United Republic of Tanzania MINISTRY OF NATURAL RESOURCES AND TOURISM TANZANIA FORESTRY SERVICES AGENCY
MTIBWA FOREST PLANTATION
MANAGEMENT PLAN (2013/14 - 2017/18)
2 (2013/14 - 2011/18) Â
APPROVAL AND DISTRIBUTION This Management plan for Mtibwa Forest Plantation has been prepared and compiled by Plantation Manager and approved by the Director of Forestry and Beekeeping. Compiled by; Hamza H. Katety Manager – Mtibwa Forest Plantation
Approved by;
CHIEF EXECUTIVE
Approving date: August 2013
Signature..........................
Distribution of copies The plantation Manager shall produce at least 17 copies of the approved plan which shall be distributed as follows; -
Project Manager (2);
-
Chief Executive (10);
-
Forestry training institute Olmotony (1);
-
Forestry Industries Training Institute (1);
-
Sokoine University of Agriculture (1);
-
TAFORI (1);
-
TTSA (1);
i
(2013/14 - 2011/18)
Â
EXECUTIVE SUMMARY This document describes Mtibwa forest management activities to be implemented in five years from 20132018. The last management plan which was approved covered the period from 2008 to 2013. The plantation has about 3115.6 ha of land of which 2068 ha are plantable and the remaining area is unsuitable for growing teak trees. The main species grown are Tectona grandis (95%) while Cedrella ordarata (3%), Milicia and Khaya spp (2%) as alternative species. The main objective of the management of the plantation is to produce fine hardwood timber on a sustained yield both for export and local consumption. The specific objectives are: to replant all open areas, to carry out tending operations according to silvicultural prescriptions, to undertake forest protection against human, animals, insects and pests, to carry out resource assessment and harvest due forest, to improve revenue collection and carry out administration effectively. The development of this plan is based on the existing policies and laws, ecological and socio economic studies conducted inside and outside the plantation, information from existing documents/ files and personal communications with key stakeholders and data from the 2013 inventory. The age class distribution of the forest is uneven meaning that the forest is not normal, therefore the management will endeavor to regulate the forest close to normal. This will be achieved by planting and harvesting an average of 50 ha per annum. In the plan period a total of 683ha shall be planted with teak, 20.4 ha with Cedrella and 200ha with indigenous spp. In preference replanting of all open areas will start before embarking on the extension sites. All the necessary silvicultural treatments will be undertaken in order to improve the growth and health of trees. Beating up will be done whenever it is appropriate in order to ensure full stocking. The quality of trees shall be ensured by following properly the scheduled thinning. During the plan period the existing infrastructure will be renovated and improved. All buildings and staff houses shall be maintained. At present only few permanent labour force are accommodated at the station and the majority of them have personal houses at Lusanga village and Dihinda village. Two more labour quarters will be built at plantation site in order to accommodate more staff close to the forest. There will be a comprehensive road maintenance programme to rehabilitate the road systems, external firebreaks and internal firelines. Also culverts will be maintained. Maintenance of existing road network and fire lines of about 10 km will be done annually. In the plan period new road/fireline of about 11 km shall be constructed in the extension area in Lusunguru block.
There is no permanent water supply to the forest station. Water for domestic use is drawn from permanent nursery at Log yard after the installation of electric water pump. Clean water for both domestic and nursery is now available at the nursery site. In this plan period, the plan is to connect pipes to staff houses and also pump to reservoir tank near plantation Manager’s quarter. ii (2013/14 - 2011/18) Â
Training shall be conducted to various manning levels depending on the needs. The current staff level is 25 expected to decrease in this plan period due to retirement. Recruitment of staff shall be done in order to replacement have adequate number of staff. Protection of the plantation and the tree crop shall be strengthened. Efforts will be made to stop illegal tree harvesting at night. Regular day and night patrols will be made and assistance from police force will be sought whenever necessary. Informers will continue to be used. Manning of forest product examination points shall be done through special unit depending on needs. Plantation boundaries and beacons shall constantly be surveyed and any encroachment shall be punished and pushed out. The plantation shall be protected against fires and other damages by implementing an integrated pest management program. A wooden fire lookout tower shall be constructed at the place where all blocks will be seen clearly. All external firebreaks and internal firelines shall be cleaned before the onset of fire season. The forest plantation management will raise awareness to the surrounding villages on fire control and prevention measures. The available information on plantation resources needs to be updated to make it accurate and adequate.. An inventory carried out in January, 2013 made it possible to know the growing stock of the plantation and was input to the preparation of this management plan. During the plan period, permanent sample plots shall be established During the plan period vehicles and plants will be maintained in order to facilitate the day-to-day administrative and management duties. In the five years management period, the aim is to harvest according to the allowable cut. The allowable cut will be made of clear-felling (99.6%) and thinning (0.34%) The total amount of revenues to be generated during the period of this plan is Tshs. 20,948,435,167 During the management plan period, the plantation will spend a total amount of Tshs 3,101,942,140 for implementing planned operations and will generate a total amount of Tshs 20,948,435,167 as revenues from clear felled compartments and other sources.
iii
(2013/14 - 2011/18)
Â
ACKNOWLEDGEMENT The management of Mtibwa Forest Plantation would like to take this opportunity to thank Tanzania Forest Services (TFS) to approve the budget for Compartmentation which enabled the inventory exercise to be carried out smoothly. I express my sincere thanks to both Compartmentation and Inventory teams for their dedication to carry out these tasks. I also appreciate the contribution provided by the Department of Forest Mensuration and Management, Faculty of Forestry and Nature Conservation (FoNC) of the Sokoine University of Agriculture (SUA) in terms of data analysis and guidance for preparation of this plan. We would also like to appreciate the cooperation accorded by TAFORI and Olmotony FTI by spending their time, resource and manpower to ensure success of the management plan preparation. Last but not least I express gratitude to the staff of Mtibwa Forest Plantation specifically the Management Team for their cooperation and team work in preparation of this Five Years Management Plan (2013/14 2017/18).
iv (2013/14 - 2011/18) Â
TABLE OF CONTENTS APPROVAL AND DISTRIBUTION........................................................................................................................ i EXECUTIVE SUMMARY..................................................................................................................................... ii ACKNOWLEDGEMENT.................................................................................................................................... iv TABLE OF CONTENTS....................................................................................................................................... v APPROVAL AND DISTRIBUTION.................................................................................................................... ii v LIST OF TABLES............................................................................................................................................... ix LIST OF FIGURES.............................................................................................................................................. x LIST OF APPENDICES....................................................................................................................................... xi PART A............................................................................................................................................................. 1 1.0 DESCRIPTION ............................................................................................................................................ 1 1.1 LOCATION.................................................................................................................................................. 1 1.2 BACKGROUND INFORMATION................................................................................................................... 1 1.2.1 History.................................................................................................................................................... 1 1.2.2 Legal status and ownership.................................................................................................................... 1 1.3 LAND.......................................................................................................................................................... 1 1.3.1 Area........................................................................................................................................................ 1 Lusunguru block/forest reserve...................................................................................................................... 2 1.3.2 Topography............................................................................................................................................. 2 1.3.3 Geology and soils.................................................................................................................................... 2 1.3.4 Vegetation.............................................................................................................................................. 2 1.3.5 Biodiversity potential............................................................................................................................. 2 1.3.6 Hydrology............................................................................................................................................... 2 1.3.7 Special features and sites....................................................................................................................... 3 1.4 CLIMATE..................................................................................................................................................... 3 1.4.1 Rainfall.................................................................................................................................................... 3 1.4.2 Temperatures......................................................................................................................................... 3 1.4.3 Wind....................................................................................................................................................... 3 1.5.1 Growth rates........................................................................................................................................... 3 1.5.2 Mean annual increment (MAI)............................................................................................................... 3 1.5.3 Allowable cut.......................................................................................................................................... 4 1.5.4 Health and vitality.................................................................................................................................. 4 1.5.5 Stocking.................................................................................................................................................. 4 1.5.6 Management units................................................................................................................................. 5 1.6 UTILIZATION............................................................................................................................................... 5 1.6.1 Markets.................................................................................................................................................. 5 v
(2013/14 - 2011/18)
Â
1.6.2 Harvesting.............................................................................................................................................. 5 1.6.3 Other forest uses.................................................................................................................................... 6 1.7 INFRASTRUCTURE...................................................................................................................................... 6 1.7.1 Road....................................................................................................................................................... 6 1.7.2 Buildings................................................................................................................................................. 7 1.7.3 Plants and equipment............................................................................................................................ 7 1.7.3.1 Vehicles............................................................................................................................................... 7 1.7.3.2 Plants and equipment......................................................................................................................... 7 1.8 COMMUNICATION FACILITIES.................................................................................................................... 7 1.10 ADMINISTRATION.................................................................................................................................... 8 1.10.1 Organization......................................................................................................................................... 8 1.10.2 Manning level....................................................................................................................................... 8 1.11 SOCIAL SERVICES..................................................................................................................................... 8 1.11.1 Education.............................................................................................................................................. 8 1.11.2 Health................................................................................................................................................... 8 1.11.3 Religion................................................................................................................................................. 9 1.11.4 Power supply........................................................................................................................................ 9 1.11.5 Social facilities and entertainment....................................................................................................... 9 1.12. SOCIAL ECONOMIC ASPECTS.................................................................................................................. 9 1.12.1. Land use.............................................................................................................................................. 9 1.12.2. Economic activities.............................................................................................................................. 9 1.12.3. Social economic impact....................................................................................................................... 9 1.13 RESEARCH................................................................................................................................................ 9 PART B........................................................................................................................................................... 11 2.0 DIRECTIVES.............................................................................................................................................. 11 2.1 OVERALL GOAL........................................................................................................................................ 11 2.2 SPECIFIC OBJECTIVES............................................................................................................................... 11 2.2.1 Silviculture............................................................................................................................................ 11 2.2.2 Capital investment................................................................................................................................ 11 2.2.3 Human Resources................................................................................................................................. 11 2.2.4 Revenue Generation............................................................................................................................. 12 2.3 STRATERGIC TARGETS.............................................................................................................................. 13 2.3.1 SILVICULTURE........................................................................................................................................ 13 2.3.1.1 Species............................................................................................................................................... 13 3.1.2 Planting targets.................................................................................................................................... 13 2.3.1.2 Nursery operations............................................................................................................................ 13 2.3.1.3 Land preparation............................................................................................................................... 13 vi (2013/14 - 2011/18) Â
2.3.1.4 Tending operations............................................................................................................................ 13 2.4 CAPITAL INVESTMENTS............................................................................................................................ 14 2.4.1 Roads.................................................................................................................................................... 14 2.4.2 Buildings............................................................................................................................................... 14 2.4.3. Communication facilities..................................................................................................................... 14 2.4.4. Vehicles, plants and equipment.......................................................................................................... 14 PART C........................................................................................................................................................... 16 3.0 PRESCRITION........................................................................................................................................... 16 3.1 SILVICULTURE .......................................................................................................................................... 16 3.1.1 NURSERY OPERATIONS......................................................................................................................... 16 3.1.1.1Species selection................................................................................................................................ 16 3.1.1.2 Soil mixture....................................................................................................................................... 16 3.1.1.2.1 Soil ingredients as above................................................................................................................ 16 3.1.1.3 Seedlings raising techniques............................................................................................................. 16 3.1.1.3.1 Pot size........................................................................................................................................... 16 3.1.1.3.2 Sowing techniques......................................................................................................................... 16 3.1.1.4 Nursery tending technique................................................................................................................ 17 3.1.1.4.1 Watering regime............................................................................................................................. 17 3.1.1.4.2 Sanitary operation.......................................................................................................................... 17 3.1.1.4.3 Pricking out..................................................................................................................................... 17 3.1.1.4.4 Root pruning................................................................................................................................... 17 3.1.1.4.5 Stump preparation......................................................................................................................... 17 3.1.1.5 Nursery Calendar............................................................................................................................... 17 3.2 PLANTING................................................................................................................................................ 18 3.2.1 Land preparation.................................................................................................................................. 18 3.2.1.1 Manual land preparation................................................................................................................... 18 3.2.1.2 Stake and stakes cutting.................................................................................................................... 18 3.2.2 Spacing................................................................................................................................................. 18 3.2.3 Pit size.................................................................................................................................................. 18 3.2.4 Timing................................................................................................................................................ 19 3.2.5 Planting Stock Size................................................................................................................................ 19 3.2.6 Survival assessment.............................................................................................................................. 19 3.3 TENDING OPERATIONS............................................................................................................................ 19 3.3.1 Weeding............................................................................................................................................... 19 3.3.1.1 Timing................................................................................................................................................ 19 3.3.1.2 Frequency........................................................................................................................................ 19 3.3.1.3Types.................................................................................................................................................. 19 vii
