PORT FO LIO AHMET
H AY TA
email: ahmethayta@me.com
CONTENTS
BALAT AFTER SCHOOL CENTRE
ACADEMIC (INDIVIDUAL)
2019-2020
1-3
BUILDING SURVEY
ACADEMIC (GROUP)
2019-2020
4
COMPETITION PROJECTS
PROFESSIONAL
2019
5
APPLICATION PROJECT
PROFESSIONAL
2019
6
DETAIL DRAWINGS
PROFESSIONAL
2018-2019
7
CO-PRODUCING SPACE
ACADEMIC (GROUP)
2018
8
DISSERTATION
ACADEMIC (INDIVIDUAL)
2017-2018
9
LEAZES WELLBEING CENTRE
ACADEMIC (GROUP)
2017-2018
10
TYNE STUDENT HUB
ACADEMIC (GROUP)
2017
11
DURHAM BOATHOUSE
ACADEMIC (INDIVIDUAL)
2016
12
BALAT AFTER SCHOOL CENTRE Architectural Design (Oğuz Özer Studio) (Individual) Mimar Sinan Fine Arts University, Istanbul September 2019 - January 2020 After school learning centre is based in Istanbul’s Balat district, aims to respond for the publicly open spaces which is observed to be lacking in the area. It is purposed to provide a quiet study area and extracurricular activities such as music, dance or illustrative art courses for the youth around, particularly for the specified in blue colour on the site map, Tarık Us Middle School’s pupils. The idea is to create public areas for the low-income residents of Balat in particular because the ongoing urban regeneration plan is driven by the economic tourist-oriented zeal and most of the elite developments are risking the low-income groups in the area.
Old and new
Area’s industrial background is celebrated through the corten panels and the contrast with the existing old walls is intended.
Topography
Porosity
Vegetation The elevation of 3m beared by the old walls is replaced by my intervention. The area is located in the church property so a relationship was also built with it.
Narrow streets and highly divisive blind walls are overwhelming Balat. Few opennings are created on the existing walls to make the building more public and porous. The intervention mimics the topography and the pattern that plane trees create. The area is also populated with various fruit trees. 1
Construction Diagram
Road Side Elevation
Front Elevation
Church Side Elevation 2
3
3
B
B
2
2
A
Ground Floor Plan
Section 1
A
First Floor Plan
Second Floor Plan
Study Room
Music Room
Section 2
Section 3
Courtyard First Floor 3
BUILDING SURVEY Building Surveying (Mevlude Kapti Studio) (Group) Mimar Sinan Fine Arts University, Istanbul September 2019 - January 2020 This project is carried out with a pair, while one of us was taking the measurements the other was drawing. The pavillion we worked, Zülüflü İsmail Paşa Köşkü is located in Kadikoy, an Asian district of Istanbul. In this module, which consists of theory and practice; the theory was about documenting historical structures, ICOMOS and UNESCO heritage preserving procedures and techniques of building or restoring on historical sites. And in the practice part, my partner and I worked on this pavilion and documented meticuluously each plans and window/door details. I am currently taking the second part of this lecture, in which we learn how to approach the building techniques and determine the structure and its construction technology. This semester we will work on the elevations and draw sections of this building. PRODUCED BY AN AUTODESK STUDENT VERSION
Window Elevations & Section PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PAFTA NO
2M
ADRES
BACA
B4 ÖĞRETMENLER ODASI
B3 ÖĞRETMENLER ODASI
KADIN WC DEPO
KANTİN
B2 ÖĞRETMENLER ODASI
MUTFAK
B1 ÖĞRETMENLER ODASI
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
ERKEK WC WC HOLÜ
PRODUCED BY AN AUTODESK STUDENT VERSION
TESİSAT
Z3 SINIFI
TESİSAT BACA
PRODUCED BY AN AUTODESK STUDENT VERSION
ANA HOL
Z4 SINIFI
BACA
ANA HOL
DEPO
WC HOLÜ
ERKEK WC
BACA
BACA
KADIN WC
GİRİŞ HOLÜ
Z2 SINIFI
Building Plans
TESİSAT
Z1 SINIFI
VERENDA
PAFTA SAYISI : 18 PAFTA NO ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN
KENT
TESİSAT
BACA
TESİSAT
DEPO
MUHASEBE GİRİŞ HOLÜ
WC HOLÜ
ERKEK WC
BACA
KADIN WC
REHBERLİK ODASI
A2 SINIFI
ANA HOL
A1 SINIFI
BALKON
ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN
:2
ADRES
İSTANBUL
FOTO SAYISI
1
ADA
397
PAFTA
PARSEL
1
2M
105 28
: ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101 ÖLÇEK: 1/50
GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE
:3
ÖLÇEK: 1/50
GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE
PARSEL
BALKON
1
ADA
397
PAFTA
ANA HOL
TESİSAT
TESİSAT
DEPO
WC HOLÜ
WC
KAZAN DAİRESİ
DEPO
DEPO
ANA HOL
1
2M
Door Elevation
KENT İSTANBUL
FOTO SAYISI
B1 SINIFI
PARSEL
105 28
: PROF. DR. HALE TOKAY : ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101
TESLİM TARİHİ: 2020
: PROF. DR. HALE TOKAY
TESLİM TARİHİ: 2020 ADRES
PARSEL
105 28
ÖLÇEK: 1/50
A3 SINIFI
ANA HOL
BİRİNCİ KAT PLANI
KENT
KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE
KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ
A4 SINIFI
PAFTA NO
2M
PAFTA
105 28
B2 SINIFI
PAFTA SAYISI : 18
1
397
ASANSÖR
KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE
ZEMİN KAT PLANI
ADRES
ADA
: ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101
TESLİM TARİHİ: 2020 2M
1
GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE
BALKON
PRODUCED BY AN AUTODESK STUDENT VERSION
TESİSAT BACA
ADRES
GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE
BALKON
B5 ÖĞRETMENLER ODASI
PAFTA
397
YANGIN ASANSÖR MERDİVENİ
: ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101 ÖLÇEK: 1/50
1
İSTANBUL
FOTO SAYISI
: PROF. DR. HALE TOKAY
YANGIN MERDİVENİ
: PROF. DR. HALE TOKAY
TESLİM TARİHİ: 2020
ÇATI KATI TAVAN PLANI
: 12
PARSEL
105 28
PRODUCED BY AN AUTODESK STUDENT VERSION
1
PAFTA
397
ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN
: ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101
PRODUCED BY AN AUTODESK STUDENT VERSION
ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN
ZEMİN KAT TAVAN PLANI
ADA
1
PAFTA NO
: PROF. DR. HALE TOKAY
TESLİM TARİHİ: 2020 2M
ADA
İSTANBUL
FOTO SAYISI
: 10
PRODUCED BY AN AUTODESK STUDENT VERSION
YANGIN ASANSÖR MERDİVENİ
ASANSÖR
B6 ÖĞRETMENLER ODASI
ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN
1
PRODUCED BY AN AUTODESK STUDENT VERSION PAFTA NO
1
: 11
KENT
KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE
PAFTA SAYISI : 18
İSTANBUL
FOTO SAYISI
PAFTA SAYISI : 18
BİRİNCİ KAT TAVAN PLANI
PAFTA SAYISI : 18
KENT
KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE
Ceiling Plans YANGIN MERDİVENİ
KENT
KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
ÖLÇEK: 1/50
GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE
4
84019 COMPETITION PROJECTS Korean War Veteran Memorial Museum (Eray Carbajo) & Berlin Architecture Museum (Independent) May 2019 - August 2019 First project, Korean War Museum which had a memorial influenced by Korean traditions of commemorating head up and so the names of the veterans are presented on a higher level. I participated with the diagrams and sections. Berlin Architecture Museum; presents different architectural movements with each sense, all of which is connected to the ‘heart’, and that is the foyer. Alienated nature of Berlin’s architecture gave us the idea of walls detracting from the people. Renders and diagrams are contributed by me.
Change of emotions; during war, victory & aftermath
‘Escaping walls’
Lobby ‘the Heart’
Toprak (Cennet) Anıt, T (Sembol)
Anıt, T (Sembol) Toprak (Cennet)
(Geleneksel) Özlem, Hüzün, Ölüm
(Öneri) Saygı, Minnet, Umut
Study of Korean traditional commemoration
Library
Sections
Section
Y
5
APPLICATION PROJECT Eray Carbajo Architects May 2019 - August 2019 This is a barber shop project I really enjoyed working on. Application details, ceiling plans and sections are drawn by me and I have also attended to the process of timber cladding production, it was challenging to fit curvy forms aligned however the results were surprisingly good. This project helped me to acquire and develop many skills such as overcoming deadlines and work effectively.
Plan
Section
Details
Shop-front Elevation & Plan (top to bottom)
Timber cladding workshop 6
AR-16013
F-CO-02A (Concrete32Screed)
CW-400
400 70
2260
520 1000
4800 150
1370
2C. 116 900x 2100
150 1590
4800
14
E-HR-02
30 29
CW-400 15
+18.50
2400
1030
50
S01D S18D
CIRCULATION
1040
S12D
100
S06D
WC MALE
S03C
S13D
S08C
S21C
1320
3J. 93 700x 2100
W-GB-01
150
1360
DW-03A-100s
S23D
S07C
100
W-CO-02
W-GB-01
3J. 118 700x 2100
520 1200
1560
400 70
160 2150 1520
1000
4800
150
150
1370
2C. 153 900x 2100
1590
11B. 156 900x 2100
520 1200
7330
5740
150
280 800
1030
400 70
260
1060
800 260
1060
800 260 800
1060
260
2040
1090
1140 1260
1260
+2.65
C-GB-04
C W-CO-02
+1.75
Ceiling hanger
CIRCULATION
W-CO-02
WC MALE
W-CO-02
S01C
S06C
S14C
W-GB-01
S03C S08C
W-GB-01
3500
4000
W-CO-02 +1.75 C-GB-04
COLLECTION STORAGE
-0.90 -0.85
C-GB-04
W-CO-02
W-GB-01 S07C
S21C S01C
F-CO-02B (Concrete Screed) Concrete Screed Liquid Sprayed Waterproofing Cast-in-place concrete
+1.75 C-GB-04
C
2600
1260
W-CO-02
CW-600
2600
3500 2150
1010
1260 2040
1140
1850 1260
2C. 41 900x 2100
800
1090
270
2490 1260
7330
2600
830
4800 150
150 5740
C
S06C
S14C
S12C
-0.90 -0.85
S12C SSL B1 -0.90 m
280
150 1030
E-DR-12
S29D
Ceiling hanger
S05D
W-GB-01
1060 S23D
100 300
S05D
COLLECTION STORAGE
S29D
S22D
260
1060
BW-02B - FR120 S14D
S28D
J
2040
E-DR-10 S12D
S06D S05D
11A. 12 700x 2100
DW-03A-100
S23D
Staff Room Plan
S05D
11A. 13 700x 2100
S28D
?
