our mission “Our mission for the New Target Center Arena project is to revitalize the downtown Minneapolis district by creating an epicenter for sports and entertainment. With this, we will have created a new
”
home for the Minnesota Timberwolves and Lynx.
meet your team
AJ PRIZZI
DAVID UBALLEZ
MATT EVEREST
TYLER EIGHMY
Born in New York, I moved to Kansas City when I was four. 0\ ELJJHVW LQÁXHQFH RQ P\ decision to be an architect stemmed from my family. I enjoy solving puzzles, playing bass guitar, and drums.
Born and raised in Jefferson City, Missouri I’ve had a passion for architecture that stems back to my days of playing with Legos. In my free time I enjoy photography and playing with my crazy wiener dog.
Born in the heart of Kansas City, I have a strong passion for architecture. In my free time -though I’m not really sure what that means - I enjoy traveling. I’ve recently traveled to Minneapolis where I hope to create a new hub for sports architecture and entertainment.
Born in Shawnee, KS. Has a Bachelors in Architectural Studies with a minor in Art History. Loves architecture, drawing, and traveling.
CONTENT 01
PATH TO A NEW HOME
02 - 03
05
FLEXIBILITY & COMFORT
54 - 61
The New Target Center Arena will set a new standard in multi-purpose arena design.
From basketball to hockey to rodeos and monster trucks, the New Target Center Arena can adapt with ease to all of these exclusive events.
02
06
VISION FOR A NEW FUTURE
04 - 19
A SUSTAINABLE FUTURE
62 - 65
The history and culture of Minnesota and Minneapolis are heavily integrated into the new arena design.
With the present state of the environment, we want the New Target Center Arena to set the standard in sustainable arena design by achieving a USGBC LEED Silver Rating.
03
07
SPORTS ARENA OF THE FUTURE
20 - 41
What makes the New Target Center by MTAD the sports arena of the future?
04
ENHANCE THE FAN EXPERIENCE
COST ANALYSIS
66 - 69
MTAD promises to get the most bang for buck while providing the highest quality of design and construction management.
42 - 53
Modern premium amenities and a state of the art VIP club create the ultimate fan experience for the premium ticket holders.
01
01
PATH TO A NEW HOME Target Center, located in the heart of Minneapolis, was once the center for basketball and exclusive live performances. But after many years of use and the advancement of arena architecture, it no longer competes with other cities in the NBA and concert venue marketplace. The New Target Center Arena, designed by MTAD Architects, promises to not only deliver a new arena that competes with the top venues in the country, but extends urban renewal in the central Minneapolis district. The design of the New Target Center Arena will focus on 3 primary concepts: an interactive and modernized fan experience, exclusive premium amenities that are unique to Minneapolis, and D VWDWH RI WKH DUW IDFDGH V\VWHP WKDW UHĂ HFWV importance of water and rivers to the history of Minneapolis.
02
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
The existing Target Center is becoming more and more of an eyesore for the members of the downtown community. Several other cities across the midwest have seen a vast amount of urban renewal due to new arenas built in their downtown areas. For example, the Sprint Center in Kansas City, Missouri along with its Power and Light District has revitalized the urban core of that city. A once desolate and deserted downtown has become a place of culture, arts, and live entertainment. 2XU ÀUP KRSHV WR WDNH WKLV SUHFHGHQW VWXG\ DQG implement it into the downtown area of Minneapolis. The New Target Center Arena will also set the standard in VIP and Premium Amenity services. Our standard suites are far from standard. The suites are larger and create a more interactive fan experience while enjoying the luxuries of a private suite. The New Target Center Arena is also introducing the Wolves Loge and Lounge which creates an exclusive dining experience with and without views to the court. Another premium feature is our Wolves Den. The Wolves Den is a suite that puts you front and center behind the goal line. The Wolves Den includes access to a private club DQG GDQFH à RRU VR DIWHU WKH JDPH \RX DQG \RXU friends can party the night away in celebration of a Wolves win! All premium ticket holders (suites and
clubs) will have access to their own private entrance in our VIP club and bar next to the New Target Center Arena. This building is a revitalized bar and club for premium ticket holders. This club is open outside the season and during the season. From the EDU \RX FDQ WUDYHO WR WKH VHFRQG à RRU DQG WDNH WKH skywalk to the New Target Center Arena and watch the Wolves win! One of the key features of the New Target Center Arena is its advanced facade system. The new facade system incorporates the history of 0LQQHDSROLV DQG LWV PLOOV E\ FUHDWLQJ D à RZLQJ pattern of metal panels, glass curtain walls, and Minnesota’s own Kasota stone. The Kasota stone reà HFWV WKH PDWHULDO¡V LPSRUWDQFH LQ WKH FLW\ DV ZHOO as creates a visual link to Target Center’s neighbor, Target Field, home of the Minnesota Twins. To conclude, GAP hopes to restore the spirit and vitality of the downtown district of Minneapolis with the New Target Center Arena. We want to bring top name concerts and events to the city as well as national and international sporting events. Also, we want to create a genuine and exciting fan experience that reiterates the tradition of Minnesota basketball in Minneapolis.
