Ferry Terminal - Male maldives proposal

Page 1

VILLINGILI FERRY TERMINAL MIX DEVELOPMENT PROPOSAL MALE, MALDIVES


01|

SITE INTRODUCTION  MACRO ANALYSIS

M A L E , M A L D I V E S

4 mins Water Taxi / Ferry Route

PROPOSED SITE OTHER FERRY TERMINALS

13 to 14 mins Car Route

4 mins Water Taxi / Ferry Route from Airport


01|

SITE CONTEXT  MICRO ANALYSIS FUTURE ARTIFICIAL LAGOON

PROPOSED SITE

PROPOSED SITE SIZE: 40,878 SQFT 3,797 SQM 0.9384 ACRES


01|

SITE ANALYSIS  ACCESSBILITY TO SITE


01|

SITE ANALYSIS  ACCESSBILITY TO SITE


01|

SITE ANALYSIS VIEW FROM SITE

SEA

VIEW CITYSCAPE VIEW

HARBOUR VIEW


01|

SITE ANALYSIS SITE CONDITION

PROPOSED SITE

DRIVING GROUND

DHIRAAGU BUILDING

INDUSTRIAL CARGO HARBOUR

RUBBISH DUMP SITE

FERRY TERMINAL

MOTORCYCLIST


02|

PROGRAMME PROPOSAL DESIGN BRIEF

ALFRESCO R E T A I L

FOOD COURT/ STALLS

SWIMMING G Y M

P R I V A T E

FERRY TERMINAL

P U B L I C

F & B ROOF TOP RESTAURANT

ACCOMODATION

S P A

C I N E M A O F F I C E

ENTERTAINMENT

B O W L I N G A R C H E R Y


02|

SITE ANALYSIS  SWOT ANALYSIS

CHALLENGES

POTENTIAL

o SOFT SOIL CONDITION

o INFINITY SEA VIEW

o BUILDING HEIGHT LIMITATION

o LOW BUILDING HEIGHTS

o PARKING LIMITATION

o BUILDING EXPOSURE TOWARDS INCOMING BOATS

o MESSY TRAFFIC FLOW o LIMITED FLOOR AREA o AVOIDING VIEW DISRUPTION FOR DHIRAAGU HEAD OFFICE

o ENTRANCE ORIENTATED BASED ON TRAFFIC FLOW o MAXIMIZED FLOOR AREA EFFICIENCY o A GAP OPENED UP BETWEEN 2 TOWERS FOR DHIRAAGU BUILDING AND NATURAL VENTILATION


02|

PROPOSAL CONCEPT  DESIGN DEVELOPMENT

DHIRAAGU BUILDING


02|

PROPOSAL CONCEPT  DESIGN DEVELOPMENT

STACK VENTILATION

GREENARIES AT PODIUM & SKY LOBBY

SUN EXPOSURE


03|

DESIGN STRATEGY  SOUTH EAST ZONING

HOTEL

RETAIL

LINKAGE

VIP LOUNGE

PODIUM

DINING

SERVICES

OFFICE

FERRY TERMINAL

CAR PARK

ENTERTAINMENT


03|

DESIGN STRATEGY  NORTH EAST ZONING

HOTEL

OFFICES

LADIES FLOOR

SERVICES

DINING

RETAIL

CAR PARK

ENTERTAINMENT

SHOWROOM


03|

CIRCULATION STRATEGY  TRAFFIC

DROP OFF SERVICES

EXISTING TRAFFIC CIRCULATION

DROP OFF

SERVICES

OUT PROPOSED TRAFFIC CIRCULATION

IN


03|

CIRCULATION STRATEGY  PEDESTRIAN

HEAVY FLOW OF PEDESTRIAN


03|

CIRCULATION STRATEGY  PEDESTRIAN VERTICAL CIRCULATION

HOTEL ACCESS ONLY

PUBLIC ACCESS

OFFICE ACCESS ONLY

PUBLIC ACCESS DIRECT TO SKY TERRACE

SERVICES ACCESS ONLY


03|

SUSTAINABLE STRATEGY  VENTILATION

STACK VENTILATION

 THE TUNNEL BETWEEN THE LINKAGE AND DROP OFF AREA HAS CREATED A WIND TUNNEL FOR THE BUILDING  STACK VENTILATION HAPPENS IN BETWEEN TWO BUILDINGS TO COOL DOWN THE WHOLE BUILDING.