S01D
1060
-0.85 FFL -0.90 SSL
8
M5B
S18D
11A. 14 700x 2100
260
1400
E-DR-11
DW-03A-100s
S22D
100
W-GB-01
26.81 m²
800
13.3.1.14
260
MALE WET ZONE
F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A
W-GB-01
3J. 117 700x 2100 +1.75 C-GB-04 +1.75 C-GB-04 S23D
STORAGE
11A. 10 700x 2100
CW-400 -0.90 -0.85
800
S08D
S21D
DW-03A-100s
S22D
1180
1590
6750 1200
S16D
DW-03A-100s
CeilingS03D hanger support
100
3J. 94 700x 2100
W-CO-02 50 1030
S14D
1180 W-GB-01
W-CO-02
BW-02B - FR120
1060
280
80 720
2C. 90 900x 2100
1400
1400 150
150
1720 1200
3260 1400 2270
S03D S19D F-CO-02B (Concrete Screed)
BW-01B
W-GB-01
S13D
+5.85 m
S21D
DW-03A-100s
C-GB-04
Liquid Sprayed Waterproofing Cast-in-place concrete
FU-LO-B01
SSL 1
800
700 W-GB-01
FU-LO-B01 Concrete ScreedW-CO-02
-0.90 -0.85
260
390
DW-02A-100s
+1.75
S07C S21C W-CO-02 Concrete Screed Liquid Sprayed Waterproofing Cast-in-place concrete
F-CO-02B (Concrete Screed)
FU-BC-B01
7000
+5.85 m
W-GB-01
WC FEMALE BW-02B - FR120
W-GB-01
S05D SSL 1
BW-02B - FR120 Ceiling hanger support
W-CO-02
S03C
S13D
S01D
CANNED FOOD &
W-GB-01
S21C
S05D
DW-03A-100s
11.29 m² BOTTLED DRINKS
FU-LO-B01 +2.65 +1.75
-0.90-0.85
BW-01B
3J. 119 700x 2100
S28D
CIRCULATION
WC MALE S08C
CW-400
800
2600
2150
0
S13D
S01D
1090
150
11A. 96 700x 2100
W-GB-01
700 W-GB-01
2C. 116 900x 2100
550 1930 1940
160
2490
1090
150
BW-01B CIRCULATION F-CO-02A (Concrete Screed) W-CO-02
S15D
1260
DW-03A-50s
47.42 m²
S06D
11A. 11 700x 2100
S29D
I
E-DR-10 S12D
+3.15
F-CO-02A W-CO-02 C-NO-02
C-GB-04
2040
S05D
W-CO-02
S22D
BW-02B - FR120 S14D
J
100 300
1060
FU-LO-B01
S05D
11A. 12 700x 2100
S23D
W-CO-02 W-GB-01 FU-LO-B01 124 LOCKERS -0.85 FFL E-DR-11 W-CO-02 -0.90 SSL S01C S12C
W-CO-02
W-CO-02
+2.65
S05D
15.1.4.2
F-CO-02A W-CO-02 C-GB-02 BW-01B W-GB-01 C-GB-02A
800
390
W-CO-02
-0.85 FFL -0.90 SSL
C-GB-04
100
W-CO-02
22.00 m²
2270
WC FEMALE
4000
AR-17711 W-GB-01
W-GB-01
700
11A. 95 700x 2100
150 W-CO-02
S16D DW-03B-50s
F-CO-02B (Concrete Screed)
W-CO-02 DW-03A-50s
1
+1.75
S08D S03D
S19D
BW-02B - FR120
S29D
FREEZERDW-03A-100 ROOM
11A. 15 700x 2100
BW-01B
E-DR-12
11A. 13 700x 2100
S28D
?
W-GB-01
BW-02B - FR120 W-CO-02
7000 MALE CHANGING ROOM 13.3.1.8
E-DR-11
M5B
S18D
11A. 14 700x 2100
-0.85 FFL -0.90 SSL W-GB-01
S23D
2C. 47 900x 2100
W-CO-02
W-CO-02
1260
S15D
11A. 92 700x 2100
+3.15
1360
DW-03A-100s
4100 W-CO-02
DW-03B-50s
26.81 m²
L
FU-LO-B01 BW-02B - FR120
BW-01B W-CO-02
FEMALE WET ZONE 13.3.1.13
DW-03A-100s
3J. 118 700x 2100
LEVEL LOADING
W-CO-02 BW-01B
+20.85 m
150
W-GB-01
-2.05 m
F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A
S03D
C-GB-04
DW-03B-50s
1850
SSL 3
S23D
DW-03A-100s
BW-01B
S22D
S21C Concrete Screed Liquid Sprayed Waterproofing Cast-in-place concrete
-0.90-0.85
BW-02B - FR120
S01D
F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A
COLD ROOM
S22D
DW-02A-100s W-GB-01
FU-BC-B01
2040
1260
I
SSL 1M +10.90 m
C-GB-04
13.3.1.14
S21D
W-CO-02
3J. 117 700x 2100
W-GB-01
W-CO-02 CW-400 WC FEMALE
3260
2490
W-GB-01
W-GB-01
GALLERIES
MALE WET ZONE
F-CO-02A (Concrete Screed)
1320
W-GB-01
DW-03A-100s
S08D
BW-02B - FR120
3J. 119 700x 2100
W-GB-01
9
W-GB-01
S16D
*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.
S18D
LEVEL B1
150
25.48 m²
S23D
1850
2C. 90 900x 2100
1260
1400
1400
2600
1140
Staff Room Section
5450
2C. 64 900x 2100 2C. 116 900x 2100
11A. 92 700x 2100
7380
7380
11A. 95 700x 2100
150 W-GB-01 S01C S12C
FU-BC-B01
W-CO-02 W-CO-02 CW-400
S19D S03DFU-TA-B05
W-CO-02 BW-01B C-GB-02
-0.85 FFL -0.90 SSL
DW-02A-100s
W-CO-02
KITCHEN
W-CO-02
S05D
11A. 11 700x 2100
270
FU-LO-B01 BW-02B - FR120
2C. 64 900x 2100
1520 610
610 2480 11A. 154 700x 2100
1780
150
150
11B. 156 900x 2100
1930
150
1090
SSL 2
Expanded Coil Mesh Horizontal Mesh in Every 3 Rows of CMU Blocks
E-DR-11
+3.15
W-CO-02
-2.05 m
+13.50
CMU Block
BW-01B
12 SEATS
S21D
ICT
-0.85 FFL -0.90 SSL
29.09 m²
In every 3 rows, CMU blocks are fixed to the structural concrete
BW-01B W-CO-02
W-CO-02
13.3.1.9
DW-03A-100s
Ceiling hanger
FU-LO-B01
W-GB-01
CW-400 FU-LO-B01
Structural Column / Wall
F-CO-02B (Concrete Screed)
BW-02B - FR120
W-GB-01
W-CO-02
7000
S15D
3J. 93 hanger 700x 2100 Ceiling support 100
C-GB-04
W-CO-02
0
60 LOCKER
1200
13.3.1.7
100
F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A
+13.35 m
ICT
W-CO-02
BW-01B
SSL B1
F-CO-02ALEVEL (Concrete Screed) LOADING
Ceiling hanger
S05D
Expanded Coil Mesh Horizontal Mesh in Every 3 Rows of CMU Blocks
FU-LO-B01
W-CO-02
MALE BREAKROOM
100
FU-BC-B01
+1.75
W-GB-01
2800
CMU Block
FU-BC-B01
FU-CH-B08
F-CO-02A BW-01B
L
FU-LO-B01 W-GB-01
280150
1200
3200 LEVEL B1 FEMALE CHANGING -0.85 m ROOM
In every 3 rows, CMU blocks are fixed to the structural concrete
CW-400
11A. 15 700x 2100
3J. 94 700x 2100
E-DR-11
W-GB-01
5450
50
2300
150
Corner brackets to be fixed to the structural slab at the top line of the wall in every 900 mm (opposite side of the following block)
W-CO-02
E-DR-11
CW-400 100
1180
BW-02B - FR120
F-CO-02A (Concrete Screed)
8
S22D
W-GB-01
W-CO-02
Structural Column / Wall
-0.85 mW-CO-02
-0.85 m
AR-17711
+21.00
150
SSL B1
1990
3
+13.35
1000
DW-02A-100s -0.85 m
150
100
S06D
BW-01B W-CO-02
DW-03B-50s
DW-02A-100s
ICT
W-GB-01
1030 BW-01B
W-CO-02
FU-LO-B01
-0.90
2C. 164 900x 2100
450
80 720 1520
2C. 153 900x 2100
550
2C. 91 900x 2100
11A. 155 700x 2100
1940
1780
150 3500
W-CO-02
W-CO-02
S07D
FU-BC-B01
-0.90
50
S14D
W-CO-02
6750
1350
S11D
Ceiling hanger
-0.85
1040
FU-LO-B01
FU-LO-B01
Corner brackets to be fixed to the structural slab at the top line of the wall in every 900 mm (opposite side of the following block)
W-GB-01
W-CO-02
47.42 m²
124 LOCKERS -0.85 FFL -0.90 SSL
AR-17728
FU-CH-B08
DW-02A-100s
LEVEL 1
+6.00 m 390 180700 1000 280 180 1180
S12D
150
2700
BW-01B
-0.85 FFL W-CO-02 -0.90 SSL
W-GB-01
W-CO-02
-0.85 FFL -0.90 SSL
3620
F-CO-02A (Concrete Screed)
BW-02B - FR120
E-DR-11
Ceiling hanger support
6.58 m²
F-CO-02A W-CO-02 C-GB-02 W-CO-02