(2013/14 - 2011/18)
Â
3.3.1.4 Method ........................................................................................................................................... 19 3.3.2 Pruning................................................................................................................................................. 19 3.3.2.1 Timing................................................................................................................................................ 20 3.3.2.2 Thinning frequency............................................................................................................................ 20 3.3.2.3 Thinning method............................................................................................................................... 20 3.3.2.4 Thinning types................................................................................................................................... 20 3.3.2.5 Thinning assessment......................................................................................................................... 20 3.4 CAPITAL INVESTMENTS............................................................................................................................ 21 3.4.1 Roads.................................................................................................................................................... 21 3.4.1.1 Construction...................................................................................................................................... 21 3.4.1.1.1 Types of construction .................................................................................................................... 21 3.4.1.2 Maintenance..................................................................................................................................... 21 3.4.2 Buildings............................................................................................................................................... 21 3.4.2.1 Construction...................................................................................................................................... 21 3.4.3.2 Construction Design.......................................................................................................................... 21 3.4.3.2 Type................................................................................................................................................... 21 3.4.2.2 Maintenance..................................................................................................................................... 22 3.4.2.2.1 Maintenance frequency................................................................................................................. 22 3.4.2.2.2 Timing of maintenance................................................................................................................... 22 3.4.2.2.3 Methods......................................................................................................................................... 22 3.4.3 Vehicles, plants, equipment and tools................................................................................................. 22 3.4.3.1 Procurement ..................................................................................................................................... 22 3.4.3.1.1 Types.............................................................................................................................................. 22 3.4.3.2 Maintenance..................................................................................................................................... 22 3.4.3.2.1 Maintenance frequency ................................................................................................................ 22 3.4.3.3 Replacement control ........................................................................................................................ 22 3.4.4 Communication facilities...................................................................................................................... 22 3.4.4.1 Procurement...................................................................................................................................... 22 3.4.4.2 Maintenance..................................................................................................................................... 23 3.4.4.3 Frequency.......................................................................................................................................... 23 3.4.4.4 Replacement..................................................................................................................................... 23 3.4.5 Water supply........................................................................................................................................ 23 3.4.5.1 Sources ............................................................................................................................................. 23 3.4.5.2 Supply system.................................................................................................................................... 23 3.4.5.3 Quality and quantity.......................................................................................................................... 23 3.5 HUMAN RESOURCES ............................................................................................................................... 23 3.5.1 Human resource development............................................................................................................. 23 viii (2013/14 - 2011/18) Â
3.5.1.1 Training Plan...................................................................................................................................... 23 3.5.1.2 Recruitment....................................................................................................................................... 23 3.5.1.3 Manning levels.................................................................................................................................. 23 3.6 REVENUE GENERATION........................................................................................................................... 24 3.6.1 Source of revenue................................................................................................................................ 24 3.6.2 Control of revenue collection............................................................................................................... 24 3.7 UTILIZATION............................................................................................................................................. 24 3.7.1 Harvesting plans................................................................................................................................... 24 3.7.1.1 Clear felling........................................................................................................................................ 24 3.7.1.2 Thinning............................................................................................................................................. 24 3.7.2.1 Pricing for sales................................................................................................................................. 24 3.7.2.2 Methods of sales............................................................................................................................... 25 3.7.2.3 Markets............................................................................................................................................. 25 3.8 PROTECTION AND CONSERVATION.......................................................................................................... 25 3.8.1 Prevention............................................................................................................................................ 25 3.8.1.1 Fireline............................................................................................................................................... 25 3.8.1.2 Control Plan for diseases and pests................................................................................................... 25 3.9 RESOURCE ASSESSMENT......................................................................................................................... 25 3.9.1 Timing................................................................................................................................................... 25 3.9.2 Methodology........................................................................................................................................ 25 3.10 ORGANIZATION...................................................................................................................................... 25 PART D........................................................................................................................................................... 26 4.0 ESTIMATES............................................................................................................................................... 26 4.1 FIRE PLAN............................................................................................................................................. 38 PART E............................................................................................................................................................ 40 5.0 APPENDICIES........................................................................................................................................ 41
ix
(2013/14 - 2011/18)
Â
LIST OF TABLES Table 1: Compartment to be thinned and clear felled in plan period..................................................................4 Table 2: Standing volume and stocking for Mtibwa plantation..........................................................................5 Table 3: List of houses at Mtibwa Forest station................................................................................................7 Table 4: Manning level Mtibwa Forest Plantation.8Table 5: Allowable cut and forecasted revenues during the plan period (2013/2014-2017/2018)....................................................................................................17 Table 6: Planting targets for Mtibwa Forest Plantation 2013/14-2017/18........................................................19 Table 7: List of existing vehicles and plants Mtibwa Forest Plantation...........................................................20 Table 8: Nursery Calendar for Mtibwa Forest plantation.................................................................................24 Table 9: Thinning schedule for Teak stands......................................................................................................27 Table 10: Thinning schedule for Teak stand as per Technical order No1 of 2003............................................28 Table 11: Summary of allowable cut................................................................................................................33 Table 12: Summary of estimates for different planned operations...................................................................36 Table 13: Maintenance and construction of buildings and other installations..................................................37 Table 14: Maintenance and construction of roads............................................................................................38 Table 15:Runnung, maintenance and procurement of vehicles and plants.......................................................40 Table 16: Office administration........................................................................................................................46
LIST OF FIGURES Figure 1: Age class distribution for all species by area- Mtibwa plantation 2013..............................................6 Figure 2: Picture showing part of Morogoro- Handeni link passing between Lusunguru block........................9
x (2013/14 - 2011/18) Â
LIST OF APPENDICES Appendix 1: Rainfall trend at Mtibwa forest plantation from 2009 to 2013....................................................56 Appendix 2: Monthly average rainfall trends at Mtibwa Plantation.................................................................57 Appendix 3: Mean monthly rainfall at Mtibwa Forest Plantation....................................................................57 Appendix 4 : Mtibwa Forest Plantation Organization Chart............................................................................58 Appendix 4: Calendar for annual nursery operations-Mtibwa Plantation........................................................59 Appendix 5: List of Mtibwa Forest Plantation Managers from 1961...............................................................60 Appendix 6: Area with satisfactory growing stock...........................................................................................61 Appendix 7: Planted areas (ha) by years and species.......................................................................................61 Appendix 8: Allowable cut...............................................................................................................................65 Appendix 9: Harvesting plan Mtibwa Forest Plantation...................................................................................67 Appendix 10: Processing capacity Mtibwa Forest plantation...........................................................................69 Appendix 11: Compartments in order of thinning sequence from 2013/14 to 2017/18...................................70 Appendix 12: Silvicultural needs ( Tectona grandis ) cost in ‘000’..................................................................72 Appendix 13: Silvicultural needs ( Cedrella ordorata).....................................................................................75 Appendix 14: Silvicultural needs indigenous species.......................................................................................76 Appendix 15: Thinning schedule for Tectona grandis ( established before 2003)...........................................77 Appendix 16: thinning schedule for Tectona grandis (stands established after 2003)......................................78 Appendix 17: Compartment register Mtibwa forest plantation........................................................................79 Appendix 18: Arrangement for staff leave........................................................................................................82 Appendix XX: Location map............................................................................................................................84
xi
(2013/14 - 2011/18)
PART
A
xii (2013/14 - 2011/18) Â
PART A 1.0 DESCRIPTION 1.1 LOCATION Mtibwa plantation is situated in Morogoro Region.It is linked by Morogoro-Handeni road. It is about 110 km from Morogoro town along the Morogoro – Dumila –Handeni road Its located in the the slopes of Nguu Mountains, in eastern side in Mvomero District. . It lies between latitude 60 -60 10’S and longitude 370 40’ -370 45’ E. It is surrounded by four villages namely: Dihinda in the North East, Lusanga in the East, Kunke in South West and Madizini in the South . There is a private airfield owned by Mtibwa sugar Estate for light aircrafts and helicopters situated just 5 km from the forest station which makes accessibility easy
1.2 BACKGROUND INFORMATION 1.2.1 History Prior to the establishment of teak plantation in the area, the area was covered by a closed lowland wet forest dominated by indigenous hardwood tree species. In 1936 Teak was introduced at Mtibwa block as a small trial plot of 8 acres, other experimental plots were established in 1954, 1955 and 1957 at Lusunguru block. Large scale planting started in 1961 at Mtibwa block where compartment number 1 having 38.6 ha was established. Planting continued annually up to 1971 when the whole block was completed. Failures which occurred were replaced by cedrella ssp. From 1972 onwards, planting was confined to Lusunguru block, with annual fluctuations caused by lack of funds. Seventeen (17) Managers headed the plantation since the plantation started (Appendix VI)
1.2.2 Legal status and ownership Mtibwa plantation is territorial forest reserve. The plantation is owned by Tanzania Forest Service (TFS). It was gazetted through Government Notice No 213 of 1944.Currently it is owned by Tanzania Forest services (TFS) under Government notice 269 of 2010. 1.3 LAND 1.3.1 Area Mtibwa forest occupies a total area of about 3115.6 ha. The plantation land is divided into two main blocks or forest reserves and these are separated by a narrow strip of public land as detailed below: Mtibwa block/ forest reserve Total area is 1023.6 ha -33% Plantable area 847.44 ha Planted area 847.44 Ha (Table1 Page5)
1
(2013/14 - 2011/18)
Lusunguru block/forest reserve Total area 1253.11 ha - 40% Plantable area 1253.11 ha Water logged and rocky area 986.14 ha – 47% of Lusunguru and 31% of total FR area Planted area 771.42 ha 36% Area available for extension 510 ha - 39% of Block plantable area and 16 of plantation area Total plantation plantable area 2129.28 ha Total planted area 1618.86ha - 51% of plantaion area and 75% of plantable area 1.3.2 Topography The plantation lies approximately 640 m.a.s.l. Topographical features on the two forest blocks are not uniform. Mtibwa block is almost flat while Lusunguru block is dominated by gentle slopes and a number of low lying hills. 1.3.3 Geology and soils The plantation land is underlain by gneiss rocks (lower basement complex) which outcrops on the Lusunguru low lying hills. The soils in Lusunguru are smooth and are fairly strong compacting. They are progressively more fertile down the catena. The soils of Mtibwa block are alluvial and fertile. Also more fertile down the catena, the soils are rich in calcium and have PH of between 5 to 8, though PH 6-7 is more common throughout the plantation area. The soils in Mtibwa and Lusunguru blocks have high capacities for water retention and at the same time very poor drainage. 1.3.4 Vegetation Mtibwa block and northern western part of Lusunguru block (flanking Kirengezi river) were originally under ground water forests. The main tree species were Milicia excelsa, Khaya, Antiaris and Sterculia with an association of heavy undergrowth. All the valuable timber species were exploited. The areas of Mtibwa block were cleared of their natural vegetation for teak plantation. A greater part of Lusunguru block is covered by moist miombo woodlands. Brachystegia with dense undergrowth of grass forms a greater part of the total tree population. The vegetation in the low-lying areas of Lusunguru block gives way to Acacia woodlands. The common tree species in the area are Khaya nyasica,Albizia gummifera,Combretum schumanni, Brachystegia species, Isoberlinia globiflora, Pterocarpus angolensis and Acacia sp. 1.3.5 Biodiversity potential There is a general decrease of plants, animals and birds population in the area. This has probably been brought about by changes in their habitats (destructive) and human population. However there is a seasonal migration of birds in the area soon after long rains to feed on paddy fields. 1.3.6 Hydrology The plantation and the nearby village of Lusanga were formerly getting water from Lunkhalwa River where the flow is annual. The supply was by gravity through aluminium pipes. This was enough to meet the demands for domestic use, nursery and fire fighting. Incidentally, all the water pipes have been stolen and taken away by unknown people. The intake and the main reservoir were left untampered.
2 (2013/14 - 2011/18) Â
Kirengezi river which used to flow through Mtibwa and Lusunguru forest reserves throughout the year is now seasonal. Its course was diverted by M/s Mtibwa sugar estates to avoid swampy conditions especially to the south of Mtibwa Block and Madizini in general. 1.3.7 Special features and sites The plantation area has scattered swampy areas which at present are un-suitable for growing teak and cedrella. 1.4 CLIMATE 1.4.1 Rainfall The plantation experiences two rain periods in a year; the long rains are from March to May. These are followed by a long dry season lasting October. Short rains are from November to December. The average mean annual rainfall is 1200 mm. . 1.4.2 Temperatures Temperatures are high particularly in the months of January and February. Mid day temperatures vary from 28 to 33 0C 1.4.3 Wind Winds blow from South East and North East directions 1.5 GROWING STOCK 1.5.1 Growth rates. The growth Record of teak have shown to grow up to 2.54m height increment per year in the first 10 years. Lusunguru block growth vigour is slightly less. Records have shown growth of 2.0m height in the first 10 years followed by 0.3m in the 10 to 20 years of age. 1.5.2 Mean annual increment (MAI) The Mean annual increment (MAI) for Mtibwa plantation in 1986 inventory was 12.28 in the year 2000 miniinventory MAI was calculated to be 7.866m3/ha/year and 7.05543/ha/year for Mtibwa block and Lusunguru respectively. Thus average MAI (2002) was 7.5 m3/ha/year for Mtibwa Plantation.
3
(2013/14 - 2011/18)
Â
Table 1: Compartment to be thinned and clear felled in plan period Thinning
Year
Clear felling
2013/14
MT9
MT10A, MT10B, MT8
2014/15
MT9, MT6B, MT6A
MT7A, MT7B, TP2006
2015/16
MT11B
2016/17
MT11B, LR12A
MT5, MT3
2017/18
LR14, LR13
LR1-10
1
2
3
4
MT7C, MT7D
LR12C
LR14,LR15,FN78A ,FN73B,FN80,FN76
MT8A, MT8B, MT10A, MT10B
MT7C
MT7A, MT7B
1.5.3 Allowable cut The age class distribution of the plantation is uneven (Fig 1), which means the forest is not normal. Therefore, the objective of this plan is to try to regulate the forest to normal. The allowable cut for the plan period is given in Appendix 8. It shows total volume to of 53,901.23 m3 will be removed 1.5.4 Health and vitality The establishment of newly seed orchard at Kwengoma area aiming at tree improvement. • Avoidance of poor stock will be done by using improved material from selected plus tree from Mtibwa and Longuza forest plantation respectively. • By using tissue culture large number of planting material will be produced. 1.5.5 Stocking The growing stock is the sum by number or volume of all trees growing in a forest. The main tree species planted at Mtibwa are Tectona grandis (95%) and Cedrella ordoratta+Milicia exelsa(5%). The age class and species distribution is as shown in
Figure 1: Age class distribution for all species by area- Mtibwa plantation 2013.
