2020 Career Portfolio

Page 1

PORT FO LIO AHMET

H AY TA

ahmethay ta@me.com


AHMET HAYTA l in kedi n.co m /i n/ahm e t ha y ta

a hme tha y ta @ me . c o m

+905303806554

S KI L L S

E XPERI ENC E TABANLIOGLU ARCHITECTURE

NOV 2018- MAY 2019

ARCHITECTURAL ASISSTANT

REVIT & BIM

ERAY CARBAJO ARCHITECTURE

MAY 2019- SEP 2019

ARCHITECTURAL ASISSTANT

AUTOCAD SKETCHUP + VRAY RHINOCEROS

E D U C ATI ON

ADOBE PHOTOSHOP

BROCKVILLE COLLEGIATE INSTITUTE FULFORD ACADEMY BRAEMAR COLLEGE (ON, CANADA)

2009-2013

INTO NEWCASTLE UNIVERSITY

2014-2015

ARCHITECTURE FOUNDATION

NEWCASTLE UNIVERSITY

2015-2018

ARCHITECTURE & URBAN PLANNING

MIMAR SINAN FINE ARTS UNIVERSITY

2019-2020

ARCHITECTURE

SECONDARY EDUCATION

ADOBE ILLUSTRATOR ADOBE INDESIGN


CONTENTS

DURHAM BOATHOUSE

ACADEMIC (INDIVIDUAL)

2016

1

TYNE STUDENT HUB

ACADEMIC (GROUP)

2017

2

LEAZES WELLBEING CENTRE

ACADEMIC (GROUP)

2017-2018

3

DISSERTATION

ACADEMIC (INDIVIDUAL)

2017-2018

4

CO-PRODUCING SPACE

ACADEMIC (GROUP)

2018

5

DETAIL DRAWINGS

PROFESSIONAL

2018-2019

6

APPLICATION PROJECT

PROFESSIONAL

2019

7

COMPETITION PROJECTS

PROFESSIONAL / GROUP

2019

8

BUILDING SURVEY

ACADEMIC (GROUP)

2019-2020

9

BALAT AFTER SCHOOL CENTRE

ACADEMIC (INDIVIDUAL)

2019-2020

10-12

ASTERISK (*) IS ADDED ON THE LABEL OF EACH DRAWING MADE BY ME (IN THE GROUP OR PROFESSIONAL PROJECTS)


DURHAM BOATHOUSE

Architectural Design Studio “Measure� (Sophie Ellis) Newcastle University March-May 2016 The project is located at the southern banks of the River Wear, accords with the 12th century Romanesque Cathedral. The project brief was mainly focussed on providing boat shed, cafe and service areas but also considering the risk of flood.

The roof takes its shape from the dynamic nature of rowing and allows daylight to be entered into the building. Corten panels are used to cover steel frame structure for its weather resistance and appropriateness to the specified location.

Working Models

While I really enjoyed working on this project, I believe I could improve the construction details of the project. Technical volume and the service core as well as the circulation space could have been developed.

Maquette

h

ts

a Bo

ed

Section

ce rvi Se ore c fe Ca

Resillience

Environment

Wet areas that are boat storage and changing rooms are situated below the flood line while areas which must be protected from water penetration such as the technical room, lift and rest are positioned 1.2m above the ground level (.2 above the flood line)

The building is juxtaposed among the existing trees Foundations are planned to be fibre piles due to the proximity with the trees, so that the piles will be carefully placed between the roots of the trees (Casa Levene in Spain for precedence).

Circulation

Spaces

Keeping the existing roads and covering them

Consists of boat sheds/storage area, small cafe, service areas

Boathouse and Durham Cathedral on the background, Plan; left corner, process; opposite 1


TYNE STUDENT HUB

Architectural Design Studio “20th Century Architecture” (Rutter Carroll) Newcastle University

Team mates: Winnie Wong Sanghyeok Lee

November 2016-February 2017

GYM

MEZANNINE

S STUDY ROO OOM STUDY

ROOM

STUDY ROOM

Axonometric Site Plan*

Keelman’s Hospital is an abandoned hostel which has a rich history and can be connected with our

Salvation Army Mens’ Palace building was serving as a homeless hostel until few years ago. There are

En-suite Rooms*

private residences around the specified building and the area is extremely rich with diverse cultural

backgrounds which is contributed by many student accommodations around.

Without harming the nature of our Grade II listed Salvation Army building, we have designed this 17m2 rooms which can accommodate up to 70 people and the number can reach to 140 with the inclusion of Keelman’s Hospital. These rooms are going to serve homeless youth and they can acquire new skills in the student hub for further study. The design aims to provide a hub not only for the residents here but the students from other accommodations can equally benefit from the student hub. This would contribute the social interaction of vulnerable homeless children which can also psychologically support them to include in society. There is, therefore, a cafe, study room and a recreational common hall to provide all sort of services they may need. However, space is a bit tight to provide variety of activities for this student hub and some spaces in the basement are not solved well, which could have been improved.

SERVICE CORE

CAFE

C SERVICE CORE

CAFE AFE

KITCHEN

GYM

Plan

Spaces Inclined roofs and walls have sound spreading quality making it easier to be diffused. Particularly, inclined walls with higher than 6 degrees slope achieves higher accoustic diffusion so is used around the building to block the noise spread by the cafe.

Perspective Section*

Quiet

Buffer

Loud

Facade of Student Hub* 2


LEAZES WELLBEING CENTRE Architectural Design Studio “Design for Vulnerable Populations� (Tim Townshend) Newcastle University

Team mates: Beyza Celebi Adil Zeynalov Ka Wong Sonali Vanketes

September 2017-January 2018 Through the interviews with the vulnerable groups (inflicted by drug and alcohol abuse) and discussions with some local architects and planners, we designed a well-being centre which would contribute these vulnerable people both psychologically and functionally. Finally, we presented this project to the Newcastle Planning authorities and received many positive feedbacks. Whilst all of us contributed on the design, I think the quality of spaces could have been improved as well as the section drawings I made.

Facade*

Maquette

Plan*

Cafe*

Gym*

Section* 3


DISSERTATION Creative Dissertation (Daniel Mallo) Newcastle University September 2017-February 2018 The aim of the research was to demonstrate the implementation of counter-terrorism design strategies without harming, on the contrary strengthening the democratic quality of the public spheres. The research has been setting out; Investigating the motivations of terrorism and hostile reconnaissance process, Comprehending the balance between security needs and necessity for secularised urban spaces wherein the users feel both safe and free Scrutinising the epitome of crime prevention through design measures and examine feasibility

Over-securisation is portrayed through digital hand sketches

Vehicles reaching public areas in case of an emergency

Graphic-novel style case study descriptions

Public spaces must divide the crowd into smaller groups 4


CO-PRODUCING SPACE Architectural Design Studio “Co-producing Space” (Armelle Tardiveau) Newcastle University

Team mates: Beyza Celebi Adil Zeynalov Ka Wong

April 2017-June 2018 As a group of four, we have designed an intervention which can stimulate the public bonding among Ouseburn residents. Our design is made of scrap materials found in Daysh building when some of the office utiliences were thrown away. We bought other cheap materials such as polycarbonate sheet and hinges so with a minimum cost we created this intervention for different activities. Intervention should have been mobile but the castors we bought didn’t carry the weight. So it was a bit hard to carry the intervention around. We demonstrated a plant making event nearby the Toffee Factory.

Office dividers to panels

Table and shelter added

Bench from scrap materials

Intervention can serve locals in many ways

Local planting session

Process 5


AR-16013

F-CO-02A (Concrete32Screed)

CW-400

400 70

2260

520 1000

4800

150

150

1370

2C. 116 900x 2100

4800

1590

14

E-HR-02

30 29

2400

6900

CW-400 15

+18.50

150

1030

50

S01D S18D

CIRCULATION

1040

S12D

280

100

S06D

WC MALE

S03C

S13D

S08C

S21C

1180

1260

1400

E-DR-11 3J. 93 700x 2100

520 1200

1560

400 70

160 2150 1520

1000

1320 W-GB-01

150

1360

DW-03A-100s

S23D

S07C

100

W-CO-02 3J. 118 700x 2100

4800

150

150

1370

2C. 153 900x 2100

1590

11B. 156 900x 2100

520 1200

DW-03A-100s

S22D

W-GB-01

7330

5740

150

280 800

1030

400 70

260

1060

800 260

1060

800 260

1060

800 260

1140

2040

1090

270

1260

1010

C

1260

+2.65

C-GB-04

C W-CO-02

+1.75

Ceiling hanger

CIRCULATION

W-CO-02

WC MALE

W-CO-02

S01C

S06C

S14C

W-GB-01

S03C S08C

W-GB-01

3500

4000

W-CO-02 +1.75 C-GB-04

COLLECTION STORAGE

-0.90 -0.85

C-GB-04

W-CO-02

W-GB-01 S07C

S21C S01C

F-CO-02B (Concrete Screed) Concrete Screed Liquid Sprayed Waterproofing Cast-in-place concrete

+1.75 C-GB-04

C

2600

1260

W-CO-02

CW-600

2600

3500 2150

800

1090 1260 2040

1140

1850 1260

2C. 41 900x 2100

830

4800 2490 1260

7330

2600

STORAGE

11A. 10 700x 2100

S06C

S14C

S12C

-0.90 -0.85

S12C SSL B1

BW-02B - FR120

-0.90 m

-0.85 FFL -0.90 SSL

150 1030

E-DR-12

S29D

Ceiling hanger

S05D

W-GB-01

1060 S23D

100 300

S05D

COLLECTION STORAGE

S29D

S22D

S28D

J

2040

1060

Staff Room Plan

S05D BW-02B - FR120

S14D E-DR-10 S12D

S06D S05D

11A. 12 700x 2100

DW-03A-100

S23D

S01D

11A. 14 700x 2100

11A. 13 700x 2100

S28D

?

