Figure 81: Manpower Status0
Figure 70: tbm progress0
4 7 . 2 Q A / Q C
Advertisement
Quality Procedure: We are operating based on the approved Project Quality Plan, Consisting of ISO 9001:2015. All the activities are being carried out after approval of Work Methodology which is adhering to Contract, code and technical specifications.
• Quality Assurance: Material quality is being confirmed by testing as per approved ITP.
• Quality Control: Approved WIR, Checklist system are in practice at field for effective control on product and productivity.
4 7 . 2 . 1 Q U A L I T Y C O N TR O L G R A PH F O R M 5 0
![](https://assets.isu.pub/document-structure/220216184549-f54cdd0106176c8f5960074094b9799d/v1/d71afcffb52b1b986ed4ca6bac1b2e40.jpeg?width=720&quality=85%2C50)
SUBMITTED BY: BHUMIKA RAJ UC5316 186