4 (2013/14 - 2011/18)
The total standing volume for Mtibwa and Lusunguru blocks in january 2013 was 66,338m3 and 66,434m3 respectively. The density for Mtibwa and Lusunguru blocks was 368,014.32 and 203,907.26 respectively. The total standing volume for the whole plantation is estimated to be 132,772M3 and the stoking of the whole plantation is 571,922 trees as shown in Table 2 Table 2: Standing volume and stocking for Mtibwa plantation Block
Density
Volume (m3)
Area (ha)
Mtibwa
292797.3
66235
532.24
Lusunguru
163921
66427
586.08
Mtibwa (young stands<5 yrs)
75217
103
315.2
Lusunguru (young stands <5yrs)
39987
7
TOTAL
571922
132772
Remarks
185.34 1618.86
1.5.6 Management units The plantation is divided into two blocks which are Mtibwa and Lusunguru blocks. The blocks are further subdivided into smaller units called ranges. Thus Mtibwa block has Mtibwa range and Lusanga range. Lusunguru block is composed of Sambai range and Dihinda range. Each range/block is subdivided into compartments eg MT1, LR3, etc. Compartments are numbered 1, 2, 3 etc 1.6 UTILIZATION 1.6.1 Markets In recent years, demand for teak particularly for export market has increased tremendously. Potential customers are private people and companies. The market absorbs big sized logs from third to fifth thinning and very rarely accepts second thinning. Main markets for forest products from Mtibwa plantation is Morogoro town, Dar es Salaam and Overseas. In addition, the plantation supplies products such as building poles, teak seeds and teak stumps to the nearby villages and regions. 1.6.2 Harvesting The sale of standing trees due for clear felling follows the procedures of Auction Selection of successful buyer is done by theAuction comitee. Small scale customers who can buy from 4m3 to 499m3 of standing timber submit their applications which are considered by the harvesting committee of the plantation. This committee consists of the following members: • Director of planning and Resource Utilization (Chairperson) • Plantation Manager- (Secretary) • Assistant Plantation Manager (Member) • Forester in charge of the area to be harvested. (Member) • Regional Forest Officer/Regional Natural Resources Adviser (Member . Disposal of forest products is done through three main ways, tender, public auction and private agreement. In the first two methods, TFS advertise through the public media (radio or newspapers). Interested buyers visit coupes to inspect and assess the stocking there-after invitation for tender or execution of auction is done. First thinning is done by the plantation staffs, forest assistants trained for tree marking and scaling under 5
(2013/14 - 2011/18)
close supervision of AFO and FO. Felling is done by experienced casual laborers. Poles from thinning are sold according to prevailing Government Notice (G.N), other thinning regime are done by customer under supervision of plantation staffs. 1.6.3 Other forest uses. Apart from saw logs and poles the forest reserve also generate some income through sales of firewood, murram, stones, and tree seeds. Seeds are collected freely by Tanzania Tree Seed Agency (TTSA). 1.7 INFRASTRUCTURE 1.7.1 Road The access road to offices of the station branch off from the Morogoro â&#x20AC;&#x201C; Handeni main road near compartment MT 1. The plantation roads were constructed to act as compartment boundaries as well as internal firelines. They run paralled to each other and finally join the Morogoro-Handeni link. The road network covering the whole plantation is about 74.8 km and they are not in good condition.
Figure 2: Picture showing part of Morogoro- Handeni link passing between Lusunguru block
6 (2013/14 - 2011/18) Â
1.7.2 Buildings The plantation office and eight staff quarters are located at Kwasama hill in Mtibwa block. The buildings include the main office, stores, generator house, un-completed health centre and un-completed garage. The health centre building is now used as temporally accommodation building for new staffs and also a stores room. Staff quarters include 1FPM house and 4 houses occupied by foresters. There are 3 houses for subordinate staff and old project offices. The condition of these buildings is bad walls and roof about to collapse, immediate rehabilitation and maintenance is needed to avoid total loss. The complete list of houses/buildings is shown in table 3. Table 3: List of houses at Mtibwa Forest station S/NO
BUILDING TYPE
QNTY
BUILDING YEAR
CONDITION
REMARKS
LOCATION
1
Managers house
1
1970/71
Fairly Good
Need renovation
Kwasama hill
2
Assist managers houses
1
1970/71
Fairly Good
Need renovation
Kwasama hill
3
F/Assistants houses
6
2011/12 1970/71
Fairly
4need renovation
Kwasama hill
4
Accountant house
1
1970/71
Fairly Good
Need renovation
Kwasama hill
5
Office and store
1
1970/71
Fairly Good
Renovated
Kwasama hill
6
Generator house
1
1970/71
poor
Need renovation
Kwasama hill
7
Other staff houses
5
1961/62
Very poor
demolited
Kwasama hill
1.7.3 Plants and equipment 1.7.3.1 Vehicles The station has two -Toyota Land Cruisers, Isuzu Lorry and ford ranger All vehicles are in good running condition. There are five motor cycles four Honda XL 125 and Yamaha 200. One Honda XL 125 is grounded. The vehicles and motorcycles are used for administration and field work table 7. 1.7.3.2 Plants and equipment There are two farm tractors which were leased from ZOFOMO. Both are used for timber extraction (skidding) and transportation (Forwarding) to the central log yard for storage. One tractor is also used for transport of casual laborers, roads maintenance (murram), distribution of water for domestic use, tree planting, nursery watering and fire fighting. They are equipped with accessories such as logging winch specialized trailers for transport and water bowser. There is also an electricity Generator plant in good running condition. 1.8 COMMUNICATION FACILITIES Mtibwa forest station office is connected with telephone services from Tanzania telecommunication company Ltd (TTCL). The area is also covered by mobile telephone service providers of Zain, Vodacom and Tigo. Staff with mobile phones enjoys reliable communication with the outside world.
7
(2013/14 - 2011/18)
Â
1.9 WATER SUPPLY There is permanent water supply from bore well to the station. In 2006 a contractor was engaged to dig a bore hole 60m deep, construct pump house and reservoir. This was done in phase one. Clean water for both domestic and nursery is now available at the nursery site. The connection of pipes from bore hole to the reservoir tank then to the staff houses have been completed.This was done in phase two 1.10 ADMINISTRATION 1.10.1 Organization Administratively, the Forest Plantation Manager is directly answerable to the Chief Executive and assisted with two Assistant forest manager. . The Assistant Forest Officers (Diplomates and Certificate holders) who are answerable to the plantation Manager are in charges of four sections of the plantation namely, Silviculture, Protection, Harvesting and Administration. Each in-charge is supported by field staffs who are responsible for daily field activities Appendix 3. 1.10.2 Manning level There are 25 staff of different categories responsible for different duties as shown in table 4.
Table 4: Manning level Mtibwa Forest Plantation S,No
Designation
Number
Duties
1
Senior Forest Officer I
1
Forest Plantation Manager
2
Forest Officer II
2
Assistant Plantation Manager
3
Senior Forest Assistant (Diploma)
1
Silviculture section Incharge
4
Forest Assistant II(Diploma)
1
Harvesting Section Incharge
5
Forest Assistant (Diploma)
1
Transport and building Incharge
6
Senior Forest Assistant (Diploma)
1
Protection Incharge
7
Assistant Accountant
1
Accounts
8
Driver Grade IV
1
Driving station vehicles
9.
Forest Assistant
9
Field works
10
Forest Assistant
1
Accounts/stores
11
Forest Assistant
1
Fuel stores
12
Forest Assistant (certificate)
1
Asst. Block Incharge-Mtibwa
13
Forest Assistant (certificate)
1
Asst.Silviculture Officer
14
Forest Assistant
1
Asst. Block Incharge-Lusunguru
15
Forest Assistant
1
Asst. Block Incharge-Lusunguru
16
Forest Assistant
1
Registry Incharge/Typist
1.11 SOCIAL SERVICES 1.11.1 Education The forest plantation has no primary schools situated in the plantation but depends on schools from neighbouring villages. Workersâ&#x20AC;&#x2122; children attend primary education at a neighbouring village of Lusanga situated about 3km from the forest station. 1.11.2 Health Health services are provided from a dispensary at Lusanga village. This dispensary is run by the Mvomero District Council. The plantation has plans to start offering first Aid services to her staff.
8 (2013/14 - 2011/18) Â
1.11.3 Religion There are different religious groups including Muslims, Christians and others, as evidenced by presence of Mosques and Churches at surrounding villages. Forest plantation staffs get religious services from surrounding villages. 1.11.4 Power supply Mtibwa forest station is supplied with electricity from the National Grid under TANESCO which was connected in 2003. The plantation also owns a generator set which is in good running condition and provides electricity to the forest office in case of power cut from TANESCO. 1.11.5 Social facilities and entertainment The forest plantation lack social hall and shop in the plantation forest area therefore most of the requirements are obtained from nearby villages. 1.12. SOCIAL ECONOMIC ASPECTS 1.12.1. Land use There are several land uses around the forest plantation such as farming and livestock keeping. Main agriculture crops includes sugarcane, maize, paddy, sunflower etc. while domestic animals reared are cattle, goats, sheep, chicken, pig. Etc. 1.12.2. Economic activities Agriculture is the main cornerstone for the economy and livelihoods of the plantationâ&#x20AC;&#x2122;s adjacent communities. Crops grown in the area include sugarcane, paddy, sunflower and maize. Other activities conducted include livestock keeping, commercial lumbering, petty business and employment in sugarcane farms and sugar factory. Roads are passable all the year around and are used for transportation of agricultural crops to the market in Morogoro. 1.12.3. Social economic impact The social economic impact of the plantation is as follows; i. ii. iii. iv. v.
Provision of employment to the local community. Supply of forest products such as timber, building materials, firewood and non-wood products. Etc. Amelioration maintenance of climate Earning of domestic and foreign currency. Provide protection to flora and fauna.
1.13 RESEARCH Currently there are research of wood density at different age classes to determine appropriate rotation age, another is on development of teak protocol on tissue culture, tree improvement programme and establishment of seed orchad .Also propagation of priority five indigineous trees species seed orchad namely; Milicia excelsa, Afzelia quanzesis, Pterocarpus angolensis khaya anthitheca and Dalbegia melanoxylon ultimately establishment of indegineous tree species plantation.
9
(2013/14 - 2011/18)
Â
PART
B
10 (2013/14 - 2011/18) Â
PART B 2.0 DIRECTIVES 2.1 OVERALL GOAL The overall goal of the plantation is to produce fine hardwood timber on a sustained yield both for export and local consumption. 2.2 SPECIFIC OBJECTIVES 2.2.1 Silviculture Teak will be the main timber species for planting. Due to soil differences, some areas especially those deposited with silt or water logged areas shall be planted with other species. Possible species are: (a) Cedrella ordorata for silt deposited areas (b) Eucalyptus spp. For water logged areas (c) Khaya nyasica for water logged areas (d) Milicia excelsa also alternative species. Teak will continue to be established in flying nurseries. Other species shall be raised in a permanent nursery. Water for nursery use is obtained from deep boreholes and pumped out by electrical pump. Increased production of wood shall be achieved through expansion of available land. In preference we shall start to replant all open areas before embarking on the extension sites. Land preparation will be done by clearing its natural vegetation and burning the trash. Beating up will be done whenever it is appropriate in order to ensure full stocking. All the necessary silvicultural treatments will be undertaken in order to improve the growth and health of trees. At least two weeding will be done each year while trees are still young. When ever conditions allows, Taungya system will be encouraged. The quality of trees and timber girth increments shall be ensured by following proper scheduled thinning. 2.2.2 Capital investment During the plan period the existing infrastructure will be renovated and improved. All buildings and staff houses shall be maintained. At present only few permanent labour force are accommodated at the station and the majority of them have personal houses at Lusanga and Dihinda villages.. New roads shall be aligned and constructed in the extension area before planting commence. There will be a comprehensive road maintenance programme to rehabilitate the road systems, external firebreaks and internal firelines. One vehicle 4FWD pickup and a farm tractor with logging accessories and log trailer shall be procured. The other tractor and a Gen set shall undergo routine maintenance. 2.2.3 Human Resources Training shall be conducted to various manning levels depending on their needs. The present staff strength of 25 shall be increased to 30 through new recruitments and replacements of those who retired or transferred.