13.3.1.8
F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A
FU-BC-B01 W-GB-01 4
22.00 m²
BW-01B
150
280
3J. 94 700x 2100
13.3.1.6
200
8 W-CO-02
CANNED FOOD & BOTTLED DRINKS
7000 MALE CHANGING ROOM
2AJ. 43 1100x 2100
F-CO-02B W-CO-02 C-GB-04 C-GB-04A 2C.W-GB-01 115 900x 2100
W-CO-02
3800
FU-LO-B01
2150
-0.85
GALLERIES
SSL 3M
+8.50
50
50 E-DR-11
DW-03A-50s
1720
1000
BW-02B - FR120 W-CO-02
BW-01B
S21D
1030
FU-TA-B05
BW-01B
2150
3500
2C. 47 900x 2100
2700
L
W-CO-02
2100
BW-02B - FR120 W-CO-02
+16.75 m
CIRCULATION 2C. 61 900x 2100
F-CO-02A (Concrete Screed)
1350
3500
CIRCULATION
CONCRETE LINTEL W-GB-01 CIRCULATION
1000
FEMALE CORRIDOR
2C. 47 900x 2100
FEMALE WET ZONE
S03D
+23.30 m
W-CO-02
150
500
Lighting MEP ZONE Fixture 1120
C-GB-04
120
1400
MEP ZONE
C-GB-04
FU-LO-B01
2100
+2.65
DW-03B-50s
W-CO-02
FEMALE WET ZONE
S16D DW-03B-50s
S13D
2C. 91 900x 2100
2700
1200
2350 500
2700
C-GB-04A
DW-03B-50s
280150
W-CO-02 BW-01B
-0.85 FFL
700
W-CO-02
4100 FU-LO-B01
100
FU-LO-B01
BW-02B - FR120 W-CO-02 W-CO-02
F-CO-02B (Concrete Screed)-0.90 SSL
390
S01D S18D
Cable Tray
2800
BW-01B
Expanded Coil Mesh Horizontal Mesh in Every 3 Rows of CMU Blocks
S08D S03D
FU-LO-B01 BW-02B - FR120
W-GB-01
CMU Block
700
11A. 96 700x 2100
2350
1650 1200
Lighting Fixture
CONCRETE LINTEL
3J. 94 700x 2100
3500
-0.85
200 E-HR-02
W-CO-02
14
+6.00 m
W-CO-02
DW-02A-100s W-GB-01
Structural Column / Wall
S19D
J
FU-BC-B01
FU-TA-B05
BW-01B
FREEZER ROOM
FU-LO-B01
150
180
5.30 m²
BW-01B
E2
W-CO-02
W-GB-01
L
230
In every 3 rows, CMU blocks are fixed to the structural concrete
FU-CH-B08
LEVEL 1
80200 420
1350
110 1060
150 6900
7380
2C. 164 900x 2100
450 1520 610
610 2480
120 160
1000
7380
110 1060 2400
6900
1520
2C. 153 900x 2100
80200 420 160
1350
160 2150 80 720
2C. 164 900x 2100
1650 1200
1400
6400
+2.65
W-GB-01 SSL 2M
F-CO-02A (Concrete Screed) Concrete Screed
60 E-HR-02 16
31
Ceiling Mounted Lighting
CORE 1 STAIR 17
1650
3060
350150
200
1650
2300
1650
1200
200
1200
2300
MEP ZONE FEMALE CHANGING ROOM
Cable C-GB-04A Tray
50
200 4540
+2.65
S03D
+20.85
CORE 1 STAIR Stair
150
1150
W-GB-01 2100
BW-01B W-CO-02
1000
280
E-DR-11
CW-400
13.3.1.13
3500
E-HR-02 32
E-HR-01
SSL 4T
+29.00 m
3500
1200 3500
6400
50
50 18
33
CEILING HANGER
13.3.1.10
W-CO-02
BW-02B - FR120
AR-17711
150
CW-400
Corner brackets to be fixed to the structural slab at the top line of the wall in every 900 mm (opposite side of the following block)
S15D
1
CONCRETE LINTEL
1350 1000
W-CO-02
W-CO-02
BW-01B W-CO-02 W-GB-01
S13D
DW-03A-100s
1010
E-HR-02
15
19 34
E-HR-02
CEILING HANGER SUPPORT
110
-0.85 FFL -0.90 SSL
MALE CORRIDOR W-GB-01 W-GB-01
W-CO-02 W-CO-02 CW-400
900
S18D
W-CO-02
DW-03A-50s
DW-02A-100s
W-GB-01
MEP ZONE
C-GB-02A
1010FU-BC-B01 150 180
FU-LO-B01
CW-500
W-CO-02
18.11 m²
W-CO-02
F-CO-02A (Concrete Screed) CW-400
-0.90
830
16
Ceiling Mounted Stair Lighting
20
35
C-GB-04A
CIRCULATION
AR-17728
W-CO-02
CW-500
W-CO-02
COLD ROOM
BW-02B - FR120
*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.
-0.85 FFL -0.90 SSL
BW-01B
-0.85
W-GB-01
2600
60 LOCKER
2600
30 29
19 18
17
24
23
21
20
36 36 35 34 33
25
22 22
21
37
37
32
40 39
38
38
31
1650
350150
1650
3500
1500
1200
23
39
E-HR-02
+8.50
41
24
40
+29.85 m
Supply Air Diffuser
CW-400
29 W-CO-02 CW-400
27
+21.00 +21.00
41
J
CONCRETE LINTEL
S21D
26 42
SSL 4
FU-LO-B01
W-CO-02
30
28
W-CT-02
13.3.1.12
F-CO-02A W-CO-02 C-GB-02
CW-500
180
25.48 m²
12 SEATS
W-CO-02
1000
WC FEMALE
L
110
16DW-02A-100s
100
29.09 m²
W-CO-02 DW-03A-50s
+5.85
Ceiling hanger support
31
E-HR-02
25
1 STAIR
CORE 1 STAIR
E-HR-02
E-HR-01
27
11A. 154 700x 2100
1350
7330
260
1060
800 260
450
1060
800 260
1520
800
1060
260
1090
610
800 270 830
60
2000
1000 2300
1650 E-HR-02
42
E-HR-02 W-CO-02
W-CO-02
32
E-HR-02 E-HR-01
Ceiling Mounted Stair Lighting
E-HR-02
33
E-HR-02
C-GB-04A
CEILING HANGER
C-GB-02A
13.3.1.7
13.3.1.9
F-CO-02A W-CO-02 C-GB-02
F-CO-02A W-CO-02 C-NO-02
4130
AR-17728
F-CO-02A W-CO-02 C-GB-02F-CO-02A (Concrete Screed) W-GB-01 C-GB-02A
FU-TA-B05
39.65 m²
C-NO-02
+6.00
2300
100 60 200
CORE 1 STAIR
28
CORE 1 STAIR
34
33
CEILING HANGER
FEMALE WET ZONE
+13.50 +13.50
1
35
26
Ceiling Mounted W-CO-02 Stair Ceiling Lighting
Mounted StairCORE Lighting
37 36 36 35
29
W-GB-01
8
W-GB-01
MAIN LOBBYSSL 3
1260
BW-02B - FR120 W-CO-02
W-GB-01
1200 3500
1000 200
50
37
31
DW-02A-100s
3200 FEMALE CHANGING E-DR-09 ROOM
FU-CH-B08
F-CO-02A (Concrete Screed) DW-03B-50s -0.85 FFL -0.90 SSL
W-CO-02
2
Ceiling Mounted Stair Lighting
38
30
2
12 SEATS
S18D
+21.00
0
+21.00 S03D m
39
34
CW-400
CIRCULATION+21.00 +21.00
3
13.3.1.5
+6.00 BW-02B - FR120 +5.85
IN-FO-02C Waterproof Membrane Blinding Concrete GravelCW-400 Rolled Earth
42
32
W-CO-02 E-HR-02
+6.00 m E-HR-02
4
40
38
BW-01B W-CO-02
Mounted Structural Stair Foundation
41 40
C-GB-05 +3000 AFF
W-CO-02
MALE BREAKROOM
W-CO-02
F-CO-02A W-CO-02 C-GB-02
I
Protective Concrete Lighting LEVEL 1IN-FO-02B High-Strenght Polyethylene
41
39
+2.65 W-CO-02
CONCRETE LINTEL
CORE 1 STAIR Ceiling
6
42
E-HR-02
MEP ZONE CORE 1 STAIR W-CO-02
FEMALE WET ZONE CONCRETE LINTEL
FU-LO-B01
2
FU-LO-B01
AR-17728
W-CO-02
4660 BW-02B - FR120
Toilets Plan
2600
LEVEL 3
Lighting Fixture
14
7
5 Structural Foundation Protective Concrete E-HR-01 IN-FO-02B High-Strenght Polyethylene IN-FO-02C Waterproof Membrane Blinding ConcreteE-HR-02 E-HR-02 Gravel Rolled Earth
1
BW-01B
AR-17702
FU-LO-B01
4 W-CO-02
13.4.2.1 1424.95 m²
-0.85 FFL -0.90 SSL
W-GB-01
W-CO-02
3620
W-CO-02
150
W-CO-02
W-CT-02
2
MEP ZONE C-GB-02 Return Air Diffuser
+16.00 +16.00
8 8
3
E-DR-10
W-CO-02
-0.85 FFL -0.90 SSL
AR-17702
FEMALEW-CO-02 BREAKROOM
MAIN LOBBY
CEILING HANGER SUPPORT
CEILING HANGER SUPPORT
F-CO-02A (Concrete Screed) Concrete Screed
11
AR-17728
6750
+10.96 m
SP1 C-GB-04
9
9
7
CONCRETE LINTEL
CORRIDOR
W-CO-02
W-CO-02 CW-400
16 15
6 5
3800
6.58 2100m²
BW-01B
900
230
DW-03A-50s
F-CO-02A (Concrete Screed) DW-03A-50s