03
02
VISION FOR A NEW FUTURE
CURRENT CONDITIONS
The current Target Center has been home to Minnesota basketball since 1990. After 25 years, the arena is outdated and the design is no longer VXIĂ€FLHQW IRU WKH 0LQQHVRWD IDQV 8SRQ RXU VLWH YLVLW we discovered several awkward conditions where the fan experience is lacking. Also, premium ticket holders are being pushed into make-shift ‘premium amenities’ that aren’t competitive with other arenas in today’s market. While there is a sense of dissatisfaction in the current arena, the surrounding area is thriving and becoming the destination for central Minneapolis nightlife. Just down the road is Nicollet Mall, the famed shopping district of Minneapolis. Another center of nightlife and entertainment is the Minneapolis Warehouse District, which is just a block away from the Target Center. Creating a link between the historical context of Minneapolis with the New Target Center Arena is key in creating a successful sports arena for the Minnesota Timberwolves.
04
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
images from Inside the current target center
Contextual information from downtown minneapolis
05
06
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
VISION FOR A NEW FUTURE
SITE CONTEXT
LOCAL SITE
The existing Target Center, located in the heart of Minneapolis, Minnesota is surrounded by dense urban infrastructure and a major interstate highway.
Surrounding the existing Target Center are 3 parking ramps to WKH QRUWK ZHVW DQG HDVW $OVR 7DUJHW )LHOG WR WKH QRUWK WKH home of the Minnesota Twins Baseball Club. the new
TARGET CENTER
07
MASTER SITE PLAN Size of arena: 504,000 sf arena seats: 16,000 Transportation to site: city bus light rail station within 0.5 miles public parking ramps skywalk access Pedestrian sidewalk access
shared public plaza between target field and target center
08
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
I-394
arrival at site
10
5 MINUTE
%
20 %
Most of the visitors to the Target Center arrive via the parking ramps surrounding the arena. There is a small percentage of patrons that use the Minneapolis Light Rail system that stops at Target Field, two blocks to the north.
80 % I-394
legend BUS STOPS STATION PLATFORM SPORTS DISTRICT WALKING DISTANCE PARKING RAMPS INTERSTATE ACCESS
90%
VIP ENTRANCE GERNERAL ADMISSION ENTRANCE SKYWAY ACCESS
the new
TARGET CENTER
09
LOADING AT DOCK
Loading + PATHS OF TRAVEL ROOF 260' - 0"
CATWALK 248' - 5"
PRESS LEVEL
COURT ACCESS
238' - 5"
UPPER CONCOURSE 204' - 4 1/2"
SUITE LEVEL 193' - 1 1/2"
CLUB/ LOGE LEVEL 180' - 3"
TRASH REMOVAL MAIN CONCOURSE
legend
169' - 4"
SPORTS / PERFORMERS EMPLOYEE / STAFF FOOD PREPERATION
SKYWALK LEVEL
TRASH
157' - 4"
STORAGE / SHOW CLUB CIRCULATION SUITE CIRCULATION GENERAL ADMISSION
EVENT LEVEL
10
140' - 9"
PRIVATE
PUBLIC
BUILDING
EGRESS
04 RETAIL[GREEN] 04.01- Retail: (0.4 sqft per general seat) [GREEN] 2,481 sqft
true north
plan north
-code requires vomitory access within 200ft of seat -code requires egress access within 200ft of vomitory
AREA TAKEOFF:
05 TOILETS [ORANGE] 05.01- Toilets General: (1.1 sqft Per General Seat) 05.01.1- Family TLT: 572 sqft 05.01.2- Men’s TLT: 15,768 sqft 05.01.3- Women’s TLT: 14,906 sqft 05.02- Toilets Club: (35% of Club Area) 05.03- Toilets Suite: (35% of Suite Area) 05.04- Toilets Press: (15% of Press Area) 05.05- Toilets Service: (5% of FacOps, FoodServ, and Load/ Stage Combined 05.06- Toilets/ Showers- NBA (40% of Required NBA Team Area) 05.07- Toilets/ Showers- NHL (25% of Required NHL Team Area) 05.08- Toilets/ Showers- Performer (15% of Required Performer Area)
