Portfolio_Architecture

Page 1



ACADEMIC WORKS 01-DIPLOMA: TRANSPORT COMMUTING NODE OF URBAN AND SUBURBAN TRAFFIC AT SAMARA RAILWAY STATION 2012, 6th year of education (supervisor-prof.Barannikov Anatoliy) 02-REDEVELOPMENT OF INDUSTRIAL AREA.CONCEPT DESIGN 2010,5th year of education (supervisor-prof.Barannikov Anatoliy) 03-MUSEUM OF CONTEMPORARY ART 2009,3th year of education (supervisor-prof.Barannikov Anatoliy) 04-RESIDENTIAL DISTRICT FOR 35 000 INHABITANTS 2010,4th year of education (supervisor-prof.Barannikov Anatoliy) 05-HOUSING GROUP WITH 2 TYPES OF DWELLING HOUSES 2010,4th year of education (supervisor-prof.Barannikov Anatoliy)

COMPETITIONS 06-PAVILION «3X3» AND «TETRAGON QUEST» 2013 07-PAVILION «SHADOWS’ ACTING» 2014 08-SHED WITH STOVE 2014


01TRANSPORT COMMUTING NODE OF URBAN AND SUBURBAN TRAFFIC AT SAMARA RAILWAY STATION The railway stations become again the centres for attraction of transportation flows, place of passage, stay and interest of large heaps of people. And it includes not only passengers directly arriving or leaving, but the part of social spaces of the city like shopping streets and malls, places of entertainment and recreation where there is an area meeting certain interests of each person. In addition, the urban space has to be organized and purposely transformed in such a way that not only transport but a specific social function of the railway station gains the maximum expressive and at the same time convenient for use embodiment. The special attention is derived from here to the projects of town‑planning development and planification of the territories adjacent to the railway stations, primarily to organization of transportation flows, car lots, parking places, public transport, to tracing of pedestrian routes, and to ensuring confident visual orientation. The first belt of space, surrounding the station and facilitating the access, approach and entry inside the railway station complex, becomes an independent town‑planning structure saturated with the transport designation facilities inviting and introducing a person into the world of the road. The external belt, to which the streets and quarters covering the railway station belong, gains additional momentum of the growth of investment and functional properties while increasing the location rating of real estate units and, correspondingly, their cost. With regard to this circumstance the prospects of construction of commercial facilities in the territories of railroad

precinct obtain serious investment argumentation. ain serious investment argumentation. Inside the railway station complex its own scenario unrolls, following which the passengers, visitors and guests receive a wide range of possible actions. The transit flows “entrance‑trains” open new and new spaces along its course going in parallel and filled with offers of services — from catering and recreation, trade, personal service to exhibition and cultural‑entertainment facilities. A sophisticated spatial organization of passenger flows, especially inherent to multimodal complexes and hubs, allows for achieving the same spatially developed system of service of these flows while creating a range unique selection of services of the super structure. The adjacent or other urban facilities functionally interacting with the railway station complex — hotels, apartment hotels, office conglomerations, production units of post‑industrial generation — represent a possibility for the formation of urbanized areas of maximum intensity and density of the facilities in the urban territory. And it is the very railway that plays the leading role in ensuring such a possibility. The principle of the railway as a horizontal elevator starts working — the majority of users of these town‑planning superstructures must arrive and depart from here by railway transport not loading the street and road network with its cars. The railway station complex represents in this case the top of another, spatial and communication structure superposed towards the city street and road network — superstructure if in terms of spatial organization of town‑planning facilities.

Final project location-Samara january-june 2012 supervisor-Prof.Barannikov barannikovai@gmail.com

The project provides for development of the area of 121,75 ha. It provides for not only transformation of the railway station into the hub but the development of the whole district as well. The city will receive 189 000 sq. m of office areas, 4600 of new apartments for 12,000 people, a park with the area of 3,5 ha. Specifications of the Whole Project •  Total area — about 121,75 ha. •  Total area railway infrastructure — 3 ha. Specifications of the Railway Station •  2 covered platforms. •  Non‑stop barrier‑free environment. •  Underground automative parking for 540 parking slots. • Garage for 36 buses •  Shopping galleries — 11,805 sq. m. •  Foodcourt— 13 916,1 sq.m. •  Metro and suburban station — 9185,8 sq. m. •  Bus station — 8928,3 sq. m. •  Underground parking — 12 729,4 sq. m. •  Utilities and Engineering service zone—7838 sq. m. •  Total square of complex— 65 318 sq. m.


TRANSPORT SCHEME

CITY HIGHWAY OF CONTINUOUS MOVEMENT CITY HIGHWAY OF ADJUSTABLE MOVEMENT DISTRICT HIGHWAY RIVERS,LAKES RAILWAY CITY BOUNDARY METRO

