M G M 2 P R O J E C T MIXED USE DEVELOPMENT Cartier MGM2 P R-OTulcea POSAL,Tulcea, Romania


This document has been prepared by Palimpscape for the developers of MGM2 based on the approved Zonal Planning Plan in 2019. The illustrations for the Masterplan and conceptual images are to best illustrate the potential of the development as a unitary neighborhood. All images are at a conceptual stage and are subject to change depending on the desired architectural program.


CONTENTS

1.Background 2.Project Overview 3.Architectural Massing 4.Planning Regulations 5.Development Plots Commercial Plots

Colective Residential

Individual Residential

Education

Sports & Recreation

CONTAC TS


BACKGROUND Tulcea city is a touristic city located in the East of Romania, often named the Gate to Danube Delta as it is the port city form where tourists set off towards this unique attraction in Europe. It has a population of approx. 193 000 and has had a spectacular increase of tourists in recent years with a particular interest in the Danube Delta. It remains an exclusivist destination for bird lovers, fishermen, and hunters during certain times of the year, but mainstream tourists seeking

leisure in the wilderness are becoming more and more apparent. Despite the strong touristic character of this city, most residents of Tulcea work in the naval & metallurgical industries, followed by shipbuilding, construction materials processing, wood processing, textile and food industries. Foreign investors are already a big part of the economic stability of the city.

So the need for high-quality housing and commercial growth has risen as people’s financial capabilities have grown. MGM2 neighborhood is an integrated mixeduse development, approved by the planning authorities in 2018 as a response to this need. The project site is conveniently located in the city and pushed its boundaries by 183 000sqm. It is a great investment opportunity for domestic and commercial uses alike.


ACCESIBILITY

lOCATION

TULCEA

t es ar h c m Bu 0 k 22

POPULATION

PROJECT SITE

Consta nt 128 km a

TULCEA Airport 16 km

TULCEA

MIXED USE projected residents

193,000

2500

CITY CENTER

183 000sqm

DEVELOPMENT O P P O R T U N I Y

ToURISTS

161,290 2018

40minWALK 5min DRIVE CITY CENTER MGM2 PROJECT

MGM2 PROJECT


PROJECT OVERVIEW



PROJECT OVERVIEW MGM2 neigbourhood is an ambitios mixed use development project that integrates residential, commercial, retail, education, leisure, sports & recreation uses across 183 000 sqm of land right at the very threshold of Tulcea city. The direct access to the main structural street of Babadag facilitates a good integration with the city infrastructure (vehicular, pedestrian, public transport, etc) and utilities ( electricity, water, sewage, gas, etc). This aspect is particularly important for the buildability and sustainability of the project.

Therefore the development was approved for the Zonal Planning Plan in 2019 and offers designated areas for: • individual dwelling areas with height regime -S + P + 1 + M on independent plots; • collective dwellings with height regime S + P +4 floors up to G + 11 floors with commercial spaces and services on the ground floor, basement and basement parking; (here the planning allows for a touristic use of the plot)

• major services for commerce, tourism, offices, banks, shows, etc., with S + P height regime up to G + 11-15 floors. • commercial spaces shops with height regime D + G + 1-2 floors. • leisure, sports and recreation area with buildings with height regime G + 3 floors.


ILLUSTRATIVE MASTERPLAN

Roundabout Access to Main Street (Str. Babadag)

INDIVIDUAL RESIDENTIAL

North-East Commercial Plot 14 427 sqm

COMMERCIAL PLOT 1

Central Square 2 348 sqm SQUARE

South-East Commercial Plot 22 937 sqm

COMMERCIAL PLOT 2

Public Playground 2 348 sqm

EDUCATION

INDIVIDUAL RESIDENTIAL

Kindergarden / Nursery 1 409 sqm

COLLECTIVE RESIDENTIAL TULCEA CITY WELCOME SIGN

Collective Residential Area/ Ofiices/Services/Tourism 5 484 sqm Green Spine & Running Track belowHighPowerCables110KV

SPORTS & RECREATION

Sports & Recreation Center 4 763 sqm *ILLUSTRATIVE MASTERPLAN is an indicative illustration only. Achitectural layout is subject to investor’s proposal and architectural program.


PROJECT OVERVIEW

H max.45.00 5.4%

5.4%

3.0

10.0

limita aliniament

limita amplasare constructii

limita amplasare constructii

limita amplasare constructii

limita aliniament

limita aliniament

limita amplasare constructii

3

1 Tulcea 22

11.0

6.0

a

4.5 4.5

R1

R12.0

Str ad

l sibi po u se Tra

5.0 7.0

1 a Str ad

2 a

Str ad

limita aliniament

limita amplasare constructii

1 2 3

.

2.0 2.0

153 15.0

0

3.0

7

151

150

128 130

132

POT = 40 % CUT =1.5 H max. 10 m.

144

.0

40

143

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

7

141

.0

10

140

POT = 40 % CUT =1.5 H max. 10 m.

5.0

63

p.

p.) 0m

3m ,3

,0

19

.7

=4

(s

.6 11 s=

T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR

D

POT = 40 % CUT =1.5 H max. 10 m.

8 4 11

9 10 5

5.0

3

5.0

5.0

GC

10.0

10.0

s=375,56mp.

5.0

10.0

10.0

+35.00

90 m

93 m

+10.00

panta teren 5.4%

95 m

+10.00

19 78.39

78.10

+20.00

102 m

106 m DN 22

83 m

SECTIUNE TRANSVERSALA

+10.00

83 m

Proiectant general:

Beneficiar:

s.c. PROMARH s.r.l. Nume:

Semnatura:

str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea

Scara:

1 / 1.000

Proiectat

arh. Marcel PAVEL

Data:

Desenat

arh. Paul Cristian MURAVELI

Noiembrie 2017

The development is easily accessible by the main street of Babadag, through a roundabout on the North East side of the site. There are aprox. 350 linear meters of opening to the main street on the East side, which provides great visibility for retail/ commercialspaces.Circulationwithinthesiteisensuredthrough 13-15m wide ring roads and 10m wide inner residential roads.

Proiect nr:

MATROZ CONSTANTIN si FLOREA ION

TULCEA

J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180

Specificatie:

Sef Proiect arh. Marcel PAVEL

Denumire proiect:

LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.

Denumire plansa:

REGLEMENTARI URBANISTICE

87/2017 Faza:

P.U.Z. Nr. plansa:

U4

85 m

87 m

78.06

+35.00

90 m

93 m

+10.00

panta teren 5.4%

95 m

+10.00

G

+45.00

Existing electrical power lines 110 KV Existing electrical power lines 50 KV Water, sewage, gas, electricity under development according to Regs

G

+10.00

1

10

142

145

a ad Str

SI

rb Pp

II AT

PU

SP

5.0

10.0

10.0

Mainstreet(Nationalimportance) Secondary ring circulation Tertiary residential circulation 78.06

POT CU H ma

.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4c

L

s=6.460,56mp.

I-

5.0

s=6.421,09mp

k 146

a ad Str

147

.0

POT = 40 % CUT =1.5 H max. 10 m.

L 131

POT = 40 % CUT =1.5 H max. 10 m.

148

EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT

PROPUNERE DE MOBILARE URBANA

Dr. 1264

POT = 40 % CUT =1.5 H max. 10 m.

36

110

129

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

w

ZONA D.N. 22 EXISTENT ZONA EXTINDERE CAROSABIL D.N. 22

127

126

149

L

POT = 40 CUT =1.5 H max. 10

.0

10 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

e

s=6.248,9

18 17

125

124

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

a

KV

ad

Str

11 0

GC 5.

s=395,23mp.

POT = 40 % CUT =1.5 H max. 10 m

109

POT = 40 % CUT =1.5 H max. 10 m.

6

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3.0

152

.0

POT = 40 % CUT =1.5 H max. 10 m.

5

3.0

108

106 4 10.0

a6

15

INDICATIV PARCELA DIN ZONA

De. 1 1 18 25.0

107

POT = 40 % CUT =1.5 H max. 10 m.

104

10 9

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4 5 6

16 15 14

.A

- SPATII VERZI, SCUARURI PUD PREALABIL

8

105

40.0

9 8

Strad

154

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

98.7

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

102

POT = 40 % CUT =1.5 H max. 10 m.

155

54

15.0

7

10.0

19 20 721

103

101

87.21

87.25

52

POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 %

CUT =1.5 H max. 10 m.

4b

100

99

12 3

L56

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

87.20

POT = 40 % CUT =1.5 H max. 10 m.

96.0

s=3.858,02mp.

une 3

POT = 40 % CUT =1.5 H max. 10 m.

s=2.352,60mp. .0

10

0

55

POT = 40 % CUT =1.5 H max. 10 m.

24.0

1

3.0

L

10 9

141312 11

51

53

58

16

10.0

POT = 40 % CUT =1.5 H max. 10 m.

44.3

8

6

Strada

97

POT = CUT = H max.

17

18

d

POT = 40 % CUT =1.5 H max. 10 m.

60

POT = CUT H max

POT = 40 % CUT =1.5 H max. 10 m.

14

13

B

40.5

161

11

19

20

POT = 40 % CUT =1.5 H max. 10 m.

11 12

16 15

13

.0

4

Secti

5

2 1211 3 10 10.0

j

POT = 40 % CUT =1.5 H max. 10 m.

22.9

PROPUNERE TRASEU STRAZI CONF. P.U.G.

F

7

Strada 98

22.0

8

6 11

5.

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

40.3

94

57

POT = 40 % CUT =1.5 H max. 10 m.

4

21.8

91 101

20

PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE

10 11

aC

96

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

91

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

59

9 8

10

2 3

21

POT = 40 % CUT =1.5 H max. 10 m.

1

10.0

121 13

25

13 12

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

a5 Strad

4a

21

2 3

1211 10

POT = 40 % CUT =1.5 H max. 10 m.

PIETONAL

12

Strad

8

95

93

POT = 40 % CUT =1.5 H max. 10 m.

14

7

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

15.0

2b

7

16 15

90.8

.0

10.0

49

5 6

Strada

POT = 40 % CUT =1.5 H max. 10 m.

5

6

17

92

POT = 40 % CUT =1.5 H max. 10 m.

41

23

POT = 40 % CUT =1.5 H max. 10 m.

40.4

18

L.E

P

a C16

Strad

5

19

89

61

62

4

20

POT = 40 % CUT =1.5 H max. 10 m.

41.5

50

40.4

10.0

9

L

7

7.0

14 13

7 89

4

12

CIRCULATII CAROSABIL 17 6

13.0

5.0

i

s=9.613,59mp.

87.20

1

5.0 5.0

12 11

5.0

10

10.0

41.0

10.0

123

une

5.0

87

90

ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE

a - -- k 8

15

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL

tor

secti

POT = 40 % CUT =1.5 H max. 10 m.

14.0

4.5

colec

a

40.0

88

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

47

POT = 40 % CUT =1.5 H max. 10 m.

4

9

28

27

POT = 40 % CUT =1.5 H max. 10 m.

L

s=8.447,07mp.

a2

7.0

H I

48

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Strad

81.90 81.93

63

40.0 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4

81.99

81.84

POT = 40 % CUT =1.5 H max. 10 m.

64

10.0

22

De. 427

POT = 40 % CUT =1.5 H max. 10 m.

65

POT = 40 % CUT =1.5 H max. 10 m.

85

a

10.0

1.5

7

16

Secti

66

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

86

ad

46.5

drum

Str

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Str

De. 1273

ad

3

limita aliniament

limita aliniament

limita amplasare constructii

limita aliniament

limita amplasare constructii limita aliniament

limita aliniament

limita amplasare constructii

limita aliniament

limita amplasare constructii

limita aliniament

limita aliniament

limita amplasare constructii

a

1 Tulcea 22

11.0

Str ad

l sibi po u se Tra

5.0 7.0

4.5

6.0

83

84

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

5

29

POT = 40 % CUT =1.5 H max. 10 m.

24

10

45

POT = 40 % CUT =1.5 H max. 10 m.

une

Secti

10.0

Fig.D6

2a

4 une

81

82

22

e sectiun

46

POT = 40 % CUT =1.5 H max. 10 m.

32

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

b

POT = 40 % CUT =1.5 H max. 10 m.

8

9

10.0

17

3

156

191.5

23

L

67 68s=5.602,14mp.

20

19 18

42.0

Strada

157

h

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

.0

26

42

POT = 40 % CUT =1.5 H max. 10 m.

44

31

4 5 6 7

10

POT = 40 % CUT =1.5 H max. 10 m.

43

POT = 40 % CUT =1.5 H max. 10 m.

69

Strada

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

L

s=7.894,21mp.

c

10.0

POT = 40 % CUT =1.5 H max. 10 m.

5

R1

79

POT = 40 % CUT =1.5 H max. 10 m.

158

Strada

l

7

7.0

R1

R12.0

80

L

71

70

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

40.0

POT = 40 % CUT =1.5 H max. 10 m.

40.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

23 22 21

38

POT = 40 % CUT =1.5 H max. 10 m.

41

72

POT = 40 % CUT =1.5 H max. 10 m.

77

78

POT = 40 % CUT =1.5 H max. 10 m.

10.0

79.3

2

3

24

36

37

39

40

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

93.9 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3

159

Strada

ctor

2b

POT = 40 % CUT =1.5 H max. 10 m.

TEHNICO EDILITARE

75

76

2 3

4

160

1 2 3

73

74

141.1

1.376,92mp.

38.7

76.7

cole

a

POT = 40 % CUT =1.5 H max. 10 m.

2 3

22 21

141.3

0.0

drum

R1

1.5 7.0

a

ad

Str

Str

4.5

1 a Str ad

2 a

Str ad

6 5

s=520,83mp. 2

POT = 40 % CUT =1,5 H max.=10m.

1a

ad

3

limita amplasare constructii

limita amplasare constructii

limita aliniament

limita aliniament

limita amplasare constructii

limita aliniament

limita amplasare constructii

limita aliniament

limita aliniament

limita aliniament

limita amplasare constructii

limita amplasare constructii

29

30

a

7.0

A

GC

13.8

Str ad

aA 1

Str25ad

26

De. 414

10.0 7.0

0

124 Strada 1

50.983,55mp.

ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.

7.0

7.0

1

10.0 7.0

Fig.C

limita amplasare constructii

1

L

12 11 10

a A1

ad Str 23

ZONA EDIFICABILA

6

6

121

40.0

44.533,80mp. +2.210,27

A

ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)

a

6

p.

p.)

0m

3m ,3

,0

5.0

83 m

LIS

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL

13

e

Dr. 1266

78.40

87 m

ad

a

9 10 11

78.39

85 m

Str

ad

Str

14 13 12

122

POT = 40 % CUT =1.5 H max. 10 m.

din care 30% spatiu verde

LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA

42.0

30.5

14 POT = 40 % CUT =1.5 H max. 10 m.

s=4.154,60mp. POT = 40 % CUT =1.5 H max. 10 m.

G.C.,P.T.E. - ZONA AMPLASARE SERVICII

3.0

1.5 3.0

4.155,43mp. 11.619,33mp.

DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp

TOTAL

12.0

3

78.10

78.40

83 m

Sect

Sectiun

3.0

5.0 1.5

a

19

+45.00

78.39

78.10

+10.00

une 2

0

.0 10.0

De. 1266

13.0

5.

10

8 15

POT = 40 % CUT =1.5 H max. 10 m.

H max.10.0m

H max.10.0m

5.0

GC

s=375,56mp.

19

G

Secti

0

.5

16

139

L

TEREN ADIACENT D.N.22 - - - - - - -

15.0

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

s=5.484,60mp.

0

3.

118

POT = 40 % CUT =1.5 H max. 10 m.

120

7

POT = 40 % CUT =1.5 H max. 10 m.

aC

f

119

0

3.

40.0

7.0 1.5

5.

35

.0

34

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

138 6 7 8

11 10

Strad

9 10 5

POT = 40 % CUT =1.5 H max. 10 m.

CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI

3.0

3.0 1.5

ZONA P EXTINDERE INTRAVILAN

1.5 7.0

0

7

63

19

.7

=4

9

5

116

.0

137

37

13 1210.0

140

POT = 40 % CUT =1.5 H max. 10 m.

8 4 11

135

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4

POT = 40 % CUT =1.5 H max. 10 m.

141

.0

10

5.0

5.

a

(s

.6 11 s=

143

13.5

a 2a

POT = 40 % CUT =1.5 H max. 10 m.

114

0

3.

136 0

3.

POT = 40 % CUT =1.5 H max. 10 m.

0

5.

.0

POT = 75 % CUT =4 H max. 25 m.

POT = 40 % CUT =1.5 H max. 10 m.

40

117

PUD PREALABIL

LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI

14.0

2 18 4.5 10.0

50.0

13 0

0

5.

10

POT = 40 % CUT =1.5 H max. 10 m.

SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m

CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA

19

POT = 75 % CUT =4 H max. 45 m.

5.

y

.7

115

.0

134

10

142

.0

40

g

40 POT = 40 % CUT =1.5 H max. 10 m.

.0

POT = 40 % CUT =1.5 H max. 10 m.

145

7.0 1.5

Strad

144

4c

.0

36

rb

T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR

D

5.0

POT = 40 % CUT =1.5 H max. 10 m.

L

POT = 40 % CUT =1.5 H max. 10 m.

ad Str

SI

Pp

II AT

PU

SP

I-

Dr. 1266

3

k 146

s=6.460,56mp.

.0

I

s=1.409,80mp.

.0

4

1.5

IS

29

POT = 40 % CUT =1.5 H max. 10 m.

.0

10

POT = 40 % CUT =1.5 H max. 10 m.

IS x2

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

ZONA INTRAVILAN EXISTENT

Fig.C29

5

s=22.937,00mp.

0

5.

0

PUD PREALABIL SPATII VERZI, PARCURI, ALEI PIETONALE

1.409,80mp. din care 30% spatiu verde

LIMITA ZONA EDIFICABILA Fig.A40

6

x2

POT = 40 % CUT =1.5 H max. 10 m.

5.

5 6 7

133

132

POT = 40 % CUT =1.5 H max. 10 m.

a ad

147

POT = 40 % CUT =1.5 H max. 10 m.

L 131

s=6.421,09mp.

7

LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)

S+D+P+2 -> 11-15 ET

UNITATI DE INVATAMANT

4 32

SPATII VERZI ,PARCURI

I - Pprb C-

H max. 10 m.

LIMITA SUPRAFATA ZONA STUDIATA

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

1 12 11

113

8 910

Dr. 1264

POT = 40 % CUT =1.5 H max. 10 m.

Str

10.0

EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT

7.0

POT = 40 % CUT =1.5 H max. 10 m.

15.0

7

5.0

PROPUNERE DE MOBILARE URBANA

129

128 130 148

z

.0

0

3.

POT = 40 % CUT =1.5 H max. 10 m.

P -

UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL

POT = 40 % CUT =1,5

d

L

ZONIFICARE

PUD PREALABIL

.0

1.5

70.606,37mp.

LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )

30.5

5.0

CRESA , GRADINITA PUD PREALABIL

H max. 10 m.

LIMITA PERIMETRU INTRAVILAN EXISTENT

R=14.0

Fig.C29

5

5.484,60mp. din care 10% spatiu verde

LOTURI AMPLASARE CONSTRUCTII S+P+1+M

LIMITE Fig.C29

11.0

7

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET

LEGENDA:

117.5

1.5

5

E

75 75 75

R12.00 4.50

37.364,00mp. din care 10% spatiu verde

POT = 40 % CUT =1,5

I -

X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134

11

17

4

NR.1 FIL TIP 655 RIU PRO GIRATO KM 178+ SENS P.U.G.conf. propus

2

R16.00

5.5 5.5

6

2

SPATII VERZI ,PARCURI, SCUARURI

40

.0

R12

2.0

R1

4

23

10.0

1.5

112

POT = 40 % CUT =1.5 H max. 10 m.

149

w

ZONA EXTINDERE CAROSABIL D.N. 22

56.2

a

KV

ad

150

1

2 3 4

14

.0

3

24

aB

9 1011

13.0

41.7

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

a1

0

Str

11

151

x1

119.2

20 19 18

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.

S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.

L-

PERIMETRU INTRAVILAN PROPUS

2

4.50

POT = 75 % CUT =4 H max. 45 m.

P

POT = 40 % CUT =1.5 H max. 10 m.

3 11

2.5

1.5

25

s=14.427,00mp.

41.7

110

4 1

27

S+D+P+2 -> 11-15 ET

13.0

10

L

POT = 40 % CUT =1.5 H max. 10 m.

127

126

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

7

7.0

Strad

111 s=6.248,94mp. .0

10

8

5.0

s=1806,59mp.

16 15

POT = 40 % CUT =1.5 H max. 10 m.

2

9

6

aB

1.5

e

109

POT = 40 % CUT =1.5 H max. 10 m.

6

3.0

.

3.0

5

e

Strad

10.0

3.0

152

.0

15 2.0 2.0

153 15.0

4

18 17

125

POT = 40 % CUT =1.5 H max. 10 m.

32 33

1

IS -ZONA

LIS -

COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.

D

15

1

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

Strad

1 2 3

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

0

42.0

7

10.0

108

106

104

1 2 3

17

3.0

107

POT = 40 % CUT =1.5 H max. 10 m.

124

154 POT = 40 % CUT =1.5 H max. 10 m.

87.25

0

GC 5.

s=395,23mp.

ZONA D.N. 22 EXISTENT

40.0

POT = 40 % CUT =1.5 H max. 10 m.

102

a6

1 18 25.0

POT = 40 % CUT =1.5 H max. 10 m.

105

4 5 6

16 15 14

56

10 9

De. 1262

98.7

POT = 40 % CUT =1.5 H max. 10 m.

5.

11

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

12.0

P

a2

15.0

721

9 8

Strad

87.21

87.20

INDICATIV PARCELA DIN ZONA

24.0

103

CUT =1.5 H max. 10 m.

.0

9 10

31

s=2.348,81.

PUD PREALABIL

14 12 13

8

a

13

12 8

2 10

IS

10.0

POT = 40 % CUT =1.5 H max. 10 m.

une 3

7

POT = 40 % CUT =1.5 H max. 10 m.

54

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 %

101

4b

87.20

- SPATII VERZI, SCUARURI PUD PREALABIL

PROPUNERE TRASEU STRAZI CONF. P.U.G.

F

1

POT = 40 % CUT =1.5 H max. 10 m.

155

52

POT = 40 % CUT =1.5 H max. 10 m.

24.0

.A

tor a C16

POT = 40 % CUT =1.5 H max. 10 m.

10.0

19 20

L56

POT = 40 % CUT =1.5 H max. 10 m.

6

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

96.0

58

60

51

53

55

s=3.858,02mp.

ne

un

0

5

3

SPATII VERZI ,PARCURI, SCUARURI

141312 11

13

a5

4

7 8

15

10 9

8

15

42.3

16

10.0

POT = 40 % CUT =1.5 H max. 10 m.

44.3

19 18

5. 6

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

17

18

Str 307 a7d aA

11

13

3

iu

cti

17 16

14

19

20

POT = 40 % CUT =1.5 H max. 10 m.

d

11

POT = 40 % CUT =1.5 H max. 10 m.

ct

5

Se

POT = 40 % CUT =1.5 H max. 10 m.

4

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

100

99

L.E

colec

5.0

s=375,56mp.

L

POT = 40 % CUT =1.5 H max. 10 m.

12 3

2 3

Secti

97

.0

PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE

6

5

13 12 11

se

.0

7

POT = 40 % CUT =1.5 H max. 10 m.

9

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

42

a

L

10

s=6.573,10mp.

POT = 40 % CUT =1.5 H max. 10 m.

13

.0

6

8

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

12 10

21

11 12

16 15

POT = 40 % CUT =1.5 H max. 10 m.

3.0

161

10

0

5.

PIETONAL

Strad

4

Strada

22.9

6 11

POT = 40 % CUT =1.5 H max. 10 m.

j

POT = 40 % CUT =1.5 H max. 10 m.

5.0

GC

98

22.0

8

40.5

20

9 8

21.8

91 101

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

57

POT = 40 % CUT =1.5 H max. 10 m.

2 1211 3 10 10.0

121 13

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

B Strada

s=2.352,60mp.

ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL

10 11

7

L

s=8.447,07mp.

Strad 1

59

7 21

ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.

14

2 3

40.3

15.0

a

ad

POT = 40 % CUT =1,5 H max.=10m.

12

C

96

POT = 40 % CUT =1.5 H max. 10 m.

94

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

92

POT = 40 % CUT =1.5 H max. 10 m.

25

10.0

49

5 6

1211 10

95

93

90.8

4

9

8 7

POT = 40 % CUT =1.5 H max. 10 m.

.0

40.4

7

POT = 40 % CUT =1.5 H max. 10 m.

91

Str

12

6

16 15

4a

POT = 40 % CUT =1.5 H max. 10 m.

5

17

40.4

L

18

61

62

5

19

89

s=9.613,59mp.

4

ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4

20

POT = 40 % CUT =1.5 H max. 10 m.

41.5

50

Strada

i

POT = 40 % CUT =1.5 H max. 10 m.

47

POT = 40 % CUT =1.5 H max. 10 m.

10.0

10.0

87

90

40.0

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

63

POT = 40 % CUT =1.5 H max. 10 m.

41

23

Strad

40.0

88

POT = 40 % CUT =1.5 H max. 10 m.

48

POT = 40 % CUT =1.5 H max. 10 m.

3

85

86

H I

POT = 40 % CUT =1.5 H max. 10 m.

64

22

De. 427

POT = 40 % CUT =1.5 H max. 10 m.

65

POT = 40 % CUT =1.5 H max. 10 m.

28

27

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

5

une

Secti

66

POT = 40 % CUT =1.5 H max. 10 m.

4

POT = 40 % CUT =1.5 H max. 10 m.

7.0

81.93

L

67 68s=5.602,14mp.

POT = 40 % CUT =1.5 H max. 10 m.

Strada

POT = 40 % CUT =1.5 H max. 10 m.

CIRCULATII CAROSABIL

5.0

81 83

84

POT = 40 % CUT =1.5 H max. 10 m.

191.5

e

sectiun

81.90

POT = 40 % CUT =1.5 H max. 10 m.

82

22

23 81.84

POT = 40 % CUT =1.5 H max. 10 m.

5

156

POT = 40 % CUT =1.5 H max. 10 m.

45

POT = 40 % CUT =1.5 H max. 10 m.

Strada

157

10.0

17

42.0

46

POT = 40 % CUT =1.5 H max. 10 m.

24

9

1

11.

