Portfolio 2020

Page 1

PORT FO LIO AHMET

H AY TA

email: ahmethayta@me.com


CONTENTS

BALAT AFTER SCHOOL CENTRE

ACADEMIC (INDIVIDUAL)

2019-2020

1-3

BUILDING SURVEY

ACADEMIC (GROUP)

2019-2020

4

COMPETITION PROJECTS

PROFESSIONAL

2019

5

APPLICATION PROJECT

PROFESSIONAL

2019

6

DETAIL DRAWINGS

PROFESSIONAL

2018-2019

7

CO-PRODUCING SPACE

ACADEMIC (GROUP)

2018

8

DISSERTATION

ACADEMIC (INDIVIDUAL)

2017-2018

9

LEAZES WELLBEING CENTRE

ACADEMIC (GROUP)

2017-2018

10

TYNE STUDENT HUB

ACADEMIC (GROUP)

2017

11

DURHAM BOATHOUSE

ACADEMIC (INDIVIDUAL)

2016

12


BALAT AFTER SCHOOL CENTRE Architectural Design (Oğuz Özer Studio) (Individual) Mimar Sinan Fine Arts University, Istanbul September 2019 - January 2020 After school learning centre is based in Istanbul’s Balat district, aims to respond for the publicly open spaces which is observed to be lacking in the area. It is purposed to provide a quiet study area and extracurricular activities such as music, dance or illustrative art courses for the youth around, particularly for the specified in blue colour on the site map, Tarık Us Middle School’s pupils. The idea is to create public areas for the low-income residents of Balat in particular because the ongoing urban regeneration plan is driven by the economic tourist-oriented zeal and most of the elite developments are risking the low-income groups in the area.

Old and new

Area’s industrial background is celebrated through the corten panels and the contrast with the existing old walls is intended.

Topography

Porosity

Vegetation The elevation of 3m beared by the old walls is replaced by my intervention. The area is located in the church property so a relationship was also built with it.

Narrow streets and highly divisive blind walls are overwhelming Balat. Few opennings are created on the existing walls to make the building more public and porous. The intervention mimics the topography and the pattern that plane trees create. The area is also populated with various fruit trees. 1


Construction Diagram

Road Side Elevation

Front Elevation

Church Side Elevation 2


3

3

B

B

2

2

A

Ground Floor Plan

Section 1

A

First Floor Plan

Second Floor Plan

Study Room

Music Room

Section 2

Section 3

Courtyard First Floor 3


BUILDING SURVEY Building Surveying (Mevlude Kapti Studio) (Group) Mimar Sinan Fine Arts University, Istanbul September 2019 - January 2020 This project is carried out with a pair, while one of us was taking the measurements the other was drawing. The pavillion we worked, Zülüflü İsmail Paşa Köşkü is located in Kadikoy, an Asian district of Istanbul. In this module, which consists of theory and practice; the theory was about documenting historical structures, ICOMOS and UNESCO heritage preserving procedures and techniques of building or restoring on historical sites. And in the practice part, my partner and I worked on this pavilion and documented meticuluously each plans and window/door details. I am currently taking the second part of this lecture, in which we learn how to approach the building techniques and determine the structure and its construction technology. This semester we will work on the elevations and draw sections of this building. PRODUCED BY AN AUTODESK STUDENT VERSION

Window Elevations & Section PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PAFTA NO

2M

ADRES

BACA

B4 ÖĞRETMENLER ODASI

B3 ÖĞRETMENLER ODASI

KADIN WC DEPO

KANTİN

B2 ÖĞRETMENLER ODASI

MUTFAK

B1 ÖĞRETMENLER ODASI

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

ERKEK WC WC HOLÜ

PRODUCED BY AN AUTODESK STUDENT VERSION

TESİSAT

Z3 SINIFI

TESİSAT BACA

PRODUCED BY AN AUTODESK STUDENT VERSION

ANA HOL

Z4 SINIFI

BACA

ANA HOL

DEPO

WC HOLÜ

ERKEK WC

BACA

BACA

KADIN WC

GİRİŞ HOLÜ

Z2 SINIFI

Building Plans

TESİSAT

Z1 SINIFI

VERENDA

PAFTA SAYISI : 18 PAFTA NO ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN

KENT

TESİSAT

BACA

TESİSAT

DEPO

MUHASEBE GİRİŞ HOLÜ

WC HOLÜ

ERKEK WC

BACA

KADIN WC

REHBERLİK ODASI

A2 SINIFI

ANA HOL

A1 SINIFI

BALKON

ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN

:2

ADRES

İSTANBUL

FOTO SAYISI

1

ADA

397

PAFTA

PARSEL

1

2M

105 28

: ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101 ÖLÇEK: 1/50

GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE

:3

ÖLÇEK: 1/50

GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE

PARSEL

BALKON

1

ADA

397

PAFTA

ANA HOL

TESİSAT

TESİSAT

DEPO

WC HOLÜ

WC

KAZAN DAİRESİ

DEPO

DEPO

ANA HOL

1

2M

Door Elevation

KENT İSTANBUL

FOTO SAYISI

B1 SINIFI

PARSEL

105 28

: PROF. DR. HALE TOKAY : ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101

TESLİM TARİHİ: 2020

: PROF. DR. HALE TOKAY

TESLİM TARİHİ: 2020 ADRES

PARSEL

105 28

ÖLÇEK: 1/50

A3 SINIFI

ANA HOL

BİRİNCİ KAT PLANI

KENT

KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE

KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ

A4 SINIFI

PAFTA NO

2M

PAFTA

105 28

B2 SINIFI

PAFTA SAYISI : 18

1

397

ASANSÖR

KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE

ZEMİN KAT PLANI

ADRES

ADA

: ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101

TESLİM TARİHİ: 2020 2M

1

GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE

BALKON

PRODUCED BY AN AUTODESK STUDENT VERSION

TESİSAT BACA

ADRES

GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE

BALKON

B5 ÖĞRETMENLER ODASI

PAFTA

397

YANGIN ASANSÖR MERDİVENİ

: ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101 ÖLÇEK: 1/50

1

İSTANBUL

FOTO SAYISI

: PROF. DR. HALE TOKAY

YANGIN MERDİVENİ

: PROF. DR. HALE TOKAY

TESLİM TARİHİ: 2020

ÇATI KATI TAVAN PLANI

: 12

PARSEL

105 28

PRODUCED BY AN AUTODESK STUDENT VERSION

1

PAFTA

397

ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN

: ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101

PRODUCED BY AN AUTODESK STUDENT VERSION

ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN

ZEMİN KAT TAVAN PLANI

ADA

1

PAFTA NO

: PROF. DR. HALE TOKAY

TESLİM TARİHİ: 2020 2M

ADA

İSTANBUL

FOTO SAYISI

: 10

PRODUCED BY AN AUTODESK STUDENT VERSION

YANGIN ASANSÖR MERDİVENİ

ASANSÖR

B6 ÖĞRETMENLER ODASI

ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN

1

PRODUCED BY AN AUTODESK STUDENT VERSION PAFTA NO

1

: 11

KENT

KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE

PAFTA SAYISI : 18

İSTANBUL

FOTO SAYISI

PAFTA SAYISI : 18

BİRİNCİ KAT TAVAN PLANI

PAFTA SAYISI : 18

KENT

KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE

Ceiling Plans YANGIN MERDİVENİ

KENT

KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

ÖLÇEK: 1/50

GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE

4


84019 COMPETITION PROJECTS Korean War Veteran Memorial Museum (Eray Carbajo) & Berlin Architecture Museum (Independent) May 2019 - August 2019 First project, Korean War Museum which had a memorial influenced by Korean traditions of commemorating head up and so the names of the veterans are presented on a higher level. I participated with the diagrams and sections. Berlin Architecture Museum; presents different architectural movements with each sense, all of which is connected to the ‘heart’, and that is the foyer. Alienated nature of Berlin’s architecture gave us the idea of walls detracting from the people. Renders and diagrams are contributed by me.

Change of emotions; during war, victory & aftermath

‘Escaping walls’

Lobby ‘the Heart’

Toprak (Cennet) Anıt, T (Sembol)

Anıt, T (Sembol) Toprak (Cennet)

(Geleneksel) Özlem, Hüzün, Ölüm

(Öneri) Saygı, Minnet, Umut

Study of Korean traditional commemoration

Library

Sections

Section

Y

5


APPLICATION PROJECT Eray Carbajo Architects May 2019 - August 2019 This is a barber shop project I really enjoyed working on. Application details, ceiling plans and sections are drawn by me and I have also attended to the process of timber cladding production, it was challenging to fit curvy forms aligned however the results were surprisingly good. This project helped me to acquire and develop many skills such as overcoming deadlines and work effectively.

Plan

Section

Details

Shop-front Elevation & Plan (top to bottom)

Timber cladding workshop 6


AR-16013

F-CO-02A (Concrete32Screed)

CW-400

400 70

2260

520 1000

4800 150

1370

2C. 116 900x 2100

150 1590

4800

14

E-HR-02

30 29

CW-400 15

+18.50

2400

1030

50

S01D S18D

CIRCULATION

1040

S12D

100

S06D

WC MALE

S03C

S13D

S08C

S21C

1320

3J. 93 700x 2100

W-GB-01

150

1360

DW-03A-100s

S23D

S07C

100

W-CO-02

W-GB-01

3J. 118 700x 2100

520 1200

1560

400 70

160 2150 1520

1000

4800

150

150

1370

2C. 153 900x 2100

1590

11B. 156 900x 2100

520 1200

7330

5740

150

280 800

1030

400 70

260

1060

800 260

1060

800 260 800

1060

260

2040

1090

1140 1260

1260

+2.65

C-GB-04

C W-CO-02

+1.75

Ceiling hanger

CIRCULATION

W-CO-02

WC MALE

W-CO-02

S01C

S06C

S14C

W-GB-01

S03C S08C

W-GB-01

3500

4000

W-CO-02 +1.75 C-GB-04

COLLECTION STORAGE

-0.90 -0.85

C-GB-04

W-CO-02

W-GB-01 S07C

S21C S01C

F-CO-02B (Concrete Screed) Concrete Screed Liquid Sprayed Waterproofing Cast-in-place concrete

+1.75 C-GB-04

C

2600

1260

W-CO-02

CW-600

2600

3500 2150

1010

1260 2040

1140

1850 1260

2C. 41 900x 2100

800

1090

270

2490 1260

7330

2600

830

4800 150

150 5740

C

S06C

S14C

S12C

-0.90 -0.85

S12C SSL B1 -0.90 m

280

150 1030

E-DR-12

S29D

Ceiling hanger

S05D

W-GB-01

1060 S23D

100 300

S05D

COLLECTION STORAGE

S29D

S22D

260

1060

BW-02B - FR120 S14D

S28D

J

2040

E-DR-10 S12D

S06D S05D

11A. 12 700x 2100

DW-03A-100

S23D

Staff Room Plan

S05D

11A. 13 700x 2100

S28D

?