8

M5B

S18D

1060

26.81 m²

W-GB-01

3J. 117 700x 2100 +1.75 C-GB-04 +1.75 C-GB-04 S23D

100

W-GB-01

150

150 5740

13.3.1.14

DW-03A-100s

S22D

C-GB-04

260

MALE WET ZONE

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

800

S08D

S21D

260

S16D

DW-03A-100s

CeilingS03D hanger support

100

3J. 94 700x 2100

W-CO-02 50 1030

S14D

1180

W-CO-02

CW-400 -0.90 -0.85

260

3260

S03D S19D F-CO-02B (Concrete Screed)

BW-01B

W-GB-01

+1.75

Liquid Sprayed Waterproofing Cast-in-place concrete

FU-LO-B01

SSL 1

S13D

+5.85 m

S21D

DW-03A-100s

W-GB-01

FU-LO-B01 Concrete ScreedW-CO-02

-0.90 -0.85

BW-01B

3J. 119 700x 2100

W-GB-01

+5.85 m

W-GB-01

S07C S21C W-CO-02 Concrete Screed Liquid Sprayed Waterproofing Cast-in-place concrete

F-CO-02B (Concrete Screed)

FU-BC-B01

7000

1060

700 W-GB-01

S03C

S05D SSL 1

CANNED FOOD &

WC FEMALE BW-02B - FR120

S21C

S13D

S01D

DW-03A-100s

11.29 m² BOTTLED DRINKS

W-CO-02

-0.90-0.85

S05D

BW-02B - FR120 Ceiling hanger support

CIRCULATION

WC MALE S08C

CW-400

800

390

DW-02A-100s

1590

6750

2150

0

S13D

S01D

1090

W-GB-01

700 W-GB-01

80 720

1200

5450 3260 1400 2270 1090

150

1850

BW-01B CIRCULATION F-CO-02A (Concrete Screed) W-CO-02

800

1200

DW-03A-50s

47.42 m²

W-CO-02

W-CO-02

+2.65

S28D

W-GB-01

W-CO-02 W-GB-01 FU-LO-B01 124 LOCKERS -0.85 FFL E-DR-11 W-CO-02 -0.90 SSL S01C S12C

S06D

11A. 11 700x 2100

S29D

I

E-DR-10 S12D

+3.15

FU-LO-B01 +2.65 +1.75

C-GB-04

2040

S05D

W-CO-02

F-CO-02A W-CO-02 C-NO-02

260

390

W-CO-02

-0.85 FFL -0.90 SSL

C-GB-04

100 300

1060

S22D

BW-02B - FR120 S14D

J

S23D

FU-LO-B01

S05D

11A. 12 700x 2100

15.1.4.2

F-CO-02A W-CO-02 C-GB-02 BW-01B W-GB-01 C-GB-02A

22.00 m²

2270

WC FEMALE

700

11A. 95 700x 2100

150 W-CO-02

S16D DW-03B-50s

F-CO-02B (Concrete Screed)

W-CO-02 DW-03A-50s

AR-17711 W-GB-01

W-GB-01

S08D S03D

S19D

BW-02B - FR120

1

+1.75

1260

S15D

11A. 92 700x 2100

+3.15

100

W-CO-02

W-GB-01

S15D

BW-01B

S05D

FREEZERDW-03A-100 ROOM

11A. 15 700x 2100

W-CO-02

S29D

W-GB-01

BW-02B - FR120 W-CO-02

7000 MALE CHANGING ROOM

W-CO-02

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

E-DR-12

11A. 13 700x 2100

S28D

?

S23D

2C. 47 900x 2100

13.3.1.8

E-DR-11

M5B

S18D

11A. 14 700x 2100

-0.85 FFL -0.90 SSL W-GB-01

C-GB-04

BW-01B W-CO-02

FEMALE WET ZONE 13.3.1.13

1360

DW-03A-100s

4100 W-CO-02

DW-03B-50s

26.81 m²

L

FU-LO-B01 BW-02B - FR120

LEVEL LOADING

2040

1260

W-GB-01

DW-03A-100s

3J. 118 700x 2100

-2.05 m

W-CO-02 BW-01B

+20.85 m

150

W-GB-01

S22D

DW-03B-50s

1850

SSL 3

S23D

DW-03A-100s

S03D

W-CO-02

3J. 117 700x 2100

280

2490

-0.90-0.85

BW-02B - FR120

S01D

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

COLD ROOM

BW-01B

9

W-GB-01

13.3.1.14

S21D

S22D

DW-02A-100s W-GB-01

S21C Concrete Screed Liquid Sprayed Waterproofing Cast-in-place concrete

150

FU-BC-B01

W-CO-02 W-CO-02 CW-400

MALE WET ZONE

F-CO-02A (Concrete Screed)

800

2600

1140

2490

I

SSL 1M +10.90 m

W-GB-01

1320

W-GB-01

DW-03A-100s

S08D

BW-02B - FR120

3J. 119 700x 2100

S18D

LEVEL B1

-0.85 FFL -0.90 SSL

W-GB-01

C-GB-04

-0.85 FFL -0.90 SSL

DW-02A-100s

W-CO-02

S16D

*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.

S23D

FU-BC-B01

S01C S12C

25.48 m²

800

FU-LO-B01

S19D S03DFU-TA-B05

E-DR-11

+3.15

W-CO-02 CW-400 WC FEMALE

W-GB-01

0

60 LOCKER

BW-02B - FR120

W-CO-02

S05D

11A. 11 700x 2100

270

1090

SSL 2

KITCHEN

W-CO-02 BW-01B C-GB-02

1200

100

29.09 m²

Expanded Coil Mesh Horizontal Mesh in Every 3 Rows of CMU Blocks

BW-01B

12 SEATS

S21D

DW-03A-100s

Ceiling hanger

W-CO-02

5450

13.3.1.7

CMU Block

BW-01B W-CO-02

W-CO-02

13.3.1.9

ICT

W-CO-02

CW-400

In every 3 rows, CMU blocks are fixed to the structural concrete

F-CO-02B (Concrete Screed)

BW-02B - FR120

FU-LO-B01

W-CO-02

FU-LO-B01

Structural Column / Wall

W-CO-02

MALE BREAKROOM

100

W-GB-01

FU-LO-B01

7000

S15D

3J. 93 hanger 700x 2100 Ceiling support 100

C-GB-04

1260

2C. 90 900x 2100

W-CO-02

BW-01B

1200

3200 LEVEL B1 FEMALE CHANGING -0.85 m ROOM

2C. 116 900x 2100

550 1930 1940

160

2C. 116 900x 2100

11A. 92 700x 2100

7380

7380

11A. 95 700x 2100

1400

1400

S05D

280150

W-GB-01

2800

Expanded Coil Mesh Horizontal Mesh in Every 3 Rows of CMU Blocks

FU-BC-B01

FU-CH-B08

F-CO-02A BW-01B

L

FU-LO-B01 W-GB-01

2600

2150

W-GB-01

CMU Block

CW-400

11A. 15 700x 2100

3J. 94 700x 2100

FU-BC-B01

BW-01B W-CO-02

1000

SSL B1

50 50

2300

150

In every 3 rows, CMU blocks are fixed to the structural concrete

W-CO-02

E-DR-11

-0.85 mW-CO-02

-0.85 m

Corner brackets to be fixed to the structural slab at the top line of the wall in every 900 mm (opposite side of the following block)

Structural Column / Wall

CW-400 100

1180

W-GB-01

BW-02B - FR120

F-CO-02A (Concrete Screed)

8

S22D

E-DR-11

-2.05 m

+13.50

GALLERIES

ICT

2C. 64 900x 2100

150 3500

6750

150 W-GB-01

F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A

Staff Room Section

Ceiling hanger

150

SSL B1

1990

100

S06D

+1.75

DW-02A-100s

ICT

W-GB-01

1030 BW-01B

W-CO-02

FU-LO-B01

-0.90

S07D

DW-02A-100s -0.85 m

+13.35 m

+21.00

50

S14D

W-CO-02

W-CO-02

FU-LO-B01

Corner brackets to be fixed to the structural slab at the top line of the wall in every 900 mm (opposite side of the following block)

W-GB-01

150

150 -0.85

1040

S12D

FU-BC-B01

-0.90

W-GB-01

DW-03B-50s

Ceiling hanger

W-CO-02

2C. 64 900x 2100

1520 610

610 2480 11A. 154 700x 2100

1780

150

1930

11B. 156 900x 2100

150

1400

1400

2C. 90 900x 2100

2C. 153 900x 2100

550

2C. 91 900x 2100

11A. 155 700x 2100

1940

1780

11A. 96 700x 2100

500

S11D

W-CO-02

124 LOCKERS -0.85 FFL -0.90 SSL

AR-17728

FU-CH-B08

DW-02A-100s

LEVEL 1

+6.00 m 390 180700 1000 280 180 1180

W-CO-02

F-CO-02ALEVEL (Concrete Screed) LOADING

+13.35

DW-03A-50s

W-CO-02

-0.85 FFL -0.90 SSL

BW-01B

BW-01B

47.42 m²

F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A

FU-BC-B01 W-GB-01 4

22.00 m²

-0.85 FFL W-CO-02 -0.90 SSL

W-CO-02

3620

13.3.1.8

FU-LO-B01

2AJ. 43 1100x 2100

F-CO-02B W-CO-02 C-GB-04 C-GB-04A 2C.W-GB-01 115 900x 2100

S16D DW-03B-50s

150

280

2C. 47 900x 2100

2700

2100

Ceiling hanger support

6.58 m²

F-CO-02A W-CO-02 C-GB-02 W-CO-02

F-CO-02A (Concrete Screed)

BW-02B - FR120

E-DR-11

2150

-0.85

150

SSL 3M

+8.50

50

3800

13.3.1.6

200

2C. 164 900x 2100

450

80 720 1520

150

150

W-CO-02

CANNED FOOD & BOTTLED DRINKS

7000 MALE CHANGING ROOM

8

W-CO-02

FEMALE WET ZONE

-0.85 FFL

1720

1000

BW-02B - FR120 W-CO-02

BW-01B

S21D

1030

FU-TA-B05

BW-01B

FU-LO-B01

+23.30 m

W-CO-02

1000

1350

120

1400

3J. 94 700x 2100

1350

3500

CIRCULATION 2C. 61 900x 2100

L

W-CO-02

2C. 91 900x 2100

2700

1200

2350 500

2700

2C. 47 900x 2100

CONCRETE LINTEL W-GB-01 CIRCULATION

F-CO-02A (Concrete Screed)