158

POT = 40 % CUT =1.5 H max. 10 m.

44

69

h

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

b

POT = 40 % CUT =1.5 H max. 10 m.

8

9 10

. 40

POT = 40 % CUT =1.5 H max. 10 m.

.0

IS -

X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066

A B C D E F G H I

.00

79

20

19 18

De

42

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

0

POT = 40 % CUT =1.5 H max. 10 m.

141.3

l

POT = 40 % CUT =1.5 H max. 10 m.

80

POT = 40 % CUT =1.5 H max. 10 m.

s=2.980,45mp.

POT = 40 % CUT =1.5 H max. 10 m.

70

40.0

10.0

159

.0

26

42

POT = 40 % CUT =1.5 H max. 10 m.

2

POT = 40 % CUT =1.5 H max. 10 m.

4

.0

30

10

POT = 40 % CUT =1.5 H max. 10 m.

43

POT = 40 % CUT =1.5 H max. 10 m.

29

POT = 40 % CUT =1.5 H max. 10 m.

16

10

POT = 40 % CUT =1.5 H max. 10 m.

29

7

38

POT = 40 % CUT =1.5 H max. 10 m.

L

s=7.894,21mp.

c

10.0

POT = 40 % CUT =1.5 H max. 10 m.

18 17

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

28

14 13 12 .0 15

10

19

35

33

32

P.T.E.

s=85,30mp.

10.0

6.

160

L

71

31

4 5 6

6

Fig.B1

R1

38.7

POT = 40 % CUT =1.5 H max. 10 m.

39 41

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

40.0

10.0

40

POT = 40 % CUT =1.5 H max. 10 m.

72

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

73

74

POT = 40 % CUT =1.5 H max. 10 m.

77

78

POT = 40 % CUT =1.5 H max. 10 m.

34

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

23 22 21

36

37

Strada de legatura - propusa prin P.U.Z.-

C

5

27

26

12.0

Sectiune 3

183.000,00mp. din care suprafete

TOTAL TEREN CE A GENERAT P.U.Z.

4

3

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

79.3

2

3

24

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

93.9 POT = 40 % CUT =1.5 H max. 10 m.

141.1

1.376,92mp.

TEHNICO EDILITARE

2 3

22 21

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3

1 2 3

12 11 10

a A1

ad Str 23 75

76

2 3

4

BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp

R12

6 5

POT = 40 % CUT =1.5 H max. 10 m.

10.0 7.0

7.0

A

GC

s=520,83mp. 2

ZONA EDIFICABILA

drum

a Strad

aA 1

Str25ad

26

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII

P

L

De. 414

Strada

De. 1273

12 11

124 Strada 1

81.99

adag

10

A

LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA

17

9

G.C.,P.T.E. - ZONA AMPLASARE SERVICII

CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA

1

13.0

14 13

7 89

din care 30% spatiu verde

44.533,80mp. +2.210,27

50.983,55mp.

7

Fig.D6

1.5 7.0

123

10.0

5.0

5.0

TOTAL

Strada

b Str Ba

7.0

R1

4 41.0

10.0

5.0

9 10 11

une

secti

POT = 40 % CUT =1.5 H max. 10 m.

TEREN ADIACENT D.N.22 - - - - - - -

DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp

H max.10.0m

B

e

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

4.155,43mp.

76.7

ctor

2a

POT = 40 % CUT =1.5 H max. 10 m.

13

POT = 40 % CUT =1.5 H max. 10 m.

121

40.0

une

3.0

1.5 3.0

1.5

7.0

L

IS X1

5.0

1.5

7.0

IS x1

15.0

5.4%

Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1

11.619,33mp.

POT = 40 % CUT =1.5 H max. 10 m.

a - -- k 8

15

PUD PREALABIL

CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI

12.0

7.0

5.4%

H max.10.0m

ZONA P EXTINDERE INTRAVILAN

7

16

Secti

SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m

LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI

6

6

12.0

13.8

cole

a

ad

122

1a

Str

L

s=4.154,60mp. POT = 40 % CUT =1.5 H max. 10 m.

LIS

s=5.484,60mp.

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL

PUD PREALABIL SPATII VERZI, PARCURI, ALEI PIETONALE

LIMITA ZONA EDIFICABILA

14.0

4.5

15.0

10.0 7.0

0.0

drum

R1

a

ad

14 13 12

Str

139

De. 1266

0

une 2

0

POT = 40 % CUT =1.5 H max. 10 m.

13.0

Secti

5.

10.0 40.0

7.0 1.5

0

6

8 15

10.0

1.5

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

14

SPATII VERZI ,PARCURI

I - Pprb C-

3.0

3.0 1.5

ZONIFICARE

7.0

7.0

46.5

30.5

POT = 75 % CUT =4 H max. 25 m. 0

3.

118

POT = 40 % CUT =1.5 H max. 10 m.

120

7 16

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

aC

119

137

138 6 7 8

11 10

Strad

5.

a

p.

p.)

3m

0m

,3

,0

63

19

.7

9

1.5 7.0

ad

7

140

9 10 5

13.5

0

5.

Str POT = 40 % CUT =1.5 H max. 10 m.

141

5

f

POT = 40 % CUT =1.5 H max. 10 m.

0

.0

POT = 40 % CUT =1.5 H max. 10 m.

4

.0

34

3.

POT = 40 % CUT =1.5 H max. 10 m.

37

13 1210.0

POT = 40 % CUT =1.5 H max. 10 m.

0

3.

136 0

3.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8 4 11

.0

a ad

143

.0

10

5.0

10

40

.5

4c

=4

(s

.6 11 s=

T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR

D

II

Str

SI

rb Pp

AT

PU

SP

I-

.0

POT = 40 % CUT =1.5 H max. 10 m.

40

117

POT = 40 % CUT =1.5 H max. 10 m.

135

.0

134

10

142

145

g

40 POT = 40 % CUT =1.5 H max. 10 m.

.0

POT = 40 % CUT =1.5 H max. 10 m.

5.

10

116

.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

10

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Str 144

a ad

EA TA AR EN M ORM LE SF A. G E. RE AN L. TR RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT

POT = 40 % CUT =1.5 H max. 10 m.

L

POT = 40 % CUT =1.5 H max. 10 m.

.0

114

POT = 40 % CUT =1.5 H max. 10 m.

115

5 6 7

133

50.0

POT = 75 % CUT =4 H max. 45 m.

0

5.

.0

13 0

5.

y

.7

29 0

CRESA , GRADINITA

POT = 40 % CUT =1,5

1.409,80mp. PUD PREALABIL din care 30% H max. 10 m. spatiu verde

LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)

14.0

2 18 4.5 10.0

42.0

s=22.937,00mp.

0

5.

I

s=1.409,80mp.

35

POT = 40 % CUT =1.5 H max. 10 m.

L 131

132

7.0 1.5

a 2a

7

5.0

.0 36

8 910

Dr. 1264

19

IS

CRESA , GRADINITA PUD PREALABIL

0

5.

4 32

4

1.5

x2

POT = 40 % CUT =1.5 H max. 10 m.

UNITATI DE INVATAMANT

P -

Sectiune 3

5.0 1.5

a

UNITATI DE INVATAMANT

ZONA INTRAVILAN EXISTENT

Fig.C29

1 12 11

113

112

129

s=6.421,09mp.

s=6.460,56mp.

z

.0

0

3.

POT = 40 % CUT =1.5 H max. 10 m.

5.0

25

LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )

Fig.C29

5

S+D+P+2 -> 11-15 ET

17

.0

40

3.0

2

LIMITA PERIMETRU INTRAVILAN EXISTENT

Fig.A40

6

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

PUD PREALABIL

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

k 146

147

Strad

a

KV

ad

POT = 40 % CUT =1.5 H max. 10 m.

15.0

0

Str

11

149

P

s=1806,59mp.

5

15.0

22 21 20

LIMITA SUPRAFATA ZONA STUDIATA

R=14.0

7

H max. 10 m.

POT = 40 % CUT =1,5

d

L

LIMITE

117.5

5.0

5

Sectiune 6 Sectiune strada 1

70.606,37mp.

LEGENDA: Fig.C29

11.0

30.5

10.0 1.5

4

E

75 75 75

R12.00 4.50

11

SPATII VERZI ,PARCURI, SCUARURI

POT = 40 % CUT =1.5 H max. 10 m.

128 130 148

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

w

56.2

.

150

13.0

1.5

110

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

aB

1

2 3 4

NR.1 FIL TIP 655 RIU PRO GIRATO KM 178+ SENS P.U.G.conf. propus

2

R16.00

5.5 5.5

6

2

5.0

41.7

10

L

POT = 40 % CUT =1.5 H max. 10 m.

127

126

POT = 40 % CUT =1.5 H max. 10 m.

151

a1

.A

s=395,23mp.

a2

L.E

2.0 2.0

POT = 40 % CUT =1.5 H max. 10 m.

23

119.2

41.7

16 15

25

24

Strad

111 s=6.248,94mp. .0

7.0

IS

9 1011

14

.0

4

POT = 75 % CUT =4 H max. 45 m.

20 19 18

1

R12

2.0

R1 3

s=14.427,00mp.

13.0

1.5

3.0

15

.0

2

4.50

S+D+P+2 -> 11-15 ET

aB

1 2 3

3 11

2.5

1.5

x1

6

4 1

27

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

Strad

10.0

e

109

POT = 40 % CUT =1.5 H max. 10 m.

6

10

POT = 40 % CUT =1.5 H max. 10 m.

3.0

152

.0

15

3.0

5

3.0

124

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

153 15.0

4

18 17

125

7

37.364,00mp. din care 10% spatiu verde 5.484,60mp. din care 10% spatiu verde

LOTURI AMPLASARE CONSTRUCTII S+P+1+M

I -

X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134

LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET

S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.

L-

COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

D

1 2

8

42.0

7

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

17

108

106

104

1 2 3

e

Strad

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

102

a6

154

POT = 40 % CUT =1.5 H max. 10 m.

87.21

87.25

0

GC 5.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4 5 6

16 15 14

155

721

9 8

Strad

10.0

19 20

87.20 87.20

une 3

7

4b

99

12 3

1 18

107

105

10.0

POT = 40 % CUT =1.5 H max. 10 m.

100

POT = 40 % CUT =1.5 H max. 10 m.

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

101

10.0

Strada

L

40.5

97

s=2.352,60mp. .0

10

Secti

7 161

POT = 40 % CUT =1.5 H max. 10 m.

j

POT = 40 % CUT =1.5 H max. 10 m.

22.9

0

5

11

32 33 9

12.0

PUD PREALABIL

56

25.0

98.7

40.0

98

22.0

8

5.

103

CUT =1.5 H max. 10 m.

6

9 10

31

SPATII VERZI ,PARCURI, SCUARURI

10 9

De. 1262

POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 %

un

14 12 13

8

0

0

10.0

POT = 40 % CUT =1.5 H max. 10 m.

24.0

1

21.8

6 11

52

54

B

2 1211 3 10 10.0

121 13

91 101

20

6

3.0

15.0

a

ad

21

60

Strad

7

Strada

5

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

58

POT = 40 % CUT =1.5 H max. 10 m.

4

L56

15.0

94

91

9 8

51

53

POT = 40 % CUT =1.5 H max. 10 m.

96.0

s=3.858,02mp.

.0

7 8

15

P

3

4 13

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

s=2.348,81.

141312 11

13

55

40.4

96

11 12

a5

d

16

15

42.3

16

10.0

10 9

8

16 15

POT = 40 % CUT =1.5 H max. 10 m.

11

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

17

POT = 40 % CUT =1.5 H max. 10 m.

44.3

a

5.

17

14

POT = 40 % CUT =1.5 H max. 10 m.

18

POT = 40 % CUT =1.5 H max. 10 m.

4a

5

Str

12

14

57

59

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

21

POT = 40 % CUT =1.5 H max. 10 m.

ne

13

12 8

2 10

5.

iu

cti

POT = 40 % CUT =1.5 H max. 10 m.

4

19

20

POT = 40 % CUT =1.5 H max. 10 m.

Strad POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

95

93

90.8

92

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

1

2 3

40.3

L

41.5

5 6

1211 10

POT = 40 % CUT =1.5 H max. 10 m.

2 3

ct

5

Se

POT = 40 % CUT =1.5 H max. 10 m.

13

.0

13 12 11

10.0

49

50 4

9

8 7

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

se

.0

7

POT = 40 % CUT =1.5 H max. 10 m.

9

19 18

3

POT = 40 % CUT =1.5 H max. 10 m.

42

a

L

10

s=6.573,10mp.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

6

8

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

12 10

23

L

s=8.447,07mp.

POT = 40 % CUT =1.5 H max. 10 m.

3

i

7

POT = 40 % CUT =1.5 H max. 10 m.

s=9.613,59mp.

POT = 40 % CUT =1.5 H max. 10 m.

6

16 15

40.4

90

4

17

Strada

POT = 40 % CUT =1.5 H max. 10 m.

18

61

62

5

19

89

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4

20

10.0

87

63

40.0

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

47

POT = 40 % CUT =1.5 H max. 10 m.

4

40.0

88

POT = 40 % CUT =1.5 H max. 10 m.

22

45

48

Strada

191.5

85

86

H I

64

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

7.0

81.93

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

De. 427

POT = 40 % CUT =1.5 H max. 10 m.

65

POT = 40 % CUT =1.5 H max. 10 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

5

une

Secti

66

POT = 40 % CUT =1.5 H max. 10 m.

10.0

17

POT = 40 % CUT =1.5 H max. 10 m.

67 68s=5.602,14mp.

5

POT = 40 % CUT =1.5 H max. 10 m.

25

b

24

9

18

42.0

46

POT = 40 % CUT =1.5 H max. 10 m.

Strada

81 83

84

POT = 40 % CUT =1.5 H max. 10 m.

L

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

82

22

e

sectiun

81.90

POT = 40 % CUT =1.5 H max. 10 m.

7

156

23 81.99

81.84

Strada

157

Strada

158

POT = 40 % CUT =1.5 H max. 10 m.

44

69

28

POT = 40 % CUT =1.5 H max. 10 m.

.0

POT = 40 % CUT =1.5 H max. 10 m.

Str 307 a7d aA

11

1

POT = 40 % CUT =1.5 H max. 10 m.

30

POT = 40 % CUT =1.5 H max. 10 m.

27 41

.0

POT = 40 % CUT =1.5 H max. 10 m.

29

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8

9

POT = 40 % CUT =1.5 H max. 10 m.

.0

0

79

76.7

l

43

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

h

5 6 7

.0

20

19

. 40

42

4

11.

POT = 40 % CUT =1.5 H max. 10 m.

141.3

L

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

70

POT = 40 % CUT =1.5 H max. 10 m.

80

POT = 40 % CUT =1.5 H max. 10 m.

s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.

10.0

40.0

10.0

159

22 21 10

26

42

2

POT = 40 % CUT =1.5 H max. 10 m.

6.

78

POT = 40 % CUT =1.5 H max. 10 m.

160

36

POT = 40 % CUT =1.5 H max. 10 m.

s=7.894,21mp.

c

10.0

141.1

38.7

71

38

POT = 40 % CUT =1.5 H max. 10 m.

L

41

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

40.0

29

De

POT = 40 % CUT =1.5 H max. 10 m.

16

10

R1

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

39

40

POT = 40 % CUT =1.5 H max. 10 m.

72

POT = 40 % CUT =1.5 H max. 10 m.

37

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

73

74

POT = 40 % CUT =1.5 H max. 10 m.

77

POT = 40 % CUT =1.5 H max. 10 m.

18 17

POT = 40 % CUT =1.5 H max. 10 m.

IS -ZONA

LIS -

PERIMETRU INTRAVILAN PROPUS

.00

13.8

2

2 3

22 21

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3

1 2 3

12 11 10

a A1

ad Str 23 75

76

2 3

4

14 13 12 .0 15

10

19

35

28

s=85,30mp.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

33

32

POT = 40 % CUT =1.5 H max. 10 m.

6

Fig.B1

P.T.E.

IS -

X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066

A B C D E F G H I

R12

7.0

6 5

31

4

34

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

23

POT = 40 % CUT =1.5 H max. 10 m.

79.3

2

3

24

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

93.9

C

5

27

26

CONSTANTA

Str25ad

26

De. 414

10.0 7.0

A

GC

10.0 7.0

aA 1

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

Strada de legatura - propusa prin P.U.Z.-

4

3

25

s=520,83mp.

COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp

B

L

H max.10.0m

183.000,00mp. din care suprafete

TOTAL TEREN CE A GENERAT P.U.Z.

Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1

e

22 21 20

124 Strada 1

BILANT SUPRAFETE

m

3.0

1.5 3.0

2

A

IS X1

H max.10.0m

150

12.0

H max.10.0m

L

5.0

1.5

IS x2

5.4%

X IAL

15.0

12.0

7

5.4%

COMPLE COMERC

3.0

3.0 1.5

5.0 1.5

a

7.0

1.5

CONSTANTA

d

L

Sectiune 3

12.0

29

L H max.10.0m

15.0

1.5

30

5.0

7.0

Fig.C

3.0

5.4%

7.0

IS x1

P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008

P+2

Sectiune 2

TEREN CARE A GENERAT P.U.Z.

P+2

Sectiune 2

m

15.0

P+2

DRUM PROPUS CONF. P.U.G. DRUM PROPUS IN . P.U.Z.

P+2

limita aliniament

STR . BARAJULUI DRUM COLECTOR ( AFERENT STR. BARAJULUI)

P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008

Sectiune 6 Sectiune strada 1

limita amplasare constructii

permitt DN 22

150

H max.10.0m

3.0 1

LEGENDA:

STR . BARAJULUI

TEREN CARE A GENERAT P.U.Z.

IS x2

3.0

h

Cladirile amp au aceeasi c

X IAL

7

H max.45.00

L

COMPLE COMERC

7.0

1.5

IS x2

5.4%

DN 22

DRUM PROPUS IN . P.U.Z.

12.0

H max.10.0m

5.0

H max.45.00

P+2

15.0

5.0

1.5

c

DRUM PROPUS CONF. P.U.G.

1.5

10.0

5.0 1.5

5.4%

L

1.5 3.0

7.0

3.0 1.5

S

3.0

5.0 1.5

f

limita aliniament

LIS Y H max.45.00

DRUM COLECTOR ( AFERENT STR. BARAJULUI)

7.0

13.0

5.0

Sectiune strazi 2-7

LEGENDA:

7.0

L

Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)

H max.45.00

IS x1

Sectiune 1

87.2

limita aliniament

limita amplasare constructii

5.4%

UTILITIES

Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)

Sectiune 2

1.50

H max.10.0m

3.0

h

L c

circulation P+2

7.00

Sectiune 5

IS x2

H max.10.0m

H max.25.00

1.50

limita amplasare constructii

limita aliniament

5.0

5.4%

3.00

±0.00 =+0.60

-2.80 21.0

-2.80

LIS y

5.0

1.5

H max.10.0m

H max.45.00

L

1.5 3.0

7.0

1.5

10.0

demisol

demisol 21.0

limita amplasare constructii

3.0

10.0

3.0 1.5

10.0

5.0 1.5

5.0 1.5

f

+3.00

parter

±0.00 =+0.60

1.50

5.4%

limita amplasare constructii

3.0

h

L

5.0

7.00

limita amplasare constructii

5.4%

L

13.0

1.50

5.0

limita aliniament

H max.45.00

3.0

limita amplasare constructii

H max.45.00

LIS Y

Sectiune strazi 2-7

P+2

13.0

limita aliniament

IS x2

limita aliniament

limita amplasare constructii

5.0

limita aliniament

limita amplasare constructii

Sectiune 1

3.00

5.4%

Sectiune 4 Sectiune strada 2

5.4%

5.0

limita amplasare constructii

1.5

1.50

H max.10.0m

limita aliniament

10.0

5.0 1.5

7.00

LIS y

5.0

1.5

1.50

Sectiune 5 limita amplasare constructii

LIS Y

10.0

H max.10.0m

limita aliniament

limita aliniament

limita aliniament

5.0

5.0

5.0 1.5

f

limita amplasare constructii

87.2

limita amplasare constructii

L

13.0

etaj

+3.00

H max.10.0m

-2.80 21.0

-2.80

+6.00

mansarda

5.4%

3.00

±0.00 =+0.60

H max.25.00 demisol

demisol 21.0

5.4%

5.0

5.4%

Sectiune 1

+3.00

parter

±0.00 =+0.60

1.50

limita amplasare constructii

13.0

3.0

7.00

87.2

limita aliniament

Sectiune strada 2

1.50

limita amplasare constructii

limita aliniament

limita amplasare constructii

P+2

SECTIUNE STRAZI SI LOTURI

+6.00

limita aliniament

etaj

+3.00

3.00

5.4%

Sectiune 4

+10.00

+6.00

mansarda

+6.00

H max.10.0m

H max.25.00

+10.00

H max.25.00

+10.00

SECTIUNE STRAZI SI LOTURI

H max.45.00

H max.45.00

H max.45.00

+10.00

CONSTRUIRE COMPLEX

CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL

CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL H max.25.00

PLAN URBANISTIC ZONAL LOT

PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si

PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si

+20.00

102 m

106 m

83 m

DN 22

+10.00

SECTIUNE TRANSVERSALA

85 m

87 m

90 m

93 m +10.00

95 m +10.00

+10.00

83 m

Proiectant general:

Beneficiar:

s.c. PROMARH s.r.l. Nume:

Semnatura:

str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea

Scara:

1 / 1.000

Proiectat

arh. Marcel PAVEL

Data:

Desenat

arh. Paul Cristian MURAVELI

Noiembrie 2017

Thedevelopmentbenefitsfromhavingenergyutilitieson-site already,whiletherestoftheutilitiesarebeingbroughton-site throughthemainstreetBabadagdirectly.(water,sewage,gas)

SECTIUNE

Proiect nr:

MATROZ CONSTANTIN si FLOREA ION

TULCEA

J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180

Specificatie:

Sef Proiect arh. Marcel PAVEL

panta teren 5.4%

Denumire proiect:

LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.

Denumire plansa:

REGLEMENTARI URBANISTICE

87/2017 Faza:

P.U.Z. Nr. plansa:

U4

Individual Ho Collective Hou Commercial M Education Parks & Leisure Sports & Recre


PROJECT OVERVIEW

c

H max.45.00

3.0

h

L

3.0

10.0

13.0

3.0

5.0

1.5

10.0

7.00

±0.00 =+0.60

+6.00

mansarda

etaj

+3.00

parter

±0.00 =+0.60

demisol

demisol 21.0

1.50

-2.80

H max.45.00

H max.10.0m

Sectiune strazi 2-7

3.0

3.0

10.0

5.4%

environmental benefits h

c

L

1.5 3.0

7.0

3.0 1.5

Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)

H max.45.00

LEGENDA:

LEGENDA:

STR . BARAJULUI

DN 22

DN 22

STR . BARAJULUI

DRUM PROPUS CONF. P.U.G.

STR . BARAJULUI

DRUM PROPUS IN . P.U.Z.

DRUM COLECTOR ( AFERENT STR. BARAJULUI)

TEREN CARE A GENERAT P.U.Z.

DRUM COLECTOR ( AFERENT STR. BARAJULUI) DRUM PROPUS CONF. P.U.G.

DRUM PROPUS CONF. P.U.G.

DRUM PROPUS IN . P.U.Z.

l sibi po u se Tra

2b a ad

1

Tulcea

22

11.0

5.0 7.0

4.5

4.5

1 a

6.0

R1

R12.0

2 a

Str ad

Str ad

limita aliniament

limita aliniament

limita amplasare constructii

limita aliniament

limita amplasare constructii

limita aliniament

limita aliniament

limita aliniament

limita amplasare constructii

3

1 Tulcea 22

11.0

6.0

R1

R12.0

a

4.5 4.5

limita amplasare constructii

Str

2b a

Str ad

l sibi po u se Tra

5.0 7.0

1 a Str ad

2 a

Str ad

limita amplasare constructii

limita aliniament

limita amplasare constructii

limita aliniament

limita amplasare constructii

limita aliniament

limita aliniament

limita amplasare constructii

limita amplasare constructii

limita aliniament

limita aliniament

limita amplasare constructii

limita amplasare constructii 1 Tulcea

6.0

3

4.5 4.5

1

22

11.0

5.0 7.0

R1

a

Tra

se

u

30

R12.0

Str ad

l sibi po

m

a

limita amplasare constructii

limita aliniament

limita amplasare constructii

29

Fig.C 150

Str ad

30

2

m

a

150

X IAL COMPLE COMERC

Str ad

29

ad

tor

Str

colec

2b

drum

a

De. 1273

ad

Fig.D6

1.5 7.0

Str

7.0

41.0

5.0

14 13

7 89

- SPATII VERZI, SCUARURI PUD PREALABIL

+ 105.00

PIETONAL

17

PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE

6

9

INDICATIV PARCELA DIN ZONA

CIRCULATII CAROSABIL

1

5.0

13.0

10.0

12 11

10.0

7.0

10

une

5.0

U4

83 m

R1

Nr. plansa:

ctor

P.U.Z.

cole

REGLEMENTARI URBANISTICE

Faza:

0.0

Noiembrie 2017

87/2017

drum

arh. Paul Cristian MURAVELI

LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.

123

8

15

5.0

5.0

Desenat

Denumire proiect:

Denumire plansa:

2a

1 / 1.000

Data:

a

str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea

Scara:

ad

10.0

Semnatura:

Proiect nr:

MATROZ CONSTANTIN si FLOREA ION

TULCEA

J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180

arh. Marcel PAVEL

10.0 POT = 40 % CUT =1.5 H max. 10 m.

P

a - -- k

7

16

Secti

Strad

a C16

PROPUNERE TRASEU STRAZI CONF. P.U.G.

F

ZONA D.N. 22 EXISTENT

10 11

ZONA EXTINDERE CAROSABIL D.N. 22

12

aC

East

PROPUNERE DE MOBILARE URBANA

Strad

Dr. 1266

3

10.0

Beneficiar:

s.c. PROMARH s.r.l. Nume:

Proiectat

121

40.0

ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL

5.0

10.0

10.0

Proiectant general:

Specificatie:

Sef Proiect arh. Marcel PAVEL

85 m

e4

13

un secti

14.0

4.5

6

6

14 POT = 40 % CUT =1.5 H max. 10 m.

Str

9 10 5

10.0

1.5

ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.

7.0

7.0 46.5

1a

122

POT = 40 % CUT =1.5 H max. 10 m.