FUNCTIONAL SCHEME

GREEN ZONE CULTURAL,PUBLIC AND ENTERTAINING ZONE INDUSTRIAL ZONE RESIDENTAL ZONE RIVERS,LAKES

WATER TRANSPORT AIRPORT

TRANSPORT COMMUTING NODE

TRANSPORT COMMUTING NODE


SITUATION


MASTERPLAN existing railway station existing concourse new concourse station entry to underground parking shopping centre

public centre

shopping galleries bus station bus parking business centre hotel

sport centre

offices business centre

residential area

entertaining and public complex

mixed-use complex

entry to parking

embankment

residential area park

yacht-club

river-boat station

transition with commercial function parking

river-boat station


SECTION 1-1 INTERURBAN PLATFORMS

NEW CONCOURSE

ENTRY TO SHOPPING UNDERGROUND AND GALLERY SUBURBAN RAILWAY STATION GOODS RAILWAYS

HIGHWAY

ENTRY TO STREETS

VERTICAL CONNECTION

VERTICAL CONNECTION

VERTICAL CONNECTION

RAILWAY STATION 50, 000 40, 000 30, 000 20, 000

1

entry to the 2nd stage entry to existing railway station of railway station

SECTION A-A

elevated underground railway

+28,000

2

+25,600

+25,600

+20,600

+20,600

+17,600

+17,600

+13,000

+13,000

+13,000

+10,000

+10,000

+10,000

+4,000

+4,000

+4,000

+0,000

+0,000

+0,000

-4,000

-4,000

-7,000

-7,000

interurban railways

underground and suburban railway station

B

B goods railways

+9,200

A

A

-0,450

2 public and commercial functions:foodcourts,cafes,shops, offices,hotel,etc (ground and overground)

7 800

116

7 800

115

7 800

114

7 800

113

7 800

112

7 800

111'

7 800

111

7 800 650 7 150 127 200

110

109 109'

7 800

108

7 800

107

7 800

106

7 800

105'

7 800

105

4 000

104

10 000

103

-0,450

4 000

102

101

public and commercial functions (underground)

transport buildings

SECTION B-B +28,000

+28,000

+28,000

+20,600

+20,600

+20,600

+17,600

+17,600

+17,600 +13,800

+10,000

+11,400

+10,000

+8,600

+8,600

+5,300

4 000

101

1

102

10 000 3 350

650 7 800

103 201' 201

7 800

202

7 800

203

7 800

204

7 800

205

7 800

206

7 800 7 800 650 142 800

207

208

7 150

209 209'

7 800

210

7 800

211

4 800

+5,300

3 000 3 000

212 501

213

4 800

502 214

7 800

7 800

215

7 800

216

217


ENTRIES TO OUTSIDE

UNDERGROUND TUNNEL

ENTRY TO PARKING

ENTRY TO PUBLIC BUILDING

ENTRY TO PUBLIC BUILDING

ENTRY TO EMBANKMENT

ENTRY TO RIVER-BOAT STATION

RIVER SAMARA


AXONOMETRIC SCHEME

ENTRY TO PLATFORM FROM UNDERGROUND TRANSFER

ENTRY FROM EXISTING CONCOURSE

ENTRY FROM RAILWAY STATION’S COMPLEX

OPEN SUBURBAN PLATFORM

+20.600

+13.800

FOODCOURT

SUBURBAN PLATFORM

ENTRY TO INTERURBAN PLATFORMS

UNDERGROUND PLATFORM

SHOPPING GALLERIES

ENTRY TO STATION

OFFICE BLOCK

+11.400 FOODCOURT

+20.600

+10.000

+13.000 BUS STATION’S WAITING ROOMS,TICKET OFFICES,ETC

+10.000 ARRIVAL BLOCK

DEPARTURE BLOCK PAY-GATES

evacuation stairs

+0.000

ENTRY TO COMPLEX FROM OUTSIDE

+17.600

elevator for passengers

PARKING

staff elevator

FEEDING BLOCK

-4.000

service elevator car elevator

PARKING

evacuation transfering directions of passenger flows bus station’s passenger flow subway and suburban station’s passenger flow entrance directions GSPublisherEngine 0.0.100.100

+17.600 -7.000

ENTRY TO UNDERGROUND SHOPPING GALLERY WHICH CONNECTING PUBLIC COMPLEXES, EMBANKMENT,RIVER-BOAT STATION,ETC


SECTION 2-2 +25,600

+25,600

+20,600

+20,600

+17,600

+17,600

+13,000

+13,000

+10,000

+10,000

+28,000

+26,600

+20,600

+20,600 +17,600

,450

+10,000

+8,600 +5,300

+4,000 +0,000

+11,400

+10,000 +7,900

+0,000

-0,100

-4,000 -7,000

7 800

1

7 800

2

7 800

3

7 800

4

7 800

5

7 800 650

6

1 750

7 7' 8

5 400

7 800

8

9

10 800

30 000

11

23 150

13

850

15

36 000

15

329 650

17

34 000

850

18

1 150 8 900

18'

20

8 900

21

8 900

22

8 900 2 000

23

24 25

6 000

21 150

26

850

27'

27


24 000

29

28

92 850 40 000

+10.000

29'

28 000

27

25' 25

10 000

8 900 2 000

24

+11.400

8 900

23

8 900

22

10 000

102 800

+10.000

8 900

21

19'

20 2 400

19

10 000

650 4 000

7 800

7 800

7 800

7 800

7 800

7 800

7 800

7 800 650

7 150

18'

7 800

7 800

202

203

204

205

206

207

208

7 800

7 800

7 800

7 800

209 209'

210

212

211

213 4 800

214

6 000

215

216

4 800

329 650

36 000

34 000

201'

17

40 000

36 000

173 000

16

+0.000

148 000

850

15 15 14

30 000

24 000

14'

13

27 000

30 000

12

11

10

WORKING SPACE

37,1 м2

7

7'