DW-03B-50s DW-03B-50s

FU-LO-B01

BW-02B - FR120 W-CO-02 W-CO-02

F-CO-02B (Concrete Screed)-0.90 SSL

700

W-CO-02

4100 FU-LO-B01

100

280150

W-CO-02 BW-01B

S13D

FEMALE CORRIDOR

AR-17711

200 E-HR-02

W-CO-02

14

Lighting MEP ZONE Fixture 1120

3

60

Ceiling Mounted Lighting

E-HR-02 16

31

2350

1650

3J. 94 700x 2100

2100

2700

6400

1200

1400

E-DR-11

S08D S03D

390

S01D S18D

C-GB-04

80200 420

1350

110 1060

150 80200 420

7380

2C. 164 900x 2100

450 1520

610 2480

120 160

1000

7380

110 1060 2400

6900

1520

2C. 153 900x 2100

610

1720

11A. 155 700x 2100

160

1350

160 2150 80 720

2C. 164 900x 2100

1650

1200 3500

BW-02B - FR120 W-CO-02

+16.75 m

GALLERIES

+20.85

CORE 1 STAIR Stair

CORE 1 STAIR 17

1650

3060

350150

200

1650

2300

1650

1200

200

1200

2300

3500

200 4540

CIRCULATION

50

-0.85

FEMALE WET ZONE

S03D

W-GB-01 SSL 2M

F-CO-02A (Concrete Screed) Concrete Screed

MEP ZONE

C-GB-04

FU-LO-B01 CONCRETE LINTEL

S03D

+2.65

2800

BW-01B

Expanded Coil Mesh Horizontal Mesh in Every 3 Rows of CMU Blocks

S19D

FU-LO-B01 BW-02B - FR120

FU-BC-B01

FU-TA-B05

BW-01B

J

FU-LO-B01

150

180

5.30 m²

FREEZER ROOM

W-GB-01

CMU Block

700

3500

E-HR-02 32

E-HR-01

3500

1200 3500

6400

50

50 18

33

+2.65

Lighting Fixture

C-GB-04A

DW-02A-100s W-GB-01

W-CO-02

W-GB-01

BW-01B

E2

W-GB-01 2100

S13D

DW-03A-100s

1010

E-HR-02

15

19 34

E-HR-02

MEP ZONE FEMALE CHANGING ROOM

Cable C-GB-04A Tray

150

830

16

20

35

SSL 4T

+29.00 m

+2.65

11A. 96 700x 2100

19 18

17

Ceiling Mounted Stair Lighting

150

BW-01B W-CO-02 W-GB-01

L

230

Structural Column / Wall

FU-CH-B08

+6.00 m

Cable Tray

1150

In every 3 rows, CMU blocks are fixed to the structural concrete

S15D

150

280

W-CO-02

BW-01B W-CO-02

1000

S18D

E-DR-11

CW-400

Corner brackets to be fixed to the structural slab at the top line of the wall in every 900 mm (opposite side of the following block)

2600

30 29

20

36 36 35 34 33

24

23

21

W-CO-02

LEVEL 1

W-CO-02

1350 1000

13.3.1.10

W-CO-02

BW-02B - FR120

AR-17711

110

CW-400

MALE CORRIDOR W-GB-01 W-GB-01

W-CO-02 W-CO-02 CW-400

900

-0.85 FFL -0.90 SSL

13.3.1.13

W-CO-02

18.11 m²

W-CO-02

F-CO-02A (Concrete Screed) CW-400

-0.90

DW-03A-50s

DW-02A-100s

W-GB-01

MEP ZONE

C-GB-02A

CW-400

29 W-CO-02 CW-400

25

22 22

21

37

37

32

40 39

38

38

31

1650

350150

1650

1200 3500

1500

200

23

39

11A. 154 700x 2100

1350

7330

260

1060

800 260

450

1060

800 260

1520

800

1060

260

1090

610

800 270

550

830

60

2000

1000 2300

1650 1200 3500

1000

+8.50

41

24

40

E-HR-02

E-HR-02 W-CO-02

W-CO-02

28 27

41

C-GB-04A

CIRCULATION

W-CO-02

CW-500

W-CO-02

COLD ROOM

BW-02B - FR120

*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.

-0.85 FFL -0.90 SSL

BW-01B

-0.85

W-GB-01

2600

60 LOCKER

1010FU-BC-B01 150 180

FU-LO-B01

CW-500

1

CONCRETE LINTEL

CEILING HANGER

CONCRETE LINTEL

S21D

W-CO-02

30

+21.00 +21.00

42

+29.85 m

Supply Air Diffuser

FU-LO-B01

26 25

CEILING HANGER SUPPORT

Ceiling hanger support

31

E-HR-02

42

1 STAIR

CORE 1 STAIR

E-HR-02

E-HR-01

27

J

4000

CORE 1 STAIR

32

E-HR-02

Ceiling Mounted Stair Lighting

E-HR-02

33

E-HR-02 E-HR-01

26

Ceiling Mounted W-CO-02 Stair Ceiling Lighting

Mounted StairCORE Lighting

28

CORE 1 STAIR

34

E-HR-02

C-GB-04A

SSL 4

FEMALE WET ZONE

+13.50 +13.50

1

35

33

BW-01B W-CO-02

CEILING HANGER

C-GB-02A

100

AR-17728

W-CO-02 DW-03A-50s

+5.85

13.3.1.12

AR-17728

29.09 m²

W-CO-02

CW-500

180

25.48 m²

12 SEATS

W-CO-02

1000

WC FEMALE

F-CO-02A W-CO-02 C-GB-02

C-NO-02

+6.00

1260

BW-02B - FR120 W-CO-02

W-GB-01

37 36 36 35

W-CT-02

MAIN LOBBYSSL 3

CEILING HANGER

13.3.1.7

13.3.1.9

F-CO-02A W-CO-02 C-GB-02

F-CO-02A W-CO-02 C-NO-02

4130

L

110

16DW-02A-100s

12 SEATS

W-CO-02

2

Ceiling Mounted Stair Lighting

38 37

29

W-GB-01

8

W-GB-01

+21.00

0

+21.00 S03D m

FU-LO-B01

39

32

CIRCULATION+21.00 +21.00

3

42

31

2

DW-02A-100s

F-CO-02A W-CO-02 C-GB-02F-CO-02A (Concrete Screed) W-GB-01 C-GB-02A

FU-TA-B05

39.65 m²

F-CO-02A (Concrete Screed) DW-03B-50s -0.85 FFL -0.90 SSL

+6.00 BW-02B - FR120 +5.85

IN-FO-02C Waterproof Membrane Blinding Concrete GravelCW-400 Rolled Earth

41

34

CW-400

FEMALE WET ZONE CONCRETE LINTEL

+6.00 m

40

38

+2.65 W-CO-02

CONCRETE LINTEL

Mounted Structural Stair Foundation

E-HR-02

4

13.3.1.5

I

Protective Concrete Lighting LEVEL 1IN-FO-02B High-Strenght Polyethylene

41

30

W-CO-02

MALE BREAKROOM

W-CO-02

F-CO-02A W-CO-02 C-GB-02

S18D

MEP ZONE C-GB-02 Return Air Diffuser

CORE 1 STAIR Ceiling

6

40

W-CO-02 E-HR-02

W-CO-02

14

42

E-HR-02

MEP ZONE CORE 1 STAIR

BW-01B

3200 FEMALE CHANGING E-DR-09 ROOM

FU-CH-B08

FEMALEW-CO-02 BREAKROOM

MAIN LOBBY

CEILING HANGER SUPPORT

CEILING HANGER SUPPORT

F-CO-02A (Concrete Screed) Concrete Screed

11

5 Structural Foundation Protective Concrete E-HR-01 IN-FO-02B High-Strenght Polyethylene IN-FO-02C Waterproof Membrane Blinding ConcreteE-HR-02 E-HR-02 Gravel Rolled Earth

C-GB-05 +3000 AFF

CONCRETE LINTEL

+16.00 +16.00

7

39

+20.85

CORRIDOR

W-CO-02

W-CO-02 CW-400

16

8 8

2

FU-LO-B01

AR-17728

W-CO-02

4660 BW-02B - FR120

Toilets Plan

2600

LEVEL 3

Lighting Fixture

E-HR-02

W-CO-02

AR-17728

6750

+10.96 m

SP1 C-GB-04

9

9

7 6

1

-0.85 FFL -0.90 SSL

AR-17702

FU-LO-B01

4 W-CO-02

13.4.2.1 1424.95 m²

-0.85 FFL -0.90 SSL

W-GB-01

W-CO-02

3620

W-CO-02

150

BW-02B - FR120

C-GB-02A

13

3

E-DR-10

W-CO-02

F-CO-02A (Concrete Screed) DW-03A-50s

16

W-CO-02

W-CT-02

2

C-NO-02

ROOM

17

-0.85

5

3800

DW-03A-50s

6.58 2100m²

BW-01B

900

230

AR-17702

BW-01B - FR120

I AR-17711

+20.85 m

Stair Lighting FEMALE CHANGING

15

-0.85 10

10

CORE 1 STAIR

1350

LEVEL 1M

FEMALE CHANGING ROOM

MEP ZONE

+2.65

Cable Tray

1990

W-CO-02

2300

100 60 200

Ceiling Mounted Stair Lighting

MEP ZONE FEMALE

BW-01B Ceiling

Supply Air

18

+5.85

200

2700

1200 C-GB-04A

1400

C-GB-04A

19

12 11

4

Ceiling Mounted Stair Lighting

BW-01B

W-CO-02

13

-0.85 50

2300 200

1200

E1

+2.65

W-CO-02

E-HR-01FU-TA-B05 E-HR-02 E-HR-02

F-CO-02A (Concrete Screed) Concrete Screed14

+13.50 +13.50

CONCRETE LINTEL

LEVEL 3M

C-GB-02A

W-CO-02

FU-CH-B08

16

C-GB-02A

W-CO-02 Mounted CORE 1 STAIR Diffuser

CONCRETE LINTEL

20

I +6.00

C-GB-02 C-GB-02A

CONCRETE LINTEL

C-GB-02 Return Air Diffuser

FEMALE CORRIDOR

19 18

17

24

22 21 21

20 BW-01B

C-GB-02A C-GB-02

25

C-GB-02 C-GB-02A 23 22

E-HR-02

W-CO-02

CEILING HANGER

24

CONCRETE LINTEL

CEILING HANGER

28 27

26

MEP ZONE FEMALE BREAKROOM

25

C-GB-02A C-GB-02 23

+2.65

E-DR-10

DW-03A-100s

E2BW-01B

W-GB-01 F-CO-02A W-CO-02 C-GB-02 W-CO-02

F-CO-02A (Concrete Screed)