06 EVENT FACILITIES [PURPLE] 06.01- Facilities: 22,046 sqft
01 PREMIUM [RED]
07 SERVICE [LIGHT GRAY]
01.01- Suites: 57,499 sqft 01.02- Club: 14,531 sqft
07.01- Facility Operations: (1.1 sqft Per General Seat) 18,196 sqft 07.02- Food Service: (0.8 sqft Per General Seat) 12,430 sqft 07.03- Loading and Receiving: (2.1 sqft Per General Seat) 4,325 sqft 07.04- Marshalling and Service Corridors: (2.1 sqft Per General Seat) 15,31 07.05- Storage and Misc: (1.3 sqft Per General Seat) 26,263 sqft
02 CONCESSIONS [CYAN] 02.01- General Concessions: 6,482 sqft 02.02- Club Concessions: (35% of Club Area)
03 CIRCULATION [YELLOW] 03.01- Circulation Horizontal: (7 sqft Per General Seat) 03.02- Circulation Vertical: (1.8 sqft Per General Seat) 03.03- Circulation Club: (65% of Club Area) 03.04- Circulation Suite: (45% of Suite Area)
08 MEP [DARK GRAY] 08.01- Mechanical: 35,953 sqft
08 PRESS [BLUE]
TOTAL AREA = 504,000 SQFT the new
TARGET CENTER
08.01- Press: 5,704 sqft
11
EVENT LEVEL 0' - 0"
1
44
43
2
42
Room Legend TALENT TLT DRESSING ROOM 500.05.69 TLT 53 SF 500.05.68 500.05.72 SHOWER 687 SF 54 SF 500.05.70 SHOWER TALENT 37 SF DRESSING 500.05.73 STORAGE ROOM 37 SF 500.05.71 500.05.76 STORAGE 46 SF 529 SF 500.05.74 46 SF
CIRCULATION 41 CONCOURSE EVENT FACILITIES FAM TLT FOOD SERVICE
EXIT STAIR
000.43.05 642 SF
000.01.03 77 SF
ST1 634 SF
JANITOR
40
500.05.75 219 SF
MECHANICAL
CONFERENCE
WTR RECLAIM
000.02.013 417 SF
000.03.02 461 SF
STORAGE 000.01.04 479 SF
000.01.02 77 SF
QUAD ELEC 000.43.001 177 SF
ELV
ELV
EL1 46 SF
EL2 46 SF
OFFICE
OFFICE
000.02.12 68 SF OFFICE
000.02.07 68 SF CLOSET
000.02.11 68 SF
000.02.06 64 SF
5
6
7
8
VERTICAL SHAFT
VENT 000.04.09 77 SF
EXIT STAIR
JANITOR
ST2 634 SF
000.06.02 617 SF
000.04.08 77 SF
ELV
ELV
QUAD ELEC
EL3 46 SF
EL4 46 SF
000.05.001 177 SF
500.05.96 1201 SF
C
FREIGHT ELV
STORAGE
000.02.10 000.02.014 000.02.05 87 SF 87 SF 236 SF
MECH 000.01.07 514 SF
OFFICE
OFFICE
000.02.09 87 SF
OFFICE
000.02.04 87 SF STORAGE CLOSET
000.02.08 72 SF
000.02.03 69 SF
9
QUAD SUBSTATION
OFFICE CORRIDOR OFFICE
ROADIES
LOCKER ROOM
4
VENT
VERTICAL SHAFT
D
3
000.03.03 1214 SF
GA ENTRANCE LOBBY EER
10
500.05.98 1277 SF
000.07.01 142 SF
ELEVATOR EMERG ELEC 000.07.02 500 SF
500.05.106 318 SF
500.05.99 ELEVATOR 35 SF 500.05.100 35 SF
MEDIA
VIP ENTRANCE 000.07.04 2414 SF
VIP ELV. WOMENS TLT
MENS TLT MARSHALLILNG
OFFICE
500.05.105 4343 SF
39
WARMING KITCHEN
000.43.03 344 SF
SUITE TALENT TRAINER
TALENT DRESSING ROOM
Food Service Storage
000.38.05 749 SF
000.43.01 432 SF
WOMENS TLT
FOOD SERVICE
FREEZERS
000.01.01 1107 SF
000.02.01 1840 SF
000.33.010 1314 SF
ZAMBONI 000.05.01 835 SF
12
500.05.104 Redundant Room
MAIN SERVER
A 000.11.03 1983 SF
000.11.02 387 SF
STORAGE 000.11.01 637 SF
QUAD SUBSTATION 000.36.05 506 SF
SHOW POWER
BOWL SUITE
500.05.84 356 SF
500.05.87 412 SF
MENS TLT
MENS TLT
WOMENS TLT
WOMENS TLT
500.05.80 124 SF
500.05.81 125 SF
500.05.82 143 SF
500.05.83 143 SF
LOCAL HWTR
13
000.13.02 66 SF
BEER ROOM
MARSHALLILNG
000.13.05 906 SF
500.05.88 332 SF
ARENA FLOOR
500.05.101 10973 SF
36
STORAGE
000.13.04 558 SF
BOWL SUITE
