M G M 2 P R O J E C T MIXED USE DEVELOPMENT Cartier MGM2 P R-OTulcea POSAL,Tulcea, Romania
This document has been prepared by Palimpscape for the developers of MGM2 based on the approved Zonal Planning Plan in 2019. The illustrations for the Masterplan and conceptual images are to best illustrate the potential of the development as a unitary neighborhood. All images are at a conceptual stage and are subject to change depending on the desired architectural program.
CONTENTS
1.Background 2.Project Overview 3.Architectural Massing 4.Planning Regulations 5.Development Plots Commercial Plots
Colective Residential
Individual Residential
Education
Sports & Recreation
CONTAC TS
BACKGROUND Tulcea city is a touristic city located in the East of Romania, often named the Gate to Danube Delta as it is the port city form where tourists set off towards this unique attraction in Europe. It has a population of approx. 193 000 and has had a spectacular increase of tourists in recent years with a particular interest in the Danube Delta. It remains an exclusivist destination for bird lovers, fishermen, and hunters during certain times of the year, but mainstream tourists seeking
leisure in the wilderness are becoming more and more apparent. Despite the strong touristic character of this city, most residents of Tulcea work in the naval & metallurgical industries, followed by shipbuilding, construction materials processing, wood processing, textile and food industries. Foreign investors are already a big part of the economic stability of the city.
So the need for high-quality housing and commercial growth has risen as people’s financial capabilities have grown. MGM2 neighborhood is an integrated mixeduse development, approved by the planning authorities in 2018 as a response to this need. The project site is conveniently located in the city and pushed its boundaries by 183 000sqm. It is a great investment opportunity for domestic and commercial uses alike.
ACCESIBILITY
lOCATION
TULCEA
t es ar h c m Bu 0 k 22
POPULATION
PROJECT SITE
Consta nt 128 km a
TULCEA Airport 16 km
TULCEA
MIXED USE projected residents
193,000
2500
CITY CENTER
183 000sqm
DEVELOPMENT O P P O R T U N I Y
ToURISTS
161,290 2018
40minWALK 5min DRIVE CITY CENTER MGM2 PROJECT
MGM2 PROJECT
PROJECT OVERVIEW
PROJECT OVERVIEW MGM2 neigbourhood is an ambitios mixed use development project that integrates residential, commercial, retail, education, leisure, sports & recreation uses across 183 000 sqm of land right at the very threshold of Tulcea city. The direct access to the main structural street of Babadag facilitates a good integration with the city infrastructure (vehicular, pedestrian, public transport, etc) and utilities ( electricity, water, sewage, gas, etc). This aspect is particularly important for the buildability and sustainability of the project.
Therefore the development was approved for the Zonal Planning Plan in 2019 and offers designated areas for: • individual dwelling areas with height regime -S + P + 1 + M on independent plots; • collective dwellings with height regime S + P +4 floors up to G + 11 floors with commercial spaces and services on the ground floor, basement and basement parking; (here the planning allows for a touristic use of the plot)
• major services for commerce, tourism, offices, banks, shows, etc., with S + P height regime up to G + 11-15 floors. • commercial spaces shops with height regime D + G + 1-2 floors. • leisure, sports and recreation area with buildings with height regime G + 3 floors.
ILLUSTRATIVE MASTERPLAN
Roundabout Access to Main Street (Str. Babadag)
INDIVIDUAL RESIDENTIAL
North-East Commercial Plot 14 427 sqm
COMMERCIAL PLOT 1
Central Square 2 348 sqm SQUARE
South-East Commercial Plot 22 937 sqm
COMMERCIAL PLOT 2
Public Playground 2 348 sqm
EDUCATION
INDIVIDUAL RESIDENTIAL
Kindergarden / Nursery 1 409 sqm
COLLECTIVE RESIDENTIAL TULCEA CITY WELCOME SIGN
Collective Residential Area/ Ofiices/Services/Tourism 5 484 sqm Green Spine & Running Track belowHighPowerCables110KV
SPORTS & RECREATION
Sports & Recreation Center 4 763 sqm *ILLUSTRATIVE MASTERPLAN is an indicative illustration only. Achitectural layout is subject to investor’s proposal and architectural program.
PROJECT OVERVIEW
H max.45.00 5.4%
5.4%
3.0
10.0
limita aliniament
limita amplasare constructii
limita amplasare constructii
limita amplasare constructii
limita aliniament
limita aliniament
limita amplasare constructii
3
1 Tulcea 22
11.0
6.0
a
4.5 4.5
R1
R12.0
Str ad
l sibi po u se Tra
5.0 7.0
1 a Str ad
2 a
Str ad
limita aliniament
limita amplasare constructii
1 2 3
.
2.0 2.0
153 15.0
0
3.0
7
151
150
128 130
132
POT = 40 % CUT =1.5 H max. 10 m.
144
.0
40
143
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
7
141
.0
10
140
POT = 40 % CUT =1.5 H max. 10 m.
5.0
63
p.
p.) 0m
3m ,3
,0
19
.7
=4
(s
.6 11 s=
T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR
D
POT = 40 % CUT =1.5 H max. 10 m.
8 4 11
9 10 5
5.0
3
5.0
5.0
GC
10.0
10.0
s=375,56mp.
5.0
10.0
10.0
+35.00
90 m
93 m
+10.00
panta teren 5.4%
95 m
+10.00
19 78.39
78.10
+20.00
102 m
106 m DN 22
83 m
SECTIUNE TRANSVERSALA
+10.00
83 m
Proiectant general:
Beneficiar:
s.c. PROMARH s.r.l. Nume:
Semnatura:
str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea
Scara:
1 / 1.000
Proiectat
arh. Marcel PAVEL
Data:
Desenat
arh. Paul Cristian MURAVELI
Noiembrie 2017
The development is easily accessible by the main street of Babadag, through a roundabout on the North East side of the site. There are aprox. 350 linear meters of opening to the main street on the East side, which provides great visibility for retail/ commercialspaces.Circulationwithinthesiteisensuredthrough 13-15m wide ring roads and 10m wide inner residential roads.
Proiect nr:
MATROZ CONSTANTIN si FLOREA ION
TULCEA
J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180
Specificatie:
Sef Proiect arh. Marcel PAVEL
Denumire proiect:
LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.
Denumire plansa:
REGLEMENTARI URBANISTICE
87/2017 Faza:
P.U.Z. Nr. plansa:
U4
85 m
87 m
78.06
+35.00
90 m
93 m
+10.00
panta teren 5.4%
95 m
+10.00
G
+45.00
Existing electrical power lines 110 KV Existing electrical power lines 50 KV Water, sewage, gas, electricity under development according to Regs
G
+10.00
1
10
142
145
a ad Str
SI
rb Pp
II AT
PU
SP
5.0
10.0
10.0
Mainstreet(Nationalimportance) Secondary ring circulation Tertiary residential circulation 78.06
POT CU H ma
.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4c
L
s=6.460,56mp.
I-
5.0
s=6.421,09mp
k 146
a ad Str
147
.0
POT = 40 % CUT =1.5 H max. 10 m.
L 131
POT = 40 % CUT =1.5 H max. 10 m.
148
EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT
PROPUNERE DE MOBILARE URBANA
Dr. 1264
POT = 40 % CUT =1.5 H max. 10 m.
36
110
129
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
w
ZONA D.N. 22 EXISTENT ZONA EXTINDERE CAROSABIL D.N. 22
127
126
149
L
POT = 40 CUT =1.5 H max. 10
.0
10 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
e
s=6.248,9
18 17
125
124
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
a
KV
ad
Str
11 0
GC 5.
s=395,23mp.
POT = 40 % CUT =1.5 H max. 10 m
109
POT = 40 % CUT =1.5 H max. 10 m.
6
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3.0
152
.0
POT = 40 % CUT =1.5 H max. 10 m.
5
3.0
108
106 4 10.0
a6
15
INDICATIV PARCELA DIN ZONA
De. 1 1 18 25.0
107
POT = 40 % CUT =1.5 H max. 10 m.
104
10 9
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4 5 6
16 15 14
.A
- SPATII VERZI, SCUARURI PUD PREALABIL
8
105
40.0
9 8
Strad
154
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
98.7
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
102
POT = 40 % CUT =1.5 H max. 10 m.
155
54
15.0
7
10.0
19 20 721
103
101
87.21
87.25
52
POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 %
CUT =1.5 H max. 10 m.
4b
100
99
12 3
L56
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
87.20
POT = 40 % CUT =1.5 H max. 10 m.
96.0
s=3.858,02mp.
une 3
POT = 40 % CUT =1.5 H max. 10 m.
s=2.352,60mp. .0
10
0
55
POT = 40 % CUT =1.5 H max. 10 m.
24.0
1
3.0
L
10 9
141312 11
51
53
58
16
10.0
POT = 40 % CUT =1.5 H max. 10 m.
44.3
8
6
Strada
97
POT = CUT = H max.
17
18
d
POT = 40 % CUT =1.5 H max. 10 m.
60
POT = CUT H max
POT = 40 % CUT =1.5 H max. 10 m.
14
13
B
40.5
161
11
19
20
POT = 40 % CUT =1.5 H max. 10 m.
11 12
16 15
13
.0
4
Secti
5
2 1211 3 10 10.0
j
POT = 40 % CUT =1.5 H max. 10 m.
22.9
PROPUNERE TRASEU STRAZI CONF. P.U.G.
F
7
Strada 98
22.0
8
6 11
5.
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
40.3
94
57
POT = 40 % CUT =1.5 H max. 10 m.
4
21.8
91 101
20
PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE
10 11
aC
96
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
91
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
59
9 8
10
2 3
21
POT = 40 % CUT =1.5 H max. 10 m.
1
10.0
121 13
25
13 12
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
a5 Strad
4a
21
2 3
1211 10
POT = 40 % CUT =1.5 H max. 10 m.
PIETONAL
12
Strad
8
95
93
POT = 40 % CUT =1.5 H max. 10 m.
14
7
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
15.0
2b
7
16 15
90.8
.0
10.0
49
5 6
Strada
POT = 40 % CUT =1.5 H max. 10 m.
5
6
17
92
POT = 40 % CUT =1.5 H max. 10 m.
41
23
POT = 40 % CUT =1.5 H max. 10 m.
40.4
18
L.E
P
a C16
Strad
5
19
89
61
62
4
20
POT = 40 % CUT =1.5 H max. 10 m.
41.5
50
40.4
10.0
9
L
7
7.0
14 13
7 89
4
12
CIRCULATII CAROSABIL 17 6
13.0
5.0
i
s=9.613,59mp.
87.20
1
5.0 5.0
12 11
5.0
10
10.0
41.0
10.0
123
une
5.0
87
90
ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE
a - -- k 8
15
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL
tor
secti
POT = 40 % CUT =1.5 H max. 10 m.
14.0
4.5
colec
a
40.0
88
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
47
POT = 40 % CUT =1.5 H max. 10 m.
4
9
28
27
POT = 40 % CUT =1.5 H max. 10 m.
L
s=8.447,07mp.
a2
7.0
H I
48
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Strad
81.90 81.93
63
40.0 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4
81.99
81.84
POT = 40 % CUT =1.5 H max. 10 m.
64
10.0
22
De. 427
POT = 40 % CUT =1.5 H max. 10 m.
65
POT = 40 % CUT =1.5 H max. 10 m.
85
a
10.0
1.5
7
16
Secti
66
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
86
ad
46.5
drum
Str
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Str
De. 1273
ad
3
limita aliniament
limita aliniament
limita amplasare constructii
limita aliniament
limita amplasare constructii limita aliniament
limita aliniament
limita amplasare constructii
limita aliniament
limita amplasare constructii
limita aliniament
limita aliniament
limita amplasare constructii
a
1 Tulcea 22
11.0
Str ad
l sibi po u se Tra
5.0 7.0
4.5
6.0
83
84
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
5
29
POT = 40 % CUT =1.5 H max. 10 m.
24
10
45
POT = 40 % CUT =1.5 H max. 10 m.
une
Secti
10.0
Fig.D6
2a
4 une
81
82
22
e sectiun
46
POT = 40 % CUT =1.5 H max. 10 m.
32
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
b
POT = 40 % CUT =1.5 H max. 10 m.
8
9
10.0
17
3
156
191.5
23
L
67 68s=5.602,14mp.
20
19 18
42.0
Strada
157
h
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
.0
26
42
POT = 40 % CUT =1.5 H max. 10 m.
44
31
4 5 6 7
10
POT = 40 % CUT =1.5 H max. 10 m.
43
POT = 40 % CUT =1.5 H max. 10 m.
69
Strada
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
L
s=7.894,21mp.
c
10.0
POT = 40 % CUT =1.5 H max. 10 m.
5
R1
79
POT = 40 % CUT =1.5 H max. 10 m.
158
Strada
l
7
7.0
R1
R12.0
80
L
71
70
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
40.0
POT = 40 % CUT =1.5 H max. 10 m.
40.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
23 22 21
38
POT = 40 % CUT =1.5 H max. 10 m.
41
72
POT = 40 % CUT =1.5 H max. 10 m.
77
78
POT = 40 % CUT =1.5 H max. 10 m.
10.0
79.3
2
3
24
36
37
39
40
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
93.9 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3
159
Strada
ctor
2b
POT = 40 % CUT =1.5 H max. 10 m.
TEHNICO EDILITARE
75
76
2 3
4
160
1 2 3
73
74
141.1
1.376,92mp.
38.7
76.7
cole
a
POT = 40 % CUT =1.5 H max. 10 m.
2 3
22 21
141.3
0.0
drum
R1
1.5 7.0
a
ad
Str
Str
4.5
1 a Str ad
2 a
Str ad
6 5
s=520,83mp. 2
POT = 40 % CUT =1,5 H max.=10m.
1a
ad
3
limita amplasare constructii
limita amplasare constructii
limita aliniament
limita aliniament
limita amplasare constructii
limita aliniament
limita amplasare constructii
limita aliniament
limita aliniament
limita aliniament
limita amplasare constructii
limita amplasare constructii
29
30
a
7.0
A
GC
13.8
Str ad
aA 1
Str25ad
26
De. 414
10.0 7.0
0
124 Strada 1
50.983,55mp.
ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.
7.0
7.0
1
10.0 7.0
Fig.C
limita amplasare constructii
1
L
12 11 10
a A1
ad Str 23
ZONA EDIFICABILA
6
6
121
40.0
44.533,80mp. +2.210,27
A
ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)
a
6
p.
p.)
0m
3m ,3
,0
5.0
83 m
LIS
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL
13
e
Dr. 1266
78.40
87 m
ad
a
9 10 11
78.39
85 m
Str
ad
Str
14 13 12
122
POT = 40 % CUT =1.5 H max. 10 m.
din care 30% spatiu verde
LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA
42.0
30.5
14 POT = 40 % CUT =1.5 H max. 10 m.
s=4.154,60mp. POT = 40 % CUT =1.5 H max. 10 m.
G.C.,P.T.E. - ZONA AMPLASARE SERVICII
3.0
1.5 3.0
4.155,43mp. 11.619,33mp.
DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp
TOTAL
12.0
3
78.10
78.40
83 m
Sect
Sectiun
3.0
5.0 1.5
a
19
+45.00
78.39
78.10
+10.00
une 2
0
.0 10.0
De. 1266
13.0
5.
10
8 15
POT = 40 % CUT =1.5 H max. 10 m.
H max.10.0m
H max.10.0m
5.0
GC
s=375,56mp.
19
G
Secti
0
.5
16
139
L
TEREN ADIACENT D.N.22 - - - - - - -
15.0
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
s=5.484,60mp.
0
3.
118
POT = 40 % CUT =1.5 H max. 10 m.
120
7
POT = 40 % CUT =1.5 H max. 10 m.
aC
f
119
0
3.
40.0
7.0 1.5
5.
35
.0
34
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
138 6 7 8
11 10
Strad
9 10 5
POT = 40 % CUT =1.5 H max. 10 m.
CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI
3.0
3.0 1.5
ZONA P EXTINDERE INTRAVILAN
1.5 7.0
0
7
63
19
.7
=4
9
5
116
.0
137
37
13 1210.0
140
POT = 40 % CUT =1.5 H max. 10 m.
8 4 11
135
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4
POT = 40 % CUT =1.5 H max. 10 m.
141
.0
10
5.0
5.
a
(s
.6 11 s=
143
13.5
a 2a
POT = 40 % CUT =1.5 H max. 10 m.
114
0
3.
136 0
3.
POT = 40 % CUT =1.5 H max. 10 m.
0
5.
.0
POT = 75 % CUT =4 H max. 25 m.
POT = 40 % CUT =1.5 H max. 10 m.
40
117
PUD PREALABIL
LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI
14.0
2 18 4.5 10.0
50.0
13 0
0
5.
10
POT = 40 % CUT =1.5 H max. 10 m.
SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m
CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA
19
POT = 75 % CUT =4 H max. 45 m.
5.
y
.7
115
.0
134
10
142
.0
40
g
40 POT = 40 % CUT =1.5 H max. 10 m.
.0
POT = 40 % CUT =1.5 H max. 10 m.
145
7.0 1.5
Strad
144
4c
.0
36
rb
T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR
D
5.0
POT = 40 % CUT =1.5 H max. 10 m.
L
POT = 40 % CUT =1.5 H max. 10 m.
ad Str
SI
Pp
II AT
PU
SP
I-
Dr. 1266
3
k 146
s=6.460,56mp.
.0
I
s=1.409,80mp.
.0
4
1.5
IS
29
POT = 40 % CUT =1.5 H max. 10 m.
.0
10
POT = 40 % CUT =1.5 H max. 10 m.
IS x2
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
ZONA INTRAVILAN EXISTENT
Fig.C29
5
s=22.937,00mp.
0
5.
0
PUD PREALABIL SPATII VERZI, PARCURI, ALEI PIETONALE
1.409,80mp. din care 30% spatiu verde
LIMITA ZONA EDIFICABILA Fig.A40
6
x2
POT = 40 % CUT =1.5 H max. 10 m.
5.
5 6 7
133
132
POT = 40 % CUT =1.5 H max. 10 m.
a ad
147
POT = 40 % CUT =1.5 H max. 10 m.
L 131
s=6.421,09mp.
7
LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)
S+D+P+2 -> 11-15 ET
UNITATI DE INVATAMANT
4 32
SPATII VERZI ,PARCURI
I - Pprb C-
H max. 10 m.
LIMITA SUPRAFATA ZONA STUDIATA
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
1 12 11
113
8 910
Dr. 1264
POT = 40 % CUT =1.5 H max. 10 m.
Str
10.0
EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT
7.0
POT = 40 % CUT =1.5 H max. 10 m.
15.0
7
5.0
PROPUNERE DE MOBILARE URBANA
129
128 130 148
z
.0
0
3.
POT = 40 % CUT =1.5 H max. 10 m.
P -
UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL
POT = 40 % CUT =1,5
d
L
ZONIFICARE
PUD PREALABIL
.0
1.5
70.606,37mp.
LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )
30.5
5.0
CRESA , GRADINITA PUD PREALABIL
H max. 10 m.
LIMITA PERIMETRU INTRAVILAN EXISTENT
R=14.0
Fig.C29
5
5.484,60mp. din care 10% spatiu verde
LOTURI AMPLASARE CONSTRUCTII S+P+1+M
LIMITE Fig.C29
11.0
7
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET
LEGENDA:
117.5
1.5
5
E
75 75 75
R12.00 4.50
37.364,00mp. din care 10% spatiu verde
POT = 40 % CUT =1,5
I -
X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134
11
17
4
NR.1 FIL TIP 655 RIU PRO GIRATO KM 178+ SENS P.U.G.conf. propus
2
R16.00
5.5 5.5
6
2
SPATII VERZI ,PARCURI, SCUARURI
40
.0
R12
2.0
R1
4
23
10.0
1.5
112
POT = 40 % CUT =1.5 H max. 10 m.
149
w
ZONA EXTINDERE CAROSABIL D.N. 22
56.2
a
KV
ad
150
1
2 3 4
14
.0
3
24
aB
9 1011
13.0
41.7
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
a1
0
Str
11
151
x1
119.2
20 19 18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.
S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.
L-
PERIMETRU INTRAVILAN PROPUS
2
4.50
POT = 75 % CUT =4 H max. 45 m.
P
POT = 40 % CUT =1.5 H max. 10 m.
3 11
2.5
1.5
25
s=14.427,00mp.
41.7
110
4 1
27
S+D+P+2 -> 11-15 ET
13.0
10
L
POT = 40 % CUT =1.5 H max. 10 m.
127
126
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
7
7.0
Strad
111 s=6.248,94mp. .0
10
8
5.0
s=1806,59mp.
16 15
POT = 40 % CUT =1.5 H max. 10 m.
2
9
6
aB
1.5
e
109
POT = 40 % CUT =1.5 H max. 10 m.
6
3.0
.
3.0
5
e
Strad
10.0
3.0
152
.0
15 2.0 2.0
153 15.0
4
18 17
125
POT = 40 % CUT =1.5 H max. 10 m.
32 33
1
IS -ZONA
LIS -
COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.
D
15
1
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
Strad
1 2 3
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
0
42.0
7
10.0
108
106
104
1 2 3
17
3.0
107
POT = 40 % CUT =1.5 H max. 10 m.
124
154 POT = 40 % CUT =1.5 H max. 10 m.
87.25
0
GC 5.
s=395,23mp.
ZONA D.N. 22 EXISTENT
40.0
POT = 40 % CUT =1.5 H max. 10 m.
102
a6
1 18 25.0
POT = 40 % CUT =1.5 H max. 10 m.
105
4 5 6
16 15 14
56
10 9
De. 1262
98.7
POT = 40 % CUT =1.5 H max. 10 m.
5.
11
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
12.0
P
a2
15.0
721
9 8
Strad
87.21
87.20
INDICATIV PARCELA DIN ZONA
24.0
103
CUT =1.5 H max. 10 m.
.0
9 10
31
s=2.348,81.
PUD PREALABIL
14 12 13
8
a
13
12 8
2 10
IS
10.0
POT = 40 % CUT =1.5 H max. 10 m.
une 3
7
POT = 40 % CUT =1.5 H max. 10 m.
54
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 %
101
4b
87.20
- SPATII VERZI, SCUARURI PUD PREALABIL
PROPUNERE TRASEU STRAZI CONF. P.U.G.
F
1
POT = 40 % CUT =1.5 H max. 10 m.
155
52
POT = 40 % CUT =1.5 H max. 10 m.
24.0
.A
tor a C16
POT = 40 % CUT =1.5 H max. 10 m.
10.0
19 20
L56
POT = 40 % CUT =1.5 H max. 10 m.
6
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
96.0
58
60
51
53
55
s=3.858,02mp.
ne
un
0
5
3
SPATII VERZI ,PARCURI, SCUARURI
141312 11
13
a5
4
7 8
15
10 9
8
15
42.3
16
10.0
POT = 40 % CUT =1.5 H max. 10 m.
44.3
19 18
5. 6
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
17
18
Str 307 a7d aA
11
13
3
iu
cti
17 16
14
19
20
POT = 40 % CUT =1.5 H max. 10 m.
d
11
POT = 40 % CUT =1.5 H max. 10 m.
ct
5
Se
POT = 40 % CUT =1.5 H max. 10 m.
4
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
100
99
L.E
colec
5.0
s=375,56mp.
L
POT = 40 % CUT =1.5 H max. 10 m.
12 3
2 3
Secti
97
.0
PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE
6
5
13 12 11
se
.0
7
POT = 40 % CUT =1.5 H max. 10 m.
9
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
42
a
L
10
s=6.573,10mp.
POT = 40 % CUT =1.5 H max. 10 m.
13
.0
6
8
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
12 10
21
11 12
16 15
POT = 40 % CUT =1.5 H max. 10 m.
3.0
161
10
0
5.
PIETONAL
Strad
4
Strada
22.9
6 11
POT = 40 % CUT =1.5 H max. 10 m.
j
POT = 40 % CUT =1.5 H max. 10 m.
5.0
GC
98
22.0
8
40.5
20
9 8
21.8
91 101
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
57
POT = 40 % CUT =1.5 H max. 10 m.
2 1211 3 10 10.0
121 13
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
B Strada
s=2.352,60mp.
ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL
10 11
7
L
s=8.447,07mp.
Strad 1
59
7 21
ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.
14
2 3
40.3
15.0
a
ad
POT = 40 % CUT =1,5 H max.=10m.
12
C
96
POT = 40 % CUT =1.5 H max. 10 m.
94
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
92
POT = 40 % CUT =1.5 H max. 10 m.
25
10.0
49
5 6
1211 10
95
93
90.8
4
9
8 7
POT = 40 % CUT =1.5 H max. 10 m.
.0
40.4
7
POT = 40 % CUT =1.5 H max. 10 m.
91
Str
12
6
16 15
4a
POT = 40 % CUT =1.5 H max. 10 m.
5
17
40.4
L
18
61
62
5
19
89
s=9.613,59mp.
4
ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4
20
POT = 40 % CUT =1.5 H max. 10 m.
41.5
50
Strada
i
POT = 40 % CUT =1.5 H max. 10 m.
47
POT = 40 % CUT =1.5 H max. 10 m.
10.0
10.0
87
90
40.0
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
63
POT = 40 % CUT =1.5 H max. 10 m.
41
23
Strad
40.0
88
POT = 40 % CUT =1.5 H max. 10 m.
48
POT = 40 % CUT =1.5 H max. 10 m.
3
85
86
H I
POT = 40 % CUT =1.5 H max. 10 m.
64
22
De. 427
POT = 40 % CUT =1.5 H max. 10 m.
65
POT = 40 % CUT =1.5 H max. 10 m.
28
27
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
5
une
Secti
66
POT = 40 % CUT =1.5 H max. 10 m.
4
POT = 40 % CUT =1.5 H max. 10 m.
7.0
81.93
L
67 68s=5.602,14mp.