PUBLIC WC CIRCULATION

MEP ZONE

+18.50

29

+2.65

3060

C-NO-02

9

280

2480 160

11B. 156 900x 2100

150

8

4 AR-17728

CW-400

30

Recessed Return Air Lighting Diffuser Fixture

W-CO-02

CEILING HANGER W-CO-02 SUPPORT

31

E-HR-01

CONCRETE LINTEL

E-HR-01

CORE 1 STAIR

+13.50 m

+23.50 m

E-HR-02

1300

SP1

-2.06 m

CEILING HANGER SUPPORT

2700

1830

LEVEL LOADING

-0.90LEVEL m LOADING

LEVEL 2

200

2350

Ceiling Mounted Stair Lighting

+5.85

E-HR-02

E-HR-02

12

F-CO-02A (Concrete Screed) Concrete Screed

-2.06 m

CORE 1 STAIR CONCRETE LINTEL

32

MEP ZONE

BW-01B - FR120

11013.3.1.6

200

1 BW-02B - FR120

W-CO-02

2200 2300 200

E1 SSL B1

35

33 CEILING HANGER

28

W-GB-01

FEMALE CORRIDOR

900

110

FU-CH-B08

FU-TA-B05

BW-02B - FR120 W-CO-02

CIRCULATION

-0.90

11A. 155 700x 2100

80200 420 1560

5740

110 1060

150

280

2400

800

1030

6900 610

150 1030 1060 1060 1060 1010

1010

150

150

5740

280 800 260 800 260 800 260 800 260 800

1090

2C. 41 900x 2100

1780

1830

1930

2C. 90 900x 2100

1590

1400

1400 1720 1200

5450 3260 1400 2270 150

2C. 41 900x 2100

1940

150

150

1370

150

150

270

11A. 92 700x 2100

11A. 95 700x 2100 280 280 280 280 280 280 280 280 280 280 280 280 280 280

830

5450

200

11A. 154 700x 2100

1000 2C. 90 900x 2100

1400 150

1200 400 70

7380

7380

2C. 64 900x 2100

2C. 116 900x 2100

7380

2C. 91 900x 2100

150

150 1400 150 1720 1200 3260 11A. 96 700x 2100

2270 150

2260

DW-03A-50s

+23.30 m

16

Ceiling Mounted Stair CONCRETE LINTEL Lighting

34

15

FU-TA-B05 -0.85 -0.90

FU-CH-B08

-0.90

+6.00

38

33

E-HR-02

W-CO-02 CW-400

PUBLIC WC CIRCULATION

40

+5.85

CEILING HANGER SUPPORT

37

37

30

COREBREAKROOM 1 STAIR FEMALE

CIRCULATION

AR-17728F-CO-02A (Concrete Screed)

8

P

+21.00 +21.00

42

Recessed C-GB-02A Lighting 27 26 Fixture

18.11 m²

W-GB-01

GALLERIES

W-CO-02 CW-400

41

31

DW-03A-100s

2C. 61 900x 2100

900

1150

AR-17728 -0.90

WC FEMALE 1000 13.3.1.12

280

DW-03B-50s

4540

200

7330

42 x 280.0 /178.6

3920

42 x 280.0 /178.6

7380

2260 120 1000 280

2330

2300 200 2300

1010

3920

200

11A. 95 700x 2100

8510

200 2300

1060 1060 1060 1090

800

200 2300

42 x 280.0 /178.6

60 3060

150

260 800

3060

260 800

200

260 800

W-CO-02

2100

W-GB-01

2300

W-CO-02

110

1120

W-CO-02

6

450 FU-CH-B08

W-CO-02

2C. 115 900x 2100

W-CO-02

450

DW-03A-50s

E-HR-02

200

W-CO-02

BW-01B

Supply Air Diffuser

+29.00 m

6

DW-03B-50s

FU-TA-B05

-0.85

KITCHEN

CW-400

DW-03B-50s

F-CO-02B W-CO-02 C-GB-04 W-GB-01

4130

W-CO-02

FU-TA-B05

BW-01B 5980 W-CO-02

180

FU-CH-B08

W-GB-01

DW-03B-50s

0

3500

W-CO-02

3500

FR120

CONCRETE LINTEL

C-GB-02A

SSL 4T

230

E2

BW-02B - FR120

2300

BW-01B

FU-TA-B05

-0.85

2700

FEMALE CORRIDOR

W-CO-02

+16.00

-0.85 -0.90

-0.90

MEP ZONE C-GB-02 Return Air Diffuser

18.11 m²

W-GB-01

900

110

1150

-0.90

13.4.2.1 1424.95 m²

2140

5.30 m²

-0.85

2B. 49 900x 2100

F-CO-02A W-CO-02 C-NO-02

F-CO-02B W-CO-02 C-GB-04 W-GB-01

SSL 3M

E-HR-02

+6.00 39

29

Mounted Recessed Stair Return Air Lighting Diffuser Lighting W-CO-02 Fixture

BW-01B

W-CO-02

-0.85 m

-0.85

3500

C-GB-02 C-GB-02A

6400

CONCRETE LINTEL

FEMALE BREAKROOM

FU-CH-B08

W-CO-02

LEVEL B1

SSL 3MM

-0.90 m

1200

1200

TE LINTEL

W-CO-02

SSL B1

CEILING HANGER SUPPORT

MEP ZONE C-GB-02A C-GB-02

C-GB-02A

BW-01B - FR120

BW-01B

Staircase Section

+2.65

13.3.1.12

280

+29.85 -0.85 m

F-CO-02B W-CO-02 C-GB-04 W-GB-01

W-CO-02

450

*Refer to LUS-BP14C-TA-REP-AR-38710

CORE 1 STAIR

E-HR-02 +6.00 E-HR-01

35

MEP ZONE

MEP ZONECeiling CIRCULATION

SUMP PIT

Recessed Lighting Fixture

CONCRETE LINTEL

MAIN LOBBY

CEILING HANGER

MEP ZONE Recessed Return Air Lighting Diffuser Fixture

LEVEL 2M +16.90 m

-0.90 -0.85

-0.90 -0.85

CEILING HANGER

C-GB-02A

CONCRETE LINTEL

MEP ZONE

CIRCULATION

SUMP PIT

LEVEL B1

CONCRETE LINTEL

SSL 4

4130

-0.90 E-DR-10

W-CO-02

3'F&B and Kitchen Design Guideline

MAIN LOBBY

CONCRETE LINTEL 32

1000

CONCRETE LINTEL

W-CO-02

-0.85 m

-0.90 -0.85

DW-03A-50s

W-CO-02

WC FEMALE

DW-03A-100s

900

L

L

W-CO-02

200 450

L CIRCULATION

E-DR-10

BW-02B - FR120

11A. 10 700x 2100

W-GB-01

W-CO-02

J

34

CEILING HANGER SUPPORT

C-GB-02

CIRCULATION

-0.90 -0.85

300

1650

1650

1

CEILING HANGER SUPPORT

I

CONCRETE LINTEL

3

3 2

STORAGE

Ceiling Mounted Stair Lighting

41

CEILING HANGER

Cable Tray Lighting Fixture

4

1

S13D

DW-03A-100s

BW-02B - FR120

6

42

200

-0.85 m

E-HR-02

Lighting Fixture

LEVEL 4 +30.00 m

5

2

11A. 11 700x 2100

CW-600

STORAGE

S05D

E-DR-11

36 36

CORE 1 STAIR Cable Tray

CONCRETE LINTEL

+5.85 m

+26.80 m

4

J

S13D

DW-03B-50s

SP1

1300

5

11.29 m²

AR-17728

F-CO-02A W-CO-02 C-NO-02

CW-500

W-CO-02

5980

160

W-CO-02

W-CO-02

DW-03B-50s

-0.85

2B. 49 900x 2100

400

1000

6

450

W-CO-02

200

CW-400

F-CO-02A W-CO-02 C-GB-02

W-GB-01

CW-500

W-CO-02 W-CO-02

-0.85 FFL -0.90 SSL

180

DW-03A-100s

-0.90 SSL

13.3.1.10

W-CO-02

CW-500

W-CT-02

I

13.4.2.1 1424.95 m²

E-DR-10

DW-03A-100s

BW-02B - FR120

AR-17711

200

2130

7

6

S05D

2140

-0.85 FFL -0.90 SSL

DW-03B-50s

Report' for details.