S01D

1060

-0.85 FFL -0.90 SSL

8

M5B

S18D

11A. 14 700x 2100

260

1400

E-DR-11

DW-03A-100s

S22D

100

W-GB-01

26.81 m²

800

13.3.1.14

260

MALE WET ZONE

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

W-GB-01

3J. 117 700x 2100 +1.75 C-GB-04 +1.75 C-GB-04 S23D

STORAGE

11A. 10 700x 2100

CW-400 -0.90 -0.85

800

S08D

S21D

DW-03A-100s

S22D

1180

1590

6750 1200

S16D

DW-03A-100s

CeilingS03D hanger support

100

3J. 94 700x 2100

W-CO-02 50 1030

S14D

1180 W-GB-01

W-CO-02

BW-02B - FR120

1060

280

80 720

2C. 90 900x 2100

1400

1400 150

150

1720 1200

3260 1400 2270

S03D S19D F-CO-02B (Concrete Screed)

BW-01B

W-GB-01

S13D

+5.85 m

S21D

DW-03A-100s

C-GB-04

Liquid Sprayed Waterproofing Cast-in-place concrete

FU-LO-B01

SSL 1

800

700 W-GB-01

FU-LO-B01 Concrete ScreedW-CO-02

-0.90 -0.85

260

390

DW-02A-100s

+1.75

S07C S21C W-CO-02 Concrete Screed Liquid Sprayed Waterproofing Cast-in-place concrete

F-CO-02B (Concrete Screed)

FU-BC-B01

7000

+5.85 m

W-GB-01

WC FEMALE BW-02B - FR120

W-GB-01

S05D SSL 1

BW-02B - FR120 Ceiling hanger support

W-CO-02

S03C

S13D

S01D

CANNED FOOD &

W-GB-01

S21C

S05D

DW-03A-100s

11.29 m² BOTTLED DRINKS

FU-LO-B01 +2.65 +1.75

-0.90-0.85

BW-01B

3J. 119 700x 2100

S28D

CIRCULATION

WC MALE S08C

CW-400

800

2600

2150

0

S13D

S01D

1090

150

11A. 96 700x 2100

W-GB-01

700 W-GB-01

2C. 116 900x 2100

550 1930 1940

160

2490

1090

150

BW-01B CIRCULATION F-CO-02A (Concrete Screed) W-CO-02

S15D

1260

DW-03A-50s

47.42 m²

S06D

11A. 11 700x 2100

S29D

I

E-DR-10 S12D

+3.15

F-CO-02A W-CO-02 C-NO-02

C-GB-04

2040

S05D

W-CO-02

S22D

BW-02B - FR120 S14D

J

100 300

1060

FU-LO-B01

S05D

11A. 12 700x 2100

S23D

W-CO-02 W-GB-01 FU-LO-B01 124 LOCKERS -0.85 FFL E-DR-11 W-CO-02 -0.90 SSL S01C S12C

W-CO-02

W-CO-02

+2.65

S05D

15.1.4.2

F-CO-02A W-CO-02 C-GB-02 BW-01B W-GB-01 C-GB-02A

800

390

W-CO-02

-0.85 FFL -0.90 SSL

C-GB-04

100

W-CO-02

22.00 m²

2270

WC FEMALE

4000

AR-17711 W-GB-01

W-GB-01

700

11A. 95 700x 2100

150 W-CO-02

S16D DW-03B-50s

F-CO-02B (Concrete Screed)

W-CO-02 DW-03A-50s

1

+1.75

S08D S03D

S19D

BW-02B - FR120

S29D

FREEZERDW-03A-100 ROOM

11A. 15 700x 2100

BW-01B

E-DR-12

11A. 13 700x 2100

S28D

?

W-GB-01

BW-02B - FR120 W-CO-02

7000 MALE CHANGING ROOM 13.3.1.8

E-DR-11

M5B

S18D

11A. 14 700x 2100

-0.85 FFL -0.90 SSL W-GB-01

S23D

2C. 47 900x 2100

W-CO-02

W-CO-02

1260

S15D

11A. 92 700x 2100

+3.15

1360

DW-03A-100s

4100 W-CO-02

DW-03B-50s

26.81 m²

L

FU-LO-B01 BW-02B - FR120

BW-01B W-CO-02

FEMALE WET ZONE 13.3.1.13

DW-03A-100s

3J. 118 700x 2100

LEVEL LOADING

W-CO-02 BW-01B

+20.85 m

150

W-GB-01

-2.05 m

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

S03D

C-GB-04

DW-03B-50s

1850

SSL 3

S23D

DW-03A-100s

BW-01B

S22D

S21C Concrete Screed Liquid Sprayed Waterproofing Cast-in-place concrete

-0.90-0.85

BW-02B - FR120

S01D

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

COLD ROOM

S22D

DW-02A-100s W-GB-01

FU-BC-B01

2040

1260

I

SSL 1M +10.90 m

C-GB-04

13.3.1.14

S21D

W-CO-02

3J. 117 700x 2100

W-GB-01

W-CO-02 CW-400 WC FEMALE

3260

2490

W-GB-01

W-GB-01

GALLERIES

MALE WET ZONE

F-CO-02A (Concrete Screed)

1320

W-GB-01

DW-03A-100s

S08D

BW-02B - FR120

3J. 119 700x 2100

W-GB-01

9

W-GB-01

S16D

*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.

S18D

LEVEL B1

150

25.48 m²

S23D

1850

2C. 90 900x 2100

1260

1400

1400

2600

1140

Staff Room Section

5450

2C. 64 900x 2100 2C. 116 900x 2100

11A. 92 700x 2100

7380

7380

11A. 95 700x 2100

150 W-GB-01 S01C S12C

FU-BC-B01

W-CO-02 W-CO-02 CW-400

S19D S03DFU-TA-B05

W-CO-02 BW-01B C-GB-02

-0.85 FFL -0.90 SSL

DW-02A-100s

W-CO-02

KITCHEN

W-CO-02

S05D

11A. 11 700x 2100

270

FU-LO-B01 BW-02B - FR120

2C. 64 900x 2100

1520 610

610 2480 11A. 154 700x 2100

1780

150

150

11B. 156 900x 2100

1930

150

1090

SSL 2

Expanded Coil Mesh Horizontal Mesh in Every 3 Rows of CMU Blocks

E-DR-11

+3.15

W-CO-02

-2.05 m

+13.50

CMU Block

BW-01B

12 SEATS

S21D

ICT

-0.85 FFL -0.90 SSL

29.09 m²

In every 3 rows, CMU blocks are fixed to the structural concrete

BW-01B W-CO-02

W-CO-02

13.3.1.9

DW-03A-100s

Ceiling hanger

FU-LO-B01

W-GB-01

CW-400 FU-LO-B01

Structural Column / Wall

F-CO-02B (Concrete Screed)

BW-02B - FR120

W-GB-01

W-CO-02

7000

S15D

3J. 93 hanger 700x 2100 Ceiling support 100

C-GB-04

W-CO-02

0

60 LOCKER

1200

13.3.1.7

100

F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A

+13.35 m

ICT

W-CO-02

BW-01B

SSL B1

F-CO-02ALEVEL (Concrete Screed) LOADING

Ceiling hanger

S05D

Expanded Coil Mesh Horizontal Mesh in Every 3 Rows of CMU Blocks

FU-LO-B01

W-CO-02

MALE BREAKROOM

100

FU-BC-B01

+1.75

W-GB-01

2800

CMU Block

FU-BC-B01

FU-CH-B08

F-CO-02A BW-01B

L

FU-LO-B01 W-GB-01

280150

1200

3200 LEVEL B1 FEMALE CHANGING -0.85 m ROOM

In every 3 rows, CMU blocks are fixed to the structural concrete

CW-400

11A. 15 700x 2100

3J. 94 700x 2100

E-DR-11

W-GB-01

5450

50

2300

150

Corner brackets to be fixed to the structural slab at the top line of the wall in every 900 mm (opposite side of the following block)

W-CO-02

E-DR-11

CW-400 100

1180

BW-02B - FR120

F-CO-02A (Concrete Screed)

8

S22D

W-GB-01

W-CO-02

Structural Column / Wall

-0.85 mW-CO-02

-0.85 m

AR-17711

+21.00

150

SSL B1

1990

3

+13.35

1000

DW-02A-100s -0.85 m

150

100

S06D

BW-01B W-CO-02

DW-03B-50s

DW-02A-100s

ICT

W-GB-01

1030 BW-01B

W-CO-02

FU-LO-B01

-0.90

2C. 164 900x 2100

450

80 720 1520

2C. 153 900x 2100

550

2C. 91 900x 2100

11A. 155 700x 2100

1940

1780

150 3500

W-CO-02

W-CO-02

S07D

FU-BC-B01

-0.90

50

S14D

W-CO-02

6750

1350

S11D

Ceiling hanger

-0.85

1040

FU-LO-B01

FU-LO-B01

Corner brackets to be fixed to the structural slab at the top line of the wall in every 900 mm (opposite side of the following block)

