Construction as Alchemy Assignment 1C - Steel shelter

Page 1

Note: * Projected length

2 B3

Note: Baldwin Spencer Building located at north of the site (Outside the boundary of the site plan) Note: All ground cover is grass

CL

7120 800

1195

778

2800

727

1620

Existing hedge with wire support

Tree 2: Trunk diameter = 60mm Canopy diameter = 2000mm

1800

Steel shelter

Note: Here is the existing concrete pedestrian footpath

800

Existing manhole cover 1000mm*1000mm Note: MSD Building located at east of the site (Outside the boundary of the site plan)

1000

Tree 1: Trunk diameter = 30mm Canopy diameter = 1000mm

Fall 4°

Relaxation deck

A-A

Brick wall

5640

CL

600

Brick wall engaged pier

C3

960

CL 3000

4440

The gaps between each decking board horizontally are 6mm and both sides of them are nailed on the joists

1920

A-A

C3

360

Note: Union House Building located at west of the site (Outside the boundary of the site plan)

1210

Roof sheets overlap every two sheets

2 C2

Roof sheet Lysaght Klip-Lok 406

CL

250 (W) x 100 (H) box gutter 80mm protruding from flashing Box gutter Fall 1:100 to this end above the pit

Flashing - Aluminum edge finish of the shelter Steamwater pit (800mm* 800mm)

4000

7300*

120

1 C2

N

CL

ROOF PLAN (including site) Scale: 1:50

Construction as Alchemy ARCH10002

2019 Studio Leader: Yi Lobachevsky Semester 1 Studio: 03 Friday 9:00 am

Name: Ziyang Yuan (Vincent) Student Number: 1025198

Part 1C : Steel Shelter

C1


CL

CL

1640

CL

4000

CL

1640

of supports: 1500(single), 1800 (end), 2100 (internal)/ max. overhang: 200 (unstiffened), 600 (stiffened) / Reference: Lysaght Roofing and walling installation manual, table 2.12.1

B1

1000

720

B1 Outriggers

CL

C1

B1 Outriggers

Outriggers welded to the top of the column

C1

RHS 150 x 100 x 6 columns connected to the outriggers via 310 x 100 x 10 column cap plate

B1

PURLINS P1

BEAMS

3000

4440

B1 P1

P1

P1

C1

In the viewports, the lin the section plane is cu will appear thicker tha alarmed if the lines ap

720

1000

CL

OTHER C1

B1 Outriggers

B1 Outriggers B1

Flashing using Galvanised Aluminum as edge finishs bolted to the spacers inside

C Purlins are connected to the UBs via the 125 x 75 UA 8 purlin cleat plate Bolted to purlins and welded to Universal Beams

The ends of the Unviersal Beams are mitred and then welded toghther at the web, the top anf bottom flange at every corners

Outrigger B1s are notched to the ring beams The top and bottom are cut away to allow two webs to connect

N

ROOF FRAMING PLAN

CL

RHS 150 x 100 x 6 columns / Hot rolled steel / Galvanized References: http://www.steelweb.info/150x100x6.htm

Outriggers/ B1

UniversaL Beam 180UB16 / max. span: 9000 / max. spacing: 4200 / Hot rolled steel / References: Lysaght Flashing Guide, table 2.10.1

Soffit

Decking board / max. span: 450 / max. spacing: N/A / F14 unseasoned pine / References: Table: 2. Decking board sizes and stress grades 4. Allowable decking board spans

Flashing

Galvanised Aluminum

Roof sheeting fixings

KL65 fixing clip for KLIP-LOK 406

Roof area calculation: 4250mm* 6930* = 29.45m^2

Scale: 1:50

720

UniversaL Beam 180UB16 / max. span: 9000 / max. spacing: 4200 / Hot rolled steel / References: Lysaght Flashing Guide, table 2.10.1

B2 etc.

P1 P1

COLUMNS

C1

C15015/ ‘C’ shaped Purlins / 1.2 (BMT) / max. span: 4200 / max. spacing: 2000 / cold formed steel / galvanized / References: Lysaght Flashing Guide, table 2.10.1

P2 etc.

B1 P1

C2-01 - ROOF FRAMING Layout size: 255mm x 1 Scale 1:50 Pan view to centre co

MEMBER SCHEDULE ROOF SHEET Lysaght Klip-Lok 406/ 0.48 (BMT) / min. roof pitch: 1 (1 in 50)/ max. spacing

7300* Note: * Projected length

3000

CL

C2-02 - ELEVATION Do not use1a screen sh Layout size: 200mm 120mm create yourx PDF as this Scale 1:50 too thick, and the scal Pan view to centre roof elevatio Galvanised Aluminum as edge finishes