74,3 м2

33,5 м2 28,1 м2

35,6 м2 35,6 м2

35,6 м2

35,6 м2

34,2 м2

7 800

215,1 м2

16,9 м2

121 м2

16,2 м2

16,2 м2

16,2 м2 16,2 м2

16,2 м2

16,2 м2

21,2 м2

16,9 м2

38,3 м2 25,2 м2

6

25,4 м2

143,6 м2

84,2 м2 56,3 м2

7 800

WORKING SPACE

28,1 м2

20 м2

5

6 000

7 800

7 800

3

10,7 м2

62 400 46 800

7 800 7 800

4

А

BUS PLATFORM

BUS PLATFORM

62 400 7 800

6

5

8

8 7 800

7 800

WORKING SPACE

2 400

7

2

501

4 7 800

7 800

1

102

1

10 000 18 000

4 000

103

ENTRY TO COMPLEX

104

7 800

15 600 31 200

105

7 800

106

7 800

107

7 150 23 400

108

650 7 800

7 800

15 600 31 200

127 200

109'109

110

111

7 800

112

7 800

113

15 600

114

7 800

3

7 800 7 800

115

2

7 800

4 000

101

116

7,8 м2

2

56,3 м2 6,8 м2

7 800 7 800

А

24 000

9 7 800 7 800

7 800

8

1 400

7 800

9

9'

3 980,7 м2 8,1 м2

1 4 000

101

102

10 000 18 000

4 000

103

104

7 800

15 600 31 200

105

7 800

106

7 800 7 800

107

7 150

650 7 800

7 800

54 600

119 400

108

109' 109

110

111

7 800

18

124 800

201

15 600

7 800

112

7 800

113

7 800 7 800

114

115

502

217


+20.600

ENTRY TO PLATFORM №2, WAYS №2,3

8 000 43 600

90,5 м2 72 м2 45,2 м2

RESTAURANT

TOILET 18,4 м

N

KITCHEN

FOODCOURT

22

39,3 м2

T 33,1 м2

A

KITCHEN

48,5 м2

18,4 м2

ST A

KITCHEN

36,3 м2

21

43,9 м2

56,3 м2 56,3 м2

WORKING SPACE 33,8 м

2

18' 7 800

7 800

7 800

7 800

7 800

7 800

7 800

7 800 650

7 150

18

7 800

7 800

7 800

7 800

7 800

7 800

44,1 м2

7 800

203

204

205

206

207

208

209 209'

30,3 м2

210

211

212

213

214

215

216

217

34 000

7 800

7 800

7 800

7 800

7 800

7 800

7 800

7 800

650

7 150

7 800

7 800

7 800

7 800

124 800

201

202

203

204

205

206

207

208

209

209'

210

211

212

213

201'

62,3 м2

4 800

6 000

4 800

15 600 62,3 м2

30,3 м2

7 800

214

7 800

215

7 800

216

44,1 м2

44,1 м2

44,1 м2

44,1 м2

62,3 м2

17

30,3 м2

44,1 м2

36 000

30,3 м2

62,3 м2

44,1 м2

30,3 м2

44,1 м2

136 800

30,3 м2

15

44,1 м2

59,5 м

13

SHOPPING GALLERY

SHOPPING GALLERY

148 000

68,5 м2

24 000

15

30 000

135 400

328 800

ENGINEERING AND UTILITY SERVICES ZONE

201'

10

650

30,3 м2

124 800

202

SHOPPING GALLERY

4 000

SHOPPING GALLERY

10 000 18 000

201

2

62,3 м2

30,3 м2

30,3 м2 30,3 м2

56,4 м2

60,6 м2

44,1 м2

44,1 м2

44,1 м2

44,1 м2

44,1 м2

21,5 м2

35,6 м2

11 21,5 м2

9'

40,4 м2

9' 9 7 800

7 800

24 000

9 8'

8

7 800 62 400 7 800

7 800

FEEDING ROOM FOR FOODCOURT

WAREHOUSE FOR SHOPPING GALLERY

KITCHEN

42,1 м

55,1 м2

93,6 м2

47,4 м2

48,1 м

2

RESTAURANT

RESTAURANTRESTAURANT

24,5 м2

7'

KITCHEN

115,9 м2 17,8 м2

2

7,6 м

2

KITCHEN 13,7 м2

OFFICE

А

TOILET

501

TOILET

А

5

6,5 м2

KITCHEN

67,1 м2 52,6 м2

RESTAURANT

6

OFFICE

ENGINEERING AND UTILITY SERVICES BLOCK

502

60,9 м2 38,9 м2

RESTAURANT

OFFICE

FOODCOURT

27 м2 27 м2 30,9 м2

А

OFFICE

83,3 м2

TOILET

4 7 800

7 800

4

KITCHEN 81,9 м2

7 800

7 800

VESTIBULE

6

35,6 м2 11,7 м2

7

7 800

7

7'