11
(2013/14 - 2011/18)
Â
2.2.4 Revenue Generation Increased revenue is expected to come from compartments which are going to be clearfelled, thinning and various fees from sales of services. We shall intensify proper control and accountability during revenue collection. In addition, the plantation will produce teak stumps and sell them to increase revenue but at the same time, this measure will reduce theft of stumps in our nurseries/planted areas. The total amount of revenues to be generated during the period of this plan is Tshs 20,608,439,314.48 Table 5: Allowable cut and forecasted revenues during the plan period (2013/2014-2017/2018) Year Allowable cut at standing vol.cm3 thinning clearfelling LMDA Royality Total
2013/14
2014/15
2015/16
2016/17
2017/18
Total
10469.56 0 10469.56 293,147,680.00 3762236386 4,055,384,066
11447.67 2478.26 8969.41 320,534,790.80 3520548684 3,841,083,475
10469 527 9897 293,132,000.00 3619726950 3,912,858,950
11046 0 11046 309,288,000.00 3969380100 4,278,668,100
10469 0 10469 293,132,000.00 3762035150 4,055,167,150
53901.23 3005.26 50850.97 Â Â 20,143,161,741
2.2.5 Utilization During thinning proper care to the remaining trees will be taken, by restricting the operation to permanent under supervision of Forest officer. Markets for small logs shall be created by encouraging saw mills to renovate their processing equipment to suite for small logs. Surveys for potential customers particularly building contractors in Morogoro and nearby urban centres shall be sought. 2.2.6 Protection and Conservation Protection of the plantation and the tree crop shall be strengthened. Efforts will be made to stop illegal tree harvesting at night. Regular day and night patrols will be made and assistance from police force will be sought whenever necessary. Also we shall continue using informers and villagers in neighbouring villages to protect their adjacent areas. Manning of forest product examination points shall be enhanced and further improvements will be made. Another checkpoint will be established near our central log yard for control of other forest products e.g. murram, fire wood, charcoal and poles. Plantation boundaries and beacons shall constantly be surveyed and any encroachment shall be punished and pushed out. The plantation shall be protected against fires and other damages, and a wooden fire lookout tower shall be constructed at Lusunguru block. All external firebreaks and internal firelines shall be cleaned before the onset of fire season. Monkeys have been noted to cause damage to young seedlings in the nursery and stumps in the planted areas. We shall keep a clear watch and if such damage occurs we shall seek advice of wildlife department for proper action. For soil erosion control and other conservation measures tree planting will be restricted to gentle slopes. Natural vegetation around riverbanks and hill tops shall not be cleared. 2.2.7 Resource assessment The available information on plantation resources is both inaccurate and inadequate. Some compartment areas are not accurate and others have not been included into the plantation maps. All compartments shall be resurveyed and accurate areas established. An inventory carried out in January 2013 allowed us to know the 12 (2013/14 - 2011/18) Â
growing stock of the plantation and was input to the preparation of this management plan. 2.3 STRATERGIC TARGETS 2.3.1 SILVICULTURE 2.3.1.1 Species The main species for planting shall be Teak (Tectona grandis), Cedrella ordorata. khaya spp, Millicia exselsa, and Afzelia quanzesis. 3.1.2 Planting targets A total of 903.4ha shall be planted, teak will cover about 683 ha, cedrella will cover about 20.4ha and indigenous species will cover about 200ha. Out of the total, 250 ha located at Mtibwa block and Lusunguru shall be replanted and 653.4 ha shall be normal planting in the extension areas of Lusunguru block. An area of about 180.5ha shall receive beating up. The planting and beating up targets for each species are summarized in Table 6 below: Table 6: Planting targets for Mtibwa Forest Plantation 2013/14-2017/18
2013/2014 Teak (ha) Cedrella Extension Teak khaya mellisia afzelia Total (ha)
103
103
2014/2015
2015/2016
2016/2017
2017/2018
Total
88.8
20 20.4
50
72
230.8 20.4
61.2 20 20 10 200
110 20 20 10 200.4
100 20 20 10 200
78 20 20 10 200
452.2 80 80 40 903.4
2.3.1.2 Nursery operations About 2,000,000 seedlings shall be raised. 1,500,000 seedlings of teak, 35,000 Cedrella, 150,000 khaya,150,000 mellisia, and 80,000 afzelia shall be raised in flying , permanent nursery and green house. 2.3.1.3 Land preparation An area of 903.4 ha will be prepared for planting/replanting. Both Taungya farmers and casual laborers will be involved for the work. 2.3.1.4 Tending operations Tending operations such as weeding, singling, biological thinning and fire line will continue to be done by casual labourers although staff and some villagers will be allowed to plant agricultural crops under the young stand. In addition, permanent staff and casual labourers will do second thinning according to prescriptions. The third, fourth and fifth thinnings, which are commercial, will be done by plantation staff or contractors Appendix 11.
13
(2013/14 - 2011/18)
Â
2.4 CAPITAL INVESTMENTS 2.4.1 Roads New roads shall be constructed in the extension area covering a length of about 11 km. Maintenance of existing road network and fire lines of about 10 km will be done annually. 2.4.2 Buildings The strategy is to maintain and improve the existing office building, staff quarters and other buildings. Construction of 4 new staff houses will be done in order to accommodate plantation workers 2.4.3. Communication facilities During this plan period, the project is planning to put up a reliable wireless communication in order to improve contacts with outside world. These shall include installation of Fax and internet services to ease communication within and outside the forest plantation. 2.4.4. Vehicles, plants and equipment For proper running of activities, it is planned that all vehicles, plants and equipment will be maintained. The strategy is to maintain the existing vehicles, plants and equipment and procure more vehicles and equipment Table 7: List of existing vehicles and plants Mtibwa Forest Plantation S/No
Vehicle/plant No
Make
Purchase year
Remarks
1
STK 1065
Land Cruiser Hardtop
2004
Need replacement
2
STK 3515
Land Cruiser Hardtop
2007
Good condition
3
STJ 7065
Isuzu Lorry
4
STH 8458
Honda M/cycle XL 125
1994
Grounded
5
STK 1803
Honda M/cycle XL 125
2005
Need replacement
6
STK 1148
Yamaha 200
2007
Good condition
7
CW 5410
FORD TRACTOR
Grounded
8
CW 5584
FORD TRACTOR
Need replacement
9
Generator
1
Poor condition
10
Water pump
1
Good condition
11
Power saws
2 Huscavana
Need Replacement
12
STK 5512
Yamaha
2010
Good condition
13
STK 1093
XL 125
2014
Good condition
14
STK 1094
XL 125
2014
Good condition
15
STL 1029
Ford ranger
2014
Good condition
16
STG 9122
L/Rover 110
Transferred 2002
Grounded
14 (2013/14 - 2011/18) Â
Good condition
PART
C
15
(2013/14 - 2011/18)
Â
PART C 3.0 PRESCRITION 3.1 SILVICULTURE 3.1.1 NURSERY OPERATIONS 3.1.1.1Species selection The choice of main species will be done by the Forest Manager on the basis of prescription of technical order recommendation. Suggestions for alternative species will be made by the FM and forwarded to the CE for approval. 3.1.1.2 Soil mixture Teak There is no standard soil mixture. The FM will select a suitable site for locating a flying nursery each year. It should have fertile soils which are well drained. The site will be ploughed and harrowed prior to seedbeds construction. Cedrella Soil mixture is 50% top forest soil and 50% cow mixture. 3.1.1.2.1 Soil ingredients as above 3.1.1.3 Seedlings raising techniques This will be governed by technical order prescription and local built up experience. 1 kg of Teak seeds produces 700 seedlings. Pre treatment of seeds is by soaking in free running water for the period of 72 hours to break their seed dormancy. Then they are broadcasted in seedbeds of 12m x 1m separated by 0.5m. 3.1.1.3.1 Pot size Black polythene tubes gauge 250 cut into inches length. 3.1.1.3.2 Sowing techniques Sowing shall be done in the month of February. The soaked seeds are broadcasted on the seedbeds at the sowing density of 4kg per 12m2 (1 karai to 1 seedbed). The seeds will be left uncovered for a period of 24 hours and thereafter covered with a layer of 2.5 cm ordinary top soil. 3.1.1.3.3 Seed germination The germination of Teak seeds is sporadic with the early seeds shooting up on the seventh to tenth day after sowing. Germination continues throughout as long as conditions for growth are available until all viable seeds germinate.
16 (2013/14 - 2011/18) Â
3.1.1.4 Nursery tending technique The Forest Management shall decide on the timing and frequency of the following activities. 3.1.1.4.1 Watering regime Watering in flying nurseries is not done but may be necessary if there are shortages of rain or prolonged drought. In such cases watering is done twice a day early in the morning and late in the evening. 3.1.1.4.2 Sanitary operation The nurseries are weeded regularly to free young teak seedlings from weed competition. The surroundings are also kept clean. A fire line is made and a strip of up to 20 metres is burnt before the onset of dry season to reduce fires risk. 3.1.1.4.3 Pricking out This is only done for Cedrella ordorata. Pricking out commence soon after appearance of second pair of leaves. This is a delicate operation and is done under shade with minimum exposure of roots. First the polythene tubes are filled with soil mixture. A hole is made at the centre. A seedling is pricked up from seedbed and inserted into the hole. The soil is leveled lightly and firmly by hand to make sure no air pockets are left. 3.1.1.4.4 Root pruning The roots growing out of polythene tubes are pruned using a sharp knife. This is done after every 3 weeks. Root pruning results in a balanced shoot-root ratio at the time of planting and creates increased mass of fibrous roots which ensures improved field survival particularly in areas of marginal rainfall. 3.1.1.4.5 Stump preparation At the time of planting out sufficient plants are left in nursery area (in situ) to form a plantation compartment at 2.5 x 2.5. The stock which remains can also provide for beating up stock for the next season (short rains). 3.1.1.5 Nursery Calendar The Forest manager will observe the following activities are undertaken within specified period (see also Appendix 4
17
(2013/14 - 2011/18)
Â
Table 8: Nursery Calendar for Mtibwa Forest plantation Month September – December December – February March March (first week) (the rest) 2nd - 4th week March – April May – June
June – March (Current year) (Next year) March – next year)
Activity Seed collection v Site preparation for new nursery (clearing) v Ploughing v Preparation of seedbeds v Seed pretreatment (soaking) v Seed Sowing v Seed germination v Weeding v Fertilizer application (top dressing with NPK) v Marking fire lines and control burning. v Root pruning, watering v Preparation of planting stumps to commence at beginning of long rains. v Cutting into sizes 10cm-tape root x2cm stem above root collar. v Stumps bundled and stored in the shade before planting.
3.2 PLANTING 3.2.1 Land preparation The FM will authorize commence of the following activities, where and when to do what. Mechanical land preparation shall not be applicable, due to lack of machines and equipment. 3.2.1.1 Manual land preparation The activity should commence in July soon after long rains. In the extension area, the natural vegetation will be cleared to give room to new teak crop at beginning of short rain. Taungya system will be allowed whenever possible to minimize land preparation costs. 3.2.1.2 Stake and stakes cutting Stake cutting for beating up will be carried out in the month of October and should be completed before short rains of November/December; when beating up would commence. The cost is 1,000 stakes per man day. Staking for normal planting shall start in February/March before long rains. Cost is 4mds/ha. 3.2.2 Spacing The spacing adopted is 2.5mx2.5m. This is according to technical order No.1 of 2003 for teak. 3.2.3 Pit size Planting holes should be as deep as 10cm. usually the holes are prepared by a crow bar. The stumps are inserted into the hole with an allowance of 20mm of its stem protruding above the ground. Finally it is firmly compacted to remove air pockets.
18 (2013/14 - 2011/18)
3.2.4 Timing Planting out is done soon after the beginning of long rains when the soil have attained enough moisture, usually in mid March. 3.2.5 Planting Stock Size The right size for planting is reached when the root collar thickness is 20mm and of planting stock is 12.5cm long. 3.2.6 Survival assessment Survival assessment is done at least six months after planting. The survival of 80% and above indicates satisfactory stocking. Beating up is effected when the survival assessment is below 80% but above 50%. When survival assessment is 50% and below the whole area (compartment) is replanted. 3.3 TENDING OPERATIONS These are initiated by the Forest Manager in accordance to T.O No 1 of 2003 for Teak, Field experience and prevailing condition. 3.3.1 Weeding. The newly established compartments receive complete weeding during the first two years and thereafter sanitary slashing and climber cutting is done once in a year. 3.3.1.1 Timing. This is done at least 2 weeks before long rains and end of short rains. 3.3.1.2 Frequency Weeding is done four times in a year for the first 2 years and if the area is under Taungya, two weeding in a year are enough. Climber cutting and sanitary slashing is done once in a year. 3.3.1.3Types Complete weeding (clean weeding) is applied. 3.3.1.4 Method Manual weeding by using hand hoe. Task 20mds/ha. 3.3.2 Pruning Teak trees are self pruning. Only climber cutting and brush cleaning is done occasionally double ladders are taken out. 3.3.2 Thinning Thinning will follow technical order number 1 of 2003. For older stands which were established with an initial spacing of 2.5 x 2.5 m, thinning will follow technical order No. 1 of 2003 Annex B. For older stands there are four thinning regimes, which are first, second, third, and fourth . The second, 3rd, and 4th thinnings are commercial. Clear felling will be at the age of 40-60 years. The thinnings will be done manually. Selective thinning will be applied for all thinning regimes . The inferior and suppressed phenotypes are selectively 19
(2013/14 - 2011/18)
Â
marked and felled according to the thinning schedule. (Appendix 16). For young stands established after 2003, there are three thinning regimes which are 1st, 2nd and 3rd at 5, 10 and 15 years respectively Appendix 15. 3.3.2.1 Timing The operation can be done throughout the year except during long rains of March â&#x20AC;&#x201C; May 3.3.2.2 Thinning frequency Thinning will start at the end of the 4th year following at an interval of 5 years as follows; Table 9: Thinning schedule for Teak stands Operation
Year
Initial stock (SPH)
Number of stems to remain after thinning
Trees to remove (SPH)
1st Thinning 2ndThinning 3rdThinning 4thThinning 5thThinning
0 5 10 15 20 25
1680 1680 1125 875 625 375
1125 875 625 375 250
555 250 250 250 125
Clear felling
40+
125
0
125
Table 10: Thinning schedule for Teak stand as per Technical order No1 of 2003 Operation
Year
Initial stock(SPH)
Number of stems to remain after thinning
Trees to remove (SPH)
-
0
1600
-
-
1st Thinning
5
1600
800
800
2ndThinning
10
800
400
400
3 Thinning
15
400
300
100
Clear felling
30-40
300
0
300
Replanting
0
1600
-
-
rd
3.3.2.3 Thinning method The operation is semi mechanized. Felling and delimbing is done by manual labor using axes, crosscutting is done by chainsaws and terrain transport (skidding) is done by farm tractors. Tasks Felling 20-25 trees/crew (2mds) crosscutting to produce 100 logs/day (chain operator) skidding 100 logs/day (tractor operator +3chockermen) 3.3.2.4 Thinning types Selective thinning is adopted for all thinning regimes. The worst trees are removed systematically leaving the best trees for final crop. 3.3.2.5 Thinning assessment A tree to be removed will be judged in terms of: - i) its quality (form, growth) ii) spacing factor iii) diseased or abnormality 20 (2013/14 - 2011/18) Â
The standing stock is assessed to establish the number of stems per hectare present in a particular compartment. Trees to be removed are marked on the basis of the standard thinning regime and the current stock (SPH) established as above i.e. If the current stocking has more trees than the standard (final stock) the extra trees are removed. If stocking is equal or less, none is removed. Marking for thinning is carried out by the department inventory section. For a mixed stand (e.g. teak and Cedrella ordorata) cedrella or other species shall be removed in favour of teak. 3.4 CAPITAL INVESTMENTS 3.4.1 Roads 3.4.1.1 Construction This represents a substantial investment in terms of capital and also involves continuing charge for maintenance. The decision for road construction will therefore be made by the CE. In the plan period we shall construct 11 km of new roads in the extension area with branches and feeder as firebreaks/fire lines. 3.4.1.1.1 Types of construction The main road to the new area shall be accessible throughout the year. The plantation roads including the external firebreaks will be constructed at low standards by manual labour. These shall be upgraded later depending on construction machinery availability. 3.4.1.2 Maintenance 3.4.1.2.1 Frequency Maintenance will be undertaken twice in a year soon after long rains, and just before onset of dry season, maintenance prior to rain season aim to open curvets and side drains while post rain maintenance rectify damage from storm and reduce fire risk. 3.4.1.2.2 Method of maintenance A motor grader shall be used on main roads and external firebreaks, internal roads shall be maintained by manual labour using hand tools. 3.4.2 Buildings 3.4.2.1 Construction For new buildings, supervision and guidelines will be given by the TEMESA. Construction of 1 new Staff house and rehabilitation. 3.4.3.2 Construction Design According to government standards 3.4.3.2 Type Grade IV living quarter. 21
(2013/14 - 2011/18)
Â
3.4.2.2 Maintenance The maintenance schedule will be prepared and updated by the Forest Manager
3.4.2.2.1 Maintenance frequency This operation will be undertaken each year and programmed to last for 5 years until all buildings and houses are covered.
