PROPOSED WASTE TO ENERGY (WTE) KEPONG
LOCATION & SITE PHOTO
WASTE TO ENERGY (WTE) - KEPONG
SITE PLAN : ZONNING
PUBLIC ZONE
WTE ZONE LOT 60455 66,678 sq.m (6.6 Hectares)
Proposed Land 30,000 sq.m (3 Hectares)
WASTE TO ENERGY (WTE) - KEPONG
ROAD & CIRCULATION
TOTAL CARPARK 91 BAY Weighbridge 2
MULTIPURPOSE HALL, WORKSHOP OFFICE & RESTAURANT
Weighbridge1
EXISTING POND
PUBLIC TRANSPORT INTERNAL DUMP TRUCK CIRCULATION DUMP TRUCK CROSSING FLYOVER
WASTE TO ENERGY (WTE) - KEPONG
INDUCED DRAFT FAN
FUEL OIL PUMP
STACK
Weighbridge 2
Weighbridge1
MULTIPURPOSE HALL, WORKSHOP OFFICE & RESTAURANT
EXISTING POND
LOT 60455 66,678 sq.m (6.6 Hectares)
Proposed Land 30,000 sq.m (3 Hectares) INDUCED DRAFT FAN
WASTE TO ENERGY (WTE) - KEPONG
FUEL OIL PUMP
STACK
FLOOR PLAN LEVEL 1
NEW SPACE RETAIN ORIGINAL PLAN RELOCATED/ REPOSITIONED
WASTE TO ENERGY (WTE) - KEPONG
FLOOR PLAN LEVEL 2
NEW SPACE RETAIN ORIGINAL PLAN RELOCATED/ REPOSITIONED
WASTE TO ENERGY (WTE) - KEPONG
FLOOR PLAN LEVEL 3
NEW SPACE RETAIN ORIGINAL PLAN RELOCATED/ REPOSITIONED
WASTE TO ENERGY (WTE) - KEPONG
Floor High (Multipurpose Hall)
6 Meter
4 Meter
6 Meter
WASTE TO ENERGY (WTE) - KEPONG
LANDSCAPE ENHANCEMENT FOR PUBLIC USE
LOT 60455 66,678 sq.m (6.6 Hectares)
WASTE TO ENERGY (WTE) - KEPONG
LANDSCAPE ENHANCEMENT FOR PUBLIC USE
CAR BOOT SALE
PROPOSED LOCATION DRIVE THRU RECYCLE BIN
LOT 60455 66,678 sq.m (6.6 Hectares)
FREE MARKET
WASTE TO ENERGY (WTE) - KEPONG
LANDSCAPE ENHANCEMENT FOR PUBLIC USE MULTIPURPOSE BASKETBALL COURT
PUBLIC PARK
LOT 60455 66,678 sq.m (6.6 Hectares)
WASTE TO ENERGY (WTE) - KEPONG
1
2
1
2
4
3
3 WASTE TO ENERGY (WTE) - KEPONG
4
OVERALL ELEVATION
1
2
1 3 4 2 3
WASTE TO ENERGY (WTE) - KEPONG
4
ELEVATION STACK / TOWER
4
3 1 2
Steel
Glass
Exterior cladding panel
Brick wall with painted cement render Brick wall with painted cement render
2
1
1
2
WASTE TO ENERGY (WTE) - KEPONG
3
AIR COOLED CONDENSER
MULTIPURPOSE HALL / CAFE / OFFICE BUILDING ELEVATION
1
2
Post & beam with break infill
External Aluminium louvers
4 3
1 2
All column refer to Engineers detail
3
WASTE TO ENERGY (WTE) - KEPONG
• External wall to be Glass • Internal wall to be brick wall with cement render / painted
4
WTE BUILDING ELEVATION
1
2
Post & beam with break infill
All wall to be brick wall with cement render / painted
4 3 1
All column refer to Engineers detail
3
WASTE TO ENERGY (WTE) - KEPONG
2
Exterior cladding panel
4
WASTE TO ENERGY (WTE) - KEPONG
WASTE TO ENERGY (WTE) - KEPONG
WASTE TO ENERGY (WTE) - KEPONG
WASTE TO ENERGY (WTE) - KEPONG
WASTE TO ENERGY (WTE) - KEPONG
THANK YOU