9 10 11

+45.00

78.40

83 m

50.0

a

POT = 40 % CUT =1.5 H max. 10 m.

78.39

78.40

+10.00

ad

L

LIS

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL

Str

14 13 12

Str

5.0

5.0

s=375,56mp.

78.06

Recreational green spaces Tree alignments +35.00

90 m

93 m

+10.00

panta teren 5.4%

95 m

+10.00

78.10

+45.00

78.39

G

87 m

une 2

0

De. 1266

13.0

5.

6

139

ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M) POT = 40 % CUT =1,5 H max.=10m.

19

78.10

DN 22

Secti

0

a

POT = 40 % CUT =1.5 H max. 10 m.

7.0 1.5

5.

ad

6 7 8

C ada

8 15 10.0

40.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

s=4.154,60mp.

120

7

138

ZONA EDIFICABILA

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

s=5.484,60mp.

0

3.

118

1.376,92mp.

TEHNICO EDILITARE

LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA

1.5 7.0

.5

9

13.5

0

Str 11 10

+ 80.00 8

.0

p.

p.)

0m

3m ,3

,0

63

19

.7

POT = 40 % CUT =1.5 H max. 10 m.

4 11

10

7 10

5

f

16

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4 13 1210.0

140

.0

34

G.C.,P.T.E. - ZONA AMPLASARE SERVICII

50.983,55mp.

ZONA P EXTINDERE INTRAVILAN

30.5

POT = 75 % CUT =4 H max. 25 m.

POT = 40 % CUT =1.5 H max. 10 m.

119

137

37

136 0

3.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

0

3. 0

3.

POT = 40 % CUT =1.5 H max. 10 m.

.0

134

POT = 40 % CUT =1.5 H max. 10 m.

141

35

a

=4 (s

.6 11 s=

T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR

D

ad Str

40

143

.0

5.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

10

142

.0

POT = 40 % CUT =1.5 H max. 10 m.

5.

a 2a

144

POT = 40 % CUT =1.5 H max. 10 m.

145

40

117

POT = 40 % CUT =1.5 H max. 10 m.

135

.0

5.

116

.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

10

POT = 40 % CUT =1.5 H max. 10 m.

g

14.0

2 18 4.5 10.0

42.0

13 0

5.

y

.7

29 0

5.

10

POT = 40 % CUT =1.5 H max. 10 m.

115

5 6 7

133 40

4c

L

POT = 40 % CUT =1.5 H max. 10 m.

7.0 1.5

Strad

k 146

5.0

GC

POT = 40 % CUT =1.5 H max. 10 m.

L 131

132

POT = 40 % CUT =1.5 H max. 10 m.

ad Str

SI

rb Pp

II AT

PU

SP

5.0

8 910

Dr. 1264

s=6.421,09mp.

s=6.460,56mp.

I-

3

5.0

129

POT = 40 % CUT =1.5 H max. 10 m.

TOTAL

LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)

POT = 75 % CUT =4 H max. 45 m.

.0

s=1.409,80mp.

.0

din care 30% spatiu verde

44.533,80mp. +2.210,27

DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp

LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )

s=22.937,00mp.

0

I

TEREN ADIACENT D.N.22 - - - - - - -

4.155,43mp. 11.619,33mp.

CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA

19 1.5

IS

5.

0

PUD PREALABIL

LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI

Fig.C29

4

x2

0

4 32

114

SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m

ZONIFICARE

POT = 40 % CUT =1.5 H max. 10 m.

1 12 11

113

SPATII VERZI, PARCURI, ALEI PIETONALE

CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI

70.606,37mp. 1.409,80mp. din care 30% spatiu verde

LIMITA ZONA EDIFICABILA Fig.A40

5

30.5

UNITATI DE INVATAMANT

5.

POT = 40 % CUT =1.5 H max. 10 m.

112

a

EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT

10.0

5.0

5.0

West

Dr. 1266

147

15.0

7

7.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

0

3.

.0

40

PUD PREALABIL

I - Pprb C-

H max. 10 m.

SPATII VERZI ,PARCURI

LIMITA PERIMETRU INTRAVILAN EXISTENT

R=14.0

6

S+D+P+2 -> 11-15 ET

17

z

.0

POT = 40 % CUT =1.5 H max. 10 m.

H max. 10 m.

UNITATI DE INVATAMANT

ZONA INTRAVILAN EXISTENT

Fig.C29

CRESA , GRADINITA PUD PREALABIL

P -

CRESA , GRADINITA PUD PREALABIL

POT = 40 % CUT =1,5

LIMITA SUPRAFATA ZONA STUDIATA

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

5.0

PUD PREALABIL

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

P

s=1806,59mp.

5

LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5

LIMITE

11.0

7

37.364,00mp. din care 10% spatiu verde 5.484,60mp. din care 10% spatiu verde

LEGENDA: Fig.C29

117.5

10.0

5

4

4.50

LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET

S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.

LI -

X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134

11

SPATII VERZI ,PARCURI, SCUARURI

110

128 130 148

1

2 3 4

13.0

1.5

10

L

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

36

56.2

a

KV

ad

150

aB

1.5

111 s=6.248,94mp. .0

10

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

a1

0

Str

11

151

e

109

POT = 40 % CUT =1.5 H max. 10 m.

6

POT = 40 % CUT =1.5 H max. 10 m.

127

126

152

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

w

ZONA D.N. 22 EXISTENT ZONA EXTINDERE CAROSABIL D.N. 22

a2

.

2.0 2.0

3.0

149

PROPUNERE DE MOBILARE URBANA

Strad

.A POT = 40 % CUT =1.5 H max. 10 m.

153 15.0

5

POT = 40 % CUT =1.5 H max. 10 m.

.0

15

87.21

87.25

0

GC 5.

s=395,23mp.

4

18 17

125

124

20 19 18

75 75 75

R12.00

6

2

119.2

41.7

16 15

4

S+D+P+2 -> 11-15 ET

41.7

E

5.5 5.5

3

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

Strad

1.5

3.0

25

NR.1 FIL TIP 655 RIU PRO GIRATO KM 178+ SENS P.U.G.conf. propus

2

R16.00

2

23

Strad

1 2 3

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3.0

1 2 3

3.0

7.0

R12

2.0

R1

2.5

4.50

24

5.0

9 1011

14

.0

1

27

IS

13.0

1

.0

POT = 75 % CUT =4 H max. 45 m.

aB

7

3 11

s=14.427,00mp.

42.0

10.0

4

1.5

x1

6

Strad

L.E 87.20 87.20

INDICATIV PARCELA DIN ZONA

a6

17

108

106

104

102

4 5 6

16 15 14

154

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

9 8

Strad

POT = 40 % CUT =1.5 H max. 10 m.

155

1 18

107

105

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

56

10 9

25.0

98.7

40.0

101

4b

7

10.0

19 20 721

103

7

s=2.348,81.

PUD PREALABIL

De. 1262

une 3

15.0

POT = 40 % CUT =1.5 H max. 10 m.

100

99

8

POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 %

CUT =1.5 H max. 10 m.

Strada

L

POT = 40 % CUT =1.5 H max. 10 m.

12 3

54

e

15

1

2

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

un

14 12 13

POT = 40 % CUT =1.5 H max. 10 m.

24.0

1

3.0

97

s=2.352,60mp. .0

10

0

52

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

40.5

161

6 11

L56

s=3.858,02mp.

B

POT = 40 % CUT =1.5 H max. 10 m.

j

POT = 40 % CUT =1.5 H max. 10 m.

22.9

96.0

58

6

2 1211 3 10 10.0

98

22.0

8

d

POT = 40 % CUT =1.5 H max. 10 m.

60

P

11

8

12.0

10.0

Secti

40.3

5

55

a

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

D

+ 105.00

32 33 9

0

5

9 10

31

SPATII VERZI ,PARCURI, SCUARURI

141312 11 POT = 40 % CUT =1.5 H max. 10 m.

40.4

57

POT = 40 % CUT =1.5 H max. 10 m.

4

21.8

PROPUNERE TRASEU STRAZI CONF. P.U.G.

F

Strada

121 13

PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE

10 11

7

9 8

4a

94

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10 9

8

51

53

POT = 40 % CUT =1.5 H max. 10 m.

42.3

16

10.0

POT = 40 % CUT =1.5 H max. 10 m.

44.3

13

a5

6

8

2 10

0

7 8

15

15

3

.0

5.

17 16

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

17

18

POT = 40 % CUT =1.5 H max. 10 m.

11 12

16 15

11

POT = 40 % CUT =1.5 H max. 10 m.

14

ne

cti

POT = 40 % CUT =1.5 H max. 10 m.

4

5

Se

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

2 3

4 13

5.

iu

POT = 40 % CUT =1.5 H max. 10 m.

9

13

.0

13 12 11

21

POT = 40 % CUT =1.5 H max. 10 m.

19

POT = 40 % CUT =1.5 H max. 10 m.

1

Strada

96

POT = 40 % CUT =1.5 H max. 10 m.

20

ct

7

L

10

1

se

.0

s=6.573,10mp.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

.0

3

POT = 40 % CUT =1.5 H max. 10 m.

42

a

POT = 40 % CUT =1.5 H max. 10 m.

12 10

23

L

s=8.447,07mp.

POT = 40 % CUT =1.5 H max. 10 m.

Strad

59

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

95

93

5.

PIETONAL

12

aC

Strad

2 3

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

90.8

92

POT = 40 % CUT =1.5 H max. 10 m.

25

10.0

49

14

1211 10

16 15

POT = 40 % CUT =1.5 H max. 10 m.

41.5

50 5 6

7

15.0

5.0

a C16

Strad

7

22

47

POT = 40 % CUT =1.5 H max. 10 m.

4

9

8

7 20

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

- SPATII VERZI, SCUARURI PUD PREALABIL

6

91

a

P

17

89

61

40.4

L

91 101

CIRCULATII CAROSABIL 17 6

9

5

ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE

tor

14 13

21

I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL

1

5.0

13.0

5.0

7 89

14.0

4.5

colec

2a

12 11

12

ad

10.0

1.5

drum

a

5.0 41.0

10.0

10

10.0

i

18

s=9.613,59mp.

POT = 40 % CUT =1.5 H max. 10 m.

Str

De. 1273 46.5

1a

ad

Str

un

secti

POT = 40 % CUT =1.5 H max. 10 m.

123

une

90

4

ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.

7.0

7.0

a - -- k 8

15

POT = 40 % CUT =1.5 H max. 10 m.

5

19

48

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

62

4

20

POT = 40 % CUT =1,5 H max.=10m.

42.0 50.0

7

16

Secti

87

63

40.0 POT = 40 % CUT =1.5 H max. 10 m.

10.0

I

ZONA EDIFICABILA

ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)

a

ad

Str

6

e4

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII

POT = 40 % CUT =1.5 H max. 10 m.

64

10.0

4

191.5

Fig.D6

H

65

POT = 40 % CUT =1.5 H max. 10 m.

85 40.0

88

81.93

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

86

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

7.0

Strada

83

84

POT = 40 % CUT =1.5 H max. 10 m.

22

e

5

7.0

R1

81.84

82

7

156

10

De. 427

Strada

157

Strada

ctor

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

sectiun

81.90

.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

5

POT = 40 % CUT =1.5 H max. 10 m.

41

b

24

9

10.0

17

45

POT = 40 % CUT =1.5 H max. 10 m.

une

Secti

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8

18

42.0

46

POT = 40 % CUT =1.5 H max. 10 m.

66

POT = 40 % CUT =1.5 H max. 10 m.

44

69

L

67 68s=5.602,14mp.

20

19

43

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

h

POT = 40 % CUT =1.5 H max. 10 m.

81

141.3

79

POT = 40 % CUT =1.5 H max. 10 m.

42

28

27

26

s=7.894,21mp.

c

10.0

6

13

12

R1

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Strada

158

23 81.99

70

POT = 40 % CUT =1.5 H max. 10 m.

80

POT = 40 % CUT =1.5 H max. 10 m.

76.7

cole

l

10.0

40.0

10.0

159

71

42

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8

POT = 40 % CUT =1.5 H max. 10 m.

S 7 11 tr 30 a 19 7da A 18

IS -ZONA

LIS -

PERIMETRU INTRAVILAN PROPUS

COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.

30

78

POT = 40 % CUT =1.5 H max. 10 m.

160

L

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

40.0

141.1

0.0

drum

R1

38.7

s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.

L

41

72

POT = 40 % CUT =1.5 H max. 10 m.

77

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4

.0

30

POT = 40 % CUT =1.5 H max. 10 m.

2

0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3

16

10

POT = 40 % CUT =1.5 H max. 10 m.

29

9

POT = 40 % CUT =1.5 H max. 10 m.

17

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

. 40

6.

2

1.376,92mp.

TEHNICO EDILITARE

75

76

2 3

4

.0

18

29

De

m

6 5

32

4 5 6 7

10

28

14 13 12 .0 15

10

0

A

GC

s=520,83mp.

31

23 22 21

36

38

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

35

33

6

Fig.B1

P.T.E.

s=85,30mp.

10.0

11.

124 Strada 1

POT = 40 % CUT =1.5 H max. 10 m.

37

39

40

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

93.9 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

73

74

POT = 40 % CUT =1.5 H max. 10 m.

34

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

De. 414

2 3

22 21

1 2 3

12 11 10

a A1

ad Str 23

2

3

24

C

5

27

26

19

150

Str25

Strada de legatura - propusa prin P.U.Z.-

4

3

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

79.3

R1

50.983,55mp.

+ 80.00

A ada 1

.00

+2.210,27

A

13.8

TOTAL

L

26

din care 30% spatiu verde

DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp

G.C.,P.T.E. - ZONA AMPLASARE SERVICII

e

183.000,00mp. din care suprafete

TOTAL TEREN CE A GENERAT P.U.Z.

IS -

X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066

A B C D E F G H I

R12

TEREN ADIACENT D.N.22 - - - - - - -

1.5 3.0

11.619,33mp.

44.533,80mp.

BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp

B

CONSTANTA

PUD PREALABIL

LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA

6

6

13

121

40.0

SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m

12.0

3.0

10.0 7.0

0

0

a

122

POT = 40 % CUT =1.5 H max. 10 m.

9 10 11

LIS

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL

14 POT = 40 % CUT =1.5 H max. 10 m.

s=4.154,60mp. POT = 40 % CUT =1.5 H max. 10 m.

C-

SPATII VERZI, PARCURI, ALEI PIETONALE

CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI

3.0 1.5

10.0 7.0

11.

1.5 7.0

une 2

5.

ad

Str

10.0

14 13 12

PUD PREALABIL

I - Pprb

15.0

5.4%

IS X1

5.0

1.5

Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1

7.0

.00

13.0

Secti

7.0 1.5

0

.0

aC

8 15

139

L

5.0 12.0

H max.10.0m

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

ZONA P EXTINDERE INTRAVILAN

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

s=5.484,60mp.

0

3.

118

POT = 40 % CUT =1.5 H max. 10 m.

120

7 16

POT = 40 % CUT =1.5 H max. 10 m.

De. 1266

0

5.

10

9

Strad

9 10 5

f

119

0

40.0

POT = 40 % CUT =1.5 H max. 10 m.

6 7 8

11 10

.0

34

POT = 40 % CUT =1.5 H max. 10 m.

3.

138

6.

0

5. .5

7

p.

p.)

3m

0m

,3

,0

63

19

.7

8

35

a

ad

140

5

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4 13 1210.0

116

.0

137

37

136 0

3.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4 11

135

POT = 40 % CUT =1.5 H max. 10 m.

.0

134

POT = 40 % CUT =1.5 H max. 10 m.

141

.0

10

5.0

114

0

3.

15.0

5.0 1.5

a

P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008

Sectiune 6 Sectiune strada 1

3.0

25

LIMITA ZONA EDIFICABILA

14.0

2 18 4.5 10.0

30.5

POT = 75 % CUT =4 H max. 25 m.

POT = 40 % CUT =1.5 H max. 10 m.

40

117

H max.10.0m

2

LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI

1.5 7.0

a 2a

40

143

13.5

Strad

4c

=4 (s

.6 11 s=

T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR

D

II

Str

SI

rb Pp

AT

PU

SP

I-

.0

POT = 40 % CUT =1.5 H max. 10 m.

g .0

POT = 40 % CUT =1.5 H max. 10 m.

.0

10

142

145

0

5.

0

5.

10

POT = 40 % CUT =1.5 H max. 10 m.

1.5

13 0

5.

y

.7

POT = 40 % CUT =1.5 H max. 10 m.

.0

10

POT = 40 % CUT =1.5 H max. 10 m.

IS x2

22 21 20

4.155,43mp.

CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA

19

POT = 75 % CUT =4 H max. 45 m.

.0

s=1.409,80mp.

.0

4

IS

29

115

5 6 7

133 40

a ad

144

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

7.0 1.5

15.0

Str

POT = 40 % CUT =1.5 H max. 10 m.

L

s=6.460,56mp.

R1

56.2

une 3

10.0

POT = 40 % CUT =1.5 H max. 10 m.

L 131

132

POT = 40 % CUT =1.5 H max. 10 m.

7

70.606,37mp. 1.409,80mp. din care 30% spatiu verde

LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)

s=22.937,00mp.

0

I

SPATII VERZI ,PARCURI

d

L

3.0

LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )

x2

5.

0

4 32

P -

H max. 10 m.

LIMITA SUPRAFATA ZONA STUDIATA

Fig.C29

S+D+P+2 -> 11-15 ET

1 12 11

113

Sectiune 3

ZONIFICARE

UNITATI DE INVATAMANT

5.

POT = 40 % CUT =1.5 H max. 10 m.

8 910

Dr. 1264

s=6.421,09mp.

k 146

147

a1

a2

40.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

36

3.0

Strad

15.0

EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT

e eation

Secti

7

ousing using/Offices Mixed Use

129

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

z

0

3.

.0

40

POT = 40 % CUT =1.5 H max. 10 m.

H max. 10 m.

LIMITA PERIMETRU INTRAVILAN EXISTENT

Fig.A40

5

30.5

POT = 40 % CUT =1.5 H max. 10 m.

CRESA , GRADINITA PUD PREALABIL

5.484,60mp. din care 10% spatiu verde

LOTURI AMPLASARE CONSTRUCTII S+P+1+M UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL

POT = 40 % CUT =1,5

ZONA INTRAVILAN EXISTENT

R=14.0

6

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

5.0

5

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET

POT = 40 % CUT =1,5

LIMITE

11.0

7

37.364,00mp. din care 10% spatiu verde

LEGENDA: Fig.C29

Fig.C29

1.5

.0

POT = 40 % CUT =1.5 H max. 10 m.

R12.00 4.50

117.5

17

5

1.5

19

106 m

+10.00

E TRANSVERSALA

40.4

a

KV

ad

149

w

41.7

P

75 75 75

LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.

S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.

LI -

X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134

11

PUD PREALABIL

112

127

1

2 3 4

10.0

s=1806,59mp.

4

110

128 130 148

aB

SPATII VERZI ,PARCURI, SCUARURI

10

L

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

119.2

13.0

E

5.5 5.5

6

2

S+D+P+2 -> 11-15 ET

1.5

16 15

4

23

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

20 19 18

R12

2.0

R1

25

NR.1 FIL TIP 655 RIU PRO GIRATO KM 178+ SENS P.U.G.conf. propus

2

R16.00

3

24

5.0

41.7

14

2

IS

9 1011

1

.0

7.0

x1

6

Strad

3

0

Str

11

10.0

102 m

150

e

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

IS -ZONA

LIS -

PERIMETRU INTRAVILAN PROPUS

COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.

.0

2.5

4.50

POT = 75 % CUT =4 H max. 45 m.

Strad

111 s=6.248,94mp. .0

10

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

+45.00 +35.00

Strada

.

151

un

4 1

27 1.5

Strad

1.5

3.0

e

109

POT = 40 % CUT =1.5 H max. 10 m.

6

7

s=14.427,00mp.

13.0

1 2 3

POT = 40 % CUT =1.5 H max. 10 m.

126

152

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

5

POT = 40 % CUT =1.5 H max. 10 m.

3.0

.A 3.0

4

8

3 11

IS -

X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066

A B C D E F G H I

D

15

1 2

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

aB

7

POT = 40 % CUT =1.5 H max. 10 m.

18 17

a

42.0

10.0

108

125

.0

2.0 2.0

153 15.0

25.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

17

107

106

104

1 2 3

124

15

GC

+20.00

POT = 40 % CUT =1.5 H max. 10 m.

56

10 9

11

32 33 9

12.0

P

9 10

31

s=2.348,81.

1 18

POT = 40 % CUT =1.5 H max. 10 m.

ne

13

12 8

2 10

0

0

5

3

5.

iu

cti

PUD PREALABIL

De. 1262

105

POT = 40 % CUT =1.5 H max. 10 m.

102

a6

154 POT = 40 % CUT =1.5 H max. 10 m.

ZONA EXTINDERE CAROSABIL D.N. 22

PROPUNERE DE MOBILARE URBANA

8

4 .0

5. 6

14 12 13

POT = 40 % CUT =1.5 H max. 10 m.

98.7

4 5 6

16 15 14

87.25

0

s=375,56mp.

78.40

9 8

4b

L.E

721

103

101

87.21

87.20

GC 5.

54

24.0

CUT =1.5 H max. 10 m.

Strad

POT = 40 % CUT =1.5 H max. 10 m.

52

POT = 40 % CUT =1.5 H max. 10 m.

19 18

13

7 8

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 %

POT = 40 % CUT =1.5 H max. 10 m.

155

s=395,23mp.

Dr. 1266

78.06

7

10.0

19 20

L56

24.0

3.0

POT = 40 % CUT =1.5 H max. 10 m.

99

96.0

POT = 40 % CUT =1.5 H max. 10 m.

10.0

100

POT = 40 % CUT =1.5 H max. 10 m.

55

s=3.858,02mp.

58

6

1

Strada

L

s=2.352,60mp.

5.0

m

40.3

4a

97

POT = 40 % CUT =1.5 H max. 10 m.

12 3

53

POT = 40 % CUT =1.5 H max. 10 m.

Str 307 a7d aA

11

POT = 40 % CUT =1.5 H max. 10 m.

.0

SPATII VERZI ,PARCURI, SCUARURI

141312 11

51

POT = 40 % CUT =1.5 H max. 10 m.

15

42.3

10 9

8

Se

17 15

16

10.0

POT = 40 % CUT =1.5 H max. 10 m.

44.3

13

B

40.5

161

10

ZONA D.N. 22 EXISTENT

10 11

Strada

22.9

6 11

17

18

d

POT = 40 % CUT =1.5 H max. 10 m.

60

2 1211 3 10 10.0

j

POT = 40 % CUT =1.5 H max. 10 m.

.0

PROPUNERE TRASEU STRAZI CONF. P.U.G.

12

aC

Strad

9 8

98

22.0

8

0

INDICATIV PARCELA DIN ZONA

57

POT = 40 % CUT =1.5 H max. 10 m.

5

21.8

91 101

20

PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE

F

7

7 21

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Strada

15.0

a

a C16

Strad

96

POT = 40 % CUT =1.5 H max. 10 m.

94

121 13

5.

- SPATII VERZI, SCUARURI PUD PREALABIL

141.1

92

POT = 40 % CUT =1.5 H max. 10 m.

91

ad

7.0

9

40.4

POT = 40 % CUT =1.5 H max. 10 m.

5

19

20

POT = 40 % CUT =1.5 H max. 10 m.

11 12

16 15

ct

5

7

16

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

42

3

POT = 40 % CUT =1.5 H max. 10 m.

9

11

POT = 40 % CUT =1.5 H max. 10 m.

14

9

1

se

.0

a

POT = 40 % CUT =1.5 H max. 10 m.

4

. 40

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

42

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

2 3

21

De

4

6

L

10

2

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

s=6.573,10mp.

13

.0

13 12 11

16

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4

10

23

POT = 40 % CUT =1.5 H max. 10 m.

17

8

POT = 40 % CUT =1.5 H max. 10 m.

29

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

12

POT = 40 % CUT =1.5 H max. 10 m.

L

Str

59

POT = 40 % CUT =1.5 H max. 10 m.

25

s=8.447,07mp.

POT = 40 % CUT =1.5 H max. 10 m.

ada 5

10.0

95

93

POT = 40 % CUT =1.5 H max. 10 m.

1

2 3

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

90.8

.0

10.0

49

14

1211 10

16 15

POT = 40 % CUT =1.5 H max. 10 m.

41.5

50

9

8

22

5 6

7

10.0

4

17

61

7

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4

POT = 40 % CUT =1.5 H max. 10 m.

41

b

24

10

47

POT = 40 % CUT =1.5 H max. 10 m.

4

18

89

6

10.0

17

48

Strada

L

5

19

8

9

18

45 De. 427

10.0

POT = 40 % CUT =1.5 H max. 10 m.

62

4

20

s=9.613,59mp.

12

141.3

i

63

PIETONAL

17 6 5.0

14 13

7 89

90

CIRCULATII CAROSABIL

1

5.0

13.0

5.0

87

POT = 40 % CUT =1.5 H max. 10 m.

Str

tor

12 11

191.5

H

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

I

5

colec

10

10.0

40.0

88

POT = 40 % CUT =1.5 H max. 10 m.

40.0 POT = 40 % CUT =1.5 H max. 10 m.

28

27

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

5

POT = 40 % CUT =1.5 H max. 10 m.

65

64

10.0

87.20

une

5.0

5.0

123

P

a - -- k 8

15

7.0

66

POT = 40 % CUT =1.5 H max. 10 m.

85

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

une

Secti

19

43 42.0

46

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

86

I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL

7

16

Secti

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

81.93

ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE

drum

4 41.0

POT = 40 % CUT =1.5 H max. 10 m.

14.0

4.5

81 83

84

POT = 40 % CUT =1.5 H max. 10 m.

c

44

69

20

19 18

.0

30

POT = 40 % CUT =1.5 H max. 10 m.

28

14 13 12 .0 15

10

10

POT = 40 % CUT =1.5 H max. 10 m.

29

6

Fig.B1

P.T.E.

s=85,30mp.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

26

42

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

L

67 68s=5.602,14mp.

.0

Strada de legatura - propusa prin P.U.Z.-

C

5

27

26

35

33

32

4 5 6 7

10

POT = 40 % CUT =1.5 H max. 10 m.

s=7.894,21mp.

10.0

h

POT = 40 % CUT =1.5 H max. 10 m.

82

22

tiune

sec

81.90

70

POT = 40 % CUT =1.5 H max. 10 m.

79

POT = 40 % CUT =1.5 H max. 10 m.

