal civic space Key achievement: Delivering a large scale scheme with appropriate detail & A sensitivity
3000 2876
A
3000
3000
L01 Ceiling Shed
3600
2850 2550
A 800
Roof Eaves Shed
4800
L01 Ceiling Shed
2850 2550
L01 FFL Shed
L00 Ceiling Shed
B
2100
B
300 0
4500
5100
4376
Workspace 7.1 m²
L00 FFL L00
3176
4900
4500
750
B
5291
L01 FFL Shed
Storage 0.6 m²
W.C. 2.1 m²
Roof Ridge Shed
750
3000
1200
7098
4500
2250
2
3176
Workspace 7.1 m²
A 1100
Roof Eaves Shed
4800
5100
4900
2876
863
5291
1
4376
3000
4500
3500
800
A
2
Workspace 7.1 m²
800
3600
Storage 0.6 m²
W.C. 2.1 m²
776
Roof Ridge Shed
3600
River Roding
3500
2
2128
1
7098
3500
1100
Storage 0.6 m²
C. m²
1
2
863
3000 2876
12
4500
3500
3000
5100
2
2
1200
A
863
800
A
B
B
Market hall @ Town quay wharf - axonometric view
Work sheds - typical 1st floor plan B
A
1
1 1
B
4500 3000
1
L00 Ceiling Shed
5000
3500
5000
2
610
7098
1
3600
2
3000 3420
B
2
3000
3500 3500
3500
776
950
L00 FFL L00
A
1
3000 3000
610
Roof Ridge Shed Roof7098 Ridge Shed Roof Ridge Shed 7098
2 2
A
4500
300 0
0m
4m
10m
4500
5000 610
800
1
2
A
7098
Roof ShedRidge Shed 7098RidgeRoof
1
3500
950
1
2
3000
3000
2876
5291
Roof Eaves Roof5291 Eaves 5291 Shed RoofShed Eaves Shed
4800
L01 Ceiling L01 4800 Ceiling Shed L01Shed Ceiling Shed 4800
Storage 0.6 m²
1100
W.C. 2.1 m²
5291
Roof ShedEaves Shed 5291EavesRoof
4800
L01 Ceiling L01 Shed Ceiling Shed 4800
A
3000
3500
950
1800
Roof Ridge Shed
1800
2128
1800
7098
7098
Roof Ridge Shed
2850 2550
Workspace 7.1 m²
3176
L00 Ceiling L00 2550 Ceiling Shed L00Shed Ceiling Shed 2550
L01 FFL Shed L01 FFL Shed 2850
4500
L01 FFLL01 Shed L01 2850 FFL Shed FFL Shed 2850
5100
4900
2850 2550
4376
Retail space 14.5 m²
4500
4500
4920
750
2250
610
Roof Ridge Shed
1800
1800
7098
A
4500
5000
500
900
300
A
L00 Ceiling L00 Shed Ceiling Shed 2550
Roof Eaves Shed
5291
Roof Eaves Shed
4800
L01 Ceiling Shed
4800
L01 Ceiling Shed
850
L00 300 FFL L00 0
L00 FFLL00 FFL 300 L00 0 L00
850
L00 Ceiling Shed
L01 1200
300 0
L00
2100
1200
L00 850
0m
1200
B
1
1800
L01 FFL Shed L00 Ceiling Shed
Work sheds - Front elevation
B
3000
2850 2550
850
L00 FFL
A
2
1950
2100
L00 0
FFL Shed
2100
300 0
L00
2
L00 FFL
Work sheds - Section AA
L00 FFL
1
L00 300FFL
L00 Ceiling Shed
2100
Work sheds - typical ground floor plan
863
300 0 2850 2550
L01 FFL Shed
B
1800
B
2100
2850 2550
300 0
1950
500
750
1800
B
800
A
1200
1950
A
2100 2100
5291
L01 Ceiling Shed 2100
Roof Eaves Shed
4800 2100
5291
300 0
L00 FFL
1m
L00
2.5m
A
4500
3500
5000 3000
950
4500
610
7098
Roof Ridge Shed
5000
3500
610
Roof Ridge Shed 7098 Work sheds @ public square - site elevation
5291
Roof Eaves Shed
7098
Roof Ridge Shed
7098
Roof Ridge Shed
Durham Uni student halls, Durham FaulknerBrowns Architects, 2017 - Large student residential scheme with 1000 bedrooms & 3 events “hubs� - Modular construction utilising stacked shipping containers - Designed flat layouts, produced drawings for team meetings & planning Key achievement: Achieved planning permission in September 2017 lle
1 ge
Co
ub
yH
rsit
ive
Un
e2
lleg
Co
b
Hu
b
Hu
Masterplan
1
2
3
2925mm
om
mm
90 121 270 0
mm
om
ro bed ite u s En 5mm 534
or rrid Co 0mm 0 15
o edr eb suit m n E 5m 534
= Structure
Modular construction
Elevation detail
= Loading points/connections
Internal perspective - college 1 hub entrance
Citygate church - Beckenham Alan Camp Architects, 2018 - Large church & community building in south London - Under director supervision I acted as main designer on this scheme - Produced all drawings, D&A statement Key achievement: Achieved planning permission in August 2018
Site location - Croydon Road, Beckenham
Ground floor plan
Facade details A - Full height brick recess detail C A
E
D
B - GRC panels with window detail gives definition to predominant facade C - Slender aluminium mullions bring verticality to glass curtain wall D - Light brown brickwork chosen to blend with surrounding context
B
Perspective looking West
E - Brick parapet helps conceal roof