POT = 40 % CUT =1.5 H max. 10 m.
Strada
POT = 40 % CUT =1.5 H max. 10 m.
CIRCULATII CAROSABIL
5.0
81 83
84
POT = 40 % CUT =1.5 H max. 10 m.
191.5
e
sectiun
81.90
POT = 40 % CUT =1.5 H max. 10 m.
82
22
23 81.84
POT = 40 % CUT =1.5 H max. 10 m.
5
156
POT = 40 % CUT =1.5 H max. 10 m.
45
POT = 40 % CUT =1.5 H max. 10 m.
Strada
157
10.0
17
42.0
46
POT = 40 % CUT =1.5 H max. 10 m.
24
9
1
11.
158
POT = 40 % CUT =1.5 H max. 10 m.
44
69
h
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
b
POT = 40 % CUT =1.5 H max. 10 m.
8
9 10
. 40
POT = 40 % CUT =1.5 H max. 10 m.
.0
IS -
X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066
A B C D E F G H I
.00
79
20
19 18
De
42
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
0
POT = 40 % CUT =1.5 H max. 10 m.
141.3
l
POT = 40 % CUT =1.5 H max. 10 m.
80
POT = 40 % CUT =1.5 H max. 10 m.
s=2.980,45mp.
POT = 40 % CUT =1.5 H max. 10 m.
70
40.0
10.0
159
.0
26
42
POT = 40 % CUT =1.5 H max. 10 m.
2
POT = 40 % CUT =1.5 H max. 10 m.
4
.0
30
10
POT = 40 % CUT =1.5 H max. 10 m.
43
POT = 40 % CUT =1.5 H max. 10 m.
29
POT = 40 % CUT =1.5 H max. 10 m.
16
10
POT = 40 % CUT =1.5 H max. 10 m.
29
7
38
POT = 40 % CUT =1.5 H max. 10 m.
L
s=7.894,21mp.
c
10.0
POT = 40 % CUT =1.5 H max. 10 m.
18 17
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
28
14 13 12 .0 15
10
19
35
33
32
P.T.E.
s=85,30mp.
10.0
6.
160
L
71
31
4 5 6
6
Fig.B1
R1
38.7
POT = 40 % CUT =1.5 H max. 10 m.
39 41
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
40.0
10.0
40
POT = 40 % CUT =1.5 H max. 10 m.
72
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
73
74
POT = 40 % CUT =1.5 H max. 10 m.
77
78
POT = 40 % CUT =1.5 H max. 10 m.
34
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
23 22 21
36
37
Strada de legatura - propusa prin P.U.Z.-
C
5
27
26
12.0
Sectiune 3
183.000,00mp. din care suprafete
TOTAL TEREN CE A GENERAT P.U.Z.
4
3
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
79.3
2
3
24
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
93.9 POT = 40 % CUT =1.5 H max. 10 m.
141.1
1.376,92mp.
TEHNICO EDILITARE
2 3
22 21
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3
1 2 3
12 11 10
a A1
ad Str 23 75
76
2 3
4
BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp
R12
6 5
POT = 40 % CUT =1.5 H max. 10 m.
10.0 7.0
7.0
A
GC
s=520,83mp. 2
ZONA EDIFICABILA
drum
a Strad
aA 1
Str25ad
26
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII
P
L
De. 414
Strada
De. 1273
12 11
124 Strada 1
81.99
adag
10
A
LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA
17
9
G.C.,P.T.E. - ZONA AMPLASARE SERVICII
CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA
1
13.0
14 13
7 89
din care 30% spatiu verde
44.533,80mp. +2.210,27
50.983,55mp.
7
Fig.D6
1.5 7.0
123
10.0
5.0
5.0
TOTAL
Strada
b Str Ba
7.0
R1
4 41.0
10.0
5.0
9 10 11
une
secti
POT = 40 % CUT =1.5 H max. 10 m.
TEREN ADIACENT D.N.22 - - - - - - -
DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp
H max.10.0m
B
e
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
4.155,43mp.
76.7
ctor
2a
POT = 40 % CUT =1.5 H max. 10 m.
13
POT = 40 % CUT =1.5 H max. 10 m.
121
40.0
une
3.0
1.5 3.0
1.5
7.0
L
IS X1
5.0
1.5
7.0
IS x1
15.0
5.4%
Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1
11.619,33mp.
POT = 40 % CUT =1.5 H max. 10 m.
a - -- k 8
15
PUD PREALABIL
CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI
12.0
7.0
5.4%
H max.10.0m
ZONA P EXTINDERE INTRAVILAN
7
16
Secti
SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m
LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI
6
6
12.0
13.8
cole
a
ad
122
1a
Str
L
s=4.154,60mp. POT = 40 % CUT =1.5 H max. 10 m.
LIS
s=5.484,60mp.
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL
PUD PREALABIL SPATII VERZI, PARCURI, ALEI PIETONALE
LIMITA ZONA EDIFICABILA
14.0
4.5
15.0
10.0 7.0
0.0
drum
R1
a
ad
14 13 12
Str
139
De. 1266
0
une 2
0
POT = 40 % CUT =1.5 H max. 10 m.
13.0
Secti
5.
10.0 40.0
7.0 1.5
0
6
8 15
10.0
1.5
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
14
SPATII VERZI ,PARCURI
I - Pprb C-
3.0
3.0 1.5
ZONIFICARE
7.0
7.0
46.5
30.5
POT = 75 % CUT =4 H max. 25 m. 0
3.
118
POT = 40 % CUT =1.5 H max. 10 m.
120
7 16
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
aC
119
137
138 6 7 8
11 10
Strad
5.
a
p.
p.)
3m
0m
,3
,0
63
19
.7
9
1.5 7.0
ad
7
140
9 10 5
13.5
0
5.
Str POT = 40 % CUT =1.5 H max. 10 m.
141
5
f
POT = 40 % CUT =1.5 H max. 10 m.
0
.0
POT = 40 % CUT =1.5 H max. 10 m.
4
.0
34
3.
POT = 40 % CUT =1.5 H max. 10 m.
37
13 1210.0
POT = 40 % CUT =1.5 H max. 10 m.
0
3.
136 0
3.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8 4 11
.0
a ad
143
.0
10
5.0
10
40
.5
4c
=4
(s
.6 11 s=
T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR
D
II
Str
SI
rb Pp
AT
PU
SP
I-
.0
POT = 40 % CUT =1.5 H max. 10 m.
40
117
POT = 40 % CUT =1.5 H max. 10 m.
135
.0
134
10
142
145
g
40 POT = 40 % CUT =1.5 H max. 10 m.
.0
POT = 40 % CUT =1.5 H max. 10 m.
5.
10
116
.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
10
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Str 144
a ad
EA TA AR EN M ORM LE SF A. G E. RE AN L. TR RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT
POT = 40 % CUT =1.5 H max. 10 m.
L
POT = 40 % CUT =1.5 H max. 10 m.
.0
114
POT = 40 % CUT =1.5 H max. 10 m.
115
5 6 7
133
50.0
POT = 75 % CUT =4 H max. 45 m.
0
5.
.0
13 0
5.
y
.7
29 0
CRESA , GRADINITA
POT = 40 % CUT =1,5
1.409,80mp. PUD PREALABIL din care 30% H max. 10 m. spatiu verde
LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)
14.0
2 18 4.5 10.0
42.0
s=22.937,00mp.
0
5.
I
s=1.409,80mp.
35
POT = 40 % CUT =1.5 H max. 10 m.
L 131
132
7.0 1.5
a 2a
7
5.0
.0 36
8 910
Dr. 1264
19
IS
CRESA , GRADINITA PUD PREALABIL
0
5.
4 32
4
1.5
x2
POT = 40 % CUT =1.5 H max. 10 m.
UNITATI DE INVATAMANT
P -
Sectiune 3
5.0 1.5
a
UNITATI DE INVATAMANT
ZONA INTRAVILAN EXISTENT
Fig.C29
1 12 11
113
112
129
s=6.421,09mp.
s=6.460,56mp.
z
.0
0
3.
POT = 40 % CUT =1.5 H max. 10 m.
5.0
25
LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )
Fig.C29
5
S+D+P+2 -> 11-15 ET
17
.0
40
3.0
2
LIMITA PERIMETRU INTRAVILAN EXISTENT
Fig.A40
6
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
PUD PREALABIL
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
k 146
147
Strad
a
KV
ad
POT = 40 % CUT =1.5 H max. 10 m.
15.0
0
Str
11
149
P
s=1806,59mp.
5
15.0
22 21 20
LIMITA SUPRAFATA ZONA STUDIATA
R=14.0
7
H max. 10 m.
POT = 40 % CUT =1,5
d
L
LIMITE
117.5
5.0
5
Sectiune 6 Sectiune strada 1
70.606,37mp.
LEGENDA: Fig.C29
11.0
30.5
10.0 1.5
4
E
75 75 75
R12.00 4.50
11
SPATII VERZI ,PARCURI, SCUARURI
POT = 40 % CUT =1.5 H max. 10 m.
128 130 148
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
w
56.2
.
150
13.0
1.5
110
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
aB
1
2 3 4
NR.1 FIL TIP 655 RIU PRO GIRATO KM 178+ SENS P.U.G.conf. propus
2
R16.00
5.5 5.5
6
2
5.0
41.7
10
L
POT = 40 % CUT =1.5 H max. 10 m.
127
126
POT = 40 % CUT =1.5 H max. 10 m.
151
a1
.A
s=395,23mp.
a2
L.E
2.0 2.0
POT = 40 % CUT =1.5 H max. 10 m.
23
119.2
41.7
16 15
25
24
Strad
111 s=6.248,94mp. .0
7.0
IS
9 1011
14
.0
4
POT = 75 % CUT =4 H max. 45 m.
20 19 18
1
R12
2.0
R1 3
s=14.427,00mp.
13.0
1.5
3.0
15
.0
2
4.50
S+D+P+2 -> 11-15 ET
aB
1 2 3
3 11
2.5
1.5
x1
6
4 1
27
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
Strad
10.0
e
109
POT = 40 % CUT =1.5 H max. 10 m.
6
10
POT = 40 % CUT =1.5 H max. 10 m.
3.0
152
.0
15
3.0
5
3.0
124
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
153 15.0
4
18 17
125
7
37.364,00mp. din care 10% spatiu verde 5.484,60mp. din care 10% spatiu verde
LOTURI AMPLASARE CONSTRUCTII S+P+1+M
I -
X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134
LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET
S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.
L-
COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
D
1 2
8
42.0
7
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
17
108
106
104
1 2 3
e
Strad
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
102
a6
154
POT = 40 % CUT =1.5 H max. 10 m.
87.21
87.25
0
GC 5.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4 5 6
16 15 14
155
721
9 8
Strad
10.0
19 20
87.20 87.20
une 3
7
4b
99
12 3
1 18
107
105
10.0
POT = 40 % CUT =1.5 H max. 10 m.
100
POT = 40 % CUT =1.5 H max. 10 m.
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
101
10.0
Strada
L
40.5
97
s=2.352,60mp. .0
10
Secti
7 161
POT = 40 % CUT =1.5 H max. 10 m.
j
POT = 40 % CUT =1.5 H max. 10 m.
22.9
0
5
11
32 33 9
12.0
PUD PREALABIL
56
25.0
98.7
40.0
98
22.0
8
5.
103
CUT =1.5 H max. 10 m.
6
9 10
31
SPATII VERZI ,PARCURI, SCUARURI
10 9
De. 1262
POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 %
un
14 12 13
8
0
0
10.0
POT = 40 % CUT =1.5 H max. 10 m.
24.0
1
21.8
6 11
52
54
B
2 1211 3 10 10.0
121 13
91 101
20
6
3.0
15.0
a
ad
21
60
Strad
7
Strada
5
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
58
POT = 40 % CUT =1.5 H max. 10 m.
4
L56
15.0
94
91
9 8
51
53
POT = 40 % CUT =1.5 H max. 10 m.
96.0
s=3.858,02mp.
.0
7 8
15
P
3
4 13
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
s=2.348,81.
141312 11
13
55
40.4
96
11 12
a5
d
16
15
42.3
16
10.0
10 9
8
16 15
POT = 40 % CUT =1.5 H max. 10 m.
11
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
17
POT = 40 % CUT =1.5 H max. 10 m.
44.3
a
5.
17
14
POT = 40 % CUT =1.5 H max. 10 m.
18
POT = 40 % CUT =1.5 H max. 10 m.
4a
5
Str
12
14
57
59
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
21
POT = 40 % CUT =1.5 H max. 10 m.
ne
13
12 8
2 10
5.
iu
cti
POT = 40 % CUT =1.5 H max. 10 m.
4
19
20
POT = 40 % CUT =1.5 H max. 10 m.
Strad POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
95
93
90.8
92
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
1
2 3
40.3
L
41.5
5 6
1211 10
POT = 40 % CUT =1.5 H max. 10 m.
2 3
ct
5
Se
POT = 40 % CUT =1.5 H max. 10 m.
13
.0
13 12 11
10.0
49
50 4
9
8 7
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
se
.0
7
POT = 40 % CUT =1.5 H max. 10 m.
9
19 18
3
POT = 40 % CUT =1.5 H max. 10 m.
42
a
L
10
s=6.573,10mp.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
6
8
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
12 10
23
L
s=8.447,07mp.
POT = 40 % CUT =1.5 H max. 10 m.
3
i
7
POT = 40 % CUT =1.5 H max. 10 m.
s=9.613,59mp.
POT = 40 % CUT =1.5 H max. 10 m.
6
16 15
40.4
90
4
17
Strada
POT = 40 % CUT =1.5 H max. 10 m.
18
61
62
5
19
89
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4
20
10.0
87
63
40.0
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
47
POT = 40 % CUT =1.5 H max. 10 m.
4
40.0
88
POT = 40 % CUT =1.5 H max. 10 m.
22
45
48
Strada
191.5
85
86
H I
64
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
7.0
81.93
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
De. 427
POT = 40 % CUT =1.5 H max. 10 m.
65
POT = 40 % CUT =1.5 H max. 10 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
5
une
Secti
66
POT = 40 % CUT =1.5 H max. 10 m.
10.0
17
POT = 40 % CUT =1.5 H max. 10 m.
67 68s=5.602,14mp.
5
POT = 40 % CUT =1.5 H max. 10 m.
25
b
24
9
18
42.0
46
POT = 40 % CUT =1.5 H max. 10 m.
Strada
81 83
84
POT = 40 % CUT =1.5 H max. 10 m.
L
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
82
22
e
sectiun
81.90
POT = 40 % CUT =1.5 H max. 10 m.
7
156
23 81.99
81.84
Strada
157
Strada
158
POT = 40 % CUT =1.5 H max. 10 m.
44
69
28
POT = 40 % CUT =1.5 H max. 10 m.
.0
POT = 40 % CUT =1.5 H max. 10 m.
Str 307 a7d aA
11
1
POT = 40 % CUT =1.5 H max. 10 m.
30
POT = 40 % CUT =1.5 H max. 10 m.
27 41
.0
POT = 40 % CUT =1.5 H max. 10 m.
29
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8
9
POT = 40 % CUT =1.5 H max. 10 m.
.0
0
79
76.7
l
43
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
h
5 6 7
.0
20
19
. 40
42
4
11.
POT = 40 % CUT =1.5 H max. 10 m.
141.3
L
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
70
POT = 40 % CUT =1.5 H max. 10 m.
80
POT = 40 % CUT =1.5 H max. 10 m.
s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.
10.0
40.0
10.0
159
22 21 10
26
42
2
POT = 40 % CUT =1.5 H max. 10 m.
6.
78
POT = 40 % CUT =1.5 H max. 10 m.
160
36
POT = 40 % CUT =1.5 H max. 10 m.
s=7.894,21mp.
c
10.0
141.1
38.7
71
38
POT = 40 % CUT =1.5 H max. 10 m.
L
41
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
40.0
29
De
POT = 40 % CUT =1.5 H max. 10 m.
16
10
R1
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
39
40
POT = 40 % CUT =1.5 H max. 10 m.
72
POT = 40 % CUT =1.5 H max. 10 m.
37
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
73
74
POT = 40 % CUT =1.5 H max. 10 m.
77
POT = 40 % CUT =1.5 H max. 10 m.
18 17
POT = 40 % CUT =1.5 H max. 10 m.
IS -ZONA
LIS -
PERIMETRU INTRAVILAN PROPUS
.00
13.8
2
2 3
22 21
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3
1 2 3
12 11 10
a A1
ad Str 23 75
76
2 3
4
14 13 12 .0 15
10
19
35
28
s=85,30mp.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
33
32
POT = 40 % CUT =1.5 H max. 10 m.
6
Fig.B1
P.T.E.
IS -
X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066
A B C D E F G H I
R12
7.0
6 5
31
4
34
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
23
POT = 40 % CUT =1.5 H max. 10 m.
79.3
2
3
24
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
93.9
C
5
27
26
CONSTANTA
Str25ad
26
De. 414
10.0 7.0
A
GC
10.0 7.0
aA 1
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
Strada de legatura - propusa prin P.U.Z.-
4
3
25
s=520,83mp.
COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp
B
L
H max.10.0m
183.000,00mp. din care suprafete
TOTAL TEREN CE A GENERAT P.U.Z.
Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1
e
22 21 20
124 Strada 1
BILANT SUPRAFETE
m
3.0
1.5 3.0
2
A
IS X1
H max.10.0m
150
12.0
H max.10.0m
L
5.0
1.5
IS x2
5.4%
X IAL
15.0
12.0
7
5.4%
COMPLE COMERC
3.0
3.0 1.5
5.0 1.5
a
7.0
1.5
CONSTANTA
d
L
Sectiune 3
12.0
29
L H max.10.0m
15.0
1.5
30
5.0
7.0
Fig.C
3.0
5.4%
7.0
IS x1
P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008
P+2
Sectiune 2
TEREN CARE A GENERAT P.U.Z.
P+2
Sectiune 2
m
15.0
P+2
DRUM PROPUS CONF. P.U.G. DRUM PROPUS IN . P.U.Z.
P+2
limita aliniament
STR . BARAJULUI DRUM COLECTOR ( AFERENT STR. BARAJULUI)
P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008
Sectiune 6 Sectiune strada 1
limita amplasare constructii
permitt DN 22
150
H max.10.0m
3.0 1
LEGENDA:
STR . BARAJULUI
TEREN CARE A GENERAT P.U.Z.
IS x2
3.0
h
Cladirile amp au aceeasi c
X IAL
7
H max.45.00
L
COMPLE COMERC
7.0
1.5
IS x2
5.4%
DN 22
DRUM PROPUS IN . P.U.Z.
12.0
H max.10.0m
5.0
H max.45.00
P+2
15.0
5.0
1.5
c
DRUM PROPUS CONF. P.U.G.
1.5
10.0
5.0 1.5
5.4%
L
1.5 3.0
7.0
3.0 1.5
S
3.0
5.0 1.5
f
limita aliniament
LIS Y H max.45.00
DRUM COLECTOR ( AFERENT STR. BARAJULUI)
7.0
13.0
5.0
Sectiune strazi 2-7
LEGENDA:
7.0
L
Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)
H max.45.00
IS x1
Sectiune 1
87.2
limita aliniament
limita amplasare constructii
5.4%
UTILITIES
Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)
Sectiune 2
1.50
H max.10.0m
3.0
h
L c
circulation P+2
7.00
Sectiune 5
IS x2
H max.10.0m
H max.25.00
1.50
limita amplasare constructii
limita aliniament
5.0
5.4%
3.00
±0.00 =+0.60
-2.80 21.0
-2.80
LIS y
5.0
1.5
H max.10.0m
H max.45.00
L
1.5 3.0
7.0
1.5
10.0
demisol
demisol 21.0
limita amplasare constructii
3.0
10.0
3.0 1.5
10.0
5.0 1.5
5.0 1.5
f
+3.00
parter
±0.00 =+0.60
1.50
5.4%
limita amplasare constructii
3.0
h
L
5.0
7.00
limita amplasare constructii
5.4%
L
13.0
1.50
5.0
limita aliniament
H max.45.00
3.0
limita amplasare constructii
H max.45.00
LIS Y
Sectiune strazi 2-7
P+2
13.0
limita aliniament
IS x2
limita aliniament
limita amplasare constructii
5.0
limita aliniament
limita amplasare constructii
Sectiune 1
3.00
5.4%
Sectiune 4 Sectiune strada 2
5.4%
5.0
limita amplasare constructii
1.5
1.50
H max.10.0m
limita aliniament
10.0
5.0 1.5
7.00
LIS y
5.0
1.5
1.50
Sectiune 5 limita amplasare constructii
LIS Y
10.0
H max.10.0m
limita aliniament
limita aliniament
limita aliniament
5.0
5.0
5.0 1.5
f
limita amplasare constructii
87.2
limita amplasare constructii
L
13.0
etaj
+3.00
H max.10.0m
-2.80 21.0
-2.80
+6.00
mansarda
5.4%
3.00
±0.00 =+0.60
H max.25.00 demisol
demisol 21.0
5.4%
5.0
5.4%
Sectiune 1
+3.00
parter
±0.00 =+0.60
1.50
limita amplasare constructii
13.0
3.0
7.00
87.2
limita aliniament
Sectiune strada 2
1.50
limita amplasare constructii
limita aliniament
limita amplasare constructii
P+2
SECTIUNE STRAZI SI LOTURI
+6.00
limita aliniament
etaj
+3.00
3.00
5.4%
Sectiune 4
+10.00
+6.00
mansarda
+6.00
H max.10.0m
H max.25.00
+10.00
H max.25.00
+10.00
SECTIUNE STRAZI SI LOTURI
H max.45.00
H max.45.00
H max.45.00
+10.00
CONSTRUIRE COMPLEX
CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL
CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL H max.25.00
PLAN URBANISTIC ZONAL LOT
PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si
PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si
+20.00
102 m
106 m
83 m
DN 22
+10.00
SECTIUNE TRANSVERSALA
85 m
87 m
90 m
93 m +10.00
95 m +10.00
+10.00
83 m
Proiectant general:
Beneficiar:
s.c. PROMARH s.r.l. Nume:
Semnatura:
str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea
Scara:
1 / 1.000
Proiectat
arh. Marcel PAVEL
Data:
Desenat
arh. Paul Cristian MURAVELI
Noiembrie 2017
Thedevelopmentbenefitsfromhavingenergyutilitieson-site already,whiletherestoftheutilitiesarebeingbroughton-site throughthemainstreetBabadagdirectly.(water,sewage,gas)
SECTIUNE
Proiect nr:
MATROZ CONSTANTIN si FLOREA ION
TULCEA
J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180
Specificatie:
Sef Proiect arh. Marcel PAVEL
panta teren 5.4%
Denumire proiect:
LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.
Denumire plansa:
REGLEMENTARI URBANISTICE
87/2017 Faza:
P.U.Z. Nr. plansa:
U4
Individual Ho Collective Hou Commercial M Education Parks & Leisure Sports & Recre
PROJECT OVERVIEW
c
H max.45.00
3.0
h
L
3.0
10.0
13.0
3.0
5.0
1.5
10.0
7.00
±0.00 =+0.60
+6.00
mansarda
etaj
+3.00
parter
±0.00 =+0.60
demisol
demisol 21.0
1.50
-2.80
H max.45.00
H max.10.0m
Sectiune strazi 2-7
3.0
3.0
10.0
5.4%
environmental benefits h
c
L
1.5 3.0
7.0
3.0 1.5
Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)
H max.45.00
LEGENDA:
LEGENDA:
STR . BARAJULUI
DN 22
DN 22
STR . BARAJULUI
DRUM PROPUS CONF. P.U.G.
STR . BARAJULUI
DRUM PROPUS IN . P.U.Z.
DRUM COLECTOR ( AFERENT STR. BARAJULUI)
TEREN CARE A GENERAT P.U.Z.
DRUM COLECTOR ( AFERENT STR. BARAJULUI) DRUM PROPUS CONF. P.U.G.
DRUM PROPUS CONF. P.U.G.
DRUM PROPUS IN . P.U.Z.
l sibi po u se Tra
2b a ad
1
Tulcea
22
11.0
5.0 7.0
4.5
4.5
1 a
6.0
R1
R12.0
2 a
Str ad
Str ad
limita aliniament
limita aliniament
limita amplasare constructii
limita aliniament
limita amplasare constructii
limita aliniament
limita aliniament
limita aliniament
limita amplasare constructii
3
1 Tulcea 22
11.0
6.0
R1
R12.0
a
4.5 4.5
limita amplasare constructii
Str
2b a
Str ad
l sibi po u se Tra
5.0 7.0
1 a Str ad
2 a
Str ad
limita amplasare constructii
limita aliniament
limita amplasare constructii
limita aliniament
limita amplasare constructii
limita aliniament
limita aliniament
limita amplasare constructii
limita amplasare constructii
limita aliniament
limita aliniament
limita amplasare constructii
limita amplasare constructii 1 Tulcea
6.0
3
4.5 4.5
1
22
11.0
5.0 7.0
R1
a
Tra
se
u
30
R12.0
Str ad
l sibi po
m
a
limita amplasare constructii
limita aliniament
limita amplasare constructii
29
Fig.C 150
Str ad
30
2
m
a
150
X IAL COMPLE COMERC
Str ad
29
ad
tor
Str
colec
2b
drum
a
De. 1273
ad
Fig.D6
1.5 7.0
Str
7.0
41.0
5.0
14 13
7 89
- SPATII VERZI, SCUARURI PUD PREALABIL
+ 105.00
PIETONAL
17
PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE
6
9
INDICATIV PARCELA DIN ZONA
CIRCULATII CAROSABIL
1
5.0
13.0
10.0
12 11
10.0
7.0
10
une
5.0
U4
83 m
R1
Nr. plansa:
ctor
P.U.Z.
cole
REGLEMENTARI URBANISTICE
Faza:
0.0
Noiembrie 2017
87/2017
drum
arh. Paul Cristian MURAVELI
LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.