W-GB-01

W-CO-02

47.42 m²

124 LOCKERS -0.85 FFL -0.90 SSL

AR-17728

FU-CH-B08

DW-02A-100s

LEVEL 1

+6.00 m 390 180700 1000 280 180 1180

S12D

150

2700

BW-01B

-0.85 FFL W-CO-02 -0.90 SSL

W-GB-01

W-CO-02

-0.85 FFL -0.90 SSL

3620

F-CO-02A (Concrete Screed)

BW-02B - FR120

E-DR-11

Ceiling hanger support

6.58 m²

F-CO-02A W-CO-02 C-GB-02 W-CO-02

13.3.1.8

F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A

FU-BC-B01 W-GB-01 4

22.00 m²

BW-01B

150

280

3J. 94 700x 2100

13.3.1.6

200

8 W-CO-02

CANNED FOOD & BOTTLED DRINKS

7000 MALE CHANGING ROOM

2AJ. 43 1100x 2100

F-CO-02B W-CO-02 C-GB-04 C-GB-04A 2C.W-GB-01 115 900x 2100

W-CO-02

3800

FU-LO-B01

2150

-0.85

GALLERIES

SSL 3M

+8.50

50

50 E-DR-11

DW-03A-50s

1720

1000

BW-02B - FR120 W-CO-02

BW-01B

S21D

1030

FU-TA-B05

BW-01B

2150

3500

2C. 47 900x 2100

2700

L

W-CO-02

2100

BW-02B - FR120 W-CO-02

+16.75 m

CIRCULATION 2C. 61 900x 2100

F-CO-02A (Concrete Screed)

1350

3500

CIRCULATION

CONCRETE LINTEL W-GB-01 CIRCULATION

1000

FEMALE CORRIDOR

2C. 47 900x 2100

FEMALE WET ZONE

S03D

+23.30 m

W-CO-02

150

500

Lighting MEP ZONE Fixture 1120

C-GB-04

120

1400

MEP ZONE

C-GB-04

FU-LO-B01

2100

+2.65

DW-03B-50s

W-CO-02

FEMALE WET ZONE

S16D DW-03B-50s

S13D

2C. 91 900x 2100

2700

1200

2350 500

2700

C-GB-04A

DW-03B-50s

280150

W-CO-02 BW-01B

-0.85 FFL

700

W-CO-02

4100 FU-LO-B01

100

FU-LO-B01

BW-02B - FR120 W-CO-02 W-CO-02

F-CO-02B (Concrete Screed)-0.90 SSL

390

S01D S18D

Cable Tray

2800

BW-01B

Expanded Coil Mesh Horizontal Mesh in Every 3 Rows of CMU Blocks

S08D S03D

FU-LO-B01 BW-02B - FR120

W-GB-01

CMU Block

700

11A. 96 700x 2100

2350

1650 1200

Lighting Fixture

CONCRETE LINTEL

3J. 94 700x 2100

3500

-0.85

200 E-HR-02

W-CO-02

14

+6.00 m

W-CO-02

DW-02A-100s W-GB-01

Structural Column / Wall

S19D

J

FU-BC-B01

FU-TA-B05

BW-01B

FREEZER ROOM

FU-LO-B01

150

180

5.30 m²

BW-01B

E2

W-CO-02

W-GB-01

L

230

In every 3 rows, CMU blocks are fixed to the structural concrete

FU-CH-B08

LEVEL 1

80200 420

1350

110 1060

150 6900

7380

2C. 164 900x 2100

450 1520 610

610 2480

120 160

1000

7380

110 1060 2400

6900

1520

2C. 153 900x 2100

80200 420 160

1350

160 2150 80 720

2C. 164 900x 2100

1650 1200

1400

6400

+2.65

W-GB-01 SSL 2M

F-CO-02A (Concrete Screed) Concrete Screed

60 E-HR-02 16

31

Ceiling Mounted Lighting

CORE 1 STAIR 17

1650

3060

350150

200

1650

2300

1650

1200

200

1200

2300

MEP ZONE FEMALE CHANGING ROOM

Cable C-GB-04A Tray

50

200 4540

+2.65

S03D

+20.85

CORE 1 STAIR Stair

150

1150

W-GB-01 2100

BW-01B W-CO-02

1000

280

E-DR-11

CW-400

13.3.1.13

3500

E-HR-02 32

E-HR-01

SSL 4T

+29.00 m

3500

1200 3500

6400

50

50 18

33

CEILING HANGER

13.3.1.10

W-CO-02

BW-02B - FR120

AR-17711

150

CW-400

Corner brackets to be fixed to the structural slab at the top line of the wall in every 900 mm (opposite side of the following block)

S15D

1

CONCRETE LINTEL

1350 1000

W-CO-02

W-CO-02

BW-01B W-CO-02 W-GB-01

S13D

DW-03A-100s

1010

E-HR-02

15

19 34

E-HR-02

CEILING HANGER SUPPORT

110

-0.85 FFL -0.90 SSL

MALE CORRIDOR W-GB-01 W-GB-01

W-CO-02 W-CO-02 CW-400

900

S18D

W-CO-02

DW-03A-50s

DW-02A-100s

W-GB-01

MEP ZONE

C-GB-02A

1010FU-BC-B01 150 180

FU-LO-B01

CW-500

W-CO-02

18.11 m²

W-CO-02

F-CO-02A (Concrete Screed) CW-400

-0.90

830

16

Ceiling Mounted Stair Lighting

20

35

C-GB-04A

CIRCULATION

AR-17728

W-CO-02

CW-500

W-CO-02

COLD ROOM

BW-02B - FR120

*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.

-0.85 FFL -0.90 SSL

BW-01B

-0.85

W-GB-01

2600

60 LOCKER

2600

30 29

19 18

17

24

23

21

20

36 36 35 34 33

25

22 22

21

37

37

32

40 39

38

38

31

1650

350150

1650

3500

1500

1200

23

39

E-HR-02

+8.50

41

24

40

+29.85 m

Supply Air Diffuser

CW-400

29 W-CO-02 CW-400

27

+21.00 +21.00

41

J

CONCRETE LINTEL

S21D

26 42

SSL 4

FU-LO-B01

W-CO-02

30

28

W-CT-02

13.3.1.12

F-CO-02A W-CO-02 C-GB-02

CW-500

180

25.48 m²

12 SEATS

W-CO-02

1000

WC FEMALE

L

110

16DW-02A-100s

100

29.09 m²

W-CO-02 DW-03A-50s

+5.85

Ceiling hanger support

31

E-HR-02

25

1 STAIR

CORE 1 STAIR

E-HR-02

E-HR-01

27

11A. 154 700x 2100

1350

7330

260

1060

800 260

450

1060

800 260

1520

800

1060

260

1090

610

800 270 830

60

2000

1000 2300

1650 E-HR-02

42

E-HR-02 W-CO-02

W-CO-02

32

E-HR-02 E-HR-01

Ceiling Mounted Stair Lighting

E-HR-02

33

E-HR-02

C-GB-04A

CEILING HANGER

C-GB-02A

13.3.1.7

13.3.1.9

F-CO-02A W-CO-02 C-GB-02

F-CO-02A W-CO-02 C-NO-02

4130

AR-17728

F-CO-02A W-CO-02 C-GB-02F-CO-02A (Concrete Screed) W-GB-01 C-GB-02A

FU-TA-B05

39.65 m²

C-NO-02

+6.00

2300

100 60 200

CORE 1 STAIR

28

CORE 1 STAIR

34

33

CEILING HANGER

FEMALE WET ZONE

+13.50 +13.50

1

35

26

Ceiling Mounted W-CO-02 Stair Ceiling Lighting

Mounted StairCORE Lighting

37 36 36 35

29

W-GB-01

8

W-GB-01

MAIN LOBBYSSL 3

1260

BW-02B - FR120 W-CO-02

W-GB-01

1200 3500

1000 200

50

37

31

DW-02A-100s

3200 FEMALE CHANGING E-DR-09 ROOM

FU-CH-B08

F-CO-02A (Concrete Screed) DW-03B-50s -0.85 FFL -0.90 SSL

W-CO-02

2

Ceiling Mounted Stair Lighting

38

30

2

12 SEATS

S18D

+21.00

0

+21.00 S03D m

39

34

CW-400

CIRCULATION+21.00 +21.00

3

13.3.1.5

+6.00 BW-02B - FR120 +5.85

IN-FO-02C Waterproof Membrane Blinding Concrete GravelCW-400 Rolled Earth

42

32

W-CO-02 E-HR-02

+6.00 m E-HR-02

4

40

38

BW-01B W-CO-02

Mounted Structural Stair Foundation

41 40

C-GB-05 +3000 AFF

W-CO-02

MALE BREAKROOM

W-CO-02

F-CO-02A W-CO-02 C-GB-02

I

Protective Concrete Lighting LEVEL 1IN-FO-02B High-Strenght Polyethylene

41

39

+2.65 W-CO-02

CONCRETE LINTEL

CORE 1 STAIR Ceiling

6

42

E-HR-02

MEP ZONE CORE 1 STAIR W-CO-02

FEMALE WET ZONE CONCRETE LINTEL

FU-LO-B01

2

FU-LO-B01

AR-17728

W-CO-02

4660 BW-02B - FR120

Toilets Plan

2600

LEVEL 3

Lighting Fixture

14

7

5 Structural Foundation Protective Concrete E-HR-01 IN-FO-02B High-Strenght Polyethylene IN-FO-02C Waterproof Membrane Blinding ConcreteE-HR-02 E-HR-02 Gravel Rolled Earth