3.4.2.2.2 Timing of maintenance It is best done soon after rains to detect leakages and also paintings may not be easily washed. 3.4.2.2.3 Methods We shall use contractors or private artisans basis (masons, carpenters, plumber or electricians) 3.4.3 Vehicles, plants, equipment and tools 3.4.3.1 Procurement The CE will assist to procure new vehicles, plants, some equipment and tools. 3.4.3.1.1 Types Selection of vehicles by plants types will be done by the Forest Manager. 3.4.3.2 Maintenance There will be a routine maintenance and schedule for all vehicles and plants for a specific period - weekly, monthly and yearly according manufacturer specifications. 3.4.3.2.1 Maintenance frequency This will be given by the manufacturer specifications and will depend on conditions for our use. It will depend on road conditions (dust, rough) and kilometers or machine hours covered. 3.4.3.3 Replacement control This will be undertaken by Director of Forestry and Beekeeping/ CE. 3.4.4 Communication facilities 3.4.4.1 Procurement This will be done by the TFS after recommendations from FM 3.4.4.2 Types -Radio call â&#x20AC;&#x201C; control centre - 6-walkie talkies
22 (2013/14 - 2011/18) Â
3.4.4.2 Maintenance Follows manufacturer’s manual specifications. 3.4.4.3 Frequency Monthly and periodic according to manufacturer. 3.4.4.4 Replacement To follow recommendations from manufacturer. 3.4.5 Water supply 3.4.5.1 Sources Mainly underground water supplemented by rain water harvesting 3.4.5.2 Supply system Water for domestic use shall be pumped to the main reservoir near Forest Manager’s house for storage and distribution. This shall be relayed on its path by electric pumps to be located at sub stations. 3.4.5.3 Quality and quantity The quality of underground water has been tested and analyzed at the region water laboratories. It was found to be suitable for human consumption and also for nursery use (PH 6.5-7.5). The quantity of the underground water after drilling is expected to suffice the needs of the community around. 3.5 HUMAN RESOURCES 3.5.1 Human resource development 3.5.1.1 Training Plan This shall be initiated by the Forest Manager and sent to the Chief Executive of TFS where it will be incorporated with those from other plantations. 3.5.1.2 Recruitment New recruitment will be done by the Chief Executive following recommendations from Forest Manager and available vacancies in the civil service for a respective cadre. 3.5.1.3 Manning levels The various manning levels within the plantation will be arranged and coordinated by the Forest Manager and his management team.
23
(2013/14 - 2011/18)
3.6 REVENUE GENERATION 3.6.1 Source of revenue The source of revenue will be from sale of round logs (thinning and clearfelling), poles, firewood, forest seeds (cedrella and teak), murram, stones and sand. 3.6.2 Control of revenue collection The Forest Manager will conduct regular training for personnel who are involved in revenue collection, timber measurements, grading, billing and timber auctioning. Regular checking and monitoring of field measurements will be done to ensure that correct records are taken and recorded in the appropriate books e.g. felling licenses, receipt books and transit passes. The daily collections must be promptly acknowledged through proper ERVs and banked. A convenient place for examination and checking of forest products passing through will be established and maintained in both exist. The purpose is to monitor the movement of forest products passing through the area, whether they are legal and are covered by proper movement order (Transit Pass) and serve for future records. 3.7 UTILIZATION 3.7.1 Harvesting plans A schedule of areas available for wood procurement for the period of 1 to 5 years will be prepared by the Forest Manager. 3.7.1.1 Clear felling In the plan period 321 ha will be clear felled. Table 11: Summary of allowable cut Year
Thinning Vol m3
Clear felling vol m3
Total
2013/14
0
10469.56
10460
2014/15
2478.26
2015/16
572
9897
10469
2016/17
0
11046
11046
2017/18
0
10469
10469
8969.4111
11447.6711
3.7.1.2 Thinning All first thinning at the age of 5 will be given priority. This will be followed by third, fourth and fifth thinnings on the criteria of number of stems per hectare and whether they are delayed or not. 3.7.2 Sales 3.7.2.1 Pricing for sales The Director of Forestry and Beekeeping will evaluate and recommend the price of forest products and non wood products available in the area. Actually the price is based on royalty rates, logging fees and silvicultural/ road maintenance fees. 24 (2013/14 - 2011/18) Â
3.7.2.2 Methods of sales Timber from clearfellings will be sold at standing volume. The volume will be stablished by tariff system. Timber from thinning will be sold by volume system (assortments). However, the procedure is to sell timber from both clearfelling and thinning through public Auction or Tender. The Director of Forestry and Beekeeping will assist in the advertisement, processing (evaluation) and award of winner. 3.7.2.3 Markets There is good market for big sized logs. Small logs from first thinning have no markets within the plantation area. The forest manager will look for markets outside the area in particular to big rural centres like Mvomero, Gairo, Dakawa and Kibaigwa. 3.8 PROTECTION AND CONSERVATION 3.8.1 Prevention 3.8.1.1 Fireline The plantation fireline maintenance plan is 500km attached as an appendix 12. 3.8.1.2 Control Plan for diseases and pests There have been no recorded incidences of disease or insect pest attack in the plantation area. If occurs remedial measures will be taken instantly. Currently Management is observing preventive measures through health, vigor forestry practices. 3.9 RESOURCE ASSESSMENT 3.9.1 Timing The forest manager will request from the TFS headquarters for availability of both survey and Inventory crews. The best convenient time is just before thinning/ clearfelling operation commence. 3.9.2 Methodology Survey and Inventory section has well trained crews stationed at TFS headquarters. These are trained on various methods depending on the use for which the (data) results are intended. 3.10 ORGANIZATION The organization structure is shown in the Appendix 3
25
(2013/14 - 2011/18)
Â
PART D. 4.0 ESTIMATES During the management plan period, the plantation will spend a total amount of Tshs 3,414,060,000 as summarised in table 9, for implementing buildings, roads, vehicle, administration and silviculture operations as detailed in Table 12,13,14, 15 and 16 and Appendix 12, 13 and 14 respectively Table 12: Summary of estimates for different planned operations S/No
Planned operation /Activity
Estimated Costs (Tshs)
1
Silvicultural operations
1,540,760,000
2
Forest protection
327,500,000
3
Running and maintenance of plants and vehicles
617,400,000
4
Office administration
456,400,000
5
Maintenance and construction of roads
240,000,000
6
Maintenance and construction of buildings
232,000,000
Total
Remarks
3,414,060,000
The Ministry of Natural Resources and Tourism will contribute this amount in terms of staff salaries. The remaining budget will be funded from LMDA generated by the Forest Plantation during the plan period and retention funds from Forest and Beekeeping Division.
Table 13: Maintenance and construction of buildings and other installations
Activity Financial to achieve year target 2013/14
Maintenance of buildings
2014/15
Maintenance of buildings Water supply
Estimated Cost per Unit (Tshs)
Input required for each target Quantity
Total cost (Tshs)
Input
Unit
Maintenance
0ffice
1
various
25,000,000
Electrical installation
Houses
1
3,000,000
3,000,000
Sub
28,000,000
Maintenance (minor)
Houses
2
20,000,000
40,000,000
Labour charge
Houses
2
5,000,000
10,000,000
Various
Various
10,000,000
60,000,000
Staff quarters Construction of a garage 26 (2013/14 - 2011/18)
2015/16
Major repair of Various buildings, water supply and other works Construction of staff quarter at Lusanga
Various
2
House
20,000,000
40,000,000
20,000,000
1
Construction of lookout tower at Lusunguru
4,000,000
64,000,000 2016/17
2017/18
Minor repair of Various buildings, water supply and other works
Various
Minor repair of Various buildings, water supply and other works
Various
2
2
20,000,000
40,000,000
Sub total
40,000,000
20,000,000
40,000,000
Sub total
40,000,000
Total 232,000,000 Table 14: Maintenance and construction of roads Financial year
Length Road type (km)
Activity
2013/14
Acess roads
10 km
Maintenance of access roads
2014/15
Access roads
Unit cost (Tshs)
5,000,000
Total cost (Tshs)
Remarks
To compartments under forest operations 50,000,000 (harvesting) 50,000,000
10 km
Maintenance
2,000,000
5km
Construction
10,000,000
To compartments under forest operations 20,000,000 (harvesting) At Lusunguru 50,000,000 Kwankore 70,000,000
Access roads
10 km
Maintenance
20,000,000
To compartments under forest operations 20,000,000 (harvesting)
2015/16
Access roads
3km
Construction
10,000,000
At Lusunguru 30,000,000 Kimunyu
50,000,000 27
(2013/14 - 2011/18)
Access roads
10 km
Maintenance
20,000,000
2016/17
Access roads
3km
Construction
1,000,000
Acess roads
10 km
Maintenance of access roads
2017/18
20,000,000
TOTAL
240,000,000
Table 15: Financial Year
2013/2014
At Lusunguru 30,000,000 Chuluwara 50,000,000
To compartments under forest operations 20,000,000 (harvesting)
2,000,000
Runnung, maintenance and procurement of vehicles and plants Activity to achieve targets
Running and Maintenance
SUB TOTAL
28 (2013/14 - 2011/18)
To compartments under forest operations 20,000,000 (harvesting)
Input required for each activity
Unit
Isuzu Lorry STJ 7065
Km
40,000
600
24,000,000
Toyota L/C STK 1065
Km
40,000
500
20,000,000
Toyota L/C STK 3515
Km
40,000
500
20,000,000
M/cycle (Honda) STK 1803
Km
30000
200
6,000,000
M/cycle (Yamaha) STK 1148
Km
30000
200
6,000,000
M/cycle (Honda) STH 8458
Km
30000
200
6,000,000
Generator (Lister Peter)
Mhr
600
500
300,000
Chain saw (2 pcs)
lts/day
180
2000
2,880,000
Tractor CW 5410
Mhr
25 lts/day
13,500,000
98,680,000
Quantity
Estimated cost per unit (Tshs)
Total Cost
2014/2015
Running and Maintenance
SUB TOTAL
Isuzu Lorry STJ 7065
km
40,000
600
24,000,000
Toyota L/C STK 1065
km
40,000
500
20,000,000
Toyota L/C STK 3515
km
40,000
500
20,000,000
M/cycle (Honda) STK 1803
km
30000
200
6,000,000
M/cycle (Yamaha)STK 1148
km
30000
200
6,000,000
M/cycle (Honda) STH 8458
km
30000
200
6,000,000
Generator (Lister Peter)
Mhr
600
500
300,000
Chain saw (2 pcs)
5lts/day in 6months
2,880,000
Tractor CW 5410
Mhr
25 lts/day
13,500,000
98,680,000
29
(2013/14 - 2011/18)
Isuzu Lorry STJ 7065
km
40,000
600
24,000,000
Toyota L/C STK 1065
km
40,000
500
20,000,000
Toyota L/C STK 3515
km
40,000
500
20,000,000
M/cycle (Honda) STK 1803
km
30000
200
6,000,000
M/cycle (Yamaha)STK 1148
km
30000
200
6,000,000
Generator (Lister Peter)
Mhr
600
500
300,000
Chain saw (2 pcs)
5lts/day in 6months
Tractor CW 5410
Mhr
25 lts/day
M/cycles (Honda XL125)
km
60,000
Procurement
M/cycle (Honda XL 125)
pc
1
Running and Maintenance
2015/2016
30 (2013/14 - 2011/18)
2,880,000
13,500,000
200
12,000,000
7500000
7,500,000
112,180,000
2016-2017
Running and Maintenance
SUB TOTAL
Isuzu Lorry STJ 7065
km
40,000
600
24,000,000
Toyota L/C STK 1065
km
40,000
500
20,000,000
Toyota L/C STK 3515
km
40,000
500
20,000,000
M/cycle (Honda) STK 1803
km
30000
200
6,000,000
M/cycle (Yamaha)STK 1148
km
30000
200
6,000,000
Generator (Lister Peter)
Mhr
600
500
300,000
Chain saw (2 pcs)
5lts/day in 6months
2,880,000
Tractor CW 5410
Mhr
25 lts/day
13,500,000
M/cycles (Honda XL125)
km
90,000
200
18,000,000
110,680,000
31
(2013/14 - 2011/18)
Isuzu Lorry STJ 7065
km
40,000
600
24,000,000
Toyota L/C STK 1065
km
40,000
500
20,000,000
Toyota L/C STK 3515
km
40,000
500
20,000,000
M/cycle (Honda) STK 1803
km
30000
200
6,000,000
M/cycle (Yamaha)STK 1148
km
30000
200
6,000,000
Generator (Lister Peter)
Mhr
600
500
300,000
Chain saw (2 pcs)
5lts/day in 6months
2,880,000
Tractor CW 5410
Mhr
25 lts/day
13,500,000
M/cycles (Honda XL125)
km
90,000
Procurement
Power saws
pcs
2
SU TOTAL
114,680,000
TOTAL
534,900,000.00
2017-2018
Running and Maintenance
32 (2013/14 - 2011/18)
200
18,000,000
2000000
4,000,000
Table 16: Office administration Financial Year
Activity to achieve Input required target for each target
E s t i m a t e d Total cost cost per unit
Telephone
Various
