BUILDING SURVEY
3
PROFESSIONAL WORKS
5
TYNE STUDENT HUB
2
BALAT AFTER-SCHOOL CENTRE
4
LEAZES WELLBEING CENTRE
1
BUILDING SURVEY Mevlude Kaptı Studio, Mimar Sinan University, Istanbul (with M. Bozkurt) September 2019 - January 2020
Zülüflü İsmail Paşa Köşkü is located in Kadikoy, an Asian district of Istanbul. In this module, which consists of theory and practice; the theory was about documenting historical structures, ICOMOS and UNESCO heritage preserving procedures and techniques of building or restoring on historical sites. And in the practice part, my partner and I worked on this pavilion and documented meticuluously each plans and window/door details.
2
BALAT AFTER SCHOOL CENTRE Oğuz Özer Studio, Mimar Sinan University, Istanbul (Individual) September 2019 - January 2020
After school learning centre is based in Istanbul’s Balat district, aims for the publicly open spaces which is lacking in the area. It is purposed to provide a quiet study area and extracurricular activities such as music, dance or illustrative art courses for the youth around, particularly for the specified in blue colour on the site map, Tarık Us Middle School’s pupils. The main theme is to create public areas for the low-income residents of Balat.
Old and new
Porosity
Area’s industrial background is celebrated through the corten panels and the contrast with the existing old walls is intended.
Narrow streets and highly divisive blind walls are overwhelming Balat. Few opennings are created on the existing walls to make the building more public and porous.
Topography
Vegetation
The elevation of 3m beared by the old walls is replaced by my intervention. The area is located in the church property so a relationship was also built with it.
The intervention mimics the topography and the pattern that plane trees create. The area is also populated with various fruit trees.
Street Sketches around the site
Site Flyover View
Study Rooms
Common Study Area Circulation Church
Topography (Retaining Walls)
Little Cardens
Library & Creative Arts Studio
Reception & Service Area
Little Cardens
Shops
Site Museum
Cafe
Music Room
Church in ruins
Performance Arts Centre
Use of buildings
Vegetation
Site Features
Perspective (Process)
Plan (Process) 1
Perspective
Ground and First Floor Plan
Section
Primary School students are my user group
w Modular design to preserve trees & site features
Ground and First Floor Plan
Perspective (Process)
Section Street Sketches around the site
Site Flyover View
Study Rooms
Little Cardens
Library & Creative Arts Studio
Perspective Section
Common Study Area Circulation Church
Topography (Retaining Walls)
Shops
Reception & Service Area
Perspective Section
Little Cardens
Site Museum
Cafe
Music Room
Church in ruins
Performance Arts Centre
Use of buildings
Vegetation
Site Features
Plan (Process) 1
Front Elevation
Front Elevation
Front Elevation
1
Ground and First Floor Plans 2
Perspective Front Elevation
Primary School students are my user group
Front Elevation Modular design to preserve trees & site features
Ground and First Floor Plans 3
Front Elevation
ans 2
Front Elevation
Section
P
3
1
9
2
AR-17702
520
PROFESSIONAL WORKS F-CO-02A (Concrete Screed)
150
W-CO-02
4660
FEMALE BREAKROOM
BW-02B - FR120
13.3.1.5
W-CO-02
13.3.1.10
150
1030
50
S01D S18D
W-CO-02 CW-400
50
100
1180
S06D
CW-400
W-CO-02
S23D
W-CO-02
BW-02B - FR120
1370 S22D
4800
1590 1200 400 70 4800
7330
5740
1590
150 1030
280 800 260 7330
1060
5740
800 260
1060
800 260
280 800
1060
800 1030260 150 800
260 800
270 1060 1060
1090 1010
260 800
830
S13D
S01D S05D
11A. 11 700x 2100
S29D S28D
L
260
800 2040
S05D
S13D
DW-03A-100s W-CO-02
6
STORAGE
AR-17728
11A. 10 700x 2100
DW-03A-50s
BW-02B - FR120
CIRCULATION
15.1.4.2
11.29 m²
F-CO-02A W-CO-02 C-NO-02
CW-600 BW-01B
W-CO-02
+16.75 m E-DR-11
+16.00 +16.00
200
150
1370
1060 S23D
BW-02B - FR120 W-CO-02 2C. 47 900x 2100
SSL 2M
+13.50
100
3J. 118 700x 2100
CW-600
W-CO-02
W-CO-02
S22D
I
E-DR-10 S12D
S05D
11A. 12 700x 2100
DW-03A-100
100 300
STORAGEBW-02B - FR120
11A. 10 700x 2100
150
S05D
DW-03B-50s
11.29 m²
W-GB-01
3J. 117 700x 2100
150 1360 DW-03A-100s E-DR-11
W-GB-01
BW-01B
W-GB-01
150
7380 150
1400
2C. 90 900x 2100
150
1200
100
E-DR-11
S05D
S23D
BW-01B
1320
S13D
DW-03B-50s
BW-02B - FR120 S06D
S29D
F-CO-02A W-CO-02 C-NO-02
S22D S23D
3J. 93 700x 2100
W-CO-02 CW-400
+13.35
1030
S14D
15.1.4.2 S22D
100
E-DR-12
S05D
DW-03A-100s
S14D
11A. 13 700x 2100
S28D
?