Strada

De. 1273

2a

une

156

7

Fig.D6

a 13

secti

10.0 40.0

81.99

157

Strada

7.0

R1

1a

122

POT = 40 % CUT =1.5 H max. 10 m.

9 10 11

6

14 POT = 40 % CUT =1.5 H max. 10 m.

121

l

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

71

40.0

POT = 40 % CUT =1.5 H max. 10 m.

40.0

80

POT = 40 % CUT =1.5 H max. 10 m.

158

L

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

34

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

31

23 22 21

38

POT = 40 % CUT =1.5 H max. 10 m.

41

72

10.0

159

L

23

74

POT = 40 % CUT =1.5 H max. 10 m.

3

24

36

37

39

40

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

93.9 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

73

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

77

78

POT = 40 % CUT =1.5 H max. 10 m.

160

22 21

75

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

76.7

ctor

a

ad

14 13 12

38.7

2 3

COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp

4

3

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

79.3

2

10.0

De. 414 1 2 3

12 11 10

a A1

ad Str 23

3

ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.

6

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL

Str

8

ad

139

Str

L

120

POT = 40 % CUT =1.5 H max. 10 m.

15

POT = 40 % CUT =1.5 H max. 10 m.

De. 1266

1.5 7.0

0 POT = 40 % CUT =1.5 H max. 10 m.

s=4.154,60mp.

10.0 40.0

POT = 40 % CUT =1.5 H max. 10 m.

aC

16

POT = 40 % CUT =1.5 H max. 10 m.

138 6 7 8

Strad

5.

6 5

11 10

0

a

ad

Str

137

37

POT = 40 % CUT =1.5 H max. 10 m.

4

9

f

119

10.0

1.5

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

LIS

s=5.484,60mp.

0

118

.0

34

POT = 40 % CUT =1.5 H max. 10 m.

7

136 0

3.

13 1210.0

POT = 75 % CUT =4 H max. 25 m.

3.

POT = 40 % CUT =1.5 H max. 10 m.

0

3. 0

3.

POT = 40 % CUT =1.5 H max. 10 m.

.0

134

0

5.

.0 40

117

POT = 40 % CUT =1.5 H max. 10 m.

135

.0

116

.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

10

POT = 40 % CUT =1.5 H max. 10 m.

g

0

5.

5.

10

aA 1

76

2 3

4

POT = 40 % CUT =1,5 H max.=10m.

46.5

L

Str25ad

ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M) 7.0

e

26

s=2.980,45mp.

ZONA EDIFICABILA

7.0

30.5

y

.7

29 0

.0

114

POT = 40 % CUT =1.5 H max. 10 m.

115

5 6 7

133 40

0

4 32

10

1

p.

une 2

0

5. .5

.

T = 40 % UT =1.5 ax. 10 m.

0

.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII

42.0

13

1 12 11

113

112

2

LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA

50.0

POT = 75 % CUT =4 H max. 45 m.

5.

5.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8 910

IS

s=22.937,00mp.

0

5.

6 5

s=520,83mp.

TEHNICO EDILITARE

ZONA P EXTINDERE INTRAVILAN

x2

POT = 40 % CUT =1.5 H max. 10 m.

s=1.409,80mp.

35

3.

.0

40

0

1.5

A

GC

LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)

13.0

Secti

a 2a

0

111 94mp.

124 Strada 1

ZONIFICARE

UNITATI DE INVATAMANT

I

1.376,92mp.

LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI

14.0

2 18 4.5 10.0

1.5 7.0

Strad

z

.0

10

50.983,55mp.

A

CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA

19

Fig.C29

CRESA , GRADINITA PUD PREALABIL

din care 30% spatiu verde

LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )

4

S+D+P+2 -> 11-15 ET

PUD PREALABIL

5

G.C.,P.T.E. - ZONA AMPLASARE SERVICII

3.0

1.5 3.0

H max.10.0m

183.000,00mp. din care suprafete

TOTAL TEREN CE A GENERAT P.U.Z.

B

44.533,80mp. +2.210,27

DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp

TOTAL

12.0

12.0

L

BILANT SUPRAFETE

Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

LIMITA ZONA EDIFICABILA Fig.C29

5

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

5.0

5

PUD PREALABIL

15.0

1.5

TEREN CARE A GENERAT P.U.Z.

5.4%

IS X1

5.0

1.5

25

ZONA INTRAVILAN EXISTENT

117.5

10.0 1.5

SI SEMICAROSABILE, PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m

3.0

3.0 1.5

12.0

2

SPATII CONSTRUCTII 11.619,33mp.

TEREN ADIACENT D.N.22 - - - - - - -

5.0

5.0 1.5

a

7.0

IS x1

7.0

5.4%

H max.10.0m

22 21 20

SPATII VERZI, PARCURI, ALEI PIETONALE

CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI

d

L

Sectiune 3

4.155,43mp.

81.84

17

4

POT = 40 % CUT =1.5 H max. 10 m.

% 5 m.

1

2 3 4

13.0

1.5

41.7

P

s=1806,59mp.

70.606,37mp. 1.409,80mp. din care 30% spatiu verde

LIMITA SUPRAFATA ZONA STUDIATA

Fig.A40

6

30.5

SPATII VERZI ,PARCURI, SCUARURI

16 15

m.

20 19 18

41.7

1.5

%

B

PUD PREALABIL

I - Pprb C-

H max. 10 m.

SPATII VERZI ,PARCURI

LIMITA PERIMETRU INTRAVILAN EXISTENT

R=14.0

7

H max. 10 m.

UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL

POT = 40 % CUT =1,5

LIMITE

11.0

13.5

1 2 3 10.0

7.0 1.5

15.0

17

7.0 1.5

56.2

1262

0

cole

a1

aB

Strad

a Strad

0.0

3.0

Strad

119.2

9 1011

LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5

LEGENDA: Fig.C29

11

S+D+P+2 -> 11-15 ET

5.0

42.0

7

drum 2

s=2.348,81.

14 12 13

R12.00 4.50

6 R1

23

POT = 75 % CUT =4 H max. 45 m.

SPATII VERZI ,PARCURI, SCUARURI

56

4

s=14.427,00mp.

13.0

E

75 75 75

3

24

IS

NR.1 FIL TIP 655 RIU PRO GIRATO KM 178+ SENS P.U.G.conf. propus

2

R16.00

5.5 5.5

2

4.50

25

LI P -

15.0

R12

1.5

R12

2.0

R1

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

PUD PREALABIL

14

.0

7.0

x1

6

1

.0

0

e

3 11

2.5

5.484,60mp. din care 10% spatiu verde

13.8

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

un

4 1

27

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET

Sectiune 6 Sectiune strada 1

3.0

5.4%

H max.10.0m

10.0 7.0

7

15

1 2

8

12.0

P

11

32 33 9

0

5

9 10

31

37.364,00mp. din care 10% spatiu verde

7.0

0

0

5.

5. 6

8

2 10

.0

D

11.

a

7 8

15

H max.10.0m

L

LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.

S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.

PERIMETRU INTRAVILAN PROPUS

X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134

IS -ZONA

LIS -

COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

.00

ne

cti

17 16

3

4 13

3

iu

13

12

6.

11

POT = 40 % CUT =1.5 H max. 10 m.

15

42.3

A

R1

Se

POT = 40 % CUT =1.5 H max. 10 m.

.

40 % =1.5 . 10 m.

6

ct

5

POT = 40 % CUT =1.5 H max. 10 m.

9

POT = 40 % CUT =1.5 H max. 10 m.

19 18

1

se

.0

Str 30 a7d a

11

POT = 40 % CUT =1.5 H max. 10 m.

.0

POT = 40 % CUT =1.5 H max. 10 m.

42

7

L

10

42

7

R12

6

a

s=6.573,10mp.

POT = 40 % CUT =1.5 H max. 10 m.

= 40 % T =1.5 x. 10 m.

9

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8

POT = 40 % CUT =1.5 H max. 10 m.

3

. 40

4

.0

POT = 40 % CUT =1.5 H max. 10 m.

2

POT = 40 % CUT =1.5 H max. 10 m.

10

30

IS x2

CONSTANTA

16

7

10.0 7.0

17

POT = 40 % CUT =1.5 H max. 10 m.

29

De

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

12

28

14 13 12 .0 15

10

18

IS -

X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066

A B C D E F G H I

CONSTANTA

33

6

Fig.B1

P.T.E.

s=85,30mp.

10.0

19

35

C

5

27

26

25

Strada de legatura - propusa prin P.U.Z.-

4

3

2

22 21 20 POT = 40 % CUT =1.5 H max. 10 m.

34

7.0

1.5

183.000,00mp. din care suprafete

TOTAL TEREN CE A GENERAT P.U.Z.

COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp

B

POT = 40 % CUT =1.5 H max. 10 m.

12.0

Fig.C

BILANT SUPRAFETE

Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1

3

15.0

1.5

X IAL

IS X1

5.0

1.5

7.0

COMPLE COMERC

12.0

7.0

IS x1

5.4%

15.0

29

5.0

7.0

Fig.C

ne strada 1

P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008

P+2

Sectiune 2

X IAL

tiune 6

15.0

P+2

TEREN CARE A GENERAT P.U.Z.

P+2

COMPLE COMERC

DRUM PROPUS IN . P.U.Z.

Sectiune 2

1.50

Sectiune 5

IS x2

L

DRUM COLECTOR ( AFERENT STR. BARAJULUI)

P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008

7.00

5.4%

DN 22

P+2

5.4%

3.00

-2.80 21.0

1.50

LIS y

5.0

1.5

H max.10.0m

5.0

1.50

5.0

5.0 1.5

f

5.4%

H max.45.00

LEGENDA:

10.0

5.0 1.5

5.4%

c

L

1.5 3.0

7.0

3.0 1.5

13.0

5.0 LIS Y

Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)

H max.45.00

L

H max.45.00

GREEN INFRASTRUCTURE

plasate deoparte si de alta a strazii cota ±0.00 ( 0.60m fata de strada)

Sectiune strada 2

5.4%

Sectiune 1

H max.10.0m

Sectiune strazi 2-7

P+2 limita aliniament

1.50

Sectiune 4

limita amplasare constructii

7.00

Sectiune 5

IS x2

5.4%

ted uses

1.50

-2.80

limita amplasare constructii

H max.10.0m

5.0

limita aliniament

5.0

1.5

H max.45.00

limita amplasare constructii

10.0

5.0 1.5

demisol 21.0

LIS y

5.0

1.5

1.50

H max.10.0m

H max.25.00

-2.80 21.0

5.4%

5.0 10.0

7.00

demisol

3.00

5.4%

limita amplasare constructii

13.0

3.0

5.0 1.5

f

1.50

±0.00 =+0.60

3.00

±0.00 =+0.60

limita aliniament

Sectiune strada 2

limita aliniament

limita aliniament

limita aliniament

LIS Y

5.4%

L

1.5 3.0

7.0

1.5

13.0

5.0

limita amplasare constructii

limita aliniament

3.0

10.0

L

limita amplasare constructii

87.2

H max.10.0m

Sectiune 5 Sectiune strazi 2-7

P+2

5.4%

Sectiune 1

3.00

5.4%

Sectiune 4

parter

limita aliniament

H max.10.0m

H max.25.00

SECTIUNE STRAZI SI LOTURI

+3.00

5.4%

limita amplasare constructii

1.50

limita amplasare constructii

m

+3.00

limita amplasare constructii

7.00

etaj

limita aliniament

1.50

-2.80

+6.00

87.2

demisol 21.0

LIS y

5.0

1.5

1.50

+10.00

H max.25.00

mansarda

+6.00

+3.00

-2.80 21.0

5.4%

5.0 10.0

7.00

demisol

3.00

±0.00 =+0.60

SECTIUNE STRAZI SI LOTURI

+6.00

limita amplasare constructii

limita aliniament

13.0

1.50

limita amplasare constructii

Sectiune strada 2

±0.00 =+0.60

H max.45.00

+10.00 +10.00

limita aliniament

3.00

5.4%

P+2

parter

H max.25.00

5.4%

limita amplasare constructii

+3.00

limita aliniament

etaj

+10.00

limita amplasare constructii

+3.00

limita amplasare constructii

SECTIUNE STRAZI SI LOTURI

+6.00

+6.00

Sectiune 4

CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL

CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL H max.45.00

mansarda

limita aliniament

+10.00

PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si

PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si

+10.00

H max.25.00

limita aliniament

TIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si X COMERCIAL SI ANSAMBLU REZIDENTIAL

+20.00

102 m

DN 22

83 m

+10.00

SECTIUNE TRANSVERSALA

78.06

G

106 m

85 m

87 m

+35.00

90 m

93 m +10.00

95 m +10.00

+20.00

102 m

106 m DN 22

+10.00

+10.00

83 m

Proiectant general:

Beneficiar:

s.c. PROMARH s.r.l. Nume:

Semnatura:

Sef Proiect arh. Marcel PAVEL

str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea

Scara:

1 / 1.000

Proiectat

arh. Marcel PAVEL

Data:

Desenat

arh. Paul Cristian MURAVELI

Noiembrie 2017

Green spaces are very important for the health & wellbeing of the residents of the MGM2 neighborhood.The development proposes approx 15,774sqm of recreational green space while tree alignments are proposedalongmostofthevehicularcirculationwithinthedevelopment.This green infrastructure benefits good air quality for the residents.

Proiect nr:

MATROZ CONSTANTIN si FLOREA ION

TULCEA

J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180

Specificatie:

Denumire proiect:

LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.

Denumire plansa:

REGLEMENTARI URBANISTICE

panta teren 5.4%

SECTIUNE TRANSVERSALA

Proiectant general:

Nr. plansa:

Nume:

U4

Sef Proiect arh. Marcel PAVEL Proiectat Desenat

Sunlight can be maximized in this location as it is an unobstructedopenlandatthehighestspotlevelofthecity(+105m) with no flooding hazard.The SouthWest winds in this region benefitthesitebypreventingcitypollutiontoreachthislocation.Thesiteisidealforresidentialuseintermsoflocationand environmental benefits.

Semnatura:

Proiect nr:

MATROZ CONSTANTIN si FLOREA ION

TULCEA

str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea

J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180

Specificatie: Faza:

P.U.Z.

Beneficiar:

s.c. PROMARH s.r.l.

87/2017

Scara:

1 / 1.000

arh. Marcel PAVEL

Data:

arh. Paul Cristian MURAVELI

Noiembrie 2017

Denumire proiect:

LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.

Denumire plansa:

REGLEMENTARI URBANISTICE

87/2017 Faza:

P.U.Z. Nr. plansa:

U4


5.0

5.4%

L

Sectiune 3

limita amplasare constructii

po sib il Tr

4.5 4.5

1 ea Tulc 22

11.0

5.0 7.0

1 a

6.0

R1

R12.0

2 a ra d

St

as eu

46.5

10

12 11

10.0

5.0

p.

9

90 m

93 m

95 m

+20.00

F

PROPUN

ZONA D

ZONA E

12

aC

Strad

102 m

a C16 Strad

10 11

PROPUNERE DE MOBILARE URBANA

10.0

10.0

+35.00

PROPUN ULTERIO

6

+45.00

78.40 78.06

PIETON

17

13.0

14 13

- SP

CIRCULATII CAROS

ne 1

66 Dr. 12

78.39

P

8

15

u Secti 5.0

5.0

7 89

I - Pprb SPATII C

ctor

123

cole

POT = 40 % CUT =1.5 H max. 10 m.

ZONA IS S+D+P POT = 7 GC - ZO SALUBR

a - --

10.0

40.0

16

41.0

10.0

14.0

drum

4

121

4.5

7

7.0

une

secti

5.0

122

POT = 40 % CUT =1.5 H max. 10 m.

6

13

POT = 40 % CUT =1.5 H max. 10 m.

10.0

1.5

ZONA L BIROUR D+ POT =7

7.0

7.0

5.0

POT = 40 % CUT =1.5 H max. 10 m.

9 10 11

ZONA

POT = 4

42.0 50.0

6

14

s=4.154,60mp.

ZONA D PRIN CONS ZONA

73

L

2a

POT = 40 % CUT =1.5 H max. 10 m.

ZONA

ZONA PRIN De. 12

2b

Fig.D6

ZONIFICAR 9

19

78.10

LINIE EL ZONA P

Fig.C2

3

G

2 18 4.5 10.0

1a

da

3 a ra d

ra d

7.0

R1

1.5 7.0

da

ra

or ect col

13.0

ra

a

d ra

118

LIS

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL

St

14 13 12

St

St

m dru

0

66

De. 12

0.0 R1

une 2

5.

139

7.0 1.5

Secti

0

POT = 40 % CUT =1.5 H max. 10 m.

1.5

14.0

0

5.

40.0

POT = 40 % CUT =1.5 H max. 10 m.

aC

8 15 10.0

138 6 7 8

11 10

16

POT = 40 % CUT =1.5 H max. 10 m.

30.5

LIMITA A

CULOAR(

19

1.5 7.

9

5

Strad

9 10 5

.5 5 13

13 .0 1210

140

137

4

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

s=5.484,60mp.

0

3.

120

7

POT = 40 % CUT =1.5 H max. 10 m.

4

POT = 40 % CUT =1.5 H max. 10 m.

7.0 1.

EA

8 4 11

.0

141

7 5.0

0

f

119

0

.0

POT = 75 % CUT =4 H max. 25 m.

POT = 40 % CUT =1.5 H max. 10 m.

3.

POT = 40 % CUT =1.5 H max. 10 m.

136

3.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

.5

da 1

35

4

143

0.0

0 5.

6

4c

ra St

POT = 40 % CUT =1.5 H max. 10 m.

0 0.

10

da ra St

da 142

145

0

3.

37

134

.0

.0

34

Fig.A40 Fig.C29

5

5.0

LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)

POT = 40 % CUT =1.5 H max. 10 m.

10

117

POT = 40 % CUT =1.5 H max. 10 m.

.0

135

.0

POT = 40 % CUT =1.5 H max. 10 m.

6

5.0

GC

s=375,56mp.

LIMITA SUPRAFATA ZONA STUDIATA LIMITA PERIMETRU INTRAVILAN EXISTENT

144

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3m

3 9,

) p.

ZONA INTRAVILAN EXISTENT

L

61

LIMITE

0m

LEGENDA:

k 146

g

40

y

5.

10

116

.0

40

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

0

.7

POT = 40 % CUT =1.5 H max. 10 m.

LIMITA Z

R=14.0

7

30.5

5.

POT = 40 % CUT =1.5 H max. 10 m.

10

133

132

POT = 40 % CUT =1.5 H max. 10 m.

. 11

1.376,92mp.

TEHNICO EDILITARE

s=

50.983,55mp.

PUD REQUIRED 5.0

,0 63

TOTAL G.C.,P.T.E. - ZONA AMPLASARE SERVICII

rb

44.533,80mp. +2.210,27

DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp

.7 =4

TEREN ADIACENT D.N.22 - - - - - - -

11.619,33mp. din care 30% spatiu verde

Pp

PUD PREALABIL

.0

POT = 40 % CUT =1.5 H max. 10 m.

s=6.421,09mp.

.0

29

.0

LIMITA T

LIMITA S ( 183,00

13

0

114

LIMITA P

11.0

POT = 75 % CUT =4 H max. 45 m.

0

5.

4 32

115

5 6 7

L 131

POT = 40 % CUT =1.5 H max. 10 m.

148

s=6.460,56mp.

36

8 910

64

Dr. 12

POT = 40 % CUT =1.5 H max. 10 m.

147

(s

SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m

CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI

150

129

POT = 40 % CUT =1.5 H max. 10 m.

128 130

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

. LE TII C 2m NA U .1 TO TR ax PIE NS T Hm CO EN EI AL TII EM =2 A T I, SP AGR CU UR RC E, SI % 0% 5.0 PA BIL NT = 40 I 3 I, A A RZ RZ OS AM OT VE VE AR VAT P TII II A IC IN AT EM SP S RU BIL SI ENT ALA P E PR D

SPATII VERZI, PARCURI, ALEI PIETONALE

4.155,43mp.

127

ra St

w PU

PUD PREALABIL

I - Pprb C-

70.606,37mp.

1.409,80mp. PUD PREALABIL din care 30% H max. 10 m. spatiu verde

SPATII VERZI ,PARCURI

7

CRESA , GRADINITA

151

149

UNITATI DE INVATAMANT

POT = 40 % CUT =1,5

POT = 40 % CUT =1.5 H max. 10 m.

112

I

s=1.409,80mp. 0

ZONA IN

LIMITA S

s=22.937,00mp.

0 5.

1 12 11

113

POT = 40 % CUT =1.5 H max. 10 m.

CRESA , GRADINITA PUD PREALABIL

5.

POT = 40 % CUT =1.5 H max. 10 m.

110

.0

10

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

SP

P -

s=395,23mp.

I-

I -

H max. 10 m.

3.0

POT = 40 % CUT =1.5 H max. 10 m.

TA AR EN M M OR . LE F A G NS .E. RE TRA L E VA PA AR D SE DU LI O . RE .D NS U CA P. CO A. IN AU E. L. PR S IE A .S. ) CT AN .E p. TE B L O UR . IN 8m PR RE E.A ,4 DE ILA I L. 56 .8 NA OB IE =6 ZO A M LIN (s C

LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5

153 1

da

L-

.0

GC 5

2.0 2.0

0 5.

0

3.

.0

40

POT = 40 % CUT =1.5 H max. 10 m.

126

152

.0

15 POT = 40 % CUT =1.5 H max. 10 m.

87.25

L

LIMITE

IS

UNITATI DE INVATAMANT

z

.0

LEGENDA Fig.C29

x2

POT = 40 % CUT =1.5 H max. 10 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

125

POT = 40 % CUT =1.5 H max. 10 m.

3.0

87.21

87.20

POT = 40 % CUT =1.5 H max. 10 m.

5

PUD PREALABIL

POT = 40 % CUT =1.5 H max. 10 m.

4.50

S+D+P+2 -> 11-15 ET

5.0

1.5

5

75 75 75

R12.00

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

17

4

5.5 5.5

117.5

10.0

s=1806,59mp.

111 s=6.248,94mp.

18 17

POT = 40 % CUT =1.5 H max. 10 m.

124

154

POT = 40 % CUT =1.5 H max. 10 m.

ra St

5.484,60mp. din care 10% spatiu verde

155

721

1 2 3

POT = 40 % CUT =1.5 H max. 10 m.

e

109

POT = 40 % CUT =1.5 H max. 10 m.

6

a1 Strad

87.20

16 15 14

6

5

41.7

P

1

2 3 4

E

X 797054.3040 413 797373.0409 413 797382.8287 413 797392.8906 413 797403.1821 41 797414.4020 41 797448.3191 41 797479.2977 41 797486.5584 41 797492.9963 413 797529.4710 413 797527.5490 413 797548.8239 413 797561.2675 413 797558.6400 413 797559.2230 413 797563.7537 413 797626.0595 413 797193.4404 413 797143.9118 413 797135.7286 413 797108.2029 413 797073.8079 413

11

PUD REQUIRED aB

Strad

20 19 18 13.0

2

6

2

SPATII VERZI ,PARCURI, SCUARURI

16 15

4

23

5.0

1.5

a 2a

19 20

4 5 6

POT = 40 % CUT =1.5 H max. 10 m.

25

24

119.2

41.7

10.0

108

106 4

1 2 3

.0

.1 IP NR FIL T IU 655 PRO TOR 178+ GIRA .- KM SENS P.U.G . nf co propus

R16.00

3

S+D+P+2 -> 11-15 ET

B

a Strad

14

2

POT = 75 % CUT =4 H max. 45 m.

9 10 11

1

R12

R1

2.5

4.50

s=14.427,00mp.

13.0

1.5

3.0

107

POT = 40 % CUT =1.5 H max. 10 m.

104

17

25.0

POT = 40 % CUT =1.5 H max. 10 m.

105

10.0

12 3

POT = 40 % CUT =1.5 H max. 10 m.

7

62

1 18

98.7

POT = 40 % CUT =1.5 H max. 10 m.

102

a Strad

7

10.0

0

5.

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

9 8

4b

99

KV

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET

100

POT = 40 % CUT =1.5 H max. 10 m.

0

37.364,00mp. din care 10% spatiu verde

POT = 40 % CUT =1.5 H max. 10 m.

s=2.352,60mp. 0

. 10

11

X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134

LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.

S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.

L

A. E.

COORDONATE STEREO 70 EREN CE A GENERAT PUZ S = 183.000,00mp.

LIS -

97

103

CUT =1.5 H max. 10 m.

10.0

40.5

161

L.

PERIMETRU NTRAVILAN PROPUS

IS -ZONA

j

POT = 40 % CUT =1.5 H max. 10 m.

22.9

6 11

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

.0 24POT = 40 %

7.0

15

2.0

1

27

IS

42.0

De. 12

POT = 40 % CUT =1.5 H max. 10 m.

24.0

101

Strada

91 101

20

24.0

1

8

56

10 9

4

1.5

x1

6

3 11 .0

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

PUD PREALABIL

Strad

7 21

6

2 1211 3 10 10.0

98

22.0

5

aB

40.0

21.8 8

9 8

3.0

15.0

da

ra

X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066

IS -

7

Strad

121 13

TOTAL TEREN CE A GENERAT P.U.Z.

OORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp

96

POT = 40 % CUT =1.5 H max. 10 m.

94

91

St 12

92

POT = 40 % CUT =1.5 H max. 10 m.

60

54

POT = 40 % CUT =1.5 H max. 10 m.

58

52

POT = 40 % CUT =1.5 H max. 10 m.

s=3.858,02mp.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4

L56

ne

0

14 12 13

POT = 40 % CUT =1.5 H max. 10 m.

7

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

iu

10.0

une 3

POT = 40 % CUT =1.5 H max. 10 m.

5

POT = 40 % CUT =1.5 H max. 10 m.

96

15.0

4

TEREN CARE A GENERAT P.U.Z.

10.0

95

93

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

55 .0

d

P

15.0

POT = 40 % CUT =1.5 H max. 10 m.

90.8

57

59

POT = 40 % CUT =1.5 H max. 10 m.

51

53

a

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

D

1 2

8

s=2.348,81.

141312 11

13

ne

11

32 33 9

5.

5

9 10

31

SPATII VERZI ,PARCURI, SCUARURI

56.2

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4a

DRUM PROPUS IN . P.U.Z.

183.000,00mp. din care suprafete

L

s=9.613,59mp.

DRUM PROPUS CONF. P.U.G.