CROSS VENTILATION


03|

SUSTAINABLE STRATEGY  FAADE TREATMENT

1

2

1 WESTERN SUN

2 FAADE TREATMENT FOR WESTERN SUN EXPOSURE


03|

SUSTAINABLE STRATEGY  VEGETATION

HEDGES

CREEPERS

FRANGYPENNY

GREENARY HELPS TO COOL OFF THE BUILDING FACING THE WESTERN SUN

PINE TREE

SHRUBS


04|

FLOOR PLAN LAYOUT  GROUND LEVEL

C B

A

A

B C


04|

FLOOR PLAN LAYOUT  GROUND UPPER LEVEL

C B

A

A

B C


04|

FLOOR PLAN LAYOUT  LEVEL 1

C B

A

A

B C


04|

FLOOR PLAN LAYOUT  LEVEL 2

C B

A

A

B C


04|

FLOOR PLAN LAYOUT  LEVEL 3

C B

A

A

B C


04|

FLOOR PLAN LAYOUT  LEVEL 4

C B

A

A

B C


04|

FLOOR PLAN LAYOUT  LEVEL 5

C B

A

A

B C


04|

FLOOR PLAN LAYOUT  LEVEL 6  10

C B

A

A

B C


04|

FLOOR PLAN LAYOUT  ROOF TOP

C B

A

A

B C


04|

SCHEMATIC ELEVATION  SOUTH ELEVATION  FLOOR HEIGHT

3.5m 3.5m

3.2m 3.2m 3.2m

3.5m 3.5m

3.2m

3.5m 3.5m 47.5m

11.0m

4.5m

4.0m 4.5m 4.0m 4.0m

8.0m

4.0m

6.0m

6.0m


04|

SCHEMATIC ELEVATION  EAST ELEVATION

3.2m 3.2m 3.2m 3.2m

11.0m

4.5m

8.0m

6.0m


04|

SCHEMATIC ELEVATION  NORTH ELEVATION

3.5m 3.2m

3.5m

3.2m

3.5m

3.2m 3.2m

3.5m 3.5m 3.5m

11.0m

4.5m 4.0m

4.5m

4.0m 4.0m

8.0m 4.0m

6.0m

6.0m

47.5m


04|

SCHEMATIC ELEVATION  WEST ELEVATION

3.5m 3.5m 3.5m 3.5m 3.5m 3.5m 4.5m 4.0m 4.0m 4.0m 4.0m

6.0m

47.5m


04| 3.5m

ROOF TOP RESTAURANT

LEVEL 11

3.5m

OFFICES

HOTEL

3.5m

OFFICES

HOTEL

3.5m 3.5m 3.5m 47.5m

SCHEMATIC SECTION  SECTION A

4.5m 4.0m

OFFICES OFFICES OFFICES PODIUM FOOD COURT & RESTAURANT RETAIL

4.0m

RETAIL

6.0m

3.2m

HOTEL

3.2m

HOTEL

3.2m

RETAIL & VIP LOUNGE

HOTEL B.O.H

11.0m

4.5m

CAR PARK

8.0m

LEVEL 3 LEVEL 2 LEVEL 1

6.0m ALFRESCO & MOTOR PARKING

LEVEL 5 LEVEL 4

HOTEL

ALFRESCO FERRY TERMINAL & ALFRESCO

LEVEL 6

HOTEL

HOTEL LOBBY

LEVEL 9

LEVEL 7

HOTEL HOTEL

LEVEL 10

LEVEL 8

HOTEL

4.0m

4.0m

3.2m

LEVEL GU LEVEL G


04| 3.5m

ROOF TOP RESTAURANT

LEVEL 11

3.5m

OFFICES

HOTEL

3.5m

OFFICES

HOTEL

3.5m

3.5m 3.5m 47.5m

SCHEMATIC SECTION  SECTION B

4.5m 4.0m

OFFICES OFFICES

3.2m

HOTEL

3.2m

HOTEL

3.2m

OFFICES PODIUM FOOD COURT & RESTAURANT RETAIL

4.0m

RETAIL

HOTEL B.O.H

11.0m

4.5m

CAR PARK HOTEL LOBBY

PEDESTRIAN STREET

ALFRESCO & MOTOR PARKING

LEVEL 5 LEVEL 4

HOTEL

RETAIL & VIP LOUNGE

FERRY TERMINAL & ALFRESCO

LEVEL 6

HOTEL

4.0m

ALFRESCO

HOTEL

LEVEL 9

LEVEL 7

HOTEL LINKAGE

LEVEL 10