LOADING DOCK 500.05.102 Not Enclosed
000.11.04 1188 SF
EMERG GEN WOMENS TLT
000.37.03 434 SF
37
11
MARSHALLING
TLT PATCH PANELS SHOWER CLOSET 000.38.04 500.05.77 61 SF 000.38.03 000.38.02 30 SF 209 SF 14 SF SHOWER TLT CLOSET 000.37.06 33 SF 000.37.05 TALENT 000.37.04 59 SF 22 SF DRESSING ROOM
38
VC
000.03.01 329 SF
ICE PLANT
000.43.02 259 SF
STORAGE
000.05.02 362 SF
BEER ROOM
000.33.009 322 SF
MENS TLT
SERVICE
000.02.02 338 SF
BEER ROOM
B
500.05.92 VIP ELV. 24 SF SERVICE 500.05.93 ELV VIP ELV. 24 SF 500.05.91 500.05.94 VIP ELV. 124 SF 24 SF 500.05.95 STORAGE 23 SF 500.05.178 96 SF
STORAGE
TICKETING 500.05.107 557 SF
BOWL SUITE LOUNGE
500.05.172 22057 SF
BOWL SUITE 500.05.89 313 SF
STORAGE 000.14.003 1154 SF
MARSHALLING 500.05.103 4325 SF
35
CONCERT STORAGE
SHOW POWER
500.05.78 632 SF
500.05.79 214 SF
BOWL SUITE
JANITOR
500.05.90 450 SF
15
000.14.01 66 SF
UTILITY POWER
SHOW POWER
QUAD SUBSTATION
000.15.01 610 SF
000.16.02 841 SF
MENS TLT
VERTICAL SHAFT 000.14.002 338 SF
000.15.02 402 SF
000.33.004 1942 SF
QUAD ELEC
FIRE PUMP ROOM
000.16.01 288 SF FIRE COMMAND CENTER
000.15.06 266 SF
34
ASSIST. COACH LOCKER 000.27.01 180 SF ASSIST. COACH LOCKER
WOMENS TLT 500.05.183 235 SF
DIST ANTENNA SYSTEM
ASSIST. COACH LOCKER
500.05.85 2488 SF
000.27.03 320 SF
STORAGE
33
000.31.03 2207 SF
MENS TLT
HSAN ROOM
500.05.184 237 SF
000.31.02 157 SF
EER 000.31.01 99 SF
HYDRO
TREATMENT
PLAYER LOUNGE
000.26.01 127 SF
000.26.02 78 SF
000.25.01 173 SF
VISITOR LOCKER ROOM
000.27.02 224 SF
PLAYER LOUNGE
TREATMENT
HYDRO
000.24.01 173 SF
000.23.02 78 SF
000.23.01 127 SF
SHOWER
SHOWER
000.25.02 214 SF
000.24.02 214 SF
ASSIST. COACH LOCKER 000.21.01 180 SF
EVENT CONCOURSE
ASSIST. COACH LOCKER HOME LOCKER ROOM
000.25.05 1319 SF
000.21.02 ASSIST. 224 SF COACH LOCKER
000.23.03 1319 SF
FAMILY TLT
STORAGE
500.05.291 272 SF
500.05.292 82 SF
000.15.03 255 SF
16
500.05.170 29200 SF
000.21.03 320 SF
HEAD COACH LOCKER
TAPE
CONFERENCE
LAUNDRY
000.27.04 372 SF
000.26.04 98 SF
000.26.03 168 SF
000.25.04 157 SF
TEAM TLT
TEAM TLT LAUNDRY
000.25.03 161 SF
000.24.04 161 SF
ARENA ENTRANCE
CONFERENCE
TAPE
HEAD COACH LOCKER
EER
000.23.05 168 SF
000.23.04 98 SF
000.21.04 228 SF
000.21.14 136 SF
000.24.03 157 SF
17
500.05.171 6619 SF
QUAD SUBSTATION 000.30.01 699 SF
KITCHEN
OFFICIAL TLT
00.05.182 370 SF
SAUNA
32
FITNESS STORAGE
000.27.06 510 SF
EMERG ELEC 500.05.86 1586 SF
000.02.14 5162 SF
QUAD ELEC 000.28.01 195 SF
31
VERT SHAFT
500.05.181 500.05.180 70 SF 70 SF
000.27.07 663 SF
INTERVIEW ROOM
INTERVIEW ROOM
000.25.12 542 SF
000.24.05 530 SF
ELV
ELV
EL8 46 SF
EL7 46 SF
EXIT STAIR ST4 634 SF
SHOWER
HEAD COACH LOCKER
000.24.10 129 SF
000.24.06 140 SF
TOILET
LOCAL HWTR 000.26.06 77 SF
AUXILLARY LOCKER ROOM 000.25.11 825 SF
VENT
000.25.07 96 SF ASSIST. COACH LOCKER
000.24.09 96 SF ASSIST. COACH LOCKER
000.25.08 99 SF
000.24.08 99 SF
000.21.09 170 SF
AUXILLARY LOCKER ROOM 000.23.06 847 SF
ELV
ELV
EL6 46 SF
EL5 46 SF
MECH 000.23.07 77 SF
EXIT STAIR
OFFICIAL'S LOCKER ROOM
ST3 634 SF
000.21.13 668 SF
000.23.09 77 SF
000.24.07 131 SF
19
000.21.12 207 SF
ELEVATOR
VENT
TRAINER
000.25.09 131 SF
000.21.08 OFFICIAL 89 SF TLT
OFFICIAL CONF
TOILET
TRAINER
000.23.08 77 SF
H
SHOWER 000.25.06 129 SF
18
000.21.10 OFFICIAL 91 SF SHOWER
000.21.05 497 SF
000.23.10 350 SF
HEAD COACH LOCKER 000.25.10 146 SF
000.21.11 90OFFICIAL SF SHOWER
OFFICIAL'S LOCKER ROOM
FITNESS STORAGE