123
8
15
5.0
5.0
Desenat
Denumire proiect:
Denumire plansa:
2a
1 / 1.000
Data:
a
str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea
Scara:
ad
10.0
Semnatura:
Proiect nr:
MATROZ CONSTANTIN si FLOREA ION
TULCEA
J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180
arh. Marcel PAVEL
10.0 POT = 40 % CUT =1.5 H max. 10 m.
P
a - -- k
7
16
Secti
Strad
a C16
PROPUNERE TRASEU STRAZI CONF. P.U.G.
F
ZONA D.N. 22 EXISTENT
10 11
ZONA EXTINDERE CAROSABIL D.N. 22
12
aC
East
PROPUNERE DE MOBILARE URBANA
Strad
Dr. 1266
3
10.0
Beneficiar:
s.c. PROMARH s.r.l. Nume:
Proiectat
121
40.0
ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL
5.0
10.0
10.0
Proiectant general:
Specificatie:
Sef Proiect arh. Marcel PAVEL
85 m
e4
13
un secti
14.0
4.5
6
6
14 POT = 40 % CUT =1.5 H max. 10 m.
Str
9 10 5
10.0
1.5
ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.
7.0
7.0 46.5
1a
122
POT = 40 % CUT =1.5 H max. 10 m.
9 10 11
+45.00
78.40
83 m
50.0
a
POT = 40 % CUT =1.5 H max. 10 m.
78.39
78.40
+10.00
ad
L
LIS
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL
Str
14 13 12
Str
5.0
5.0
s=375,56mp.
78.06
Recreational green spaces Tree alignments +35.00
90 m
93 m
+10.00
panta teren 5.4%
95 m
+10.00
78.10
+45.00
78.39
G
87 m
une 2
0
De. 1266
13.0
5.
6
139
ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M) POT = 40 % CUT =1,5 H max.=10m.
19
78.10
DN 22
Secti
0
a
POT = 40 % CUT =1.5 H max. 10 m.
7.0 1.5
5.
ad
6 7 8
C ada
8 15 10.0
40.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
s=4.154,60mp.
120
7
138
ZONA EDIFICABILA
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
s=5.484,60mp.
0
3.
118
1.376,92mp.
TEHNICO EDILITARE
LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA
1.5 7.0
.5
9
13.5
0
Str 11 10
+ 80.00 8
.0
p.
p.)
0m
3m ,3
,0
63
19
.7
POT = 40 % CUT =1.5 H max. 10 m.
4 11
10
7 10
5
f
16
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4 13 1210.0
140
.0
34
G.C.,P.T.E. - ZONA AMPLASARE SERVICII
50.983,55mp.
ZONA P EXTINDERE INTRAVILAN
30.5
POT = 75 % CUT =4 H max. 25 m.
POT = 40 % CUT =1.5 H max. 10 m.
119
137
37
136 0
3.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
0
3. 0
3.
POT = 40 % CUT =1.5 H max. 10 m.
.0
134
POT = 40 % CUT =1.5 H max. 10 m.
141
35
a
=4 (s
.6 11 s=
T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR
D
ad Str
40
143
.0
5.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
10
142
.0
POT = 40 % CUT =1.5 H max. 10 m.
5.
a 2a
144
POT = 40 % CUT =1.5 H max. 10 m.
145
40
117
POT = 40 % CUT =1.5 H max. 10 m.
135
.0
5.
116
.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
10
POT = 40 % CUT =1.5 H max. 10 m.
g
14.0
2 18 4.5 10.0
42.0
13 0
5.
y
.7
29 0
5.
10
POT = 40 % CUT =1.5 H max. 10 m.
115
5 6 7
133 40
4c
L
POT = 40 % CUT =1.5 H max. 10 m.
7.0 1.5
Strad
k 146
5.0
GC
POT = 40 % CUT =1.5 H max. 10 m.
L 131
132
POT = 40 % CUT =1.5 H max. 10 m.
ad Str
SI
rb Pp
II AT
PU
SP
5.0
8 910
Dr. 1264
s=6.421,09mp.
s=6.460,56mp.
I-
3
5.0
129
POT = 40 % CUT =1.5 H max. 10 m.
TOTAL
LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)
POT = 75 % CUT =4 H max. 45 m.
.0
s=1.409,80mp.
.0
din care 30% spatiu verde
44.533,80mp. +2.210,27
DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp
LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )
s=22.937,00mp.
0
I
TEREN ADIACENT D.N.22 - - - - - - -
4.155,43mp. 11.619,33mp.
CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA
19 1.5
IS
5.
0
PUD PREALABIL
LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI
Fig.C29
4
x2
0
4 32
114
SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m
ZONIFICARE
POT = 40 % CUT =1.5 H max. 10 m.
1 12 11
113
SPATII VERZI, PARCURI, ALEI PIETONALE
CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI
70.606,37mp. 1.409,80mp. din care 30% spatiu verde
LIMITA ZONA EDIFICABILA Fig.A40
5
30.5
UNITATI DE INVATAMANT
5.
POT = 40 % CUT =1.5 H max. 10 m.
112
a
EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT
10.0
5.0
5.0
West
Dr. 1266
147
15.0
7
7.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
0
3.
.0
40
PUD PREALABIL
I - Pprb C-
H max. 10 m.
SPATII VERZI ,PARCURI
LIMITA PERIMETRU INTRAVILAN EXISTENT
R=14.0
6
S+D+P+2 -> 11-15 ET
17
z
.0
POT = 40 % CUT =1.5 H max. 10 m.
H max. 10 m.
UNITATI DE INVATAMANT
ZONA INTRAVILAN EXISTENT
Fig.C29
CRESA , GRADINITA PUD PREALABIL
P -
CRESA , GRADINITA PUD PREALABIL
POT = 40 % CUT =1,5
LIMITA SUPRAFATA ZONA STUDIATA
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
5.0
PUD PREALABIL
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
P
s=1806,59mp.
5
LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5
LIMITE
11.0
7
37.364,00mp. din care 10% spatiu verde 5.484,60mp. din care 10% spatiu verde
LEGENDA: Fig.C29
117.5
10.0
5
4
4.50
LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET
S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.
LI -
X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134
11
SPATII VERZI ,PARCURI, SCUARURI
110
128 130 148
1
2 3 4
13.0
1.5
10
L
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
36
56.2
a
KV
ad
150
aB
1.5
111 s=6.248,94mp. .0
10
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
a1
0
Str
11
151
e
109
POT = 40 % CUT =1.5 H max. 10 m.
6
POT = 40 % CUT =1.5 H max. 10 m.
127
126
152
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
w
ZONA D.N. 22 EXISTENT ZONA EXTINDERE CAROSABIL D.N. 22
a2
.
2.0 2.0
3.0
149
PROPUNERE DE MOBILARE URBANA
Strad
.A POT = 40 % CUT =1.5 H max. 10 m.
153 15.0
5
POT = 40 % CUT =1.5 H max. 10 m.
.0
15
87.21
87.25
0
GC 5.
s=395,23mp.
4
18 17
125
124
20 19 18
75 75 75
R12.00
6
2
119.2
41.7
16 15
4
S+D+P+2 -> 11-15 ET
41.7
E
5.5 5.5
3
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
Strad
1.5
3.0
25
NR.1 FIL TIP 655 RIU PRO GIRATO KM 178+ SENS P.U.G.conf. propus
2
R16.00
2
23
Strad
1 2 3
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3.0
1 2 3
3.0
7.0
R12
2.0
R1
2.5
4.50
24
5.0
9 1011
14
.0
1
27
IS
13.0
1
.0
POT = 75 % CUT =4 H max. 45 m.
aB
7
3 11
s=14.427,00mp.
42.0
10.0
4
1.5
x1
6
Strad
L.E 87.20 87.20
INDICATIV PARCELA DIN ZONA
a6
17
108
106
104
102
4 5 6
16 15 14
154
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
9 8
Strad
POT = 40 % CUT =1.5 H max. 10 m.
155
1 18
107
105
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
56
10 9
25.0
98.7
40.0
101
4b
7
10.0
19 20 721
103
7
s=2.348,81.
PUD PREALABIL
De. 1262
une 3
15.0
POT = 40 % CUT =1.5 H max. 10 m.
100
99
8
POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 %
CUT =1.5 H max. 10 m.
Strada
L
POT = 40 % CUT =1.5 H max. 10 m.
12 3
54
e
15
1
2
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
un
14 12 13
POT = 40 % CUT =1.5 H max. 10 m.
24.0
1
3.0
97
s=2.352,60mp. .0
10
0
52
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
40.5
161
6 11
L56
s=3.858,02mp.
B
POT = 40 % CUT =1.5 H max. 10 m.
j
POT = 40 % CUT =1.5 H max. 10 m.
22.9
96.0
58
6
2 1211 3 10 10.0
98
22.0
8
d
POT = 40 % CUT =1.5 H max. 10 m.
60
P
11
8
12.0
10.0
Secti
40.3
5
55
a
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
D
+ 105.00
32 33 9
0
5
9 10
31
SPATII VERZI ,PARCURI, SCUARURI
141312 11 POT = 40 % CUT =1.5 H max. 10 m.
40.4
57
POT = 40 % CUT =1.5 H max. 10 m.
4
21.8
PROPUNERE TRASEU STRAZI CONF. P.U.G.
F
Strada
121 13
PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE
10 11
7
9 8
4a
94
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10 9
8
51
53
POT = 40 % CUT =1.5 H max. 10 m.
42.3
16
10.0
POT = 40 % CUT =1.5 H max. 10 m.
44.3
13
a5
6
8
2 10
0
7 8
15
15
3
.0
5.
17 16
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
17
18
POT = 40 % CUT =1.5 H max. 10 m.
11 12
16 15
11
POT = 40 % CUT =1.5 H max. 10 m.
14
ne
cti
POT = 40 % CUT =1.5 H max. 10 m.
4
5
Se
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
2 3
4 13
5.
iu
POT = 40 % CUT =1.5 H max. 10 m.
9
13
.0
13 12 11
21
POT = 40 % CUT =1.5 H max. 10 m.
19
POT = 40 % CUT =1.5 H max. 10 m.
1
Strada
96
POT = 40 % CUT =1.5 H max. 10 m.
20
ct
7
L
10
1
se
.0
s=6.573,10mp.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
.0
3
POT = 40 % CUT =1.5 H max. 10 m.
42
a
POT = 40 % CUT =1.5 H max. 10 m.
12 10
23
L
s=8.447,07mp.
POT = 40 % CUT =1.5 H max. 10 m.
Strad
59
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
95
93
5.
PIETONAL
12
aC
Strad
2 3
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
90.8
92
POT = 40 % CUT =1.5 H max. 10 m.
25
10.0
49
14
1211 10
16 15
POT = 40 % CUT =1.5 H max. 10 m.
41.5
50 5 6
7
15.0
5.0
a C16
Strad
7
22
47
POT = 40 % CUT =1.5 H max. 10 m.
4
9
8
7 20
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
- SPATII VERZI, SCUARURI PUD PREALABIL
6
91
a
P
17
89
61
40.4
L
91 101
CIRCULATII CAROSABIL 17 6
9
5
ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE
tor
14 13
21
I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL
1
5.0
13.0
5.0
7 89
14.0
4.5
colec
2a
12 11
12
ad
10.0
1.5
drum
a
5.0 41.0
10.0
10
10.0
i
18
s=9.613,59mp.
POT = 40 % CUT =1.5 H max. 10 m.
Str
De. 1273 46.5
1a
ad
Str
un
secti
POT = 40 % CUT =1.5 H max. 10 m.
123
une
90
4
ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.
7.0
7.0
a - -- k 8
15
POT = 40 % CUT =1.5 H max. 10 m.
5
19
48
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
62
4
20
POT = 40 % CUT =1,5 H max.=10m.
42.0 50.0
7
16
Secti
87
63
40.0 POT = 40 % CUT =1.5 H max. 10 m.
10.0
I
ZONA EDIFICABILA
ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)
a
ad
Str
6
e4
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII
POT = 40 % CUT =1.5 H max. 10 m.
64
10.0
4
191.5
Fig.D6
H
65
POT = 40 % CUT =1.5 H max. 10 m.
85 40.0
88
81.93
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
86
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
7.0
Strada
83
84
POT = 40 % CUT =1.5 H max. 10 m.
22
e
5
7.0
R1
81.84
82
7
156
10
De. 427
Strada
157
Strada
ctor
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
sectiun
81.90
.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
5
POT = 40 % CUT =1.5 H max. 10 m.
41
b
24
9
10.0
17
45
POT = 40 % CUT =1.5 H max. 10 m.
une
Secti
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8
18
42.0
46
POT = 40 % CUT =1.5 H max. 10 m.
66
POT = 40 % CUT =1.5 H max. 10 m.
44
69
L
67 68s=5.602,14mp.
20
19
43
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
h
POT = 40 % CUT =1.5 H max. 10 m.
81
141.3
79
POT = 40 % CUT =1.5 H max. 10 m.
42
28
27
26
s=7.894,21mp.
c
10.0
6
13
12
R1
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Strada
158
23 81.99
70
POT = 40 % CUT =1.5 H max. 10 m.
80
POT = 40 % CUT =1.5 H max. 10 m.
76.7
cole
l
10.0
40.0
10.0
159
71
42
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8
POT = 40 % CUT =1.5 H max. 10 m.
S 7 11 tr 30 a 19 7da A 18
IS -ZONA
LIS -
PERIMETRU INTRAVILAN PROPUS
COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.
30
78
POT = 40 % CUT =1.5 H max. 10 m.
160
L
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
40.0
141.1
0.0
drum
R1
38.7
s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.
L
41
72
POT = 40 % CUT =1.5 H max. 10 m.
77
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4
.0
30
POT = 40 % CUT =1.5 H max. 10 m.
2
0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3
16
10
POT = 40 % CUT =1.5 H max. 10 m.
29
9
POT = 40 % CUT =1.5 H max. 10 m.
17
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
. 40
6.
2
1.376,92mp.
TEHNICO EDILITARE
75
76
2 3
4
.0
18
29
De
m
6 5
32
4 5 6 7
10
28
14 13 12 .0 15
10
0
A
GC
s=520,83mp.
31
23 22 21
36
38
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
35
33
6
Fig.B1
P.T.E.
s=85,30mp.
10.0
11.
124 Strada 1
POT = 40 % CUT =1.5 H max. 10 m.
37
39
40
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
93.9 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
73
74
POT = 40 % CUT =1.5 H max. 10 m.
34
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
De. 414
2 3
22 21
1 2 3
12 11 10
a A1
ad Str 23
2
3
24
C
5
27
26
19
150
Str25
Strada de legatura - propusa prin P.U.Z.-
4
3
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
79.3
R1
50.983,55mp.
+ 80.00
A ada 1
.00
+2.210,27
A
13.8
TOTAL
L
26
din care 30% spatiu verde
DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp
G.C.,P.T.E. - ZONA AMPLASARE SERVICII
e
183.000,00mp. din care suprafete
TOTAL TEREN CE A GENERAT P.U.Z.
IS -
X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066
A B C D E F G H I
R12
TEREN ADIACENT D.N.22 - - - - - - -
1.5 3.0
11.619,33mp.
44.533,80mp.
BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp
B
CONSTANTA
PUD PREALABIL
LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA
6
6
13
121
40.0
SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m
12.0
3.0
10.0 7.0
0
0
a
122
POT = 40 % CUT =1.5 H max. 10 m.
9 10 11
LIS
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL
14 POT = 40 % CUT =1.5 H max. 10 m.
s=4.154,60mp. POT = 40 % CUT =1.5 H max. 10 m.
C-
SPATII VERZI, PARCURI, ALEI PIETONALE
CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI
3.0 1.5
10.0 7.0
11.
1.5 7.0
une 2
5.
ad
Str
10.0
14 13 12
PUD PREALABIL
I - Pprb
15.0
5.4%
IS X1
5.0
1.5
Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1
7.0
.00
13.0
Secti
7.0 1.5
0
.0
aC
8 15
139
L
5.0 12.0
H max.10.0m
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
ZONA P EXTINDERE INTRAVILAN
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
s=5.484,60mp.
0
3.
118
POT = 40 % CUT =1.5 H max. 10 m.
120
7 16
POT = 40 % CUT =1.5 H max. 10 m.
De. 1266
0
5.
10
9
Strad
9 10 5
f
119
0
40.0
POT = 40 % CUT =1.5 H max. 10 m.
6 7 8
11 10
.0
34
POT = 40 % CUT =1.5 H max. 10 m.
3.
138
6.
0
5. .5
7
p.
p.)
3m
0m
,3
,0
63
19
.7
8
35
a
ad
140
5
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4 13 1210.0
116
.0
137
37
136 0
3.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4 11
135
POT = 40 % CUT =1.5 H max. 10 m.
.0
134
POT = 40 % CUT =1.5 H max. 10 m.
141
.0
10
5.0
114
0
3.
15.0
5.0 1.5
a
P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008
Sectiune 6 Sectiune strada 1
3.0
25
LIMITA ZONA EDIFICABILA
14.0
2 18 4.5 10.0
30.5
POT = 75 % CUT =4 H max. 25 m.
POT = 40 % CUT =1.5 H max. 10 m.
40
117
H max.10.0m
2
LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI
1.5 7.0
a 2a
40
143
13.5
Strad
4c
=4 (s
.6 11 s=
T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR
D
II
Str
SI
rb Pp
AT
PU
SP
I-
.0
POT = 40 % CUT =1.5 H max. 10 m.
g .0
POT = 40 % CUT =1.5 H max. 10 m.
.0
10
142
145
0
5.
0
5.
10
POT = 40 % CUT =1.5 H max. 10 m.
1.5
13 0
5.
y
.7
POT = 40 % CUT =1.5 H max. 10 m.
.0
10
POT = 40 % CUT =1.5 H max. 10 m.
IS x2
22 21 20
4.155,43mp.
CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA
19
POT = 75 % CUT =4 H max. 45 m.
.0
s=1.409,80mp.
.0
4
IS
29
115
5 6 7
133 40
a ad
144
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
7.0 1.5
15.0
Str
POT = 40 % CUT =1.5 H max. 10 m.
L
s=6.460,56mp.
R1
56.2
une 3
10.0
POT = 40 % CUT =1.5 H max. 10 m.
L 131
132
POT = 40 % CUT =1.5 H max. 10 m.
7
70.606,37mp. 1.409,80mp. din care 30% spatiu verde
LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)
s=22.937,00mp.
0
I
SPATII VERZI ,PARCURI
d
L
3.0
LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )
x2
5.
0
4 32
P -
H max. 10 m.
LIMITA SUPRAFATA ZONA STUDIATA
Fig.C29
S+D+P+2 -> 11-15 ET
1 12 11
113
Sectiune 3
ZONIFICARE
UNITATI DE INVATAMANT
5.
POT = 40 % CUT =1.5 H max. 10 m.
8 910
Dr. 1264
s=6.421,09mp.
k 146
147
a1
a2
40.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
36
3.0
Strad
15.0
EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT
e eation
Secti
7
ousing using/Offices Mixed Use
129
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
z
0
3.
.0
40
POT = 40 % CUT =1.5 H max. 10 m.
H max. 10 m.
LIMITA PERIMETRU INTRAVILAN EXISTENT
Fig.A40
5
30.5
POT = 40 % CUT =1.5 H max. 10 m.
CRESA , GRADINITA PUD PREALABIL
5.484,60mp. din care 10% spatiu verde
LOTURI AMPLASARE CONSTRUCTII S+P+1+M UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL
POT = 40 % CUT =1,5
ZONA INTRAVILAN EXISTENT
R=14.0
6
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
5.0
5
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET
POT = 40 % CUT =1,5
LIMITE
11.0
7
37.364,00mp. din care 10% spatiu verde
LEGENDA: Fig.C29
Fig.C29
1.5
.0
POT = 40 % CUT =1.5 H max. 10 m.
R12.00 4.50
117.5
17
5
1.5
19
106 m
+10.00
E TRANSVERSALA
40.4
a
KV
ad
149
w
41.7
P
75 75 75
LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.
S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.
LI -
X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134
11
PUD PREALABIL
112
127
1
2 3 4
10.0
s=1806,59mp.
4
110
128 130 148
aB
SPATII VERZI ,PARCURI, SCUARURI
10
L
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
119.2
13.0
E
5.5 5.5
6
2
S+D+P+2 -> 11-15 ET
1.5
16 15
4
23
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
20 19 18
R12
2.0
R1
25
NR.1 FIL TIP 655 RIU PRO GIRATO KM 178+ SENS P.U.G.conf. propus
2
R16.00
3
24
5.0
41.7
14
2
IS
9 1011
1
.0
7.0
x1
6
Strad
3
0
Str
11
10.0
102 m
150
e
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
IS -ZONA
LIS -
PERIMETRU INTRAVILAN PROPUS
COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.
.0
2.5
4.50
POT = 75 % CUT =4 H max. 45 m.
Strad
111 s=6.248,94mp. .0
10
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
+45.00 +35.00
Strada
.
151
un
4 1
27 1.5
Strad
1.5
3.0
e
109
POT = 40 % CUT =1.5 H max. 10 m.
6
7
s=14.427,00mp.
13.0
1 2 3
POT = 40 % CUT =1.5 H max. 10 m.
126
152
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
5
POT = 40 % CUT =1.5 H max. 10 m.
3.0
.A 3.0
4
8
3 11
IS -
X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066
A B C D E F G H I
D
15
1 2
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
aB
7
POT = 40 % CUT =1.5 H max. 10 m.
18 17
a
42.0
10.0
108
125
.0
2.0 2.0
153 15.0
25.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
17
107
106
104
1 2 3
124
15
GC
+20.00
POT = 40 % CUT =1.5 H max. 10 m.
56
10 9
11
32 33 9
12.0
P
9 10
31
s=2.348,81.
1 18
POT = 40 % CUT =1.5 H max. 10 m.
ne
13
12 8
2 10
0
0
5
3
5.
iu
cti
PUD PREALABIL
De. 1262
105
POT = 40 % CUT =1.5 H max. 10 m.
102
a6
154 POT = 40 % CUT =1.5 H max. 10 m.
ZONA EXTINDERE CAROSABIL D.N. 22
PROPUNERE DE MOBILARE URBANA
8
4 .0
5. 6
14 12 13
POT = 40 % CUT =1.5 H max. 10 m.
98.7
4 5 6
16 15 14
87.25
0
s=375,56mp.
78.40
9 8
4b
L.E
721
103
101
87.21
87.20
GC 5.
54
24.0
CUT =1.5 H max. 10 m.
Strad
POT = 40 % CUT =1.5 H max. 10 m.
52
POT = 40 % CUT =1.5 H max. 10 m.
19 18
13
7 8
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 %
POT = 40 % CUT =1.5 H max. 10 m.
155
s=395,23mp.
Dr. 1266
78.06
7
10.0
19 20
L56
24.0
3.0
POT = 40 % CUT =1.5 H max. 10 m.
99
96.0
POT = 40 % CUT =1.5 H max. 10 m.
10.0
100
POT = 40 % CUT =1.5 H max. 10 m.
55
s=3.858,02mp.
58
6
1
Strada
L
s=2.352,60mp.
5.0
m
40.3
4a
97
POT = 40 % CUT =1.5 H max. 10 m.
12 3
53
POT = 40 % CUT =1.5 H max. 10 m.
Str 307 a7d aA
11
POT = 40 % CUT =1.5 H max. 10 m.
.0
SPATII VERZI ,PARCURI, SCUARURI
141312 11
51
POT = 40 % CUT =1.5 H max. 10 m.
15
42.3
10 9
8
Se
17 15
16
10.0
POT = 40 % CUT =1.5 H max. 10 m.
44.3
13
B
40.5
161
10
ZONA D.N. 22 EXISTENT
10 11
Strada
22.9
6 11
17
18
d
POT = 40 % CUT =1.5 H max. 10 m.
60
2 1211 3 10 10.0
j
POT = 40 % CUT =1.5 H max. 10 m.
.0
PROPUNERE TRASEU STRAZI CONF. P.U.G.
12
aC
Strad
9 8
98
22.0
8
0
INDICATIV PARCELA DIN ZONA
57
POT = 40 % CUT =1.5 H max. 10 m.
5
21.8
91 101
20
PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE
F
7
7 21
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Strada
15.0
a
a C16
Strad
96
POT = 40 % CUT =1.5 H max. 10 m.
94
121 13
5.
- SPATII VERZI, SCUARURI PUD PREALABIL
141.1
92
POT = 40 % CUT =1.5 H max. 10 m.
91
ad
7.0
9
40.4
POT = 40 % CUT =1.5 H max. 10 m.
5
19
20
POT = 40 % CUT =1.5 H max. 10 m.
11 12
16 15
ct
5
7
16
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
42
3
POT = 40 % CUT =1.5 H max. 10 m.
9
11
POT = 40 % CUT =1.5 H max. 10 m.
14
9
1
se
.0
a
POT = 40 % CUT =1.5 H max. 10 m.
4
. 40
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
42
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
2 3
21
De
4
6
L
10
2
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
s=6.573,10mp.
13
.0
13 12 11
16
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4
10
23
POT = 40 % CUT =1.5 H max. 10 m.
17
8
POT = 40 % CUT =1.5 H max. 10 m.
29
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
12
POT = 40 % CUT =1.5 H max. 10 m.
L
Str
59
POT = 40 % CUT =1.5 H max. 10 m.
25
s=8.447,07mp.
POT = 40 % CUT =1.5 H max. 10 m.
ada 5
10.0
95
93
POT = 40 % CUT =1.5 H max. 10 m.
1
2 3
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
90.8
.0
10.0
49
14
1211 10
16 15
POT = 40 % CUT =1.5 H max. 10 m.