LEVEL 8

HOTEL

4.0m

6.0m

3.2m

8.0m

LEVEL 3 LEVEL 2 LEVEL 1

6.0m

LEVEL GU LEVEL G


04|

SCHEMATIC SECTION  SECTION C

ROOF TOP RESTAURANT OFFICES OFFICES OFFICES OFFICES OFFICES PODIUM

LEVEL 11

3.5m

LEVEL 10

3.5m

LEVEL 9

3.5m

LEVEL 8

3.5m

LEVEL 7

3.5m

LEVEL 6

3.5m 4.5m

47.5m

LEVEL 5

4.0m

LEVEL 4

RETAIL

4.0m

LEVEL 3

RETAIL

4.0m

LEVEL 2

4.0m

LEVEL 1

FOOD COURT & RESTAURANT

RETAIL & VIP LOUNGE

ALFRESCO FERRY TERMINAL & ALFRESCO

6.0m

LEVEL GU LEVEL G


05|

ENTERTAINMENT BOWLING  ARCADE  MOVIES


05|

PEDESTRIAN STREET


05|

LIFESTYLE ALFRESCO  F&B  SHOPPING


05|

LADIES FLOOR SWIMMING  GYM  SPA


05|

LUXURY SKY BAR  FINE DINING


05|

SUSTAINABILITY GREEN STRATEGY


06|

EXTERIOR PERSPECTIVE  VIEW FROM HARBOUR


06|

EXTERIOR PERSPECTIVE  VIEW FROM TEST DRIVING GROUND


06|

EXTERIOR PERSPECTIVE  VIEW FROM DHIRAAGU BUILDING


06|

EXTERIOR PERSPECTIVE SUNSET VIEW


06|

EXTERIOR PERSPECTIVE  AERIEL VIEW


06|

INTERIOR PERSPECTIVE  FERRY TERMINAL


06|

INTERIOR PERSPECTIVE  HOTEL LOBBY


06|

INTERIOR PERSPECTIVE  PEDESTRIAN STREET


06|

INTERIOR PERSPECTIVE  ALFRESCO


06|

INTERIOR PERSPECTIVE  ALFRESCO


06|

INTERIOR PERSPECTIVE  ALFRESCO


06|

INTERIOR PERSPECTIVE  ROOF TOP RESTAURANT


06|

INTERIOR PERSPECTIVE  PODIUM


06|

INTERIOR PERSPECTIVE  PODIUM


07|

DESIGN PROPOSAL  CONSTRUCTION PHASING

P H A S E

1

P H A S E

2

RELOCATION OF FERRY TERMINAL T E M P O R A R Y F E R R Y T E R M I N A L


07|

DESIGN PROPOSAL  CONSTRUCTION PHASING

PHASE 1 CONSTRUCTION OF: 1.FERRY TERMINAL 2.OFFICE TOWER 3.PARTIAL RETAIL 4.PODIUM FACILITIES 5. FINE DINING

P E R M E N A N T F E R R Y T E R M I N A L

P H A S E

T E M P O R A R Y F E R R Y T E R M I N A L

2

FERRY TERMINAL TO BE RELOCATE TO PERMANENT LOCATION AFTER PHASE 1 IS COMPLETED


07|

DESIGN PROPOSAL  CONSTRUCTION PHASING

PHASE 2 CONSTRUCTION OF: 1.HOTEL 2.F & B 3.CAR PARK 4.GAMING ARCADE 5.NURSERY CENTRE 6. FITNESS CENTRE 7. LADIES FLOOR


07|

DESIGN PROPOSAL  CONSTRUCTION PHASING

LINKAGE CONSTRUCTION OF: 1.ENTERTAINMENT 2.BANQUET HALL 3.LADIES FLOOR

L I N K A G E

LINKAGE CONSTRUCTION FOR FINAL COMPLETION


08|

DATA TABULATION

DATA TABULATION VILINGILI FERRY TERMINAL MIXED DEVELOPMENT

Land size (phase 1) Land size (phase 2) Land Parcel of existing road Proposed Land size (phase 1 + phase 2 + Road parcel) = UNITS