000.26.05 357 SF
VIP CLUB
ELEVATOR ELEVATOR
14
000.13.01 1811 SF
500.05.176 ELEVATOR 33 SF 500.05.175 STORAGE37 SF
true north
plan north
20
500.05.177 93 SF
30
29
28
22 27
12
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
26
25
24
23
21
1
000 - Event Level 1" = 40'-0" 25’ 50’
100’
1
44
43
42
2
3
4
MECH
Room Legend 41
D
6
8
500.05.207 77 SF
MECH
MECH
500.05.206 77 SF
500.05.208 77 SF
SKYWALK LEVEL
7
MECH
500.05.205 77 SF
EGRESS 500.05.189 634 SF
5
16' - 7"
EGRESS 500.05.190 634 SF
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
500.05.197 500.05.198 46 SF 46 SF
500.05.199 500.05.200 46 SF 46 SF
9
EXIT 500.05.210 642 SF
CIRCULATION EGRESS
10
MECHANICAL 40
MENS TLT
C
STORAGE SUITE VC
11
VERTICAL CIRCULATION B
39
WOMENS TLT
12 38 A
STORAGE 500.05.188 47 SF
Men's Tlt 000.02.027
37
13
36
14
Club Mezz 000.02.026
35
15 Women's Tlt 000.02.028
STORAGE STORAGE
500.05.187 42 SF
500.05.136 116 SF
34
ELEVATOR
16
500.05.137 69 SF
33
17
VIP CLUB 500.05.293
SKYWALK
18
000.02.026
32
EXIT 500.05.209 832 SF
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
500.05.195 500.05.196 46 SF 46 SF
MECH
MECH
500.05.185500.05.186 70 SF 70 SF
500.05.203 77 SF
500.05.201 77 SF
EGRESS 500.05.191 634 SF
19 ELEVATOR ELEVATOR
500.05.193 500.05.194 46 SF 46 SF
31
MECH
MECH
500.05.202 77 SF
500.05.204 77 SF
true north
EGRESS
plan north
500.05.192 634 SF
20
H 30
29
28
22 27
26
25
24
23
21
2
CLUB MEZZ 1" = 40'-0" 25’
50’
100’
13
main CONCOURSE
1
44
43
2
FOOD PREP
42
28' - 7"
500.05.43 164 SF
100.44.01
MECH 100.01.04
STORAGE 500.05.27 582 SF
41
100.01.03
4
5
6
7
8
FOOD PREP
500.05.153 282 SF
MECH EGRESS STAIR
TEL SHAFT
Room Legend
3
MECH
500.05.152 282 SF
CONCESSIONS
CONCESSIONS
500.05.154 289 SF
500.05.155 289 SF
100.04.01
EGRESS STAIR
TEL
100.04.03
SHAFT
500.05.42 164 SF
MECH
STORAGE
100.04.02
500.05.28 582 SF
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
100.44.02100.44.03
100.05.01100.05.02
9
D
CONCESSION CONCOURSE
WOMENS TLT
EGRESS
10
MAIN CONCOURSE
100.41.01
ELEVATOR
000.05.35
40
FOOD SERVICE
MENS TLT
MECHANICAL
WOMENS TLT
500.05.212 ELEVATOR 35 SF 500.05.213 35 SF
C FREIGHT ELEVATOR
100.40.01
100.08.01
500.05.214 318 SF
MENS TLT
VIP ELV
MENS TOILET 500.05.215 VIP ELV SERVICE 100.09.01 24 SF ELEVATOR500.05.216 VIP ELV 500.05.211 24 SF 500.05.217 VIP ELV 124 SF 24 SF 500.05.218 23 SF
RETAIL STORAGE B
39 VC
11
FOOD PREP
VERTICAL CIRCULATION
500.05.111 660 SF
WOMENS TLT
CONCESSIONS
FOOD PREP CONCESSIONS
500.05.109 532 SF
500.05.39 669 SF
500.05.38 532 SF
12 38 CONCESSIONS FOOD PREP 500.05.112 451 SF
CONCESSIONS
A
500.05.110 427 SF
500.05.40 427 SF
FOOD PREP 500.05.41 456 SF
FAN STORE 500.05.51 975 SF
13
37 WOMENS TLT
WOMENS TLT
100.13.01
100.36.01
TEAM MERCH
36
14
500.05.50 660 SF
MENS TLT
MENS TLT
100.35.01
100.14.01
35
15 TEAM STORE
SHAFT 500.05.219
500.05.49 846 SF
CONCESSIONS FOOD PREP 500.05.32 475 SF
500.05.113 490 SF
34 ELEVATOR 500.05.52 69 SF
16
STORAGE 500.05.138 924 SF
CONCESSIONS FOOD PREP
500.05.114 484 SF
500.05.30 630 SF
33
MENS TLT
FOOD PREP
FOOD PREP
500.05.45 314 SF
500.05.46 321 SF
CONCESSIONS
CONCESSIONS
500.05.143 191 SF
500.05.142 195 SF
17
18
100.31.01
32
WOMENS TLT 100.30.01
19 31
STORAGE
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
100.27.02 100.27.01
100.22.02100.22.01
500.05.29 580 SF
MECH EGRESS STAIR
TEL
SHAFT
100.26.03
500.05.44 124 SF
MECH
100.26.02
100.23.01
MECH.