16
BW-02B - FR120
C-GB-02A
13
CORE 1 STAIR
1350
LEVEL 1M
FEMALE CHANGING ROOM
MEP ZONE
+2.65
E-HR-02
W-CO-02
-0.85
4
E-DR-10
DW-03A-100s
E2BW-01B
W-GB-01 F-CO-02A W-CO-02 C-GB-02 W-CO-02
200
1 BW-02B - FR120
BW-01B - FR120
I AR-17711
C-NO-02
ROOM
17
+20.85
200
2700
1200 C-GB-04A
1400
C-GB-04A
Cable Tray
1990
W-CO-02
+20.85 m
Stair Lighting FEMALE CHANGING
18
-0.85 10
10
1300
2300 200
1200
E1
+2.65
19
W-CO-02
12 11
E-HR-02
Ceiling Mounted Stair Lighting
Ceiling Mounted Stair Lighting
LEVEL 3M
C-GB-02A
W-CO-02
E-HR-01FU-TA-B05
13
-0.85
+13.50 +13.50
CONCRETE LINTEL
BW-01B
20
E-HR-02 E-HR-02
MEP ZONE FEMALE
BW-01B Ceiling
Supply Air
3060
C-NO-02
W-CO-02
CEILING HANGER
FEMALE CORRIDOR
W-CO-02
FU-CH-B08
C-GB-02A
W-CO-02 Mounted CORE 1 STAIR Diffuser
CONCRETE LINTEL
+5.85
C-GB-02 C-GB-02A
CONCRETE LINTEL
C-GB-02 Return Air Diffuser
F-CO-02A (Concrete Screed) Concrete Screed14
E-HR-01
CORE 1 STAIR
+13.50 m
+23.50 m
24
22
19 18
17 16
C-GB-02A C-GB-02
26
21 21
20 BW-01B
CEILING HANGER
28 27
25
C-GB-02 C-GB-02A 23 22
1000
SP1
-2.06 m
CEILING HANGER SUPPORT
2700
Ceiling Mounted Stair Lighting
+5.85
-0.90LEVEL m LOADING
LEVEL 2
200
2350 500
1830
LEVEL LOADING -2.06 m
24
CONCRETE LINTEL
11013.3.1.6
F-CO-02A (Concrete Screed)
PUBLIC WC CIRCULATION
MEP ZONE
+18.50
29
+2.65
MEP ZONE FEMALE BREAKROOM
25
C-GB-02A C-GB-02 23
+2.65
W-GB-01
FEMALE CORRIDOR
900
110
9
280
2480 160
2200 2300 200
E1 SSL B1
30
Recessed Return Air Lighting Diffuser Fixture
I +6.00
CW-400
E-HR-01
W-CO-02
CEILING HANGER W-CO-02 SUPPORT
31
12
F-CO-02A (Concrete Screed) Concrete Screed
E-HR-02
CONCRETE LINTEL
32
E-HR-02
E-HR-02
15
FU-TA-B05 -0.85 -0.90
FU-CH-B08
CORE 1 STAIR
34 33 CEILING HANGER
MEP ZONE
CONCRETE LINTEL
DW-03A-100s
2C. 61 900x 2100
900
FU-CH-B08
FU-TA-B05
BW-02B - FR120 W-CO-02
CIRCULATION
-0.90
11A. 155 700x 2100
80200 420 1560
5740
110 1060
150
280
2400
800
1030
6900 610
150 1030 1060 1060 1060
550
150
150
5740
280 800 260 800 260 800
1090 1010
11B. 156 900x 2100
150
1010
11A. 155 700x 2100
1830
1930
2C. 90 900x 2100
1590
1400
1400
5450 3260 1400 2270
260 800 260 800 270 830
11A. 92 700x 2100
11A. 95 700x 2100 280 280 280 280 280 280 280 280 280 280 280 280 280 280
2C. 41 900x 2100
1780
1940
150
150
1370
150
150
1720 1200
2C. 90 900x 2100
1400 150
5450 2270 150
200
11A. 154 700x 2100
1000 150
150 1400 150 1720 1200 3260 11A. 96 700x 2100
1200 400 70
7380
7380
2C. 64 900x 2100
2C. 116 900x 2100
7380
2C. 91 900x 2100
2260 120 1000 280
2260
2C. 41 900x 2100
4540
200
7330
42 x 280.0 /178.6
3920
42 x 280.0 /178.6
7380
8510
2330
2300 200 2300
1010
3920
200
11A. 95 700x 2100
8510
200 2300
1060 1060 1060 1090
800
2300
830
42 x 280.0 /178.6
60 3060
150
260 800
3060
260 800
200
260 800
2300
260
W-CO-02
150
8
4 AR-17728
Ceiling Mounted Stair CONCRETE LINTEL Lighting
35
33
E-HR-02
W-CO-02 CW-400
-0.90
+6.00
38
CONCRETE LINTEL 32
BW-01B - FR120
COREBREAKROOM 1 STAIR FEMALE
PUBLIC WC CIRCULATION
40
+5.85
CEILING HANGER SUPPORT
37
37
30
18.11 m²
W-GB-01
+23.30 m
16
P
+21.00 +21.00
42
28
AR-17728 -0.90
WC FEMALE 1000 13.3.1.12
1150
DW-03B-50s
GALLERIES
W-CO-02 CW-400
41
Recessed C-GB-02A Lighting 27 26 Fixture
1120
280
-0.85
450 FU-CH-B08
W-CO-02
2C. 115 900x 2100
FU-TA-B05
W-CO-02
6
4130
KITCHEN
CW-400
DW-03B-50s
F-CO-02B W-CO-02 C-GB-04 W-GB-01
W-CO-02
2300
W-CO-02
2100
W-GB-01
DW-03A-50s
DW-03B-50s
W-CO-02
450
FU-CH-B08
W-GB-01
W-CO-02
FU-TA-B05
BW-01B 5980 W-CO-02
180
DW-03A-50s
E-HR-02
200
W-CO-02
BW-01B
Supply Air Diffuser
110
W-CO-02
DW-03B-50s
0
3500
W-CO-02
3500
FR120
CONCRETE LINTEL
C-GB-02A
900
CIRCULATION
AR-17728F-CO-02A (Concrete Screed)
BW-02B - FR120
2300
BW-01B
FU-TA-B05
-0.85
2700
FEMALE CORRIDOR
W-CO-02
+16.00
-0.85 -0.90
-0.90
MEP ZONE C-GB-02 Return Air Diffuser
+29.00 m
W-GB-01
6
SSL 3M
E-HR-02
+6.00 39
29
Mounted Recessed Stair Return Air Lighting Diffuser Lighting W-CO-02 Fixture
BW-01B
W-CO-02
-0.85 m
-0.85
3500
C-GB-02 C-GB-02A
6400
CONCRETE LINTEL
FEMALE BREAKROOM
FU-CH-B08
W-CO-02
LEVEL B1
SSL 3MM
-0.90 m
1200
1200
TE LINTEL
W-CO-02
SSL B1
CEILING HANGER SUPPORT
MEP ZONE C-GB-02A C-GB-02
C-GB-02A
BW-01B - FR120
BW-01B
Staircase Section
+2.65
SSL 4T
230
E2
*Refer to LUS-BP14C-TA-REP-AR-38710
CORE 1 STAIR
E-HR-02 +6.00 E-HR-01
31
MEP ZONE
MEP ZONECeiling CIRCULATION
SUMP PIT
Recessed Lighting Fixture
CONCRETE LINTEL
MAIN LOBBY
CEILING HANGER
MEP ZONE Recessed Return Air Lighting Diffuser Fixture
LEVEL 2M +16.90 m
-0.90 -0.85
-0.90 -0.85
CEILING HANGER
C-GB-02A
CONCRETE LINTEL
MEP ZONE
CIRCULATION
SUMP PIT
LEVEL B1
CONCRETE LINTEL
18.11 m²
F-CO-02B W-CO-02 C-GB-04 W-GB-01
110
1150
-0.90
13.4.2.1 1424.95 m²
2140
5.30 m²
-0.85
2B. 49 900x 2100
F-CO-02A W-CO-02 C-NO-02
F-CO-02B W-CO-02 C-GB-04 W-GB-01
3'F&B and Kitchen Design Guideline
MAIN LOBBY
35
200
CONCRETE LINTEL
13.3.1.12
280
+29.85 -0.85 m
-0.90 E-DR-10
W-CO-02 450
8
J
34
CEILING HANGER SUPPORT
W-CO-02
-0.85 m
-0.90 -0.85
SSL 4
4130
DW-03A-100s
DW-03A-50s
W-CO-02
WC FEMALE
W-CO-02
900
L
L
11A. 10 700x 2100
W-GB-01
Ceiling Mounted Stair Lighting
41
C-GB-02
CIRCULATION
-0.90 -0.85
300
1650
1650
CEILING HANGER SUPPORT
I
CONCRETE LINTEL
3
3
1
STORAGE
BW-02B - FR120
6
42
CEILING HANGER
Cable Tray Lighting Fixture
4
1
2
E-HR-02
Lighting Fixture
LEVEL 4 +30.00 m
5
2
S13D
DW-03A-100s
W-CO-02
200 450
L CIRCULATION
E-DR-10
BW-02B - FR120
E-DR-11
1300
-0.85 m
CORE 1 STAIR Cable Tray
CONCRETE LINTEL
+5.85 m
+26.80 m
4
S05D
SP1
1000
5
J
DW-03B-50s
400
200
6
STORAGE
AR-17728
F-CO-02A W-CO-02 C-NO-02
CW-500
W-CO-02
5980
160
W-CO-02
W-CO-02
DW-03B-50s
-0.85
2B. 49 900x 2100
S13D
11A. 11 700x 2100
CW-600
W-CO-02
200
CW-400
F-CO-02A W-CO-02 C-GB-02
W-GB-01
CW-500
W-CO-02 W-CO-02
-0.85 FFL -0.90 SSL
180
DW-03A-100s
-0.90 SSL
13.3.1.10
W-CO-02
CW-500
W-CT-02
I
13.4.2.1 1424.95 m²
E-DR-10
DW-03A-100s
BW-02B - FR120
AR-17711
1300
2130
7
6
S05D
2140
-0.85 FFL -0.90 SSL
DW-03B-50s
Report' for details.