Acre

sq.m

sq.ft

0.3797

1536.5

16,539

0.3953

1599.9

17,221

0.1634

661.3

7,118

0.9384

3797.7

40,878

STOREY

AREA/UNIT (sq.m)

NFA (sq.m)

GFA (sq.m)

NFA (sq.ft)

GFA (sq.ft)

LVL G LVL G (Ferry Terminal Building) -PHASE 1 Loading / Unloading Services Locker Room Office + Ticketing + Information counter Coffee Station Alfresco F&B Alfresco Restroom Building Security Room Ferry Terminal Building + Waiting Hall/Lobby Landing Deck (Arrival Deck) First Aid Room Customer Care Point M&E Services TOTAL (One Stop Centre + MTTC Gallery + F&B) -PHASE 2 Foyer One Stop Centre Coffee Stations Post Counter Tourism Counter Syariah Counter Zakat Counter Wakaf Counter Restroom Utility Room F&B - Alfresco MTCC Show Gallery + Storage

23.4 58.3 82.9 119.2

283.8

67.3 15.6 14.9 14.5 14.5 14.9

151 259.2

Hotel Loading / Unloading Services Building Security Checkpoint Hotel Arrival Lobby M&E Services TOTAL

551.9

54.3 23.4 58.3 82.9 119.2 45.9 7.5 700 228.7 5.3 2.9 332.1 1660.5

64.6 276.6 67.3 15.6 14.9 14.5 14.5 14.9 28.2 11.2 151 259.2

251.88 627.54 892.33 1,283.06

3,054.79

724.41 167.92 160.38 156.08 156.08 160.38

1,625.35 2,790.00

584.48 251.88 627.54 892.33 1,283.06 494.06 80.73 7,534.73 2,461.70 57.05 31.22 3,574.69 17,873.46

695.35 2,977.29 724.41 167.92 160.38 156.08 156.08 160.38 303.54 120.56 1,625.35 2,790.00

64.8

697.50

7.7 54.5 264.875

82.88 586.63 2,851.09

1324.375

5,940.60

14,255.44


08|

DATA TABULATION

LVL GU (Mezzanine)

UNITS

STOREY

AREA/UNI T (sq.m)

NFA (sq.m)

GFA (sq.m)

NFA (sq.ft)

GFA (sq.ft)

(F&B) -PHASE 1 Ferry Terminal Offices F & B + Alfresco

132.3 124

132.3 149.7

1,424.06 1,334.72

1,424.06 1,611.36

TOTAL

256.3

282

2,758.79

3,035.42

(F&B) -PHASE 2 F & B + Alfresco

271.2

303.2

2,919.17

3,263.61

TOTAL

271.2

303.2

2,919.17

3,263.61

LVL 1 (Retail) - PHASE 1 Retail VIP lounge Prayers Room Restroom Retail Services Zone M&E Services TOTAL (Hotel) - PHASE 2 Hotel Management Office Management Office Restroom Hotel Lobby + Lounge + Reception Building Services Administration Office Restroom Building Service Administration Office M&E Services TOTAL

UNITS

STOREY

AREA/UNI T (sq.m)

NFA (sq.m)

GFA (sq.m)

NFA (sq.ft)

GFA (sq.ft)