BILANT SUPRAFETE

i

16 15

1

2 3

1211 10

11 12

Secti

90

7

10 9

8

POT = 40 % CUT =1.5 H max. 10 m.

Strada

POT = 40 % CUT =1.5 H max. 10 m.

17

89

6

40.4

Another important aspect of the zonal planning plan is that it allows for changes within T larger plots through the reANIA NATIONALA ZI SI DRUMURI quirement of the Urban Detail N ROMANIA S.A. Plans (PUD). These plots are 05- 2008 highlighted bellow. STR . BARAJULUI

DRUM COLECTOR ( AFERENT STR. BARAJULUI)

18

7

POT = 40 % CUT =1.5 H max. 10 m.

44.3

0

12.0

15

42.3

5.

7 8

15

16

10.0

6

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

17

18

17 16

14

19

POT = 40 % CUT =1.5 H max. 10 m.

16 15

11

POT = 40 % CUT =1.5 H max. 10 m.

a5 Strad

40.3

DN 22

5

19

8

14

5 6

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

3.0

87

4

9

3 4

40.4

POT = 40 % CUT =1.5 H max. 10 m.

61

62

4

20

POT = 40 % CUT =1.5 H max. 10 m.

12 11

21

a2

POT = 40 % CUT =1.5 H max. 10 m.

41.5

POT = 40 % CUT =1.5 H max. 10 m.

ct

9

POT = 40 % CUT =1.5 H max. 10 m.

2

Se

POT = 40 % CUT =1.5 H max. 10 m.

13

.0

13

s=8.447,07mp.

20

10.0

49

50

10.0

POT = 40 % CUT =1.5 H max. 10 m.

47

POT = 40 % CUT =1.5 H max. 10 m.

10

23

Strad

40.0

40.0 POT = 40 % CUT =1.5 H max. 10 m.

10.0

H

64

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

L

POT = 40 % CUT =1.5 H max. 10 m.

a3

88

63

7

Strad

85

48

POT = 40 % CUT =1.5 H max. 10 m.

4

7.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

86

65

22

De. 42

POT = 40 % CUT =1.5 H max. 10 m.

Strada

81.90

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

81.93

66

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

5

une

Secti

POT = 40 % CUT =1.5 H max. 10 m.

a5

81.99

81.84

22

ne sectiu

83

84

POT = 40 % CUT =1.5 H max. 10 m.

L

10

45

POT = 40 % CUT =1.5 H max. 10 m.

67 68s=5.602,14mp.

191.5

23

156

81

82

a7

POT = 40 % CUT =1.5 H max. 10 m.

157

Strad

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Strad

158

24

9

10.0

17

42.0

46

POT = 40 % CUT =1.5 H max. 10 m.

18

5

iu

POT = 40 % CUT =1.5 H max. 10 m.

s=6.573,10mp.

POT = 40 % CUT =1.5 H max. 10 m.

ct

7

L

10

12

se

.0

a

POT = 40 % CUT =1.5 H max. 10 m.

25

b

POT = 40 % CUT =1.5 H max. 10 m.

8

19

POT = 40 % CUT =1.5 H max. 10 m.

44

69

h

POT = 40 % CUT =1.5 H max. 10 m.

141.3

79

20

43

.0

3

POT = 40 % CUT =1.5 H max. 10 m.

42

.0

0

POT = 40 % CUT =1.5 H max. 10 m.

c

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

41

6

8

POT = 40 % CUT =1.5 H max. 10 m.

8

2 10

3

4 13

6.

80

POT = 40 % CUT =1.5 H max. 10 m.

76.7

l

70

10.0

159

L

10.0

POT = 40 % CUT =1.5 H max. 10 m.

s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.

40.0

POT = 40 % CUT =1.5 H max. 10 m.

40.0

28

27

POT = 40 % CUT =1.5 H max. 10 m.

1

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

13

12

R1

78

POT = 40 % CUT =1.5 H max. 10 m.

160

71

42

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

26

s=7.894,21mp.

10.0

141.1

38.7

POT = 40 % CUT =1.5 H max. 10 m.

77

L

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

.0

POT = 40 % CUT =1.5 H max. 10 m.

41

72

POT = 40 % CUT =1.5 H max. 10 m.

10

St

13.8

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3

s=520,83mp. 2

75

76

2 3

4

38

POT = 40 % CUT =1.5 H max. 10 m.

St 307 ra 19 7da A 18

11

St

limita aliniament

limita aliniament

limita amplasare constructii

6 5

POT = 40 % CUT =1.5 H max. 10 m.

39

40

POT = 40 % CUT =1.5 H max. 10 m.

09

POT = 40 % CUT =1.5 H max. 10 m.

.0

4

.0

30

30

A

GC

22 21

73

74

42

PERIMETRU INTRAVILAN PRO

m

124 Strada 1

2 3

2

POT = 40 % CUT =1.5 H max. 10 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

29

.4

POT = 40 % CUT =1.5 H max. 10 m.

16

X 797030,5331 413 797409,3030 413 797427,9179 413 797545,9730 413 797573,5475 413 797649,6928 413 797180,2294 413 797101,4915 413 797061,2446 413

COORDONATE STER TEREN CE A GENERA S = 183.000,00mp

150

a A1

S23trad

I

LEGENDA:

9

A

POT = 40 % CUT =1.5 H max. 10 m.

6 7

18 17

POT = 40 % CUT =1.5 H max. 10 m.

4 5

22 21

35

33

32

C2

1.50

POT = 40 % CUT =1.5 H max. 10 m.

31

23

36

37

34

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Fig.

7.00

12 11 10

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

93.9 POT = 40 % CUT =1.5 H max. 10 m.

79.3

2

3

29

De

0 .0 12

1.50

10.0 7.0

21.0

10.0

28

14 13 12 .0 15

10

19

A B C D E F G H I

R

-2.80

1 2 3

24

P.T.E.

s=85,30mp.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

6

Fig.B1

11.0

ol

26

4 De. 41

5.4%

3.00

±0.00 =+0.60

aA 1

Str25ad

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

C

5

27

26

22 21 20

POT = 40 % CUT =1.5 H max. 10 m.

4

3

25

7.0

rter

L

LEX

+3.00

e

Strada de legatura - propusa prin P.U.Z.-

IAL

+6.00

taj

1.5 3.0

12.0

3.0 1.5

COORDONATE STE ZONA STUDIAT S = 216.675m

B

10.0 7.0

sarda

3.0

15.0

Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1

2

The approved Planning Zonal Plan sets out the permitted uses in this development. It regulates the: -POT: maximum building area per plot according to the use -CUT: all floors area divided by plot area -H: maximum heights of buildings -minimum building offsets from plot boundaries

+10.00

d

L

5.0

1.5

CON STAN TA

E LOCUINTE si ENTIAL

3.0

12.0

H max.10.0m

RC

PLANNING REGULATIONS

5.0 1.5

a

5.4%

IS X1

CO CO MP ME

H max.10.0m

limita am constr

limita

limita

limita con

15.0

3.0

106 m DN 22


VOLUMETRIC SUGGESTION


ARCHITECTURAL MASSING



ARCHITECTURAL MASSING



MIXED USE COMMERCIAL The Eastside plots of this development offer a great opportunity for either retail, commercial, hospitality, office or high rise residential development uses. The 350m of main street opening offers great visibility to ground floor development up to 3 stories high. The planning regulations allow for up to 45m high towers in these locations, subject to a PUD (Urban Detail Planning Plan) so that even PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL high rise residential, offices or hospitality are suitable and permitted. H max.45.00

+10.00

H max.25.00

+10.00

SECTIUNE STRAZI SI LOTURI

+6.00

mansarda

+6.00

+3.00

etaj

+3.00

parter

±0.00 =+0.60

5.4%

3.00

There are currently 2 plots: - North East Plot ( 14 427 sqm, 75% permitted built area, 45m max permitted building height) - South East Plot ( 22 937 sqm, 75% permitted built area, 45m max permitted building height) H max.10.0m

P+2

limita aliniament

13.0

H max.10.0m

5.0

demisol

-2.80

21.0

demisol 21.0

1.50

-2.80

7.00

1.50

H max.10.0m

Sectiune 5

IS x2

H max.45.00

5.4%

h

L

Sectiune strazi 2-7

3.0

3.0

10.0

5.4%

c

L

1.5 3.0

7.0

3.0 1.5

limita amplasare constructii

5.0

1.5

±0.00 =+0.60

1.50

LIS y

5.0

1.5

limita aliniament

10.0

limita amplasare constructii

limita aliniament

13.0

5.0 1.5

H max.45.00

limita aliniament

LIS Y

limita amplasare constructii

limita aliniament

limita amplasare constructii

87.2

Sectiune 1

5.0

10.0

7.00

5.4%

5.0

5.0 1.5

f

1.50

limita amplasare constructii

Sectiune strada 2

3.0

5.4%

L

3.00

5.4%

Sectiune 4

limita aliniament

limita amplasare constructii

H max.25.00

NORTH-EAST MIXED USE COMMERCIAL

Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)

H max.45.00

LEGENDA: DN 22

STR . BARAJULUI

DRUM COLECTOR ( AFERENT STR. BARAJULUI) DRUM PROPUS CONF. P.U.G. DRUM PROPUS IN . P.U.Z.

limita amplasare constructii

H max.10.0m

Sectiune 6 Sectiune strada 1

15.0

3.0

5.0

5.4%

L

l sibi po u Tra

4.5

4.5

R1

7.0

R1 Fig.D6

1.5 7.0

De. 1273 10.0

1.5

une

Secti

10.0

5.0

12 11

5.0

14 13

7 89

- SPATII VERZI, SCUARURI PUD PREALABIL

9

INDICATIV PARCELA DIN ZONA

PIETONAL

17

PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE

6

10.0

10

P

CIRCULATII CAROSABIL

1

5.0

13.0

7.0

POT = 40 % CUT =1.5 H max. 10 m.

123

8

15

41.0

10.0 40.0

I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL

a - -- k

7

16

5.0

se

121

4

5.0

122

POT = 40 % CUT =1.5 H max. 10 m.

9 10 11

e ctiun

ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE

tor colec

2a

s=4.154,60mp. POT = 40 % CUT =1.5 H max. 10 m.

6

13

14.0

4.5

6

14 POT = 40 % CUT =1.5 H max. 10 m.

ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.

7.0

7.0 46.5

drum

a

1 Tulcea 22

11.0

6.0

or R12.0

2 da

Str a

se

ct cole

Str ad

drum

0.0 R1

une 2

2b

3 ad a

Str

0

13.0

Secti

7.0 1.5

a

ad

8

14 13 12

POT = 40 % CUT =1,5 H max.=10m.

42.0

1a

139

ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)

a

POT = 40 % CUT =1.5 H max. 10 m.

De. 1266

L

LIS

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL

Str

Strad

9 10 5

40.0

POT = 40 % CUT =1.5 H max. 10 m.

aC

15 10.0

138 6 7 8

ad Str

5

11 10

0

9

5.

7

p.)

p. 3m

0m

,3

,0

63

19

.7

.6

=4

11

(s

s=

da

b

8 4 11

13 1210.0

140

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4

POT = 40 % CUT =1.5 H max. 10 m.

16

ZONA EDIFICABILA

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

s=5.484,60mp.

POT = 40 % CUT =1.5 H max. 10 m.

120

7

136 0

3.

POT = 40 % CUT =1.5 H max. 10 m.

141

POT = 40 % CUT =1.5 H max. 10 m.

0

a Str

40

143

5.

r Pp

T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA II AT MI IN AT SP SE RU BIL SP SI NT LA PE EA PR D PU

I-

.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

10

5.0

f

POT = 40 % CUT =1.5 H max. 10 m.

119

137

37

POT = 75 % CUT =4 H max. 25 m. 0

3.

118

1.376,92mp.

TEHNICO EDILITARE

LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA

1.5 7.0

10

142

145

34

0

0

3.

POT = 40 % CUT =1.5 H max. 10 m.

.0

134

.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

13.5

4c

s=6.460,56mp.

.0

3.

135

.0

POT = 40 % CUT =1.5 H max. 10 m.

7.0 1.5

6

ad Str 144

a

EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT

5.0

L

147

.0

36

a

7

w

k 146

g

40

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

132

POT = 40 % CUT =1.5 H max. 10 m.

5.

10

116

.0

40

117

.0

133

s=6.421,09mp.

POT = 40 % CUT =1.5 H max. 10 m.

0

da

KV

POT = 40 % CUT =1.5 H max. 10 m.

L 131

POT = 40 % CUT =1.5 H max. 10 m.

148

POT = 40 % CUT =1.5 H max. 10 m.

149

y

.7

29

0

.0

114

POT = 40 % CUT =1.5 H max. 10 m.

G.C.,P.T.E. - ZONA AMPLASARE SERVICII

50.983,55mp.

ZONA P EXTINDERE INTRAVILAN

30.5

13

0

5.

POT = 40 % CUT =1.5 H max. 10 m.

115

5 6 7

ad Str

0

a Str

11

150

POT = 40 % CUT =1.5 H max. 10 m.

5.

.

151

112

8 910

POT = 40 % CUT =1.5 H max. 10 m.

TOTAL

LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI

14.0

2 18 4.5 10.0

50.0

POT = 75 % CUT =4 H max. 45 m.

0

5. .0

s=1.409,80mp.

4 32

.0 10

.A

s=395,23mp.

113

POT = 40 % CUT =1.5 H max. 10 m.

Dr. 1264

128 130

din care 30% spatiu verde

44.533,80mp. +2.210,27

DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp

LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)

s=22.937,00mp.

0

5.

I

TEREN ADIACENT D.N.22 - - - - - - -

4.155,43mp. 11.619,33mp.

LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )

IS

POT = 40 % CUT =1.5 H max. 10 m.

CRESA , GRADINITA PUD PREALABIL

0

PUD PREALABIL

CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA

19 1.5

x2

1 12 11

SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m

ZONIFICARE

UNITATI DE INVATAMANT

5.

POT = 40 % CUT =1.5 H max. 10 m.

110

.0

10

129

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

z

.0

0

3.

.0

40

POT = 40 % CUT =1.5 H max. 10 m.

127

126

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

5

POT = 40 % CUT =1.5 H max. 10 m.

SPATII VERZI, PARCURI, ALEI PIETONALE

CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI

70.606,37mp. 1.409,80mp. din care 30% spatiu verde

LIMITA ZONA EDIFICABILA Fig.C29

4

30.5

17

4

10

L

POT = 40 % CUT =1.5 H max. 10 m.

PUD PREALABIL

I - Pprb C-

H max. 10 m.

SPATII VERZI ,PARCURI

LIMITA PERIMETRU INTRAVILAN EXISTENT

Fig.A40

5

S+D+P+2 -> 11-15 ET

PUD PREALABIL

111 s=6.248,94mp.

H max. 10 m.

UNITATI DE INVATAMANT

ZONA INTRAVILAN EXISTENT

Fig.C29

5

P -

CRESA , GRADINITA PUD PREALABIL

POT = 40 % CUT =1,5

LIMITA SUPRAFATA ZONA STUDIATA

R=14.0

6

LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5

LIMITE

11.0

7

37.364,00mp. din care 10% spatiu verde 5.484,60mp. din care 10% spatiu verde

LEGENDA: Fig.C29

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

5.0

1.5

.5 35

L.E 0

GC 5.

2.0 2.0

3.0

P

4.50

117.5

10.0

s=1806,59mp.

75 75 75

R12.00

LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET

S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.

LI -

X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134

11

SPATII VERZI ,PARCURI, SCUARURI

16 15

e

109

POT = 40 % CUT =1.5 H max. 10 m.

6

125

POT = 40 % CUT =1.5 H max. 10 m.

3.0

152

.0

15 POT = 40 % CUT =1.5 H max. 10 m.

153 15.0

5

1

2 3 4

13.0

1.5

a 2a

POT = 40 % CUT =1.5 H max. 10 m.

124

154

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

106

18 17

POT = 40 % CUT =1.5 H max. 10 m.

20 19 18

41.7

1.5

3.0

108

POT = 40 % CUT =1.5 H max. 10 m.

4

aB

41.7

E

5.5 5.5

6

2

119.2

Strad

1 2 3

25

23

Strad

10.0

Strad

2 3

POT = 40 % CUT =1.5 H max. 10 m.

155

721

87.21

87.25

POT = 40 % CUT =1.5 H max. 10 m.

107

105

104

1

17

R12

2.0

4

S+D+P+2 -> 11-15 ET

aB

7 15.0

12 3 19 20

87.20 87.20

1 18

98.7

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

102

4 5 6

16 15 14

10.0

10

0

5.

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

POT = 40 % CUT =1.5 H max. 10 m.

103

CUT =1.5 H max. 10 m.

9 8

a6 Strad

7

10.0

99

40.0

POT = 40 % CUT =1.5 H max. 10 m.

100

POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 %

101

10.0

4b Strada

L

40.5

97

s=2.352,60mp. .0

56

10 9

25.0

.0

7.0

NR.1 FIL TIP 655 RIU PRO GIRATO .G.- KM 178+ SENS P.U conf. propus

2

R16.00

3

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

9 1011

14

2

24

5.0

13.0

1

R1

2.5

4.50

IS

42.0

De. 1262

POT = 40 % CUT =1.5 H max. 10 m.

24.0

3.0

98

7 161

POT = 40 % CUT =1.5 H max. 10 m.

j

POT = 40 % CUT =1.5 H max. 10 m.

22.9

8

24.0

1

21.8 22.0

8

6 11

54

aB

2 1211 3 10 10.0

121 13

91 101

20

52

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

6

Strad

15.0

a

ad

21

L56

s=3.858,02mp.

58

60

15

.0

POT = 75 % CUT =4 H max. 45 m.

s=2.348,81.

PUD PREALABIL 56.2

7

5

d

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4

P

3 11

1

27 1.5

x1

6

4

s=14.427,00mp.

14 12 13

POT = 40 % CUT =1.5 H max. 10 m.

e

a1

94

9 8

un

10.0

une 3

96

96.0

15.0

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

55

7

0

5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

IS -ZONA

LIS -

PERIMETRU INTRAVILAN PROPUS

COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.

D

1 2

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

12.0

3.0

10.0

95

93

57

59

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

91

Str

12

16 15

90.8

4a

5

17

92

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

a

SPATII VERZI ,PARCURI, SCUARURI

141312 11

POT = 40 % CUT =1.5 H max. 10 m.

1

10 9

8

51

53

POT = 40 % CUT =1.5 H max. 10 m.

42.3

16

10.0

POT = 40 % CUT =1.5 H max. 10 m.

44.3

13

a5

Strad

6

11

32 33

8

7 8

15

15

9 10

31

9

5.

17 16

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8

2 10

.0

0

Strad

18

89

POT = 40 % CUT =1.5 H max. 10 m.

2 3

1211 10

11

POT = 40 % CUT =1.5 H max. 10 m.

14

17

18

POT = 40 % CUT =1.5 H max. 10 m.

11 12

16 15

POT = 40 % CUT =1.5 H max. 10 m.

4

ne

cti

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

2 3

Secti

L

POT = 40 % CUT =1.5 H max. 10 m.

14

7

13 12 11

21

POT = 40 % CUT =1.5 H max. 10 m.

19

10.0

49

5 6

40.3

i

s=9.613,59mp.

POT = 40 % CUT =1.5 H max. 10 m.

7

41.5

50

40.4

90

4

6

47

POT = 40 % CUT =1.5 H max. 10 m.

4

9

8

Strada

POT = 40 % CUT =1.5 H max. 10 m.

5

19

61

62

4

20

48

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

20

5

Se

3

4 13

5.

iu

POT = 40 % CUT =1.5 H max. 10 m.

9

13

.0

23

L

s=8.447,07mp.

POT = 40 % CUT =1.5 H max. 10 m.

ct

7

L

10

s=6.573,10mp.

POT = 40 % CUT =1.5 H max. 10 m.

1

se

.0

a

POT = 40 % CUT =1.5 H max. 10 m.

12 10

40.4

87

63

40.0 POT = 40 % CUT =1.5 H max. 10 m.

25

a2 Strad

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

I

POT = 40 % CUT =1.5 H max. 10 m.

64

10.0

10.0

H

65

POT = 40 % CUT =1.5 H max. 10 m.

85 40.0

88

81.93

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

86

22

POT = 40 % CUT =1.5 H max. 10 m.

3

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

7.0

4 Strada

81.90

83

84

POT = 40 % CUT =1.5 H max. 10 m.

191.5

81.84

82

22

e

5

156

POT = 40 % CUT =1.5 H max. 10 m.

De. 427

Strada

157

7 Strada

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

sectiun

10

.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

5

POT = 40 % CUT =1.5 H max. 10 m.

41

b

24

9

10.0

17

45

POT = 40 % CUT =1.5 H max. 10 m.

une

Secti

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8

18

42.0

46

POT = 40 % CUT =1.5 H max. 10 m.

66

POT = 40 % CUT =1.5 H max. 10 m.

44

69

L

67 68s=5.602,14mp.

20

19

43

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

h

POT = 40 % CUT =1.5 H max. 10 m.

81

141.3

79

POT = 40 % CUT =1.5 H max. 10 m.

42

28

27

26

s=7.894,21mp.

c

10.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

3

POT = 40 % CUT =1.5 H max. 10 m.

42

0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Strada

158

23 81.99

70

POT = 40 % CUT =1.5 H max. 10 m.

80

POT = 40 % CUT =1.5 H max. 10 m.

76.7

l

10.0

40.0

10.0

159

71

42

POT = 40 % CUT =1.5 H max. 10 m.

6

13

12

6.

78

POT = 40 % CUT =1.5 H max. 10 m.

160

L

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

40.0

141.1

38.7

s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.

L

41

72

POT = 40 % CUT =1.5 H max. 10 m.

77

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8

POT = 40 % CUT =1.5 H max. 10 m.

Str 307 a 19 7da A 18

11

R1

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3

9

4

.0

30

POT = 40 % CUT =1.5 H max. 10 m.

2

11.

13.8

2

75

76

2 3

4

16 10

POT = 40 % CUT =1.5 H max. 10 m.

29

. 40

POT = 40 % CUT =1.5 H max. 10 m.

17

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

18

29

De

.00

6 5

32

4 5 6 7

10

.0

35

33

28

14 13 12 .0 15

10

R12

A

GC

s=520,83mp.

31

23 22 21

36

38

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

34

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

6

Fig.B1

P.T.E.

s=85,30mp.

10.0

19

IS -

X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066

A B C D E F G H I

CONSTANTA

7.0

10.0 7.0

124 Strada 1

POT = 40 % CUT =1.5 H max. 10 m.

37

39

40

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

93.9 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

73

74

POT = 40 % CUT =1.5 H max. 10 m.

2

3

24

10.0

De. 414

2 3

22 21

1 2 3

12 11 10

a A1

ad Str 23

10.0 7.0

Str25

26

Strada de legatura - propusa prin P.U.Z.-

C

5

27

26

25

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

79.3

4

3

2

22 21 20

A ada 1

5.0

L

7.0

e

183.000,00mp. din care suprafete

TOTAL TEREN CE A GENERAT P.U.Z.

1

1.5 3.0

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

A

BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp

B

a

12.0

3.0

ad

3.0 1.5

5.4%

IS X1

5.0

1.5

Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1

Str

15.0

12.0

limita amplasare constructii

3.0

5.0 1.5

a

H max.10.0m

limita aliniament

limita aliniament

limita amplasare constructii

d

L

Sectiune 3

29

H max.10.0m

limita amplasare constructii

limita amplasare constructii

limita aliniament

IS x2

limita aliniament

7

30

limita amplasare constructii

limita aliniament

1.5

Fig.C

limita aliniament

12.0

P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008

m

1.5

7.0

150

7.0

IS x1

15.0

X IAL

7.0

TEREN CARE A GENERAT P.U.Z.

P+2

Sectiune 2

COMPLE COMERC

P+2

Strad

a C16

PROPUNERE TRASEU STRAZI CONF. P.U.G.

F

ZONA D.N. 22 EXISTENT

10 11

ZONA EXTINDERE CAROSABIL D.N. 22

12

aC

PROPUNERE DE MOBILARE URBANA

Strad

Dr. 1266

5.0

3

5.0

5.0

GC

10.0

10.0

s=375,56mp.

19 +45.00

78.39 78.40 78.10

78.06

G

83 m

85 m

87 m

+35.00

90 m

93 m +10.00

95 m +10.00

+20.00

102 m

106 m DN 22

+10.00

+10.00

83 m

panta teren 5.4%

SECTIUNE TRANSVERSALA

Proiectant general:

Beneficiar:

s.c. PROMARH s.r.l. Nume:

Semnatura:

Proiect nr:

MATROZ CONSTANTIN si FLOREA ION

TULCEA

str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea

J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180

Specificatie:

Sef Proiect arh. Marcel PAVEL

Scara:

1 / 1.000

Proiectat

arh. Marcel PAVEL

Data:

Desenat

arh. Paul Cristian MURAVELI

Noiembrie 2017

Denumire proiect:

LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.

Denumire plansa:

REGLEMENTARI URBANISTICE

87/2017 Faza:

P.U.Z. Nr. plansa:

U4

SOUTH-EAST MIXED USE COMMERCIAL


eAt

work & live

shop



RETAIL CENTER Max Buildable Area: 28 000 sqm

APARTMENT BUILDINGS Max Buildable Area: 60 000 sqm Estimate No. Apartments: 500


COLLECTIVE RESIDENTIAL The MGM2 development offers a plot that is suitable for hospitality or collective housing with potential for commercial ground floor with an area of 5 484.60 sqm. The maximum built area permitted is no more than 75% of this area while the maximum building height is set at 26m.