720

Roor pitch 4°

250 (W) x 100 (H) box gutter

Roof sheet Lysaght KlipLok 406

detail 1

detail 2

C4

Flashing using Galvanised Aluminum as edge finishs

From the lowest point to the decking surface

RHS 150 x 100 x 6 columns

Ground line

Relaxation deck Concrete Stump

ELEVATION 1

Stairs to access sheltered deck

ELEVATION 2

Scale: 1:50

Construction as Alchemy ARCH10002

Ground line

2300

250 (W) x 100 (H) box gutter 80mm protruding from flashing

2690

C4

Scale: 1:50

2019 Studio Leader: Yi Lobachevsky Semester 1 Studio: 03 Friday 9:00 am

Name: Ziyang Yuan (Vincent) Student Number: 1025198

Part 1C : Steel Shelter

C2


CL

CL

1798

1686

CL

1725

CL

Flashing using Galvanised Aluminum as edge finishs bolted to the spacers inside

1600

1445

338

CL

CL

CL

CL

CL

4010

CL 1600

Flashing using Galvanised Aluminum as edge finishs bolted to the spacers inside

Fall 4° Outrigger beams are notched to the ring beams The top and bottom are cut away to allow two webs to connect

Furring channel Soffit lining using decking board 120mm* 35mm

C Purlins are connected to the UBs via the 125 x 75 UA 8 purlin cleat plate Bolted to purlins and welded to Universal Beams

2300

2690

RHS 150 x 100 x 6 columns connected to the outriggers via 310 x 100 x 10 column cap plate

From the lowest point to the decking surface

Stairs access to the sheltered deck

Hanging joists under decking board to support the hole (240mm* 240mm)

RHS 150 x 100 x 6 columns

Ground line

SECTION A-A [CUTTING ACROSS THE PURLIN CROSS SECTION] Scale: 1:20

Construction as Alchemy ARCH10002

2019 Studio Leader: Yi Lobachevsky Semester 1 Studio: 03 Friday 9:00 am

Name: Ziyang Yuan (Vincent) Student Number: 1025198

Part 1C : Steel Shelter

C3


C4-01 - DETAIL 1 Layout size: 200mm x 250mm Scale 1:5 Pan view to centre correct det Underlaps on one side and Overlaps on the other side to fix the roof sheet

C Purlins are connected to the UBs via the 125 x 75 UA 8 purlin cleat plate Bolted to purlins and welded to Universal Beams

Flashing fixed box gutter onto the C purlin Gutter bracket hang on purlins on both sides

Timber spacer 65mm* 130mm Bolted onto beam

Roof sheet Lysaght Klip-Lok 406 screwed onto purlins

Galvanised Aluminum lashing bolted onto the spacers

Timber spacer 45mm* 150mm Bolted onto beam

25

In the section viewports, the lin the section plane is cutting will appear thicker than when p alarmed if the lines appear too

320

Roof sheet Lysaght Klip-Lok 406 Fixed by KL65 fixing clip

Timber spacer 82mm* 60mm Bolted onto beam

Galvanised Aluminum lashing bolted onto the spacers

320

Do not use a screen shot of the create your PDF as this will mak too thick, and the scale to be d

Furring channel Bloted onto C purlins Soffit lining using decking board 120mm* 35mm Bolted onto the furring channel

Universal beam 180UB16

Timber spacer 45mm* 150mm Bolted onto beam

Universal beam 180UB16

C Purlins are connected to the UBs via the 125 x 75 UA 8 purlin cleat plate Bolted to purlins and welded to Universal Beams

Soffit lining using decking board 120mm* 35mm Bolted onto the furring channel

Furring channel Bloted onto C purlins

450

CL

DETAIL 1: BOX GUTTER DETAIL Scale: 1:5

Construction as Alchemy ARCH10002

2019 Studio Leader: Yi Lobachevsky Semester 1 Studio: 03 Friday 9:00 am

CL

DETAIL 2: ROOF EDGE DETAIL Scale: 1:5

Name: Ziyang Yuan (Vincent) Student Number: 1025198

Part 1C : Steel Shelter

C4


C5-01 - 3D HERO VIEW Layout size: 250mm x 25 Orbit and pan to show roof deck and wall con Flashing - Aluminum edge finish of the shelter

250 (W) x 100 (H) box gutter 80mm protruding from flashing Box gutter Fall 1:100 to this end above the pit Brick wall

Soffit lining using decking board 120mm* 35mm Bolted onto the furring channel

Roof sheet Lysaght Klip-Lok 406

Flashing - Aluminum edge finish of the shelter

Underlaps on one side and Overlaps on the other side to fix the roof sheet

Relaxation deck

PERSPECTIVE 1 C Purlins are connected to the UBs via the 125 x 75 UA 8 purlin cleat plate Bolted to purlins and welded to Universal Beams

Hanging joists under decking board to support the hole (240mm* 240mm)

Furring channels spacing at 450mm between each other

Steel shelter Gutter bracket spacing at 1000mm between each other

Outrigger Beams are notched to the ring beams The top and bottom are cut away to allow two webs to connect

Hanging joists to support the hole (240mm* 240mm) 500mm dia x 1200mm column footings

3D HERO VIEW

Construction as Alchemy ARCH10002

PERSPECTIVE 2

2019 Studio Leader: Yi Lobachevsky Semester 1 Studio: 03 Friday 9:00 am

Name: Ziyang Yuan (Vincent) Student Number: 1025198

Part 1C : Steel Shelter