41.5
50
9
8
22
5 6
7
10.0
4
17
61
7
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4
POT = 40 % CUT =1.5 H max. 10 m.
41
b
24
10
47
POT = 40 % CUT =1.5 H max. 10 m.
4
18
89
6
10.0
17
48
Strada
L
5
19
8
9
18
45 De. 427
10.0
POT = 40 % CUT =1.5 H max. 10 m.
62
4
20
s=9.613,59mp.
12
141.3
i
63
PIETONAL
17 6 5.0
14 13
7 89
90
CIRCULATII CAROSABIL
1
5.0
13.0
5.0
87
POT = 40 % CUT =1.5 H max. 10 m.
Str
tor
12 11
191.5
H
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
I
5
colec
10
10.0
40.0
88
POT = 40 % CUT =1.5 H max. 10 m.
40.0 POT = 40 % CUT =1.5 H max. 10 m.
28
27
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
5
POT = 40 % CUT =1.5 H max. 10 m.
65
64
10.0
87.20
une
5.0
5.0
123
P
a - -- k 8
15
7.0
66
POT = 40 % CUT =1.5 H max. 10 m.
85
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
une
Secti
19
43 42.0
46
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
86
I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL
7
16
Secti
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
81.93
ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE
drum
4 41.0
POT = 40 % CUT =1.5 H max. 10 m.
14.0
4.5
81 83
84
POT = 40 % CUT =1.5 H max. 10 m.
c
44
69
20
19 18
.0
30
POT = 40 % CUT =1.5 H max. 10 m.
28
14 13 12 .0 15
10
10
POT = 40 % CUT =1.5 H max. 10 m.
29
6
Fig.B1
P.T.E.
s=85,30mp.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
26
42
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
L
67 68s=5.602,14mp.
.0
Strada de legatura - propusa prin P.U.Z.-
C
5
27
26
35
33
32
4 5 6 7
10
POT = 40 % CUT =1.5 H max. 10 m.
s=7.894,21mp.
10.0
h
POT = 40 % CUT =1.5 H max. 10 m.
82
22
tiune
sec
81.90
70
POT = 40 % CUT =1.5 H max. 10 m.
79
POT = 40 % CUT =1.5 H max. 10 m.
Strada
De. 1273
2a
une
156
7
Fig.D6
a 13
secti
10.0 40.0
81.99
157
Strada
7.0
R1
1a
122
POT = 40 % CUT =1.5 H max. 10 m.
9 10 11
6
14 POT = 40 % CUT =1.5 H max. 10 m.
121
l
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
71
40.0
POT = 40 % CUT =1.5 H max. 10 m.
40.0
80
POT = 40 % CUT =1.5 H max. 10 m.
158
L
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
34
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
31
23 22 21
38
POT = 40 % CUT =1.5 H max. 10 m.
41
72
10.0
159
L
23
74
POT = 40 % CUT =1.5 H max. 10 m.
3
24
36
37
39
40
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
93.9 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
73
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
77
78
POT = 40 % CUT =1.5 H max. 10 m.
160
22 21
75
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
76.7
ctor
a
ad
14 13 12
38.7
2 3
COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp
4
3
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
79.3
2
10.0
De. 414 1 2 3
12 11 10
a A1
ad Str 23
3
ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.
6
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL
Str
8
ad
139
Str
L
120
POT = 40 % CUT =1.5 H max. 10 m.
15
POT = 40 % CUT =1.5 H max. 10 m.
De. 1266
1.5 7.0
0 POT = 40 % CUT =1.5 H max. 10 m.
s=4.154,60mp.
10.0 40.0
POT = 40 % CUT =1.5 H max. 10 m.
aC
16
POT = 40 % CUT =1.5 H max. 10 m.
138 6 7 8
Strad
5.
6 5
11 10
0
a
ad
Str
137
37
POT = 40 % CUT =1.5 H max. 10 m.
4
9
f
119
10.0
1.5
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
LIS
s=5.484,60mp.
0
118
.0
34
POT = 40 % CUT =1.5 H max. 10 m.
7
136 0
3.
13 1210.0
POT = 75 % CUT =4 H max. 25 m.
3.
POT = 40 % CUT =1.5 H max. 10 m.
0
3. 0
3.
POT = 40 % CUT =1.5 H max. 10 m.
.0
134
0
5.
.0 40
117
POT = 40 % CUT =1.5 H max. 10 m.
135
.0
116
.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
10
POT = 40 % CUT =1.5 H max. 10 m.
g
0
5.
5.
10
aA 1
76
2 3
4
POT = 40 % CUT =1,5 H max.=10m.
46.5
L
Str25ad
ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M) 7.0
e
26
s=2.980,45mp.
ZONA EDIFICABILA
7.0
30.5
y
.7
29 0
.0
114
POT = 40 % CUT =1.5 H max. 10 m.
115
5 6 7
133 40
0
4 32
10
1
p.
une 2
0
5. .5
.
T = 40 % UT =1.5 ax. 10 m.
0
.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII
42.0
13
1 12 11
113
112
2
LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA
50.0
POT = 75 % CUT =4 H max. 45 m.
5.
5.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8 910
IS
s=22.937,00mp.
0
5.
6 5
s=520,83mp.
TEHNICO EDILITARE
ZONA P EXTINDERE INTRAVILAN
x2
POT = 40 % CUT =1.5 H max. 10 m.
s=1.409,80mp.
35
3.
.0
40
0
1.5
A
GC
LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)
13.0
Secti
a 2a
0
111 94mp.
124 Strada 1
ZONIFICARE
UNITATI DE INVATAMANT
I
1.376,92mp.
LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI
14.0
2 18 4.5 10.0
1.5 7.0
Strad
z
.0
10
50.983,55mp.
A
CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA
19
Fig.C29
CRESA , GRADINITA PUD PREALABIL
din care 30% spatiu verde
LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )
4
S+D+P+2 -> 11-15 ET
PUD PREALABIL
5
G.C.,P.T.E. - ZONA AMPLASARE SERVICII
3.0
1.5 3.0
H max.10.0m
183.000,00mp. din care suprafete
TOTAL TEREN CE A GENERAT P.U.Z.
B
44.533,80mp. +2.210,27
DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp
TOTAL
12.0
12.0
L
BILANT SUPRAFETE
Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
LIMITA ZONA EDIFICABILA Fig.C29
5
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
5.0
5
PUD PREALABIL
15.0
1.5
TEREN CARE A GENERAT P.U.Z.
5.4%
IS X1
5.0
1.5
25
ZONA INTRAVILAN EXISTENT
117.5
10.0 1.5
SI SEMICAROSABILE, PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m
3.0
3.0 1.5
12.0
2
SPATII CONSTRUCTII 11.619,33mp.
TEREN ADIACENT D.N.22 - - - - - - -
5.0
5.0 1.5
a
7.0
IS x1
7.0
5.4%
H max.10.0m
22 21 20
SPATII VERZI, PARCURI, ALEI PIETONALE
CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI
d
L
Sectiune 3
4.155,43mp.
81.84
17
4
POT = 40 % CUT =1.5 H max. 10 m.
% 5 m.
1
2 3 4
13.0
1.5
41.7
P
s=1806,59mp.
70.606,37mp. 1.409,80mp. din care 30% spatiu verde
LIMITA SUPRAFATA ZONA STUDIATA
Fig.A40
6
30.5
SPATII VERZI ,PARCURI, SCUARURI
16 15
m.
20 19 18
41.7
1.5
%
B
PUD PREALABIL
I - Pprb C-
H max. 10 m.
SPATII VERZI ,PARCURI
LIMITA PERIMETRU INTRAVILAN EXISTENT
R=14.0
7
H max. 10 m.
UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL
POT = 40 % CUT =1,5
LIMITE
11.0
13.5
1 2 3 10.0
7.0 1.5
15.0
17
7.0 1.5
56.2
1262
0
cole
a1
aB
Strad
a Strad
0.0
3.0
Strad
119.2
9 1011
LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5
LEGENDA: Fig.C29
11
S+D+P+2 -> 11-15 ET
5.0
42.0
7
drum 2
s=2.348,81.
14 12 13
R12.00 4.50
6 R1
23
POT = 75 % CUT =4 H max. 45 m.
SPATII VERZI ,PARCURI, SCUARURI
56
4
s=14.427,00mp.
13.0
E
75 75 75
3
24
IS
NR.1 FIL TIP 655 RIU PRO GIRATO KM 178+ SENS P.U.G.conf. propus
2
R16.00
5.5 5.5
2
4.50
25
LI P -
15.0
R12
1.5
R12
2.0
R1
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
PUD PREALABIL
14
.0
7.0
x1
6
1
.0
0
e
3 11
2.5
5.484,60mp. din care 10% spatiu verde
13.8
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
un
4 1
27
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET
Sectiune 6 Sectiune strada 1
3.0
5.4%
H max.10.0m
10.0 7.0
7
15
1 2
8
12.0
P
11
32 33 9
0
5
9 10
31
37.364,00mp. din care 10% spatiu verde
7.0
0
0
5.
5. 6
8
2 10
.0
D
11.
a
7 8
15
H max.10.0m
L
LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.
S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.
PERIMETRU INTRAVILAN PROPUS
X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134
IS -ZONA
LIS -
COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
.00
ne
cti
17 16
3
4 13
3
iu
13
12
6.
11
POT = 40 % CUT =1.5 H max. 10 m.
15
42.3
A
R1
Se
POT = 40 % CUT =1.5 H max. 10 m.
.
40 % =1.5 . 10 m.
6
ct
5
POT = 40 % CUT =1.5 H max. 10 m.
9
POT = 40 % CUT =1.5 H max. 10 m.
19 18
1
se
.0
Str 30 a7d a
11
POT = 40 % CUT =1.5 H max. 10 m.
.0
POT = 40 % CUT =1.5 H max. 10 m.
42
7
L
10
42
7
R12
6
a
s=6.573,10mp.
POT = 40 % CUT =1.5 H max. 10 m.
= 40 % T =1.5 x. 10 m.
9
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8
POT = 40 % CUT =1.5 H max. 10 m.
3
. 40
4
.0
POT = 40 % CUT =1.5 H max. 10 m.
2
POT = 40 % CUT =1.5 H max. 10 m.
10
30
IS x2
CONSTANTA
16
7
10.0 7.0
17
POT = 40 % CUT =1.5 H max. 10 m.
29
De
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
12
28
14 13 12 .0 15
10
18
IS -
X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066
A B C D E F G H I
CONSTANTA
33
6
Fig.B1
P.T.E.
s=85,30mp.
10.0
19
35
C
5
27
26
25
Strada de legatura - propusa prin P.U.Z.-
4
3
2
22 21 20 POT = 40 % CUT =1.5 H max. 10 m.
34
7.0
1.5
183.000,00mp. din care suprafete
TOTAL TEREN CE A GENERAT P.U.Z.
COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp
B
POT = 40 % CUT =1.5 H max. 10 m.
12.0
Fig.C
BILANT SUPRAFETE
Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1
3
15.0
1.5
X IAL
IS X1
5.0
1.5
7.0
COMPLE COMERC
12.0
7.0
IS x1
5.4%
15.0
29
5.0
7.0
Fig.C
ne strada 1
P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008
P+2
Sectiune 2
X IAL
tiune 6
15.0
P+2
TEREN CARE A GENERAT P.U.Z.
P+2
COMPLE COMERC
DRUM PROPUS IN . P.U.Z.
Sectiune 2
1.50
Sectiune 5
IS x2
L
DRUM COLECTOR ( AFERENT STR. BARAJULUI)
P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008
7.00
5.4%
DN 22
P+2
5.4%
3.00
-2.80 21.0
1.50
LIS y
5.0
1.5
H max.10.0m
5.0
1.50
5.0
5.0 1.5
f
5.4%
H max.45.00
LEGENDA:
10.0
5.0 1.5
5.4%
c
L
1.5 3.0
7.0
3.0 1.5
13.0
5.0 LIS Y
Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)
H max.45.00
L
H max.45.00
GREEN INFRASTRUCTURE
plasate deoparte si de alta a strazii cota ±0.00 ( 0.60m fata de strada)
Sectiune strada 2
5.4%
Sectiune 1
H max.10.0m
Sectiune strazi 2-7
P+2 limita aliniament
1.50
Sectiune 4
limita amplasare constructii
7.00
Sectiune 5
IS x2
5.4%
ted uses
1.50
-2.80
limita amplasare constructii
H max.10.0m
5.0
limita aliniament
5.0
1.5
H max.45.00
limita amplasare constructii
10.0
5.0 1.5
demisol 21.0
LIS y
5.0
1.5
1.50
H max.10.0m
H max.25.00
-2.80 21.0
5.4%
5.0 10.0
7.00
demisol
3.00
5.4%
limita amplasare constructii
13.0
3.0
5.0 1.5
f
1.50
±0.00 =+0.60
3.00
±0.00 =+0.60
limita aliniament
Sectiune strada 2
limita aliniament
limita aliniament
limita aliniament
LIS Y
5.4%
L
1.5 3.0
7.0
1.5
13.0
5.0
limita amplasare constructii
limita aliniament
3.0
10.0
L
limita amplasare constructii
87.2
H max.10.0m
Sectiune 5 Sectiune strazi 2-7
P+2
5.4%
Sectiune 1
3.00
5.4%
Sectiune 4
parter
limita aliniament
H max.10.0m
H max.25.00
SECTIUNE STRAZI SI LOTURI
+3.00
5.4%
limita amplasare constructii
1.50
limita amplasare constructii
m
+3.00
limita amplasare constructii
7.00
etaj
limita aliniament
1.50
-2.80
+6.00
87.2
demisol 21.0
LIS y
5.0
1.5
1.50
+10.00
H max.25.00
mansarda
+6.00
+3.00
-2.80 21.0
5.4%
5.0 10.0
7.00
demisol
3.00
±0.00 =+0.60
SECTIUNE STRAZI SI LOTURI
+6.00
limita amplasare constructii
limita aliniament
13.0
1.50
limita amplasare constructii
Sectiune strada 2
±0.00 =+0.60
H max.45.00
+10.00 +10.00
limita aliniament
3.00
5.4%
P+2
parter
H max.25.00
5.4%
limita amplasare constructii
+3.00
limita aliniament
etaj
+10.00
limita amplasare constructii
+3.00
limita amplasare constructii
SECTIUNE STRAZI SI LOTURI
+6.00
+6.00
Sectiune 4
CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL
CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL H max.45.00
mansarda
limita aliniament
+10.00
PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si
PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si
+10.00
H max.25.00
limita aliniament
TIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si X COMERCIAL SI ANSAMBLU REZIDENTIAL
+20.00
102 m
DN 22
83 m
+10.00
SECTIUNE TRANSVERSALA
78.06
G
106 m
85 m
87 m
+35.00
90 m
93 m +10.00
95 m +10.00
+20.00
102 m
106 m DN 22
+10.00
+10.00
83 m
Proiectant general:
Beneficiar:
s.c. PROMARH s.r.l. Nume:
Semnatura:
Sef Proiect arh. Marcel PAVEL
str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea
Scara:
1 / 1.000
Proiectat
arh. Marcel PAVEL
Data:
Desenat
arh. Paul Cristian MURAVELI
Noiembrie 2017
Green spaces are very important for the health & wellbeing of the residents of the MGM2 neighborhood.The development proposes approx 15,774sqm of recreational green space while tree alignments are proposedalongmostofthevehicularcirculationwithinthedevelopment.This green infrastructure benefits good air quality for the residents.
Proiect nr:
MATROZ CONSTANTIN si FLOREA ION
TULCEA
J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180
Specificatie:
Denumire proiect:
LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.
Denumire plansa:
REGLEMENTARI URBANISTICE
panta teren 5.4%
SECTIUNE TRANSVERSALA
Proiectant general:
Nr. plansa:
Nume:
U4
Sef Proiect arh. Marcel PAVEL Proiectat Desenat
Sunlight can be maximized in this location as it is an unobstructedopenlandatthehighestspotlevelofthecity(+105m) with no flooding hazard.The SouthWest winds in this region benefitthesitebypreventingcitypollutiontoreachthislocation.Thesiteisidealforresidentialuseintermsoflocationand environmental benefits.
Semnatura:
Proiect nr:
MATROZ CONSTANTIN si FLOREA ION
TULCEA
str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea
J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180
Specificatie: Faza:
P.U.Z.
Beneficiar:
s.c. PROMARH s.r.l.
87/2017
Scara:
1 / 1.000
arh. Marcel PAVEL
Data:
arh. Paul Cristian MURAVELI
Noiembrie 2017
Denumire proiect:
LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.
Denumire plansa:
REGLEMENTARI URBANISTICE
87/2017 Faza:
P.U.Z. Nr. plansa:
U4
5.0
5.4%
L
Sectiune 3
limita amplasare constructii
po sib il Tr
4.5 4.5
1 ea Tulc 22
11.0
5.0 7.0
1 a
6.0
R1
R12.0
2 a ra d
St
as eu
46.5
10
12 11
10.0
5.0
p.
9
90 m
93 m
95 m
+20.00
F
PROPUN
ZONA D
ZONA E
12
aC
Strad
102 m
a C16 Strad
10 11
PROPUNERE DE MOBILARE URBANA
10.0
10.0
+35.00
PROPUN ULTERIO
6
+45.00
78.40 78.06
PIETON
17
13.0
14 13
- SP
CIRCULATII CAROS
ne 1
66 Dr. 12
78.39
P
8
15
u Secti 5.0
5.0
7 89
I - Pprb SPATII C
ctor
123
cole
POT = 40 % CUT =1.5 H max. 10 m.
ZONA IS S+D+P POT = 7 GC - ZO SALUBR
a - --
10.0
40.0
16
41.0
10.0
14.0
drum
4
121
4.5
7
7.0
une
secti
5.0
122
POT = 40 % CUT =1.5 H max. 10 m.
6
13
POT = 40 % CUT =1.5 H max. 10 m.
10.0
1.5
ZONA L BIROUR D+ POT =7
7.0
7.0
5.0
POT = 40 % CUT =1.5 H max. 10 m.
9 10 11
ZONA
POT = 4
42.0 50.0
6
14
s=4.154,60mp.
ZONA D PRIN CONS ZONA
73
L
2a
POT = 40 % CUT =1.5 H max. 10 m.
ZONA
ZONA PRIN De. 12
2b
Fig.D6
ZONIFICAR 9
19
78.10
LINIE EL ZONA P
Fig.C2
3
G
2 18 4.5 10.0
1a
da
3 a ra d
ra d
7.0
R1
1.5 7.0
da
ra
or ect col
13.0
ra
a
d ra
118
LIS
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL
St
14 13 12
St
St
m dru
0
66
De. 12
0.0 R1
une 2
5.
139
7.0 1.5
Secti
0
POT = 40 % CUT =1.5 H max. 10 m.
1.5
14.0
0
5.
40.0
POT = 40 % CUT =1.5 H max. 10 m.
aC
8 15 10.0
138 6 7 8
11 10
16
POT = 40 % CUT =1.5 H max. 10 m.
30.5
LIMITA A
CULOAR(
19
1.5 7.
9
5
Strad
9 10 5
.5 5 13
13 .0 1210
140
137
4
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
s=5.484,60mp.
0
3.
120
7
POT = 40 % CUT =1.5 H max. 10 m.
4
POT = 40 % CUT =1.5 H max. 10 m.
7.0 1.
EA
8 4 11
.0
141
7 5.0
0
f
119
0
.0
POT = 75 % CUT =4 H max. 25 m.
POT = 40 % CUT =1.5 H max. 10 m.
3.
POT = 40 % CUT =1.5 H max. 10 m.
136
3.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
.5
da 1
35
4
143
0.0
0 5.
6
4c
ra St
POT = 40 % CUT =1.5 H max. 10 m.
0 0.
10
da ra St
da 142
145
0
3.
37
134
.0
.0
34
Fig.A40 Fig.C29
5
5.0
LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)
POT = 40 % CUT =1.5 H max. 10 m.
10
117
POT = 40 % CUT =1.5 H max. 10 m.
.0
135
.0
POT = 40 % CUT =1.5 H max. 10 m.
6
5.0
GC
s=375,56mp.
LIMITA SUPRAFATA ZONA STUDIATA LIMITA PERIMETRU INTRAVILAN EXISTENT
144
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3m
3 9,
) p.
ZONA INTRAVILAN EXISTENT
L
61
LIMITE
0m
LEGENDA:
k 146
g
40
y
5.
10
116
.0
40
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
0
.7
POT = 40 % CUT =1.5 H max. 10 m.
LIMITA Z
R=14.0
7
30.5
5.
POT = 40 % CUT =1.5 H max. 10 m.
10
133
132
POT = 40 % CUT =1.5 H max. 10 m.
. 11
1.376,92mp.
TEHNICO EDILITARE
s=
50.983,55mp.
PUD REQUIRED 5.0
,0 63
TOTAL G.C.,P.T.E. - ZONA AMPLASARE SERVICII
rb
44.533,80mp. +2.210,27
DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp
.7 =4
TEREN ADIACENT D.N.22 - - - - - - -
11.619,33mp. din care 30% spatiu verde
Pp
PUD PREALABIL
.0
POT = 40 % CUT =1.5 H max. 10 m.
s=6.421,09mp.
.0
29
.0
LIMITA T
LIMITA S ( 183,00
13
0
114
LIMITA P
11.0
POT = 75 % CUT =4 H max. 45 m.
0
5.
4 32
115
5 6 7
L 131
POT = 40 % CUT =1.5 H max. 10 m.
148
s=6.460,56mp.
36
8 910
64
Dr. 12
POT = 40 % CUT =1.5 H max. 10 m.
147
(s
SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m
CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI
150
129
POT = 40 % CUT =1.5 H max. 10 m.
128 130
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
. LE TII C 2m NA U .1 TO TR ax PIE NS T Hm CO EN EI AL TII EM =2 A T I, SP AGR CU UR RC E, SI % 0% 5.0 PA BIL NT = 40 I 3 I, A A RZ RZ OS AM OT VE VE AR VAT P TII II A IC IN AT EM SP S RU BIL SI ENT ALA P E PR D
SPATII VERZI, PARCURI, ALEI PIETONALE
4.155,43mp.
127
ra St
w PU
PUD PREALABIL
I - Pprb C-
70.606,37mp.
1.409,80mp. PUD PREALABIL din care 30% H max. 10 m. spatiu verde
SPATII VERZI ,PARCURI
7
CRESA , GRADINITA
151
149
UNITATI DE INVATAMANT
POT = 40 % CUT =1,5
POT = 40 % CUT =1.5 H max. 10 m.
112
I
s=1.409,80mp. 0
ZONA IN
LIMITA S
s=22.937,00mp.
0 5.
1 12 11
113
POT = 40 % CUT =1.5 H max. 10 m.
CRESA , GRADINITA PUD PREALABIL
5.
POT = 40 % CUT =1.5 H max. 10 m.
110
.0
10
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
SP
P -
s=395,23mp.
I-
I -
H max. 10 m.
3.0
POT = 40 % CUT =1.5 H max. 10 m.
TA AR EN M M OR . LE F A G NS .E. RE TRA L E VA PA AR D SE DU LI O . RE .D NS U CA P. CO A. IN AU E. L. PR S IE A .S. ) CT AN .E p. TE B L O UR . IN 8m PR RE E.A ,4 DE ILA I L. 56 .8 NA OB IE =6 ZO A M LIN (s C
LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5
153 1
da
L-
.0
GC 5
2.0 2.0
0 5.
0
3.
.0
40
POT = 40 % CUT =1.5 H max. 10 m.
126
152
.0
15 POT = 40 % CUT =1.5 H max. 10 m.
87.25
L
LIMITE
IS
UNITATI DE INVATAMANT
z
.0
LEGENDA Fig.C29
x2
POT = 40 % CUT =1.5 H max. 10 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
125
POT = 40 % CUT =1.5 H max. 10 m.
3.0
87.21
87.20
POT = 40 % CUT =1.5 H max. 10 m.
5
PUD PREALABIL
POT = 40 % CUT =1.5 H max. 10 m.
4.50
S+D+P+2 -> 11-15 ET
5.0
1.5
5
75 75 75
R12.00
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
17
4
5.5 5.5
117.5
10.0
s=1806,59mp.
111 s=6.248,94mp.
18 17
POT = 40 % CUT =1.5 H max. 10 m.
124
154
POT = 40 % CUT =1.5 H max. 10 m.
ra St
5.484,60mp. din care 10% spatiu verde
155
721
1 2 3
POT = 40 % CUT =1.5 H max. 10 m.
e
109
POT = 40 % CUT =1.5 H max. 10 m.
6
a1 Strad
87.20
16 15 14
6
5
41.7
P
1
2 3 4
E
X 797054.3040 413 797373.0409 413 797382.8287 413 797392.8906 413 797403.1821 41 797414.4020 41 797448.3191 41 797479.2977 41 797486.5584 41 797492.9963 413 797529.4710 413 797527.5490 413 797548.8239 413 797561.2675 413 797558.6400 413 797559.2230 413 797563.7537 413 797626.0595 413 797193.4404 413 797143.9118 413 797135.7286 413 797108.2029 413 797073.8079 413
11
PUD REQUIRED aB
Strad
20 19 18 13.0
2
6
2
SPATII VERZI ,PARCURI, SCUARURI
16 15
4
23
5.0
1.5
a 2a
19 20
4 5 6
POT = 40 % CUT =1.5 H max. 10 m.
25
24
119.2
41.7
10.0
108
106 4
1 2 3
.0
.1 IP NR FIL T IU 655 PRO TOR 178+ GIRA .- KM SENS P.U.G . nf co propus
R16.00
3
S+D+P+2 -> 11-15 ET
B
a Strad
14
2
POT = 75 % CUT =4 H max. 45 m.
9 10 11
1
R12
R1
2.5
4.50
s=14.427,00mp.
13.0
1.5
3.0
107
POT = 40 % CUT =1.5 H max. 10 m.
