Forslag 86

Page 1

98600

PROW


existing gross area: 7464sq.m

3D comparison between existing and proposed

98600

proposed gross area: 8139sq.m - excluding car and bicycle parking

PROW


3D views of proposed scheme

98600

PROW


STRATEGY

create one multifunctional hall for sports and meetings

proposed areas for redevelopment

partial modification to entrance foyer

vacate gymnasium wing and convert for new classrooms

proposed redevelopment phasing strategy

98600

PROW


STRATEGY

Assessment: The site comprises of intricate assembly of buildings forming two large courtyard spaces. The frontage of the school addresses the main street by the means of a small square used also for parking bicycles. There is an existing theatre/meeting hall at the front next to the main entrance and two smaller sports gymnasiums at the far back facing each other across the smaller courtyard. The larger courtyard has been recently remodeled and now has an external seating/amphitheatre like area connecting with the lower level of the building. Most of the buildings are connected either by covered walkways or internal corridors and stairs.

What are the main advantages of the existing masterplan? The complex is designed in a linear way making best use of the perimeter of the site. This interconnected assembly of long and thin buildings creates a natural link/circulation routes between the buildings as well as making best use of daylight. Although the overall building shape appears slightly unbalanced, its internal spaces offer great flexibility.

What are the main weaknesses of the existing masterplan? The front part of the complex feels rather unfinished. The existing assembly/theatre hall has very peculiar connection with the north wing both internally and externally. Its awkward location is also the reason why the south wing feels slightly detached. Why the new sports/meeting hall should not be located between the two gymnasiums? As it is, the existing masterplan is unbalanced. Its most complete parts are at the centre and the rear and most fragile/unfinished one is at the front. If any of the proposed new buildings are to be constructed at the back this would turn the unfinished but stable boat into precarious raft.

What is a feasible strategy for the competition brief? Build a new muiltifunctional hall addressing and furfilling all necessary requirements while refurbishing the existing gymnasiums in a playful way into new classrooms. By doing this, the rear of the complex will largely retain its appearence but also will add the new asset in much more integral way.

Proposed new multifunctional hall: The new building is situated over the basement of the existing meeting hall and extending across the main entrance external space. The basement of the existing hall is converted into changing rooms. The new hall is lowering the slab of the entrance foyer and also removing 50sq.m off the area of the south wing in order to create a free area of 1100sq.m for the proposed new flexible space. The new meeting/sports hall is reusing most of the existing circulation spaces adding some additional escape routes. The main objective of the space is to have clear headroom of 12meters above the basketball/volleyball pitch and to be able to host up to 960 people when not used for training. When used for sport, the hall offers six badminton courts, or three badminton and one volleyball or two volleyball or one basketball. When used for events, the proposed seating comprises of two retractable bleacher-seating units, located at each end of the hall with total capacity of 960 people. The larger unit has seating for 640, the smaller for 320. There location of the current gallery will be retained creating a bew balcony looking across the hall. The structure is designed in cantilevered laminated timber beams forming a large lightweight rooflight structure above the hall. The basement beneath the hall is to be a masonry plinth built in reused bricks from the existing meeting hall. The outer walls of the hall are divided into two. The lower part is designed in brick and the upper part and the roof clad in copper.

Proposed new classrooms in refurbished gymnasiums: The location of the existing gymnasiums at the back is ideal for additional classrooms. The two buildings are well connected with the main body of the school and have both south facing windows. Their refurbishment into classrooms would be more effective then building new once but also offers much greater scope for the use of reclaimed and recycled building materials in spontanious and playful way.