1300

8

7

BW-01B

AR-17728

W-GB-01

CIRCULATION

160

W-CO-02

DW-03A-100s

W-GB-01

MALE CORRIDOR -0.85 FFL

W-CO-02

F-CO-02A (Concrete Screed) W-GB-01 -0.85 FFL -0.85 FFL -0.90 SSL -0.90 SSL

2110

2110

DW-03B-50s DW-03A-100s

W-GB-01

12 SEATS

2AJ. 43 1100x 2100

W-GB-01

2100 150 11B. 163 900x 1350 180 1000

130 550

-0.85 FFL -0.90 SSL

F-CO-02B W-CO-02 C-GB-04 W-GB-01

DW-03A-100s

FU-TA-B05

11B. 163 900x 2100

DW-03B-50s

-0.90

S06D

13.3.1.11 m² F-CO-02A23.04 W-CO-02 C-GB-02

130 550

5

-0.85

-0.85 FFL -0.90 SSL

39.65 m²

F-CO-02B W-CO-02 C-GB-04 W-GB-01

W-GB-01

1010

FU-BC-B01

38

1000

9

C-NO-02

CONCRETE LINTEL

CIRCULATION

8

+5.85

W-CO-02

W-CO-02

CIRCULATION

15.1.4.2

9

J

0

+6.00

1C. 76 1630x 2100

10

M1A2

W-CO-02

CONCRETE LINTEL

200

9

11

PUBLIC WC CIRCULATION

W-CO-02 CW-400

10

CORE 1 STAIR

E-HR-02

12

W-CO-02

39

2200

15 14 13

CONCRETE LINTEL

SSL 1 +5.85 m

W-CO-02 CW-400

CORE 1 STAIR

BW-01B

40

Ceiling Mounted Stair Lighting

100 60 200

11

+6.00 m

+6.00

C-GB-02

E-HR-02

11.29 m² CW-600

2000

12

S13D

11A. 10 700x 2100

BW-01B BW-02B - FR120

CW-400

CIRCULATION

F-CO-02A W-CO-02 C-NO-02

+21.00 +21.00

1000

200

1000

16

Ceiling Mounted Stair Lighting

14 13

+6.00 +5.85

MAIN LOBBY

+6.00 +5.85

SSL 1

16 15

19

18

W-CO-02

C-GB-05 +3000 AFF

C-NO-02

+6.00

Ceiling Mounted Stair Lighting

17

22 21 20

+1.43 17

S13D

DW-03A-100s

S28D

15.1.4.2

S28D

F-CO-02A W-CO-02 C-NO-02

E1

200

CW-400

1000

W-CO-02

E-HR-02

200

24

200

3370 E-HR-01

S22D

I

2040

S05D S29D

E-DR-11

E-HR-02

MAIN LOBBY

LEVEL 1

21 20

19 18

23

+1.43

LEVEL B1

+3.37

25 24

350150

CW-400

SP1

+6.00

26

+6.00 m

LEVEL 3

+5.85

O

LEVEL 1

+21.00 m

+3.37

25

11A. 11 700x 2100

S05D

W-CO-02

W-CO-02 BW-02B - FR120 W-CO-02

100 300

S22D

S01D 2C. 47 900x 2100 2040

S29D

3J. 118 700x 2100

E-DR-10

100S12D 1060

BW-02B - FR120S05D W-CO-02

100 300

S23D

S18D

AR-17728

AR-17711

13.3.1.5

DW-03A-100s

5980E-DR-10 S12D

DW-03A-100s 5 E-DR-11 FEMALE BREAKROOM DW-03B-50s AR-17728

DW-03B-50s

13.3.1.11 23.04 Screed) m² F-CO-02A (Concrete

W-GB-01

FU-CH-B08

WC MALE

11A. 161 700x 2100

7

2

S01D

S23D

L

11A. 12 700x 2100 W-CO-02

BW-02B - FR120

1060

BW-02B - FR120 DW-03A-100

450

W-CO-02

BW-02B - FR120

E-DR-10 11A. 12 700x 2100

DW-03B-50s

M5B

E-DR-11 DW-03A-50s

E-DR-11

WC MALE CIRCULATION

11A. 161 700x 2100

W-CO-02

4660

W-GB-01

11A. 162 700x 2100

W-GB-01

S14D

W-GB-01

S05D

S22D DW-03A-100

S05D

S06D

CORE 1 STAIR

8

22

W-CO-02

27

E-HR-02

2130

E1

W-CO-02

26

W-GB-01

1360

11A. 13 700x 2100

S05D

W-CO-02

DW-03B-50s

W-CO-02

E-DR-12

11A. 14 700x 2100

11A. 13 700x 2100

S29D

S23D

DW-03A-100s

W-GB-01 S28D 2B. 49 900x 2100

S22D

3J. 118 700x 2100

S05D

Staircase Plan

SP1

MAIN LOBBY W-CO-02

W-CO-02

27

23

28

J MAIN LOBBY

830 28

29

E-HR-01

Ceiling Mounted Stair Lighting

29

31

SP1

2300

260

Ceiling Mounted Stair Lighting

CORE 1 STAIR

32

150

S29D

M5B

?

S05D

S14D2100 3J. 117 700x

P

8

2300

33

30

E1

Lighting

30

3370

34

CORE 1 STAIR

1030

800 60

E-HR-02 35

CORE 1 STAIR

1320

S28D

W-GB-01

W-GB-01

W-CO-02

100

W-GB-01

S23D

DW-03A-100s

26.81 m² W-GB-01 -0.85 FFL -0.90 SSL

200

11A. 14 700x 2100

-0.85 FFL -0.90 SSL

2140

W-CO-02

W-CT-02

BW-02B - FR120

O

SSL 1M

+5.85 Stair

31

36

Ceiling Mounted Stair Lighting

270

32

S05D

1360

DW-03A-100s

4400

500

37

CORE 1 STAIR

33

S23D

100

?

C-GB-04 C-GB-04A

-0.85 FFL -0.90 SSL

S22D DW-03A-100s

3J. 93 700x 2100

S22D S23D

3500

38

+6.00 +6.00

34

1

13.3.1.14

E-DR-12

3J. 119 700x 2100

DW-03A-100s

S18D

S01D

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

S18D

S01D

26.81 m²

F-CO-02B W-CO-02 100 AR-16013 W-GB-01

E-DR-11

3J. 117 700x 2100

150

1180

DW-03A-100s

E-DR-11

CORE 1 LOBBY

Ceiling Mounted+6.00

35

2

100

S06D

S07D

BW-01B

+10.90 m

+6.00 +6.00

W-CO-02 E-HR-02

36

3

Ceiling Mounted Stair Lighting

1 39

42

CW-400

2350

1000 200

37

4

3 2

+6.00 +6.00

1030

3J. 119 700x 2100

E-HR-01

500

1000

5

4

W-CO-02

1

E-HR-02

38

BW-02B - FR120

LEVEL 3M +23.50 m

ART LOADING

2

41

SSL 1M

W-CO-02

3

39

6

5

CW-400

1

4

MALE WET ZONE

DW-03A-100s

S03D

9

ART LOADING

E-HR-02

5

3

CORE 1 STAIR

2

8 8 +6.00 +6.00 7 7 6

6

6

4

10

9

7

5

11

10

W-CO-02 9

E-HR-02

+6.00 m

13 12

CW-400

200

LEVEL 1

11

8

7

50

2C. 47 900x 2100

1.01

2C. 47 900x 2100

1300

E-HR-02

13

1300

Ceiling Mounted Stair CORE 1 STAIR Lighting

+8.508

15 14

CORE 1 STAIR

40

CORE 1 CIRCULATION

12

9

39

S21D

3J. 94 700x 2100

CW-300

2350

200

14

9

16

SSL 2

E1

13

11

W-CO-02 10

10

17

S23D S22D

E-HR-02

3500

1000 15

11

18

W-CO-02

W-CO-02 CW-400

+8.50

15 14

E-HR-02

12

19

18

Ceiling E-HR-02 E-HR-02 Mounted Stair CORE 1 STAIR E-HR-01 Lighting

16

37

13.3.1.14

S03D

S14D

W-CO-02

SSL 2

1650

19

Ceiling

Stair Lighting

13

W-GB-01

W-CO-02

17

Mounted E-HR-01

CORE 1 STAIR

14

S05D

35

W-GB-01 38

3J. 93 700x 2100

1040

1320

MALE WET ZONE W-GB-01

DW-03A-100s

S08D

S21D

11A. 15 700x 2100

S08D

BW-01B

S12D

BW-01B

W-CO-02 DW-03A-100s

1

1180

M1A1W-GB-01

W-GB-01

DW-03B-50s 36

100

280

W-CO-02

BW-01B BW-01B

DW-03A-100s

DW-02A-100s

700

W-GB-01

34

S23D

1180

+10.90 m

18

E-HR-02

16 15

20

17 16

12

SP1

21

Ceiling Mounted Stair Lighting

E-HR-02

19

E-HR-02

32

S22D

E-DR-11

+13.35 m

1650

E-HR-02

E1

23

22 22

21

20

19 18

17

31

33

3J. 94 700x 2100S11D

100

W-CO-02

O

2300

1300

+8.50

23

20

20

27 26 25

24

24

21 CW-400

21

29 28

W-CO-02

+13.35

26

CORE 1 STAIR

S21D

CW-300

25

24 22 22W-CO-02

50

30

S01D S18D

W-CO-02

+13.50

CW-400

28

23

23

W-GB-01

100

S06D

+13.50

27

24

30

1180

DW-03B-50s S16D

BW-02B - FR120

F-CO-02B (Concrete Screed)

S21D

BW-01B

160

11A. 15 700x 2100

CW-400 S19D S03D

S15D FU-LO-B01

W-CO-02

2110

W-CO-02

E-DR-11

-0.85 FFL -0.90 SSL

W-CO-02

7

400

DW-03A-50s

W-GB-01

AR-17728

W-GB-01

11B. 163 900x 2100 BW-02B - FR120 DW-03A-100s

W-CO-02

FU-LO-B01

22.00 m²

-0.85 FFL SSL S03D S19D -0.90S16D

F-CO-02B (Concrete Screed)

390

BW-01B

E-HR-01

W-CO-02 29

E-HR-02

31

E-HR-02 25

+8.50

25 32

DW-03B-50s 30

GALLERIES

+13.35 m 30

S07D

700

29

1030

W-GB-01

SSL 3MM

200

1000 200

27 26

SP1

26 33

+13.35

E-HR-02

280

1030

+16.75 m

32 31

Ceiling Mounted Stair Lighting

27

E-HR-02

E-HR-01

28

CORE 1 STAIR

W-CO-02

28

Ceiling Mounted Stair Lighting

CORE 1 STAIR

50

S14D

32

+26.80 m

GALLERIES

33

CORE 1 STAIR

SSL 2M

+13.50 +13.50

42

1040

35

S12D

29

40

37 CW-400

36

50

33

S11D

W-CO-02

2

E-HR-02

37

1030

150

W-GB-01

34

CW-400

E-HR-02 3

E-HR-01

29

CORE 1 STAIR

29

Ceiling Mounted Stair Lighting

38

11A. 10 700x 2100

4

W-CO-02

E-HR-02

AR-17711

2050

22.00 m²

-0.85 FFL -0.90 SSL

700

E-DR-11

390

DW-03A-100s DW-02A-100sS13D

390

31

6

+13.50 +13.50 34

34

30

34

E-HR-02

31 30

CW-400

E1

35

35 34

Ceiling Mounted Stair Lighting

33 32

9

1000

36 36

E-HR-02

39

37

CORE 1 STAIR

W-CO-02

1

700

700

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

S16D DW-03B-50s

38 W-GB-01

+16.75 m

Ceiling Mounted Stair Lighting

41

33

390

S13D

39

32

700

DW-03A-100s

35

35

2

42

31

150

1

13.3.1.13

DW-03A-50s S15D

W-CO-02 BW-01B

FEMALE WET ZONE

DW-03A-50s

7000

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

S16D DW-03B-50s

F-CO-02B (Concrete Screed)

W-CO-02

13.3.1.13

P

W-CO-02

130 550

BW-01B - FR120

W-GB-01 DW-03A-100s

11A. 162 700x 2100

E-DR-09

W-CO-02

DW-03A-100s

W-GB-01

CW-400

CW-400

FU-BC-B01

FEMALE WET ZONE W-CO-02

BW-02B - FR120

F-CO-02B (Concrete Screed)

40 39

W-GB-01

F-CO-02B W-CO-02 C-GB-04 W-GB-01

FU-LO-B01

AR-17728

W-CO-02

W-GB-01

S19D CW-300S08D S03D

+16.00 FFL W-CO-02 DW-03A-50s 300

41

W-CO-02 DW-03A-50s

FU-BC-B01

FU-LO-B01

BW-02B - FR120

BW-01B W-CO-02

5

-0.85 FFL -0.90 SSL

23.04 m²

W-GB-01

W-CO-02

F-CO-02A (Concrete Screed)

W-CO-02

CORE 1 STAIR

150

S08D S03D

S19D

BW-02B - FR120

200

200 +10.96 m

38

37 CW-400

W-CO-02 36 36

3

41 40

S15D

124 LOCKERS -0.85 FFL -0.90 SSL

DW-03B-50s

WC MALE

7000

FU-LO-B01

BW-01B W-CO-02

F-CO-01AW-GB-01 W-CO-02 C-NO-02 S15D

E-HR-02

CW-400

DW-03B-50s

*Refer to LUS-BP14C-TA-REP-AR-38710

16'F&B and Kitchen Design Guideline Report' for details.