MECH
100.26.01
100.23.02
EGRESS STAIR
true north
plan north
100.22.03
20
H 30
29
28
22 27
14
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
26
25
24
23
21
3
MAIN CON. 1" = 40'-0" 25’
50’
100’
Room Legend
1
44
43
2
4
5
6
LOGE LE`VEL
7
8
42 EGRESS STAIR
CONCOURSE
200.44.01
EGRESS FOOD SERVICE 41
MECHANICAL
3
MECH
MECH
200.01.01
200.04.01
MECH
MECH
200.01.02
200.04.02
39' - 6"
EGRESS STAIR 200.04.03
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
200.44.02 200.44.03
200.05.01200.05.02
9
D
MENS TLT SUITE
WOMENS TLT
VC
500.05.157
40
VERTICAL CIRCULATION
FOOD PREP
FOOD PREP
000.05.05 424 SF
500.05.227 424 SF
10
C FREIGHT ELEVATOR
MENS TLT
WOMENS TLT
500.05.159 710 SF
500.05.221 318 SF
VIP ELV 500.05.223 VIP ELV 24 SF SERVICE ELEVATOR500.05.224 VIP ELV 24 SF 500.05.222 500.05.225 VIP ELV 124 SF 24 SF
B
39
11
500.05.226 23 SF
LOGE BOTHS 500.05.230 1485 SF
12 38 A
37
13
FOOD PREP MENS TLT
500.05.228 457 SF
500.05.271 640 SF
LOGE BOXES
36
14
500.05.231 1780 SF
FOOD PREP 000.05.18 457 SF
WOMENS TLT 500.05.272 640 SF
15
35
34 16 LOGE BOOTHS 500.05.232 1485 SF
33
17 LOGE CONCOURSE 500.05.53 45114 SF
MENS TLT
MENS TLT
500.05.161 710 SF
500.05.163 710 SF
WOMENS TLT
32
FOOD PREP
FOOD PREP
000.05.21 424 SF
500.05.229 424 SF
18
WOMENS TLT
500.05.160
500.05.162
19 31
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
200.27.02200.27.01
200.22.03200.22.02
MECH
MECH EGRESS STAIR 200.26.02 200.26.03
200.23.02
EGRESS STAIR
true north
200.22.01
MECH
MECH
200.26.01
200.23.01
plan north
20
H 30
4 29
28
22 27
26
25
24
23
21
LOGE 1" = 40'-0" 25’
50’
100’
15
SUITE LEVEL 52' - 4
1/2
"
1
44
43
2
42 EGRESS 500.05.239 634 SF
Room Legend 41
D
3
4
5
MECH
MECH
500.05.256 77 SF
500.05.258 77 SF
MECH
MECH
500.05.255 77 SF
500.05.257 77 SF
6
7
8 EGRESS 500.05.240 634 SF
ELVATOR ELEVATOR
ELEVATOR ELVATOR
500.05.253 500.05.254 46 SF 46 SF
500.05.260 500.05.259 46 SF 46 SF
9
CONCOURSE EGRESS
WOMENS TLT
MECHANICAL
10
500.05.165
40
MENS TLT
MENS TLT FREIGHT ELEVATOR
500.05.164
SUITE
C
500.05.233 318 SF
VC
SUITE
SUITE
SUITE
SUITE
SUITE
SUITE
2
7
6
5
4
3
WOMENS TLT SUITE
39
VIP ELV
B
1
500.05.235 VIP ELV SERVICE 24 SF ELEVATOR500.05.236 VIP ELV 24 SF 500.05.234 500.05.237 VIP ELV 124 SF 24 SF
SUITE
11
500.05.238 23 SF
15
SUITE SUITE
14
26
12 38 A SUITE 13
13
37
SUITE MENS TLT
12
500.05.249 640 SF
36
14
SUITE WOMENS TLT
11
500.05.250
35
15
SUITE 10
34 16 SUITE 25
SUITE 16
SUITE
33
SUITE
24
17
17
SUITE SUITE SUITE
SUITE
21
20
22
SUITE
SUITE
19
18
23
MENS TLT
MENS TLT
500.05.166
18
500.05.168
SUITE CONCOURSE
WOMENS TLT
32
WOMENS TLT
34
500.05.167
500.05.169
500.05.264 500.05.263 46 SF 46 SF
MECH
MECH
500.05.261 77 SF
500.05.265 77 SF
EGRESS 500.05.270 634 SF
true north
EGRESS 500.05.269 634 SF
MECH
MECH
500.05.262 77 SF
500.05.266 77 SF
H
19
ELEVATOR ELVATOR
ELVATOR ELEVATOR 500.05.267 500.05.268 46 SF 46 SF
31
30
5 29
28
22 27
16
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
26
25
24
plan north
20
23
21
SUITE 1" = 40'-0" 25’
50’
100’
1
44
43
2
3
4
5
6
UPPER CONCOURSE
7
Room Legend 42
MECH 500.05.280 77 SF
CONCESSION CONCOURSE STORAGE
EGRESS
500.05.54 607 SF
41
FOOD SERVICE
ELV
63' - 7
500.05.284 77 SF
MECH
MECH
500.05.281 77 SF
500.05.285 77 SF
ELV
ELV
500.05.279 500.05.278 46 SF 46 SF
D
8
MECH
1/2
"
STORAGE
ELV
500.05.55 602 SF
400.05.02400.05.01 46 SF 46 SF