98600

PROW


Proposed multifunctional hall configuration when used for events

98600

PROW


Proposed multifunctional hall configuration when used for sport and training

98600

PROW


PLAN 1:200

front entrance as existing

front entrance cross section as existing - red colour identifies structure proposed to be removed

diagram of front entrance cross section as proposed

front entrance elevation as proposed with amended openings

proposed redevelopment strategy to main entrance allowing to retain all main circulation and avoiding costly excavation

98600

PROW


CROSS SECTION 1:200

Multifunctional Hal l

Layout as existing

13.11

Main Entrance Foyer

Main Entrance 10.30

proposed redevelopment to main entrance and existing assembly hall

98600

PROW


LONG SECTION 1:200

seating capacity: 3 20

seating capacity: 640

Multifunctional Hal l

Female Dressi ng Rooms

Car Park

Viewi ng Gallery

Male Dressing Rooms

Assembly hall used for seating

Multifunctional Hal l

Car Park

Viewi ng Gallery

Female Dressi ng Rooms

Male Dressing Rooms

Assembly hall used for sport

proposed redevelopment to main entrance and assembly hall

98600

PROW


PLAN 1:200

escape exit 01

10.84 Main Entrance

11.84

escape exit 02

11.34

void

WC

WC

Car Park

Female Changing Room

Male Changing Room

Bicycle Parking capacity of 80 bicycles Car Park

escape exit 03 Store Room

Displey Area

11.27

Female WC

Male WC

10.30 11.35

Main Entrance Foyer

10.30

existing void

escape exit 04

11.47

proposed redevelopment to main entrance and existing assembly hall basement

98600

PROW


PLAN 1:200

badminton

badminton

volleyball

volleyball

basketball

volleyball

badminton

badminton

badminton

badminton

Multifunctional Hal l 13.11

Entrance Lobby

Entrance Lobby

13.11

13.11

11.96 Layout as existing

10.30

11.47

11.96

Layout as existing Layout as existing

proposed redevelopment to ground floor and existing assembly hall when used for sports

98600

PROW


PLAN 1:200

seating capacity: 64 0

seating capacity: 32 0

Multifunctional Hal l wi th total seating capacity 950

13.11

Entrance Lobby

Entrance Lobby

13.11

13.11

11.96 Layout as existing

10.30

11.47

11.96

Layout as existing Layout as existing

proposed redevelopment to ground floor and existing assembly hall

98600

PROW


PLAN 1:200

17.53

Viewi ng Gallery

Layout as existing

room reduced

Layout as existing 16.55

15.40 Layout as existing

Layout as existing

proposed redevelopment to existing assembly hall gallery

98600

PROW


PLAN 1:200 10.30

10.81 Female WC

Male WC

New Classroom 01

Decanting Room to Existi ng Functi on

10.81 Courtyard Garden Decanting Room to Existi ng Functi on

New Classroom 02

Decanting Room to Existi ng Functi on

proposed redevelopment to ground floor existing gymnasium spaces and their convertion to new classrooms and decanting spaces

98600

PROW


PLAN 1:200

Staff Room

Decanting Room to Existi ng Functi on

New Classroom 03

New Classroom 04

New Classroom 05 Terrace

New Classroom 06

proposed redevelopment to upper floor of existing gymnasium spaces and their convertion to classrooms, staff room and decanting existing spaces

98600

PROW


SECTION 1:200

proposed new windows to match existing

Decanting Roo m to Existing Function

New Classroom 05

New Classroom 01

New Classroom 02

proposed new enclosed connection linking the two buildings

proposed redevelopment to main entrance and existing assembly hall

98600

PROW


SITE LOCATION PLAN 1:500 0.00

?

?

?

?

0.00

?

?

0.00

0.00

?

ped ram l a rn exte new ance r ent

0.00

0.00

?

0.00

0.00

?

?

?

new

bic

pa ycle

enlarged external area

?

?

?

0.00

new

rk in

g

a carp

rk in

g

?

courty ard

garden ?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

proposed site location plan identifying the external areas for redevelopment

98600

PROW


0. 00

MASTER PLAN 1:1000 0. 00 0. 00

0. 00

0. 00

0. 00 0. 00

0. 00

0. 00

0. 00

0. 00

0. 00

0. 00 0. 00

0. 00

0. 00

0. 00

0. 00

0. 00

0. 00

0. 00

0. 00

0. 00

0. 00

0. 00

proposed redevelopment masterplan

98600

0. 00 0. 00

0. 00

PROW