13.3.1.11

11A. 161 700x 2100

W-CO-02

FU-LO-B01

DW-03A-100s

W-CO-02 DW-03A-50s FU-LO-B01 BW-02B - FR120 E-DR-11

CANNED FOOD & FU-BC-B01 BOTTLED DRINKS

47.42 m²

CANNED FOOD & BOTTLED DRINKS

W-GB-01

FU-LO-B01

11A. 162 700x 2100

124 LOCKERS -0.85 FFL -0.90 SSL W-GB-01

F-CO-02A (Concrete Screed)

AR-17728

13.3.1.8

47.42 m²

F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A

7

W-CO-02 BW-01B

W-GB-01

W-GB-01

42

SSL 2M

STORAGE CORE 1 STAIR

W-CO-02

-0.85 FFL -0.90 SSL

DW-03B-50s

O

AR-17711

I

I

W-CO-02 CW-400

S13D

FU-LO-B01

13.3.1.8

W-CO-02

F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A

FU-BC-B01

2600

60 LOCKER

2050

1

+16.00 +16.00

14

1

38

37 E-HR-02

E-HR-02

W-CO-02

39

CW-600

38

E-HR-02

1300

LEVEL 1M

39

W-CO-02

W-GB-01

LEVEL 4

2430

COREE-HR-02 1 STAIR

1 42 E-DR-11 41

W-CO-02

Mounted Stair Lighting

40

CW-400

S01D S18D

13

100

FU-BC-B01

W-CO-02

E1

W-CO-02

W-CO-02 150 W-CO-02 CW-400

DW-02A-100s 17.1.1.57 39.35 m²

150

1C. 76 1630x 2100

1000

3

41

W-CO-02 DW-03B-50s

+30.00 m

S05D

29.09 m²

BW-01B W-GB-01 C-GB-02A

J

7000 MALE CHANGING ROOM

FU-LO-B01 FU-LO-B01

4100

W-GB-01

7000

-0.85 FFL -0.90 SSL

F-CO-02A (Concrete Screed)

O

2600 MALE CHANGING 150ROOM

60 LOCKER

FREEZER ROOM DW-03B-50s

DW-03B-50s

FU-BC-B01

DW-03B-50s

100

BW-01B

W-CO-02

DW-02A-100s

GALLERIES

CW-400 W-CO-02

W-CO-02 W-CO-02 CW-400

+20.85 m

5

Ceiling Mounted Stair Lighting

CORE 1 STAIR

42

11.29 m²

+20.85 m

4020

4

2

9

16

E-HR-02 BW-02B - FR120

E-HR-02

BW-01C - FR120

300

9

CW-400

E-HR-01

2

17

280150

3200 FEMALE CHANGING ROOM

16

W-CO-02 FU-LO-B01

4100

FU-LO-B01 BW-02B - FR120

BW-01B

DW-02A-100s

AR-16013

13.3.1.7

W-CO-02

29.09 m²

FU-LO-B01

I

SSL 3

Ceiling

11A. 1115700x 2100

W-CO-02 W-CO-02 7

+16.00 +16.00

5

4

3

7 7 F-CO-02A W-CO-02 C-NO-02 Ceiling 6 6 Mounted 5 Stair 4 E-HR-01 Lighting

5

40

BW-01BCeiling

CW-400

1000

+13.50 +13.50 10 111 10 CIRCULATION 8 8 15.1.4.2

E-HR-02

BW-01B

6 15

13 12

CW-400

CORE 1 CIRCULATION

+21.00

E-DR-10

+18.50

S06D

1B. 205 1630x 2100

E-HR-01

+13.50 +13.50

16

14

11

W-CO-02

7

17

E-HR-02

W-CO-02

10

+20.85

SSL 3

Stair Lighting

11

9

9

8 8

18

E-HR-02

13

BW-02B - FR120 W-CO-02

CORE 1 STAIR

SP1

W-CO-02

1500

E-HR-01

S28D

19

14

12

Ceiling 2C. 47 900xMounted 2100 Stair Lighting

10

E-HR-02

W-CO-02

S05D

12

S29D

11

CORE 1 STAIRE-HR-02

15

Ceiling Mounted Stair Lighting

CORE 1 STAIR

200

17 16

13

12

1300

W-CO-02

2040

S05D

14

24

23

22

2300

+16.00

26

15

25

200

23

200

+13.50 m

S23D

13.3.1.7

FU-BC-B01

SP1

8

AR-17702

FU-LO-B01

280150

FU-BC-B01

F-CO-02A W-CO-02 C-GB-02

W-GB-01

W-GB-01

2

AR-17702

FU-LO-B01 BW-02B - FR120

W-GB-01

100

W-CO-02

100

DW-02A-100s

FU-LO-B01

DW-02A-100s

2800

W-GB-01

W-CO-02

2800

W-GB-01

1000

1

9

FREEZER ROOM

COLD ROOM

FU-BC-B01

W-CO-02

DW-02A-100s

W-GB-01

W-CO-02

BW-02B - FR120

3200 FEMALE CHANGING ROOM F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A

BW-02B - FR120

+21.00

E-HR-02 S01D

2300

LEVEL 2

E1

24

W-CO-02 CW-400 +20.85 S12D

1000

2

BW-01B

E-DR-11

W-CO-02

E-DR-11 BW-01B

W-CO-02

W-GB-01

W-GB-01

BW-01B W-CO-02

W-CO-02

F-CO-02A (Concrete Screed)

Mounted CORE 1 STAIR S13D

200

BW-02B - FR120

E-HR-02

100 300

25

21 21 3J. 118 700x 2100 Ceiling Mounted 20 S22D 20 E-HR-01 Stair 19 18 Lighting

1000

W-CO-02

TE LINTEL

essed hting xture

S22D

100+16.001060

26

22

W-CO-02 CW-400 SP1

150

S05D

1360

DW-03A-100s

E-HR-02 E-HR-02

E-HR-02

11A. 12 700x 2100

18

E-HR-01

28

27

26

+23.30 m

GALLERIES

29 28

19

+18.50

18

200

E1

W-GB-01

150

Ceiling Mounted Stair Lighting

CORE 1 STAIR

S23D

3J. 93 700x 2100

S07D

1320 W-GB-01

19 29

17 16

20 CW-400

20

30

E-HR-02 3J. 117 700x 2100 W-GB-01 W-CO-02 E-HR-01 CW-400 27

28

100

E-DR-11

E-HR-02

30

29

1300

1180

W-CO-02

S23D

31

150

W-CO-02

DW-02A-100s

BW-02B - FR120

SSL 3M

CORE 1 STAIR

30

25

23

22

21 DW-03A-10021W-CO-02

32

E-HR-02

FU-LO-B01

150

W-CO-02

S05D

31 13 700x 2100 11A.

24

CORE 1 STAIR 23 E-HR-02 22

33

2C. 41 900x 2100

100

S06D

24 34

32

27

S05D

25 35

200

1030

S14D

26

36 36

CORE 1S23D STAIR

33

E-HR-01

27

1300

3J. 94 700x 2100

Ceiling Mounted 35 Stair S22D 34 Lighting

34

Ceiling Mounted S29D Stair Lighting

40

28

39

32 31

1500

LEVEL 2M

33

29

?

S28D

1990

GALLERIES

E-DR-12

S14D

E-HR-02

E-HR-02

2300

E-HR-02

W-GB-01 CW-400 +21.00 +21.00

41

37

37

CORE 1 STAIR

S22D

DW-03A-100s 38 38

39

W-CO-02

34

42

W-CO-02

FU-LO-B01

AR-17711

W-CO-02 CW-400

Ceiling 11A. 14 700x 2100 Mounted Stair Lighting

39

-0.85 FFL -0.9035 SSL

35

33 32 31 30

1000

100

+16.90 m

E-HR-02

200

1180 W-GB-01

1000

280

200

50

11A. 92 700x 2100

40

DW-03A-100s

DW-02A-100s

700 W-GB-01

2270

390

E-HR-02

40

3J. 119 700x 2100

38

36 36

E-HR-02

E-HR-01

BW-01B

AR-17711

3

+23.30 m

+21.00 +21.00 S01D

41

40

150

BW-01B

FU-LO-B01

FU-LO-B01 DW-02A-100s W-GB-01

M5B

CORE 1 STAIR

E-HR-02 11A. 15 700x 2100

42

26.81 m²

CORE371 STAIR 37

DW-03A-100s

W-CO-02 41

Ceiling Mounted W-GB-01 Stair Lighting

13.3.1.14

F-CO-02B W-CO-02 C-GB-04 39 W-GB-01 C-GB-04A

S03D

E-HR-02

42

1300

DW-03A-50s

0

40

38

CORE 1 STAIR

BW-01B

+21.00 +21.00

S21D

1400

-0.85 FFL -0.90 SSL

O-02B (Concrete Screed)

BW-01B

22.00 m²

200

13.3.1.13

F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A

S16D DW-03B-50s

Ceiling Mounted Stair Lighting

W-CO-02

E-HR-02

W-CO-02

41

S21D

1990 BW-01B

W-GB-01

S18D

200

W-CO-02

FEMALE WET ZONE

MALE WET ZONE

42

3620

150

F-CO-02A (Concrete Screed)

FU-BC-B01

P SSL 3M

E-HR-02

Ceiling DW-03A-100s MountedE-HR-01 Stair Lighting

S08D

1B. 205 1630x 2100

CORE 1 STAIR

F-CO-02B (Concrete Screed)