9
MECHANICAL MENS TLT
CONCOURSE 400.01.001 55244 SF
STORAGE 40
VC WOMENS TLT
10
C
FREIGHT ELEVATOR 500.05.275 318 SF
FOOD PREP
CONCESSIONS
CONCESSIONS
500.05.122 195 SF
500.05.123 328 SF
500.05.124 328 SF
FOOD PREP 500.05.125 195 SF
11
SERVICE ELEVATOR 500.05.290 124 SF
B
39
12 FOOD PREP
38
FOOD PREP
500.05.121 195 SF
500.05.116 195 SF
A
CONCESSIONS
CONCESSIONS
500.05.119 328 SF
500.05.117 328 SF
13
37 WOMENS TLT 400.36.01
36
14
35
15
34
CONCESSIONS
CONCESSIONS
500.05.118 328 SF
500.05.61 328 SF
FOOD PREP
FOOD PREP
500.05.60 195 SF
500.05.120 195 SF
16
33 17
FOOD PREP
CONCESSIONS
500.05.127 195 SF
500.05.126 328 SF
CONCESSIONS
FOOD PREP
500.05.128 328 SF
500.05.129 195 SF
18 CONCOURSE 400.01.001 55244 SF
32
19 ELV
31
ELV
ELV
400.27.02400.27.01 46 SF 46 SF
STORAGE 500.05.56 598 SF
ELV
400.22.03400.22.02 46 SF 46 SF
MECH
MECH
500.05.289 77 SF
500.05.287 77 SF
MECH
MECH
500.05.288 77 SF
500.05.286 77 SF
ELEVATOR 500.05.276 ELEVATOR 33 SF 500.05.277 37 SF
true north
plan north
20
H 30
6 29
28
22 27
26
25
24
23
21
UPPER CON. 1" = 40'-0" 25’
50’
100’
17
PRESS LEVEL 97' - 8"
1
Room Legend 9
CIRCULATION
41
D
MECHANICAL MEDIA MENS TLT PRESS C
VERTICAL CIRCULATION WOMENS TLT
B
A
37
13
36
14
35
15
CATWALK STAIR
OFFICE 500.05.16
000.14.04
WOMENS TLT 500.05.25
RADIO
TV
500.05.13 RADIO
500.05.11
MENS TLT 500.05.24
500.05.14
TV RADIO
500.05.10
500.05.15
TV
STORAGE ELECTRICAL
500.05.09
TV
PRESS CIRCULATION
REPLAY
500.05.05
500.05.08
500.05.12
500.05.23
CATWALK STAIR
500.05.26 4508 SF
OFFICE 500.05.22
000.14.05
OFFICE
31
PRESS WRITING
AUDIO
SCOREBOARD
500.05.07
500.05.06
000.14.03
500.05.21
TEL. 500.05.20
STATS. 500.05.19
ELECTRICAL
BREAK
500.05.18
500.05.17
true north
plan north
H
7 27
18
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
26
25
24
23
PRESS 25’ 1" = 40'-0"
50’
100’
CATWALK
1
107' - 8"
Room Legend CATWALK
9 41
D
C
B
A
37
13
36
14
35
15
31
true north
plan north
H
8 27
26
25
24
23
CATWALK 1" = 40'-0" 25’
50’
100’
19
stone foundation
03
SPORTS ARENA OF THE FUTURE The New Target Center Arena will be the new standard in professional sports arena design. The design of the arena is heavily rooted in Minnesota history and culture. One material that is helping communicate this idea is the use of Kasota Stone from nearby Kasota. This stone will line our entrance and welcome visitors to the New Target Center Arena. As one enters the arena, they are immediately connected to all levels of the arena with its open atrium. The New Target Center Arena will also be connected to Minneapolis’ existing skywalk system, which gives visitors another way to access the building. The skywalk also leads to Target Field, home of the Minnesota Twins. One of the great features of the site is the public plaza linking the New Target Center to Target Field. The link created by this plaza introduces a fun and exciting fan experience that brings two traditions of Minneapolis sports together. Lastly, the façade of Minneapolis’ new arena, which is rooted in the St. Anthony Falls of the Mississippi River, is the face of the new Target Center Arena. Inspired by the powerful Mississippi, the new façade is fabricatHG IURP SHUIRUDWHG PHWDO VFUHHQV 7KH VFUHHQ ÁRZV DQG bends around the building similarly to the river, while also providing a centerpiece for downtown Minneapolis.