62 400

7 800

FEEDING ROOM FOR FOODCOURT

7 800

8

5

23 м2

19,4 м2

20

4 000

3

3

TOILET

7 800

7 800

OFFICE +13.000

OFFICE

2

7,8 м2

83,3 м2

2

9,4 м2

7,8 м2

7 800

7 800

А

21,2 м2

38,3 м2

3 248,4 м2

20

OFFICE OFFICE

WORKING SPACE

ENTRY TO SUBWAYSTATION

166 м2

21,2 м2

TOILET

186,2 м2

B

2

TOILET

RE

8 900

59,9 м2

RESTAURANT RESTAURANT

23

B

OFFICE BLOCK OFFICE BLOCK

88,2 м2

33,1 м2

WORKING SPACE

8 900 8 900

ENGINEERING AND UTILITY SERVICES BLOCK

WORKING SPACE

21

B

INQUIRY OFFICE

17,9 м2

KITCHEN

48,5 м2

8 900

ENTRY TO PLATFORMS

TICKET OFFICE

WORKING SPACE

8 900 8 900

35 600

43 600

WORKING SPACE

TICKET OFFICE

WORKING SPACE

KITCHEN

OFFICE OFFICE

49,5 м2

8 900

FEEDING ROOM FOR FOODCOURT

OFFICE

23

22

WC 41,3 м2

24

OFFICE BLOCK

24

PLATFORM №7

ENTRY TO PLATFORM №6, WAY №10

ENTRY TO PLATFORM №5, WAYS №8,9 26

8 900

26

8 000 8 000

25'

4 000

18 000

27

EXISTING CONCOURSE

UR

24 000 40 000

28

2 1

ENTRY TO PLATFORM №4, WAYS №6,7

1 29

ENTRY TO PLATFORM №3, WAYS №4,5

+17.600

2

29'

4 670 м2

1

8,1 м2

1

4 000

101

102

1

10 000 18 000

4 000

103

104

7 800

15 600 31 200

105

7 800

106

7 800 7 800

107

7 150

650 7 800

7 800

54 600

119 400

108

109'109

110

111

15 600

7 800

112

7 800

113

4 000

7 800 7 800

114

10 000

4 000

7 800

15 600

18 000

7 800

7 800

31 200

7 150

650

7 800

7 800

15 600

7 800

7 800

7 800

7 800

54 600

7 800

119 400

15

101

2

102

1

103

104

105

106

107

108

109' 109

110

111

112

113

114

15

2

217

B


WEST FACADE +28,600

+28,600 +26,600

+20,600

+20,600

+17,600

+17,600

+13,000

+13,000

+11,400 +10,000

+10,000 +8,600 +5,300

+4,000

+0,000

328 800

29

1

EAST FACADE +28,600

+28,600 +26,600

+20,600

+20,600

+17,600

+17,600

+13,000

+13,000

+11,400 +10,000

+10,000 +8,600 +5,300

+4,000

+0,000

4 000

242 800

116

1

METRO STATION’S SOUTH FACADE

BUS STATION’S SOUTH FACADE +28,600

+28,600

+26,600

26

101

+28,600 +26,600

+20,600

+20,600

+20,600

+17,600

+17,600

+17,600

+13,000

+13,000

+13,000

+11,400 +10,000

+10,000

+10,000

+8,600

4 000

101

102

10 000 18 000

4 000

103 201' 201

85 800

124 800

4 800

212 501

6 000

4 800

502 214

+4,000

+4,000

+0,000

+0,000

23 400

127 200

1

217

101

116

102



02

REDEVELOPMENT OF INDUSTRIAL AREA .CONCEPT DESIGN academic, individual work location-Samara sept-dec 2010 supervisor-Prof.Barannikov barannikovai@gmail.com

RECONSTRUCTED BUILDINGS SAVED FACADES DEMOLISHED BUILDINGS REDEVELOPMENT AREA

RECONSTRUCTED BUILDINGS AND SAVED FACADES

SITUATION

+ GREEN ZONE PUBLIC, CULTURAL AND ENTERTAINING ZONE INDUSTRIAL ZONE RESIDENTAL ZONE RIVERS,LAKES

=

REDEVELOPMENT OF INDUSTRIAL AREA The history of Samara city begins from this territory. Samara was developing from this place across the rivers Volga and Samara like a sector. Samara was the «bread» capital in the end of the 19th century. There were mills and bread factory here. Unfortunately, a big amount of old industrial buildings were demolished in Soviet time. So, this area has its own historic value and it would be reorganized. The main idea of this project is creating multifunctional zone with recreational area where citizens and tourists could spend their time, could work and study. Proposals: -creating green zone for improving environment (nowadays there is a lack of green area); -creating centres of attraction for different social groups (not only commercial and entertaining but educational scientific and cultural centres); -mixture of different functions for providing streams of people during the day and in all periods of the year («living» area); -creating «generators of variety»; -residential area; - creating innovation centre in surrounding area for economic development of the city; - mills transformations into the art centre; - reorganizing transport infrastructure; - parking; - areas for mass celebrations; - areas for fairs, summer festivals, traditional winter holidays, etc.; - stub-end elevated underground railway station;


MASTERPLAN PARK

WITH TEMPORARY BUILDINGS, FAIR, ATTRACTIONS, SUMMER CINEMA,SKATING RING,BEACH AND MANY PLACES FOR SUMMER AND WINTER ACTIVITIES

GARDEN

MULTIFUNCTIONAL CULTURAL AND EDUCATIONAL CENTRE WITH ARENA

PARKING GARDEN

STUB-END ELEVATED UNDERGROUND RAILWAY STATION

RESIDENTAIL COMPLEX RESIDENTIAL COMPLEX WITH SAVED OLD FACADES RESIDENTIAL RESIDENTIAL COMPLEX COMPLEX CONTEMPORARY WITH SAVED OLD OFFICE BLOCK EMBANKMENT FACADES ART CENTRE

PARKING

SHOPS TECHNOPARK

(RECONSTRUCTED)

WORKSHOPS AND ART CENTRE (RECONSTUCTED) EMBANKMENT

LABS (TECHNOPARK)

RESIDENTIAL COMPLEX WITH SAVED OLD FACADES




VIEW FROM RIVER VOLGA Special attention was given to influencing and promoting activities, interaction and micro-climates. Day and night, summer and winter activities were seen as a keystone to creating a vibrant and sustainable disrict. To create a range of special places and different characters, the same kinds of functions are placed in proximity to each other. This means that the most activity creating functions are assembled, thus creating lively and exciting places. A masterplan was instrumental in creating sensual and permeable sequences of green spaces and water to intertwine within the urban fabric. This unique linkage system of intriguing paths, lanes and squares promotes variations of discovery. The water’s edge is designed to invite residents for leisurely walks and cycle rides along most of the coastline.