M5B
2C. 41 900x 2100
E-HR-02
1180 W-GB-01
S07D
200
CORE 1 STAIR
Ceiling Mounted Stair Lighting
280
3J. 94 700x 2100
W-CO-02
S13D
S11D
2C. 116 900x 2100
150 520 1040
S12D
700 W-GB-01
S01D
11A. 11 700x 2100
S01D
W-CO-02
S13D
S05D
11A. 14 700x 2100
-0.85 FFL S28D -0.90 SSL
DW-03A-100s
CIRCULATION
2300
GALLERIES
390
S29D
W-GB-01
BW-02B - FR120 W-CO-02DW-03A-100s 3J. 119 700x 2100
S05D
11A. 12 700x 2100
5
AR-17728
S06D
S18D
7
1060
700
S03D
S12D
BW-02B - FR120
260
390
S22D
26.81 m²
F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A
S21D
2C. 47 900x 2100 W-GB-01 DW-03A-100s
DW-02A-100s
13.3.1.14
E-DR-10
W-CO-02
DW-03B-50s
AR-17728
BW-02B - FR120 S14D
11A. 15 700x 2100
2040
800
700
W-GB-01
AR-17711
3J. 118 700x 2100
W-CO-02
W-CO-02 BW-01B
BW-01B
W-CO-02 DW-03A-100s
S05D
S21D
S05D
CW-400
S08D 1060S16D 100 300 MALE WET ZONE
F-CO-02B (Concrete Screed)
BW-02B - FR120
FU-LO-B01
S05D
S19D
S01D
11A. 13 700x 2100
BW-01B
S23D
W-CO-02
FU-LO-B01
DW-03A-100
2C. 41 900x 2100
150
+20.85 m
150
-0.85 FFL
DW-03A-50s
S03D 100
E-DR-11 1360
DW-03A-100s S15D
W-GB-01
S29D
W-GB-01
3J. 117 700x 2100
150
CANNED FOOD & BOTTLED DRINKS E-DR-12
11A. 14 700x 2100
S28D
?
S22D
1320
F-CO-02B W-CO-02 C-GB-04 W-GB-01 C-GB-04A
S16D DW-03B-50s
DW-03A-100s
BW-01B W-CO-02
W-CO-02 BW-01B W-GB-01
F-CO-02B (Concrete Screed) -0.90 SSL S05D W-CO-02 BW-02B - FR120
W-CO-02 DW-03A-50s
+16.75 m
7000
3J. 119 700x 2100
S23D
S23D W-CO-02 WET ZONE S22D W-GB-0113.3.1.13 22.00 m²
DW-03B-50s BW-02B - FR120
SSL 3
CW-400
150
3J. 93 700x 2100 FEMALE
S08D S03D
S19D
11A. 92 700x 2100
S15D
S11D
100
E-DR-11
W-GB-01
W-CO-02
M5B
S18D
FU-LO-B01
FU-LO-B01
-0.85 FFL -0.90 SSL
DW-03A-100s
S03D
BW-01B
S23D
1180
DW-03B-50s
124 LOCKERS 26.81 m² -0.85 FFL
13.3.1.14
F-CO-02B W-CO-02 C-GB-04 -0.90 SSL W-GB-01 C-GB-04A
F-CO-02A (Concrete Screed)
FU-BC-B01
S22D
W-GB-01 3J. 94 700x 2100
100
S07D
+21.00
100
S06D
W-CO-02 C-GB-02
W-GB-01 C-GB-02A MALE WET ZONE
W-CO-02
DW-02A-100s W-GB-01
1030
S14D
S08D F-CO-02A
S21D
F-CO-02BFU-LO-B01 (Concrete Screed) W-CO-02
W-GB-01
3260
50
1180
W-GB-01 FU-BC-B01
+18.50
29 28
1400
280
W-CO-02 W-CO-02 CW-400
1040
11A. 95 700x 2100
2300
700
W-GB-01
S12D
1
E-HR-02
F-CO-02A (Concrete Screed)
FU-LO-B01
BW-02B - FR120
11A. 15 700x 2100
47.42 m² DW-03A-100s
13.3.1.8
S16D
FU-BC-B01
2270
50
I
SSL 2M
CORE 1 STAIR
390
W-CO-02 7000 MALE CHANGING ROOM
S15D
W-GB-01
2600 S21D
DW-03A-100s
DW-02A-100s