1

BW-01B

AR-17702

FU-LO-B01

4 W-CO-02

13.4.2.1 1424.95 m²

-0.85 FFL -0.90 SSL

W-GB-01

W-CO-02

3620

W-CO-02

150

W-CO-02

W-CT-02

2

MEP ZONE C-GB-02 Return Air Diffuser

+16.00 +16.00

8 8

3

E-DR-10

W-CO-02

-0.85 FFL -0.90 SSL

AR-17702

FEMALEW-CO-02 BREAKROOM

MAIN LOBBY

CEILING HANGER SUPPORT

CEILING HANGER SUPPORT

F-CO-02A (Concrete Screed) Concrete Screed

11

AR-17728

6750

+10.96 m

SP1 C-GB-04

9

9

7

CONCRETE LINTEL

CORRIDOR

W-CO-02

W-CO-02 CW-400

16 15

6 5

3800

6.58 2100m²

BW-01B

900

230

DW-03A-50s

F-CO-02A (Concrete Screed) DW-03A-50s

16

BW-02B - FR120

C-GB-02A

13

CORE 1 STAIR

1350

LEVEL 1M

FEMALE CHANGING ROOM

MEP ZONE

+2.65

E-HR-02

W-CO-02

-0.85

4

E-DR-10

DW-03A-100s

E2BW-01B

W-GB-01 F-CO-02A W-CO-02 C-GB-02 W-CO-02

200

1 BW-02B - FR120

BW-01B - FR120

I AR-17711

C-NO-02

ROOM

17

+20.85

200

2700

1200 C-GB-04A

1400

C-GB-04A

Cable Tray

1990

W-CO-02

+20.85 m

Stair Lighting FEMALE CHANGING

18

-0.85 10

10

1300

2300 200

1200

E1

+2.65

19

W-CO-02

12 11

E-HR-02

Ceiling Mounted Stair Lighting

Ceiling Mounted Stair Lighting

LEVEL 3M

C-GB-02A

W-CO-02

E-HR-01FU-TA-B05

13

-0.85

+13.50 +13.50

CONCRETE LINTEL

BW-01B

20

E-HR-02 E-HR-02

MEP ZONE FEMALE

BW-01B Ceiling

Supply Air

3060

C-NO-02

W-CO-02

CEILING HANGER

FEMALE CORRIDOR

W-CO-02

FU-CH-B08

C-GB-02A

W-CO-02 Mounted CORE 1 STAIR Diffuser

CONCRETE LINTEL

+5.85

C-GB-02 C-GB-02A

CONCRETE LINTEL

C-GB-02 Return Air Diffuser

F-CO-02A (Concrete Screed) Concrete Screed14

E-HR-01

CORE 1 STAIR

+13.50 m

+23.50 m

24

22

19 18

17 16

C-GB-02A C-GB-02

26

21 21

20 BW-01B

CEILING HANGER

28 27

25

C-GB-02 C-GB-02A 23 22

1000

SP1

-2.06 m

CEILING HANGER SUPPORT

2700

Ceiling Mounted Stair Lighting

+5.85

-0.90LEVEL m LOADING

LEVEL 2

200

2350 500

1830

LEVEL LOADING -2.06 m

24

CONCRETE LINTEL

11013.3.1.6

F-CO-02A (Concrete Screed)

PUBLIC WC CIRCULATION

MEP ZONE

+18.50

29

+2.65

MEP ZONE FEMALE BREAKROOM

25

C-GB-02A C-GB-02 23

+2.65

W-GB-01

FEMALE CORRIDOR

900

110

9

280

2480 160

2200 2300 200

E1 SSL B1

30

Recessed Return Air Lighting Diffuser Fixture

I +6.00

CW-400

E-HR-01

W-CO-02

CEILING HANGER W-CO-02 SUPPORT

31

12

F-CO-02A (Concrete Screed) Concrete Screed

E-HR-02

CONCRETE LINTEL

32

E-HR-02

E-HR-02

15

FU-TA-B05 -0.85 -0.90

FU-CH-B08

CORE 1 STAIR

34 33 CEILING HANGER

MEP ZONE

CONCRETE LINTEL

DW-03A-100s

2C. 61 900x 2100

900

FU-CH-B08

FU-TA-B05

BW-02B - FR120 W-CO-02

CIRCULATION

-0.90

11A. 155 700x 2100

80200 420 1560

5740

110 1060

150

280

2400

800

1030

6900 610

150 1030 1060 1060 1060

550

150

150

5740

280 800 260 800 260 800

1090 1010

11B. 156 900x 2100

150

1010

11A. 155 700x 2100

1830

1930

2C. 90 900x 2100

1590

1400

1400

5450 3260 1400 2270

260 800 260 800 270 830

11A. 92 700x 2100

11A. 95 700x 2100 280 280 280 280 280 280 280 280 280 280 280 280 280 280

2C. 41 900x 2100

1780

1940

150

150

1370

150

150

1720 1200

2C. 90 900x 2100

1400 150

5450 2270 150

200

11A. 154 700x 2100

1000 150

150 1400 150 1720 1200 3260 11A. 96 700x 2100

1200 400 70

7380

7380

2C. 64 900x 2100

2C. 116 900x 2100

7380

2C. 91 900x 2100

2260 120 1000 280

2260

2C. 41 900x 2100

4540

200

7330

42 x 280.0 /178.6

3920

42 x 280.0 /178.6

7380

8510

2330

2300 200 2300

1010

3920

200

11A. 95 700x 2100

8510

200 2300

1060 1060 1060 1090

800

2300

830

42 x 280.0 /178.6

60 3060

150

260 800

3060

260 800

200

260 800

2300

260

W-CO-02

150

8

4 AR-17728

Ceiling Mounted Stair CONCRETE LINTEL Lighting

35

33

E-HR-02

W-CO-02 CW-400

-0.90

+6.00

38

CONCRETE LINTEL 32

BW-01B - FR120

COREBREAKROOM 1 STAIR FEMALE

PUBLIC WC CIRCULATION

40

+5.85

CEILING HANGER SUPPORT

37

37

30

18.11 m²

W-GB-01

+23.30 m

16

P

+21.00 +21.00

42

28

AR-17728 -0.90

WC FEMALE 1000 13.3.1.12

1150

DW-03B-50s

GALLERIES

W-CO-02 CW-400

41

Recessed C-GB-02A Lighting 27 26 Fixture

1120

280

-0.85

450 FU-CH-B08

W-CO-02

2C. 115 900x 2100

FU-TA-B05

W-CO-02

6

4130

KITCHEN

CW-400

DW-03B-50s

F-CO-02B W-CO-02 C-GB-04 W-GB-01

W-CO-02

2300

W-CO-02

2100

W-GB-01

DW-03A-50s

DW-03B-50s

W-CO-02

450

FU-CH-B08

W-GB-01

W-CO-02

FU-TA-B05

BW-01B 5980 W-CO-02

180

DW-03A-50s

E-HR-02

200

W-CO-02

BW-01B

Supply Air Diffuser

110

W-CO-02

DW-03B-50s

0

3500

W-CO-02

3500

FR120

CONCRETE LINTEL

C-GB-02A

900

CIRCULATION

AR-17728F-CO-02A (Concrete Screed)

BW-02B - FR120

2300

BW-01B

FU-TA-B05

-0.85

2700

FEMALE CORRIDOR

W-CO-02

+16.00

-0.85 -0.90

-0.90

MEP ZONE C-GB-02 Return Air Diffuser

+29.00 m

W-GB-01

6

SSL 3M

E-HR-02

+6.00 39

29

Mounted Recessed Stair Return Air Lighting Diffuser Lighting W-CO-02 Fixture

BW-01B

W-CO-02

-0.85 m

-0.85

3500

C-GB-02 C-GB-02A

6400

CONCRETE LINTEL

FEMALE BREAKROOM

FU-CH-B08

W-CO-02

LEVEL B1

SSL 3MM

-0.90 m

1200

1200

TE LINTEL

W-CO-02

SSL B1

CEILING HANGER SUPPORT

MEP ZONE C-GB-02A C-GB-02

C-GB-02A

BW-01B - FR120

BW-01B

Staircase Section

+2.65

SSL 4T

230

E2

*Refer to LUS-BP14C-TA-REP-AR-38710

CORE 1 STAIR

E-HR-02 +6.00 E-HR-01

31

MEP ZONE

MEP ZONECeiling CIRCULATION

SUMP PIT

Recessed Lighting Fixture

CONCRETE LINTEL

MAIN LOBBY

CEILING HANGER

MEP ZONE Recessed Return Air Lighting Diffuser Fixture

LEVEL 2M +16.90 m

-0.90 -0.85

-0.90 -0.85

CEILING HANGER

C-GB-02A

CONCRETE LINTEL

MEP ZONE

CIRCULATION

SUMP PIT

LEVEL B1

CONCRETE LINTEL

18.11 m²

F-CO-02B W-CO-02 C-GB-04 W-GB-01

110

1150

-0.90

13.4.2.1 1424.95 m²

2140

5.30 m²

-0.85

2B. 49 900x 2100

F-CO-02A W-CO-02 C-NO-02

F-CO-02B W-CO-02 C-GB-04 W-GB-01

3'F&B and Kitchen Design Guideline

MAIN LOBBY

35

200

CONCRETE LINTEL

13.3.1.12

280

+29.85 -0.85 m

-0.90 E-DR-10

W-CO-02 450

8

J

34

CEILING HANGER SUPPORT

W-CO-02

-0.85 m

-0.90 -0.85

SSL 4

4130

DW-03A-100s

DW-03A-50s

W-CO-02

WC FEMALE

W-CO-02

900

L

L

11A. 10 700x 2100

W-GB-01

Ceiling Mounted Stair Lighting

41

C-GB-02

CIRCULATION

-0.90 -0.85

300

1650

1650

CEILING HANGER SUPPORT

I

CONCRETE LINTEL

3

3

1

STORAGE

BW-02B - FR120

6

42

CEILING HANGER

Cable Tray Lighting Fixture

4

1

2

E-HR-02

Lighting Fixture

LEVEL 4 +30.00 m

5

2

S13D

DW-03A-100s

W-CO-02

200 450

L CIRCULATION

E-DR-10

BW-02B - FR120

E-DR-11

1300

-0.85 m

CORE 1 STAIR Cable Tray

CONCRETE LINTEL

+5.85 m

+26.80 m

4

S05D

SP1

1000

5

J

DW-03B-50s

400

200

6

STORAGE

AR-17728

F-CO-02A W-CO-02 C-NO-02

CW-500

W-CO-02

5980

160

W-CO-02

W-CO-02

DW-03B-50s

-0.85

2B. 49 900x 2100

S13D

11A. 11 700x 2100

CW-600

W-CO-02

200

CW-400

F-CO-02A W-CO-02 C-GB-02

W-GB-01

CW-500

W-CO-02 W-CO-02

-0.85 FFL -0.90 SSL

180

DW-03A-100s

-0.90 SSL

13.3.1.10

W-CO-02

CW-500

W-CT-02

I

13.4.2.1 1424.95 m²

E-DR-10

DW-03A-100s

BW-02B - FR120

AR-17711

1300

2130

7

6

S05D

2140

-0.85 FFL -0.90 SSL

DW-03B-50s

Report' for details.