Various
2,500,000
Postal Charges
Various
Various
600,000
Cleaning supplies
Various
Various
1,200,000
Computer accessories Various
Various
4,500,000
Stationary supplies
Various
Various
2,500,000
Electricity bills
Various
Various
7,600,000
photocopy Various
Various
1,500,000
Printer, spares
2013/14
Leave travel
18staff
1,500,000
Uniforms
27staff
3,000,000
Per Diem Domestic
20,000,000
Extra duty
10,000,000
2Plant operator + 1 driver
4,400,000
Burial services
1,500,000
guard
4,800,000
Security service
Refreshment/Meals
Staffs
Various
2,000,000
Meeting/Honoraria
Various
Various
3,000,000
Station hand
16,000,000
Sub total
86,600,000
33
(2013/14 - 2011/18)
Table 16: Office administration Financial Year
Activity to achieve Input required target for each target
E s t i m a t e d Total cost cost per unit
Telephone
Various
Various
2,500,000
Postal Charges
Various
Various
600,000
Cleaning supplies
Various
Various
1,200,000
Computer accessories Various
Various
4,500,000
Stationary supplies
Various
Various
2,500,000
Electricity bills
Various
Various
7,600,000
Instal Internet
Various
Various
7,000,000
photocopy Various
Various
1,500,000
Printer, spares
2014/15
Leave travel
1,500,000
Refreshment/Meals
Staffs
Various
2,000,000
Meeting/Honoraria
Various
Various
3,000,000
Uniforms
3,000,000
Per Diem Domestic
20,000,000
Extra duty
10,000,000
2Plant operator + 1 driver
4,400,000
Burial services
1,500,000
guard
6,800,000
Station hand
16,000,000
Sub total
95,600,000
Security service
34 (2013/14 - 2011/18)
Table 16: Office administration Financial Year
Activity to achieve Input required target for each target
E s t i m a t e d Total cost cost per unit
Telephone/ charges
Various
2,500,000 600,000
Postal Charges
Various
Various
Cleaning supplies
1,200,000
Computer accessories
4,500,000
Stationary supplies
2,500,000
Electricity bills
7,600,000
Various
1,500,000
Printer, spares
2015/16
internet Various
photocopy Various
Leave travel
1,500,000
Uniforms
3,000,000
Per Diem Domestic
20,000,000
Extra duty
10,000,000
Refreshment/Meals
Staffs
Various
2,000,000
Meeting/Honoraria
Various
Various
3,000,000
1
4,400,000
1,500,000
guard
6,800,000
Station hand
17,000,000
Sub total
2Plant Operator driver Burial services Security service
90,200,000
35
(2013/14 - 2011/18)
Table 16: Office administration Financial Year
Activity to achieve Input required target for each target
E s t i m a t e d Total cost cost per unit
Telephone/internet Various charges
Various
2,500,000
Postal Charges
Various
Various
600,000
Cleaning supplies
1,200,000
Computer accessories 1 x 2,000,000
2,000,000
4,500,000
Stationary supplies
2,500,000
Electricity bills
8,000,000
Various
2,500,000
Printer, spares
2016/17
photocopy Various
Leave travel
1,500,000
Uniforms
3,000,000
Per Diem Domestic
20,000,000
Extra duty
10,000,000
Refreshment/Meals
Staffs
Various
2,000,000
Meeting/Honoraria
Various
Various
3,000,000
2Plant operator + 1 driver
4,400,000
Burial services
500,000
guard
6,800,000
Station hand
18,000,000
Sub total
92,000,000
Security service
36 (2013/14 - 2011/18)
Table 16: Office administration Financial Year
Activity to achieve Input required target for each target
E s t i m a t e d Total cost cost per unit
Telephone/internet Various charges
Various
2,500,000
Postal Charges
Various
Various
600,000
Cleaning supplies
1,200,000
Computer accessories 1 x 2,000,000
2,000,000
4,500,000
Stationary supplies
2,500,000
Electricity bills
8,000,000
Various
2,500,000
Printer, spares
2017/2018
photocopy Various
Leave travel
1,500,000
Uniforms
3,000,000
Refreshment/Meals
Staffs
Various
2,000,000
Meeting/Honoraria
Various
Various
3,000,000
Per Diem Domestic
20,000,000
Extra duty
10,000,000
2Plant operator + 1 driver
4,400,000
Burial services
1,500,000
guard
6,800,000
Station hand
18,000,000
Sub total
92,000,000
456,400,000
Security service
TOTAL
37
(2013/14 - 2011/18)
4.1
FIRE PLAN
INRODUCTION Mtibwa teak plantation is located in an area which is frequently open to forest fires. This is due to the nature of the vegetation, cultural and farming practices adopted in the area. 2. FIRE PREVENTION The common sources of fires are: a) Hunters – They start fires by burning bushes and dry vegetation to drive off wild animals from their hiding places. b) People traveling in buses, Lorries, bicycles etc throw smoldering cigarette pieces along the roadsides. These may later ignite forest fire. c) Farmers – they use fires during preparation of their farms. When left uncontrolled such fires may develop into destructive. d) Arson – These are people who start fires deliberately or with grudges. e) Grazers – They start wild fires at far distances to promote good pastures for their animals. Such fires may later spread into our plantation. f) Small sugarcane growers – they use fires when harvesting their sugarcane. If such fires are not controlled, may later spread and jump into our plantation. 2.1 FIRE DANGER PERIOD The critical fire season is from July to November and January to March For the purpose of eliminating/ reducing the occurrence of fires the following deliberate measures will be adopted each year before the onset of dry season. Prevention activities shall commence on 1st July, each year. 2.1.2 Identification of High and low Fire hazard areas. High fire risk areas are those adjacent to high human activities e.g. farming, hunting, honey collectors etc. which includes the eastern side of our plantation in particular Lusunguru block are more open to fire due to the nature of vegetation (tall grass) and prevailing winds. 2.2.1 Fire protection measures (permanent measures Fire protection measures will involve the following activities: a) Maintenance of external firebreaks This will be kept clean. Manual screefing of both sides of firebreaks should be done at 20md/km and the strip between shall be burnt (early) before the surrounding area is dry. b) Maintenance of firelines/plantation roads These shall be maintained clean. Roadside slashing 6-10 m width by manual labour at 10 mds/km. c) Training All employed personnel must be trained on how to fight fires. Forest officers should from time to time try to educate the people of neighbouring villages on the value of forests to themselves and to the nation. Such education should be delivered through political meetings, village meetings, school and other gatherings. d) Public relations – Good public relations between the public and forest officials is necessary. This is where recruitment of auxiliary forces for fighting fires is obtained.
38 (2013/14 - 2011/18)
3. FIRE DETECTION This is very effective under proper provisions of fire lookouts, communication systems, ground patrols and patrol vehicles. 3.1 LOOKOUT POINTS Two fire towers one for Mtibwa and the second for Lusunguru block are needed. Their function is to detect smoke and relay information to the main office. At present there is only one look out point near the forest manager’s house. It screens all compartments in Mtibwa block, but those of Lusunguru are beyond its reach. 3.2 Communication system There is a radio call facility, which need to be strengthened by increasing the number of units to improve communication with the central unit. Telephone service providers i.e. Vodacom, airtel and Tigo cover some of the plantation area. During this plan period, this telecommunication system (cellular phones) will be utilised by providing the users with airtime. Reporting of fire will be much faster than in the previous years when there was no telecommunication system. 3.3 Patrols During fire season (July –November) a group of casual labourers are employed to patrol along high fire hazard areas on foot or by bicycles. They report fire incidences which are within and outside plantation area but threatening the forest plantation area. Other patrols are conducted by vehicles, including those done during the night. 4.0 FIRE SUPPRESSION During the fire danger period there must always be a standby crew on alert. The necessary fire fighting tools shall be made available and in good condition. 4.1 Standby crew These are formed of Forest officers, Forest Assistants and drivers present in the plantation. Each standby crew will be made of 6 people and they will work on a roaster basis. The officer will coordinate and supervise the crew under their charge. The crews shall be trained on various methods of fighting fire.
4.2 Chain of command Fire fighters will receive commands or orders and report to their crew leader. The crew leader will instruct his crew on what tools and what method to use at the time of fighting fire. If the initial attack is not effective the crew leader will seek assistance from the nearest village. If it is still inadequate the crew leader will report to 39
(2013/14 - 2011/18)
the Forest Manager who will jointly consult other village leaders and government officials in the area to assist in putting the fire out. 4.3 Tools and equipment Fire fighting tools will include the following: 1. Matchet (Panga) 2. Hoes 3. Fire rakes 4. Back packs water pumps 5. Back firing torches 6. Watering cans 7. Fire beaters 8. Water pump with suction and discharge hose 9. Siren (mobile) 10. Binoculars pair Vehicles 1 Land cruiser (4Wd vehicle) 1 Lorry 1 tractor with water bowser or with a trailer Others 1 siren to alert people Maps
4.4 Water supply There should be ample water supplies for fire fighting. Two reservoir tanks (sim tanks) each of 1000 litres will be filled with water for the purpose. 5.0 MOPPING UP This shall start soon after the fire is contained. The crews must not leave the area until when fire is dead and declared so by the officer in charge. During this operation water is essential. The crew leader will be the last person to leave the scene after assessing the following:i. Extent of damage caused ii. Causes of fire iii. Cost of putting the fire out iv. At the office, the crew leader will make a report by using relevant forms. This together with other information is sent to the Director of Forestry and Beekeeping within 48 hours. 6.0 INSPECTION REPORT People are organised along the periphery and within the burnt area to inspect signs for fires, which may resurface again. Patrols will carry hand tools and will be moving within a calling distance until the area is safe.
PART E 40 (2013/14 - 2011/18) Â
5.0 APPENDICIES Appendix 1: Rainfall trend at Mtibwa forest plantation from 2009 to 2013
2009 120.1 115.1 179.7 252.1 119.1 25.1 17.5 17.1 26.6 68.9 108.2 132.2 1181.7
January February March April May Jun July August September October November December Total
2010 123.3 117.3 184.2 250.7 119.3 25.2 17.5 16.8 27.3 67.7 106.6 131 1186.9
2011 123.1 116.6 183 246.5 119.5 25.1 17.2 16.6 27.3 68 105.8 138 1186.7
2012 123.2 115.9 185.8 244 119.8 24.8 16.9 16.8 26.9 66.7 105.8 134.7 1181.3
2013 121.7 115.8 184.3 247 119.5 25.3 17.1 16.7 27.1 67.3 105.7 132.8 1180.3
Total 611.4 580.7 917 1240.3 597.2 125.5 86.2 84 135.2 338.6 532.1 668.7 5916.9
Appendix 2: Monthly average rainfall trends at Mtibwa Plantation
month
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Rainfall mm
122
116.1
183.4
248.1
119.4
25.1
17.2
17
27.
67.7
106.4
133.7
Appendix 3: Mean monthly rainfall at Mtibwa Forest Plantation
41
(2013/14 - 2011/18)
Â
42
(2013/14 - 2011/18)
• • •
Nursery Planting & beating up Land preparation (Extension area)
SILVICULTURE
• • • • • • •
ASSISTANT FOREST MANAGER
• • • • •
58
ACCOUNTS &STORES
Tree marking Tree felling Scaling Skidding & forwarding Landing & Log assortment
• • •
Protection & law enforcement Patrol (general) Fire prevention and control
PROTECTION
ASSISTANT FOREST MANAGER
HARVESTING
FOREST ASSISTANTS
Road construction Road maintenance Building construction Building maintenance Transportation schedule Vehicle maintenance Manpower development
ADMINISTRATION
FOREST MANAGER
Appendix 4 : Mtibwa Forest Plantation Organization Chart
Appendix 4 : Mtibwa Forest Plantation Organization Chart
Appendix 4: Calendar for annual nursery operations-Mtibwa Plantation
Sept
Oct Nov Dec
Jan
Feb
Mar
Apr
May Jun
Jul
Seed collection
Site preparation, and Ploughing harrowing
Preparation of seedbed
Seed pretreatment (soaking)
Seed sawing
Weeding
Fertilizer application, weeding
Root pruning and watering
Preparation of stumps,seedlings
43
(2013/14 - 2011/18)
Â
Aug
Appendix 5: List of Mtibwa Forest Plantation Managers from 1961.
