Perpetual results. EASI adoption.
ABM Learning and Quality
CHARGEPOINT CT4000 | INSTALLER TIPS > Torque Mounting Bolts to 120 ft lbs on Bollard Mount > Must have at least 2 bars of cellular network coverage on cell phone at installation location > Dedicated Ground must be bonded to neutral at circuit origin location > Mac ID and Station ID labels need to be affixed to Installation Sheet included with station to aid in activation process > Install SIM card with edge of SIM card carrier facing correct direction to click into place > If using “Circuit Sharing” feature make sure jumpers are installed correctly and seated firmly in place > Configure station for “Circuit Sharing” prior to activation to prevent overload of single circuit breaker and feeder
Perpetual results. EASI adoption.
ABM Learning and Quality
CHARGEPOINT CT500 | INSTALLER TIPS > Be sure to mount CT500 to structural members or to unistrut across structural members > Be sure to mount holster to CT500 before mounting CT500 to wall > Recommend circuit entrance on right hand side of unit to allow service loop inside left side equipment connection > Dedicated ground must be bonded to ground at circuit origin location
ABM POCKET PALS by ABMLQ
ISSUE NO. 14-0122