WINTER/SUMMER ACTIVITIES


VIEW FROM RIVER VOLGA Except for the preservation historical district to the north redeveloping area is designed to offer residents a full variety of experiences and services within their general vicinity thus relieving them of having to travel to adjacent districts for necessities. Specifications of the Whole Project: total area — about 79,73 ha., park — 14,4 ha., shopping centres — 28 990 sq. m., hotel— 6180 sq.m., technopark— 22 283,8 sq. m., office-16 973,83 sq. m., parking — 52 683,85 sq. m., reconstracted labs—26 000 sq. m., reconsructed artcentre-6200 sq.m., residential complexes- res 308 166,14 sq.m. + com 89 000 sq.m., multifunctional centre -30 074,8 sq.m.

FUNCTIONS AND PROCESSES




03

MUSEUM OF CONTEMPORARY ART academic, individual work location-Samara may-june 2009 supervisor-Prof.Barannikov barannikovai@gmail.com

The aim of this project is designing a museum in a small park near the embankment of the river Volga. There was a swimming pool which was demolished within this area. The main idea is creating a building like an ÂŤArt ObjectÂť in picturesque landscape of Gorky Park. The main tools for creating the project are simple shape, white colour and light. Interiors are white too. Consequently, internal and external spaces are not separated. People can enjoy all processes in, out and between internal and external spaces. From the place for contemplation and meditation people can see the other bank of Volga and white simple shape of museum.


MASTERPLAN

«White is the most wonderful color because within it you can see all the colors of the rainbow. The whiteness of white is never just white; it is almost always transformed by light and that which is changing; the sky, the clouds, the sun and the moon.» «Whiteness allows the architectural ideas to be understood most clearly—the difference between opacity and transparency, solid and void, structure and surface. These things are more perceptible in a white environment. They have a greater clarity.» Richard Meier


SECTIONS

0.000

+3.600

+7.200


used pictures-Igor Kalinauskas


DIAGRAM

contemplation and meditation ground

cinema and media installation




04

RESIDENTIAL DISTRICT FOR 35000 INHABITANTS academic, individual work location-Samara january-february 2010 supervisor-Prof.Barannikov barannikovai@gmail.com

SITUATION PLAN HISTORICAL CENTRE

RAILWAY ZONE

CROSSING INDUSTRIAL ZONE

INDUSTRIAL ZONE

DILAPIDATED SHELTERS CHURCH

PLANT BOG BERRY DEMOLISHED BUILDING

BOG BERRY

BOG BERRY

RECONSTRUCTED BUILDING

BOUNDARY OF FILLED-UP GROUND BOG BERRY

GSPublisherEngine 0.0.100.100

The aim of this project is designing residental district by means of three-level service system and microdistrict principle. This area is accepted like depressive. Dilapidated houses and pollution are to be concerned. The advantage of this territory is that it is located near the river Samara and historic centre of the city. The main idea is creating various space with compound prospects by using simple shape of square 6x6. Modules 6x6 organize the residental development on «tetris-snake» principle. Public zone is organized to provide an access for every inhabitant of this district. This project is created with all planning transport infrastructure changes in our city such as bypass highway and Karl Marx’s highway.