S/No NAME
DATE
1
Rashid Abdalla
1961
2
Seif S. Salehe
1968
3
I.M.Shehagilo
1968
4
A.J.Mbagha
1969
5
Johnson Aman
1971
6
M.E.Shoo
1972
7
H.Salim
1973
8
V. Lyapembile
1975
9
J.S.Mawi
1976
10
G. S. Kiogwe
1984
11
J.K.P. Mosha
1987
12
R.M.Kirenga
1993
13
C.Haule
1995
14
C.P.Mbuya
1995
15
M.M.Kiboga
1997
16
P.A.Mamkwe
2000
17
Hamza Kateti
2008 todate
44 (2013/14 - 2011/18) Â
Appendix 6: Area with satisfactory growing stock
SPECIES
AREA(Ha)
Planted areas
teak
cedrela
Replanting
teak
cedrela
250.8
Extension area
teak
452.2
khaya
80
afzelia
40
mellicia
80
652.2
Beating up
180
1668.63 66.2 1734.83 230.8 20
Appendix 7: Planted areas (ha) by years and species
Compt No P.year
Teak
Cedrella
Others
Total
Remarks
1.Areas with satisfactory growing stock LR1
1954
3.64
0
0
3.64
LR2
1955
3.64
0
0
3.64
LR3
1957
10.73
0
0
10.73
LR7
1957
2.02
0
0
2.02
LR4
1958
4.05
0
0
4.05
LR5-A
1959
2.63
0
0
2.63
LR5-B
1959
5.67
0
0
5.67
LR6
1960
6.08
0
0
6.08
LR8
1960
1.62
0
0
1.62 Flying nursery 1960
LR9
1961
3.04
0
0
3.04 Flying nursery 1961
MT1
1961
38.6
0
0
38.6 TTSA
45
(2013/14 - 2011/18)
Compt No P.year
Cedrella
Others
Total
Remarks
MT2
1962
29.6
0
0
29.6 TTSA
LR10
1964
1.62
0
0
1.62 Flying nursery 1964
LR11
1964
0.6
0
0
0.6
MT4
1964
54.8
0
0
54.8
TP64-A
1964
1.6
0
0
1.6
TP64-B
1964
1.6
0
0
1.6
TP64-C
1964
1.4
0
0
1.4
MT6-A
1966
72.4
0
0
72.4
MT6-B
1966
0
20
0
20 TTSA Harvesting in 88.8 progress
MT9
1969
88.8
0
0
FN70
1970
5.8
0
0
5.8
MT11-B
1971
106.6
0
0
106.6
LR12-A
1972
59.4
0
0
59.4
FN 73-A
1973
3
0
0
3
FN73-B
1973
3.4
0
0
3.4
LR13
1973
102
0
0
102
LR14
1974
18.2
0
0
18.2
FN75
1975
1.4
0
0
1.4
LR15
1975
32.6
0
0
32.6
FN76
1976
2.4
0
0
2.4
FN77
1977
4
0
0
4
LR16-A
1977
46.6
0
0
46.6
LR16-B
1977
48.6
0
0
48.6
FN78-A
1978
1.6
0
0
1.6
FN78-B
1978
3.1
0
0
3.1
LR17
1978
53.4
0
0
53.4
LR18
1979
42.99
0
0
42.99
46 (2013/14 - 2011/18)
Teak
Compt No P.year
Teak
Cedrella
Others
Total
Remarks
LR21
1980
60
0
0
LR22
1980
15.5
0
0
15.5
FN90
1990
0.5
0
0
0.5
FN91
1991
0.6
0
0
0.6
LR12-B
1999
1.7
0
0
1.7
MT10-C
1999
0
16
0
0
LR12-C
2000
10
0
0
10
MT7-C
2001
5
0
0
5
MT7-D
2002
15
0
0
15
MT7-B
2006
27
0
0
27
MT8
2006
80
0
0
80
TP2006
2006
22.5
0
0
22.5
TP2008
2006
5
0
0
MT10-A
2007
42
0
0
42
MT10-B
2007
28
0
0
28
MT11-A
2008
0
36.4
0
36.4
MT3-A
2008
20.8
0
0
20.8 7 ha open
MT3-B
2008
0
13.8
0
13.8
MT5
2011
106
0
0
106
MT7-A
2008
43
0
0
Total
60 half area not planted
5ha Uprooted
43
1302.23
2.Open areas (and other areas ) once planted but now in need of replanting MT 9
1969
88.8
88.8 Harvesting in progress
3.Planned extension of the plantation area Lusunguru
2013-18
Total
652.2
47
(2013/14 - 2011/18)
48
(2013/14 - 2011/18)
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
CO
TG
TG
TG
TG
TG
TG
TG
TG
LR19
LR5B
LR7
FN70
LR10
LR2
LR3
LR4
LR6
LR8
LR9
MT5
LR5
MT3A
MT7A
MT11A
MT10A
MT10B
MT7B
MT8
TP2006
MT7D
MT7C
LR12C
SPP
MT4
CMPT
2000
2001
2002
2006
2006
2006
2007
2007
2008
2008
2008
2010
2010
2011
2011
2011
2011
2011
2011
2011
2011
2012
2012
2012
2012
P/YEAR
Appendix 8: Allowable cut
7
7
7
6
6
5
5
5
3
3
2
2
2
2
2
2
2
2
1
1
1
1
13
12
11
AGE
10
5
15
22.5
80
30
28
42
36.4
43
20.8
2.6
43
3.04
1.6
6.08
4.5
10.7
3.6
1.6
3.8
46
5.7
50
54.8
AREA
4542
1525
3402
9307
93450
29700
27800
31900
6626
52609
10589
1516
26460
2634
1093
3430
3599
9788
2564
693
823
3084
4787
5998
48798
TREES/ COMPT
819
572
838
888
9388
3413
2829
2621
121
1073
130
3
59
0
0
0
4
0
0
0
0
0
0
0
44
VOL/ COMPT
454
305
226
413
1168
990
992
759
182
1223
509
583
615
866
683
564
799
914
712
433
216
67
839
120
890
TREES /HA
8.789
14.26
7.439
5.372
15.60
12.44
9.144
7.159
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
B.AREA /HA
17.99
18.44
15.92
11.02
11.16
13.98
15.41
10.54
7.71
9.04
6.59
2.11
3.23
1
0.25
0.25
2.16
0.25
0.25
0.25
0.25
0.25
0.25
0.25
1.37
H.MEAN/ HA
YTSPH
81.9
114.4
55.8666
39.4666
117.35
113.767
101.035
62.4047
3.32417
24.9534
6.25
1.15384
1.37209
0
0
0
0.88888
0
0
0
0
0
0
0
0.80292
VOL/HA
YTVOL /HA
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
YT CAI
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
12.1209
ADJ CAI
121.2092
60.6046
181.8138
272.7207
969.6736
363.6276
339.38576
509.07864
441.20076
521.1987
252.11472
31.51434
521.1987
36.847536
19.39344
73.695072
54.54405
129.69363
43.63524
19.39344
46.05942
557.5614
69.08913
606.045
664.22532
TOTAL CAI
(2013/14 - 2011/18)
49
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
LR18
FN78A
FN78B
LR17
FN77
LR16A
LR16B
FN76
FN75
LR15
LR14
FN73A
FN73B
LR13
LR12A
MT11B
FN64
CO
TG
LR21
MT6B
TG
FN91
TG
CO/TG
MT3B
MT9
CO
MT10C
TG
CO/TG
MT10B
TP64C
TG
LR12B
1966
1969
1964
1964
1971
1972
1973
1973
1973
1974
1975
1975
1976
1977
1977
1977
1978
1978
1978
1979
1980
1991
1999
1999
2000
1999
47
44
49
49
42
41
40
40
40
39
38
38
37
36
36
36
35
35
35
34
33
22
14
14
13
14
15.5
88.8
1.4
1.6
100
22
88
3.4
3
18.2
32.6
1.4
2.4
34
46.6
4
53.4
3.1
1.6
98
50
0.6
10
16
4.44
20
2444
11823
607
640
13350
3150
17850
1927
2400
7078
19866
758
1180
10250
26601
1600
17612
827
493
20250
13000
175
800
5825
1111
4100
3804
21159
407
395
17771
3204
12452
1105
1232
2889
5686
173
551
3834
9182
831
3099
499
362
8865
6954
77
397
1788
331
2923
157
133
433
400
133
143
202
566
800
388
609
541
491
301
570
400
329
266
308
206
260
291
80
364
250
205
28.36
21.14
24.87
23.47
23.05
13.85
14.10
28.86
38.12
17.57
22.24
13.06
21.33
15.47
20.42
21.29
23.35
20.88
20.28
10.90
18.52
14.27
6.791
19.90
10.04
17.09
24.28
29.26
25.84
23.86
21.81
25.88
23.9
24.71
23.7
20.43
18.14
18.96
23.27
17.9
21.09
22.06
19.75
19.18
25.94
21.44
18.65
20.24
16.03
15.26
18.6
21.74
244.473
238.277
290.714
246.875
177.71
145.636
141.5
325
410.666
158.736
174.417
123.571
229.583
112.765
197.038
207.75
58.0337
160.968
226.25
90.4591
139.08
128.333
39.7
111.75
74.5495
146.15
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
10
10
10
10
10
15
18
18
18
18
3.36692
3.36692
3.36692
3.36692
3.36692
3.36692
3.36692
3.36692
3.36692
3.36692
3.36692
3.36692
3.36692
3.36692
3.36692
3.36692
6.73383
6.73383
6.73383
6.73383
6.73383
10.1008
12.1209
12.1209
12.1209
12.1209
10,469.56
52.389275
298.98249
4.713688
5.387072
336.692
74.07224
296.28896
11.447528
10.10076
61.277944
109.76159
4.713688
8.080608
114.47528
156.89847
13.46768
359.58652
20.874873
10.774128
659.91534
336.6915
6.06048
121.2092
193.93472
53.816884
242.4184
Appendix 9: Harvesting plan Mtibwa Forest Plantation Table … Summary of Thinning and Clearfelling Compartment during the planning period (2013/14 - 2017/2018) Remaining After Clear Felling
Clear Felling
Year
Thinning Volume
Compartment No.
Spp
MT9
TG
MT6B
TG
20
48
244.473
3857
3857
0
MT9
TG
88.8
45
238.277
3312.41
3312.41
0
MT6A
CO
72.4
48
1800
1800
360.72
LR12C
TG
10
14
81.9
819
360.72
428.152
LR14
TG
18.2
40
158.736
2472.32
428.1515
409.673
LR15
TG
32.6
39
174.417
4532.2
409.6734
0
0
235.422
FN76
TG
2.4
38
229.583
506.022
235.422
90.6057
FN78A
TG
1.6
36
226.25
414.197
90.6057
218.618
FN73B
TG
3.4
41
325
768.48
218.618
735.071
FN80
TG
2.03
33
735.071
1023.96
735.0705
0
0
TOTAL
2478.26
11447.6711
MT7C
TG
5
15
114.4
572
572
-
-
MT11B
TG
100
45
177.7
17771
9897
LR12A
TG
22
41
MT11B
TG
100
45
LR14
TG
18.2
42
158.736
2889
2889
LR13
TG
88
40
141.5
7580
7580
10469
13377.6
53,901.23
2013/14
TOTAL
2014/15
20115/16
572
TOTAL
2016/17 TOTAL 2017/18 TOTAL GRAND TOTAL
Area (ha)
Age (yrs)
88.8
Vol/ha
44
Total Vol.