36 36

1000

8

7

450 11.29 m²

9

J

0

9

C-NO-02

CONCRETE LINTEL

CIRCULATION

8

+5.85

W-CO-02

W-CO-02

CIRCULATION

15.1.4.2

AR-17728

W-GB-01

CIRCULATION

160

W-CO-02

DW-03A-100s

W-GB-01

MALE CORRIDOR -0.85 FFL

W-CO-02

F-CO-02A (Concrete Screed) W-GB-01 -0.85 FFL -0.85 FFL -0.90 SSL -0.90 SSL

2110

2110

DW-03B-50s DW-03A-100s

W-GB-01

12 SEATS

2AJ. 43 1100x 2100

W-GB-01

2100 150 11B. 163 900x 1350 180 1000

130 550

-0.85 FFL -0.90 SSL

F-CO-02B W-CO-02 C-GB-04 W-GB-01

DW-03A-100s

FU-TA-B05

11B. 163 900x 2100

DW-03B-50s

-0.90

S06D

13.3.1.11 m² F-CO-02A23.04 W-CO-02 C-GB-02

130 550

5

-0.85

-0.85 FFL -0.90 SSL

39.65 m²

F-CO-02B W-CO-02 C-GB-04 W-GB-01

W-GB-01

1010

FU-BC-B01

38

200

+6.00

1C. 76 1630x 2100

10

M1A2

CONCRETE LINTEL

2200

9

11

PUBLIC WC CIRCULATION

W-CO-02 CW-400

10

CORE 1 STAIR

E-HR-02

12

W-CO-02

39

100 60 200

15 14 13

+5.85 m

W-CO-02 CW-400

CORE 1 STAIR

BW-01B

40

Ceiling Mounted Stair Lighting

CONCRETE LINTEL

SSL 1

C-GB-02

E-HR-02

11.29 m² CW-600

2000

11

+6.00 m

+6.00

1000

12

BW-01B BW-02B - FR120

CW-400

CIRCULATION

+21.00 +21.00

200

200

1000

16

Ceiling Mounted Stair Lighting

14 13

S13D

11A. 10 700x 2100

C-GB-05 +3000 AFF

MAIN LOBBY

+6.00 +5.85

SSL 1

16 15

19

18

BW-01B

E1

C-NO-02

+6.00

Ceiling Mounted Stair Lighting

17

22 21 20

+1.43 17

+6.00 +5.85

2300

CW-400

1000

W-CO-02

E-HR-02

200

24

200

3370 E-HR-01

W-CO-02

F-CO-02A W-CO-02 C-NO-02

W-CO-02

S28D

S13D

E-DR-11

E-HR-02

MAIN LOBBY

LEVEL 1

21 20

19 18

23

+1.43

LEVEL B1

+3.37

25 24

350150

CW-400

SP1

+6.00

26

+6.00 m

LEVEL 3

+5.85

O

LEVEL 1

+21.00 m

+3.37

25

S29D

DW-03A-100s

S28D

I

2040

S05D

S22D

F-CO-02A W-CO-02 C-NO-02

CORE 1 STAIR

8

22

W-CO-02

27

E-HR-02

2130

E1

W-CO-02

26

S22D

W-CO-02

15.1.4.2

100 300

100S12D 1060

11A. 11 700x 2100

S05D

Staircase Plan

SP1

MAIN LOBBY W-CO-02

W-CO-02

27

23

28

J MAIN LOBBY

2300 28

29

E-HR-01

Ceiling Mounted Stair Lighting

29

31

SP1

200

270

Ceiling Mounted Stair Lighting

CORE 1 STAIR

32

2C. 47 900x 2100 2040

S29D

W-CO-02 BW-02B - FR120 W-CO-02

E-DR-10

S01D

100 300

S18D

AR-17728

AR-17711

13.3.1.5

DW-03A-100s

5980E-DR-10 S12D

DW-03A-100s 5 E-DR-11 FEMALE BREAKROOM DW-03B-50s AR-17728

DW-03B-50s

13.3.1.11 23.04 Screed) m² F-CO-02A (Concrete

W-GB-01

FU-CH-B08

WC MALE

11A. 161 700x 2100

7

2

S01D

S06D

BW-02B - FR120S05D W-CO-02

BW-02B - FR120

1060

BW-02B - FR120 DW-03A-100

450

W-CO-02

BW-02B - FR120

E-DR-10 11A. 12 700x 2100

DW-03B-50s

M5B

E-DR-11 DW-03A-50s

E-DR-11

WC MALE CIRCULATION

11A. 161 700x 2100

W-CO-02

4660

W-GB-01

11A. 162 700x 2100

W-GB-01

S14D

W-GB-01

S05D

S05D

W-CO-02

DW-03B-50s

W-CO-02

E-DR-12

11A. 14 700x 2100

11A. 13 700x 2100

S05D

S23D

L

11A. 12 700x 2100 W-CO-02

S23D

3J. 118 700x 2100

3500

33

30

E1

Lighting

30

3370

34

CORE 1 STAIR

1030

800 60

E-HR-02 35

CORE 1 STAIR

W-GB-01

1360

11A. 13 700x 2100

S22D DW-03A-100

W-GB-01

S29D

S23D

DW-03A-100s

P

S28D 2B. 49 900x 2100

S22D

3J. 118 700x 2100

S05D

-0.85 FFL -0.90 SSL

8

SSL 1M

+5.85 Stair

31

36

Ceiling Mounted Stair Lighting

200

32

S29D

W-GB-01

W-CO-02

100

150

W-GB-01

M5B

?

S05D

S14D2100 3J. 117 700x

DW-03A-100s

S18D

2140

W-CO-02

W-CT-02

BW-02B - FR120

O

2350

37

CORE 1 STAIR

33

S05D

1360

DW-03A-100s

1320

S28D

DW-03A-100s

26.81 m² W-GB-01 -0.85 FFL -0.90 SSL

200

11A. 14 700x 2100

W-GB-01

S23D

3J. 93 700x 2100

S22D S23D

4400

500

38

+6.00 +6.00

34

1

S23D

100

?

C-GB-04 C-GB-04A

-0.85 FFL -0.90 SSL

S22D DW-03A-100s

E-DR-11

3J. 117 700x 2100

150

1180

DW-03A-100s

S07D

BW-01B

CW-400

CORE 1 LOBBY

Ceiling Mounted+6.00

35

2

42

100

S06D

E-HR-01

+10.90 m

+6.00 +6.00

W-CO-02 E-HR-02

36

3

Ceiling Mounted Stair Lighting

1 39

BW-02B - FR120

LEVEL 3M +23.50 m

2C. 47 900x 2100

1000 200

37

4

3 2

+6.00 +6.00

1030

3J. 119 700x 2100

CW-300

2350

200

5

4

W-CO-02

1

E-HR-02

38

41

SSL 1M

1650

1000

1300

5

CW-400

1

40

CORE 1 CIRCULATION

ART LOADING

2

13.3.1.14

E-DR-12

3J. 119 700x 2100

160

S01D

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

S18D

9

W-CO-02

3

39

6

6

4

50

E-DR-11

1.01

ART LOADING

E-HR-02

5

3

CORE 1 STAIR

2

8 8 +6.00 +6.00 7 7

E-HR-02

6

6 5 4

10

9

7

MALE WET ZONE

DW-03A-100s

S03D

S01D

26.81 m²

F-CO-02B W-CO-02 100 AR-16013 W-GB-01

3J. 94 700x 2100

2C. 47 900x 2100

3500

13 12 11

10

CORE 1 STAIR

8

7

14

CW-400 W-CO-02 9

+8.508

15

SSL 2

12

11

39

E-HR-02

W-CO-02 CW-400

E1

13

9

S23D S22D

S21D

S03D

S14D

W-CO-02

SSL 2

1650

1300

11

9

16

37

CW-300

+8.50

15 14

W-CO-02 10

10

17

W-CO-02

+13.35 m

2300

1000 200

LEVEL 1

11

18

E-HR-02

13

16

E-HR-02

12

19

18

14

Ceiling

Stair Lighting

W-GB-01

W-CO-02

17

Mounted E-HR-01

CORE 1 STAIR 13

3J. 93 700x 2100

S05D

35

W-GB-01 38

E-DR-11

1040

1320

MALE WET ZONE W-GB-01 13.3.1.14

BW-01B

DW-03A-100s

S08D

S21D

11A. 15 700x 2100

S08D

BW-01B

S12D

BW-01B

W-CO-02 DW-03A-100s

1

1180

M1A1W-GB-01

W-GB-01

DW-03B-50s 36

100

280

W-CO-02

BW-01B BW-01B

S21D

DW-03A-100s

DW-02A-100s

700

W-GB-01

34

S23D

1180

+10.90 m

18

16

14

Ceiling Mounted Stair Lighting

E-HR-02

19

E-HR-02

32

S22D

3J. 94 700x 2100S11D

100

W-CO-02

O

200

19

20

E-HR-02

15

20

Ceiling E-HR-02 E-HR-02 Mounted Stair CORE 1 STAIR E-HR-01 Lighting

15

Ceiling Mounted Stair CORE 1 STAIR Lighting

+6.00 m

21

17 16

12

SP1

23

22 22

21

20 19 18

17

+13.35

2430

1300

+8.50

23

20

21 CW-400

21

29

27 26 25

24

31

33

W-CO-02

+13.50

26

CORE 1 STAIR

S21D

100

S06D

SSL 3MM

25

24

50

30

S01D S18D

E-HR-01

CW-400

28

22 22W-CO-02

1180

DW-03B-50s S16D

BW-02B - FR120

F-CO-02B (Concrete Screed) W-CO-02

2110

11A. 15 700x 2100

CW-400 S19D S03D

S15D FU-LO-B01

-0.85 FFL -0.90 SSL

W-CO-02

7

400

DW-03A-50s

W-GB-01

AR-17728

W-GB-01

11B. 163 900x 2100 BW-02B - FR120 DW-03A-100s

W-CO-02

E-DR-11

W-CO-02

130 550

BW-01B - FR120

W-GB-01 DW-03A-100s

11A. 162 700x 2100

E-DR-09

W-CO-02

DW-03A-100s

W-GB-01

CW-400

W-CO-02

FU-LO-B01

22.00 m²

-0.85 FFL SSL S03D S19D -0.90S16D

F-CO-02B (Concrete Screed)