1000

SP1

E-HR-02

S16D

+21.00 +21.00

S15D

W-CO-02 BW-01B

E1

D S03D

E-DR-11

2300

+21.00 m

C-GB-05 S03D S19D +3000 AFF

2000

LEVEL 3

W-CO-02

E-HR-02

W-CO-02

200

Ceiling Mounted Stair Lighting

2300

3260

W-GB-01

100 60 200

DW-02A-100s W-GB-01

200 BW-02B - FR120

CORE 1 LOBBY

Ceiling Mounted Stair Lighting

280

BW-01B

CORE 1 STAIR

1000

SP1

-0.90 SSL CORE 1 CIRCULATION

F-CO-02A (Concrete Screed)

CW-400

BW-02B - FR120 W-CO-02

W-GB-01

M1A2 F-CO-02A (Concrete Screed)

W-CO-02

W-CO-02

150

S18D

W-CO-02

CW-400

-0.85 FFL -0.90 SSL

W-CO-02

150

FU-LO-B01

W-CO-02

-0.85 FFL -0.90 SSL

3620 F-CO-02A (Concrete Screed)

W-CO-02 -0.85 FFL

6.58 m²

F-CO-02A W-CO-02 C-GB-02

F-CO-02A (Concrete Screed)

BW-02B - FR120

4540

100 60 200 2000

5450

Stair Lighting

F-CO-02A W-CO-02 C-GB-02

200

-0.85 FFL -0.90 SSL

*Refer to LUS-BP14C-TA-REP-AR-38710 BW-01B W-GB-01 'F&B and Kitchen Design Guideline W-GB-01 Report' for details. W-CO-02

12 SEATS

BW-01B

180

25.48 m²

W-CO-02

S18D

FU-TA-B05

180

COLD ROOM

BW-02B - FR120

*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.

12 SEATS

W-CO-02

1000

25.48 m²

F-CO-02A W-CO-02 C-GB-02

3800

BW-01B

6.58 m²

BW-01B

13.3.1.6

13.3.1.9

2C. 115 900x 2100

W-CO-02

180W-CO-02 1000 FEMALE CORRIDOR CW-300

4400

13.3.1.9

F-CO-02A W-CO-02 C-GB-02

BW-01B

MALE BREAKROOM

BW-02B - FR120 W-CO-02

-0.85 FFL -0.90 SSL

13.3.1.6

3800

CW-400

FU-BC-B01

400

+29.00 m

W-CO-02

FU-LO-B01 C-GB-05 +3000 AFF

BW-01B W-CO-02 Mounted

E1

FU-LO-B01

BW-01B

1000

MALE BREAKROOM

KITCHEN

2C. 115 900x 2100

-0.85 FFL

FU-CH-B08 -0.90 SSL

180

FU-CH-B08

E-HR-01

1120

BW-01B

42 x 280.0 /178.6

FU-BC-B01

Ceiling

LEVEL 3M +23.50 m

2200

CO-02 C-GB-02 GB-01 C-GB-02A

FU-TA-B05

BW-02B - FR120 W-CO-02

CW-400

FU-TA-B05

5.30 m²

W-CO-02

2C. 61 900x 2100

1000

BW-01B

FU-CH-B08

FU-TA-B05

3

7000

200

-0.85 FFL -0.90 SSL

oncrete Screed)

CIRCULATION

CW-400

2200

1830

150

W-CO-02

E-HR-02

FEMALE CORRIDOR

2C. 61 900x 2100

SSL 4T

W-CO-02

1200

60 LOCKER

+29.85 m

F-CO-02A (Concrete Screed)

W-GB-01

1.01

280

W-CO-02

SSL 4

W-CO-02

180

BW-01B

1120

BW-02B - FR120

42

BW-02B - FR120 FU-TA-B05

W-CO-02

FU-LO-B01

4540

FU-LO-B01

W-CO-02

47.42 m²

124 LOCKERS -0.85 FFL -0.90 SSL

13.3.1.10

W-CO-02

FU-LO-B01

5740

BW-01B

2600

29.09 m²

FU-TA-B05

5.30 m²

W-CO-02 W-CO-02

CW-400

MALE39CORRIDOR

CW-500

BW-02B - FR120

W-CO-02

CW-500

1350 1000

37

41

F-CO-02A (Concrete Screed)

2C. 91 900x 2100

13.3.1.8

F-CO-02A W-CO-02 C-GB-02 W-GB-01 C-GB-02A

O

150 180

W-CO-02

38

FU-CH-B08

120

7000 MALE CHANGING ROOM

FU-BC-B01

DW-02A-100s

100

FU-CH-B08

2AJ. 43 1100x 2100

W-CO-02

F-CO-02A40W-CO-02 C-GB-02

W-CO-02 CW-400 CIRCULATION

+29.00 m

36

CW-500

1010

W-CO-02

CW-300

J

35

BW-02B - FR120

W-CO-02

SSL 4T

CANNED FOOD & BOTTLED DRINKS 7330

280150

FU-BC-B01

00 CHANGING OOM

13.3.1.10

F-CO-02A (Concrete Screed)

FU-TA-B05

W-CO-02

1000

DW-03B-50s

2300

W-GB-01

W-GB-01

150

SSL 4

200

DW-02A-100s

1720

SSL 3MM +26.80 m

W-CO-02

+29.85 m

FU-BC-B01

1830

150

4100

W-CO-02

FU-LO-B01

FU-CH-B08

MALE CORRIDOR

CW-500

33 F-CO-02A (Concrete Screed) -0.85 FFL CIRCULATION 34 SSL -0.90

W-CO-02 CW-500

CW-500

W-CT-02 BW-02B - FR120

200

1000

W-CO-02

W-CO-02

100

150

BW-01B

KITCHEN

CW-400

180

F-CO-02A W-CO-02 C-GB-02

BW-02B - FR120

E-HR-01

W-CO-02

P

32

W-CT-02

W-CO-02

FU-CH-B08

F-CO-02A (Concrete Screed) 30 -0.85 FFL -0.90 SSL

FU-LO-B01

2430

3620

31SEATS 12

FU-LO-B01 BW-02B - FR120

FU-LO-B01

1400

1400

-0.85 FFL -0.90 SSL

2800

W-GB-01

BW-01B W-CO-02

W-CO-02

2C. 90 900x 2100

+30.00 m

150

39.65 m²

F-CO-02A 32W-CO-02 C-GB-02

S18D

29

W-GB-01

W-GB-01

150

150

LEVEL 4

W-CO-02

13.3.1.5

W-CO-02

AR-17711

DW-02A-100s

W-GB-01

34

W-CO-02

FEMALE33BREAKROOM

BW-02B - FR120

1590

BW-01B

(Concrete Screed)

FREEZER ROOM

4660

35

E-DR-11

2

W-CO-02

O

W-CO-02

W-CT-02

400

BW-01B

E-DR-11

8510

F-CO-02A (Concrete Screed)

CW-400

36

150

BW-01B - FR120

4020

FU-TA-B05

E CORRIDOR

1350 1000

12 SEATS

E-DR-09

3500

180

38 37

W-CO-02

3800

150 180

FU-TA-B05

39.65 m²

31 F-CO-02A W-CO-02 C-GB-02

S18D

2150

SP1

1000

39

S18D

BW-01B

11A. 96 700x 2100

180

-0.85 FFL -0.90 SSL

W-CO-02

*Refer to LUS-BP14C-TA-REP-AR-38710 AR-17711 'F&B and Kitchen Design Guideline Report' for details.

E1

BW-01B

13.3.1.5

W-CO-02

40

2700

2C. 116 900x 2100

-0.85 FFL -0.90 SSL

150

FU-CH-B08

00

AR-16013 1010

FU-CH-B08

FEMALE BREAKROOM 30

BW-02B - FR120

41

2

1400

12 SEATS

2C. 115 900x 2100

CORE 1 CIRCULATION

W-CO-02 C-GB-02

42

*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.

280 280 280 280 280 280 28011A.280 280 92 700x 2100 280 280 280 280 280

1000

4400

7380

1.01

6.58 m²

W-CO-02

29

M1A1

W-CO-02

4660

E-DR-11

W-CO-02

1260

25.48 m²

F-CO-02A W-CO-02 C-GB-02

E1

2050

W-CO-02

W-CT-02

CW-400

A recreational building designed by a renowned architectural company. My office was the executive architecture office of this long going project. O In my 5 months of internship, I worked on these detail drawings and general plans both on Autocad and Revit. The most important point of this project for me was seeing a large scale application project Pand learning to use Revit on the BIM environment. These sections and plans are taken on Revit however, O they were very rough and I fixed some of the parts, added furniture and annotation. Seperately I have drawn other detail drawings which can be provided if J necessary. J J 16

CW-500

7380

13.3.1.9

CW-300

W-CO-02 CW-400

W-CO-02

MALE BREAKROOM

BW-02B - FR120 M1A2 W-CO-02

W-CO-02

300 400 E-HR-02

1

4000

BW-01B

W-CO-02

CW-300

2050

COLD ROOM

BW-02B - FR120

4800

W-CO-02

W-CO-02

CORE 1 LOBBY

W-CO-02

W-CO-02

W-CO-02

8

CIRCULATION F-CO-02A (Concrete Screed)

BW-01B - FR120 AR-17702 W-CO-02

1560

CW-400

December 2018 - May 2019 SP1

2AJ. 43 1100x 2100

E-DR-09

2

+16.00 FFL

2150

BW-01C - FR120

E-HR-01

CORE 1 CIRCULATION

CW-300

AR-17702

1000

E-HR-02

E-HR-01

W-CO-02

39.35 m²

1370

42

9

FU-TA-B05

FU-TA-B05

5.30 m²

17.1.1.57

*ReferF-CO-01A to LUS-BP14C-TA-REP-AR-38710 W-CO-02 C-NO-02 'F&B and 1 Kitchen Design Guideline Report' for details.

