Quality Procedure: We are operating based on the approved Project Quality Plan, Consisting of ISO 9001:2015. All the activities are being carried out after approval of Work Methodology which is adhering to Contract, code and technical specifications.

• Quality Assurance: Material quality is being confirmed by testing as per approved ITP.

• Quality Control: Approved WIR, Checklist system are in practice at field for effective control on product and productivity.

4 7 . 2 . 1 Q U A L I T Y C O N TR O L G R A PH F O R M 5 0

SUBMITTED BY: BHUMIKA RAJ UC5316 186