PUBLIC SQUARE (PLAYGROUND) MIXED USE COMMERCIAL

PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si

CONSTRUIRE COMPLEX SI ANSAMBLU REZIDENTIAL This plot also allows for office spaces and COMERCIAL commercial/ service activities on the ground floors. It is also well-positioned between the individual residential and the commercial side. H max.45.00

+10.00

H max.25.00

+10.00

SECTIUNE STRAZI SI LOTURI

+3.00

H max.10.0m

Sectiune 4

P+2

limita aliniament

Sectiune strada 2

13.0

3.0

1.5

5.0

demisol 21.0

1.50

-2.80

7.00

1.50

H max.10.0m

IS x2 H max.45.00 5.4%

Sectiune strazi 2-7

3.0

h

L

3.0

10.0

KINDERGARDEN/ NURSARY

5.4%

c

L

1.5 3.0

7.0

3.0 1.5

limita amplasare constructii

10.0

5.0 1.5

H max.45.00

5.4%

3.00

-2.80

21.0

1.50

Sectiune 5 limita amplasare constructii

LIS Y

H max.10.0m

+3.00

±0.00 =+0.60

demisol

LIS y

5.0

1.5

limita aliniament

5.0

10.0

limita aliniament

limita aliniament

limita aliniament

13.0

5.0

5.0 1.5

f

limita amplasare constructii

87.2

limita amplasare constructii

L

7.00

±0.00 =+0.60

etaj

parter

5.4%

5.0

5.4%

Sectiune 1

1.50

limita amplasare constructii

limita aliniament

limita amplasare constructii

H max.25.00

3.00

5.4%

+6.00

mansarda

+6.00

Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada) H max.45.00

LEGENDA: DN 22 STR . BARAJULUI DRUM COLECTOR ( AFERENT STR. BARAJULUI) DRUM PROPUS CONF. P.U.G. DRUM PROPUS IN . P.U.Z.

limita amplasare constructii

H max.10.0m

Sectiune 6

limita amplasare constructii

Sectiune strada 1

15.0

3.0

5.0

5.4%

L

sibi l po u se

4.5

R12.0

Fig.D6

1.5 7.0

ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)

De. 1273

POT = 40 % CUT =1,5 H max.=10m.

42.0

46.5

10.0

1.5

une 10.0

5.0

14 13

7 89

9

INDICATIV PARCELA DIN ZONA

PIETONAL

17

PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE

6

13.0

5.0

- SPATII VERZI, SCUARURI PUD PREALABIL

CIRCULATII CAROSABIL

1

5.0

10.0

12 11

P

a - -- k 8

15

7.0

10

ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL

7

16

Secti

5.0

POT = 40 % CUT =1.5 H max. 10 m.

123

4 41.0

10.0 40.0

14.0

4.5

tor colec

se

121

ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.

7.0

7.0

drum

122

POT = 40 % CUT =1.5 H max. 10 m.

9 10 11

6

e ctiun

5.0

14 13 12

1 Tulcea 22

11.0

6.0

R1

7.0

R1

2b

4.5

2 a ad

Str

Tra

ctor

a

cole

Str

0.0

drum

R1

ad

3 a ad

Str

0

13.0

une 2 Secti

139

7.0 1.5

POT = 40 % CUT =1.5 H max. 10 m.

De. 1266

2a

8 15 10.0

40.0

POT = 40 % CUT =1.5 H max. 10 m.

aC

Strad

9 10 5

16

POT = 40 % CUT =1.5 H max. 10 m.

138 6 7 8

a

5

11 10

ad

7

9

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL

13

a C16

Strad

PROPUNERE TRASEU STRAZI CONF. P.U.G.

F

ZONA D.N. 22 EXISTENT

10 11

ZONA EXTINDERE CAROSABIL D.N. 22

12

aC

PROPUNERE DE MOBILARE URBANA

Strad

Dr. 1266

5.0

3

5.0

5.0

GC

10.0

10.0

s=375,56mp.

19 +45.00

78.39 78.40 78.10

78.06

G

83 m

85 m

87 m

+35.00

90 m

93 m +10.00

95 m +10.00

+20.00

102 m

106 m DN 22

+10.00

+10.00

83 m

panta teren 5.4%

SECTIUNE TRANSVERSALA

COLECTIVE HOUSING/

1.376,92mp.

TEHNICO EDILITARE

ZONA EDIFICABILA

50.0

1a

a

p.

p.)

3m

0m

,3

,0

63

19

.7

.6

=4

(s

11 s=

8 4 11

13 1210.0

140

137

37

POT = 40 % CUT =1.5 H max. 10 m.

4

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

G.C.,P.T.E. - ZONA AMPLASARE SERVICII

50.983,55mp.

LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA

6

14 POT = 40 % CUT =1.5 H max. 10 m.

s=4.154,60mp.

120

7

136 0

3.

POT = 40 % CUT =1.5 H max. 10 m.

141

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

L

TOTAL

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII

a

40

143

ad

rb

T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR

D

II

Str

SI

Pp

AT

PU

SP

.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

10

5.0

118

LIS

s=5.484,60mp.

0

3.

Str

10

142

145

f

119

3.

POT = 40 % CUT =1.5 H max. 10 m.

.0

134

.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

g

.0

34

din care 30% spatiu verde

44.533,80mp. +2.210,27

DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp

ZONA P EXTINDERE INTRAVILAN

30.5

POT = 75 % CUT =4 H max. 25 m.

POT = 40 % CUT =1.5 H max. 10 m.

0

14.0

2 18 4.5 10.0

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

ad Str

4c

144

s=6.460,56mp.

I-

5.0

L

147

.0

36

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

0

3.

135

.0

40

ad

w

k 146

Str

POT = 40 % CUT =1.5 H max. 10 m.

40

117

POT = 40 % CUT =1.5 H max. 10 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

132

POT = 40 % CUT =1.5 H max. 10 m.

116

.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

133

s=6.421,09mp.

POT = 40 % CUT =1.5 H max. 10 m.

a

EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT

149

POT = 40 % CUT =1.5 H max. 10 m.

L 131

POT = 40 % CUT =1.5 H max. 10 m.

148

POT = 40 % CUT =1.5 H max. 10 m.

0

150

0

5. .0

5.

10

POT = 40 % CUT =1.5 H max. 10 m.

115

5 6 7

TEREN ADIACENT D.N.22 - - - - - - -

4.155,43mp. 11.619,33mp.

CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA

19

13

5.

y

.7

29

0

.0

4

1.5

POT = 75 % CUT =4 H max. 45 m.

0

5.

128 130

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8 910

Dr. 1264

6

7

151

129

POT = 40 % CUT =1.5 H max. 10 m.

a ad

a

KV

ad

POT = 40 % CUT =1.5 H max. 10 m.

127

I

PUD PREALABIL

LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI

Fig.C29

5

IS

s=1.409,80mp.

4 32

114

SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m

LIMITA ZONA EDIFICABILA Fig.A40

6

x2

1 12 11

113

112

0

5.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Str

0

Str

11

3.0

0

3.

.0

40

110

SPATII VERZI, PARCURI, ALEI PIETONALE

CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI

LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)

s=22.937,00mp.

0

5.

0 5.

.

2.0 2.0

153 15.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

z

.0

10

L

111 s=6.248,94mp. .0

10

126

152

POT = 40 % CUT =1.5 H max. 10 m.

e

109

POT = 40 % CUT =1.5 H max. 10 m.

6

POT = 40 % CUT =1.5 H max. 10 m.

C-

LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )

S+D+P+2 -> 11-15 ET

17

POT = 40 % CUT =1.5 H max. 10 m.

.0

3.0

.A 0

GC 5.

s=395,23mp.

5

125

POT = 40 % CUT =1.5 H max. 10 m.

.0

POT = 40 % CUT =1.5 H max. 10 m.

4

18 17

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

124

15

87.21

87.25

106

104

1 2 3

PUD PREALABIL

I - Pprb

70.606,37mp. 1.409,80mp. din care 30% spatiu verde

LIMITA SUPRAFATA ZONA STUDIATA

1.5 7.0

a6

10

L.E 87.20 87.20

POT = 40 % CUT =1.5 H max. 10 m.

102

4 5 6

16 15 14

154

POT = 40 % CUT =1.5 H max. 10 m.

5

SPATII VERZI ,PARCURI

LIMITA PERIMETRU INTRAVILAN EXISTENT

R=14.0

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

5.0

1.5

P -

H max. 10 m.

ZONIFICARE

UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL

H max. 10 m.

UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL

POT = 40 % CUT =1,5

ZONA INTRAVILAN EXISTENT

Fig.C29

Fig.C29

PUD PREALABIL

5

5.484,60mp. din care 10% spatiu verde

LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5

LIMITE

11.0

7

37.364,00mp. din care 10% spatiu verde

LEGENDA:

30.5

10.0

1.5 41.7

P

s=1806,59mp.

4

4.50

117.5

0

9 8

Strad

POT = 40 % CUT =1.5 H max. 10 m.

155

1

2 3 4

75 75 75

R12.00

LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET

S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.

LI -

X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134

11

SPATII VERZI ,PARCURI, SCUARURI

5.

7

10.0

19 20 721

aB

9 1011

13.0

E

5.5 5.5

6

2

119.2

.5

99

4

POT = 75 % CUT =4 H max. 45 m.

41.7

1.5

16 15

25

S+D+P+2 -> 11-15 ET

20 19 18

R12

2.0

23

Strad

10.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

7.0

NR.1 FIL TIP 655 RIU PRO GIRATO .G.- KM 178+ SENS P.U conf. propus

2

R16.00

3

24

5.0

aB

14

2

4.50

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

Strad

1 2 3

1

R1

2.5

1.5

x1

6

15

.0

1

27

IS

13.0

35

POT = 40 % CUT =1.5 H max. 10 m.

100

POT = 40 % CUT =1.5 H max. 10 m.

12 3

17

3.0

108

POT = 40 % CUT =1.5 H max. 10 m.

10.0

j

L

s=2.352,60mp. .0

4b Strada

97

40.5

161

10

0

5.

1 18 25.0

107

105

98.7

POT = 40 % CUT =1.5 H max. 10 m.

7

42.0

7

De. 1262

a 2a

7 22.9

6 11

103

CUT =1.5 H max. 10 m.

56

10 9

POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 %

101

8

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

3 11

s=14.427,00mp.

14 12 13

8

e

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

IS -ZONA

LIS -

PERIMETRU INTRAVILAN PROPUS

COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.

D

1 2 4

13.5

6

1

10.0

un

10.0

POT = 40 % CUT =1.5 H max. 10 m.

a

7.0 1.5

60

54

Strad

5

52

POT = 40 % CUT =1.5 H max. 10 m.

11

32 33 9

12.0

P

9 10

31

s=2.348,81.

PUD PREALABIL

15.0

4

L56

POT = 40 % CUT =1.5 H max. 10 m.

aB

2 1211 3 10 10.0 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

96.0

40.0

a 20

POT = 40 % CUT =1.5 H max. 10 m.

51

53

55

s=3.858,02mp.

58

3.0

15.0

ad Str

21

9 8

98

21.8 22.0

8

a5

d

POT = 40 % CUT =1.5 H max. 10 m.

15.0

7

Strad

121 13

91 101

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

57

POT = 40 % CUT =1.5 H max. 10 m.

0

SPATII VERZI ,PARCURI, SCUARURI

141312 11

une 3 Secti

96

POT = 40 % CUT =1.5 H max. 10 m.

94

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10 9

8

15

42.3

16

10.0

POT = 40 % CUT =1.5 H max. 10 m.

44.3

5.

0

5

8

2 10

.0

7 8

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

17

18

13

POT = 40 % CUT =1.5 H max. 10 m.

1

59

POT = 40 % CUT =1.5 H max. 10 m.

92

POT = 40 % CUT =1.5 H max. 10 m.

91

14

2 3

10.0

95

19

20

POT = 40 % CUT =1.5 H max. 10 m.

Strad

5 6

1211 10

40.3

90.8

4

9

8 7

POT = 40 % CUT =1.5 H max. 10 m.

93

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

11 12

16 15

6

A 3

4 13

5.

17 16 15

56.2

7

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

11

POT = 40 % CUT =1.5 H max. 10 m.

14

10.0

49

POT = 40 % CUT =1.5 H max. 10 m.

4

ne

cti

9

POT = 40 % CUT =1.5 H max. 10 m.

2 3

5

Se

POT = 40 % CUT =1.5 H max. 10 m.

13

.0

13 12 11

21

40.4

6

16 15

4a

POT = 40 % CUT =1.5 H max. 10 m.

5

17

41.5

50

40.4

L

18

61

62

5

19

89

s=9.613,59mp.

4

12

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4

20

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

47

POT = 40 % CUT =1.5 H max. 10 m.

Strada

i

10.0

87

48

POT = 40 % CUT =1.5 H max. 10 m.

10.0

10

23

POT = 40 % CUT =1.5 H max. 10 m.

a2

40.0

10.0

POT = 40 % CUT =1.5 H max. 10 m.

90

POT = 40 % CUT =1.5 H max. 10 m.

L

s=8.447,07mp.

3.0

40.0

POT = 40 % CUT =1.5 H max. 10 m.

22

Strad

88

POT = 40 % CUT =1.5 H max. 10 m.

63

POT = 40 % CUT =1.5 H max. 10 m.

3

85

86

H I

POT = 40 % CUT =1.5 H max. 10 m.

64

10

De. 427

POT = 40 % CUT =1.5 H max. 10 m.

65

POT = 40 % CUT =1.5 H max. 10 m.

4

191.5

7.0

81.93

Secti

66

POT = 40 % CUT =1.5 H max. 10 m.

10.0

17

iu

POT = 40 % CUT =1.5 H max. 10 m.

s=6.573,10mp.

POT = 40 % CUT =1.5 H max. 10 m.

ct

7

L

10

12

18

1

se

.0

a

POT = 40 % CUT =1.5 H max. 10 m.

25

POT = 40 % CUT =1.5 H max. 10 m.

5

une

68s=5.602,14mp.

POT = 40 % CUT =1.5 H max. 10 m.

Strada

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

3

POT = 40 % CUT =1.5 H max. 10 m.

42

a1 Strad

81 83

84

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

41

b

24

9

18

45

POT = 40 % CUT =1.5 H max. 10 m.

67

5

e

sectiun

81.90

POT = 40 % CUT =1.5 H max. 10 m.

82

22

23 81.99

81.84

POT = 40 % CUT =1.5 H max. 10 m.

7

156

POT = 40 % CUT =1.5 H max. 10 m.

42.0

46

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8

19

43

44

69

L

20

Strada

157

c

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

h

POT = 40 % CUT =1.5 H max. 10 m.

141.3

79

Strada

158

Strada

l

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

70

POT = 40 % CUT =1.5 H max. 10 m.

76.7

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

80

POT = 40 % CUT =1.5 H max. 10 m.

42

28

27

26

s=7.894,21mp.

10.0

6

13

12

0

POT = 40 % CUT =1.5 H max. 10 m.

40.0

10.0

159

71

42

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8

POT = 40 % CUT =1.5 H max. 10 m.

S 7 11 tr 30 a 19 7da

6.

78

POT = 40 % CUT =1.5 H max. 10 m.

160

L

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

40.0

141.1

38.7

s=2.980,45mp.

L

41

72

POT = 40 % CUT =1.5 H max. 10 m.

77

2

4

.0

30

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

29

POT = 40 % CUT =1.5 H max. 10 m.

9

R1

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3

16

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

6 7

.0

. 40

POT = 40 % CUT =1.5 H max. 10 m.

17

11.

13.8

2

75

76

2 3

4

32

4 5

22 21 10

18

29

De

.00

6 5

31

23

36

38

POT = 40 % CUT =1.5 H max. 10 m.

35

33

28

14 13 12 .0 15

10

R12

7.0

A

GC

s=520,83mp.

POT = 40 % CUT =1.5 H max. 10 m.

37

39

40

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

93.9 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

73

74

POT = 40 % CUT =1.5 H max. 10 m.

34

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

De. 414

2 3

22 21

1 2 3

12 11 10

a A1

ad Str 23

79.3

2

3

24

6

Fig.B1

P.T.E.

s=85,30mp.

10.0

19

IS -

X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066

A B C D E F G H I

CONSTANTA

Str25ad

26

10.0 7.0

124 Strada 1

10.0 7.0

aA 1

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

C

5

27

26

25

Strada de legatura - propusa prin P.U.Z.-

4

3

2

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

5.0

L

7.0

e

183.000,00mp. din care suprafete

TOTAL TEREN CE A GENERAT P.U.Z.

1

1.5 3.0

22 21 20

A

BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp

B

da

12.0

3.0

Str a

3.0 1.5

5.4%

IS X1

5.0

1.5

Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1

limita amplasare constructii

15.0

limita aliniament

limita aliniament

limita amplasare constructii

3.0

12.0

H max.10.0m

29

d

L

Sectiune 3

30

H max.10.0m

5.0 1.5

a

limita amplasare constructii

IS x2

limita aliniament

7

limita aliniament

limita aliniament

7.0

1.5

Fig.C

limita aliniament

12.0

m

limita amplasare constructii

15.0

1.5

150

7.0

P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008

X IAL

7.0

IS x1

TEREN CARE A GENERAT P.U.Z.

P+2

Sectiune 2

COMPLE COMERC

P+2

Proiectant general:

Beneficiar:

s.c. PROMARH s.r.l. Nume:

Semnatura:

Proiect nr:

MATROZ CONSTANTIN si FLOREA ION

TULCEA

str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea

J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180

Specificatie:

Sef Proiect arh. Marcel PAVEL

Scara:

1 / 1.000

Proiectat

arh. Marcel PAVEL

Data:

Desenat

arh. Paul Cristian MURAVELI

Noiembrie 2017

Denumire proiect:

LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.

Denumire plansa:

REGLEMENTARI URBANISTICE

87/2017 Faza:

P.U.Z. Nr. plansa:

U4

INDIVIDUAL HOUSING

HOSPITALITY/ OFFICES


OWN

BUILD

invest

shop


APARTMENT BUILDINGS Max Buildable Area: 20 000 sqm Estimate No. Flats: 160



INDIVIDUAL RESIDENTIAL Approximately 10 ha of the site is dedicated to low rise residential development. This will generate a young neighborhood of 160 individual houses. The smallest plot is approximately 300sqm while the largest is about 700sqm. The maximum building permitted area on each plot is 40% of the size of the plot, while the maximum height permitted is 10m. PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si

CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL H max.45.00

+10.00

The anticipated average age of the residential buyer for these plots is around 34, so the neighborhood is expected to have young residents and a need for educational, commercial and leisure uses within neighborhood proximity. H max.25.00

+10.00

SECTIUNE STRAZI SI LOTURI

+3.00

H max.10.0m

Sectiune 4

P+2

limita aliniament

Sectiune strada 2

13.0

3.0

H max.10.0m

5.4%

3.00

-2.80

21.0

1.50

demisol 21.0

1.50

-2.80

7.00

1.50

H max.10.0m

Sectiune 5

IS x2 H max.45.00 5.4%

h

L

Sectiune strazi 2-7

3.0

3.0

10.0

5.4%

c

L

1.5 3.0

7.0

3.0 1.5

limita amplasare constructii

5.0

+3.00

±0.00 =+0.60

demisol

LIS y

5.0

1.5

limita aliniament

5.0

1.5

H max.45.00

limita amplasare constructii

10.0

5.0 1.5

10.0

limita aliniament

limita aliniament

limita aliniament

13.0

5.0 LIS Y

5.0 1.5

f

limita amplasare constructii

87.2

limita amplasare constructii

L

7.00

±0.00 =+0.60

etaj

parter

5.4%

5.0

5.4%

Sectiune 1

1.50

limita amplasare constructii

limita aliniament

limita amplasare constructii

H max.25.00

3.00

5.4%

+6.00

mansarda

+6.00

Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada) H max.45.00

LEGENDA: DN 22 STR . BARAJULUI DRUM COLECTOR ( AFERENT STR. BARAJULUI) DRUM PROPUS CONF. P.U.G. DRUM PROPUS IN . P.U.Z.

limita amplasare constructii

H max.10.0m

Sectiune 6

limita amplasare constructii

Sectiune strada 1

15.0

3.0

5.0

5.4%

L

sibi l po u se

4.5

4.5

1 Tulcea 22

11.0

6.0

R1

7.0

R1 Fig.D6

1.5 7.0

R12.0

2 a ad

Str

Tra

ctor

POT = 40 % CUT =1,5 H max.=10m.

42.0

46.5

10.0

1.5

une 10.0

10.0

14 13

7 89

9

INDICATIV PARCELA DIN ZONA

PIETONAL

17

PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE

6

13.0

5.0

- SPATII VERZI, SCUARURI PUD PREALABIL

CIRCULATII CAROSABIL

1

5.0

7.0

12 11

P

a - -- k 8

15

5.0

5.0

10

ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL

7

16

Secti

5.0

10.0

123

4 41.0

POT = 40 % CUT =1.5 H max. 10 m.

14.0

4.5

tor colec

e ctiun

ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.

7.0

7.0

drum

2a

6

13

se

121

40.0

MAIN BOULEVARD

ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)

De. 1273

2b

cole

a

0.0

drum

R1

13.0

une 2 Secti

7.0 1.5

Str

0

ad

3 a ad

Str

6.

R1

a

ad

122

POT = 40 % CUT =1.5 H max. 10 m.

9 10 11

1.376,92mp.

TEHNICO EDILITARE

ZONA EDIFICABILA

50.0

1a

7

14 13 12

POT = 40 % CUT =1.5 H max. 10 m.

44.533,80mp. +2.210,27

50.983,55mp.

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII

a

139

Str

8 15

POT = 40 % CUT =1.5 H max. 10 m.

De. 1266

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL

14 POT = 40 % CUT =1.5 H max. 10 m.

s=4.154,60mp.

120

10.0 40.0

POT = 40 % CUT =1.5 H max. 10 m.

aC

Strad

9 10 5

16

POT = 40 % CUT =1.5 H max. 10 m.

138 6 7 8

119

137

37

5

11 10

POT = 40 % CUT =1.5 H max. 10 m.

L

TOTAL

LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA

6

s=5.484,60mp.

0

3.

118

LIS

a C16

Strad

PROPUNERE TRASEU STRAZI CONF. P.U.G.

F

ZONA D.N. 22 EXISTENT

10 11

ZONA EXTINDERE CAROSABIL D.N. 22

12

aC

PROPUNERE DE MOBILARE URBANA

Strad

Dr. 1266

5.0

3

5.0

5.0

GC

10.0

10.0

s=375,56mp.

19 +45.00

78.39 78.40 78.10

78.06

G

83 m

85 m

87 m

+35.00

90 m

93 m +10.00

95 m +10.00

+20.00

102 m

106 m DN 22

+10.00

+10.00

83 m

panta teren 5.4%

SECTIUNE TRANSVERSALA

TYPICAL INDIVIDUAL HOUSING PLOT

DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp

G.C.,P.T.E. - ZONA AMPLASARE SERVICII

ZONA P EXTINDERE INTRAVILAN

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

ad Str

a

p.

p.)

3m

0m

,3

,0

63

19

.7

.6

=4

(s

11 s=

8 4 11

9

f

7

POT = 40 % CUT =1.5 H max. 10 m.

4 13 1210.0

140

.0

34

POT = 40 % CUT =1.5 H max. 10 m.

3.

POT = 40 % CUT =1.5 H max. 10 m.

136 0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

0

3.

0

.0

3.

POT = 40 % CUT =1.5 H max. 10 m.

141

POT = 40 % CUT =1.5 H max. 10 m.

0

40

143

ad

rb

T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR

D

II

Str

SI

Pp

AT

PU

SP

.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

10

5.0

5.

10

142

145

g

134

.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4c

144

s=6.460,56mp.

I-

5.0

L

147

.0

36

40

117

POT = 40 % CUT =1.5 H max. 10 m.

135

.0

40

ad

w

k 146

Str

POT = 40 % CUT =1.5 H max. 10 m.

.0

POT = 40 % CUT =1.5 H max. 10 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

132

POT = 40 % CUT =1.5 H max. 10 m.

14.0

2 18 4.5 10.0

30.5

POT = 75 % CUT =4 H max. 25 m.

POT = 40 % CUT =1.5 H max. 10 m.

.0

133

s=6.421,09mp.

POT = 40 % CUT =1.5 H max. 10 m.

a

EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT

149

POT = 40 % CUT =1.5 H max. 10 m.

L 131

POT = 40 % CUT =1.5 H max. 10 m.

148

POT = 40 % CUT =1.5 H max. 10 m.

0 5.

150

TEREN ADIACENT D.N.22 - - - - - - -

din care 30% spatiu verde

LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI

1.5 7.0

128 130

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

0

5. .0

5.

10

116

CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI

4.155,43mp. 11.619,33mp.

CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA

19 1.5

13

0

0

.0

PUD PREALABIL

LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)

POT = 75 % CUT =4 H max. 45 m.

5.

y

.7

29

115

5 6 7

6

7

151

8 910

Dr. 1264

a ad

a

KV

ad

POT = 40 % CUT =1.5 H max. 10 m.

129

POT = 40 % CUT =1.5 H max. 10 m.

I

s=1.409,80mp. 0

4 32

114

SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m

LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )

s=22.937,00mp.

0

1 12 11

113

C-

SPATII VERZI, PARCURI, ALEI PIETONALE

LIMITA ZONA EDIFICABILA Fig.C29

4

IS

5.

5.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Str

0

Str

11

3.0

0

3.

.0

40

110 112

127

13.5

.

2.0 2.0

153 15.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

z

.0

10

L

111 s=6.248,94mp. .0

10

126

152

POT = 40 % CUT =1.5 H max. 10 m.

e

109

POT = 40 % CUT =1.5 H max. 10 m.

6

POT = 40 % CUT =1.5 H max. 10 m.

PUD PREALABIL

I - Pprb

70.606,37mp. 1.409,80mp. din care 30% spatiu verde

LIMITA SUPRAFATA ZONA STUDIATA

Fig.A40

5

x2

UNITATI DE INVATAMANT

.0

3.0

.A 0

GC 5.

s=395,23mp.

5

125

POT = 40 % CUT =1.5 H max. 10 m.

.0

POT = 40 % CUT =1.5 H max. 10 m.

4

18 17

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

124

15

87.21

87.25

106

104

1 2 3

7.0 1.5

a6

10

L.E 87.20 87.20

POT = 40 % CUT =1.5 H max. 10 m.

102

4 5 6

16 15 14

154

POT = 40 % CUT =1.5 H max. 10 m.

SPATII VERZI ,PARCURI

ZONIFICARE

POT = 40 % CUT =1.5 H max. 10 m.

CRESA , GRADINITA PUD PREALABIL

P -

H max. 10 m.

LIMITA PERIMETRU INTRAVILAN EXISTENT

R=14.0

6

30.5

17

5

H max. 10 m.

UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL

POT = 40 % CUT =1,5

ZONA INTRAVILAN EXISTENT

Fig.C29

5

5.484,60mp. din care 10% spatiu verde

LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5

LIMITE

11.0

7

37.364,00mp. din care 10% spatiu verde

LEGENDA: Fig.C29

S+D+P+2 -> 11-15 ET

PUD PREALABIL

16 15

FIL TIP 655 RIU PRO GIRATO .G.- KM 178+ SENS P.U conf. propus

75 75 75

R12.00

4.50

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

5.0

0

9 8

Strad

POT = 40 % CUT =1.5 H max. 10 m.