36 36
1000
8
7
450 11.29 m²
9
J
0
9
C-NO-02
CONCRETE LINTEL
CIRCULATION
8
+5.85
W-CO-02
W-CO-02
CIRCULATION
15.1.4.2
AR-17728
W-GB-01
CIRCULATION
160
W-CO-02
DW-03A-100s
W-GB-01
MALE CORRIDOR -0.85 FFL
W-CO-02
F-CO-02A (Concrete Screed) W-GB-01 -0.85 FFL -0.85 FFL -0.90 SSL -0.90 SSL
2110
2110
DW-03B-50s DW-03A-100s
W-GB-01
12 SEATS
2AJ. 43 1100x 2100
W-GB-01
2100 150 11B. 163 900x 1350 180 1000
130 550
-0.85 FFL -0.90 SSL
F-CO-02B W-CO-02 C-GB-04 W-GB-01
DW-03A-100s
FU-TA-B05
11B. 163 900x 2100
DW-03B-50s
-0.90
S06D
13.3.1.11 m² F-CO-02A23.04 W-CO-02 C-GB-02
130 550
5
-0.85
-0.85 FFL -0.90 SSL
39.65 m²
F-CO-02B W-CO-02 C-GB-04 W-GB-01
W-GB-01
1010
FU-BC-B01
38
200
+6.00
1C. 76 1630x 2100
10
M1A2
CONCRETE LINTEL
2200
9
11
PUBLIC WC CIRCULATION
W-CO-02 CW-400
10
CORE 1 STAIR
E-HR-02
12
W-CO-02
39
100 60 200
15 14 13
+5.85 m
W-CO-02 CW-400
CORE 1 STAIR
BW-01B
40
Ceiling Mounted Stair Lighting
CONCRETE LINTEL
SSL 1
C-GB-02
E-HR-02
11.29 m² CW-600
2000
11
+6.00 m
+6.00
1000
12
BW-01B BW-02B - FR120
CW-400
CIRCULATION
+21.00 +21.00
200
200
1000
16
Ceiling Mounted Stair Lighting
14 13
S13D
11A. 10 700x 2100
C-GB-05 +3000 AFF
MAIN LOBBY
+6.00 +5.85
SSL 1
16 15
19
18
BW-01B
E1
C-NO-02
+6.00
Ceiling Mounted Stair Lighting
17
22 21 20
+1.43 17
+6.00 +5.85
2300
CW-400
1000
W-CO-02
E-HR-02
200
24
200
3370 E-HR-01
W-CO-02
F-CO-02A W-CO-02 C-NO-02
W-CO-02
S28D
S13D
E-DR-11
E-HR-02
MAIN LOBBY
LEVEL 1
21 20
19 18
23
+1.43
LEVEL B1
+3.37
25 24
350150
CW-400
SP1
+6.00
26
+6.00 m
LEVEL 3
+5.85
O
LEVEL 1
+21.00 m
+3.37
25
S29D
DW-03A-100s
S28D
I
2040
S05D
S22D
F-CO-02A W-CO-02 C-NO-02
CORE 1 STAIR
8
22
W-CO-02
27
E-HR-02
2130
E1
W-CO-02
26
S22D
W-CO-02
15.1.4.2
100 300
100S12D 1060
11A. 11 700x 2100
S05D
Staircase Plan
SP1
MAIN LOBBY W-CO-02
W-CO-02
27
23
28
J MAIN LOBBY
2300 28
29
E-HR-01
Ceiling Mounted Stair Lighting
29
31
SP1
200
270
Ceiling Mounted Stair Lighting
CORE 1 STAIR
32
2C. 47 900x 2100 2040
S29D
W-CO-02 BW-02B - FR120 W-CO-02
E-DR-10
S01D
100 300
S18D
AR-17728
AR-17711
13.3.1.5
DW-03A-100s
5980E-DR-10 S12D
DW-03A-100s 5 E-DR-11 FEMALE BREAKROOM DW-03B-50s AR-17728
DW-03B-50s
13.3.1.11 23.04 Screed) m² F-CO-02A (Concrete
W-GB-01
FU-CH-B08
WC MALE
11A. 161 700x 2100
7
2
S01D
S06D
BW-02B - FR120S05D W-CO-02
BW-02B - FR120
1060
BW-02B - FR120 DW-03A-100
450
W-CO-02
BW-02B - FR120
E-DR-10 11A. 12 700x 2100
DW-03B-50s
M5B
E-DR-11 DW-03A-50s
E-DR-11
WC MALE CIRCULATION
11A. 161 700x 2100
W-CO-02
4660
W-GB-01
11A. 162 700x 2100
W-GB-01
S14D
W-GB-01
S05D
S05D
W-CO-02
DW-03B-50s
W-CO-02
E-DR-12
11A. 14 700x 2100
11A. 13 700x 2100
S05D
S23D
L
11A. 12 700x 2100 W-CO-02
S23D
3J. 118 700x 2100
3500
33
30
E1
Lighting
30
3370
34
CORE 1 STAIR
1030
800 60
E-HR-02 35
CORE 1 STAIR
W-GB-01
1360
11A. 13 700x 2100
S22D DW-03A-100
W-GB-01
S29D
S23D
DW-03A-100s
P
S28D 2B. 49 900x 2100
S22D
3J. 118 700x 2100
S05D
-0.85 FFL -0.90 SSL
8
SSL 1M
+5.85 Stair
31
36
Ceiling Mounted Stair Lighting
200
32
S29D
W-GB-01
W-CO-02
100
150
W-GB-01
M5B
?
S05D
S14D2100 3J. 117 700x
DW-03A-100s
S18D
2140
W-CO-02
W-CT-02
BW-02B - FR120
O
2350
37
CORE 1 STAIR
33
S05D
1360
DW-03A-100s
1320
S28D
DW-03A-100s
26.81 m² W-GB-01 -0.85 FFL -0.90 SSL
200
11A. 14 700x 2100
W-GB-01
S23D
3J. 93 700x 2100
S22D S23D
4400
500
38
+6.00 +6.00
34
1
S23D
100
?