6

8

4

6

6

8

8

10

6 6

6

6

12 12 12

6

10

10

10

10

8

6

12 12 6 6

16

10

12

10

12

16 16 16 16

4

10

4

10

12

8

12

8

6

6

8

16 16

10

6

4

20 16 20 20 20

10

4

10

12

6 6 6

8

10

8

6

10

4

10

8

6

6

20

10

10

4

10

8

8 8

8

10

6

6

6

10

10

8

8

8 6

6

6

8

8

8

6

6

8

12 12 12 12

8

8

8

8

8

8

8

4 4 4

8

4 4

12

4 4

16

6 6

16

12

4

12

16

20

6

20 20

8

8

8

8

12 12 12 12 12 12

8

12

8

6 6 4

12

20

16

8

16

12

8

8

8

8

16

12 12 12 12 12 12

12

8

12 8

8

8 8

8

8

8 8

20 20 20

8

20

12

8

8

8

8

8

16 16 16 16

8

4

12 12 12 12

30

30

8

4

8 8

30

8 8

8

30

30

30 30

30

30

30 30

30

30

30

30

30

30

30

30

30 30

30

30 30

30 30

30

30 30

30

30

20 20

30

20 20 20 16 16 16 16 16

30

30

30

30 30

30

30

20

12 12 12

20

16

16 16 16

30

12 12

20

12

8

20

12

16

16 16

20

10

16

20

20

10

20

20

20

10

10

16

12 12 12 12 12 12

24

10

12

20 16 20 20 20 16

24

10

16

20

24 24 24

10

16

16

24 24 24

10

10

16 10

12

16

12

6

10

8

24

6 6

10

12 12

24

20

6

20

12

12

24

6 6

6

10

20

24

8

14

10

24 24 24

8 8

14

10

10

20

6

8

30

30

20

8

30

14

14

4

8

6

30

14

8

4

24 24 24

6

6

30

14

10

8

4

24

6

30

14

10

8

20

6

30

4

8

6

16 16

12

20

4 4

4 4

4

4

4

4 4

6

20

8

4

8

6

20

12

6

16

8

4

4

16

20

4 4 4

4

8

12

30

24 24 24 24

6 6

16 16 16 16 16 16

24

12

20

14

20

6 6 6

4

16 16 16 16 16 16

8

8

8

6

4

12

6

4

4

12

6

4

4

12

6

4

4

12

6

8

4

12

6

8

4

4

12

6

8

6 6 6

12

6

4

4

12

6

20

24

6

4

4

4

20

6

4 4 6

16

6

4

6

4

4

8

4

6

6

8

4

12

6

6

4 4

8

20

6

10

16

16

12

20

8

20

20

6

10

12

16

20

8

4

8

16

8

4

4

8

20

8

4

4

10

8

6

20

20

4

4

4

12

12

12

12

16

12

12

6

12

12

4

4

6

6

12

6

6

6

6

4

6

6

6

8

12

8

12

8

6

14 14

8

8 8

4

8

4

6

6

16

8

4

6

6

16

8

4

6

12

8

4

6

12

4

16

12

8

4

6

12

6

8

4 4

12

6

12

4

4

12

12

8

4

4

12

12

4 8

8

4

4

12 4

14

6

6

6

14

6

6

6

14

14

6 6 6

6 4 4

14

14

MASTERPLAN

12

24 24 24 24 24

24

30

24 24 24 24

30

30

12 12 1 30 30

30 30

30


THREE-LEVEL SERVICE SYSTEM

TRANSPORT SCHEME OF DISTRICT

1-Daily working institutions: kindergartens,policlinics,schools, supermarkets,cafes,dining-rooms (servicing radius-350-500m) 2-Institutions for periodic usage: cinemas,department stores, sport centres,libraries,clubs (transport accessibility-no more than 15 min.)

HIGHWAY RAILWAY DISTRICT’S ROADS DISTRICT’S ROADS UNDERGROUND PARKING

3-Institutions for episodic usage: museums,theatres,galleries,offices (transport accessibility-no more than 30 min.)

BUS STOP(R=500M) BOAT STATION

FUNCTION SCHEME OF DISTRICT

20 20 20 20 20 16 16

8

16

8

8 8

16

8

16 16

16 16

12

12

12

12

12

12 12 12

12

8

12

12

12

12

12

8

8

8

8 8 8 8

12 12

8 8 8 8

8 8

8

8 8

8

8

12

8 8

12

16

16

20

20

20

20

16

16

12

12 12

8

8

8

12

4

16

4

12

4

12

16

16

PROTECTIVE GREEN ZONE 16

20

20

20

EMBANKMENT

20

KINDERGARTEN SCHOOL

8 8 8

8

8

4

8

8

8

8 12 12 12

4

12

16

20

16

20

4

4

4

4

4 6 6

6

8

6 6

8

8

8

6

10 10 10

6

6 6

6

6

6

8

8

6 6

8

8

8

14

14

14

14

14

14

6

14

6

12

14

12

6 6 6 6

12 8

8

6

8

12

12

8

12 12 12 12 12

12 12

8

8

8

12 12 12 12

8

12

8

12

8

12

4

8

6

10

6

10

6

10

6

4

10

4

4

10

10

10

6

10

4

6

4

6

6

6

6

6

6

6

4

6

6

4

8

12

4

6 6

8

12

4

8

4

8

8

8

8

4

4

12

4

4

4

12

4

4

4

8

4

12

4

4

12

4

4

12

4

12 12 12

12

12 12 12 12

12

6

12

8

12

8

12

8

12

8

12

8

6

6

6

12

4

10 10 10 10 10

6

8 4

8

4

8

8

12 12 12 12

4

12

8

4

20

12

8

12

16

12

12

16

8

16

8

16

16

12 12 12 12

12 12 12

16

12 12 12 12 12 12 12

8

20

8

8

8 8

20

12

8

12

12

12

8

12 12 12

12

8

20

PUBLIC BUILDING

6

6

8

4

8

6

6

8

8

6

8

8

12

6

8

12

8

8

8

PUBLIC,CULTURAL AND ENTERTAINING ZONE

6 6

12 12 12 12 12 12 12

RESIDENTAL

6

12

8

12

8

8 8

8

8 20 20 20 20 20




05

HOUSING GROUP WITH 2 TYPES OF DWELLING HOUSES academic, individual work location-Samara january-june 2012 supervisor-Prof.Barannikov barannikovai@gmail.com