BW-02B - FR120 FU-LO-B01 FU-LO-B01 W-CO-02
22.00 m²
-0.90 SSL
29.09 m²
W-CO-02 C-GB-02 W-GB-01 C-GB-02A
CW-400
BW-01B
S03D S19D
W-CO-02
1400
3060 200
Ceiling Mounted Stair Lighting
W-CO-02
S13D
GALLERIES
W-CO-02 CW-400
+20.85
700
BW-02B - FR120
1030
S01D S18D
+23.30 m
+21.00 +21.00
390 11A. 95 700x 2100
150
SSL 3M
11A. 96 700x 2100
AR-17711
60
700
W-GB-01
1
CORE 1 STAIR
13.3.1.7
F-CO-02A DW-03A-50s
W-CO-02
4100 FU-LO-B01
DW-03B-50s
280150
BW-01B
-0.85 FFL 60 LOCKER -0.85 FFL -0.90 SSL
FREEZER ROOM FU-LO-B01
W-GB-01
100
FU-BC-B01
BW-01B
2270
150
+20.85 m
E-HR-02
3200 S16D DW-03B-50s FEMALE CHANGING ROOM F-CO-02B (Concrete Screed)
W-CO-02 DW-03A-50s
W-CO-02
DW-02A-100s W-GB-01
BW-02B - FR120
BW-01B
FU-BC-B01
W-GB-01
E-DR-11
DW-02A-100s
F-CO-02B W-CO-02 C-GB-04 100 C-GB-04A W-GB-01
S08D S03D S19D 150
11A. 96 700x 2100
4540
SSL 3
1990
BW-02B - FR120
11A. 92 700x 2100
S15D
AR-17711
Ceiling Mounted Stair Lighting
W-CO-02
13.3.1.13
150
1000
W-CO-02 BW-01B W-GB-01
W-CO-02
FU-LO-B01
W-CO-02 DW-02A-100s
FEMALE WET ZONE
3
2C. 64 900x 2100
1000
5450
FU-LO-B01
FU-BC-B01
+21.00
150
3260
W-CO-02
FU-LO-B01
150
280
BW-01B
W-GB-01
I
E-DR-11
2800 BW-01B W-GB-01 W-CO-02
BW-01B W-CO-02
W-CO-02 -0.85 FFL -0.90 SSL
6.58 m²
W-GB-01
150
W-CO-02
5450
1000
13.3.1.6
DW-03B-50s
-0.90 SSL
7000
W-CO-02
3800
BW-01B
F-CO-02A W-CO-02 C-GB-02
+23.30 m
GALLERIES
BW-01B
-0.85 FFL -0.90 SSL
1400
2C. 91 900x 2100
60 LOCKER
1000
2C. 61 900x 2100
SSL 3M
CW-400
W-CO-02
150
W-CO-02
F-CO-02A (Concrete(Concrete Screed) Screed) F-CO-02A
CW-400
2600
FU-TA-B05
DW-02A-100s 200 3620 F-CO-02A (Concrete Screed) W-CO-02 BW-02B - FR120W-GB-01 BW-01B W-CO-02 F-CO-02A (Concrete Screed)W-GB-01 W-CO-02 CW-400
W-CO-02
180
W-GB-01
CANNED FOOD & BOTTLED DRINKS
COLD ROOM FU-LO-B01
BW-02B - FR120
'F&B and Kitchen Design FU-LO-B01 Guideline Report' for details. 124 LOCKERS -0.85 FFL -0.85 FFL -0.90 SSL
S18D
W-CO-02 BW-01B FU-BC-B01 1000 180
47.42 m²
12 SEATS
2C. 115 900x 2100
1720
120
+29.00 m
25.48 m²
13.3.1.8
F-CO-02A W-CO-02 C-GB-02 *ReferC-GB-02A to LUS-BP14C-TA-REP-AR-38710 W-GB-01
270
100
FEMALE CORRIDOR FU-BC-B01
FU-LO-B01
CIRCULATION
BW-02B - FR120
MALE CHANGING ROOM
13.3.1.9
-0.85 FFL -0.90 SSL FU-LO-B01W-CO-02
BW-01B
1200
3200 CHANGING ROOM
F-CO-02A (Concrete Screed)
SSL 4
SSL 4T
DW-03B-50s 7000 MALE BREAKROOM
BW-02B - FR120 W-CO-02
FU-CH-B08
BW-02B - FEMALE FR120
+29.85 m
BW-01B W-CO-02
W-CO-02
DW-02A-100s FU-BC-B01