C-GB-04 C-GB-04A
-0.85 FFL -0.90 SSL
S22D DW-03A-100s
E-DR-11
3J. 117 700x 2100
150
1180
DW-03A-100s
S07D
BW-01B
CW-400
CORE 1 LOBBY
Ceiling Mounted+6.00
35
2
42
100
S06D
E-HR-01
+10.90 m
+6.00 +6.00
W-CO-02 E-HR-02
36
3
Ceiling Mounted Stair Lighting
1 39
BW-02B - FR120
LEVEL 3M +23.50 m
2C. 47 900x 2100
1000 200
37
4
3 2
+6.00 +6.00
1030
3J. 119 700x 2100
CW-300
2350
200
5
4
W-CO-02
1
E-HR-02
38
41
SSL 1M
1650
1000
1300
5
CW-400
1
40
CORE 1 CIRCULATION
ART LOADING
2
13.3.1.14
E-DR-12
3J. 119 700x 2100
160
S01D
F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A
S18D
9
W-CO-02
3
39
6
6
4
50
E-DR-11
1.01
ART LOADING
E-HR-02
5
3
CORE 1 STAIR
2
8 8 +6.00 +6.00 7 7
E-HR-02
6
6 5 4
10
9
7
MALE WET ZONE
DW-03A-100s
S03D
S01D
26.81 m²
F-CO-02B W-CO-02 100 AR-16013 W-GB-01
3J. 94 700x 2100
2C. 47 900x 2100
3500
13 12 11
10
CORE 1 STAIR
8
7
14
CW-400 W-CO-02 9
+8.508
15
SSL 2
12
11
39
E-HR-02
W-CO-02 CW-400
E1
13
9
S23D S22D
S21D
S03D
S14D
W-CO-02
SSL 2
1650
1300
11
9
16
37
CW-300
+8.50
15 14
W-CO-02 10
10
17
W-CO-02
+13.35 m
2300
1000 200
LEVEL 1
11
18
E-HR-02
13
16
E-HR-02
12
19
18
14
Ceiling
Stair Lighting
W-GB-01
W-CO-02
17
Mounted E-HR-01
CORE 1 STAIR 13
3J. 93 700x 2100
S05D
35
W-GB-01 38
E-DR-11
1040
1320
MALE WET ZONE W-GB-01 13.3.1.14
BW-01B
DW-03A-100s
S08D
S21D
11A. 15 700x 2100
S08D
BW-01B
S12D
BW-01B
W-CO-02 DW-03A-100s
1
1180
M1A1W-GB-01
W-GB-01
DW-03B-50s 36
100
280
W-CO-02
BW-01B BW-01B
S21D
DW-03A-100s
DW-02A-100s
700
W-GB-01
34
S23D
1180
+10.90 m
18
16
14
Ceiling Mounted Stair Lighting
E-HR-02
19
E-HR-02
32
S22D
3J. 94 700x 2100S11D
100
W-CO-02
O
200
19
20
E-HR-02
15
20
Ceiling E-HR-02 E-HR-02 Mounted Stair CORE 1 STAIR E-HR-01 Lighting
15
Ceiling Mounted Stair CORE 1 STAIR Lighting
+6.00 m
21
17 16
12
SP1
23
22 22
21
20 19 18
17
+13.35
2430
1300
+8.50
23
20
21 CW-400
21
29
27 26 25
24
31
33
W-CO-02
+13.50
26
CORE 1 STAIR
S21D
100
S06D
SSL 3MM
25
24
50
30
S01D S18D
E-HR-01
CW-400
28
22 22W-CO-02
1180
DW-03B-50s S16D
BW-02B - FR120
F-CO-02B (Concrete Screed) W-CO-02
2110
11A. 15 700x 2100
CW-400 S19D S03D
S15D FU-LO-B01
-0.85 FFL -0.90 SSL
W-CO-02
7
400
DW-03A-50s
W-GB-01
AR-17728
W-GB-01
11B. 163 900x 2100 BW-02B - FR120 DW-03A-100s
W-CO-02
E-DR-11
W-CO-02
130 550
BW-01B - FR120
W-GB-01 DW-03A-100s
11A. 162 700x 2100
E-DR-09
W-CO-02
DW-03A-100s
W-GB-01
CW-400
W-CO-02
FU-LO-B01
22.00 m²
-0.85 FFL SSL S03D S19D -0.90S16D
F-CO-02B (Concrete Screed)
390
BW-01B
29
1030
W-GB-01
+13.50
27
23
23
S07D
DW-03B-50s 30
W-CO-02 29
24
33
GALLERIES
+13.35 m 30
E-HR-02
30
28
W-CO-02 24
E-HR-02
E1
25
31
E-HR-02 25
+8.50
26
32
+13.35
E-HR-02
280
1030
+16.75 m
32 31
50
S14D
32
200
1000 200
27 26
SP1
27
E-HR-02
E-HR-01
28
CORE 1 STAIR
W-CO-02
28
Ceiling Mounted Stair Lighting
1040
35
S12D
+26.80 m
GALLERIES
CORE 1 STAIR
37 CW-400
36
50
700 W-GB-01
22.00 m²
150
W-GB-01
37
1030
2050
F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A
-0.85 FFL -0.90 SSL
700
E-DR-11
390
DW-03A-100s DW-02A-100sS13D
390
29
+13.50 +13.50
42
Ceiling Mounted Stair Lighting
AR-17711
S11D
40
33
CORE 1 STAIR
700
38 W-GB-01
34
W-CO-02
2
E-HR-02
390
S13D
CW-400
E-HR-02 3
E-HR-01
29
CORE 1 STAIR
29
Ceiling Mounted Stair Lighting
38
11A. 10 700x 2100
4
W-CO-02
E-HR-02
700
700
FEMALE WET ZONE
DW-03A-50s
31
6
+13.50 +13.50 34
34
30
33
E-HR-02
31 30
39
34
Ceiling Mounted Stair Lighting
33 32
E1
35
35 34
E-HR-02
CW-400
1
150
1
13.3.1.13
DW-03A-50s S15D
W-CO-02 BW-01B
W-CO-02
F-CO-02B (Concrete Screed)
40
7000
F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A
S16D DW-03B-50s
F-CO-02B (Concrete Screed)
BW-02B - FR120
13.3.1.13
P
F-CO-02B W-CO-02 C-GB-04 W-GB-01
FU-LO-B01
CW-400
FU-BC-B01
FEMALE WET ZONE W-CO-02 S19D CW-300S08D S03D
+16.00 FFL W-CO-02 DW-03A-50s
S16D DW-03B-50s
41
W-GB-01
FU-LO-B01
BW-02B - FR120
AR-17728
W-CO-02
W-GB-01
W-CO-02
CORE 1 STAIR
300
39
FU-BC-B01
-0.85 FFL -0.90 SSL
23.04 m²
W-GB-01
W-CO-02
BW-01B W-CO-02
5
DW-03B-50s
WC MALE
7000
FU-LO-B01
FU-LO-B01
BW-01B W-CO-02
F-CO-01AW-GB-01 W-CO-02 C-NO-02 S15D
150
S08D S03D
S19D
W-CO-02 DW-03A-50s
LEVEL 4
SSL 2M
41
33
S15D
BW-02B - FR120
39
32 31
I
I
E-DR-10
124 LOCKERS -0.85 FFL -0.90 SSL
W-CO-02 BW-01B
W-GB-01
E-HR-02
CW-400
DW-03B-50s
*Refer to LUS-BP14C-TA-REP-AR-38710
16'F&B and Kitchen Design Guideline Report' for details.
13.3.1.11
11A. 161 700x 2100
CANNED FOOD & FU-BC-B01 BOTTLED DRINKS
47.42 m²
DW-03A-100s
W-CO-02 DW-03A-50s FU-LO-B01 BW-02B - FR120 E-DR-11
W-CO-02
7
CANNED FOOD & BOTTLED DRINKS
W-GB-01
FU-LO-B01
11A. 162 700x 2100
124 LOCKERS -0.85 FFL -0.90 SSL W-GB-01
F-CO-02A (Concrete Screed)
AR-17728
13.3.1.8
47.42 m²
F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A
F-CO-02A (Concrete Screed)
-0.85 FFL -0.90 SSL
AR-17711
+16.75 m
Ceiling Mounted Stair Lighting
STORAGE CORE 1 STAIR
W-CO-02
13.3.1.8
W-CO-02
F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A
FU-BC-B01
DW-03B-50s
O
W-GB-01
42
E1
FU-LO-B01
W-CO-02 150 W-CO-02 CW-400
2600
60 LOCKER
2050
1
SSL 2M
35
35
2
42
37 36 36
W-CO-02 36 36
3
41
W-CO-02
W-GB-01
W-CO-02 CW-400
S13D
100
FU-BC-B01
W-CO-02
DW-03A-100s
1
38
37 E-HR-02
40
1000
38
37 CW-400
CW-600
38
E-HR-02
W-CO-02
39
CORE 1 STAIR
W-CO-02
39
CW-400
4020
200 +10.96 m
40
E-HR-02
1300
LEVEL 1M
41
W-CO-02 DW-03B-50s
S01D S18D
5
Ceiling Mounted Stair Lighting
CORE 1 STAIR
42
11.29 m²
+20.85 m
+16.00 +16.00
14
29.09 m²
W-CO-02
J
7000 MALE CHANGING ROOM
FU-LO-B01 FU-LO-B01
4100
W-GB-01
7000
-0.85 FFL -0.90 SSL
BW-01B W-GB-01 C-GB-02A
O
2600 MALE CHANGING 150ROOM
60 LOCKER
FREEZER ROOM DW-03B-50s
DW-03B-50s
FU-BC-B01
DW-03B-50s
100
F-CO-02A (Concrete Screed)
DW-02A-100s 17.1.1.57 39.35 m²
150
13
E-HR-02 BW-02B - FR120
E-HR-02
2
BW-01C - FR120
300
COREE-HR-02 1 STAIR
1 42 E-DR-11 41
CW-400
SSL 3
+30.00 m
S05D
11A. 1115700x 2100
W-CO-02 W-CO-02 7
E-HR-01
+21.00
Ceiling
1C. 76 1630x 2100
1000
3
2
9
10
+16.00 +16.00
5
4
3
16
280150
3200 FEMALE CHANGING ROOM
AR-16013
W-CO-02 FU-LO-B01
BW-01B
W-CO-02
DW-02A-100s
8
AR-17702
16
FU-LO-B01 BW-02B - FR120
4100
FU-LO-B01 BW-02B - FR120
BW-01B
DW-02A-100s
GALLERIES
CW-400 W-CO-02
W-CO-02 W-CO-02 CW-400
FU-BC-B01
SP1
2
AR-17702
FU-LO-B01
280150
FU-BC-B01
13.3.1.7
W-CO-02
29.09 m²
FU-LO-B01
I
+20.85 m
1B. 205 1630x 2100
4
W-CO-02
Mounted Stair Lighting
9
1500
9
40
BW-01BCeiling
CW-400
1000
+13.50 +13.50 10 111 10 CIRCULATION 8 8 15.1.4.2
BW-01B
6 15
13
7 7 F-CO-02A W-CO-02 C-NO-02 Ceiling 6 6 Mounted 5 Stair 4 E-HR-01 Lighting
5
+13.50 +13.50
16
14
E-HR-01
W-CO-02
7
17
12
17
11
9
9
8 8
18
E-HR-02
E-HR-02
W-CO-02
200
E-HR-01
S28D
19
E-HR-02
W-CO-02 11
CORE 1 STAIR
10
+20.85
S05D
12
S29D
E-HR-02
CORE 1 STAIRE-HR-02
13
Ceiling Mounted Stair Lighting
CORE 1 STAIR 11
14
BW-02B - FR120 W-CO-02
Ceiling 2C. 47 900xMounted 2100 Stair Lighting
13
12
1300
17 16
15
12
SP1
TE LINTEL
essed hting xture
W-CO-02
2040
S05D
14
200
+13.50 m
+16.00
26
15
25
24
23
22
CW-400
CORE 1 CIRCULATION
BW-02B - FR120
+18.50
E-HR-02 S01D
2300
LEVEL 2
E1
23
13.3.1.7
W-GB-01
J
W-GB-01
100
W-CO-02
100
DW-02A-100s
FU-LO-B01
F-CO-02A W-CO-02 C-GB-02
W-GB-01
1000
DW-02A-100s
2800
W-GB-01
W-CO-02
2800
W-GB-01
16
1
9
FREEZER ROOM
COLD ROOM
FU-BC-B01
W-CO-02
DW-02A-100s
W-GB-01
W-CO-02
BW-02B - FR120
3200 FEMALE CHANGING ROOM F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A
W-CO-02
SSL 3
Stair Lighting
1000
2
BW-01B
E-DR-11
W-CO-02
E-DR-11 BW-01B
W-CO-02
W-GB-01
W-GB-01
BW-01B W-CO-02
W-CO-02
F-CO-02A (Concrete Screed)
Mounted CORE 1 STAIR S13D
200
BW-02B - FR120
S23D
E-HR-02 E-HR-02
+23.30 m
+21.00
S06D
11A. 12 700x 2100
2300
W-CO-02
24
1000
150
S05D
E-HR-02
100 300
25
22
W-CO-02 CW-400 SP1
S22D
100+16.001060
26
21 21 3J. 118 700x 2100 Ceiling Mounted 20 S22D 20 E-HR-01 Stair 19 18 Lighting
26
18
E-HR-01
28
27
W-CO-02 CW-400 +20.85 S12D
29 28
19
+18.50
18
200
E1
1360
DW-03A-100s
CORE 1 STAIR
S23D
W-GB-01
150
Ceiling Mounted Stair Lighting
W-GB-01
3J. 93 700x 2100
S07D
1320
100
19 29
17 16
20 CW-400
20
30
E-HR-02 3J. 117 700x 2100 W-GB-01 W-CO-02 E-HR-01 CW-400 27
28
31
E-HR-02
30
25
23
22
21 DW-03A-10021W-CO-02
32
E-HR-02
150
W-CO-02
DW-02A-100s
BW-02B - FR120
SSL 3M
CORE 1 STAIR
31 13 700x 2100 11A.