MASTERPLAN

department store sports ground 50x30 entry to underground parking

29

sports ground sports ground 30x15

sports ground 50x30 high-rise apartment building with variable number of floors

22

garbage ground 24

service,shops

16

boulevard

kindergarten sports ground 20x15

sports ground 30x15 high-rise apartment building

24

29

12

entry to underground parking sports ground 20x15 6

SECTION 1-1

public centre


89,3 м2

103,9 м2

86,5 м2

7,10,13,16,19,22

86,3 м

2

86,3 м2

104 м2

89,3 м2

54,5 м2 86,5 м2

6 floors - apartments with terraces 23-28

18 floors - duplex apartments

apparatus floor

160,7 м2 92,9 м2

160,7 м2

92,9 м2

33,7 м2

33,8 м2

40,4 м2 36,2 м2 47,5 м2

23,2 м2

6,9,12,15,18,21

54,4 м2

23,2 м2

47,5 м2 36,2 м2 33,7 м2

54,5 м2

34,4 м2

54,4 м2

89,3 м2

86,5 м2

103,9 м2

5,8,11,14,17,20

86,3 м2

104 м2 86,3 м2

89,3 м2

86,5 м2

ground floor with commercial function- supermarket, shops, laundry,etc

4 floors- small apartments 1,2,3,4

40,4 м2

44,8 м2

46,3 м2

46,3 м2

25,9 м2

39,7 м2

44,8 м2

42 м2

42 м2

25,9 м2 39,7 м2

46,3 м2

44,8 м2

46,3 м2

44,8 м2


SECTION

FACADE



06

PAVILION «3X3» AND «TETRAGON QUEST»

pavilion’s authors: Petr Slastenin, Lidiia Leonova, Ilya Nekrasov, Valeriia Rudneva, Renata Nasybulina,Dmitriy Zavarzin,Georgiy Iakovlev mapping’s authors: Lidiia Leonova, Georgiy Iakovlev The conception of mapping installation is based on the ideas of Neoplasticism. The pavillion was created for celebration of «World Day of Architecture» in Samara. The students’ works and photos were exhibited. Our team built this object by hand. The total value was about 200 euros.

TETRAGON QUEST


07

PAVILION «SHADOWS’ ACTING» Meditation pavillion for competition in Nizhniy Novgorod. Team work: Petr Slastenin, Lidiia Leonova, Valeriia Rudneva, Kristina Kvartalnova, Daria Zmazneva The main idea is that this construction makes beautiful shadows on the ground and these shadows are changing during the day. Also, benches are located diagonally: therefore, visitors have the choice between communicating or meditation. Total value-15 000rub/250 euros


08

the Open International Competition for the Design of Summer Residential Unit. Competition projects evaluation criteria: – compliance with the specified function – solidity – artistic value – originality – economic efficiency – replicability – transportability and possibility for multiple assembling – well illuminated inner space – compliance with environmental conditions (summer – autumn in SaintPetersburg)

SHED WITH STOVE traditional shed

new «stove»

traditional russian stove

new shed

The main idea is using traditional forms in new functions. The «stove» has main interior function: bed, kitchen, cupboard, wardrobe and entrance area. Metalware and wood are two main materials. All wood surfaces are painted by mordant. The concept of interior is the contrast between the stove and internal space. This residental unit can be prefabricated and multiplied. Its exteriors fall into different Russian countryside contexts. Total value-100 000rub/ 1 500 euros


ОСНОВНЫЕ ОСНОВНЫЕ ПРОЕКЦИИ ПРОЕКЦИИ DETAIL 1-1

FACADE 3-3 FACADE FACADE 3-3 3-3

DETAIL 2-2 WALL

FACADE 1-1

FACADE 4-4 FACADE FACADE 1-1 SECTION SECTION 1-1 1-11-1

FACADE FACADE 3-3 3-3

FACADE FACADE FACADE 4-4 4-4

2-2SECTION SECTION 2-2

PANEL

ОСНОВНЫЕ ПРОЕКЦИИ ОСНОВНЫЕ ПРОЕКЦИИ BATTEN -15 ММ

MEMBRANE -VAPOR SEALING

ROCKWOOL-50ММ

MEMBRANE -WATERPROOFING

+3.360

+3.360

+2.450

+2.450

+2.000

+2.000

2-2

2-2

BATTEN -15 ММ

JUMP-WELDING

SECTION 1-1 SECTION 1-1

50

BOLTING (100)