104
17
25.0
POT = 40 % CUT =1.5 H max. 10 m.
105
10.0
12 3
POT = 40 % CUT =1.5 H max. 10 m.
7
62
1 18
98.7
POT = 40 % CUT =1.5 H max. 10 m.
102
a Strad
7
10.0
0
5.
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
9 8
4b
99
KV
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET
100
POT = 40 % CUT =1.5 H max. 10 m.
0
37.364,00mp. din care 10% spatiu verde
POT = 40 % CUT =1.5 H max. 10 m.
s=2.352,60mp. 0
. 10
11
X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134
LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.
S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.
L
A. E.
COORDONATE STEREO 70 EREN CE A GENERAT PUZ S = 183.000,00mp.
LIS -
97
103
CUT =1.5 H max. 10 m.
10.0
40.5
161
L.
PERIMETRU NTRAVILAN PROPUS
IS -ZONA
j
POT = 40 % CUT =1.5 H max. 10 m.
22.9
6 11
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
.0 24POT = 40 %
7.0
15
2.0
1
27
IS
42.0
De. 12
POT = 40 % CUT =1.5 H max. 10 m.
24.0
101
Strada
91 101
20
24.0
1
8
56
10 9
4
1.5
x1
6
3 11 .0
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
PUD PREALABIL
Strad
7 21
6
2 1211 3 10 10.0
98
22.0
5
aB
40.0
21.8 8
9 8
3.0
15.0
da
ra
X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066
IS -
7
Strad
121 13
TOTAL TEREN CE A GENERAT P.U.Z.
OORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp
96
POT = 40 % CUT =1.5 H max. 10 m.
94
91
St 12
92
POT = 40 % CUT =1.5 H max. 10 m.
60
54
POT = 40 % CUT =1.5 H max. 10 m.
58
52
POT = 40 % CUT =1.5 H max. 10 m.
s=3.858,02mp.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4
L56
ne
0
14 12 13
POT = 40 % CUT =1.5 H max. 10 m.
7
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
iu
10.0
une 3
POT = 40 % CUT =1.5 H max. 10 m.
5
POT = 40 % CUT =1.5 H max. 10 m.
96
15.0
4
TEREN CARE A GENERAT P.U.Z.
10.0
95
93
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
55 .0
d
P
15.0
POT = 40 % CUT =1.5 H max. 10 m.
90.8
57
59
POT = 40 % CUT =1.5 H max. 10 m.
51
53
a
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
D
1 2
8
s=2.348,81.
141312 11
13
ne
11
32 33 9
5.
5
9 10
31
SPATII VERZI ,PARCURI, SCUARURI
56.2
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4a
DRUM PROPUS IN . P.U.Z.
183.000,00mp. din care suprafete
L
s=9.613,59mp.
DRUM PROPUS CONF. P.U.G.
BILANT SUPRAFETE
i
16 15
1
2 3
1211 10
11 12
Secti
90
7
10 9
8
POT = 40 % CUT =1.5 H max. 10 m.
Strada
POT = 40 % CUT =1.5 H max. 10 m.
17
89
6
40.4
Another important aspect of the zonal planning plan is that it allows for changes within T larger plots through the reANIA NATIONALA ZI SI DRUMURI quirement of the Urban Detail N ROMANIA S.A. Plans (PUD). These plots are 05- 2008 highlighted bellow. STR . BARAJULUI
DRUM COLECTOR ( AFERENT STR. BARAJULUI)
18
7
POT = 40 % CUT =1.5 H max. 10 m.
44.3
0
12.0
15
42.3
5.
7 8
15
16
10.0
6
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
17
18
17 16
14
19
POT = 40 % CUT =1.5 H max. 10 m.
16 15
11
POT = 40 % CUT =1.5 H max. 10 m.
a5 Strad
40.3
DN 22
5
19
8
14
5 6
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
3.0
87
4
9
3 4
40.4
POT = 40 % CUT =1.5 H max. 10 m.
61
62
4
20
POT = 40 % CUT =1.5 H max. 10 m.
12 11
21
a2
POT = 40 % CUT =1.5 H max. 10 m.
41.5
POT = 40 % CUT =1.5 H max. 10 m.
ct
9
POT = 40 % CUT =1.5 H max. 10 m.
2
Se
POT = 40 % CUT =1.5 H max. 10 m.
13
.0
13
s=8.447,07mp.
20
10.0
49
50
10.0
POT = 40 % CUT =1.5 H max. 10 m.
47
POT = 40 % CUT =1.5 H max. 10 m.
10
23
Strad
40.0
40.0 POT = 40 % CUT =1.5 H max. 10 m.
10.0
H
64
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
L
POT = 40 % CUT =1.5 H max. 10 m.
a3
88
63
7
Strad
85
48
POT = 40 % CUT =1.5 H max. 10 m.
4
7.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
86
65
22
De. 42
POT = 40 % CUT =1.5 H max. 10 m.
Strada
81.90
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
81.93
66
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
5
une
Secti
POT = 40 % CUT =1.5 H max. 10 m.
a5
81.99
81.84
22
ne sectiu
83
84
POT = 40 % CUT =1.5 H max. 10 m.
L
10
45
POT = 40 % CUT =1.5 H max. 10 m.
67 68s=5.602,14mp.
191.5
23
156
81
82
a7
POT = 40 % CUT =1.5 H max. 10 m.
157
Strad
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Strad
158
24
9
10.0
17
42.0
46
POT = 40 % CUT =1.5 H max. 10 m.
18
5
iu
POT = 40 % CUT =1.5 H max. 10 m.
s=6.573,10mp.
POT = 40 % CUT =1.5 H max. 10 m.
ct
7
L
10
12
se
.0
a
POT = 40 % CUT =1.5 H max. 10 m.
25
b
POT = 40 % CUT =1.5 H max. 10 m.
8
19
POT = 40 % CUT =1.5 H max. 10 m.
44
69
h
POT = 40 % CUT =1.5 H max. 10 m.
141.3
79
20
43
.0
3
POT = 40 % CUT =1.5 H max. 10 m.
42
.0
0
POT = 40 % CUT =1.5 H max. 10 m.
c
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
41
6
8
POT = 40 % CUT =1.5 H max. 10 m.
8
2 10
3
4 13
6.
80
POT = 40 % CUT =1.5 H max. 10 m.
76.7
l
70
10.0
159
L
10.0
POT = 40 % CUT =1.5 H max. 10 m.
s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.
40.0
POT = 40 % CUT =1.5 H max. 10 m.
40.0
28
27
POT = 40 % CUT =1.5 H max. 10 m.
1
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
13
12
R1
78
POT = 40 % CUT =1.5 H max. 10 m.
160
71
42
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
26
s=7.894,21mp.
10.0
141.1
38.7
POT = 40 % CUT =1.5 H max. 10 m.
77
L
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
.0
POT = 40 % CUT =1.5 H max. 10 m.
41
72
POT = 40 % CUT =1.5 H max. 10 m.
10
St
13.8
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3
s=520,83mp. 2
75
76
2 3
4
38
POT = 40 % CUT =1.5 H max. 10 m.
St 307 ra 19 7da A 18
11
St
limita aliniament
limita aliniament
limita amplasare constructii
6 5
POT = 40 % CUT =1.5 H max. 10 m.
39
40
POT = 40 % CUT =1.5 H max. 10 m.
09
POT = 40 % CUT =1.5 H max. 10 m.
.0
4
.0
30
30
A
GC
22 21
73
74
42
PERIMETRU INTRAVILAN PRO
m
124 Strada 1
2 3
2
POT = 40 % CUT =1.5 H max. 10 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
29
.4
POT = 40 % CUT =1.5 H max. 10 m.
16
X 797030,5331 413 797409,3030 413 797427,9179 413 797545,9730 413 797573,5475 413 797649,6928 413 797180,2294 413 797101,4915 413 797061,2446 413
COORDONATE STER TEREN CE A GENERA S = 183.000,00mp
150
a A1
S23trad
I
LEGENDA:
9
A
POT = 40 % CUT =1.5 H max. 10 m.
6 7
18 17
POT = 40 % CUT =1.5 H max. 10 m.
4 5
22 21
35
33
32
C2
1.50
POT = 40 % CUT =1.5 H max. 10 m.
31
23
36
37
34
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Fig.
7.00
12 11 10
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
93.9 POT = 40 % CUT =1.5 H max. 10 m.
79.3
2
3
29
De
0 .0 12
1.50
10.0 7.0
21.0
10.0
28
14 13 12 .0 15
10
19
A B C D E F G H I
R
-2.80
1 2 3
24
P.T.E.
s=85,30mp.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
6
Fig.B1
11.0
ol
26
4 De. 41
5.4%
3.00
±0.00 =+0.60
aA 1
Str25ad
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
C
5
27
26
22 21 20
POT = 40 % CUT =1.5 H max. 10 m.
4
3
25
7.0
rter
L
LEX
+3.00
e
Strada de legatura - propusa prin P.U.Z.-
IAL
+6.00
taj
1.5 3.0
12.0
3.0 1.5
COORDONATE STE ZONA STUDIAT S = 216.675m
B
10.0 7.0
sarda
3.0
15.0
Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1
2
The approved Planning Zonal Plan sets out the permitted uses in this development. It regulates the: -POT: maximum building area per plot according to the use -CUT: all floors area divided by plot area -H: maximum heights of buildings -minimum building offsets from plot boundaries
+10.00
d
L
5.0
1.5
CON STAN TA
E LOCUINTE si ENTIAL
3.0
12.0
H max.10.0m
RC
PLANNING REGULATIONS
5.0 1.5
a
5.4%
IS X1
CO CO MP ME
H max.10.0m
limita am constr
limita
limita
limita con
15.0
3.0
106 m DN 22
VOLUMETRIC SUGGESTION
ARCHITECTURAL MASSING
ARCHITECTURAL MASSING
MIXED USE COMMERCIAL The Eastside plots of this development offer a great opportunity for either retail, commercial, hospitality, office or high rise residential development uses. The 350m of main street opening offers great visibility to ground floor development up to 3 stories high. The planning regulations allow for up to 45m high towers in these locations, subject to a PUD (Urban Detail Planning Plan) so that even PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL high rise residential, offices or hospitality are suitable and permitted. H max.45.00
+10.00
H max.25.00
+10.00
SECTIUNE STRAZI SI LOTURI
+6.00
mansarda
+6.00
+3.00
etaj
+3.00
parter
±0.00 =+0.60
5.4%
3.00
There are currently 2 plots: - North East Plot ( 14 427 sqm, 75% permitted built area, 45m max permitted building height) - South East Plot ( 22 937 sqm, 75% permitted built area, 45m max permitted building height) H max.10.0m
P+2
limita aliniament
13.0
H max.10.0m
5.0
demisol
-2.80
21.0
demisol 21.0
1.50
-2.80
7.00
1.50
H max.10.0m
Sectiune 5
IS x2
H max.45.00
5.4%
h
L
Sectiune strazi 2-7
3.0
3.0
10.0
5.4%
c
L
1.5 3.0
7.0
3.0 1.5
limita amplasare constructii
5.0
1.5
±0.00 =+0.60
1.50
LIS y
5.0
1.5
limita aliniament
10.0
limita amplasare constructii
limita aliniament
13.0
5.0 1.5
H max.45.00
limita aliniament
LIS Y
limita amplasare constructii
limita aliniament
limita amplasare constructii
87.2
Sectiune 1
5.0
10.0
7.00
5.4%
5.0
5.0 1.5
f
1.50
limita amplasare constructii
Sectiune strada 2
3.0
5.4%
L
3.00
5.4%
Sectiune 4
limita aliniament
limita amplasare constructii
H max.25.00
NORTH-EAST MIXED USE COMMERCIAL
Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)
H max.45.00
LEGENDA: DN 22
STR . BARAJULUI
DRUM COLECTOR ( AFERENT STR. BARAJULUI) DRUM PROPUS CONF. P.U.G. DRUM PROPUS IN . P.U.Z.
limita amplasare constructii
H max.10.0m
Sectiune 6 Sectiune strada 1
15.0
3.0
5.0
5.4%
L
l sibi po u Tra
4.5
4.5
R1
7.0
R1 Fig.D6
1.5 7.0
De. 1273 10.0
1.5
une
Secti
10.0
5.0
12 11
5.0
14 13
7 89
- SPATII VERZI, SCUARURI PUD PREALABIL
9
INDICATIV PARCELA DIN ZONA
PIETONAL
17
PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE
6
10.0
10
P
CIRCULATII CAROSABIL
1
5.0
13.0
7.0
POT = 40 % CUT =1.5 H max. 10 m.
123
8
15
41.0
10.0 40.0
I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL
a - -- k
7
16
5.0
se
121
4
5.0
122
POT = 40 % CUT =1.5 H max. 10 m.
9 10 11
e ctiun
ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE
tor colec
2a
s=4.154,60mp. POT = 40 % CUT =1.5 H max. 10 m.
6
13
14.0
4.5
6
14 POT = 40 % CUT =1.5 H max. 10 m.
ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.
7.0
7.0 46.5
drum
a
1 Tulcea 22
11.0
6.0
or R12.0
2 da
Str a
se
ct cole
Str ad
drum
0.0 R1
une 2
2b
3 ad a
Str
0
13.0
Secti
7.0 1.5
a
ad
8
14 13 12
POT = 40 % CUT =1,5 H max.=10m.
42.0
1a
139
ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)
a
POT = 40 % CUT =1.5 H max. 10 m.
De. 1266
L
LIS
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL
Str
Strad
9 10 5
40.0
POT = 40 % CUT =1.5 H max. 10 m.
aC
15 10.0
138 6 7 8
ad Str
5
11 10
0
9
5.
7
p.)
p. 3m
0m
,3
,0
63
19
.7
.6
=4
11
(s
s=
da
b
8 4 11
13 1210.0
140
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4
POT = 40 % CUT =1.5 H max. 10 m.
16
ZONA EDIFICABILA
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
s=5.484,60mp.
POT = 40 % CUT =1.5 H max. 10 m.
120
7
136 0
3.
POT = 40 % CUT =1.5 H max. 10 m.
141
POT = 40 % CUT =1.5 H max. 10 m.
0
a Str
40
143
5.
r Pp
T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA II AT MI IN AT SP SE RU BIL SP SI NT LA PE EA PR D PU
I-
.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
10
5.0
f
POT = 40 % CUT =1.5 H max. 10 m.
119
137
37
POT = 75 % CUT =4 H max. 25 m. 0
3.
118
1.376,92mp.
TEHNICO EDILITARE
LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA
1.5 7.0
10
142
145
34
0
0
3.
POT = 40 % CUT =1.5 H max. 10 m.
.0
134
.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
13.5
4c
s=6.460,56mp.
.0
3.
135
.0
POT = 40 % CUT =1.5 H max. 10 m.
7.0 1.5
6
ad Str 144
a
EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT
5.0
L
147
.0
36
a
7
w
k 146
g
40
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
132
POT = 40 % CUT =1.5 H max. 10 m.
5.
10
116
.0
40
117
.0
133
s=6.421,09mp.
POT = 40 % CUT =1.5 H max. 10 m.
0
da
KV
POT = 40 % CUT =1.5 H max. 10 m.
L 131
POT = 40 % CUT =1.5 H max. 10 m.
148
POT = 40 % CUT =1.5 H max. 10 m.
149
y
.7
29
0
.0
114
POT = 40 % CUT =1.5 H max. 10 m.
G.C.,P.T.E. - ZONA AMPLASARE SERVICII
50.983,55mp.
ZONA P EXTINDERE INTRAVILAN
30.5
13
0
5.
POT = 40 % CUT =1.5 H max. 10 m.
115
5 6 7
ad Str
0
a Str
11
150
POT = 40 % CUT =1.5 H max. 10 m.
5.
.
151
112
8 910
POT = 40 % CUT =1.5 H max. 10 m.
TOTAL
LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI
14.0
2 18 4.5 10.0
50.0
POT = 75 % CUT =4 H max. 45 m.
0
5. .0
s=1.409,80mp.
4 32
.0 10
.A
s=395,23mp.
113
POT = 40 % CUT =1.5 H max. 10 m.
Dr. 1264
128 130
din care 30% spatiu verde
44.533,80mp. +2.210,27
DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp
LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)
s=22.937,00mp.
0
5.
I
TEREN ADIACENT D.N.22 - - - - - - -
4.155,43mp. 11.619,33mp.
LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )
IS
POT = 40 % CUT =1.5 H max. 10 m.
CRESA , GRADINITA PUD PREALABIL
0
PUD PREALABIL
CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA
19 1.5
x2
1 12 11
SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m
ZONIFICARE
UNITATI DE INVATAMANT
5.
POT = 40 % CUT =1.5 H max. 10 m.
110
.0
10
129
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
z
.0
0
3.
.0
40
POT = 40 % CUT =1.5 H max. 10 m.
127
126
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
5
POT = 40 % CUT =1.5 H max. 10 m.
SPATII VERZI, PARCURI, ALEI PIETONALE
CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI
70.606,37mp. 1.409,80mp. din care 30% spatiu verde
LIMITA ZONA EDIFICABILA Fig.C29
4
30.5
17
4
10
L
POT = 40 % CUT =1.5 H max. 10 m.
PUD PREALABIL
I - Pprb C-
H max. 10 m.
SPATII VERZI ,PARCURI
LIMITA PERIMETRU INTRAVILAN EXISTENT
Fig.A40
5
S+D+P+2 -> 11-15 ET
PUD PREALABIL
111 s=6.248,94mp.
H max. 10 m.
UNITATI DE INVATAMANT
ZONA INTRAVILAN EXISTENT
Fig.C29
5
P -
CRESA , GRADINITA PUD PREALABIL
POT = 40 % CUT =1,5
LIMITA SUPRAFATA ZONA STUDIATA
R=14.0
6
LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5
LIMITE
11.0
7
37.364,00mp. din care 10% spatiu verde 5.484,60mp. din care 10% spatiu verde
LEGENDA: Fig.C29
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
5.0
1.5
.5 35
L.E 0
GC 5.
2.0 2.0
3.0
P
4.50
117.5
10.0
s=1806,59mp.
75 75 75
R12.00
LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET
S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.
LI -
X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134
11
SPATII VERZI ,PARCURI, SCUARURI
16 15
e
109
POT = 40 % CUT =1.5 H max. 10 m.
6
125
POT = 40 % CUT =1.5 H max. 10 m.
3.0
152
.0
15 POT = 40 % CUT =1.5 H max. 10 m.
153 15.0
5
1
2 3 4
13.0
1.5
a 2a
POT = 40 % CUT =1.5 H max. 10 m.
124
154
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
106
18 17
POT = 40 % CUT =1.5 H max. 10 m.
20 19 18
41.7
1.5
3.0
108
POT = 40 % CUT =1.5 H max. 10 m.
4
aB
41.7
E
5.5 5.5
6
2
119.2
Strad
1 2 3
25
23
Strad
10.0
Strad
2 3
POT = 40 % CUT =1.5 H max. 10 m.
155
721
87.21
87.25
POT = 40 % CUT =1.5 H max. 10 m.
107
105
104
1
17
R12
2.0
4
S+D+P+2 -> 11-15 ET
aB
7 15.0
12 3 19 20
87.20 87.20
1 18
98.7
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
102
4 5 6
16 15 14
10.0
10
0
5.
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
POT = 40 % CUT =1.5 H max. 10 m.
103
CUT =1.5 H max. 10 m.
9 8
a6 Strad
7
10.0
99
40.0
POT = 40 % CUT =1.5 H max. 10 m.
100
POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 %
101
10.0
4b Strada
L
40.5
97
s=2.352,60mp. .0
56
10 9
25.0
.0
7.0
NR.1 FIL TIP 655 RIU PRO GIRATO .G.- KM 178+ SENS P.U conf. propus
2
R16.00
3
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
9 1011
14
2
24
5.0
13.0
1
R1
2.5
4.50
IS
42.0
De. 1262
POT = 40 % CUT =1.5 H max. 10 m.
24.0
3.0
98
7 161
POT = 40 % CUT =1.5 H max. 10 m.
j
POT = 40 % CUT =1.5 H max. 10 m.
22.9
8
24.0
1
21.8 22.0
8
6 11
54
aB
2 1211 3 10 10.0
121 13
91 101
20
52
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
6
Strad
15.0
a
ad
21
L56
s=3.858,02mp.
58
60
15
.0
POT = 75 % CUT =4 H max. 45 m.
s=2.348,81.
PUD PREALABIL 56.2
7
5
d
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4
P
3 11
1
27 1.5
x1
6
4
s=14.427,00mp.
14 12 13
POT = 40 % CUT =1.5 H max. 10 m.
e
a1
94
9 8
un
10.0
une 3
96
96.0
15.0
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
55
7
0
5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
IS -ZONA
LIS -
PERIMETRU INTRAVILAN PROPUS
COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.
D
1 2
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
12.0
3.0
10.0
95
93
57
59
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
91
Str
12
16 15
90.8
4a
5
17
92
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
a
SPATII VERZI ,PARCURI, SCUARURI
141312 11
POT = 40 % CUT =1.5 H max. 10 m.
1
10 9
8
51
53
POT = 40 % CUT =1.5 H max. 10 m.
42.3
16
10.0
POT = 40 % CUT =1.5 H max. 10 m.
44.3
13
a5
Strad
6
11
32 33
8
7 8
15
15
9 10
31
9
5.
17 16
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8
2 10
.0
0
Strad
18
89
POT = 40 % CUT =1.5 H max. 10 m.
2 3
1211 10
11
POT = 40 % CUT =1.5 H max. 10 m.
14
17
18
POT = 40 % CUT =1.5 H max. 10 m.
11 12
16 15
POT = 40 % CUT =1.5 H max. 10 m.
4
ne
cti
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
2 3
Secti
L
POT = 40 % CUT =1.5 H max. 10 m.
14
7
13 12 11
21
POT = 40 % CUT =1.5 H max. 10 m.
19
10.0
49
5 6
40.3
i
s=9.613,59mp.
POT = 40 % CUT =1.5 H max. 10 m.
7
41.5
50
40.4
90
4
6
47
POT = 40 % CUT =1.5 H max. 10 m.
4
9
8
Strada
POT = 40 % CUT =1.5 H max. 10 m.
5
19
61
62
4
20
48
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
20
5
Se
3
4 13
5.
iu
POT = 40 % CUT =1.5 H max. 10 m.
9
13
.0
23
L
s=8.447,07mp.
POT = 40 % CUT =1.5 H max. 10 m.
ct
7
L
10
s=6.573,10mp.
POT = 40 % CUT =1.5 H max. 10 m.
1
se
.0
a
POT = 40 % CUT =1.5 H max. 10 m.
12 10
40.4
87
63
40.0 POT = 40 % CUT =1.5 H max. 10 m.
25
a2 Strad
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
I
POT = 40 % CUT =1.5 H max. 10 m.
64
10.0
10.0
H
65
POT = 40 % CUT =1.5 H max. 10 m.
85 40.0
88
81.93
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
86
22
POT = 40 % CUT =1.5 H max. 10 m.
3
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
7.0
4 Strada
81.90
83
84
POT = 40 % CUT =1.5 H max. 10 m.
191.5
81.84
82
22
e
5
156
POT = 40 % CUT =1.5 H max. 10 m.
De. 427
Strada
157
7 Strada
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
sectiun
10
.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
5
POT = 40 % CUT =1.5 H max. 10 m.
41
b
24
9
10.0
17
45
POT = 40 % CUT =1.5 H max. 10 m.
une
Secti
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8
18
42.0
46
POT = 40 % CUT =1.5 H max. 10 m.
66
POT = 40 % CUT =1.5 H max. 10 m.
44
69
L
67 68s=5.602,14mp.
20
19
43
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
h
POT = 40 % CUT =1.5 H max. 10 m.
81
141.3
79
POT = 40 % CUT =1.5 H max. 10 m.
42
28
27
26
s=7.894,21mp.
c
10.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
3
POT = 40 % CUT =1.5 H max. 10 m.
42
0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Strada
158
23 81.99
70
POT = 40 % CUT =1.5 H max. 10 m.
80
POT = 40 % CUT =1.5 H max. 10 m.
76.7
l
10.0
40.0
10.0
159
71
42
POT = 40 % CUT =1.5 H max. 10 m.
6
13
12
6.
78
POT = 40 % CUT =1.5 H max. 10 m.
160
L
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
40.0
141.1
38.7
s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.
L
41
72
POT = 40 % CUT =1.5 H max. 10 m.
77
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8
POT = 40 % CUT =1.5 H max. 10 m.
Str 307 a 19 7da A 18
11
R1
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3
9
4
.0
30
POT = 40 % CUT =1.5 H max. 10 m.
2
11.
13.8
2
75
76
2 3
4
16 10
POT = 40 % CUT =1.5 H max. 10 m.
29
. 40
POT = 40 % CUT =1.5 H max. 10 m.
17
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
18
29
De
.00
6 5
32
4 5 6 7
10
.0
35
33
28
14 13 12 .0 15
10
R12
A
GC
s=520,83mp.
31
23 22 21
36
38
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
34
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
6
Fig.B1
P.T.E.
s=85,30mp.
10.0
19
IS -
X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066
A B C D E F G H I
CONSTANTA
7.0
10.0 7.0
124 Strada 1
POT = 40 % CUT =1.5 H max. 10 m.
37
39
40
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
93.9 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
73
74
POT = 40 % CUT =1.5 H max. 10 m.
2
3
24
10.0
De. 414
2 3
22 21
1 2 3
12 11 10
a A1
ad Str 23
10.0 7.0
Str25
26
Strada de legatura - propusa prin P.U.Z.-
C
5
27
26
25
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
79.3
4
3
2
22 21 20
A ada 1
5.0
L
7.0
e
183.000,00mp. din care suprafete
TOTAL TEREN CE A GENERAT P.U.Z.