24
CORE 1 STAIR 23 E-HR-02 22
1300
1180 E-DR-11
24
32
27
S05D
25
34 33
2C. 41 900x 2100
100
S06D
26
35
E-HR-02
30
29
E-HR-01
36 36
CORE 1S23D STAIR
33
Ceiling Mounted S29D Stair Lighting
40
200
1030
S14D
W-CO-02
S23D
S28D
27
1300
3J. 94 700x 2100
Ceiling Mounted 35 Stair S22D 34 Lighting
34
E-HR-02
E-HR-02
28
39
32 31
1500
LEVEL 2M
33
29
?
FU-LO-B01
150
W-CO-02
GALLERIES
S14D
1990
GALLERIES
E-DR-12
S05D
200
E-HR-02
W-GB-01 CW-400 +21.00 +21.00
41
37
37
CORE 1 STAIR
S22D
DW-03A-100s 38 38
39
W-CO-02
34
42
W-CO-02
FU-LO-B01
AR-17711
W-CO-02 CW-400
Ceiling 11A. 14 700x 2100 Mounted Stair Lighting
39
-0.85 FFL -0.9035 SSL
35
33 32 31 30
1000
100
+16.90 m
E-HR-02
200
1180 W-GB-01
1000
280
200
50
11A. 92 700x 2100
40
DW-03A-100s
DW-02A-100s
700 W-GB-01
2270
390
E-HR-02
40
3J. 119 700x 2100
38
36 36
E-HR-02
E-HR-01
BW-01B
AR-17711
3
+23.30 m
+21.00 +21.00 S01D
41
40
150
BW-01B
FU-LO-B01
FU-LO-B01 DW-02A-100s W-GB-01
M5B
CORE 1 STAIR
E-HR-02 11A. 15 700x 2100
42
26.81 m²
CORE371 STAIR 37
DW-03A-100s
W-CO-02 41
Ceiling Mounted W-GB-01 Stair Lighting
13.3.1.14
F-CO-02B W-CO-02 C-GB-04 39 W-GB-01 C-GB-04A
S03D
E-HR-02
42
1300
DW-03A-50s
0
40
38
CORE 1 STAIR
BW-01B
+21.00 +21.00
S21D
1400
-0.85 FFL -0.90 SSL
O-02B (Concrete Screed)
BW-01B
22.00 m²
200
13.3.1.13
F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A
S16D DW-03B-50s
Ceiling Mounted Stair Lighting
W-CO-02
E-HR-02
W-CO-02
41
S21D
1990 BW-01B
W-GB-01
S18D
2300
W-CO-02
FEMALE WET ZONE
MALE WET ZONE
42
3620
150
F-CO-02A (Concrete Screed)
FU-BC-B01
P SSL 3M
E-HR-02
Ceiling DW-03A-100s MountedE-HR-01 Stair Lighting
S08D
1B. 205 1630x 2100
CORE 1 STAIR
F-CO-02B (Concrete Screed)
1000
SP1
E-HR-02
S16D
+21.00 +21.00
S15D
W-CO-02 BW-01B
E1
D S03D
E-DR-11
2300
+21.00 m
C-GB-05 S03D S19D +3000 AFF
2000
LEVEL 3
W-CO-02
E-HR-02
W-CO-02
200
Ceiling Mounted Stair Lighting
2300
3260
W-GB-01
100 60 200
DW-02A-100s W-GB-01
200 BW-02B - FR120
CORE 1 LOBBY
Ceiling Mounted Stair Lighting
280
BW-01B
CORE 1 STAIR
1000
SP1
-0.90 SSL CORE 1 CIRCULATION
F-CO-02A (Concrete Screed)
CW-400
BW-02B - FR120 W-CO-02
W-GB-01
M1A2 F-CO-02A (Concrete Screed)
W-CO-02
W-CO-02
150
FU-LO-B01
W-CO-02
W-CO-02
CW-400
-0.85 FFL -0.90 SSL
W-CO-02
150
S18D
W-CO-02
*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.
-0.85 FFL -0.90 SSL
*Refer to LUS-BP14C-TA-REP-AR-38710 BW-01B W-GB-01 'F&B and Kitchen Design Guideline W-GB-01 Report' for details. W-CO-02
-0.85 FFL -0.90 SSL
3620 F-CO-02A (Concrete Screed)
W-CO-02 -0.85 FFL
6.58 m²
F-CO-02A W-CO-02 C-GB-02
F-CO-02A (Concrete Screed)
BW-02B - FR120
4540
100 60 200 2000
5450
Stair Lighting
F-CO-02A W-CO-02 C-GB-02
25.48 m²
12 SEATS
BW-01B
180
200
180
COLD ROOM
BW-02B - FR120
S18D
FU-TA-B05
1000
25.48 m²
12 SEATS
W-CO-02
F-CO-02A W-CO-02 C-GB-02
3800
BW-01B
6.58 m²
BW-01B
13.3.1.6
13.3.1.9
2C. 115 900x 2100
W-CO-02
180W-CO-02 1000 FEMALE CORRIDOR CW-300
4400
13.3.1.9
F-CO-02A W-CO-02 C-GB-02
BW-01B
MALE BREAKROOM
BW-02B - FR120 W-CO-02
-0.85 FFL -0.90 SSL
13.3.1.6
3800
CW-400
FU-BC-B01
400
+29.00 m
W-CO-02
FU-LO-B01 C-GB-05 +3000 AFF
BW-01B W-CO-02 Mounted
E1
FU-LO-B01
BW-01B
1000
MALE BREAKROOM
KITCHEN
2C. 115 900x 2100
-0.85 FFL
FU-CH-B08 -0.90 SSL
180
FU-CH-B08
E-HR-01
1120
BW-01B
42 x 280.0 /178.6
FU-BC-B01
Ceiling
LEVEL 3M +23.50 m
2200
CO-02 C-GB-02 GB-01 C-GB-02A
FU-TA-B05
BW-02B - FR120 W-CO-02
CW-400
FU-TA-B05
5.30 m²
W-CO-02
2C. 61 900x 2100
1000
BW-01B
FU-CH-B08
FU-TA-B05
3
7000
200
-0.85 FFL -0.90 SSL
oncrete Screed)
CIRCULATION
CW-400
2200
1830
150
W-CO-02
E-HR-02
FEMALE CORRIDOR
2C. 61 900x 2100
SSL 4T
W-CO-02
1200
60 LOCKER
+29.85 m
F-CO-02A (Concrete Screed)
W-GB-01
1.01
280
W-CO-02
SSL 4
W-CO-02
180
BW-01B
1120
BW-02B - FR120
42
BW-02B - FR120 FU-TA-B05
W-CO-02
FU-LO-B01
4540
FU-LO-B01
W-CO-02
47.42 m²
124 LOCKERS -0.85 FFL -0.90 SSL
13.3.1.10
W-CO-02
FU-LO-B01
5740
BW-01B
2600
29.09 m²
FU-TA-B05
5.30 m²
W-CO-02 W-CO-02
CW-400
MALE39CORRIDOR
CW-500
BW-02B - FR120
W-CO-02
CW-500
1350 1000
37
41
F-CO-02A (Concrete Screed)
2C. 91 900x 2100
13.3.1.8
F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A
O
150 180
W-CO-02
38
FU-CH-B08
120
7000 MALE CHANGING ROOM
FU-BC-B01
DW-02A-100s
100
FU-CH-B08
2AJ. 43 1100x 2100
W-CO-02
F-CO-02A40W-CO-02 C-GB-02
W-CO-02 CW-400 CIRCULATION
+29.00 m
36
CW-500
1010
W-CO-02
CW-300
J
35
BW-02B - FR120
W-CO-02
SSL 4T
CANNED FOOD & BOTTLED DRINKS 7330
280150
FU-BC-B01
00 CHANGING OOM
13.3.1.10
F-CO-02A (Concrete Screed)
FU-TA-B05
W-CO-02
1000
DW-03B-50s
200
W-GB-01
W-GB-01
150
SSL 4
200
DW-02A-100s
1720
SSL 3MM +26.80 m
FU-CH-B08
MALE CORRIDOR
CW-500
33 F-CO-02A (Concrete Screed) -0.85 FFL CIRCULATION 34 SSL -0.90
W-CO-02 CW-500
W-CO-02
+29.85 m
W-CO-02
FU-LO-B01
KITCHEN
CW-400
180
F-CO-02A W-CO-02 C-GB-02
BW-02B - FR120
E-HR-01 CW-500
W-CT-02 BW-02B - FR120
FU-BC-B01
2430
W-CO-02
4100
1830
150
W-CO-02
29
W-CO-02
100
150
BW-01B
1000
J
P
4020
3620
31SEATS 12
32
W-CT-02
W-CO-02
FU-CH-B08
F-CO-02A (Concrete Screed) 30 -0.85 FFL -0.90 SSL
FU-LO-B01
FU-LO-B01
1400
1400
-0.85 FFL -0.90 SSL
2800
W-GB-01
BW-01B W-CO-02
W-CO-02
2C. 90 900x 2100
+30.00 m
150
39.65 m²
F-CO-02A 32W-CO-02 C-GB-02
S18D
FU-LO-B01 BW-02B - FR120
W-GB-01
W-GB-01
150
150
LEVEL 4
W-CO-02
13.3.1.5
W-CO-02
AR-17711
DW-02A-100s
W-GB-01
34
W-CO-02
FEMALE33BREAKROOM
BW-02B - FR120
1590 BW-01B
(Concrete Screed)
FREEZER ROOM
4660
35
E-DR-11
2
W-CO-02
O
W-CO-02
W-CT-02
400
BW-01B
E-DR-11
36
150
BW-01B - FR120
F-CO-02A (Concrete Screed)
CW-400
FU-TA-B05
E CORRIDOR
1350 1000
12 SEATS
E-DR-09
3500
180
38 37
W-CO-02
3800
150 180
FU-TA-B05
39.65 m²
31 F-CO-02A W-CO-02 C-GB-02
S18D
2150
SP1
1000
39
S18D
BW-01B
11A. 96 700x 2100
180
-0.85 FFL -0.90 SSL
W-CO-02
*Refer to LUS-BP14C-TA-REP-AR-38710 AR-17711 'F&B and Kitchen Design Guideline Report' for details.