FU-LO-B01
FU-TA-B05
F-CO-02A W-CO-02 C-GB-02
280150 W-CO-02
2C. 116 900x 2100
W-GB-01
W-GB-01
FU-LO-B01 BW-02B - FR120 KITCHEN W-CO-02
4100
FU-TA-B05
CW-500
DW-02A-100s
FU-CH-B08
F-CO-02A W-CO-02 C-GB-02
W-CO-02 W-CO-02
W-CO-02
29.09 m²
FU-CH-B08
830
150 CW-500
100
1090
1000
W-CO-02
CW-400
A recreational building designed by a renowned architectural company. My office was the J executive architecture office of this long going project. In my 5 months of internship, I worked on these detail drawings and general plans both on Autocad and Revit. The most important point of this project for me was seeing a large J scale application project and learning to use Revit on the BIM environment. These sections and plans are taken on Revit however, they were very rough and I fixed some ofI the parts, added furniture and annotation. Seperately I have drawn other detail drawings which can be provided if necessary.
FREEZER ROOM
W-CO-02
W-GB-01
W-GB-01
1010
CW-500
2C. 90 900x 2100
BW-01B W-CO-02
W-CO-02
FU-LO-B01
13.3.1.7
1000
7380 150
-0.90 SSL
CW-400
DW-02A-100s
W-GB-01
1350 1000 180 2800 W-GB-01
FU-LO-B01 MALE CORRIDOR FU-BC-B01 13.3.1.10 5.30 m²
150
150 1400
-0.85 FFL 12 SEATS
150 180
150
W-CO-02
F-CO-02A W-CO-02 C-GB-02
BW-01B
1010
FU-TA-B05
39.65 m²
F-CO-02A (Concrete Screed) -0.85 FFL -0.90 SSL
W-CO-02
F-CO-02A W-CO-02 C-GB-02 1120 W-GB-01 C-GB-02A
BW-01B
FU-CH-B08
3620
W-CT-02
W-CO-02
BW-01B
E-DR-11
F-CO-02A (Concrete Screed)
1400
13.3.1.5
BW-02B - FR120
3
8
F-CO-02A (Concrete Screed) CW-400
W-CO-02
W-CO-02
FEMALE BREAKROOM
F-CO-02A (Concrete Screed)
AR-17711
-0.85 FFL -0.90 SSL
2AJ. 43 1100x 2100
150
120 1000 280
3800
BW-01B
13.3.1.6 S18D 6.58 m²
150
W-CO-02
S18D
BW-01B
180
COLD ROOM
BW-02B - FR120
*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.
12 SEATS
W-CO-02
W-CO-02
W-CO-02
W-CO-02
4660
E-DR-11
FU-LO-B01
AR-17702
1000
25.48 m²
CIRCULATION
FU-TA-B05
W-CO-02
F-CO-02A W-CO-02 C-GB-02
BW-01B
13.3.1.9
F-CO-02A W-CO-02 C-GB-02
2C. 115 900x 2100
-0.85 FFL -0.90 SSL
E-DR-09
BW-01B - FR120
200
BW-02B - FR120
MALE BREAKROOM
BW-02B - FR120 W-CO-02
FU-CH-B08
FEMALE CORRIDOR
W-CO-02
P
1990
FU-TA-B05
2
180
W-CT-02
1000
BW-01B
AR-17702
7380
CW-500 W-CO-02
BW-02B - FR120
2C. 61 900x 2100
9
CW-500
W-CO-02
400
W-CO-02
1
7380
2C. 91 900x 2100
1120
150
FU-TA-B05
5.30 m²
W-CO-02
W-CO-02
J
KITCHEN
FU-CH-B08
150
W-CO-02
*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.