155

P

s=1806,59mp.

E

5.5 5.5

6

11

SPATII VERZI ,PARCURI, SCUARURI

4

NR.1

LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET

S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.

LI -

X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134

117.5

10.0

1.5

5.

7

10.0

19 20 721

1

2 3 4

13.0

1.5

.5

99

POT = 40 % CUT =1.5 H max. 10 m.

.0

R12

2.0

R1

4

2

aB

9 1011

20 19 18

2

R16.00

.0

23

119.2

41.7

14

3

S+D+P+2 -> 11-15 ET

41.7

1

2

4.50

25

24

5.0

35

POT = 40 % CUT =1.5 H max. 10 m.

100

POT = 40 % CUT =1.5 H max. 10 m.

12 3

10.0

j

L

4b Strada

97

s=2.352,60mp. .0

x1

15

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

Strad

1.5

3.0

3 11

2.5

1.5

Strad

1 2 3

4 1

27

IS

13.0

10.0

108

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

17

107

105

7

7.0

POT = 75 % CUT =4 H max. 45 m.

aB

7

De. 1262 1 18

98.7

8

42.0

a 2a

101

10.0

40.5

161

10

0

5.

103

CUT =1.5 H max. 10 m.

56

10 9

25.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 %

P

2

9

6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

D

1

s=14.427,00mp.

14 12 13

8

0

s=2.348,81.

Strad

1

15

11

32 33

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

0

5

10.0

POT = 40 % CUT =1.5 H max. 10 m.

a

e

12.0

PUD PREALABIL

15.0

7 22.9

6 11

54

40.0

a 20

POT = 40 % CUT =1.5 H max. 10 m.

52

POT = 40 % CUT =1.5 H max. 10 m.

24.0

2 1211 3 10 10.0

3.0

15.0

ad Str

21

L56

aB

Strad 98

POT = 40 % CUT =1.5 H max. 10 m.

96.0

POT = 40 % CUT =1.5 H max. 10 m.

6

21.8 22.0

8

55

s=3.858,02mp.

58

60

15.0

7

5

d

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4

5.

9 10

31

SPATII VERZI ,PARCURI, SCUARURI

141312 11 POT = 40 % CUT =1.5 H max. 10 m.

une 3 Secti

96

94

57

40.3

POT = 40 % CUT =1.5 H max. 10 m.

91

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10 9

8

51

53

42.3

16

10.0

POT = 40 % CUT =1.5 H max. 10 m.

44.3

POT = 40 % CUT =1.5 H max. 10 m.

ne

un

5.

6

8

2 10

.0

7 8

15

A 3

4

13

12

13

3

iu

cti

17 16

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

13

a5 POT = 40 % CUT =1.5 H max. 10 m.

1

59

9 8

11

POT = 40 % CUT =1.5 H max. 10 m.

14

ct

5

Se

POT = 40 % CUT =1.5 H max. 10 m.

4

17

18

POT = 40 % CUT =1.5 H max. 10 m.

11 12

16 15

Strad

10.0

POT = 40 % CUT =1.5 H max. 10 m.

121 13

91 101

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

2 3

1211 10

95

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

14

7

POT = 40 % CUT =1.5 H max. 10 m.

93

3

56.2

7

POT = 40 % CUT =1.5 H max. 10 m.

2

12 11

21

POT = 40 % CUT =1.5 H max. 10 m.

19

a2

6

16 15

90.8

POT = 40 % CUT =1.5 H max. 10 m.

20

3.0

17

92

L

s=8.447,07mp.

POT = 40 % CUT =1.5 H max. 10 m.

se

.0

7

POT = 40 % CUT =1.5 H max. 10 m.

9

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

18

1

POT = 40 % CUT =1.5 H max. 10 m.

42

a

s=6.573,10mp.

POT = 40 % CUT =1.5 H max. 10 m.

13

.0

L

10

12 10

6

8

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

25

13

40.4

18

.0

S 7 11 tr 30 a 19 7da

POT = 40 % CUT =1.5 H max. 10 m.

.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

a1 Strad

5

19

89

POT = 40 % CUT =1.5 H max. 10 m.

41

23

10.0

49

5 6

4a

POT = 40 % CUT =1.5 H max. 10 m.

5

12

62

4

20

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

41.5

50

40.4

L

s=9.613,59mp.

22

47

POT = 40 % CUT =1.5 H max. 10 m.

4

9

8

Strada

i

61

10.0

87

90

48

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

28

27

POT = 40 % CUT =1.5 H max. 10 m.

Strad

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

63

40.0 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3

40.0

POT = 40 % CUT =1.5 H max. 10 m.

4

POT = 40 % CUT =1.5 H max. 10 m.

64

10.0

17

45 De. 427

4

88

H I

65

POT = 40 % CUT =1.5 H max. 10 m.

85

86

81.93

66

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

7.0

24

10

POT = 40 % CUT =1.5 H max. 10 m.

5

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

b

POT = 40 % CUT =1.5 H max. 10 m.

8

9

10.0

42.0

46

POT = 40 % CUT =1.5 H max. 10 m.

une

Secti

POT = 40 % CUT =1.5 H max. 10 m.

Strada

POT = 40 % CUT =1.5 H max. 10 m.

191.5

81.90

83

84

POT = 40 % CUT =1.5 H max. 10 m.

22

e

44

POT = 40 % CUT =1.5 H max. 10 m.

5

81.99

81.84

82

7

156

sectiun

L

67 68s=5.602,14mp.

20

19 18

Strada

157

Strada

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

23

81

69

h

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

.0

26

42

POT = 40 % CUT =1.5 H max. 10 m.

42

4

.0

30

10

POT = 40 % CUT =1.5 H max. 10 m.

43

POT = 40 % CUT =1.5 H max. 10 m.

141.3

79

POT = 40 % CUT =1.5 H max. 10 m.

Strada

158

38

POT = 40 % CUT =1.5 H max. 10 m.

L

s=7.894,21mp.

c

10.0

POT = 40 % CUT =1.5 H max. 10 m.

141.1

POT = 40 % CUT =1.5 H max. 10 m.

76.7

l

71

70

POT = 40 % CUT =1.5 H max. 10 m.

80

POT = 40 % CUT =1.5 H max. 10 m.

s=2.980,45mp.

39 41

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

40.0

10.0

40

POT = 40 % CUT =1.5 H max. 10 m.

72

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

40.0

10.0

159

L

73

74

POT = 40 % CUT =1.5 H max. 10 m.

77

78

POT = 40 % CUT =1.5 H max. 10 m.

2

POT = 40 % CUT =1.5 H max. 10 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

29

9

IS -ZONA

LIS -

PERIMETRU INTRAVILAN PROPUS

COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.

0

13.8

38.7

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

2 3

22 21

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3

16

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

6 7

. 40

POT = 40 % CUT =1.5 H max. 10 m.

17

11.

a A1

ad Str 23 75

76

2 3

4

160

32

4 5

22 21

18

29

De

.00

6 5

POT = 40 % CUT =1.5 H max. 10 m.

31

23

36

37

35

33

28

14 13 12 .0 15

10

R12

7.0

A

GC

s=520,83mp. 2

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

93.9 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

34

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

De. 414 1 2 3

12 11 10

79.3

2

3

24

6

Fig.B1

P.T.E.

s=85,30mp.

10.0

19

IS -

X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066

A B C D E F G H I

CONSTANTA

Str25ad

26

10.0 7.0

124 Strada 1

10.0 7.0

aA 1

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

C

5

27

26

25

Strada de legatura - propusa prin P.U.Z.-

4

3

2

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

5.0

L

7.0

e

183.000,00mp. din care suprafete

TOTAL TEREN CE A GENERAT P.U.Z.

1

1.5 3.0

22 21 20

A

BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp

B

da

12.0

3.0

Str a

3.0 1.5

5.4%

IS X1

5.0

1.5

Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1

limita amplasare constructii

15.0

limita aliniament

limita aliniament

limita amplasare constructii

3.0

12.0

H max.10.0m

29

d

L

Sectiune 3

30

H max.10.0m

5.0 1.5

a

limita amplasare constructii

IS x2

limita aliniament

7

limita aliniament

limita aliniament

7.0

1.5

Fig.C

limita aliniament

12.0

m

limita amplasare constructii

15.0

1.5

150

7.0

P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008

X IAL

7.0

IS x1

TEREN CARE A GENERAT P.U.Z.

P+2

Sectiune 2

COMPLE COMERC

P+2

Proiectant general:

Beneficiar:

s.c. PROMARH s.r.l. Nume:

Semnatura:

Proiect nr:

MATROZ CONSTANTIN si FLOREA ION

TULCEA

str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea

J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180

Specificatie:

Sef Proiect arh. Marcel PAVEL

Scara:

1 / 1.000

Proiectat

arh. Marcel PAVEL

Data:

Desenat

arh. Paul Cristian MURAVELI

Noiembrie 2017

Denumire proiect:

LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.

Denumire plansa:

REGLEMENTARI URBANISTICE

87/2017 Faza:

P.U.Z. Nr. plansa:

U4


home

relax

invest

shop



HOUSES Areas Between: 357 - 760 sqm Aprox. Buildable Area: 140- 300 sqm


EDUCATION At the very center of the development, there is a designated plot for educational use as part of the planning for the MGM2 neighborhood. This plot is most suitable for a nursery or primary school due to the average age of the residents that are expected to purchase the individual plots as well as the apartments. CENTRAL SQUARE

PLAN URBANISTIC ZONAL LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si

CONSTRUIRE COMPLEX COMERCIAL SI from ANSAMBLU REZIDENTIAL The size of the plot is 1 409 sqm and it is accessible 2 streets (West & East) while being buffered by a recreational green space at the northern boundary. The green space adjacent to the educational plot can be easily incorporated to support educational purposes. H max.45.00

+10.00

H max.25.00

+10.00

SECTIUNE STRAZI SI LOTURI

+3.00

H max.10.0m

Sectiune 4

P+2

limita aliniament

Sectiune strada 2

13.0

3.0

H max.10.0m

5.4%

3.00

-2.80

21.0

1.50

demisol 21.0

1.50

-2.80

7.00

1.50

H max.10.0m

Sectiune 5

IS x2 H max.45.00

Sectiune strazi 2-7

3.0

limita amplasare constructii

5.0

+3.00

±0.00 =+0.60

LIS y

5.0

1.5

limita aliniament

5.0

1.5

H max.45.00

limita amplasare constructii

10.0

5.0 1.5

10.0

limita aliniament

limita aliniament

limita aliniament

13.0

5.0 LIS Y

5.0 1.5

f

limita amplasare constructii

87.2

limita amplasare constructii

L

7.00

etaj

parter

demisol

5.4%

5.0

5.4%

Sectiune 1

1.50

limita amplasare constructii

limita aliniament

limita amplasare constructii

H max.25.00

±0.00 =+0.60

+6.00

mansarda

+6.00

3.00

5.4%

3.0

10.0

5.4%

The plot needs a PUD (Detail Urban Plan) but the maximum building area permitted is 40% of the site area and the maximum height of the buildings must not exceed 10m. 5.4%

h

L

c

L

1.5 3.0

7.0

3.0 1.5

Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)

MAIN BOULEVARD

H max.45.00

LEGENDA: DN 22

STR . BARAJULUI

DRUM COLECTOR ( AFERENT STR. BARAJULUI) DRUM PROPUS CONF. P.U.G. DRUM PROPUS IN . P.U.Z.

limita amplasare constructii

H max.10.0m

Sectiune 6

limita amplasare constructii

Sectiune strada 1

15.0

3.0

5.0

5.4%

L

sibi l po u se

4.5

1 Tulcea 22

11.0

6.0

R1

7.0

R1

R12.0

Fig.D6

1.5 7.0

De. 1273 10.0

1.5

2a

4

10.0

5.0

14 13

7 89

- SPATII VERZI, SCUARURI PUD PREALABIL

a C16

Strad

INDICATIV PARCELA DIN ZONA

PIETONAL PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE PROPUNERE TRASEU STRAZI CONF. P.U.G.

F

ZONA D.N. 22 EXISTENT

10 11

ZONA EXTINDERE CAROSABIL D.N. 22

12

aC

PROPUNERE DE MOBILARE URBANA

Strad

5.0

COLECTIVE HOUSING

Dr. 1266

3

5.0

10.0

10.0

19 +45.00

78.39 78.40 78.10

78.06

G

83 m

85 m

87 m

+35.00

90 m

93 m +10.00

95 m +10.00

+20.00

102 m

106 m DN 22

+10.00

+10.00

83 m

panta teren 5.4%

SECTIUNE TRANSVERSALA

INDIVIDUAL HOUSING

CIRCULATII CAROSABIL 17 6

9

10.0

12 11

P

1

5.0

13.0

5.0

10

une

5.0

7.0

10.0

123

I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL

a - -- k 8

15

41.0

POT = 40 % CUT =1.5 H max. 10 m.

ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE

7

16

Secti

5.0

une

14.0

4.5

tor colec

a

ad

6

13

secti

ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.

7.0

7.0 46.5

drum

2b

4.5

2 a ad

Str

Tra

ctor

POT = 40 % CUT =1,5 H max.=10m.

42.0

5.0

GC

s=375,56mp.

KINDERGARDEN/ NURSARY

ZONA EDIFICABILA

50.0

1a

a

cole

LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA

6

14 POT = 40 % CUT =1.5 H max. 10 m.

121

40.0

1.376,92mp.

TEHNICO EDILITARE

ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)

a

122

POT = 40 % CUT =1.5 H max. 10 m.

9 10 11

LIS

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL

Str

7

14 13 12

ad Str

Str

0.0

drum

R1

0

ad

3 a ad

0

Str

11.

13.0

une 2 Secti

5.

a

ad

139

7.0 1.5

0 5.

8 15

POT = 40 % CUT =1.5 H max. 10 m.

De. 1266

L

G.C.,P.T.E. - ZONA AMPLASARE SERVICII

50.983,55mp.

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

s=5.484,60mp.

0

3.

118

POT = 40 % CUT =1.5 H max. 10 m.

s=4.154,60mp. POT = 40 % CUT =1.5 H max. 10 m.

TOTAL

ZONA P EXTINDERE INTRAVILAN

30.5

POT = 75 % CUT =4 H max. 25 m.

120

10.0 40.0

POT = 40 % CUT =1.5 H max. 10 m.

aC

16

POT = 40 % CUT =1.5 H max. 10 m.

138 6 7 8

f

din care 30% spatiu verde

44.533,80mp. +2.210,27

DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp

LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI

14.0

2 18 4.5 10.0

1.5 7.0

5

11 10

Strad

9 10 5

13.5

6

4c

p.

p.)

3m

0m

,3

,0

63

19

.7

.6

=4

(s

11 s=

8 4 11

9

.0

34

119

137

37

POT = 40 % CUT =1.5 H max. 10 m.

4 13 1210.0

140

5.

POT = 40 % CUT =1.5 H max. 10 m.

7

136 0

3.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

0

3.

0

3.

POT = 40 % CUT =1.5 H max. 10 m.

.0

134

10

POT = 40 % CUT =1.5 H max. 10 m.

141

POT = 40 % CUT =1.5 H max. 10 m.

7.0 1.5

a ad

ad

rb

T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR

D

II

Str

SI

Pp

AT

PU

SP

40

143

40

117

POT = 40 % CUT =1.5 H max. 10 m.

135

.0

142

.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

10

5.0

g

40 POT = 40 % CUT =1.5 H max. 10 m.

.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

145

0

Str 144

s=6.460,56mp.

I-

5.0

L

147

.0

36

POT = 40 % CUT =1.5 H max. 10 m.

0

.0

10

116

.0

POT = 40 % CUT =1.5 H max. 10 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

132

POT = 40 % CUT =1.5 H max. 10 m.

.0

133

s=6.421,09mp.

k 146

a

EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT

w

POT = 40 % CUT =1.5 H max. 10 m.

L 131

POT = 40 % CUT =1.5 H max. 10 m.

148

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

5.

150

149

Str

128 130

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

4 32

114

1.5

POT = 75 % CUT =4 H max. 45 m.

0

5. .0

POT = 40 % CUT =1.5 H max. 10 m.

115

5 6 7

TEREN ADIACENT D.N.22 - - - - - - -

4.155,43mp.

LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)

13

0

5.

y

.7

.0

7

151

8 910

Dr. 1264

PUD PREALABIL

CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI

1.409,80mp. din care 30% spatiu verde

11.619,33mp.

LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )

s=22.937,00mp.

0

s=1.409,80mp.

29

10

a

KV

ad

POT = 40 % CUT =1.5 H max. 10 m.

112

129

POT = 40 % CUT =1.5 H max. 10 m.

SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m

ZONIFICARE

5.

I

SPATII VERZI, PARCURI, ALEI PIETONALE

CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA

19

IS

CRESA , GRADINITA PUD PREALABIL

0

PUD PREALABIL

I - Pprb C-

H max. 10 m.

SPATII VERZI ,PARCURI

LIMITA ZONA EDIFICABILA Fig.C29

4

x2

1 12 11

113

UNITATI DE INVATAMANT CRESA , GRADINITA PUD PREALABIL

POT = 40 % CUT =1,5

LIMITA SUPRAFATA ZONA STUDIATA

Fig.A40

5

30.5

POT = 40 % CUT =1.5 H max. 10 m.

5.

POT = 40 % CUT =1.5 H max. 10 m.

H max. 10 m.

POT = 40 % CUT =1,5

I P -

LIMITA PERIMETRU INTRAVILAN EXISTENT

R=14.0

6

S+D+P+2 -> 11-15 ET

UNITATI DE INVATAMANT

.5

0

Str

11

3.0

z

.0

0

3.

.0

40

POT = 40 % CUT =1.5 H max. 10 m.

CENTRAL SQUARE (PLAYGROUND)

70.606,37mp.

ZONA INTRAVILAN EXISTENT

Fig.C29

5

5.484,60mp. din care 10% spatiu verde

LOTURI AMPLASARE CONSTRUCTII S+P+1+M

LIMITE

11.0

7

37.364,00mp. din care 10% spatiu verde

LEGENDA: Fig.C29

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

5.0

17

5

POT = 40 % CUT =1.5 H max. 10 m.

4.50

11

PUD PREALABIL

35

.

2.0 2.0

153 15.0

a 2a

.A 0

GC 5.

s=395,23mp.

P

75 75 75

R12.00

117.5

10.0

s=1806,59mp.

4

110

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

1

2 3 4

13.0

1.5

10

L

POT = 40 % CUT =1.5 H max. 10 m.

127

126

POT = 40 % CUT =1.5 H max. 10 m.

aB

SPATII VERZI ,PARCURI, SCUARURI

16 15

e

20 19 18

E

5.5 5.5

6

2

119.2

1.5

111 s=6.248,94mp. .0

10

POT = 40 % CUT =1.5 H max. 10 m.

3.0

152

.0

15 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

109

POT = 40 % CUT =1.5 H max. 10 m.

6

23

S+D+P+2 -> 11-15 ET

41.7

Strad

124

POT = 40 % CUT =1.5 H max. 10 m.

154

POT = 40 % CUT =1.5 H max. 10 m.

87.21

87.25

5

125

4

24

5.0

41.7

R12

2.0

25

NR.1 FIL TIP 655 RIU PRO GIRATO .G.- KM 178+ SENS P.U conf. propus

2

R16.00

3

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

Strad

1.5

3.0

.0

7.0

Strad

1 2 3

14

2

IS

9 1011

1

R1

2.5

4.50

POT = 75 % CUT =4 H max. 45 m.

13.0

10.0

15

.0

1

27 1.5

x1

6

aB

7 15.0

10.0

L.E 87.20 87.20

4

18 17

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

17

108

106

104

1 2 3

7

42.0

De. 1262 1 18

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

102

a6

56

10 9

107

105

4 5 6

16 15 14

155

721

9 8

Strad

56.2

7

8

8

3 11

s=14.427,00mp.

14 12 13

25.0

98.7

10.0

99

19 20

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

101

10.0

POT = 40 % CUT =1.5 H max. 10 m.

100

POT = 40 % CUT =1.5 H max. 10 m.

12 3

103

15

P

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 %

CUT =1.5 H max. 10 m.

4b Strada

L

40.5

97

s=2.352,60mp. .0

10

54

40.0

7 161

POT = 40 % CUT =1.5 H max. 10 m.

j

POT = 40 % CUT =1.5 H max. 10 m.

22.9

0

5.

52

POT = 40 % CUT =1.5 H max. 10 m.

24.0

1

3.0

a

98

22.0

8

6 11

L56

POT = 40 % CUT =1.5 H max. 10 m.

aB

2 1211 3 10 10.0 21.8

91 101

20

96.0

s=3.858,02mp.

58

6

Strad

121 13

d

POT = 40 % CUT =1.5 H max. 10 m.

60

e

4

LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET

S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.

L-

PERIMETRU INTRAVILAN PROPUS

X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134

IS -ZONA

LIS -

COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

D

1 2

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

s=2.348,81.

PUD PREALABIL

a2

7

5

un

10.0

POT = 40 % CUT =1.5 H max. 10 m.

a

0

5

11

32 33 9

12.0

3.0

96

94

57

POT = 40 % CUT =1.5 H max. 10 m.

4

15.0

POT = 40 % CUT =1.5 H max. 10 m.

91

9 8

55

une 3 Secti

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

95

93

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

6

9 10

31

SPATII VERZI ,PARCURI, SCUARURI

141312 11

POT = 40 % CUT =1.5 H max. 10 m.

1

59

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

15.0

ad Str

21

2 3

1211 10

16 15

90.8

7

10 9

8

51

53

POT = 40 % CUT =1.5 H max. 10 m.

42.3

16

10.0

POT = 40 % CUT =1.5 H max. 10 m.

44.3

13

a5

0

7 8

15

2 10

.0

5.

17 16

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

17

18

POT = 40 % CUT =1.5 H max. 10 m.

11 12

16 15

Strad

4a

POT = 40 % CUT =1.5 H max. 10 m.

5

12

17

92

14

11

POT = 40 % CUT =1.5 H max. 10 m.

14

ne

cti

POT = 40 % CUT =1.5 H max. 10 m.

4

3

13

12 8

5.

a1 Strad

18

89

POT = 40 % CUT =1.5 H max. 10 m.

s=9.613,59mp.

POT = 40 % CUT =1.5 H max. 10 m.

Se

9

POT = 40 % CUT =1.5 H max. 10 m.

2 3

iu

5

7

POT = 40 % CUT =1.5 H max. 10 m.

13

.0

13 12 11

21

POT = 40 % CUT =1.5 H max. 10 m.

19

ct

POT = 40 % CUT =1.5 H max. 10 m.

s=6.573,10mp.

POT = 40 % CUT =1.5 H max. 10 m.

10

23

POT = 40 % CUT =1.5 H max. 10 m.

20

10.0

49

5 6

40.3

L

7

POT = 40 % CUT =1.5 H max. 10 m.

L

s=8.447,07mp.

40.4

i

6

41.5

50

40.4

90

5

19

POT = 40 % CUT =1.5 H max. 10 m.

47

POT = 40 % CUT =1.5 H max. 10 m.

4

9

8

Strada

POT = 40 % CUT =1.5 H max. 10 m.

4

62

4

20

61

10.0

87

48

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

22

POT = 40 % CUT =1.5 H max. 10 m.

a

L

10

12

se

.0

A

13

3

POT = 40 % CUT =1.5 H max. 10 m.

42

19 18

4

POT = 40 % CUT =1.5 H max. 10 m.

6

Str 307 a7d a

11

1

POT = 40 % CUT =1.5 H max. 10 m.

8

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

25

Strad

POT = 40 % CUT =1.5 H max. 10 m.

63

40.0 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3

40.0

POT = 40 % CUT =1.5 H max. 10 m.

I

POT = 40 % CUT =1.5 H max. 10 m.

64

10.0

10

De. 427

4

H

65

POT = 40 % CUT =1.5 H max. 10 m.

85

88

81.93

66

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

86

10.0

17

Strada

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Strada

83

84

POT = 40 % CUT =1.5 H max. 10 m.

7.0

.0

POT = 40 % CUT =1.5 H max. 10 m.

5

POT = 40 % CUT =1.5 H max. 10 m.

41

b

24

9

18

45

POT = 40 % CUT =1.5 H max. 10 m.

une

Secti

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8

19

POT = 40 % CUT =1.5 H max. 10 m.

42.0

46

POT = 40 % CUT =1.5 H max. 10 m.

20

43

44

69

L

67 68s=5.602,14mp.

191.5

81.90

82

22

e

sectiun

c

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

h

POT = 40 % CUT =1.5 H max. 10 m.

81

141.3

79

POT = 40 % CUT =1.5 H max. 10 m.

5

156

7

81.99

Strada

157

23 81.84

70

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Strada

158

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

80

POT = 40 % CUT =1.5 H max. 10 m.

76.7

l

42

28

27

26

s=7.894,21mp.

10.0

9

POT = 40 % CUT =1.5 H max. 10 m.

.0

0

POT = 40 % CUT =1.5 H max. 10 m.

40.0

10.0

159

71

.0

30

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

. 40

42

4

6.

78

POT = 40 % CUT =1.5 H max. 10 m.

160

L

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

40.0

141.1

38.7

s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.

L

41

72

POT = 40 % CUT =1.5 H max. 10 m.

77

.0

2

POT = 40 % CUT =1.5 H max. 10 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

29

7 10

29

De

POT = 40 % CUT =1.5 H max. 10 m.

16

R1

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

3

POT = 40 % CUT =1.5 H max. 10 m.

6

21

38

POT = 40 % CUT =1.5 H max. 10 m.

28

14 13 12 .0 15

10

18 17

POT = 40 % CUT =1.5 H max. 10 m.

.00

13.8

2

75

76

2 3

4

5

22

36

37

39

40

POT = 40 % CUT =1.5 H max. 10 m.

6

Fig.B1

P.T.E.

s=85,30mp.

10.0

19

35

33

32

4

R12

6 5

93.9 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

73

74

POT = 40 % CUT =1.5 H max. 10 m.

31

POT = 40 % CUT =1.5 H max. 10 m.

34

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

23

POT = 40 % CUT =1.5 H max. 10 m.

79.3

2

3

24

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

IS -

X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066

A B C D E F G H I

CONSTANTA

7.0

A

GC

s=520,83mp.