390

BW-01B

29

1030

W-GB-01

+13.50

27

23

23

S07D

DW-03B-50s 30

W-CO-02 29

24

33

GALLERIES

+13.35 m 30

E-HR-02

30

28

W-CO-02 24

E-HR-02

E1

25

31

E-HR-02 25

+8.50

26

32

+13.35

E-HR-02

280

1030

+16.75 m

32 31

50

S14D

32

200

1000 200

27 26

SP1

27

E-HR-02

E-HR-01

28

CORE 1 STAIR

W-CO-02

28

Ceiling Mounted Stair Lighting

1040

35

S12D

+26.80 m

GALLERIES

CORE 1 STAIR

37 CW-400

36

50

700 W-GB-01

22.00 m²

150

W-GB-01

37

1030

2050

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

-0.85 FFL -0.90 SSL

700

E-DR-11

390

DW-03A-100s DW-02A-100sS13D

390

29

+13.50 +13.50

42

Ceiling Mounted Stair Lighting

AR-17711

S11D

40

33

CORE 1 STAIR

700

38 W-GB-01

34

W-CO-02

2

E-HR-02

390

S13D

CW-400

E-HR-02 3

E-HR-01

29

CORE 1 STAIR

29

Ceiling Mounted Stair Lighting

38

11A. 10 700x 2100

4

W-CO-02

E-HR-02

700

700

FEMALE WET ZONE

DW-03A-50s

31

6

+13.50 +13.50 34

34

30

33

E-HR-02

31 30

39

34

Ceiling Mounted Stair Lighting

33 32

E1

35

35 34

E-HR-02

CW-400

1

150

1

13.3.1.13

DW-03A-50s S15D

W-CO-02 BW-01B

W-CO-02

F-CO-02B (Concrete Screed)

40

7000

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

S16D DW-03B-50s

F-CO-02B (Concrete Screed)

BW-02B - FR120

13.3.1.13

P

F-CO-02B W-CO-02 C-GB-04 W-GB-01

FU-LO-B01

CW-400

FU-BC-B01

FEMALE WET ZONE W-CO-02 S19D CW-300S08D S03D

+16.00 FFL W-CO-02 DW-03A-50s

S16D DW-03B-50s

41

W-GB-01

FU-LO-B01

BW-02B - FR120

AR-17728

W-CO-02

W-GB-01

W-CO-02

CORE 1 STAIR

300

39

FU-BC-B01

-0.85 FFL -0.90 SSL

23.04 m²

W-GB-01

W-CO-02

BW-01B W-CO-02

5

DW-03B-50s

WC MALE

7000

FU-LO-B01

FU-LO-B01

BW-01B W-CO-02

F-CO-01AW-GB-01 W-CO-02 C-NO-02 S15D

150

S08D S03D

S19D

W-CO-02 DW-03A-50s

LEVEL 4

SSL 2M

41

33

S15D

BW-02B - FR120

39

32 31

I

I

E-DR-10

124 LOCKERS -0.85 FFL -0.90 SSL

W-CO-02 BW-01B

W-GB-01

E-HR-02

CW-400

DW-03B-50s

*Refer to LUS-BP14C-TA-REP-AR-38710

16'F&B and Kitchen Design Guideline Report' for details.

13.3.1.11

11A. 161 700x 2100

CANNED FOOD & FU-BC-B01 BOTTLED DRINKS

47.42 m²

DW-03A-100s

W-CO-02 DW-03A-50s FU-LO-B01 BW-02B - FR120 E-DR-11

W-CO-02

7

CANNED FOOD & BOTTLED DRINKS

W-GB-01

FU-LO-B01

11A. 162 700x 2100

124 LOCKERS -0.85 FFL -0.90 SSL W-GB-01

F-CO-02A (Concrete Screed)

AR-17728

13.3.1.8

47.42 m²

F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A

F-CO-02A (Concrete Screed)

-0.85 FFL -0.90 SSL

AR-17711

+16.75 m

Ceiling Mounted Stair Lighting

STORAGE CORE 1 STAIR

W-CO-02

13.3.1.8

W-CO-02

F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A

FU-BC-B01

DW-03B-50s

O

W-GB-01

42

E1

FU-LO-B01

W-CO-02 150 W-CO-02 CW-400

2600

60 LOCKER

2050

1

SSL 2M

35

35

2

42

37 36 36

W-CO-02 36 36

3

41

W-CO-02

W-GB-01

W-CO-02 CW-400

S13D

100

FU-BC-B01

W-CO-02

DW-03A-100s

1

38

37 E-HR-02

40

1000

38

37 CW-400

CW-600

38

E-HR-02

W-CO-02

39

CORE 1 STAIR

W-CO-02

39

CW-400

4020

200 +10.96 m

40

E-HR-02

1300

LEVEL 1M

41

W-CO-02 DW-03B-50s

S01D S18D

5

Ceiling Mounted Stair Lighting

CORE 1 STAIR

42

11.29 m²

+20.85 m

+16.00 +16.00

14

29.09 m²

W-CO-02

J

7000 MALE CHANGING ROOM

FU-LO-B01 FU-LO-B01

4100

W-GB-01

7000

-0.85 FFL -0.90 SSL

BW-01B W-GB-01 C-GB-02A

O

2600 MALE CHANGING 150ROOM

60 LOCKER

FREEZER ROOM DW-03B-50s

DW-03B-50s

FU-BC-B01

DW-03B-50s

100

F-CO-02A (Concrete Screed)

DW-02A-100s 17.1.1.57 39.35 m²

150

13

E-HR-02 BW-02B - FR120

E-HR-02

2

BW-01C - FR120

300

COREE-HR-02 1 STAIR

1 42 E-DR-11 41

CW-400

SSL 3

+30.00 m

S05D

11A. 1115700x 2100

W-CO-02 W-CO-02 7

E-HR-01

+21.00

Ceiling

1C. 76 1630x 2100

1000

3

2

9

10

+16.00 +16.00

5

4

3

16

280150

3200 FEMALE CHANGING ROOM

AR-16013

W-CO-02 FU-LO-B01

BW-01B

W-CO-02

DW-02A-100s

8

AR-17702

16

FU-LO-B01 BW-02B - FR120

4100

FU-LO-B01 BW-02B - FR120

BW-01B

DW-02A-100s

GALLERIES

CW-400 W-CO-02

W-CO-02 W-CO-02 CW-400

FU-BC-B01

SP1

2

AR-17702

FU-LO-B01

280150

FU-BC-B01

13.3.1.7

W-CO-02

29.09 m²

FU-LO-B01

I

+20.85 m

1B. 205 1630x 2100

4

W-CO-02

Mounted Stair Lighting

9

1500

9

40

BW-01BCeiling

CW-400

1000

+13.50 +13.50 10 111 10 CIRCULATION 8 8 15.1.4.2

BW-01B

6 15

13

7 7 F-CO-02A W-CO-02 C-NO-02 Ceiling 6 6 Mounted 5 Stair 4 E-HR-01 Lighting

5

+13.50 +13.50

16

14

E-HR-01

W-CO-02

7

17

12

17

11

9

9

8 8

18

E-HR-02

E-HR-02

W-CO-02

200

E-HR-01

S28D

19

E-HR-02

W-CO-02 11

CORE 1 STAIR

10

+20.85

S05D

12

S29D

E-HR-02

CORE 1 STAIRE-HR-02

13

Ceiling Mounted Stair Lighting

CORE 1 STAIR 11

14

BW-02B - FR120 W-CO-02

Ceiling 2C. 47 900xMounted 2100 Stair Lighting

13

12

1300

17 16

15

12

SP1

TE LINTEL

essed hting xture

W-CO-02

2040

S05D

14

200

+13.50 m

+16.00

26

15

25

24

23

22

CW-400

CORE 1 CIRCULATION

BW-02B - FR120

+18.50

E-HR-02 S01D

2300

LEVEL 2

E1

23

13.3.1.7

W-GB-01

J

W-GB-01

100

W-CO-02

100

DW-02A-100s

FU-LO-B01

F-CO-02A W-CO-02 C-GB-02

W-GB-01

1000

DW-02A-100s

2800

W-GB-01

W-CO-02

2800

W-GB-01

16

1

9

FREEZER ROOM

COLD ROOM

FU-BC-B01

W-CO-02

DW-02A-100s

W-GB-01

W-CO-02

BW-02B - FR120

3200 FEMALE CHANGING ROOM F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A

W-CO-02

SSL 3

Stair Lighting

1000

2

BW-01B

E-DR-11

W-CO-02

E-DR-11 BW-01B

W-CO-02

W-GB-01

W-GB-01

BW-01B W-CO-02

W-CO-02

F-CO-02A (Concrete Screed)

Mounted CORE 1 STAIR S13D

200

BW-02B - FR120

S23D

E-HR-02 E-HR-02

+23.30 m

+21.00

S06D

11A. 12 700x 2100

2300

W-CO-02

24

1000

150

S05D

E-HR-02

100 300

25

22

W-CO-02 CW-400 SP1

S22D

100+16.001060

26

21 21 3J. 118 700x 2100 Ceiling Mounted 20 S22D 20 E-HR-01 Stair 19 18 Lighting

26

18

E-HR-01

28

27

W-CO-02 CW-400 +20.85 S12D

29 28

19

+18.50

18

200

E1

1360

DW-03A-100s

CORE 1 STAIR

S23D

W-GB-01

150

Ceiling Mounted Stair Lighting

W-GB-01

3J. 93 700x 2100

S07D

1320

100

19 29

17 16

20 CW-400

20

30

E-HR-02 3J. 117 700x 2100 W-GB-01 W-CO-02 E-HR-01 CW-400 27

28

31

E-HR-02

30

25

23

22

21 DW-03A-10021W-CO-02

32

E-HR-02

150

W-CO-02

DW-02A-100s

BW-02B - FR120

SSL 3M

CORE 1 STAIR

31 13 700x 2100 11A.