BW-02B - FR120
2
FU-CH-B08
CW-500
1720
J
CIRCULATION AR-17711 F-CO-02A (Concrete Screed)
180
F-CO-02A W-CO-02 C-GB-02
F-CO-02A (Concrete Screed) -0.85 FFL -0.90 SSL
W-CT-02
SSL 4T
W-CO-02
CW-400
12 SEATS
BW-02B - FR120
+29.00 m
CW-400
MALE CORRIDOR
FU-TA-B05
39.65 m²
F-CO-02A W-CO-02 C-GB-02
S18D
AR-17711
SSL 4
1350 1000
December 2018 - May 2019
2
+29.85 m
150 180
FU-CH-B08
E-DR-11
O
1010
2C. 64 900x 2100
W-CO-02
W-CT-02
400 70
W-CO-02
Tabanlioglu Architects 400
1200
CIRCULATION
BW-01B - FR120
1 AR-16013
2AJ. 43 1100x 2100
E-DR-09
*Refer to LUS-BP14C-TA-REP-AR-38710 'F&B and Kitchen Design Guideline Report' for details.
+20.85
8
AR-17702
9
SSL 2
W-CO-02
BW-01B
CW-400
W-CO-02
8
+13.35 m
CORE 1 STAIR Ceiling
GALLERIES 2300
Mounted Stair Lighting CW-400
E-HR-02
W-CO-02
+13.50 +13.50
+13.35
200
1
E-HR-02
9
SSL 2
8
+13.35 m
SSL 1M +10.90 m
2300
Ceiling Mounted Stair Lighting
RE 1 STAIR
+13.50
W-CO-02
-0.90 -0.85
-0.90 -0.85
-2.06 m
SSL B1 -0.90 m
LEVEL LOADING SSL B1 -0.90 m
-2.06 m
F-CO-02A (Concrete Screed) Concrete Screed
-0.85 Structural Foundation Protective Concrete IN-FO-02B High-Strenght Polyethylene IN-FO-02C Waterproof Membrane Blinding Concrete Gravel Structural Rolled EarthFoundation
Protective Concrete IN-FO-02B High-Strenght Polyethylene IN-FO-02C Waterproof Membrane Blinding Concrete Gravel Rolled Earth
F-CO-02A (Concrete Screed) Concrete Screed
2350 Cable Tray Lighting Fixture
S21D
E-DR-11
-0.85
S21D
2700
Ceilin
W-CO-02
3500
W-GB-01
2C. 47 900x 2100
BW-02B - FR120 W-CO-02
W-CO-02
1350
1350
BW-02B - FR120 W-CO-02
W-GB-01
Ceilin
CIRCULATION
3500
S03D
2150
S03D
FU-LO-B01
MEP ZONE
C-GB-04
+2.65
CONCRETE LINTEL FEMALE WET ZONE CIRCULATION
FU-LO-B01
500
2700 MEP ZONE
500
MEP ZONE
2150
F-CO-02A (Concrete Screed) Concrete Screed
-0.85
1400
C-GB-04A C-GB-04
2100 -0.85
-0.85
1650 1200
2700
1200 1400
+2.65
FEMALE WET ZONE CONCRETE LINTEL
FU-TA-B05
FU-TA-B05
2350
1650
1650
ROOM
C-GB-04A
Lighting Fixture
2C. 47 900x 2100
W-CO-02
C-GB-04A
2700
BW-01B
C-GB-04A +2.65
Cable Tray
2100
W-CO-02
W-CO-02
C-GB-02A +2.65
3J. 94 700x 2100
W-CO-02
W-CO-02
MEP ZONE
FEMALE CHANGING FEMALE CHANGING ROOM
3500
W-CO-02
C-GB-02A Supply Air Supply Air C-GB-02A Diffuser Diffuser
CEILING HANGER
MEP ZONE
3500
CONCRETE LINTEL CONCRETE LINTEL
FEMALE CORRIDORBW-01B
6400
FEMALE CORRIDOR
Return C-GB-02A Air Diffuser
LEVEL 1 +6.00 m
CONCRETE LINTEL
CONCRETE LINTEL
CEILING HANGER
1200
1200
C-GB-02 C-GB-02A C-GB-02 C-GB-02 C-GB-02 C-GB-02A Return Air Diffuser
6400
W-CO-02
MEP ZONE
C-NO-02
C-NO-02
3J. 94 700x 2100
350150 1200
1200
W-CO-02
F-CO-02A (Concrete Screed) Concrete Screed
CEILING HANGER SUPPORT
CEILING HANGER
-0.90
SSL B1
E-DR-11
50
-0.85 -0.90 LEVEL LOADING
CEILING HANGER SUPPORT
CEILING HANGER SUPPORT
+5.85
+5.85
50
-0.90
-0.85 m
-0.85 -0.90
BW-01B