366.5 88.8

870.6 88.8 70.2 40.4 45.8 278.95

3,944.97 955.83

9,371.05 955.83 755.63 434.86 492.99 3,002.59

455.3

1394.75

4,900.80

15,012.95

187.1

202.1 33.4 254.2 40.4 36.6 109.7 169.1

2,013.93

2,175.38 359.51 2,736.18 434.86 393.96 1,180.80 1,820.18

845.5

6,029.94

239.8 40.4 92.9

560.2

2,581.18 434.86 999.97

9,100.88


08|

DATA TABULATION

LVL 2

UNITS

AREA/UNI T (sq.m)

STOREY

(Retail) - PHASE 1 Retail Restroom Retail Services Zone M&E Services TOTAL

(Fitness centre + Hotel) - PHASE 2 Fitness Centre Fitness Centre's Restroom Hotel Coffee Shop Restroom Hotel's BOH M&E Services

UNITS

AREA/UNI T (sq.m)

STOREY

(Retail) - PHASE 1 Retail Restroom Retail Services Zone M&E Services TOTAL (Nursery Centre + Hotel) - PHASE 2 Nursery Centre Nursery Centre's Restroom Hotel Suites Meeting rooms Meeting room's Restroom Hotel's Serviced Kitchen Hotel's BOH M&E Services

6

1

20.4

NFA (sq.ft)

GFA (sq.ft)

1017 40.4 45.8 275.8

5,732.85

10,946.89 434.86 492.99 2,968.68

532.6

1379

5,732.85

14,843.42

195.2

210.2 33.5 101.1 39 109.7 123.375

2,101.11

2,262.57 360.59 1,088.23 419.79 1,180.80 1,328.00

616.875

3,025.73

281.1 LVL 3

GFA (sq.m)

532.6

85.9

TOTAL

TOTAL

NFA (sq.m)

NFA (sq.m)

GFA (sq.m)

924.62

NFA (sq.ft)

6,639.98 GFA (sq.ft)

545.6

1033.6 40.4 45.8 279.95

5,872.78

11,125.57 434.86 492.99 3,013.35

545.6

1399.75

5,872.78

15,066.77

211

226 33.5 202.3 68 12.5 38.6 109.7 172.65

2,271.18

2,432.64 360.59 2,177.54 731.95 134.55 415.49 1,180.80 1,858.39

863.25

4,103.20

122.4 47.8

381.2

1,317.50 514.51

9,291.94


08|

DATA TABULATION

LVL 4

UNITS

AREA/UNI T (sq.m)

STOREY

(Food court+Restaurant)- PHASE 1 Food court Restroom Kids zone Restaurant M&E Services

123.8

TOTAL (Archery + Bowling + Cinema)- LINKAGE Archery Cinema Restroom + Janitor storeroom Bowling Circulation (entertainment, food court and Restaurant) M&E Services TOTAL

6

1

20.4

GFA (sq.m)

NFA (sq.ft)

GFA (sq.ft)

123.8 31.7 46.2 203.1 101.2

1,332.57

373.1

506

4,016.01

5,446.53

122.4

202.3 29.5 28.6

1,317.50

2,177.54 317.54 307.85

122.4

260.4

1,317.50

2,802.92

123.2 817.3

123.2 834.1 43.6 422.9

1,326.11 8,797.34

1,326.11 8,978.17 469.31 4,552.05

46.2 203.1

TOTAL (Hotel)- PHASE 2 Hotel Suites BOH M & E Plants Room

NFA (sq.m)

422.9

497.29 2,186.15

4,552.05

544 491.95 1363.4

2459.75

1,332.57 341.22 497.29 2,186.15 1,089.31

5,855.56 5,295.30 14,675.50

26,476.50


08|

DATA TABULATION

LVL 5

UNITS

AREA/UNI T (sq.m)

STOREY

(Hotel Facilities)- PHASE 1 All Day Dining All Day Dining's Kitchen Changing Room Gym Swimming Pool + Outdoor Deck Podium Lobby + Link Bridge to Hotel M&E Services

187

TOTAL (Hotel)- PHASE 2 Hotel Suites Hotel store Hotel BOH M & E Plants Room TOTAL

NFA (sq.m)

6

1

20.4

GFA (sq.m)

NFA (sq.ft)

GFA (sq.ft)