POLYCARBONATE

0.850

POLYCARBONATE

STEEL PIPE 25Х25Х1,5

+3.360

STEEL PIPE 50Х25Х1,5 STEEL PIPE 50Х50Х1,5

FLOOR PANEL

FACADE FACADE 3-3 3-3

STEEL PIPE 50Х25Х1,5

FACADE FACADE 3-3 3-3

STEEL PIPE 50Х25Х1,5

+3.360

SECTION SECTION 1-1 1-1

2-2

+2.825

SCREW CONNECTION

PLANK -22 ММ MEMBRANE -VAPOR SEALING MEMBRANE-WATERPROOFING OSB -12ММ

ROOF CARCASS

2-2

0.000

0.000

-0.280

-0.280

+2.825 +2.475

+2.450

SECTION 1-1

BOLTING

0.850

2-2

+3.360

STEEL PIPE 25Х25Х1,5

STEEL CORNER 50Х50

ROCKWOOL-50ММ

SECTION 2-2 SECTION 2-2

+2.450 +2.000 +3.360 +3.360 FACADE FACADE 1-1 1-1

SECTION SECTION 2-2 2-2

1-1

+2.450

+2.000 +3.360 +3.360 ПЛАН ПЛАН НА ОТМ Н

ПЛАНПЛАН НА ОТМЕТКЕ НА ОТМЕТКЕ + 0.000 + 0.000

+2.000

+2.000 +0.950 1-1

50 25

50 25 800 2 650 2 500 800 25

2-2 4-4

2-2

25

25

2 650 2 500 4-4 800 25

25 338 25 25

800

800 50 25

2

2

2

50 25

2-2

2

2-2

2

1 650

375 650 600 25 25

1 650

375

375

25 25 600 600 600 25 25 2 52525 25 600 600 600 600 25 2 525 3-3 1 3-3

600

25

1 1

2

1

25

25 25

25 25

2

1

800

1

50 25

25

650 600 25

SLEEPING SLEEPING ZONE ZONE

25

800

3-3 25 25

2 575 2 575 2 000 1 225 1 225 25 1 225 1 225 25

650 600 25

2-2

25

50 25

25 25

450

25

1-1

2 000 2 000

1

4-4

1

2-2

2-2

338 25 25

25

650 600 25

2

25

3-3

1-1 1-1 2 000 SLEEPING ZONE375

1

25 450

25 450

200 338 25

500 25

500

25

350 400 5050

25

600

200

25

25

25

50700 350 50

0.000 0.000

SLEEPING ZONE

4-4 2 650 4-4 2 500 502 650 25 800 800 2 650 252 500 2 650 50 25 50800 25 25 800 25 800 502 500 2 500 50 25 25800 800 25 25800 800 25 25 800 25

1

400 325 25 5025 325 25 600 600 25 BAR 2 52525 25 25 600 600 600 600 25 2 575 2 525 DINNINGDINNING ZONE ZONE 2 575 1 3-3

600

4-4

2-2 2-2

325 25

25 288

288

CUPBOARD CUPBOARD 700 50

25 25 25 2 600 25 600 600 600 600 2 525 2

25

1 650

2

2

25

2

450 25

200

50

25

25

25

400

350 50

DINNING ZONE

KITCHENKITCHEN BAR 25

1

325 25

200

500

25

350 50

500

50 700 350 50 25

700 50 25

50

50

450

CUPBOARD KITCHEN BAR 50 700 50

400

338 25

350 50

338 25

50

25

1

ПЛАН ПЛАН НА НА ОТМЕТКЕ ОТМЕТКЕ + 2.000 + 2.000

25

25

288 25

700

350 50

288

50

50

1

1-1 2 575 650 1 225 650 2 575 25 25 600 25 1 225 600 25 650 1 225 650 25 600 25 1 225 25 600 25

1-1 350 50 1-1

50

700

1

3-3

+2.000

2 700

CUPBOARD

25

1

338 25

2

3-3

ENTRANCE ZONE

KITCHEN ENTRANCE ENTRANCE ZONE ZONE BAR DINNING ZONE

50

25

500 25

1

25

2 00

0.000 +1.000+1.000

ПЛАН НА ОТМЕТКЕ + 2.000 ПЛАН НА ОТМЕТКЕ + 2.000

ENTRANCE ZONE

50

325 25

2 000

+0.950+0.950 0.000

50 25

25

ПЛАН ПЛАН НА НА ОТМЕТКЕ ОТМЕТКЕ + 0.000 + 0.000

50

50

800 1 650 800

1-1

1

50350 325 50 25 400

BAR

25 25 25 25 25 25 600 25 600 600 600 600 600 600 25 600 2 525 2 525 2 575 2 575 1-1 1-1

1-1

1

400 50

450

288

288 25 500 25

350700 50

KITCHEN BAR 1-1

200

2 650 2 600 800 25

2 650 4-4 2 600 800 25

5050

2 1 25 1

+1.000 SLEEPING ZON +2.000+2.000

DINNING ZONE DINNING ZONE

1

ПЛАН НА ОТМЕТКЕ + 0.000 ПЛАН НА ОТМЕТКЕ + 0.000

2

(DETAIL 2-2)

700

KITCHEN

800

0.000

The stove is assembled before the last wall. The roof material is polycarbonate. When construction must be disassembled two sides of roof are put together. Before that the comb of roof which fixed by clips is taken away.

50

0.000 0.000

25

FACADE FACADE 1-1 1-1

Electric wiring is located in one panel with door. FACADE FACADE 4-4 4-4

1

CUPBOARD1-1 CUPBOARD

-0.280 -0.280

4-4 4-4 4-4 2 650 2 600 2 650 50 25 800 25 800 800 2 650 25 2 600 50 2 650 25 2 600 50 25 800 252 600800 25 800 25 50 50 25 800 25 50 800 25 25800 800 25 50 25 800 25 800 25 50

FACADE 1-1 FACADE 1-1

Overall dimensions of panels don’t exceed FACADE 4-4 standard dimensions of FACADE truck4-4 body.

0.850

350 50

800

0.850

-0.280

50

800

50 50 350 700 50 25

700

50 25 800 25

1-1

50 25 800 25

4-4

0.000 -0.280 0.000

2

2 ENTRANCE ZONE ENTRANCE ZONE 50

650 6501 225 +2.450 +2.450 +1.000 600 2525 6001 225 25

25

25

0.850

25

+2.000+2.000

1

+0.950 2 575

25 50

2-2

800

0.850

25 50

20

4-4

15

1-1

+2.475+2.475

+2.450+2.450

100

15

1-1

800

25 25 50

+2.825+2.825

200

PLAN

+3.360

+2.450

SECTION 2-2

+2.475

2-2 FACADE 2-2 FACADE 4-4 4-4

1-1

1 650

ОСНОВНЫЕ ОСНОВНЫЕ ПРОЕКЦИИ ПРОЕКЦИИ

15

+2.475

800

FACADE 3-3 FACADE 3-3

+2.825

+2.475

1

2-2

FACADE 3-3 FACADE 3-3 35 STEEL FLAT BAR 50Х5

+2.825

3-



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.