E1
BW-01B
13.3.1.5
W-CO-02
40
2700
2C. 116 900x 2100
-0.85 FFL -0.90 SSL
150
FU-CH-B08
00
AR-16013 1010
FU-CH-B08
FEMALE BREAKROOM 30
BW-02B - FR120
41
2
1400
12 SEATS
2C. 115 900x 2100
CORE 1 CIRCULATION
W-CO-02 C-GB-02
42
*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.
280 280 280 280 280 280 28011A.280 280 92 700x 2100 280 280 280 280 280
1000
4400
7380
1.01
6.58 m²
W-CO-02
29
M1A1
W-CO-02
4660
E-DR-11
W-CO-02
1260
25.48 m²
F-CO-02A W-CO-02 C-GB-02
E1
2050
W-CO-02
W-CT-02
CW-400
A recreational building designed by a renowned architectural company. My office was the executives of this long going project. In my 5 O months of internship, I worked on these detail drawings and general plans both on Autocad and Revit. The most important point of this project for me was seeingO a large scale application project andPlearning to use Revit on the BIM environment. Details and further information can be shared in an interview due to confidentiality. J
CW-500
7380
13.3.1.9
CW-300
W-CO-02 CW-400
W-CO-02
MALE BREAKROOM
BW-02B - FR120 M1A2 W-CO-02
W-CO-02
300 400 E-HR-02
1
4000
BW-01B
W-CO-02
CW-300
2050
COLD ROOM
BW-02B - FR120
4800
W-CO-02
W-CO-02
CORE 1 LOBBY
W-CO-02
W-CO-02
W-CO-02
8
CIRCULATION F-CO-02A (Concrete Screed)
BW-01B - FR120 AR-17702 W-CO-02
1560
CW-400
December 2018 - May 2019 SP1
2AJ. 43 1100x 2100
E-DR-09
2
+16.00 FFL
2150
BW-01C - FR120
E-HR-01
CORE 1 CIRCULATION
CW-300
AR-17702
1000
E-HR-02
E-HR-01
W-CO-02
39.35 m²
1370
42
9
FU-TA-B05
FU-TA-B05
5.30 m²
17.1.1.57
*ReferF-CO-01A to LUS-BP14C-TA-REP-AR-38710 W-CO-02 C-NO-02 'F&B and 1 Kitchen Design Guideline Report' for details.
1200
13.3.1.10
CORE 1 STAIR
CW-400 W-CO-02
CORE 1 CIRCULATION
F-CO-02A W-CO-02 C-GB-02
2260
W-CO-02
CORE 1 LOBBY
O
500
1.01
CW-500
41
CW-400
W-CO-02
FU-CH-B08
40
400 70
FU-CH-B08
4400
39
MALE CORRIDOR
2C. 64 900x 2100
29
12 SEATS
CO-02
180
37
38 CW-400 W-CO-02
KITCHEN
CW-400
CW-300
520
31 30
W-500
W-CO-02
36
8
AR-17702
P
150
1350 CW-300 1000
W-CO-02
2
AR-17702
GALLERIES
W-CO-02
M1A2
35
1370
FU-TA-B05
CO-02A (Concrete Screed) -0.85 FFL -0.90 SSL
150 180
34
Tabanlioglu Architects 32
-CO-02A W-CO-02 C-GB-02
6
P
280 280 280 280 280 280 280 280 280 280 280 280 280 280
34 33
39.65 m²
42 x 280.0 /178.6
35
2C. 64 900x 2100
1010
36
FU-CH-B08
O MALE BREAKROOM
33
1
9
2AJ. 43 1100x 2100
2330
42
E-HR-01
31
E-HR-01
3920
150
38 37
W-CO-02
4660
13.3.1.5
41
E-HR-02
DETAIL DRAWINGS 39
8510
CO-02
30
40
280 280 280 280 280 280 280 280 280 280 280 280 280 280
40
CIRCULATION 29
M1A1
3J. 94 700x 2100
W-CO-02
29
2100
BW-01B - FR120
41
30
1200
280 280 280 280 280 280 280 280 280 280 280 280 280 280
42
2050
31
E-HR-02
280 280 280
300
E-DR-09
42 x 280.0 /178.6
32
2050
280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280
W-CO-02
W-CO-02
W-CO-02
42 x 280.0 /178.6
CW-400
0
STORAGE
I
7
I
CO-PRODUCING SPACE Architectural Design Studio “Co-producing Space� (Armelle Tardiveau) Newcastle University April 2017-June 2018 As a group of four, we have designed an intervention which can stimulate the public bonding among Ouseburn residents. Our design is made of scrap materials found in Daysh building when some of the office utiliences were thrown away. We bought other cheap materials such as polycarbonate sheet and hinges so with a minimum cost we created this intervention for different activities. We demonstrated a plant making event nearby the Toffee Factory.
Office dividers to panels
Table and shelter added
Bench from scrap materials
Intervention can serve locals in many ways
Local planting session
Process 8
DISSERTATION Architectural Design Studio “Design for Vulnerable Populations� Newcastle University (Daniel September 2017-February 2018 The aim of the research was to demonstrate the implementation of counter-terrorism design strategies without harming, on the contrary strengthening the democratic quality of the public spheres. The research has been setting out; Investigating the motivations of terrorism and hostile reconnaissance process, Comprehending the balance between security needs and necessity for secularised urban spaces wherein the users feel both safe and free Scrutinising the epitome of crime prevention through design measures and examine feasibility
Over-securisation is portrayed through digital hand sketches
Vehicles reaching public areas in case of an emergency
Graphic-novel style case study descriptions
Public spaces must divide the crowd into smaller groups 9
LEAZES WELLBEING CENTRE Architectural Design Studio “Design for Vulnerable Populations� Newcastle University (Tim Townshend) September 2017-January 2018 Through the interviews with the vulnerable groups (inflicted by drug and alcohol abuse) and discussions with some local architects and planners, we designed a well-being centre which would contribute these vulnerable people both psychologically and functionally. Finally, we presented this project to the Newcastle Planning authorities and received many positive feedbacks. Whilst all of us contributed on the design, I have worked on the renders, plans and sections.
Facade
Maquette
Plan
Cafe
Gym
Section 10
TYNE STUDENT HUB
Architectural Design Studio “20th Century Architecture” Newcastle University November 2016-February 2017
Axonometric Site Plan
Keelman’s Hospital is an abandoned hostel which has a rich history and can be connected with our
Salvation Army Mens’ Palace building was serving as a homeless hostel until few years ago. There are
private residences around the specified building and the area is extremely rich with diverse cultural
backgrounds which is contributed by many student accommodations around.
Plan
Perspective Section
Without harming the nature of our Grade II listed Salvation Army building, we have designed this 17m2 rooms which can accommodate up to 70 people and the number can reach to 140 with the inclusion of Keelman’s Hospital. These rooms are going to serve homeless youth and they can acquire new skills in the student hub for further study. The design aims to provide a hub not only for the residents here but the students from other accommodations can equally benefit from the student hub. This would contribute the social interaction of vulnerable homeless children which can also psychologically support them to include in society. There is, therefore, a cafe, study room and a recreational common hall to provide all sort of services they may need.
En-suite Rooms
Facade of Student Hub 11
DURHAM BOATHOUSE
Architectural Design Studio “Measure� Newcastle University (March-May 2016) The project is located at the southern banks of the River Wear, accords with the 12th century Romanesque Cathedral. The project brief was mainly focussed on providing boat shed, cafe and service areas but also considering the risk of flood.
Maquette
The roof takes its shape from the dynamic nature of rowing and allows daylight to be entered into the building. Corten panels are used to cover steel frame structure for its damp resistance and appropriateness to the specified location.
Resillience
Environment
Wet areas that are boat storage and changing rooms are situated below the flood line while areas which must be protected from water penetration such as the technical room, lift and rest are positioned 1.2m above the ground level (.2 above the flood line)
The building is juxtaposed among the existing trees Foundations are planned to be fibre piles due to the proximity with the trees, so that the piles will be carefully placed between the roots of the trees (Casa Levene in Spain for precedence).
Circulation
Spaces
Keeping the existing roads and covering them
Consists of boat sheds/storage area, small cafe, service areas
Section
Boathouse and Durham Cathedral on the background 12