1
1.5 3.0
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
A
BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp
B
a
12.0
3.0
ad
3.0 1.5
5.4%
IS X1
5.0
1.5
Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1
Str
15.0
12.0
limita amplasare constructii
3.0
5.0 1.5
a
H max.10.0m
limita aliniament
limita aliniament
limita amplasare constructii
d
L
Sectiune 3
29
H max.10.0m
limita amplasare constructii
limita amplasare constructii
limita aliniament
IS x2
limita aliniament
7
30
limita amplasare constructii
limita aliniament
1.5
Fig.C
limita aliniament
12.0
P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008
m
1.5
7.0
150
7.0
IS x1
15.0
X IAL
7.0
TEREN CARE A GENERAT P.U.Z.
P+2
Sectiune 2
COMPLE COMERC
P+2
Strad
a C16
PROPUNERE TRASEU STRAZI CONF. P.U.G.
F
ZONA D.N. 22 EXISTENT
10 11
ZONA EXTINDERE CAROSABIL D.N. 22
12
aC
PROPUNERE DE MOBILARE URBANA
Strad
Dr. 1266
5.0
3
5.0
5.0
GC
10.0
10.0
s=375,56mp.
19 +45.00
78.39 78.40 78.10
78.06
G
83 m
85 m
87 m
+35.00
90 m
93 m +10.00
95 m +10.00
+20.00
102 m
106 m DN 22
+10.00
+10.00
83 m
panta teren 5.4%
SECTIUNE TRANSVERSALA
Proiectant general:
Beneficiar:
s.c. PROMARH s.r.l. Nume:
Semnatura:
Proiect nr:
MATROZ CONSTANTIN si FLOREA ION
TULCEA
str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea
J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180
Specificatie:
Sef Proiect arh. Marcel PAVEL
Scara:
1 / 1.000
Proiectat
arh. Marcel PAVEL
Data:
Desenat
arh. Paul Cristian MURAVELI
Noiembrie 2017
Denumire proiect:
LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.
Denumire plansa:
REGLEMENTARI URBANISTICE
87/2017 Faza:
P.U.Z. Nr. plansa:
U4
SOUTH-EAST MIXED USE COMMERCIAL
eAt
work & live
shop
RETAIL CENTER Max Buildable Area: 28 000 sqm
APARTMENT BUILDINGS Max Buildable Area: 60 000 sqm Estimate No. Apartments: 500
COLLECTIVE RESIDENTIAL The MGM2 development offers a plot that is suitable for hospitality or collective housing with potential for commercial ground floor with an area of 5 484.60 sqm. The maximum built area permitted is no more than 75% of this area while the maximum building height is set at 26m.
PUBLIC SQUARE (PLAYGROUND) MIXED USE COMMERCIAL
PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si
CONSTRUIRE COMPLEX SI ANSAMBLU REZIDENTIAL This plot also allows for office spaces and COMERCIAL commercial/ service activities on the ground floors. It is also well-positioned between the individual residential and the commercial side. H max.45.00
+10.00
H max.25.00
+10.00
SECTIUNE STRAZI SI LOTURI
+3.00
H max.10.0m
Sectiune 4
P+2
limita aliniament
Sectiune strada 2
13.0
3.0
1.5
5.0
demisol 21.0
1.50
-2.80
7.00
1.50
H max.10.0m
IS x2 H max.45.00 5.4%
Sectiune strazi 2-7
3.0
h
L
3.0
10.0
KINDERGARDEN/ NURSARY
5.4%
c
L
1.5 3.0
7.0
3.0 1.5
limita amplasare constructii
10.0
5.0 1.5
H max.45.00
5.4%
3.00
-2.80
21.0
1.50
Sectiune 5 limita amplasare constructii
LIS Y
H max.10.0m
+3.00
±0.00 =+0.60
demisol
LIS y
5.0
1.5
limita aliniament
5.0
10.0
limita aliniament
limita aliniament
limita aliniament
13.0
5.0
5.0 1.5
f
limita amplasare constructii
87.2
limita amplasare constructii
L
7.00
±0.00 =+0.60
etaj
parter
5.4%
5.0
5.4%
Sectiune 1
1.50
limita amplasare constructii
limita aliniament
limita amplasare constructii
H max.25.00
3.00
5.4%
+6.00
mansarda
+6.00
Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada) H max.45.00
LEGENDA: DN 22 STR . BARAJULUI DRUM COLECTOR ( AFERENT STR. BARAJULUI) DRUM PROPUS CONF. P.U.G. DRUM PROPUS IN . P.U.Z.
limita amplasare constructii
H max.10.0m
Sectiune 6
limita amplasare constructii
Sectiune strada 1
15.0
3.0
5.0
5.4%
L
sibi l po u se
4.5
R12.0
Fig.D6
1.5 7.0
ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)
De. 1273
POT = 40 % CUT =1,5 H max.=10m.
42.0
46.5
10.0
1.5
une 10.0
5.0
14 13
7 89
9
INDICATIV PARCELA DIN ZONA
PIETONAL
17
PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE
6
13.0
5.0
- SPATII VERZI, SCUARURI PUD PREALABIL
CIRCULATII CAROSABIL
1
5.0
10.0
12 11
P
a - -- k 8
15
7.0
10
ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL
7
16
Secti
5.0
POT = 40 % CUT =1.5 H max. 10 m.
123
4 41.0
10.0 40.0
14.0
4.5
tor colec
se
121
ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.
7.0
7.0
drum
122
POT = 40 % CUT =1.5 H max. 10 m.
9 10 11
6
e ctiun
5.0
14 13 12
1 Tulcea 22
11.0
6.0
R1
7.0
R1
2b
4.5
2 a ad
Str
Tra
ctor
a
cole
Str
0.0
drum
R1
ad
3 a ad
Str
0
13.0
une 2 Secti
139
7.0 1.5
POT = 40 % CUT =1.5 H max. 10 m.
De. 1266
2a
8 15 10.0
40.0
POT = 40 % CUT =1.5 H max. 10 m.
aC
Strad
9 10 5
16
POT = 40 % CUT =1.5 H max. 10 m.
138 6 7 8
a
5
11 10
ad
7
9
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL
13
a C16
Strad
PROPUNERE TRASEU STRAZI CONF. P.U.G.
F
ZONA D.N. 22 EXISTENT
10 11
ZONA EXTINDERE CAROSABIL D.N. 22
12
aC
PROPUNERE DE MOBILARE URBANA
Strad
Dr. 1266
5.0
3
5.0
5.0
GC
10.0
10.0
s=375,56mp.
19 +45.00
78.39 78.40 78.10
78.06
G
83 m
85 m
87 m
+35.00
90 m
93 m +10.00
95 m +10.00
+20.00
102 m
106 m DN 22
+10.00
+10.00
83 m
panta teren 5.4%
SECTIUNE TRANSVERSALA
COLECTIVE HOUSING/
1.376,92mp.
TEHNICO EDILITARE
ZONA EDIFICABILA
50.0
1a
a
p.
p.)
3m
0m
,3
,0
63
19
.7
.6
=4
(s
11 s=
8 4 11
13 1210.0
140
137
37
POT = 40 % CUT =1.5 H max. 10 m.
4
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
G.C.,P.T.E. - ZONA AMPLASARE SERVICII
50.983,55mp.
LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA
6
14 POT = 40 % CUT =1.5 H max. 10 m.
s=4.154,60mp.
120
7
136 0
3.
POT = 40 % CUT =1.5 H max. 10 m.
141
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
L
TOTAL
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII
a
40
143
ad
rb
T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR
D
II
Str
SI
Pp
AT
PU
SP
.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
10
5.0
118
LIS
s=5.484,60mp.
0
3.
Str
10
142
145
f
119
3.
POT = 40 % CUT =1.5 H max. 10 m.
.0
134
.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
g
.0
34
din care 30% spatiu verde
44.533,80mp. +2.210,27
DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp
ZONA P EXTINDERE INTRAVILAN
30.5
POT = 75 % CUT =4 H max. 25 m.
POT = 40 % CUT =1.5 H max. 10 m.
0
14.0
2 18 4.5 10.0
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
ad Str
4c
144
s=6.460,56mp.
I-
5.0
L
147
.0
36
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
0
3.
135
.0
40
ad
w
k 146
Str
POT = 40 % CUT =1.5 H max. 10 m.
40
117
POT = 40 % CUT =1.5 H max. 10 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
132
POT = 40 % CUT =1.5 H max. 10 m.
116
.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
133
s=6.421,09mp.
POT = 40 % CUT =1.5 H max. 10 m.
a
EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT
149
POT = 40 % CUT =1.5 H max. 10 m.
L 131
POT = 40 % CUT =1.5 H max. 10 m.
148
POT = 40 % CUT =1.5 H max. 10 m.
0
150
0
5. .0
5.
10
POT = 40 % CUT =1.5 H max. 10 m.
115
5 6 7
TEREN ADIACENT D.N.22 - - - - - - -
4.155,43mp. 11.619,33mp.
CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA
19
13
5.
y
.7
29
0
.0
4
1.5
POT = 75 % CUT =4 H max. 45 m.
0
5.
128 130
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8 910
Dr. 1264
6
7
151
129
POT = 40 % CUT =1.5 H max. 10 m.
a ad
a
KV
ad
POT = 40 % CUT =1.5 H max. 10 m.
127
I
PUD PREALABIL
LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI
Fig.C29
5
IS
s=1.409,80mp.
4 32
114
SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m
LIMITA ZONA EDIFICABILA Fig.A40
6
x2
1 12 11
113
112
0
5.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Str
0
Str
11
3.0
0
3.
.0
40
110
SPATII VERZI, PARCURI, ALEI PIETONALE
CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI
LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)
s=22.937,00mp.
0
5.
0 5.
.
2.0 2.0
153 15.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
z
.0
10
L
111 s=6.248,94mp. .0
10
126
152
POT = 40 % CUT =1.5 H max. 10 m.
e
109
POT = 40 % CUT =1.5 H max. 10 m.
6
POT = 40 % CUT =1.5 H max. 10 m.
C-
LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )
S+D+P+2 -> 11-15 ET
17
POT = 40 % CUT =1.5 H max. 10 m.
.0
3.0
.A 0
GC 5.
s=395,23mp.
5
125
POT = 40 % CUT =1.5 H max. 10 m.
.0
POT = 40 % CUT =1.5 H max. 10 m.
4
18 17
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
124
15
87.21
87.25
106
104
1 2 3
PUD PREALABIL
I - Pprb
70.606,37mp. 1.409,80mp. din care 30% spatiu verde
LIMITA SUPRAFATA ZONA STUDIATA
1.5 7.0
a6
10
L.E 87.20 87.20
POT = 40 % CUT =1.5 H max. 10 m.
102
4 5 6
16 15 14
154
POT = 40 % CUT =1.5 H max. 10 m.
5
SPATII VERZI ,PARCURI
LIMITA PERIMETRU INTRAVILAN EXISTENT
R=14.0
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
5.0
1.5
P -
H max. 10 m.
ZONIFICARE
UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL
H max. 10 m.
UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL
POT = 40 % CUT =1,5
ZONA INTRAVILAN EXISTENT
Fig.C29
Fig.C29
PUD PREALABIL
5
5.484,60mp. din care 10% spatiu verde
LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5
LIMITE
11.0
7
37.364,00mp. din care 10% spatiu verde
LEGENDA:
30.5
10.0
1.5 41.7
P
s=1806,59mp.
4
4.50
117.5
0
9 8
Strad
POT = 40 % CUT =1.5 H max. 10 m.
155
1
2 3 4
75 75 75
R12.00
LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET
S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.
LI -
X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134
11
SPATII VERZI ,PARCURI, SCUARURI
5.
7
10.0
19 20 721
aB
9 1011
13.0
E
5.5 5.5
6
2
119.2
.5
99
4
POT = 75 % CUT =4 H max. 45 m.
41.7
1.5
16 15
25
S+D+P+2 -> 11-15 ET
20 19 18
R12
2.0
23
Strad
10.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
7.0
NR.1 FIL TIP 655 RIU PRO GIRATO .G.- KM 178+ SENS P.U conf. propus
2
R16.00
3
24
5.0
aB
14
2
4.50
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
Strad
1 2 3
1
R1
2.5
1.5
x1
6
15
.0
1
27
IS
13.0
35
POT = 40 % CUT =1.5 H max. 10 m.
100
POT = 40 % CUT =1.5 H max. 10 m.
12 3
17
3.0
108
POT = 40 % CUT =1.5 H max. 10 m.
10.0
j
L
s=2.352,60mp. .0
4b Strada
97
40.5
161
10
0
5.
1 18 25.0
107
105
98.7
POT = 40 % CUT =1.5 H max. 10 m.
7
42.0
7
De. 1262
a 2a
7 22.9
6 11
103
CUT =1.5 H max. 10 m.
56
10 9
POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 %
101
8
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
3 11
s=14.427,00mp.
14 12 13
8
e
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
IS -ZONA
LIS -
PERIMETRU INTRAVILAN PROPUS
COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.
D
1 2 4
13.5
6
1
10.0
un
10.0
POT = 40 % CUT =1.5 H max. 10 m.
a
7.0 1.5
60
54
Strad
5
52
POT = 40 % CUT =1.5 H max. 10 m.
11
32 33 9
12.0
P
9 10
31
s=2.348,81.
PUD PREALABIL
15.0
4
L56
POT = 40 % CUT =1.5 H max. 10 m.
aB
2 1211 3 10 10.0 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
96.0
40.0
a 20
POT = 40 % CUT =1.5 H max. 10 m.
51
53
55
s=3.858,02mp.
58
3.0
15.0
ad Str
21
9 8
98
21.8 22.0
8
a5
d
POT = 40 % CUT =1.5 H max. 10 m.
15.0
7
Strad
121 13
91 101
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
57
POT = 40 % CUT =1.5 H max. 10 m.
0
SPATII VERZI ,PARCURI, SCUARURI
141312 11
une 3 Secti
96
POT = 40 % CUT =1.5 H max. 10 m.
94
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10 9
8
15
42.3
16
10.0
POT = 40 % CUT =1.5 H max. 10 m.
44.3
5.
0
5
8
2 10
.0
7 8
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
17
18
13
POT = 40 % CUT =1.5 H max. 10 m.
1
59
POT = 40 % CUT =1.5 H max. 10 m.
92
POT = 40 % CUT =1.5 H max. 10 m.
91
14
2 3
10.0
95
19
20
POT = 40 % CUT =1.5 H max. 10 m.
Strad
5 6
1211 10
40.3
90.8
4
9
8 7
POT = 40 % CUT =1.5 H max. 10 m.
93
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
11 12
16 15
6
A 3
4 13
5.
17 16 15
56.2
7
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
11
POT = 40 % CUT =1.5 H max. 10 m.
14
10.0
49
POT = 40 % CUT =1.5 H max. 10 m.
4
ne
cti
9
POT = 40 % CUT =1.5 H max. 10 m.
2 3
5
Se
POT = 40 % CUT =1.5 H max. 10 m.
13
.0
13 12 11
21
40.4
6
16 15
4a
POT = 40 % CUT =1.5 H max. 10 m.
5
17
41.5
50
40.4
L
18
61
62
5
19
89
s=9.613,59mp.
4
12
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4
20
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
47
POT = 40 % CUT =1.5 H max. 10 m.
Strada
i
10.0
87
48
POT = 40 % CUT =1.5 H max. 10 m.
10.0
10
23
POT = 40 % CUT =1.5 H max. 10 m.
a2
40.0
10.0
POT = 40 % CUT =1.5 H max. 10 m.
90
POT = 40 % CUT =1.5 H max. 10 m.
L
s=8.447,07mp.
3.0
40.0
POT = 40 % CUT =1.5 H max. 10 m.
22
Strad
88
POT = 40 % CUT =1.5 H max. 10 m.
63
POT = 40 % CUT =1.5 H max. 10 m.
3
85
86
H I
POT = 40 % CUT =1.5 H max. 10 m.
64
10
De. 427
POT = 40 % CUT =1.5 H max. 10 m.
65
POT = 40 % CUT =1.5 H max. 10 m.
4
191.5
7.0
81.93
Secti
66
POT = 40 % CUT =1.5 H max. 10 m.
10.0
17
iu
POT = 40 % CUT =1.5 H max. 10 m.
s=6.573,10mp.
POT = 40 % CUT =1.5 H max. 10 m.
ct
7
L
10
12
18
1
se
.0
a
POT = 40 % CUT =1.5 H max. 10 m.
25
POT = 40 % CUT =1.5 H max. 10 m.
5
une
68s=5.602,14mp.
POT = 40 % CUT =1.5 H max. 10 m.
Strada
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
3
POT = 40 % CUT =1.5 H max. 10 m.
42
a1 Strad
81 83
84
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
41
b
24
9
18
45
POT = 40 % CUT =1.5 H max. 10 m.
67
5
e
sectiun
81.90
POT = 40 % CUT =1.5 H max. 10 m.
82
22
23 81.99
81.84
POT = 40 % CUT =1.5 H max. 10 m.
7
156
POT = 40 % CUT =1.5 H max. 10 m.
42.0
46
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8
19
43
44
69
L
20
Strada
157
c
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
h
POT = 40 % CUT =1.5 H max. 10 m.
141.3
79
Strada
158
Strada
l
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
70
POT = 40 % CUT =1.5 H max. 10 m.
76.7
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
80
POT = 40 % CUT =1.5 H max. 10 m.
42
28
27
26
s=7.894,21mp.
10.0
6
13
12
0
POT = 40 % CUT =1.5 H max. 10 m.
40.0
10.0
159
71
42
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8
POT = 40 % CUT =1.5 H max. 10 m.
S 7 11 tr 30 a 19 7da
6.
78
POT = 40 % CUT =1.5 H max. 10 m.
160
L
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
40.0
141.1
38.7
s=2.980,45mp.
L
41
72
POT = 40 % CUT =1.5 H max. 10 m.
77
2
4
.0
30
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
29
POT = 40 % CUT =1.5 H max. 10 m.
9
R1
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3
16
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
6 7
.0
. 40
POT = 40 % CUT =1.5 H max. 10 m.
17
11.
13.8
2
75
76
2 3
4
32
4 5
22 21 10
18
29
De
.00
6 5
31
23
36
38
POT = 40 % CUT =1.5 H max. 10 m.
35
33
28
14 13 12 .0 15
10
R12
7.0
A
GC
s=520,83mp.
POT = 40 % CUT =1.5 H max. 10 m.
37
39
40
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
93.9 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
73
74
POT = 40 % CUT =1.5 H max. 10 m.
34
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
De. 414
2 3
22 21
1 2 3
12 11 10
a A1
ad Str 23
79.3
2
3
24
6
Fig.B1
P.T.E.
s=85,30mp.
10.0
19
IS -
X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066
A B C D E F G H I
CONSTANTA
Str25ad
26
10.0 7.0
124 Strada 1
10.0 7.0
aA 1
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
C
5
27
26
25
Strada de legatura - propusa prin P.U.Z.-
4
3
2
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
5.0
L
7.0
e
183.000,00mp. din care suprafete
TOTAL TEREN CE A GENERAT P.U.Z.
1
1.5 3.0
22 21 20
A
BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp
B
da
12.0
3.0
Str a
3.0 1.5
5.4%
IS X1
5.0
1.5
Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1
limita amplasare constructii
15.0
limita aliniament
limita aliniament
limita amplasare constructii
3.0
12.0
H max.10.0m
29
d
L
Sectiune 3
30
H max.10.0m
5.0 1.5
a
limita amplasare constructii
IS x2
limita aliniament
7
limita aliniament
limita aliniament
7.0
1.5
Fig.C
limita aliniament
12.0
m
limita amplasare constructii
15.0
1.5
150
7.0
P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008
X IAL
7.0
IS x1
TEREN CARE A GENERAT P.U.Z.
P+2
Sectiune 2
COMPLE COMERC
P+2
Proiectant general:
Beneficiar:
s.c. PROMARH s.r.l. Nume:
Semnatura:
Proiect nr:
MATROZ CONSTANTIN si FLOREA ION
TULCEA
str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea
J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180
Specificatie:
Sef Proiect arh. Marcel PAVEL
Scara:
1 / 1.000
Proiectat
arh. Marcel PAVEL
Data:
Desenat
arh. Paul Cristian MURAVELI
Noiembrie 2017
Denumire proiect:
LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.
Denumire plansa:
REGLEMENTARI URBANISTICE
87/2017 Faza:
P.U.Z. Nr. plansa:
U4
INDIVIDUAL HOUSING
HOSPITALITY/ OFFICES
OWN
BUILD
invest
shop
APARTMENT BUILDINGS Max Buildable Area: 20 000 sqm Estimate No. Flats: 160
INDIVIDUAL RESIDENTIAL Approximately 10 ha of the site is dedicated to low rise residential development. This will generate a young neighborhood of 160 individual houses. The smallest plot is approximately 300sqm while the largest is about 700sqm. The maximum building permitted area on each plot is 40% of the size of the plot, while the maximum height permitted is 10m. PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si
CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL H max.45.00
+10.00
The anticipated average age of the residential buyer for these plots is around 34, so the neighborhood is expected to have young residents and a need for educational, commercial and leisure uses within neighborhood proximity. H max.25.00
+10.00
SECTIUNE STRAZI SI LOTURI
+3.00
H max.10.0m
Sectiune 4
P+2
limita aliniament
Sectiune strada 2
13.0
3.0
H max.10.0m
5.4%
3.00
-2.80
21.0
1.50
demisol 21.0
1.50
-2.80
7.00
1.50
H max.10.0m
Sectiune 5
IS x2 H max.45.00 5.4%
h
L
Sectiune strazi 2-7
3.0
3.0
10.0
5.4%
c
L
1.5 3.0
7.0
3.0 1.5
limita amplasare constructii
5.0
+3.00
±0.00 =+0.60
demisol
LIS y
5.0
1.5
limita aliniament
5.0
1.5
H max.45.00
limita amplasare constructii
10.0
5.0 1.5
10.0
limita aliniament
limita aliniament
limita aliniament
13.0
5.0 LIS Y
5.0 1.5
f
limita amplasare constructii
87.2
limita amplasare constructii
L
7.00
±0.00 =+0.60
etaj
parter
5.4%
5.0
5.4%
Sectiune 1
1.50
limita amplasare constructii
limita aliniament
limita amplasare constructii
H max.25.00
3.00
5.4%
+6.00
mansarda
+6.00
Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada) H max.45.00
LEGENDA: DN 22 STR . BARAJULUI DRUM COLECTOR ( AFERENT STR. BARAJULUI) DRUM PROPUS CONF. P.U.G. DRUM PROPUS IN . P.U.Z.
limita amplasare constructii
H max.10.0m
Sectiune 6
limita amplasare constructii
Sectiune strada 1
15.0
3.0
5.0
5.4%
L
sibi l po u se
4.5
4.5
1 Tulcea 22
11.0
6.0
R1
7.0
R1 Fig.D6
1.5 7.0
R12.0
2 a ad
Str
Tra
ctor
POT = 40 % CUT =1,5 H max.=10m.
42.0
46.5
10.0
1.5
une 10.0
10.0
14 13
7 89
9
INDICATIV PARCELA DIN ZONA
PIETONAL
17
PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE
6
13.0
5.0
- SPATII VERZI, SCUARURI PUD PREALABIL
CIRCULATII CAROSABIL
1
5.0
7.0
12 11
P
a - -- k 8
15
5.0
5.0
10
ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL
7
16
Secti
5.0
10.0
123
4 41.0
POT = 40 % CUT =1.5 H max. 10 m.
14.0
4.5
tor colec
e ctiun
ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.
7.0
7.0
drum
2a
6
13
se
121
40.0
MAIN BOULEVARD
ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)
De. 1273
2b
cole
a
0.0
drum
R1
13.0
une 2 Secti
7.0 1.5
Str
0
ad
3 a ad
Str
6.
R1
a
ad
122
POT = 40 % CUT =1.5 H max. 10 m.
9 10 11
1.376,92mp.
TEHNICO EDILITARE
ZONA EDIFICABILA
50.0
1a
7
14 13 12
POT = 40 % CUT =1.5 H max. 10 m.
44.533,80mp. +2.210,27
50.983,55mp.
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII
a
139
Str
8 15
POT = 40 % CUT =1.5 H max. 10 m.
De. 1266
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL
14 POT = 40 % CUT =1.5 H max. 10 m.
s=4.154,60mp.
120
10.0 40.0
POT = 40 % CUT =1.5 H max. 10 m.
aC
Strad
9 10 5
16
POT = 40 % CUT =1.5 H max. 10 m.
138 6 7 8
119
137
37
5
11 10
POT = 40 % CUT =1.5 H max. 10 m.
L
TOTAL
LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA
6
s=5.484,60mp.
0
3.
118
LIS
a C16
Strad
PROPUNERE TRASEU STRAZI CONF. P.U.G.
F
ZONA D.N. 22 EXISTENT
10 11
ZONA EXTINDERE CAROSABIL D.N. 22
12
aC
PROPUNERE DE MOBILARE URBANA
Strad
Dr. 1266
5.0
3
5.0
5.0
GC
10.0
10.0
s=375,56mp.
19 +45.00
78.39 78.40 78.10
78.06
G
83 m
85 m
87 m
+35.00
90 m
93 m +10.00
95 m +10.00
+20.00
102 m
106 m DN 22
+10.00
+10.00
83 m
panta teren 5.4%
SECTIUNE TRANSVERSALA
TYPICAL INDIVIDUAL HOUSING PLOT
DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp
G.C.,P.T.E. - ZONA AMPLASARE SERVICII
ZONA P EXTINDERE INTRAVILAN
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
ad Str
a
p.
p.)
3m
0m
,3
,0
63
19
.7
.6
=4
(s
11 s=
8 4 11
9
f
7
POT = 40 % CUT =1.5 H max. 10 m.