24

CORE 1 STAIR 23 E-HR-02 22

1300

1180 E-DR-11

24

32

27

S05D

25

34 33

2C. 41 900x 2100

100

S06D

26

35

E-HR-02

30

29

E-HR-01

36 36

CORE 1S23D STAIR

33

Ceiling Mounted S29D Stair Lighting

40

200

1030

S14D

W-CO-02

S23D

S28D

27

1300

3J. 94 700x 2100

Ceiling Mounted 35 Stair S22D 34 Lighting

34

E-HR-02

E-HR-02

28

39

32 31

1500

LEVEL 2M

33

29

?

FU-LO-B01

150

W-CO-02

GALLERIES

S14D

1990

GALLERIES

E-DR-12

S05D

200

E-HR-02

W-GB-01 CW-400 +21.00 +21.00

41

37

37

CORE 1 STAIR

S22D

DW-03A-100s 38 38

39

W-CO-02

34

42

W-CO-02

FU-LO-B01

AR-17711

W-CO-02 CW-400

Ceiling 11A. 14 700x 2100 Mounted Stair Lighting

39

-0.85 FFL -0.9035 SSL

35

33 32 31 30

1000

100

+16.90 m

E-HR-02

200

1180 W-GB-01

1000

280

200

50

11A. 92 700x 2100

40

DW-03A-100s

DW-02A-100s

700 W-GB-01

2270

390

E-HR-02

40

3J. 119 700x 2100

38

36 36

E-HR-02

E-HR-01

BW-01B

AR-17711

3

+23.30 m

+21.00 +21.00 S01D

41

40

150

BW-01B

FU-LO-B01

FU-LO-B01 DW-02A-100s W-GB-01

M5B

CORE 1 STAIR

E-HR-02 11A. 15 700x 2100

42

26.81 m²

CORE371 STAIR 37

DW-03A-100s

W-CO-02 41

Ceiling Mounted W-GB-01 Stair Lighting

13.3.1.14

F-CO-02B W-CO-02 C-GB-04 39 W-GB-01 C-GB-04A

S03D

E-HR-02

42

1300

DW-03A-50s

0

40

38

CORE 1 STAIR

BW-01B

+21.00 +21.00

S21D

1400

-0.85 FFL -0.90 SSL

O-02B (Concrete Screed)

BW-01B

22.00 m²

200

13.3.1.13

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

S16D DW-03B-50s

Ceiling Mounted Stair Lighting

W-CO-02

E-HR-02

W-CO-02

41

S21D

1990 BW-01B

W-GB-01

S18D

2300

W-CO-02

FEMALE WET ZONE

MALE WET ZONE

42

3620

150

F-CO-02A (Concrete Screed)

FU-BC-B01

P SSL 3M

E-HR-02

Ceiling DW-03A-100s MountedE-HR-01 Stair Lighting

S08D

1B. 205 1630x 2100

CORE 1 STAIR

F-CO-02B (Concrete Screed)

1000

SP1

E-HR-02

S16D

+21.00 +21.00

S15D

W-CO-02 BW-01B

E1

D S03D

E-DR-11

2300

+21.00 m

C-GB-05 S03D S19D +3000 AFF

2000

LEVEL 3

W-CO-02

E-HR-02

W-CO-02

200

Ceiling Mounted Stair Lighting

2300

3260

W-GB-01

100 60 200

DW-02A-100s W-GB-01

200 BW-02B - FR120

CORE 1 LOBBY

Ceiling Mounted Stair Lighting

280

BW-01B

CORE 1 STAIR

1000

SP1

-0.90 SSL CORE 1 CIRCULATION

F-CO-02A (Concrete Screed)

CW-400

BW-02B - FR120 W-CO-02

W-GB-01

M1A2 F-CO-02A (Concrete Screed)

W-CO-02

W-CO-02

150

FU-LO-B01

W-CO-02

W-CO-02

CW-400

-0.85 FFL -0.90 SSL

W-CO-02

150

S18D

W-CO-02

*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.

-0.85 FFL -0.90 SSL

*Refer to LUS-BP14C-TA-REP-AR-38710 BW-01B W-GB-01 'F&B and Kitchen Design Guideline W-GB-01 Report' for details. W-CO-02

-0.85 FFL -0.90 SSL

3620 F-CO-02A (Concrete Screed)

W-CO-02 -0.85 FFL

6.58 m²

F-CO-02A W-CO-02 C-GB-02

F-CO-02A (Concrete Screed)

BW-02B - FR120

4540

100 60 200 2000

5450

Stair Lighting

F-CO-02A W-CO-02 C-GB-02

25.48 m²

12 SEATS

BW-01B

180

200

180

COLD ROOM

BW-02B - FR120

S18D

FU-TA-B05

1000

25.48 m²

12 SEATS

W-CO-02

F-CO-02A W-CO-02 C-GB-02

3800

BW-01B

6.58 m²

BW-01B

13.3.1.6

13.3.1.9

2C. 115 900x 2100

W-CO-02

180W-CO-02 1000 FEMALE CORRIDOR CW-300

4400

13.3.1.9

F-CO-02A W-CO-02 C-GB-02

BW-01B

MALE BREAKROOM

BW-02B - FR120 W-CO-02

-0.85 FFL -0.90 SSL

13.3.1.6

3800

CW-400

FU-BC-B01

400

+29.00 m

W-CO-02

FU-LO-B01 C-GB-05 +3000 AFF

BW-01B W-CO-02 Mounted

E1

FU-LO-B01

BW-01B

1000

MALE BREAKROOM

KITCHEN

2C. 115 900x 2100

-0.85 FFL

FU-CH-B08 -0.90 SSL

180

FU-CH-B08

E-HR-01

1120

BW-01B

42 x 280.0 /178.6

FU-BC-B01

Ceiling

LEVEL 3M +23.50 m

2200

CO-02 C-GB-02 GB-01 C-GB-02A

FU-TA-B05

BW-02B - FR120 W-CO-02

CW-400

FU-TA-B05

5.30 m²

W-CO-02

2C. 61 900x 2100

1000

BW-01B

FU-CH-B08

FU-TA-B05

3

7000

200

-0.85 FFL -0.90 SSL

oncrete Screed)

CIRCULATION

CW-400

2200

1830

150

W-CO-02

E-HR-02

FEMALE CORRIDOR

2C. 61 900x 2100

SSL 4T

W-CO-02

1200

60 LOCKER

+29.85 m

F-CO-02A (Concrete Screed)

W-GB-01

1.01

280

W-CO-02

SSL 4

W-CO-02

180

BW-01B

1120

BW-02B - FR120

42

BW-02B - FR120 FU-TA-B05

W-CO-02

FU-LO-B01

4540

FU-LO-B01

W-CO-02

47.42 m²

124 LOCKERS -0.85 FFL -0.90 SSL

13.3.1.10

W-CO-02

FU-LO-B01

5740

BW-01B

2600

29.09 m²

FU-TA-B05

5.30 m²

W-CO-02 W-CO-02

CW-400

MALE39CORRIDOR

CW-500

BW-02B - FR120

W-CO-02

CW-500

1350 1000

37

41

F-CO-02A (Concrete Screed)

2C. 91 900x 2100

13.3.1.8

F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A

O

150 180

W-CO-02

38

FU-CH-B08

120

7000 MALE CHANGING ROOM

FU-BC-B01

DW-02A-100s

100

FU-CH-B08

2AJ. 43 1100x 2100

W-CO-02

F-CO-02A40W-CO-02 C-GB-02

W-CO-02 CW-400 CIRCULATION

+29.00 m

36

CW-500

1010

W-CO-02

CW-300

J

35

BW-02B - FR120

W-CO-02

SSL 4T

CANNED FOOD & BOTTLED DRINKS 7330

280150

FU-BC-B01

00 CHANGING OOM

13.3.1.10

F-CO-02A (Concrete Screed)