BW-01B
W-CO-02
FU-CH-B08
-0.85
CONCRETE LINTEL CONCRETE LINTEL
BW-01B - FR120
FU-CH-B08
-0.85 m
1650
350150 W-CO-02
W-CO-02
50
3500
BW-01B - FR120
C-GB-02A C-GB-02AC-GB-02 C-GB-02
3500
W-CO-02
3500
BW-01B
W-CO-02
CIRCULATION LEVEL B1
CEILING HANGER SUPPORT
3500
Recessed C-GB-02A Recessed Return Air Return Air C-GB-02 Recessed C-GB-02A Recessed +2.65 +2.65 Lighting Lighting Diffuser Lighting Lighting Diffuser Fixture Fixture Fixture Fixture CIRCULATION FEMALE BREAKROOM CONCRETE LINTEL FEMALE BREAKROOM CONCRETE LINTEL
3500
CIRCULATION SUMP PIT W-CO-02
-0.90
CONCRETE LINTEL CONCRETE LINTEL
MEP ZONE
50
1C. 76 1630x 2100
CONCRETE LINTEL
BW-01B
-0.85
+6.00
MEP ZONE
MEP ZONE
3500
200
SUMP PIT
LEVEL B1
-0.90 -0.85
MEP ZONE
MEP ZONE
C-GB-02
W-CO-02 CW-400
CIRCULATION
Lighting Fixture
1200
MEP ZONE
W-CO-02
Ceiling Mounted Stair Lighting
MAIN LOBBY
CEILING HANGER
CEILING HANGER
Cable Tray
1200
2700
Lighting Fixture
CONCRETE LINTEL
CONCRETE LINTEL
MAIN LOBBY
PUBLIC WC CIRCULATION
CEILING HANGER
Cable Tray
+3.37
RE 1 STAIR
CEILING HANGER SUPPORT
CONCRETE LINTEL
I
+6.00
+5.85
+5.85
1650
SSL 1
CEILING HANGER SUPPORT CONCRETE LINTEL
+5.85 m
+6.00
1650
CONCRETE LINTEL
CONCRETE LINTEL
2350
200
+5.85
+6.00
C-NO-02
+6.00
2430
Ceiling Mounted Stair Lighting
1 STAIR
+6.00 +5.85
2700
SSL 1 +5.85 m
MAIN LOBBY
2350
W-CO-02
+6.00 +6.00
CONCRETE LINTEL
500
+6.00
MAIN LOBBY
C-NO-02
+6.00 m
2300
E-HR-02
+6.00
1650
LEVEL 1
+6.00
500
200
ART LOADING
4020
5.85
+6.00 m
300
STAIR
LEVEL 1
1B. 205 1630x 2100
ART LOADING
PUBLIC WC CIRCULATION
J
MAIN LOBBY
+6.00 +5.85
1650
MAIN LOBBY
W-CO-02
+8.50
I
50
200 2300
E-HR-02
J
SSL 1M +10.90 m
50
CW-400
Ceiling Mounted CORE 1 STAIR Stair Lighting
-0.85 m
-0.85
-0.90
LEVEL B1 -0.85 m
LEVEL LOADING -2.05 m
4
LEAZES WELLBEING CENTRE Design for Vulnerable Populations, Newcastle University (Group) September 2017 - January 2018
Through the interviews with the vulnerable groups (inflicted by drug and alcohol abuse) and discussions with some local architects and planners, we designed a well-being centre which would contribute these vulnerable people both psychologically and functionally. Finally, we presented this project to the Newcastle planning authorities and received many positive feedbacks.
5
TYNE STUDENT HUB 20th Century Architecture, Newcastle University (Group) November 2016 - February 2017
These rooms are housing homeless youth and providing them a study area for further improvement. The project aims for interaction between the residents and neighbouring other student accommodations. This is to contribute to vulnerable youth’s social relations which can psychologically support them to include in society. There is a cafe, study room and a recreational common hall to provide all sort of services any student may need.