4 13 1210.0
140
.0
34
POT = 40 % CUT =1.5 H max. 10 m.
3.
POT = 40 % CUT =1.5 H max. 10 m.
136 0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
0
3.
0
.0
3.
POT = 40 % CUT =1.5 H max. 10 m.
141
POT = 40 % CUT =1.5 H max. 10 m.
0
40
143
ad
rb
T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR
D
II
Str
SI
Pp
AT
PU
SP
.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
10
5.0
5.
10
142
145
g
134
.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4c
144
s=6.460,56mp.
I-
5.0
L
147
.0
36
40
117
POT = 40 % CUT =1.5 H max. 10 m.
135
.0
40
ad
w
k 146
Str
POT = 40 % CUT =1.5 H max. 10 m.
.0
POT = 40 % CUT =1.5 H max. 10 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
132
POT = 40 % CUT =1.5 H max. 10 m.
14.0
2 18 4.5 10.0
30.5
POT = 75 % CUT =4 H max. 25 m.
POT = 40 % CUT =1.5 H max. 10 m.
.0
133
s=6.421,09mp.
POT = 40 % CUT =1.5 H max. 10 m.
a
EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT
149
POT = 40 % CUT =1.5 H max. 10 m.
L 131
POT = 40 % CUT =1.5 H max. 10 m.
148
POT = 40 % CUT =1.5 H max. 10 m.
0 5.
150
TEREN ADIACENT D.N.22 - - - - - - -
din care 30% spatiu verde
LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI
1.5 7.0
128 130
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
0
5. .0
5.
10
116
CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI
4.155,43mp. 11.619,33mp.
CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA
19 1.5
13
0
0
.0
PUD PREALABIL
LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)
POT = 75 % CUT =4 H max. 45 m.
5.
y
.7
29
115
5 6 7
6
7
151
8 910
Dr. 1264
a ad
a
KV
ad
POT = 40 % CUT =1.5 H max. 10 m.
129
POT = 40 % CUT =1.5 H max. 10 m.
I
s=1.409,80mp. 0
4 32
114
SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m
LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )
s=22.937,00mp.
0
1 12 11
113
C-
SPATII VERZI, PARCURI, ALEI PIETONALE
LIMITA ZONA EDIFICABILA Fig.C29
4
IS
5.
5.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Str
0
Str
11
3.0
0
3.
.0
40
110 112
127
13.5
.
2.0 2.0
153 15.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
z
.0
10
L
111 s=6.248,94mp. .0
10
126
152
POT = 40 % CUT =1.5 H max. 10 m.
e
109
POT = 40 % CUT =1.5 H max. 10 m.
6
POT = 40 % CUT =1.5 H max. 10 m.
PUD PREALABIL
I - Pprb
70.606,37mp. 1.409,80mp. din care 30% spatiu verde
LIMITA SUPRAFATA ZONA STUDIATA
Fig.A40
5
x2
UNITATI DE INVATAMANT
.0
3.0
.A 0
GC 5.
s=395,23mp.
5
125
POT = 40 % CUT =1.5 H max. 10 m.
.0
POT = 40 % CUT =1.5 H max. 10 m.
4
18 17
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
124
15
87.21
87.25
106
104
1 2 3
7.0 1.5
a6
10
L.E 87.20 87.20
POT = 40 % CUT =1.5 H max. 10 m.
102
4 5 6
16 15 14
154
POT = 40 % CUT =1.5 H max. 10 m.
SPATII VERZI ,PARCURI
ZONIFICARE
POT = 40 % CUT =1.5 H max. 10 m.
CRESA , GRADINITA PUD PREALABIL
P -
H max. 10 m.
LIMITA PERIMETRU INTRAVILAN EXISTENT
R=14.0
6
30.5
17
5
H max. 10 m.
UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL
POT = 40 % CUT =1,5
ZONA INTRAVILAN EXISTENT
Fig.C29
5
5.484,60mp. din care 10% spatiu verde
LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5
LIMITE
11.0
7
37.364,00mp. din care 10% spatiu verde
LEGENDA: Fig.C29
S+D+P+2 -> 11-15 ET
PUD PREALABIL
16 15
FIL TIP 655 RIU PRO GIRATO .G.- KM 178+ SENS P.U conf. propus
75 75 75
R12.00
4.50
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
5.0
0
9 8
Strad
POT = 40 % CUT =1.5 H max. 10 m.
155
P
s=1806,59mp.
E
5.5 5.5
6
11
SPATII VERZI ,PARCURI, SCUARURI
4
NR.1
LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET
S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.
LI -
X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134
117.5
10.0
1.5
5.
7
10.0
19 20 721
1
2 3 4
13.0
1.5
.5
99
POT = 40 % CUT =1.5 H max. 10 m.
.0
R12
2.0
R1
4
2
aB
9 1011
20 19 18
2
R16.00
.0
23
119.2
41.7
14
3
S+D+P+2 -> 11-15 ET
41.7
1
2
4.50
25
24
5.0
35
POT = 40 % CUT =1.5 H max. 10 m.
100
POT = 40 % CUT =1.5 H max. 10 m.
12 3
10.0
j
L
4b Strada
97
s=2.352,60mp. .0
x1
15
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
Strad
1.5
3.0
3 11
2.5
1.5
Strad
1 2 3
4 1
27
IS
13.0
10.0
108
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
17
107
105
7
7.0
POT = 75 % CUT =4 H max. 45 m.
aB
7
De. 1262 1 18
98.7
8
42.0
a 2a
101
10.0
40.5
161
10
0
5.
103
CUT =1.5 H max. 10 m.
56
10 9
25.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 %
P
2
9
6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
D
1
s=14.427,00mp.
14 12 13
8
0
s=2.348,81.
Strad
1
15
11
32 33
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
0
5
10.0
POT = 40 % CUT =1.5 H max. 10 m.
a
e
12.0
PUD PREALABIL
15.0
7 22.9
6 11
54
40.0
a 20
POT = 40 % CUT =1.5 H max. 10 m.
52
POT = 40 % CUT =1.5 H max. 10 m.
24.0
2 1211 3 10 10.0
3.0
15.0
ad Str
21
L56
aB
Strad 98
POT = 40 % CUT =1.5 H max. 10 m.
96.0
POT = 40 % CUT =1.5 H max. 10 m.
6
21.8 22.0
8
55
s=3.858,02mp.
58
60
15.0
7
5
d
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4
5.
9 10
31
SPATII VERZI ,PARCURI, SCUARURI
141312 11 POT = 40 % CUT =1.5 H max. 10 m.
une 3 Secti
96
94
57
40.3
POT = 40 % CUT =1.5 H max. 10 m.
91
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10 9
8
51
53
42.3
16
10.0
POT = 40 % CUT =1.5 H max. 10 m.
44.3
POT = 40 % CUT =1.5 H max. 10 m.
ne
un
5.
6
8
2 10
.0
7 8
15
A 3
4
13
12
13
3
iu
cti
17 16
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
13
a5 POT = 40 % CUT =1.5 H max. 10 m.
1
59
9 8
11
POT = 40 % CUT =1.5 H max. 10 m.
14
ct
5
Se
POT = 40 % CUT =1.5 H max. 10 m.
4
17
18
POT = 40 % CUT =1.5 H max. 10 m.
11 12
16 15
Strad
10.0
POT = 40 % CUT =1.5 H max. 10 m.
121 13
91 101
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
2 3
1211 10
95
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
14
7
POT = 40 % CUT =1.5 H max. 10 m.
93
3
56.2
7
POT = 40 % CUT =1.5 H max. 10 m.
2
12 11
21
POT = 40 % CUT =1.5 H max. 10 m.
19
a2
6
16 15
90.8
POT = 40 % CUT =1.5 H max. 10 m.
20
3.0
17
92
L
s=8.447,07mp.
POT = 40 % CUT =1.5 H max. 10 m.
se
.0
7
POT = 40 % CUT =1.5 H max. 10 m.
9
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
18
1
POT = 40 % CUT =1.5 H max. 10 m.
42
a
s=6.573,10mp.
POT = 40 % CUT =1.5 H max. 10 m.
13
.0
L
10
12 10
6
8
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
25
13
40.4
18
.0
S 7 11 tr 30 a 19 7da
POT = 40 % CUT =1.5 H max. 10 m.
.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
a1 Strad
5
19
89
POT = 40 % CUT =1.5 H max. 10 m.
41
23
10.0
49
5 6
4a
POT = 40 % CUT =1.5 H max. 10 m.
5
12
62
4
20
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
41.5
50
40.4
L
s=9.613,59mp.
22
47
POT = 40 % CUT =1.5 H max. 10 m.
4
9
8
Strada
i
61
10.0
87
90
48
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
28
27
POT = 40 % CUT =1.5 H max. 10 m.
Strad
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
63
40.0 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3
40.0
POT = 40 % CUT =1.5 H max. 10 m.
4
POT = 40 % CUT =1.5 H max. 10 m.
64
10.0
17
45 De. 427
4
88
H I
65
POT = 40 % CUT =1.5 H max. 10 m.
85
86
81.93
66
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
7.0
24
10
POT = 40 % CUT =1.5 H max. 10 m.
5
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
b
POT = 40 % CUT =1.5 H max. 10 m.
8
9
10.0
42.0
46
POT = 40 % CUT =1.5 H max. 10 m.
une
Secti
POT = 40 % CUT =1.5 H max. 10 m.
Strada
POT = 40 % CUT =1.5 H max. 10 m.
191.5
81.90
83
84
POT = 40 % CUT =1.5 H max. 10 m.
22
e
44
POT = 40 % CUT =1.5 H max. 10 m.
5
81.99
81.84
82
7
156
sectiun
L
67 68s=5.602,14mp.
20
19 18
Strada
157
Strada
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
23
81
69
h
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
.0
26
42
POT = 40 % CUT =1.5 H max. 10 m.
42
4
.0
30
10
POT = 40 % CUT =1.5 H max. 10 m.
43
POT = 40 % CUT =1.5 H max. 10 m.
141.3
79
POT = 40 % CUT =1.5 H max. 10 m.
Strada
158
38
POT = 40 % CUT =1.5 H max. 10 m.
L
s=7.894,21mp.
c
10.0
POT = 40 % CUT =1.5 H max. 10 m.
141.1
POT = 40 % CUT =1.5 H max. 10 m.
76.7
l
71
70
POT = 40 % CUT =1.5 H max. 10 m.
80
POT = 40 % CUT =1.5 H max. 10 m.
s=2.980,45mp.
39 41
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
40.0
10.0
40
POT = 40 % CUT =1.5 H max. 10 m.
72
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
40.0
10.0
159
L
73
74
POT = 40 % CUT =1.5 H max. 10 m.
77
78
POT = 40 % CUT =1.5 H max. 10 m.
2
POT = 40 % CUT =1.5 H max. 10 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
29
9
IS -ZONA
LIS -
PERIMETRU INTRAVILAN PROPUS
COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.
0
13.8
38.7
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
2 3
22 21
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3
16
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
6 7
. 40
POT = 40 % CUT =1.5 H max. 10 m.
17
11.
a A1
ad Str 23 75
76
2 3
4
160
32
4 5
22 21
18
29
De
.00
6 5
POT = 40 % CUT =1.5 H max. 10 m.
31
23
36
37
35
33
28
14 13 12 .0 15
10
R12
7.0
A
GC
s=520,83mp. 2
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
93.9 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
34
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
De. 414 1 2 3
12 11 10
79.3
2
3
24
6
Fig.B1
P.T.E.
s=85,30mp.
10.0
19
IS -
X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066
A B C D E F G H I
CONSTANTA
Str25ad
26
10.0 7.0
124 Strada 1
10.0 7.0
aA 1
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
C
5
27
26
25
Strada de legatura - propusa prin P.U.Z.-
4
3
2
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
5.0
L
7.0
e
183.000,00mp. din care suprafete
TOTAL TEREN CE A GENERAT P.U.Z.
1
1.5 3.0
22 21 20
A
BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp
B
da
12.0
3.0
Str a
3.0 1.5
5.4%
IS X1
5.0
1.5
Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1
limita amplasare constructii
15.0
limita aliniament
limita aliniament
limita amplasare constructii
3.0
12.0
H max.10.0m
29
d
L
Sectiune 3
30
H max.10.0m
5.0 1.5
a
limita amplasare constructii
IS x2
limita aliniament
7
limita aliniament
limita aliniament
7.0
1.5
Fig.C
limita aliniament
12.0
m
limita amplasare constructii
15.0
1.5
150
7.0
P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008
X IAL
7.0
IS x1
TEREN CARE A GENERAT P.U.Z.
P+2
Sectiune 2
COMPLE COMERC
P+2
Proiectant general:
Beneficiar:
s.c. PROMARH s.r.l. Nume:
Semnatura:
Proiect nr:
MATROZ CONSTANTIN si FLOREA ION
TULCEA
str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea
J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180
Specificatie:
Sef Proiect arh. Marcel PAVEL
Scara:
1 / 1.000
Proiectat
arh. Marcel PAVEL
Data:
Desenat
arh. Paul Cristian MURAVELI
Noiembrie 2017
Denumire proiect:
LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.
Denumire plansa:
REGLEMENTARI URBANISTICE
87/2017 Faza:
P.U.Z. Nr. plansa:
U4
home
relax
invest
shop
HOUSES Areas Between: 357 - 760 sqm Aprox. Buildable Area: 140- 300 sqm
EDUCATION At the very center of the development, there is a designated plot for educational use as part of the planning for the MGM2 neighborhood. This plot is most suitable for a nursery or primary school due to the average age of the residents that are expected to purchase the individual plots as well as the apartments. CENTRAL SQUARE
PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si
CONSTRUIRE COMPLEX COMERCIAL SI from ANSAMBLU REZIDENTIAL The size of the plot is 1 409 sqm and it is accessible 2 streets (West & East) while being buffered by a recreational green space at the northern boundary. The green space adjacent to the educational plot can be easily incorporated to support educational purposes. H max.45.00
+10.00
H max.25.00
+10.00
SECTIUNE STRAZI SI LOTURI
+3.00
H max.10.0m
Sectiune 4
P+2
limita aliniament
Sectiune strada 2
13.0
3.0
H max.10.0m
5.4%
3.00
-2.80
21.0
1.50
demisol 21.0
1.50
-2.80
7.00
1.50
H max.10.0m
Sectiune 5
IS x2 H max.45.00
Sectiune strazi 2-7
3.0
limita amplasare constructii
5.0
+3.00
±0.00 =+0.60
LIS y
5.0
1.5
limita aliniament
5.0
1.5
H max.45.00
limita amplasare constructii
10.0
5.0 1.5
10.0
limita aliniament
limita aliniament
limita aliniament
13.0
5.0 LIS Y
5.0 1.5
f
limita amplasare constructii
87.2
limita amplasare constructii
L
7.00
etaj
parter
demisol
5.4%
5.0
5.4%
Sectiune 1
1.50
limita amplasare constructii
limita aliniament
limita amplasare constructii
H max.25.00
±0.00 =+0.60
+6.00
mansarda
+6.00
3.00
5.4%
3.0
10.0
5.4%
The plot needs a PUD (Detail Urban Plan) but the maximum building area permitted is 40% of the site area and the maximum height of the buildings must not exceed 10m. 5.4%
h
L
c
L
1.5 3.0
7.0
3.0 1.5
Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)
MAIN BOULEVARD
H max.45.00
LEGENDA: DN 22
STR . BARAJULUI
DRUM COLECTOR ( AFERENT STR. BARAJULUI) DRUM PROPUS CONF. P.U.G. DRUM PROPUS IN . P.U.Z.
limita amplasare constructii
H max.10.0m
Sectiune 6
limita amplasare constructii
Sectiune strada 1
15.0
3.0
5.0
5.4%
L
sibi l po u se
4.5
1 Tulcea 22
11.0
6.0
R1
7.0
R1
R12.0
Fig.D6
1.5 7.0
De. 1273 10.0
1.5
2a
4
10.0
5.0
14 13
7 89
- SPATII VERZI, SCUARURI PUD PREALABIL
a C16
Strad
INDICATIV PARCELA DIN ZONA
PIETONAL PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE PROPUNERE TRASEU STRAZI CONF. P.U.G.
F
ZONA D.N. 22 EXISTENT
10 11
ZONA EXTINDERE CAROSABIL D.N. 22
12
aC
PROPUNERE DE MOBILARE URBANA
Strad
5.0
COLECTIVE HOUSING
Dr. 1266
3
5.0
10.0
10.0
19 +45.00
78.39 78.40 78.10
78.06
G
83 m
85 m
87 m
+35.00
90 m
93 m +10.00
95 m +10.00
+20.00
102 m
106 m DN 22
+10.00
+10.00
83 m
panta teren 5.4%
SECTIUNE TRANSVERSALA
INDIVIDUAL HOUSING
CIRCULATII CAROSABIL 17 6
9
10.0
12 11
P
1
5.0
13.0
5.0
10
une
5.0
7.0
10.0
123
I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL
a - -- k 8
15
41.0
POT = 40 % CUT =1.5 H max. 10 m.
ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE
7
16
Secti
5.0
une
14.0
4.5
tor colec
a
ad
6
13
secti
ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.
7.0
7.0 46.5
drum
2b
4.5
2 a ad
Str
Tra
ctor
POT = 40 % CUT =1,5 H max.=10m.
42.0
5.0
GC
s=375,56mp.
KINDERGARDEN/ NURSARY
ZONA EDIFICABILA
50.0
1a
a
cole
LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA
6
14 POT = 40 % CUT =1.5 H max. 10 m.
121
40.0
1.376,92mp.
TEHNICO EDILITARE
ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)
a
122
POT = 40 % CUT =1.5 H max. 10 m.
9 10 11
LIS
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL
Str
7
14 13 12
ad Str
Str
0.0
drum
R1
0
ad
3 a ad
0
Str
11.
13.0
une 2 Secti
5.
a
ad
139
7.0 1.5
0 5.
8 15
POT = 40 % CUT =1.5 H max. 10 m.
De. 1266
L
G.C.,P.T.E. - ZONA AMPLASARE SERVICII
50.983,55mp.
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
s=5.484,60mp.
0
3.
118
POT = 40 % CUT =1.5 H max. 10 m.
s=4.154,60mp. POT = 40 % CUT =1.5 H max. 10 m.
TOTAL
ZONA P EXTINDERE INTRAVILAN
30.5
POT = 75 % CUT =4 H max. 25 m.
120
10.0 40.0
POT = 40 % CUT =1.5 H max. 10 m.
aC
16
POT = 40 % CUT =1.5 H max. 10 m.
138 6 7 8
f
din care 30% spatiu verde
44.533,80mp. +2.210,27
DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp
LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI
14.0
2 18 4.5 10.0
1.5 7.0
5
11 10
Strad
9 10 5
13.5
6
4c
p.
p.)
3m
0m
,3
,0
63
19
.7
.6
=4
(s
11 s=
8 4 11
9
.0
34
119
137
37
POT = 40 % CUT =1.5 H max. 10 m.
4 13 1210.0
140
5.
POT = 40 % CUT =1.5 H max. 10 m.
7
136 0
3.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
0
3.
0
3.
POT = 40 % CUT =1.5 H max. 10 m.
.0
134
10
POT = 40 % CUT =1.5 H max. 10 m.
141
POT = 40 % CUT =1.5 H max. 10 m.
7.0 1.5
a ad
ad
rb
T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR
D
II
Str
SI
Pp
AT
PU
SP
40
143
40
117
POT = 40 % CUT =1.5 H max. 10 m.
135
.0
142
.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
10
5.0
g
40 POT = 40 % CUT =1.5 H max. 10 m.
.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
145
0
Str 144
s=6.460,56mp.
I-
5.0
L
147
.0
36
POT = 40 % CUT =1.5 H max. 10 m.
0
.0
10
116
.0
POT = 40 % CUT =1.5 H max. 10 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
132
POT = 40 % CUT =1.5 H max. 10 m.
.0
133
s=6.421,09mp.
k 146
a
EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT
w
POT = 40 % CUT =1.5 H max. 10 m.
L 131
POT = 40 % CUT =1.5 H max. 10 m.
148
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
5.
150
149
Str
128 130
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
4 32
114
1.5
POT = 75 % CUT =4 H max. 45 m.
0
5. .0
POT = 40 % CUT =1.5 H max. 10 m.
115
5 6 7
TEREN ADIACENT D.N.22 - - - - - - -
4.155,43mp.
LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)
13
0
5.
y
.7
.0
7
151
8 910
Dr. 1264
PUD PREALABIL
CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI
1.409,80mp. din care 30% spatiu verde
11.619,33mp.
LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )
s=22.937,00mp.
0
s=1.409,80mp.
29
10
a
KV
ad
POT = 40 % CUT =1.5 H max. 10 m.
112
129
POT = 40 % CUT =1.5 H max. 10 m.
SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m
ZONIFICARE
5.
I
SPATII VERZI, PARCURI, ALEI PIETONALE
CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA
19
IS
CRESA , GRADINITA PUD PREALABIL
0
PUD PREALABIL
I - Pprb C-
H max. 10 m.
SPATII VERZI ,PARCURI
LIMITA ZONA EDIFICABILA Fig.C29
4
x2
1 12 11
113
UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL
POT = 40 % CUT =1,5
LIMITA SUPRAFATA ZONA STUDIATA
Fig.A40
5
30.5
POT = 40 % CUT =1.5 H max. 10 m.
5.
POT = 40 % CUT =1.5 H max. 10 m.
H max. 10 m.
POT = 40 % CUT =1,5
I P -
LIMITA PERIMETRU INTRAVILAN EXISTENT
R=14.0
6
S+D+P+2 -> 11-15 ET
UNITATI DE INVATAMANT
.5
0
Str
11
3.0
z
.0
0
3.
.0
40
POT = 40 % CUT =1.5 H max. 10 m.
CENTRAL SQUARE (PLAYGROUND)
70.606,37mp.
ZONA INTRAVILAN EXISTENT
Fig.C29
5
5.484,60mp. din care 10% spatiu verde
LOTURI AMPLASARE CONSTRUCTII S+P+1+M
LIMITE
11.0
7
37.364,00mp. din care 10% spatiu verde
LEGENDA: Fig.C29
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
5.0
17
5
POT = 40 % CUT =1.5 H max. 10 m.
4.50
11
PUD PREALABIL
35
.
2.0 2.0
153 15.0
a 2a
.A 0
GC 5.
s=395,23mp.
P
75 75 75
R12.00
117.5
10.0
s=1806,59mp.
4
110
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
1
2 3 4
13.0
1.5
10
L
POT = 40 % CUT =1.5 H max. 10 m.
127
126
POT = 40 % CUT =1.5 H max. 10 m.
aB
SPATII VERZI ,PARCURI, SCUARURI
16 15
e
20 19 18
E
5.5 5.5
6
2
119.2
1.5
111 s=6.248,94mp. .0
10
POT = 40 % CUT =1.5 H max. 10 m.
3.0
152
.0
15 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
109
POT = 40 % CUT =1.5 H max. 10 m.
6
23
S+D+P+2 -> 11-15 ET
41.7
Strad
124
POT = 40 % CUT =1.5 H max. 10 m.
154
POT = 40 % CUT =1.5 H max. 10 m.
87.21
87.25
5
125
4
24
5.0
41.7
R12
2.0
25
NR.1 FIL TIP 655 RIU PRO GIRATO .G.- KM 178+ SENS P.U conf. propus
2
R16.00
3
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
Strad
1.5
3.0
.0
7.0
Strad
1 2 3
14
2
IS
9 1011
1
R1
2.5
4.50
POT = 75 % CUT =4 H max. 45 m.
13.0
10.0
15
.0
1
27 1.5
x1
6
aB
7 15.0
10.0
L.E 87.20 87.20
4
18 17
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
17
108
106
104
1 2 3
7
42.0
De. 1262 1 18
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
102
a6
56
10 9
107
105
4 5 6
16 15 14
155
721
9 8
Strad
56.2
7
8
8
3 11
s=14.427,00mp.
14 12 13
25.0
98.7
10.0
99
19 20
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
101
10.0
POT = 40 % CUT =1.5 H max. 10 m.
100
POT = 40 % CUT =1.5 H max. 10 m.
12 3
103
15
P
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 %
CUT =1.5 H max. 10 m.
4b Strada
L
40.5
97
s=2.352,60mp. .0
10
54
40.0
7 161
POT = 40 % CUT =1.5 H max. 10 m.
j
POT = 40 % CUT =1.5 H max. 10 m.
22.9
0
5.
52
POT = 40 % CUT =1.5 H max. 10 m.
24.0
1
3.0
a
98
22.0
8
6 11
L56
POT = 40 % CUT =1.5 H max. 10 m.
aB
2 1211 3 10 10.0 21.8
91 101
20
96.0
s=3.858,02mp.
58
6
Strad
121 13
d
POT = 40 % CUT =1.5 H max. 10 m.
60
e
4
LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET
S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.
L-
PERIMETRU INTRAVILAN PROPUS
X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134
IS -ZONA
LIS -
COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
D
1 2
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
s=2.348,81.
PUD PREALABIL
a2
7
5
un
10.0
POT = 40 % CUT =1.5 H max. 10 m.
a
0
5
11
32 33 9
12.0
3.0
96
94
57
POT = 40 % CUT =1.5 H max. 10 m.
4
15.0
POT = 40 % CUT =1.5 H max. 10 m.
91
9 8
55
une 3 Secti
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
95
93
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
6
9 10
31
SPATII VERZI ,PARCURI, SCUARURI
141312 11
POT = 40 % CUT =1.5 H max. 10 m.
1
59
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
15.0
ad Str
21
2 3
1211 10
16 15
90.8
7
10 9
8
51
53
POT = 40 % CUT =1.5 H max. 10 m.
42.3
16
10.0
POT = 40 % CUT =1.5 H max. 10 m.
44.3
13
a5
0
7 8
15
2 10
.0
5.