238.277
Allowable cut
13781.41
10469.56 10469.56
Vol. 0
3312.41
0
0
0
3312.41
7874
10469
3172
7874
7874
11046
PROCESSING CAPACITY MTIBWA FOREST PLANTATION Processing capacity
OLAM
50 (2013/14 - 2011/18)
Assortment required
Actual
Planned (000 ob)
Appendix 10: Processing capacity Mtibwa Forest plantation
Customer
Area (ha)
Forecast
2013/14
2014/15
2015/16
2016/17
2017/18
2019/20
After 10 yrs
M
S
C/p
Poles
Fuel logs
Total
Total
(2013/14 - 2011/18)
51
Sub total Total Vol
2017/2018
Sub total
2016/2017
Sub total
2015/16
Sub total
2014/2015
Sub total
2013/2014
YEAR
TG TG TG TG TG TG TG TG
MT5 MT3 MT7D MT7A MT7B MT10B LR1-10 MT4
TG TG TG TG TG TG TG TG TG TG TG TG TG
MT8 MT10B MT10A MT7A MT7B LR12C TP2006 MT7D MT7C MT8 MT10A MT7C MT10B
Sp
Compt No
28 50.5 54.8
106 30 15 43 30
80 42 5 28
43 30 10 22.5 15 5
80 28 42
Area
1ST 1ST 3RD 2ND 2ND 2ND 1ST 1ST
1ST 1ST 1ST 1ST 1ST 3RD 1ST 2ND 2ND 2ND 2ND 3RD 2ND
Thinning No
10 5 5
5 5 15 10 11
10 10 15 10
7 9 13 9 13 14
8 8 8
Thinned
Age
74.4089 2.06 4.98
4.53 17.69 58.3734 64.1465
21.21685
8.6274 21.834 9.7731 39.466667 55.866667 114.4
36.96933 0.6978 62.404762
Vol/Ha
2829 11.742 44 2368.095 13377.59
59 130 838 242.66767 529.30909 6696.516
212.1685
212.1685
370.9782 655.02 97.731 888 838 572 0
2957.5464 19.5384 2621 4100.814
Total Vol
Appendix 11: Compartments in order of thinning sequence from 2013/14 to 2017/18
0.0049562 0.0204273 0.0729668 0.0801831 0.0465056 0.0012875 0.0031125
0.0316518 0.0007034 0.0822197 0.0070543 0.0220545 0.0215267 0.091147 0.2471976 0.375082 0.0530421
Av/vol/tree
1600 1600 1600
914 866 800 800
400
1223 990 454 433 226 305 0
1168 992 759 0
sph
400 39 90 529 2836
114 66 400 400 1080
100
154 NIL NIL NIL
368 192 1227 423 190
removed/ha
sph to be
1000
1000
18189 5700 540 24429
29440 5376 34816
11200 222.3 4932 16354.3 122019.7
1219.8 200.64 32000 12000 45420.44
/compt
sph to b removed
520.8623 0.2862113 15.35085 536.4994 5098.076
962.1975 3307.278
6.0456171 4.0985238 2334.936
53.04213
53.042125
265.6458
128.31053 125.71091 11.624392
935.6113
931.82969 3.7816258
vol to be removed/comp
52
(2013/14 - 2011/18)
50
25
30
13
20
2
16
2
Planting (ha)
SpotWeeding (ha)Twice
Pesticides(100ha)
Beating up
Tree impovement
Singling
Sanitary Slashing(4times)
Climber cutting
/unit
M/days
L/preparation
Nursery
Operation
15
120
15
150
97.5
112.5
187.5
100
0.1
Unit cost
251
520
0
20.6
103
251
103
200
400,000
Quantity
2013/14
3765
62400
0
0
3090
10042.5
28237.5
19312.5
20000
40000
000 Tshs
303
517
252
40
200
303
200
200
400,000
Quantity
2014/15
Appendix 12: Silvicultural needs ( Tectona grandis ) cost in ‘000’
4545
62040
3780
6000
19500
34087.5
37500
20000
40000
000 Tshs
400
669
222
40
200.4
400
200.4
200
400,000
Quantity
2015/16
6000
80280
3330
6000
19539
45000
37575
20000
40000
000 Tshs
400
687
140
40
200
400
200
200
400,000
Quantity
2016/17
6000
82440
2100
0
6000
19500
45000
37500
20000
40000
000 Tshs
400
694
200
40
200
400
200
100
400,000
Quantity
2017/18
6000
83280
3000
0
6000
19500
45000
37500
10000
40000
000 Tshs
1754
3087
814
0
180.6
903.4
1754
903.4
900
2000000
Quantity
Total
26310
370440
12210
0
27090
88081.5
197325
169387.5
90000
200000
000 Tshs
(2013/14 - 2011/18)
53
4
12
14
14
13
12
20
2
4
Pruning
Marking for 1st Thin
Marking for 2nd Thin
Marking for 3rd Thin
Marking for 4th Thin(h
Thinning
Forest protection (ha)
(i) fireline slashing (km)
(ii) fireline screefing (km)
(iii) control burning(km)
(iv) Forest patrol(mdays)
16
15
150
90
49.4
105
105
90
30
2500
100
100
100
150
150
0
273258
40000
1500
15000
9000
7410
0
0
0
13500
0
2500
100
100
100
92.5
60.23
10
92.5
252
314457
40000
1500
15000
9000
4569.5
0
1050
0
8325
7560
2500
100
100
100
150
5
150
222
353569
40000
1500
15000
9000
7410
0
525
15750
0
6660
2500
100
100
100
228.5
15
92.5
136
140
363055
40000
1500
15000
9000
11287.9
0
1575
9712.5
12240
4200
2500
100
100
100
50.5
50.5
200
328820
40000
1500
15000
9000
2494.7
0
0
0
4545
6000
12500
500
500
500
671.5
60.23
30
242.5
429
814
1,633,159
200000
7500
75000
45000
0
33172.1
0
3150
25462.5
38610
24420
54
(2013/14 - 2011/18)
50
25
30
13
20
2
16
2
4
12
L/preparation
Planting (ha)
SpotWeeding (ha) Twice
Pesticides(100ha)
Beating up
Tree impovement
Singling
Sanitary Slashing(4times)
Climber cutting
Pruning
Marking for 1st Thin
/unit
M/days
Nursery
Operation
100
0.1
90
30
15
120
15
150
97.5
112.5
187.5
Unit cost
Quantity
2013/14
Appendix 13: Silvicultural needs ( Cedrella ordorata)
000 Tshs
20.4
35,000
Quantity
2014/15
5540
2040
3500
000 Tshs
24
20.4
20.4
20.4
20.4
Quantity
2015/16
12717
2160
2448
1989
2295
3825
000 Tshs
20.4
20.4
4
20.4
20.4
Quantity
2016/17
7638
306
2448
600
1989
2295
000 Tshs
20.4
20.4
20.4
20.4
20.4
20.4
Quantity
2017/18
7956
612
306
2448
306
1989
2295
000 Tshs
24
20.4
40.8
61.2
20.4
0
4
61.2
61.2
20.4
20.4
35000
0
Quantity
Total
0
33851
2160
612
612
7344
306
0
600
5967
6885
3825
2040
3500
000 Tshs
(2013/14 - 2011/18)
55
13
20
2
16
2
4
Pesticides(100ha)
Beating up
Singling
Sanitary Slashing(4times)
Climber cutting
Pruning
SpotWeeding (ha) Twice
25
Planting (ha)
30
/unit
M/days
50
L/preparation
Nursery
Operation
30
15
120
15
150
97.5
112.5
187.5
100
0.1
Unit cost
Quantity
2013/14
000 Tshs
Appendix 14: Silvicultural needs indigenous species
50
50
50
38875
0
0
6000
0
0
4875
5625
9375
50
8000 5000
000 Tshs
50
80,000
Quantity
2014/15
50
Quantity
50
100
10
50
50
50
80,000
2015/16
47125
750
12000
0
1500
4875
5625
9375
5000
8000
000 Tshs
50
50
150
50
10
50
50
50
80,000
Quantity
2016/17
53875
750
18000
750
1500
4875
5625
9375
5000
8000
000 Tshs
50
50
50
200
50
10
50
50
50
80,000
Quantity
2017/18
61375
1500
750
24000
750
1500
4875
5625
9375
5000
8000
000 Tshs
50
150
500
100
30
200
200
200
200
320,000
Quantity
Total
201,250
1500
2250
60000
1500
4500
19500
22500
37500
20000
32000
000 Tshs
56
Â
(2013/14 - 2011/18)
1st Thinning
2nd Thinning
3rd Thinning
4th Thinning
5th Thinning
Clear felling
Replanting
4
8
12
16
20
60
0
1,680
250
375
625
875
1,125
1,680
1,680
Thinning
Trees Before
-
0
250
375
625
875
1,125
-
After Thinning
-
250
125
250
250
250
555
-
Tree Cut
-
-
-
-
-
-
-
-
Before Thinning
Standing vol.(M3)
Operation
Planting
1st Thinning
2nd Thinning
3rd Thinning
Clearfelling
Replanting
Age/Years
0
5
10
15
30-40
0
1600
300
400
800
1600
1600
Before thinning
Appendix 16: thinning schedule for Tectona grandis (stands established after 2003)
NB thinning schedules for Cedrella and other species same as teak.
TOTAL
Planting
Operation
0
AgeYrs
Appendix 15: Thinning schedule for Tectona grandis ( established before 2003)
-
-
300
400
800
After thinning
Stems per hactare
-
-
-
-
-
-
-
-
After Thinning
398
-
350
30
35
20
-
-
-
Saw logs
227
-
20
5
25
30
45
40
-
625
-
370
35
50 60
45
40
-
Total
-
300
100
400
800
Trees to be cut
Chip logs
Allowable cut (M3/Ha)
(2013/14 - 2011/18)
57
Â
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
FN
FN
FN
FN
FN
FN
MTIBWA
MTIBWA
MTIBWA
MTIBWA
MTIBWA
MTIBWA
MTIBWA
MTIBWA
MTIBWA
MTIBWA
MTIBWA
MTIBWA
MTIBWA
MTIBWA
MTIBWA
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
FN
MT
MTIBWA
LUSUNGURU
MT
MTIBWA
FN
MT
MTIBWA
LUSUNGURU
MT
MTIBWA
FN
MT
MTIBWA
LUSUNGURU
BLOK/ID
BLOCK
FN78B
FN78A
FN77
FN76
FN75
FN73B
FN73A
FN70
FN64
MT9
MT8
MT7D
MT7C
MT7B
MT7A
MT10B
MT6B
MT6A
MT5
MT4
MT3B
MT3A
MT2
MT1
MT11B
MT11A
MT10C
MT10B
MT10A
COMPT
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
CO
CO
TG
TG
TG
CO/TG
TG
TG
TG
TG
CO
CO
TG
TG
SPP
P/YEAR
Appendix 17: Compartment register Mtibwa forest plantation
1978
1978
1977
1976
1975
1973
1973
2011
1964
1969
2006
2002
2001
2006
2008
2000
1966
2013
2010
2012
1999
2008
2013
2013
1971
2008
1999
2007
2007
AREA
3.1
1.6
4
2.4
1.4
3.4
3
3.8
1.6
88.8
80
15
5
30
43
4.44
20
73.2
106
54.8
10
20.8
29.6
38.6
106.6
36.4
16
28
42
827
493
1600
1180
758
1927
2400
823
640
11823
93450
3402
1525
29700
52609
1111
2444
0
26460
48798
800
10589
0
0
13350
6626
5825
27800
31900
TREES/CMPT
499
362
831
551
173
1105
1232
0
395
21159
9388
838
572
3413
1073
331
3804
0
59
44
397
130
0
0
17771
121
1788
2829
VOLUME/ COMPT 2621
266
308
400
491
541
566
800
216
400
133
1168
226
305
990
1223
250
157
0
615
890
80
509
0
0
133
182
364
992
759
TREES/HA
20.886
20.285
21.294
21.327
13.058
28.86
38.12
0
23.477
21.141
15.606
7.439
14.261
12.44
0
10.04
28.36
0
0
0
6.791
0
0
0
23.057
0
19.901
9.144
7.159
B.AREA/HA
19.18
25.94
22.06
23.27
18.96
24.71
23.7
0.25
23.86
29.26
11.16
15.92
18.44
13.98
9.04
18.6
24.28
0
3.23
1.37
16.03
6.59
0
0
21.81
7.71
15.26
15.41
10.54
H.MEAN/HA
58
Â
(2013/14 - 2011/18)
KK1
KK2
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
TP
TP
LR
LR
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
LUSUNGURU
TOTAL
TP64C
LR
LUSUNGURU
TP2006
LR9
LR8
LR7
LR6
LR5B
LR5
LR4
LR3
LR21
LR2
LR19
LR18
LR17
LR16B
LR16A
LR15
LR14
LR13
LR12C
LR12B
LR12A
LR10
LR
LUSUNGURU
FN91
FN
LUSUNGURU
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG/ON
TG
TG
CO
TG
TG
TG
TG/ON
TG
TG
TG
TG
TG/ON
TG
TG
2013
2013
1964
2006
2011
2011
2012
2011
2012
2010
2011
2011
1980
2011
2012
1979
1978
1977
1977
1975
1974
1973/1974
2000
1999
1972
2011
1991
68.4
46 1618.86
1.4
22.5
3.04
1.6
46
6.08
5.7
2.6
4.5
10.7
50
3.6
50
98
53.4
34
46.6
32.6
18.2
88
10
20
22
1.6
0.6
0
0
607
9307
2634
1093
3084
3430
4787
1516
3599
9788
13000
2564
5998
20250
17612
10250
26601
19866
7078
17850
4542
4100
3150
693
175
0
0
407
888
0
0
0
0
0
3
4
0
6954
0
0
8865
3099
3834
9182
5686
2889
12452
819
2923
3204
0
77
0
0
433
413
866
683
67
564
839
583
799
914
260
712
120
206
329
301
570
609
388
202
454
205
143
433
291
0
0
24.872
5.372
0
0
0
0
0
0
0
0
18.52
0
0
10.901
23.352
15.472
20.416
22.244
17.569
14.107
8.789
17.094
13.857
0
14.277
0
0
25.84
11.02
1
0.25
0.25
0.25
0.25
2.11
2.16
0.25
18.65
0.25
0.25
21.44
19.75
17.9
21.09
18.14
20.43
23.9
17.99
21.74
25.88
0.25
20.24
Appendix 18: Arrangement for staff leave
S/N 1 2 3 4 5 6 7. 8 9 10 11 12 13 14 15 16 17 18 29 20 21 22 23 24 25
NAME Hamza H. Katety Robert Faustine John A. Athumani Karimo Mangachi Peter Mwidima George Senyangwa Evaline Abraham Elibariki Mduma Francis Chamba Omari shabani Pascal Patrice Rose Nghome Elizabeth Daniel Hassan Juma Masudi Mauga Bernard Ngoda Stanley Assa Severa Francis Pascal Msebele Zuberi Twaha Helena Kintebwe Daimon Sewando Vita Bakari John Mbaigwa Eliudi Meshaka
Starting
Ending
Remarks
APPENDIX XX: Location map