AISHWARY KAUSHAL | 15BAR1047
BUILDING STUDY REPORT
LIST OF PROJECTS FOR BUILDING STUDY REPORT
PUBLIC CHURCH This project is about a church construction on an inclined slope where the difference in height between the front and the back is intense. Overcoming the slopes to build the church and the brickwork on a floating wall about 500 sqm area is the project need and challenges.
Location : Beomeo-dong, Suseong-gu, Daegu, Republic of Korea Project Area : 633.6 sqm Project period : March, 2019 - November, 2019 Present status : Concrete Placing for the first floor slab Project cost : 3 Billion (KRW)/ [18 Cr INR] Project client : Manchon Dongsan Church Scope of work in the project : Architectural Planning
PUBLIC CHURCH
PAGE 1
MIXED USE DEVELOPMENT This project is about a 4 storey Multifuctional building (Commercial + Residence) in Gangnam District. The key challenge is the overcoming construction law stating sunshine regulation on due north direction.
Location : Nonhyeon-dong, Gangnam-gu, Seoul, Republic of Korea Project Area : 235 sqm Project period : June, 2018 - April, 2019 Present status : Interior Lighting Project cost : 1.2 Billion (KRW)/ [7.3 Cr INR] Project client : SUSUMU Fashion Designers Co. Scope of work in the project : Architectural Engineering and Services
MIXED USE DEVELOPMENT
PAGE 2
MIXED USE DEVELOPMENT This project is about the multi-functional building located in Gangnam District. It apart from the main street Gangnamdae-ro. The key challenge is the concept of the double skin facade where the external glass facade is covered with internal brick mass.
Location : Yeoksam, Gangnam-gu, Seoul, Republic of Korea Project Area : 70 sqm Project period : April, 2019 - December, 2019 Present status : Basement Foundation Project cost : 600 Million (KRW)/ [3.6 Cr INR] Project client : Individual Scope of work in the project : Architectural Planning and Construction
MIXED USE DEVELOPMENT
PAGE 3