2,012.85

80.1

204.5 34 53.1 80.1 352.2 72.1 199

862.19

2,201.22 365.97 571.56 862.19 3,791.05 776.08 2,142.02

267.1

995

2,875.04

10,710.08

122.4

202.3 3.7 29.5 28.6

1,317.50

2,177.54 39.83 317.54 307.85

122.4

264.1

1,317.50

2,842.75

(Archery + Bowling + Cinema)- LINKAGE Food Storage Main Kitchen + Passage Banquet Hall Pre-Function Area Ladies Floor (SPA + POOL + GYM) M&E Services

325.6

TOTAL

403.4

77.8

69.8 116.6 339.9 226.8 331.3 271.1 1355.5

3,504.73 837.43

4,342.16

751.32 1,255.07 3,658.65 2,441.25 3,566.08 2,918.09 14,590.47


08|

DATA TABULATION

LVL6, 8, 10

UNITS

AREA/UNI T (sq.m)

STOREY

(Offices) - PHASE 1 Offices Restroom M&E Services

3

TOTAL (Hotel) - PHASE 2 Hotel Suites Hotel BOH M&E Services

12

3

20.4

TOTAL LVL7,9

UNITS

AREA/UNI T (sq.m)

STOREY

(Offices) - PHASE 1 Offices Restroom M&E Services

2

TOTAL (Hotel) - PHASE 2 Hotel Suites Hotel BOH M&E Services

TOTAL

12

2

20.4

NFA (sq.m)

GFA (sq.m)

NFA (sq.ft)

GFA (sq.ft)

1275.3

1654.2 159.3 453.375

13,727.20

17,805.64 1,714.69 4,880.08

1275.3

2266.875

13,727.20

24,400.42

734.4

1039.2 88.5 281.925

7,905.01

11,185.84 952.61 3,034.61

734.4

1409.625

7,905.01

15,173.06

NFA (sq.m)

GFA (sq.m)

NFA (sq.ft)

GFA (sq.ft)

817.2

1081.6 106.2 296.95

8,796.26

11,642.23 1,143.13 3,196.34

817.2

1484.75

8,796.26

15,981.70

489.6

692.8 59 187.95

5,270.01

7,457.23 635.07 2,023.08

489.6

939.75

5,270.01

10,115.38


08|

DATA TABULATION

LVL11

UNITS

AREA/UNI T (sq.m)

STOREY

(Fine Dining) - PHASE 1 Restaurant (indoor) Kitchen Outdoor Deck Restroom M&E Services

1

152.2

TOTAL (Hotel) - PHASE 2 Hotel Suites Hotel BOH M&E Services

12

1

20.43

TOTAL Roof

UNITS

STOREY

NFA (sq.m)

AREA/UNI T (sq.m)

GFA (sq.m)

NFA (sq.ft)

GFA (sq.ft)

1,638.27

141.8

273.3 125.4 141.8 53.1 148.4

294

593.6

1,638.27

5,039.66

245.16

319.56 30.9 87.615

2,638.88

3,439.71 332.60 943.08

245.16

438.075

2,638.88

4,715.40

NFA (sq.m)

GFA (sq.m)

2,941.77 1,526.32 571.56 1,597.36

NFA (sq.ft)

GFA (sq.ft)

PHASE 1 + 2 Roof Plinth

539.3

5,804.97

TOTAL

539.3

5,804.97


08|

DATA TABULATION

CARPARKING DATA TABULATION LVL G - MOTORCYCLE PARKING LVL 1A - CARPARKING + MOTORCYCLE PARKING LVL 2A - CARPARKING LVL 3A - CARPARKING LVL 4A - CARPARKING LVL 5A - CARPARKING TOTAL SUMMARY

UNITS/BAYS

(CAR)

(MOTORCYCLE) 126

AREA (sq.m) 384.4

8 16 16 16 16 72

14

551 614 614 614 551 3328.4

140 NFA (sq.m)

LAND SIZE (P1+P2) TOTAL PLOT RATIO

10626.66

AREA (sqft) 4,137.64 5,930.91 6,609.03 6,609.03 6,609.03 5,930.91 35,826.56

GFA (sq.m) 3797.7 23581.925 6.2

NFA (sq.ft)

114,384.31

NFA (sq.ft) 40,877.80 253,833.48


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.