FU-TA-B05

W-CO-02

1000

DW-03B-50s

200

W-GB-01

W-GB-01

150

SSL 4

200

DW-02A-100s

1720

SSL 3MM +26.80 m

FU-CH-B08

MALE CORRIDOR

CW-500

33 F-CO-02A (Concrete Screed) -0.85 FFL CIRCULATION 34 SSL -0.90

W-CO-02 CW-500

W-CO-02

+29.85 m

W-CO-02

FU-LO-B01

KITCHEN

CW-400

180

F-CO-02A W-CO-02 C-GB-02

BW-02B - FR120

E-HR-01 CW-500

W-CT-02 BW-02B - FR120

FU-BC-B01

2430

W-CO-02

4100

1830

150

W-CO-02

29

W-CO-02

100

150

BW-01B

1000

J

P

4020

3620

31SEATS 12

32

W-CT-02

W-CO-02

FU-CH-B08

F-CO-02A (Concrete Screed) 30 -0.85 FFL -0.90 SSL

FU-LO-B01

FU-LO-B01

1400

1400

-0.85 FFL -0.90 SSL

2800

W-GB-01

BW-01B W-CO-02

W-CO-02

2C. 90 900x 2100

+30.00 m

150

39.65 m²

F-CO-02A 32W-CO-02 C-GB-02

S18D

FU-LO-B01 BW-02B - FR120

W-GB-01

W-GB-01

150

150

LEVEL 4

W-CO-02

13.3.1.5

W-CO-02

AR-17711

DW-02A-100s

W-GB-01

34

W-CO-02

FEMALE33BREAKROOM

BW-02B - FR120

1590 BW-01B

(Concrete Screed)

FREEZER ROOM

4660

35

E-DR-11

2

W-CO-02

O

W-CO-02

W-CT-02

400

BW-01B

E-DR-11

36

150

BW-01B - FR120

F-CO-02A (Concrete Screed)

CW-400

FU-TA-B05

E CORRIDOR

1350 1000

12 SEATS

E-DR-09

3500

180

38 37

W-CO-02

3800

150 180

FU-TA-B05

39.65 m²

31 F-CO-02A W-CO-02 C-GB-02

S18D

2150

SP1

1000

39

S18D

BW-01B

11A. 96 700x 2100

180

-0.85 FFL -0.90 SSL

W-CO-02

*Refer to LUS-BP14C-TA-REP-AR-38710 AR-17711 'F&B and Kitchen Design Guideline Report' for details.

E1

BW-01B

13.3.1.5

W-CO-02

40

2700

2C. 116 900x 2100

-0.85 FFL -0.90 SSL

150

FU-CH-B08

00

AR-16013 1010

FU-CH-B08

FEMALE BREAKROOM 30

BW-02B - FR120

41

2

1400

12 SEATS

2C. 115 900x 2100

CORE 1 CIRCULATION

W-CO-02 C-GB-02

42

*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.

280 280 280 280 280 280 28011A.280 280 92 700x 2100 280 280 280 280 280

1000

4400

7380

1.01

6.58 m²

W-CO-02

29

M1A1

W-CO-02

4660

E-DR-11

W-CO-02

1260

25.48 m²

F-CO-02A W-CO-02 C-GB-02

E1

2050

W-CO-02

W-CT-02

CW-400

A recreational building designed by a renowned architectural company. My office was the executives of this long going project. In my 5 O months of internship, I worked on these detail drawings and general plans both on Autocad and Revit. The most important point of this project for me was seeingO a large scale application project andPlearning to use Revit on the BIM environment. Details and further information can be shared in an interview due to confidentiality. J

CW-500

7380

13.3.1.9

CW-300

W-CO-02 CW-400

W-CO-02

MALE BREAKROOM

BW-02B - FR120 M1A2 W-CO-02

W-CO-02

300 400 E-HR-02

1

4000

BW-01B

W-CO-02

CW-300

2050

COLD ROOM

BW-02B - FR120

4800

W-CO-02

W-CO-02

CORE 1 LOBBY

W-CO-02

W-CO-02

W-CO-02

8

CIRCULATION F-CO-02A (Concrete Screed)

BW-01B - FR120 AR-17702 W-CO-02

1560

CW-400

December 2018 - May 2019 SP1

2AJ. 43 1100x 2100

E-DR-09

2

+16.00 FFL

2150

BW-01C - FR120

E-HR-01

CORE 1 CIRCULATION

CW-300

AR-17702

1000

E-HR-02

E-HR-01

W-CO-02

39.35 m²

1370

42

9

FU-TA-B05

FU-TA-B05

5.30 m²

17.1.1.57

*ReferF-CO-01A to LUS-BP14C-TA-REP-AR-38710 W-CO-02 C-NO-02 'F&B and 1 Kitchen Design Guideline Report' for details.

1200

13.3.1.10

CORE 1 STAIR

CW-400 W-CO-02

CORE 1 CIRCULATION

F-CO-02A W-CO-02 C-GB-02

2260

W-CO-02

CORE 1 LOBBY

O

500

1.01

CW-500

41

CW-400

W-CO-02

FU-CH-B08

40

400 70

FU-CH-B08

4400

39

MALE CORRIDOR

2C. 64 900x 2100

29

12 SEATS

CO-02

180

37

38 CW-400 W-CO-02

KITCHEN

CW-400

CW-300

520

31 30

W-500

W-CO-02

36

8

AR-17702

P

150

1350 CW-300 1000

W-CO-02

2

AR-17702

GALLERIES

W-CO-02

M1A2

35

1370

FU-TA-B05

CO-02A (Concrete Screed) -0.85 FFL -0.90 SSL

150 180

34

Tabanlioglu Architects 32

-CO-02A W-CO-02 C-GB-02

6

P

280 280 280 280 280 280 280 280 280 280 280 280 280 280

34 33

39.65 m²

42 x 280.0 /178.6

35

2C. 64 900x 2100

1010

36

FU-CH-B08

O MALE BREAKROOM

33

1

9

2AJ. 43 1100x 2100

2330

42

E-HR-01

31

E-HR-01

3920

150

38 37

W-CO-02

4660

13.3.1.5

41

E-HR-02

DETAIL DRAWINGS 39

8510

CO-02

30

40

280 280 280 280 280 280 280 280 280 280 280 280 280 280

40

CIRCULATION 29

M1A1

3J. 94 700x 2100

W-CO-02

29

2100

BW-01B - FR120

41

30

1200

280 280 280 280 280 280 280 280 280 280 280 280 280 280

42

2050

31

E-HR-02

280 280 280

300

E-DR-09

42 x 280.0 /178.6

32

2050

280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280

W-CO-02

W-CO-02

W-CO-02

42 x 280.0 /178.6

CW-400

0

STORAGE

I

7

I


CO-PRODUCING SPACE Architectural Design Studio “Co-producing Space� (Armelle Tardiveau) Newcastle University April 2017-June 2018 As a group of four, we have designed an intervention which can stimulate the public bonding among Ouseburn residents. Our design is made of scrap materials found in Daysh building when some of the office utiliences were thrown away. We bought other cheap materials such as polycarbonate sheet and hinges so with a minimum cost we created this intervention for different activities. We demonstrated a plant making event nearby the Toffee Factory.

Office dividers to panels

Table and shelter added

Bench from scrap materials

Intervention can serve locals in many ways

Local planting session

Process 8


DISSERTATION Architectural Design Studio “Design for Vulnerable Populations� Newcastle University (Daniel September 2017-February 2018 The aim of the research was to demonstrate the implementation of counter-terrorism design strategies without harming, on the contrary strengthening the democratic quality of the public spheres. The research has been setting out; Investigating the motivations of terrorism and hostile reconnaissance process, Comprehending the balance between security needs and necessity for secularised urban spaces wherein the users feel both safe and free Scrutinising the epitome of crime prevention through design measures and examine feasibility

Over-securisation is portrayed through digital hand sketches

Vehicles reaching public areas in case of an emergency

Graphic-novel style case study descriptions

Public spaces must divide the crowd into smaller groups 9


LEAZES WELLBEING CENTRE Architectural Design Studio “Design for Vulnerable Populations� Newcastle University (Tim Townshend) September 2017-January 2018 Through the interviews with the vulnerable groups (inflicted by drug and alcohol abuse) and discussions with some local architects and planners, we designed a well-being centre which would contribute these vulnerable people both psychologically and functionally. Finally, we presented this project to the Newcastle Planning authorities and received many positive feedbacks. Whilst all of us contributed on the design, I have worked on the renders, plans and sections.

Facade

Maquette

Plan

Cafe

Gym

Section 10


TYNE STUDENT HUB

Architectural Design Studio “20th Century Architecture” Newcastle University November 2016-February 2017

Axonometric Site Plan

Keelman’s Hospital is an abandoned hostel which has a rich history and can be connected with our

Salvation Army Mens’ Palace building was serving as a homeless hostel until few years ago. There are

private residences around the specified building and the area is extremely rich with diverse cultural

backgrounds which is contributed by many student accommodations around.

Plan

Perspective Section

Without harming the nature of our Grade II listed Salvation Army building, we have designed this 17m2 rooms which can accommodate up to 70 people and the number can reach to 140 with the inclusion of Keelman’s Hospital. These rooms are going to serve homeless youth and they can acquire new skills in the student hub for further study. The design aims to provide a hub not only for the residents here but the students from other accommodations can equally benefit from the student hub. This would contribute the social interaction of vulnerable homeless children which can also psychologically support them to include in society. There is, therefore, a cafe, study room and a recreational common hall to provide all sort of services they may need.

En-suite Rooms

Facade of Student Hub 11


DURHAM BOATHOUSE

Architectural Design Studio “Measure� Newcastle University (March-May 2016) The project is located at the southern banks of the River Wear, accords with the 12th century Romanesque Cathedral. The project brief was mainly focussed on providing boat shed, cafe and service areas but also considering the risk of flood.

Maquette

The roof takes its shape from the dynamic nature of rowing and allows daylight to be entered into the building. Corten panels are used to cover steel frame structure for its damp resistance and appropriateness to the specified location.

Resillience

Environment

Wet areas that are boat storage and changing rooms are situated below the flood line while areas which must be protected from water penetration such as the technical room, lift and rest are positioned 1.2m above the ground level (.2 above the flood line)

The building is juxtaposed among the existing trees Foundations are planned to be fibre piles due to the proximity with the trees, so that the piles will be carefully placed between the roots of the trees (Casa Levene in Spain for precedence).

Circulation

Spaces

Keeping the existing roads and covering them

Consists of boat sheds/storage area, small cafe, service areas

Section

Boathouse and Durham Cathedral on the background 12


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.