2 3

22 21

1 2 3

12 11 10

a A1

ad Str 23

10.0 7.0

124 Strada 1

10.0 7.0

Str25ad

26

De. 414

C

5

27

26

25

22 21 20

aA 1

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

Strada de legatura - propusa prin P.U.Z.-

4

3

5.0

L

7.0

e

183.000,00mp. din care suprafete

TOTAL TEREN CE A GENERAT P.U.Z.

1

1.5 3.0

2

A

BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp

B

da

12.0

3.0

Str a

3.0 1.5

5.4%

IS X1

5.0

1.5

Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1

limita amplasare constructii

15.0

limita aliniament

limita aliniament

limita amplasare constructii

3.0

12.0

H max.10.0m

29

d

L

Sectiune 3

30

H max.10.0m

5.0 1.5

a

limita amplasare constructii

IS x2

limita aliniament

7

limita aliniament

limita aliniament

7.0

1.5

Fig.C

limita aliniament

12.0

m

limita amplasare constructii

15.0

1.5

150

7.0

P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008

X IAL

7.0

IS x1

TEREN CARE A GENERAT P.U.Z.

P+2

Sectiune 2

COMPLE COMERC

P+2

Proiectant general:

Beneficiar:

s.c. PROMARH s.r.l. Nume:

Semnatura:

Proiect nr:

MATROZ CONSTANTIN si FLOREA ION

TULCEA

str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea

J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180

Specificatie:

Sef Proiect arh. Marcel PAVEL

Scara:

1 / 1.000

Proiectat

arh. Marcel PAVEL

Data:

Desenat

arh. Paul Cristian MURAVELI

Noiembrie 2017

Denumire proiect:

LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.

Denumire plansa:

REGLEMENTARI URBANISTICE

87/2017 Faza:

P.U.Z. Nr. plansa:

U4


CREATE

LEARN

PLAY



PRIMARY SCHOOL Aprox. Buildable Area: 1500 sqm

PLAYGROUND PARK Aprox Area: 1200 sqm


SPORTS & RECREATION CENTER On the South Western side of the development, there is a major powerline cable zone that requires a protection area of 18m on each side of its axis. This results in an approximately 6 000 sqm of green buffer space. Adjacent to this buffer area, there is availability for additional green space comLOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si prising of 11 963 sqmPLAN thatURBANISTIC can be ZONAL used forCOMERCIAL educational / hospice / sports and CONSTRUIRE COMPLEX SI ANSAMBLU REZIDENTIAL leisure activities. Private tennis courts or mixed-use sports fields would be a valuable addition to the MGM2 neighborhood considering the anticipated number of residents on a medium to long term. Buildings are permitted in this area but cannot occupy more than 40% of the total leisure area and can not be more than 12m high. H max.45.00

+10.00

H max.25.00

+10.00

SECTIUNE STRAZI SI LOTURI

etaj

+3.00

H max.10.0m

P+2

limita aliniament

13.0

3.0

H max.10.0m

demisol

+3.00

5.4%

3.00

±0.00 =+0.60

-2.80

21.0

1.50

demisol 21.0

1.50

-2.80

7.00

1.50

H max.10.0m

Sectiune 5

IS x2

H max.45.00

5.4%

h

L

Sectiune strazi 2-7

3.0

3.0

10.0

5.4%

c

L

1.5 3.0

7.0

3.0 1.5

limita amplasare constructii

5.0

±0.00 =+0.60

LIS y

5.0

1.5

limita aliniament

1.5

limita amplasare constructii

10.0

5.0 1.5

H max.45.00

limita aliniament

limita aliniament

limita aliniament

5.0

5.0

LIS Y

10.0

7.00

parter

5.4%

5.0

5.0 1.5

f

limita amplasare constructii

87.2

limita amplasare constructii

L

13.0

1.50

limita amplasare constructii

Sectiune strada 2

5.4%

Sectiune 1

3.00

5.4%

Sectiune 4

limita aliniament

limita amplasare constructii

H max.25.00

+6.00

mansarda

+6.00

Cladirile amplasate deoparte si de alta a strazii au aceeasi cota ±0.00 ( 0.60m fata de strada)

H max.45.00

LEGENDA: DN 22 STR . BARAJULUI DRUM COLECTOR ( AFERENT STR. BARAJULUI) DRUM PROPUS CONF. P.U.G. DRUM PROPUS IN . P.U.Z.

limita amplasare constructii

H max.10.0m

Sectiune 6 15.0

5.0

sibi l po u se

4.5

1 Tulcea 22

11.0

6.0

R1

ZONA EDIFICABILA

ZONA DE PROTECTIE L.E.A. CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. DUPA TRANSFORMAREA LINIEI L.E.A. IN L.E.S. SAU CONSOLIDARE L.E.A. ZONA I - CONSTRUCTII PENTRU INVATAMANT ( cresa , gradinita) ZONA L - LOTURI AMPLASARE CONSTRUCTII S+P+1 (M)

De. 1273

POT = 40 % CUT =1,5 H max.=10m.

42.0 50.0 10.0

1.5

10.0

5.0

6

13.0

14 13

7 89

9

10.0

5.0

INDICATIV PARCELA DIN ZONA

PIETONAL

17

7.0

12 11

- SPATII VERZI, SCUARURI PUD PREALABIL

CIRCULATII CAROSABIL

1 5.0

10

une

5.0

5.0

123

P

a - -- k 8

15

41.0

10.0 POT = 40 % CUT =1.5 H max. 10 m.

ZONA IS - LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m GC - ZONA AMPLASARE SERVICII TEHNICO EDILITARE POMPE APE MENAJARE, SALUBRITATE , PTE I - Pprb SPATII VERZI, PARCURI, ALEI PIETONALE SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT PUD PREALABIL

tor

4

121

14.0

4.5

colec

2a

une

secti

ZONA LIS - ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI PUD PREALABIL D+P+4-6 S+P+1->2 POT =75 % CUT =4 H max.=25m.

7.0

7.0 46.5

drum

a

Fig.D6

1.5 7.0

R12.0

2 a ad

Str

4.5

7.0

R1

2b

3 da

Tra

or

ad

ct cole

Str

drum

0.0 R1

13.0

une 2 Secti

7.0 1.5

LINIE ELECTRICA AERIANA 110 KV SI 20KV L.E.A. EXISTENTA

7

16

Secti

a Strad

C16

PROPUNERE EXTINDEREA STRAZILOR IN ETAPELE ULTERIOARE PROPUNERE TRASEU STRAZI CONF. P.U.G.

F

ZONA D.N. 22 EXISTENT

10 11

ZONA EXTINDERE CAROSABIL D.N. 22

12

aC

PROPUNERE DE MOBILARE URBANA

Strad

Dr. 1266

5.0

3

5.0

5.0

GC

10.0

10.0

s=375,56mp.

19 +45.00

78.39 78.40 78.10

78.06

G

83 m

85 m

87 m

+35.00

90 m

93 m +10.00

95 m +10.00

+20.00

102 m

106 m DN 22

+10.00

+10.00

83 m

panta teren 5.4%

SECTIUNE TRANSVERSALA

S

Str a

0 11.

0

a

ad

De. 1266

13

POT = 40 % CUT =1.5 H max. 10 m.

40.0

1.376,92mp.

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII

1a

C

122

POT = 40 % CUT =1.5 H max. 10 m.

9 10 11

6

14

s=4.154,60mp. POT = 40 % CUT =1.5 H max. 10 m.

50.983,55mp.

TEHNICO EDILITARE

ZONA P EXTINDERE INTRAVILAN

a

10.0

14 13 12

2 18 4.5 10.0

6

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET S+P+1 -> 4 ET - 6 ET H max. 25 m. PUD PREALABIL

Str

a Strad

8 15

POT = 40 % CUT =1.5 H max. 10 m.

139

L

LIS

s=5.484,60mp.

0

3.

118

POT = 40 % CUT =1.5 H max. 10 m.

120

7

40.0

POT = 40 % CUT =1.5 H max. 10 m.

6 7 8

16

POT = 40 % CUT =1.5 H max. 10 m.

138

5

1.5

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII - parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

ad Str

4 11

9

9 10 5

0

7

p.

p.)

3m

0m

,3

,0

63

19

.7

.6

8

11 10

5.

a

11

=4 (s

s=

5.0

13 1210.0

140

137

37

POT = 40 % CUT =1.5 H max. 10 m.

4

POT = 40 % CUT =1.5 H max. 10 m.

f

119

0

3.

POT = 40 % CUT =1.5 H max. 10 m.

136 0

3.

POT = 40 % CUT =1.5 H max. 10 m.

141

POT = 40 % CUT =1.5 H max. 10 m.

0 5.

40

143

ad

rb

T I, SP AGRE CU UR RC E, SI % % PA BIL NT = 40 I 30 I, RZ SA MA T RZ RO TA PO II VE VE CA VA AT MI IN SP SE RU BIL NT LA PE EA PR

D

II

Str

SI

Pp

AT

PU

SP

I-

.0

POT = 40 % CUT =1.5 H max. 10 m.

.0

10

.0

34

POT = 40 % CUT =1.5 H max. 10 m.

TOTAL G.C.,P.T.E. - ZONA AMPLASARE SERVICII

LIMITA ZONA EDIFICABILA

14.0

1.5 7.0

6

10

142

145

POT = 40 % CUT =1.5 H max. 10 m.

0

3.

.0

134

.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

116

.0

40

117

din care 30% spatiu verde

44.533,80mp. +2.210,27

DRUM NATIONAL EXISTENT DN 22 - - - - +4.239,48mp

LIMITA TERENURI EXISTENTE ( Nr.cad.8003, nr.cad.8001, nd.cad.8004, nr. cad.7998)

30.5

POT = 75 % CUT =4 H max. 25 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

135

.0

4c

144

s=6.460,56mp.

13.5

a ad

a Str

L

147

g

40 POT = 40 % CUT =1.5 H max. 10 m.

da

EA TA AR EN M ORM LE SF A. G E. RE TRAN L. RE VA PA DA SE DU LI O RE U.D. NS CA P. CO A. IN U E. L. PR SA IE S. CT NA E. p.) TE BA L. O UR IN 8m PR RE E.A. ,4 LE TII m. NA UC DE LA L. 56 12 TO TR x. .8 NA OBI EI PIE NS ma =6 ZO M LINI EI II CO NT H (s CA ME =2 AL AT

5.0

POT = 40 % CUT =1.5 H max. 10 m.

115

POT = 40 % CUT =1.5 H max. 10 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

132

POT = 40 % CUT =1.5 H max. 10 m.

.0

114

4.155,43mp. 11.619,33mp.

LIMITA SUPRAFATA CARE A GENERAT PUZ ( 183,000 mp. intravilan propus )

POT = 75 % CUT =4 H max. 45 m.

0

5. .0

5.

POT = 40 % CUT =1.5 H max. 10 m.

.0

133

s=6.421,09mp.

k 146

0

7

POT = 40 % CUT =1.5 H max. 10 m.

.0

36

POT = 40 % CUT =1.5 H max. 10 m.

L 131

POT = 40 % CUT =1.5 H max. 10 m.

5 6 7

Str

a

KV

ad

149

w

Dr. 1264

128 130 148

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

8 910

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

150

129

PUD PREALABIL

CULOAR( ZONA ) DE PROTECTIE LINIE ELECTRICA AERIANA 110 KV L.E.A. EXISTENTA

19

13

0

5.

y

.7

29

0

.0

0

Str

11

151

112

127

0

5.

I

SI SEMICAROSABILE, SPATII CONSTRUCTII PENTRU INVATAMANT SI AGREMENT POT = 40% CUT =2 H max. 12 m

TEREN ADIACENT D.N.22 - - - - - - -

LIMITA AMPLASAMENT SI ALINIAMENT CLADIRI

Fig.C29

4

s=22.937,00mp.

s=1.409,80mp. 0

4 32

SPATII VERZI, PARCURI, ALEI PIETONALE

CAI DE CIRCULATII DRUMURI CAROSARBILE - - - - - - , ALEI PIETONALE SI SCUARURI

70.606,37mp. 1.409,80mp. din care 30% spatiu verde

LIMITA PERIMETRU INTRAVILAN EXISTENT

Fig.A40

5

IS

POT = 40 % CUT =1.5 H max. 10 m.

1 12 11

113

PUD PREALABIL

I - Pprb C-

H max. 10 m.

SPATII VERZI ,PARCURI

ZONIFICARE

UNITATI DE INVATAMANT

5.

POT = 40 % CUT =1.5 H max. 10 m.

10

.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

0

3.

.0

40

POT = 40 % CUT =1.5 H max. 10 m.

H max. 10 m.

UNITATI DE INVATAMANT

LIMITA SUPRAFATA ZONA STUDIATA

x2

CRESA , GRADINITA PUD PREALABIL

P -

CRESA , GRADINITA PUD PREALABIL

POT = 40 % CUT =1,5

ZONA INTRAVILAN EXISTENT

R=14.0

6

LOTURI AMPLASARE CONSTRUCTII S+P+1+M POT = 40 % CUT =1,5

LIMITE

11.0

7

37.364,00mp. din care 10% spatiu verde 5.484,60mp. din care 10% spatiu verde

LEGENDA: Fig.C29

30.5

17

z

.0

POT = 40 % CUT =1.5 H max. 10 m.

110

R12.00

4.50

6

S+D+P+2 -> 11-15 ET

PUD PREALABIL

10

L

POT = 40 % CUT =1.5 H max. 10 m.

4

Fig.C29

5

5

75 75 75

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

5.0

1.5

4

5.5 5.5

117.5

10.0

s=1806,59mp.

E

11

SPATII VERZI ,PARCURI, SCUARURI

111 s=6.248,94mp. .0

10

1

2 3 4

13.0

1.5

.5

.A 2.0 2.0

3.0

e

109

POT = 40 % CUT =1.5 H max. 10 m.

6

20 19 18

41.7

P

NR.1 FIL TIP 655 RIU PRO GIRATO .G.- KM 178+ SENS P.U conf. propus

2

R16.00

3

2

aB

41.7

16 15

POT = 40 % CUT =1.5 H max. 10 m.

126

152

.0

15 POT = 40 % CUT =1.5 H max. 10 m.

153 15.0

5

125

POT = 40 % CUT =1.5 H max. 10 m.

3.0

87.21

87.25

0

GC 5.

s=395,23mp.

4

18 17

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

124

154

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

25

23

119.2

35

1 2 3

108

106

104 10.0

L.E 87.20 87.20

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

102

a6

16 15 14

3.0

2.0

S+D+P+2 -> 11-15 ET

Strad

1 2 3

14

2

24

5.0

9 1011

1

R12

R1

2.5

4.50

IS -ZONA LOCUINTE, SERVICII, COMERT, TURISM, BIROURI

aB

7

15

.0

1

27

7.0

x1

Strad

10.0

3 11

.0

IS

13.0

1.5

107

POT = 40 % CUT =1.5 H max. 10 m.

4 5 6

Strad

POT = 40 % CUT =1.5 H max. 10 m.

155

721

9 8

4b

7

10.0

19 20

17

4

1.5

- parcarea autovehiculelor se va face la demsiol si la subsol cca. 1200 loc -

6

42.0

De. 1262 1 18

98.7

7

POT = 75 % CUT =4 H max. 45 m.

5.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

100

99

56

10 9

25.0

POT = 40 % CUT =1.5 H max. 10 m.

105

40.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

12 3

103

CUT =1.5 H max. 10 m.

8

8

s=14.427,00mp.

14 12 13

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 % CUT =1.5 H max. 10 m.

24.0 POT = 40 %

101

Strada

L

40.5

97

s=2.352,60mp. .0

54

e

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

LOCUINTE, SERVICII, COMERT, TURISM, BIROURI S+D+P+2 -> 11-15 ET POT = 75 % CUT =4 H max. 45 m.

-ZONA LOCUINTE COLECTIVE , SERVICII, COMERT, TURISM, BIROURI D+P+1 -> 2ET

S+P+1 -> 4 ET - 6 ET PUD PREALABIL POT = 75 % CUT =4 H max. 25 m.

LI -

X Y 797054.3040 413616.7819 797373.0409 413697.5535 797382.8287 413701.2943 797392.8906 413702.3052 797403.1821 413698.6938 797414.4020 413685.2368 797448.3191 413662.9321 797479.2977 413646.0075 797486.5584 413642.7674 797492.9963 413641.9191 797529.4710 413645.6510 797527.5490 413662.6510 797548.8239 413661.7530 797561.2675 413660.8403 797558.6400 413639.4275 797559.2230 413614.2920 797563.7537 413584.9756 797626.0595 413333.7674 797193.4404 413224.2131 797143.9118 413421.0113 797135.7286 413419.3960 797108.2029 413525.8864 797073.8079 413517.1134

IS -ZONA

LIS -

PERIMETRU INTRAVILAN PROPUS

COORDONATE STEREO 70 TEREN CE A GENERAT PUZ S = 183.000,00mp.

D

1 2

9

s=2.348,81.

a 2a Strad

1

3.0

7 161

10

52

POT = 40 % CUT =1.5 H max. 10 m.

24.0

2 1211 3 10 10.0

j

POT = 40 % CUT =1.5 H max. 10 m.

22.9

0

L56

POT = 40 % CUT =1.5 H max. 10 m.

aB

Strad 98

22.0

8

5.

96.0

s=3.858,02mp.

58

6

21.8

6 11

55

d

POT = 40 % CUT =1.5 H max. 10 m.

60

un

10.0

15.0

5

11

32 33

7.0 1.5

57

POT = 40 % CUT =1.5 H max. 10 m.

4

P

9 10

31

ZONA CARE SE VA REGLEMENTA CA MOBILARE URBANA PRIN P.U.D. IN VEDEREA AUTORIZARII

cti

PUD PREALABIL 56.2

9 8

15.0

7

0

SPATII VERZI ,PARCURI, SCUARURI

141312 11 POT = 40 % CUT =1.5 H max. 10 m.

une 3 Secti

96

121 13

91 101

20

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

59

POT = 40 % CUT =1.5 H max. 10 m.

94

1

10.0

95

POT = 40 % CUT =1.5 H max. 10 m.

15.0

a

ad

21

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

2 3

1211 10 POT = 40 % CUT =1.5 H max. 10 m.

93

10 9

8

51

53

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

a2

7

POT = 40 % CUT =1.5 H max. 10 m.

16

10.0

POT = 40 % CUT =1.5 H max. 10 m.

44.3

13

a5

3.0

6

16 15

90.8

91

Str

12

17

92

17

18

POT = 40 % CUT =1.5 H max. 10 m.

11 12

16 15

5.

0

5

8

2 10

.0

5.

6

3

4

13

12

13

12.0

15

42.3

a

7 8

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

ne

a1 Strad

18

POT = 40 % CUT =1.5 H max. 10 m.

14

Strad

Se

17 16 15

Strad

5

19

89

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

11

POT = 40 % CUT =1.5 H max. 10 m.

14

iu

5

7

POT = 40 % CUT =1.5 H max. 10 m.

4

ct

POT = 40 % CUT =1.5 H max. 10 m.

9

POT = 40 % CUT =1.5 H max. 10 m.

2 3

19

20

a

POT = 40 % CUT =1.5 H max. 10 m.

13

.0

13 12 11

21

POT = 40 % CUT =1.5 H max. 10 m.

se

.0

s=6.573,10mp.

POT = 40 % CUT =1.5 H max. 10 m.

10

23

POT = 40 % CUT =1.5 H max. 10 m.

1

3

POT = 40 % CUT =1.5 H max. 10 m.

42

L

10

12

POT = 40 % CUT =1.5 H max. 10 m.

L

s=8.447,07mp.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

49

40.3

L

41.5

50 5 6

4a Strada

i

s=9.613,59mp.

POT = 40 % CUT =1.5 H max. 10 m.

47

POT = 40 % CUT =1.5 H max. 10 m.

4

9

8 7

40.4

90

61

22

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

6

Str 307 a 19 7da A 18

11

POT = 40 % CUT =1.5 H max. 10 m.

.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

8

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

25

40.4

87

POT = 40 % CUT =1.5 H max. 10 m.

5

63

62

24

10

3 Strada

POT = 40 % CUT =1.5 H max. 10 m.

4

POT = 40 % CUT =1.5 H max. 10 m.

40.0 POT = 40 % CUT =1.5 H max. 10 m.

4

20

10.0

H I

65

64

10.0

POT = 40 % CUT =1.5 H max. 10 m.

4 Strada

40.0

88

141.3

191.5

85

86

.0

b

POT = 40 % CUT =1.5 H max. 10 m.

8

10.0

17

45

48

POT = 40 % CUT =1.5 H max. 10 m.

41

POT = 40 % CUT =1.5 H max. 10 m.

De. 427

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

7.0

81.93

66

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

9

18

42.0

46

POT = 40 % CUT =1.5 H max. 10 m.

e5

un Secti

5

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

22

e

83

84

7

156

sectiun

81.90

81

82

20

POT = 40 % CUT =1.5 H max. 10 m.

44

POT = 40 % CUT =1.5 H max. 10 m.

67 68s=5.602,14mp.

19

43

POT = 40 % CUT =1.5 H max. 10 m.

69

L

42

c

10.0

POT = 40 % CUT =1.5 H max. 10 m.

h

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

Strada

Strada

POT = 40 % CUT =1.5 H max. 10 m.

157

23 81.99

81.84

70

POT = 40 % CUT =1.5 H max. 10 m.

79

76.7

l

POT = 40 % CUT =1.5 H max. 10 m.

10.0

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

71

40.0

POT = 40 % CUT =1.5 H max. 10 m.

40.0

80

POT = 40 % CUT =1.5 H max. 10 m.

158

s=7.894,21mp.

28

42

4

.0

30

POT = 40 % CUT =1.5 H max. 10 m.

27

2

POT = 40 % CUT =1.5 H max. 10 m.

10

POT = 40 % CUT =1.5 H max. 10 m.

29

POT = 40 % CUT =1.5 H max. 10 m.

26

16

6.

77

78

POT = 40 % CUT =1.5 H max. 10 m.

10.0

159

POT = 40 % CUT =1.5 H max. 10 m.

6 7

.0

17

POT = 40 % CUT =1.5 H max. 10 m.

4 5

22 21 10

9

.00

3

160

L

L

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

141.1

38.7

s=2.980,45mp. POT = 40 % CUT =1.5 H max. 10 m.

72

POT = 40 % CUT =1.5 H max. 10 m.

33

32

. 40

R1

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

23

36

38

POT = 40 % CUT =1.5 H max. 10 m. POT = 40 % CUT =1.5 H max. 10 m.

41

31

29

De

POT = 40 % CUT =1.5 H max. 10 m.

R12

13.8

GC

s=520,83mp. 2

76

2 3

4

POT = 40 % CUT =1.5 H max. 10 m.

37

39

40

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

93.9 POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

73

74

POT = 40 % CUT =1.5 H max. 10 m.

34

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

10.0

28

14 13 12 .0 15

10

18

IS -

X Y 797030,5331 413630.9912 797409,3030 413726,7448 797427,9179 413699,7573 797545,9730 413662,9739 797573,5475 413636,4442 797649,6928 413321,8195 797180,2294 413203,7019 797101,4915 413504,7600 797061,2446 413494,8066

A B C D E F G H I

CONSTANTA

6 5

10.0 7.0

7.0

A

2 3

22 21

75

1 2 3

12 11 10

a A1

ad Str 23

10.0 7.0

124 Strada 1

3

24

De. 414

Strada de legatura - propusa prin P.U.Z.-

6

Fig.B1

P.T.E.

s=85,30mp.

10.0

19

35

C

5

27

26

25

POT = 40 % CUT =1.5 H max. 10 m.

POT = 40 % CUT =1.5 H max. 10 m.

79.3

2

4

3

2

22 21 20

aA 1

Strad 26 25

5.0

L

7.0

e

183.000,00mp. din care suprafete

TOTAL TEREN CE A GENERAT P.U.Z.

1

1.5 3.0

Strada de legatura spre str. Barajului - propusa prin P.U.Z.pe traseul D.e. 414, D.e. 426 si D.e. 466

A

BILANT SUPRAFETE COORDONATE STEREO 70 ZONA STUDIATA S = 216.675mp

B

da

3.0

Str a

12.0

5.4%

IS X1

5.0

1.5

Strada de legatura spre str. Barajului - propusa prin P.U.G.pe traseul D.e. 405/1

limita amplasare constructii

3.0 1.5

limita aliniament

limita aliniament

limita amplasare constructii

15.0

12.0

29

3.0

5.0 1.5

H max.10.0m

30

d

L

Sectiune 3

Fig.C

H max.10.0m

a

BLE CA ER OW V H P 110 K

limita amplasare constructii

Sectiune strada 1

3.0

5.4%

L

limita amplasare constructii

IS x2

limita aliniament

7

limita aliniament

limita aliniament

1.5

m

limita aliniament

12.0

P.U.Z. APROBAT ACORD COMPANIA NATIONALA DE AUTOSTRAZI SI DRUMURI NATIONALE DIN ROMANIA S.A. NR. 14312 / 16-05- 2008

150

1.5

7.0

HIG

7.0

IS x1

15.0

X IAL

limita amplasare constructii

Sectiune 2

7.0

TEREN CARE A GENERAT P.U.Z.

P+2

COMPLE COMERC

P+2

Proiectant general:

Beneficiar:

s.c. PROMARH s.r.l. Nume:

Semnatura:

Proiect nr:

MATROZ CONSTANTIN si FLOREA ION

TULCEA

str.Babadag, nr.143, bl.25, sc.C, ap.4, loc. Tulcea, jud. Tulcea

J36/917/1994 , C.U.I. RO 6585583 tel/fax: 0240 510180

Specificatie:

Sef Proiect arh. Marcel PAVEL

Scara:

1 / 1.000

Proiectat

arh. Marcel PAVEL

Data:

Desenat

arh. Paul Cristian MURAVELI

Noiembrie 2017

Denumire proiect:

LOTIZARE TEREN PENTRU CONSTRUIRE LOCUINTE si CONSTRUIRE COMPLEX COMERCIAL SI ANSAMBLU REZIDENTIAL tarla 25, parcela 413 , extravilan T 54, P 1265, 1263, 1261.

Denumire plansa:

REGLEMENTARI URBANISTICE

87/2017 Faza:

P.U.Z. Nr. plansa:

U4

SPORTS & RECREATION CENTER


energize

refuel

PLAY


RECREATIONAL CENTER Aprox. Area: 15 000 sqm Aprox. Buildable Area: 4 400 sqm




CONTACT For enquiries, please contact: Mihai George Munteanu email | prodesignsrl@yahoo.com tel | +40722352553

Constantin Matroz email | matrozconstantin@yahoo.com tel | +40729058691


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.