17 16
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
17
18
POT = 40 % CUT =1.5 H max. 10 m.
11 12
16 15
Strad
4a
POT = 40 % CUT =1.5 H max. 10 m.
5
12
17
92
14
11
POT = 40 % CUT =1.5 H max. 10 m.
14
ne
cti
POT = 40 % CUT =1.5 H max. 10 m.
4
3
13
12 8
5.
a1 Strad
18
89
POT = 40 % CUT =1.5 H max. 10 m.
s=9.613,59mp.
POT = 40 % CUT =1.5 H max. 10 m.
Se
9
POT = 40 % CUT =1.5 H max. 10 m.
2 3
iu
5
7
POT = 40 % CUT =1.5 H max. 10 m.
13
.0
13 12 11
21
POT = 40 % CUT =1.5 H max. 10 m.
19
ct
POT = 40 % CUT =1.5 H max. 10 m.
s=6.573,10mp.
POT = 40 % CUT =1.5 H max. 10 m.
10
23
POT = 40 % CUT =1.5 H max. 10 m.
20
10.0
49
5 6
40.3
L
7
POT = 40 % CUT =1.5 H max. 10 m.
L
s=8.447,07mp.
40.4
i
6
41.5
50
40.4
90
5
19
POT = 40 % CUT =1.5 H max. 10 m.
47
POT = 40 % CUT =1.5 H max. 10 m.
4
9
8
Strada
POT = 40 % CUT =1.5 H max. 10 m.
4
62
4
20
61
10.0
87
48
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
22
POT = 40 % CUT =1.5 H max. 10 m.
a
L
10
12
se
.0
A
13
3
POT = 40 % CUT =1.5 H max. 10 m.
42
19 18
4
POT = 40 % CUT =1.5 H max. 10 m.
6
Str 307 a7d a
11
1
POT = 40 % CUT =1.5 H max. 10 m.
8
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
25
Strad
POT = 40 % CUT =1.5 H max. 10 m.
63
40.0 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3
40.0
POT = 40 % CUT =1.5 H max. 10 m.
I
POT = 40 % CUT =1.5 H max. 10 m.
64
10.0
10
De. 427
4
H
65
POT = 40 % CUT =1.5 H max. 10 m.
85
88
81.93
66
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
86
10.0
17
Strada
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Strada
83
84
POT = 40 % CUT =1.5 H max. 10 m.
7.0
.0
POT = 40 % CUT =1.5 H max. 10 m.
5
POT = 40 % CUT =1.5 H max. 10 m.
41
b
24
9
18
45
POT = 40 % CUT =1.5 H max. 10 m.
une
Secti
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8
19
POT = 40 % CUT =1.5 H max. 10 m.
42.0
46
POT = 40 % CUT =1.5 H max. 10 m.
20
43
44
69
L
67 68s=5.602,14mp.
191.5
81.90
82
22
e
sectiun
c
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
h
POT = 40 % CUT =1.5 H max. 10 m.
81
141.3
79
POT = 40 % CUT =1.5 H max. 10 m.
5
156
7
81.99
Strada
157
23 81.84
70
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Strada
158
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
80
POT = 40 % CUT =1.5 H max. 10 m.
76.7
l
42
28
27
26
s=7.894,21mp.
10.0
9
POT = 40 % CUT =1.5 H max. 10 m.
.0
0
POT = 40 % CUT =1.5 H max. 10 m.
40.0
10.0
159
71
.0
30
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
. 40
42
4
6.
78
POT = 40 % CUT =1.5 H max. 10 m.
160
L
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
40.0
141.1
38.7
s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.
L
41
72
POT = 40 % CUT =1.5 H max. 10 m.
77
.0
2
POT = 40 % CUT =1.5 H max. 10 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
29
7 10
29
De
POT = 40 % CUT =1.5 H max. 10 m.
16
R1
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
3
POT = 40 % CUT =1.5 H max. 10 m.
6
21
38
POT = 40 % CUT =1.5 H max. 10 m.
28
14 13 12 .0 15
10
18 17
POT = 40 % CUT =1.5 H max. 10 m.
.00
13.8
2
75
76
2 3
4
5
22
36
37
39
40
POT = 40 % CUT =1.5 H max. 10 m.
6
Fig.B1
P.T.E.
s=85,30mp.
10.0
19
35
33
32
4
R12
6 5
93.9 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
73
74
POT = 40 % CUT =1.5 H max. 10 m.
31
POT = 40 % CUT =1.5 H max. 10 m.
34
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
23
POT = 40 % CUT =1.5 H max. 10 m.
79.3
2
3
24
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
IS -
X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066
A B C D E F G H I
CONSTANTA
7.0
A
GC
s=520,83mp.
2 3
22 21
1 2 3
12 11 10
a A1
ad Str 23
10.0 7.0
124 Strada 1
10.0 7.0
Str25ad
26
De. 414
C
5
27
26
25
22 21 20
aA 1
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
Strada de legatura - propusa prin P.U.Z.-
4
3
5.0
L
7.0
e
183.000,00mp. din care suprafete
TOTAL TEREN CE A GENERAT P.U.Z.
1
1.5 3.0
2
A
BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp
B
da
12.0
3.0
Str a
3.0 1.5
5.4%
IS X1
5.0
1.5
Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1
limita amplasare constructii
15.0
limita aliniament
limita aliniament
limita amplasare constructii
3.0
12.0
H max.10.0m
29
d
L
Sectiune 3
30
H max.10.0m
5.0 1.5
a
limita amplasare constructii
IS x2
limita aliniament
7
limita aliniament
limita aliniament
7.0
1.5
Fig.C
limita aliniament
12.0
m
limita amplasare constructii
15.0
1.5
150
7.0
P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008
X IAL
7.0
IS x1
TEREN CARE A GENERAT P.U.Z.
P+2
Sectiune 2
COMPLE COMERC
P+2
Proiectant general:
Beneficiar:
s.c. PROMARH s.r.l. Nume:
Semnatura:
Proiect nr:
MATROZ CONSTANTIN si FLOREA ION
TULCEA
str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea
J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180
Specificatie:
Sef Proiect arh. Marcel PAVEL
Scara:
1 / 1.000
Proiectat
arh. Marcel PAVEL
Data:
Desenat
arh. Paul Cristian MURAVELI
Noiembrie 2017
Denumire proiect:
LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.
Denumire plansa:
REGLEMENTARI URBANISTICE
87/2017 Faza:
P.U.Z. Nr. plansa:
U4
CREATE
LEARN
PLAY
PRIMARY SCHOOL Aprox. Buildable Area: 1500 sqm
PLAYGROUND PARK Aprox Area: 1200 sqm
SPORTS & RECREATION CENTER On the South Western side of the development, there is a major powerline cable zone that requires a protection area of 18m on each side of its axis. This results in an approximately 6 000 sqm of green buffer space. Adjacent to this buffer area, there is availability for additional green space comLOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si prising of 11 963 sqmPLAN thatURBANISTIC can be ZONAL used forCOMERCIAL educational / hospice / sports and CONSTRUIRE COMPLEX SI ANSAMBLU REZIDENTIAL leisure activities. Private tennis courts or mixed-use sports fields would be a valuable addition to the MGM2 neighborhood considering the anticipated number of residents on a medium to long term. Buildings are permitted in this area but cannot occupy more than 40% of the total leisure area and can not be more than 12m high. H max.45.00
+10.00
H max.25.00
+10.00
SECTIUNE STRAZI SI LOTURI
etaj
+3.00
H max.10.0m
P+2
limita aliniament
13.0
3.0
H max.10.0m
demisol
+3.00
5.4%
3.00
±0.00 =+0.60
-2.80
21.0
1.50
demisol 21.0
1.50
-2.80
7.00
1.50
H max.10.0m
Sectiune 5
IS x2
H max.45.00
5.4%
h
L
Sectiune strazi 2-7
3.0
3.0
10.0
5.4%
c
L
1.5 3.0
7.0
3.0 1.5
limita amplasare constructii
5.0
±0.00 =+0.60
LIS y
5.0
1.5
limita aliniament
1.5
limita amplasare constructii
10.0
5.0 1.5
H max.45.00
limita aliniament
limita aliniament
limita aliniament
5.0
5.0
LIS Y
10.0
7.00
parter
5.4%
5.0
5.0 1.5
f
limita amplasare constructii
87.2
limita amplasare constructii
L
13.0
1.50
limita amplasare constructii
Sectiune strada 2
5.4%
Sectiune 1
3.00
5.4%
Sectiune 4
limita aliniament
limita amplasare constructii
H max.25.00
+6.00
mansarda
+6.00
Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)
H max.45.00
LEGENDA: DN 22 STR . BARAJULUI DRUM COLECTOR ( AFERENT STR. BARAJULUI) DRUM PROPUS CONF. P.U.G. DRUM PROPUS IN . P.U.Z.
limita amplasare constructii
H max.10.0m
Sectiune 6 15.0
5.0
sibi l po u se
4.5
1 Tulcea 22
11.0
6.0
R1
ZONA EDIFICABILA
ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)
De. 1273
POT = 40 % CUT =1,5 H max.=10m.
42.0 50.0 10.0
1.5
10.0
5.0
6
13.0
14 13
7 89
9
10.0
5.0
INDICATIV PARCELA DIN ZONA
PIETONAL
17
7.0
12 11
- SPATII VERZI, SCUARURI PUD PREALABIL
CIRCULATII CAROSABIL
1 5.0
10
une
5.0
5.0
123
P
a - -- k 8
15
41.0
10.0 POT = 40 % CUT =1.5 H max. 10 m.
ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL
tor
4
121
14.0
4.5
colec
2a
une
secti
ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.
7.0
7.0 46.5
drum
a
Fig.D6
1.5 7.0
R12.0
2 a ad
Str
4.5
7.0
R1
2b
3 da
Tra
or
ad
ct cole
Str
drum
0.0 R1
13.0
une 2 Secti
7.0 1.5
LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA
7
16
Secti
a Strad
C16
PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE PROPUNERE TRASEU STRAZI CONF. P.U.G.
F
ZONA D.N. 22 EXISTENT
10 11
ZONA EXTINDERE CAROSABIL D.N. 22
12
aC
PROPUNERE DE MOBILARE URBANA
Strad
Dr. 1266
5.0
3
5.0
5.0
GC
10.0
10.0
s=375,56mp.
19 +45.00
78.39 78.40 78.10
78.06
G
83 m
85 m
87 m
+35.00
90 m
93 m +10.00
95 m +10.00
+20.00
102 m
106 m DN 22
+10.00
+10.00
83 m
panta teren 5.4%
SECTIUNE TRANSVERSALA
S
Str a
0 11.
0
a
ad
De. 1266
13
POT = 40 % CUT =1.5 H max. 10 m.
40.0
1.376,92mp.
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII
1a
C
122
POT = 40 % CUT =1.5 H max. 10 m.
9 10 11
6
14
s=4.154,60mp. POT = 40 % CUT =1.5 H max. 10 m.
50.983,55mp.
TEHNICO EDILITARE
ZONA P EXTINDERE INTRAVILAN
a
10.0
14 13 12
2 18 4.5 10.0
6
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL
Str
a Strad
8 15
POT = 40 % CUT =1.5 H max. 10 m.
139
L
LIS
s=5.484,60mp.
0
3.
118
POT = 40 % CUT =1.5 H max. 10 m.
120
7
40.0
POT = 40 % CUT =1.5 H max. 10 m.
6 7 8
16
POT = 40 % CUT =1.5 H max. 10 m.
138
5
1.5
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
ad Str
4 11
9
9 10 5
0
7
p.
p.)
3m
0m
,3
,0
63
19
.7
.6
8
11 10
5.
a
11
=4 (s
s=
5.0
13 1210.0
140
137
37
POT = 40 % CUT =1.5 H max. 10 m.
4
POT = 40 % CUT =1.5 H max. 10 m.
f
119
0
3.
POT = 40 % CUT =1.5 H max. 10 m.
136 0
3.
POT = 40 % CUT =1.5 H max. 10 m.
141
POT = 40 % CUT =1.5 H max. 10 m.
0 5.
40
143
ad
rb
T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR
D
II
Str
SI
Pp
AT
PU
SP
I-
.0
POT = 40 % CUT =1.5 H max. 10 m.
.0
10
.0
34
POT = 40 % CUT =1.5 H max. 10 m.
TOTAL G.C.,P.T.E. - ZONA AMPLASARE SERVICII
LIMITA ZONA EDIFICABILA
14.0
1.5 7.0
6
10
142
145
POT = 40 % CUT =1.5 H max. 10 m.
0
3.
.0
134
.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
116
.0
40
117
din care 30% spatiu verde
44.533,80mp. +2.210,27
DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp
LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)
30.5
POT = 75 % CUT =4 H max. 25 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
135
.0
4c
144
s=6.460,56mp.
13.5
a ad
a Str
L
147
g
40 POT = 40 % CUT =1.5 H max. 10 m.
da
EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT
5.0
POT = 40 % CUT =1.5 H max. 10 m.
115
POT = 40 % CUT =1.5 H max. 10 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
132
POT = 40 % CUT =1.5 H max. 10 m.
.0
114
4.155,43mp. 11.619,33mp.
LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )
POT = 75 % CUT =4 H max. 45 m.
0
5. .0
5.
POT = 40 % CUT =1.5 H max. 10 m.
.0
133
s=6.421,09mp.
k 146
0
7
POT = 40 % CUT =1.5 H max. 10 m.
.0
36
POT = 40 % CUT =1.5 H max. 10 m.
L 131
POT = 40 % CUT =1.5 H max. 10 m.
5 6 7
Str
a
KV
ad
149
w
Dr. 1264
128 130 148
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
8 910
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
150
129
PUD PREALABIL
CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA
19
13
0
5.
y
.7
29
0
.0
0
Str
11
151
112
127
0
5.
I
SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m
TEREN ADIACENT D.N.22 - - - - - - -
LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI
Fig.C29
4
s=22.937,00mp.
s=1.409,80mp. 0
4 32
SPATII VERZI, PARCURI, ALEI PIETONALE
CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI
70.606,37mp. 1.409,80mp. din care 30% spatiu verde
LIMITA PERIMETRU INTRAVILAN EXISTENT
Fig.A40
5
IS
POT = 40 % CUT =1.5 H max. 10 m.
1 12 11
113
PUD PREALABIL
I - Pprb C-
H max. 10 m.
SPATII VERZI ,PARCURI
ZONIFICARE
UNITATI DE INVATAMANT
5.
POT = 40 % CUT =1.5 H max. 10 m.
10
.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
0
3.
.0
40
POT = 40 % CUT =1.5 H max. 10 m.
H max. 10 m.
UNITATI DE INVATAMANT
LIMITA SUPRAFATA ZONA STUDIATA
x2
CRESA , GRADINITA PUD PREALABIL
P -
CRESA , GRADINITA PUD PREALABIL
POT = 40 % CUT =1,5
ZONA INTRAVILAN EXISTENT
R=14.0
6
LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5
LIMITE
11.0
7
37.364,00mp. din care 10% spatiu verde 5.484,60mp. din care 10% spatiu verde
LEGENDA: Fig.C29
30.5
17
z
.0
POT = 40 % CUT =1.5 H max. 10 m.
110
R12.00
4.50
6
S+D+P+2 -> 11-15 ET
PUD PREALABIL
10
L
POT = 40 % CUT =1.5 H max. 10 m.
4
Fig.C29
5
5
75 75 75
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
5.0
1.5
4
5.5 5.5
117.5
10.0
s=1806,59mp.
E
11
SPATII VERZI ,PARCURI, SCUARURI
111 s=6.248,94mp. .0
10
1
2 3 4
13.0
1.5
.5
.A 2.0 2.0
3.0
e
109
POT = 40 % CUT =1.5 H max. 10 m.
6
20 19 18
41.7
P
NR.1 FIL TIP 655 RIU PRO GIRATO .G.- KM 178+ SENS P.U conf. propus
2
R16.00
3
2
aB
41.7
16 15
POT = 40 % CUT =1.5 H max. 10 m.
126
152
.0
15 POT = 40 % CUT =1.5 H max. 10 m.
153 15.0
5
125
POT = 40 % CUT =1.5 H max. 10 m.
3.0
87.21
87.25
0
GC 5.
s=395,23mp.
4
18 17
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
124
154
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
25
23
119.2
35
1 2 3
108
106
104 10.0
L.E 87.20 87.20
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
102
a6
16 15 14
3.0
2.0
S+D+P+2 -> 11-15 ET
Strad
1 2 3
14
2
24
5.0
9 1011
1
R12
R1
2.5
4.50
IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI
aB
7
15
.0
1
27
7.0
x1
Strad
10.0
3 11
.0
IS
13.0
1.5
107
POT = 40 % CUT =1.5 H max. 10 m.
4 5 6
Strad
POT = 40 % CUT =1.5 H max. 10 m.
155
721
9 8
4b
7
10.0
19 20
17
4
1.5
- parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -
6
42.0
De. 1262 1 18
98.7
7
POT = 75 % CUT =4 H max. 45 m.
5.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
100
99
56
10 9
25.0
POT = 40 % CUT =1.5 H max. 10 m.
105
40.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
12 3
103
CUT =1.5 H max. 10 m.
8
8
s=14.427,00mp.
14 12 13
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 % CUT =1.5 H max. 10 m.
24.0 POT = 40 %
101
Strada
L
40.5
97
s=2.352,60mp. .0
54
e
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.
-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET
S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.
LI -
X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134
IS -ZONA
LIS -
PERIMETRU INTRAVILAN PROPUS
COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.
D
1 2
9
s=2.348,81.
a 2a Strad
1
3.0
7 161
10
52
POT = 40 % CUT =1.5 H max. 10 m.
24.0
2 1211 3 10 10.0
j
POT = 40 % CUT =1.5 H max. 10 m.
22.9
0
L56
POT = 40 % CUT =1.5 H max. 10 m.
aB
Strad 98
22.0
8
5.
96.0
s=3.858,02mp.
58
6
21.8
6 11
55
d
POT = 40 % CUT =1.5 H max. 10 m.
60
un
10.0
15.0
5
11
32 33
7.0 1.5
57
POT = 40 % CUT =1.5 H max. 10 m.
4
P
9 10
31
ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII
cti
PUD PREALABIL 56.2
9 8
15.0
7
0
SPATII VERZI ,PARCURI, SCUARURI
141312 11 POT = 40 % CUT =1.5 H max. 10 m.
une 3 Secti
96
121 13
91 101
20
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
59
POT = 40 % CUT =1.5 H max. 10 m.
94
1
10.0
95
POT = 40 % CUT =1.5 H max. 10 m.
15.0
a
ad
21
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
2 3
1211 10 POT = 40 % CUT =1.5 H max. 10 m.
93
10 9
8
51
53
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
a2
7
POT = 40 % CUT =1.5 H max. 10 m.
16
10.0
POT = 40 % CUT =1.5 H max. 10 m.
44.3
13
a5
3.0
6
16 15
90.8
91
Str
12
17
92
17
18
POT = 40 % CUT =1.5 H max. 10 m.
11 12
16 15
5.
0
5
8
2 10
.0
5.
6
3
4
13
12
13
12.0
15
42.3
a
7 8
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
ne
a1 Strad
18
POT = 40 % CUT =1.5 H max. 10 m.
14
Strad
Se
17 16 15
Strad
5
19
89
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
11
POT = 40 % CUT =1.5 H max. 10 m.
14
iu
5
7
POT = 40 % CUT =1.5 H max. 10 m.
4
ct
POT = 40 % CUT =1.5 H max. 10 m.
9
POT = 40 % CUT =1.5 H max. 10 m.
2 3
19
20
a
POT = 40 % CUT =1.5 H max. 10 m.
13
.0
13 12 11
21
POT = 40 % CUT =1.5 H max. 10 m.
se
.0
s=6.573,10mp.
POT = 40 % CUT =1.5 H max. 10 m.
10
23
POT = 40 % CUT =1.5 H max. 10 m.
1
3
POT = 40 % CUT =1.5 H max. 10 m.
42
L
10
12
POT = 40 % CUT =1.5 H max. 10 m.
L
s=8.447,07mp.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
49
40.3
L
41.5
50 5 6
4a Strada
i
s=9.613,59mp.
POT = 40 % CUT =1.5 H max. 10 m.
47
POT = 40 % CUT =1.5 H max. 10 m.
4
9
8 7
40.4
90
61
22
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
6
Str 307 a 19 7da A 18
11
POT = 40 % CUT =1.5 H max. 10 m.
.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
8
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
25
40.4
87
POT = 40 % CUT =1.5 H max. 10 m.
5
63
62
24
10
3 Strada
POT = 40 % CUT =1.5 H max. 10 m.
4
POT = 40 % CUT =1.5 H max. 10 m.
40.0 POT = 40 % CUT =1.5 H max. 10 m.
4
20
10.0
H I
65
64
10.0
POT = 40 % CUT =1.5 H max. 10 m.
4 Strada
40.0
88
141.3
191.5
85
86
.0
b
POT = 40 % CUT =1.5 H max. 10 m.
8
10.0
17
45
48
POT = 40 % CUT =1.5 H max. 10 m.
41
POT = 40 % CUT =1.5 H max. 10 m.
De. 427
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
7.0
81.93
66
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
9
18
42.0
46
POT = 40 % CUT =1.5 H max. 10 m.
e5
un Secti
5
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
22
e
83
84
7
156
sectiun
81.90
81
82
20
POT = 40 % CUT =1.5 H max. 10 m.
44
POT = 40 % CUT =1.5 H max. 10 m.
67 68s=5.602,14mp.
19
43
POT = 40 % CUT =1.5 H max. 10 m.
69
L
42
c
10.0
POT = 40 % CUT =1.5 H max. 10 m.
h
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
Strada
Strada
POT = 40 % CUT =1.5 H max. 10 m.
157
23 81.99
81.84
70
POT = 40 % CUT =1.5 H max. 10 m.
79
76.7
l
POT = 40 % CUT =1.5 H max. 10 m.
10.0
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
71
40.0
POT = 40 % CUT =1.5 H max. 10 m.
40.0
80
POT = 40 % CUT =1.5 H max. 10 m.
158
s=7.894,21mp.
28
42
4
.0
30
POT = 40 % CUT =1.5 H max. 10 m.
27
2
POT = 40 % CUT =1.5 H max. 10 m.
10
POT = 40 % CUT =1.5 H max. 10 m.
29
POT = 40 % CUT =1.5 H max. 10 m.
26
16
6.
77
78
POT = 40 % CUT =1.5 H max. 10 m.
10.0
159
POT = 40 % CUT =1.5 H max. 10 m.
6 7
.0
17
POT = 40 % CUT =1.5 H max. 10 m.
4 5
22 21 10
9
.00
3
160
L
L
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
141.1
38.7
s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.
72
POT = 40 % CUT =1.5 H max. 10 m.
33
32
. 40
R1
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
23
36
38
POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.
41
31
29
De
POT = 40 % CUT =1.5 H max. 10 m.
R12
13.8
GC
s=520,83mp. 2
76
2 3
4
POT = 40 % CUT =1.5 H max. 10 m.
37
39
40
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
93.9 POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
73
74
POT = 40 % CUT =1.5 H max. 10 m.
34
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
10.0
28
14 13 12 .0 15
10
18
IS -
X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066
A B C D E F G H I
CONSTANTA
6 5
10.0 7.0
7.0
A
2 3
22 21
75
1 2 3
12 11 10
a A1
ad Str 23
10.0 7.0
124 Strada 1
3
24
De. 414
Strada de legatura - propusa prin P.U.Z.-
6
Fig.B1
P.T.E.
s=85,30mp.
10.0
19
35
C
5
27
26
25
POT = 40 % CUT =1.5 H max. 10 m.
POT = 40 % CUT =1.5 H max. 10 m.
79.3
2
4
3
2
22 21 20
aA 1
Strad 26 25
5.0
L
7.0
e
183.000,00mp. din care suprafete
TOTAL TEREN CE A GENERAT P.U.Z.
1
1.5 3.0
Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466
A
BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp
B
da
3.0
Str a
12.0
5.4%
IS X1
5.0
1.5
Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1
limita amplasare constructii
3.0 1.5
limita aliniament
limita aliniament
limita amplasare constructii
15.0
12.0
29
3.0
5.0 1.5
H max.10.0m
30
d
L
Sectiune 3
Fig.C
H max.10.0m
a
BLE CA ER OW V H P 110 K
limita amplasare constructii
Sectiune strada 1
3.0
5.4%
L
limita amplasare constructii
IS x2
limita aliniament
7
limita aliniament
limita aliniament
1.5
m
limita aliniament
12.0
P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008
150
1.5
7.0
HIG
7.0
IS x1
15.0
X IAL
limita amplasare constructii
Sectiune 2
7.0
TEREN CARE A GENERAT P.U.Z.
P+2
COMPLE COMERC
P+2
Proiectant general:
Beneficiar:
s.c. PROMARH s.r.l. Nume:
Semnatura:
Proiect nr:
MATROZ CONSTANTIN si FLOREA ION
TULCEA
str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea
J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180
Specificatie:
Sef Proiect arh. Marcel PAVEL
Scara:
1 / 1.000
Proiectat
arh. Marcel PAVEL
Data:
Desenat
arh. Paul Cristian MURAVELI
Noiembrie 2017
Denumire proiect:
LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.
Denumire plansa:
REGLEMENTARI URBANISTICE
87/2017 Faza:
P.U.Z. Nr. plansa:
U4
SPORTS & RECREATION CENTER
energize
refuel
PLAY
RECREATIONAL CENTER Aprox. Area: 15 000 sqm Aprox. Buildable Area: 4 400 sqm
CONTACT For enquiries, please contact: Mihai George Munteanu email | prodesignsrl@yahoo.com tel | +40722352553
Constantin Matroz email | matrozconstantin@yahoo.com tel | +40729058691