1200

13.3.1.10

CORE 1 STAIR

CW-400 W-CO-02

CORE 1 CIRCULATION

F-CO-02A W-CO-02 C-GB-02

2260

W-CO-02

CORE 1 LOBBY

O

500

1.01

CW-500

41

CW-400

W-CO-02

FU-CH-B08

40

400 70

FU-CH-B08

4400

39

MALE CORRIDOR

2C. 64 900x 2100

29

12 SEATS

CO-02

180

37

38 CW-400 W-CO-02

KITCHEN

CW-400

CW-300

520

31 30

W-500

W-CO-02

36

8

AR-17702

P

150

1350 CW-300 1000

W-CO-02

2

AR-17702

GALLERIES

W-CO-02

M1A2

35

1370

FU-TA-B05

CO-02A (Concrete Screed) -0.85 FFL -0.90 SSL

150 180

34

Tabanlioglu Architects 32

-CO-02A W-CO-02 C-GB-02

6

P

280 280 280 280 280 280 280 280 280 280 280 280 280 280

34 33

39.65 m²

42 x 280.0 /178.6

35

2C. 64 900x 2100

1010

36

FU-CH-B08

O MALE BREAKROOM

33

1

9

2AJ. 43 1100x 2100

2330

42

E-HR-01

31

E-HR-01

3920

150

38 37

W-CO-02

4660

13.3.1.5

41

E-HR-02

DETAIL DRAWINGS 39

8510

CO-02

30

40

280 280 280 280 280 280 280 280 280 280 280 280 280 280

40

CIRCULATION 29

M1A1

3J. 94 700x 2100

W-CO-02

29

2100

BW-01B - FR120

41

30

1200

280 280 280 280 280 280 280 280 280 280 280 280 280 280

42

2050

31

E-HR-02

280 280 280

300

E-DR-09

42 x 280.0 /178.6

32

2050

280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280 280

W-CO-02

W-CO-02

W-CO-02

42 x 280.0 /178.6

CW-400

0

STORAGE

I

6

I


APPLICATION PROJECT Eray Carbajo Architects May 2019 - August 2019 This is a barber shop project I really enjoyed working on. Application details, ceiling plans and sections are drawn by me and I have also attended to the process of timber cladding production, it was challenging to fit curvy forms aligned however the results were surprisingly good. This project helped me to acquire and develop many skills such as overcoming deadlines and work effectively.

Plan*

Section*

Details*

Shop-front Elevation & Plan (top to bottom)*

Timber cladding workshop 7


4)&?,*-*-).'?#)A,4*+ COMPETITION PROJECTS Memor al Museum (Eray Carbajo) & Korean War Veteran Memorial n Arch tecture Museum (Independent) Berl Berlin Architecture May 2019 - August 2019 Korean War Museum

Berlin Architecture Museum

F rst project, Korean War Museum wh ch First project, Korean War Museum which trad t ons had a memor al nfluenced by Korean had a memorial influenced by Korean traditions of commemorat ng head up and so names of the commemorating head up and so the names of the veterans are presented on of a hthe gher level. veterans are presented on a higher level. ons. was tight so I couldn’t find time to I part c pated w th the d agrams and Thesect deadline Berl n Arch tecture Museum; edit presents the sections and the diagrams. d fferent arch tectural movements w th each Berlin Architecture Museum; presents sense, all of wh ch s connected todifferent the ‘heart’, architectural movements with each and that s the foyer. Al enated nature sense,ofall of which is connected to the ‘heart’, walls Berl n’s arch tecture gave us the dea and of that is the foyer. Alienated nature of detract ng from the people. Renders and Berlin’s architecture gave us the idea of walls d agrams are contr buted by me. detracting from the people.

Change of emotions; emot ons; dur ng war, vvictory ctory & during aftermath aftermath*

‘Escap ngwalls’* walls’ ‘Escaping

Lobby‘the ‘theHeart’* Heart’ Lobby

Toprak (Cennet) Anıt, T (Sembol)

Anıt, T (Sembol) Toprak (Cennet)

(Geleneksel) Özlem, Hüzün, Ölüm

(Öneri) Saygı, Minnet, Umut

Study of Korean tradStudy t onalof commemorat on Plan* Korean rituals*

Sect ons Sections

Facade*

L brary Library*

Sect on Section C 8 5


BUILDING SURVEY Team mates: Mazlum Bozkurt

Building Surveying (Mevlude Kaptı) Mimar Sinan Fine Arts University, Istanbul September 2019 - January 2020 This project is carried out with a pair, while one of us was taking the measurements the other was drawing. The pavillion we worked, Zülüflü İsmail Paşa Köşkü is located in Kadikoy, an Asian district of Istanbul. In this module, which consists of theory and practice; the theory was about documenting historical structures, ICOMOS and UNESCO heritage preserving procedures and techniques of building or restoring on historical sites. And in the practice part, my partner and I worked on this pavilion and documented meticuluously each plans and window/door details. I am currently taking the second part of this lecture, in which we learn how to approach the building techniques and determine the structure and its construction technology. This semester we will work on the elevations and draw sections of this building. PRODUCED BY AN AUTODESK STUDENT VERSION

Window Elevations & Section*

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PAFTA NO

2M

ADRES

BACA

B4 ÖĞRETMENLER ODASI

B3 ÖĞRETMENLER ODASI

KADIN WC DEPO

KANTİN

B2 ÖĞRETMENLER ODASI

MUTFAK

B1 ÖĞRETMENLER ODASI

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

ERKEK WC WC HOLÜ

PRODUCED BY AN AUTODESK STUDENT VERSION

TESİSAT

Z3 SINIFI

TESİSAT BACA

PRODUCED BY AN AUTODESK STUDENT VERSION

ANA HOL

Z4 SINIFI

BACA

ANA HOL

DEPO

WC HOLÜ

ERKEK WC

BACA

BACA

KADIN WC

GİRİŞ HOLÜ

Z2 SINIFI

Building Plans

TESİSAT

Z1 SINIFI

VERENDA

PAFTA SAYISI : 18 PAFTA NO ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN

KENT

TESİSAT

BACA

TESİSAT

DEPO

MUHASEBE GİRİŞ HOLÜ

WC HOLÜ

ERKEK WC

BACA

KADIN WC

REHBERLİK ODASI

A2 SINIFI

ANA HOL

A1 SINIFI

BALKON

ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN

:2

ADRES

İSTANBUL

FOTO SAYISI

1

ADA

397

PAFTA

PARSEL

1

2M

105 28

: ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101 ÖLÇEK: 1/50

GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE

:3

ÖLÇEK: 1/50

GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE

PARSEL

BALKON

1

ADA

397

PAFTA

ANA HOL

TESİSAT

TESİSAT

DEPO

WC HOLÜ

WC

KAZAN DAİRESİ

DEPO

DEPO

ANA HOL

1

2M

Door Elevation*

KENT İSTANBUL

FOTO SAYISI

B1 SINIFI

PARSEL

105 28

: PROF. DR. HALE TOKAY : ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101

TESLİM TARİHİ: 2020

: PROF. DR. HALE TOKAY

TESLİM TARİHİ: 2020 ADRES

PARSEL

105 28

ÖLÇEK: 1/50

A3 SINIFI

ANA HOL

BİRİNCİ KAT PLANI

KENT

KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE

KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ

A4 SINIFI

PAFTA NO

2M

PAFTA

105 28

B2 SINIFI

PAFTA SAYISI : 18

1

397

ASANSÖR

KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE

ZEMİN KAT PLANI

ADRES

ADA

: ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101

TESLİM TARİHİ: 2020 2M

1

GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE

BALKON

PRODUCED BY AN AUTODESK STUDENT VERSION

TESİSAT BACA

ADRES

GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE

BALKON

B5 ÖĞRETMENLER ODASI

PAFTA

397

YANGIN ASANSÖR MERDİVENİ

: ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101 ÖLÇEK: 1/50

1

İSTANBUL

FOTO SAYISI

: PROF. DR. HALE TOKAY

YANGIN MERDİVENİ

: PROF. DR. HALE TOKAY

TESLİM TARİHİ: 2020

ÇATI KATI TAVAN PLANI

: 12

PARSEL

105 28

PRODUCED BY AN AUTODESK STUDENT VERSION

1

PAFTA

397

ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN

: ELİF YALÇIN 20171301023 ZEYNEP ALMALI 20171301101

PRODUCED BY AN AUTODESK STUDENT VERSION

ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN

ZEMİN KAT TAVAN PLANI

ADA

1

PAFTA NO

: PROF. DR. HALE TOKAY

TESLİM TARİHİ: 2020 2M

ADA

İSTANBUL

FOTO SAYISI

: 10

PRODUCED BY AN AUTODESK STUDENT VERSION

YANGIN ASANSÖR MERDİVENİ

ASANSÖR

B6 ÖĞRETMENLER ODASI

ÇALIŞMAYI YÖNETEN ÇALIŞMAYI HAZIRLAYAN

1

PRODUCED BY AN AUTODESK STUDENT VERSION PAFTA NO

1

: 11

KENT

KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE

PAFTA SAYISI : 18

İSTANBUL

FOTO SAYISI

PAFTA SAYISI : 18

BİRİNCİ KAT TAVAN PLANI

PAFTA SAYISI : 18

KENT

KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE

Ceiling Plans YANGIN MERDİVENİ

KENT

KONU: ZÜLÜFLÜ İSMAİL PAŞA KÖŞKÜ İLÇE: KADIKÖY SEMT: GÖZTEPE

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

ÖLÇEK: 1/50

GÖZTEPE MAHALLESİ BAHARİYELİ SOKAK GÖZTEPE

9


BALAT AFTER SCHOOL CENTRE Architectural Design (Oğuz Özer) (Individual) Mimar Sinan Fine Arts University, Istanbul September 2019 - January 2020 After school learning centre is based in Istanbul’s Balat district, aims to respond for the publicly open spaces which is observed to be lacking in the area. It is purposed to provide a quiet study area and extracurricular activities such as music, dance or illustrative art courses for the youth around, particularly for the specified in blue colour on the site map, Tarık Us Middle School’s pupils. The idea is to create public areas for the low-income residents of Balat in particular because the ongoing urban regeneration plan is driven by the economic tourist-oriented zeal and most of the elite developments are risking the low-income groups in the area.

Old and new

Area’s industrial background is celebrated through the corten panels and the contrast with the existing old walls is intended.

Topography

Porosity

Vegetation The elevation of 3m beared by the old walls is replaced by my intervention. The area is located in the church property so a relationship was also built with it.

Narrow streets and highly divisive blind walls are overwhelming Balat. Few opennings are created on the existing walls to make the building more public and porous. The intervention mimics the topography and the pattern that plane trees create. The area is also populated with various fruit trees. 10


Construction Diagram

Road Side Elevation

Front Elevation

Church Side Elevation 11


3

3

B

B

2

2

A

Ground Floor Plan

Section 1

A

First Floor Plan

Second Floor Plan

Study Room

Music Room

Section 2

Section 3

Courtyard First Floor 12


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.