20
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
minneapolis
kasota
WATER MOVEMENT
ST. PAUL St. Paul Minneapolis
MINNEAPOLIS
21
east elevation
22
Minnesota timberwolves UNIVERSITY OF KANSAS SADP
minnesota lynx
23
north elevation
24
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
25
south elevation
26
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
27
west elevation
28
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
29
H
D
Roof 260' - 0"
1
1 A301
SECTION DETAILS
600 - Catwalk 248' - 5"
500 - Press 238' - 5"
2 A301
2
400 - Upper Concourse 204' - 4 1/2"
300 - Suite Level 193' - 1 1/2"
200 - Loge Level 180' - 3"
100 - Main Concourse 169' - 4"
050 - Skywalk/Club 157' - 4"
3 A301
000 - Event Level 140' - 9"
1
30
1_1/4" Full Detail 1/4" = 1'-0"
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
3
C
B
A
35
1
14 - CEILING SUPPORT SYSTEM 15 - LAY-IN CEILING TILE 14. CEILING SUPPORT SYSTEM 16 - ROOF DRAIN 15. LAY-IN CEILING TILE 16. ROOF DRAIN 17 - 1-PLY ROOFING MATERIAL 17. 1-PLY ROOFING MATERIAL 18. OVERLAY BOARD 19. MEMBRANE 18 - OVERLAY BOARD 20. SHEATHING 21. RIGID INSULATION 19 - ROOFING MEMBRANE 22. CONCRETE PAVERS SUPPLY AIR DUCT 20 - SHEATHING 23. 24. SUPPLY FLEX DUCT 25. SUPPLY DIFFUSER 26. ROOF STRUCTURE 21 - RIGID INSULATION 22 - CONCRETE PAVERS 23 - SUPPLY AIR DUCT 24 - AIR SUPPLY FLEX DUCT 25 - AIR SUPPLY DIFFUSER 26 - ROOF STRUCTURE
1 - METAL FLASHING 2 - METAL PANEL SYSTEM (PARAPET CONNECTION) METAL FLASHING 3 - STEEL CHANNEL AT 2.1.PARAPET METAL PANEL SYSTEM PARAPET CONNECTION STEEL CHANNEL AT PARAPET 4 - STEEL STRUCTURAL3.4. COLUMN STEEL STRUCTURAL COLUMN 5. ROOF BLOCKING SUBROOF 5 - ROOF BLOCKING 6.7. CAST-IN-PLACE 3" METAL DECKING 8. STEEL STRUCTURAL BEAM 6 - CAST-IN-PLACE SUBROOF 9. L-SHAPED STRUCTURAL BEAM CONNECTION METAL STUD WALL 7 - 3” METAL DECKING 10. 11. FIBERGLASS INSULATION 12. GYPSUM WALL BOARD PIPING FROM ROOF DRAINAGE SYSTEM 8 - STEEL STRUCTURAL13.BEAM 9 - L-SHAPED STRUCTURAL BEAM CONNECTION 10 - METAL STUD WALL 11 - FIBERGLASS INSULATION 12 - GYPSUM WALL BOARD 13 - PIPING FROM ROOF DRAINAGE SYSTEM
11 22 33 44 55 66 77 88 99 10 10 1111 12 12
1/4" / 1'-0"
1/4" / 1'-0"
16
16
17 18 19 19 20 20 17 18
21 22
21 22
23
1/4" / 1'-0"
1/4" / 1'-0"
23
24
24
25
25
26
26
600 - Catwalk 248' - 5"
13 13 14 14 15 15
H
2
11 223 3 44 55
6
6
7 8 9 9 7 8
3 11
10 11 12 13 13
22 33
10 11 12
1 - RAINSCREEN CONNECTION 2 - SKIN STRUCTURE ANCHOR 3 - SKIN SECONDARY TRUSS 4 - SKIN TERTIY STRUCTURE 5 - METAL RAINSCREEN FACADE 6 - SKIN TO CURTAIN WALL ANCHOR CONNECTION 400 - Upper Concourse 7 - METAL PANEL CONNECTION JOINT 204' - 4 1/2" 8 - CONNECTION TO PRIMARY ARENA STRUCTURE 9 - UNITIZED METAL PANEL (INSULATED) 10 - STEEL COLUMN SKIN PANEL DETAIL 1. RAINSCREEN CONNECTION 11 - HORIZONTAL INSULATED METAL PANEL CONNECTION 2. SKIN STRUCTURE ANCHOR 3. SKIN SECONDARY TRUSS 12 - INSULATED METAL PANEL HEAD CONNECTION 4. SKIN TERTIARY STRUCTURE 5. METAL RAINSCREEN FACADE TO CURTAIN WALL ANCHOR CONNECTION 13 - PRIMARY BEAM FOR SKIN STRUCTURE 6.7. SKIN METAL PANEL CONNECTION JOINT 8. STRUCTURAL CONNECTION TO PRIMARY ARENA STRUCTURE 11 - GLASS CURTAIN PANEL HEAD CONNECTION 9. UNITIZED METAL PANEL (INSULATED) 10. STEEL COLUMN HORIZONTAL INSULATED METAL PANEL CONNECTION 12 - DOUBLE PANEL CURTAIN WALL GLAZING11. 12. INSULATED METAL PANEL HEAD CONNECTION 13. PRIMARY BEAM FOR SKIN STRUCTURE 13 - HORIZONTAL GLASS CURTAIN WALL CONNECTION 14. GLASS CURTAIN PANEL HEAD CONNECTION
1 - CENTRIA FORMAWALL 2 - FORMAWALL HORIZONTAL CONNECTION 3 - STEEL STRUCTURAL COLUMN 10 10 4 - STEEL STRUCTURAL COLUMN L-CONNECTION 5 - FORMAWALL BASE CONNECTION 11 11 6 - SHEET METAL FLASHING 7 - ANCHOR BOLT 8 - CONCRETE BASE 1. CENTRIA FORMAWALL 2. FORMAWALL HORIZONTAL CONNECTION 9 - FOUNDATION SLAB 3. STEEL STRUCTURAL COLUMN 4. STEEL STRUCTURAL COLUMN L-CONNECTION 10 - STEEL STUD WALL ASSEMBLY 5. FORMAWALL BASE CONNECTION 6. SHEET METAL FLASHING 11BOLT - 2 x 2 CONCRETE COLUMN 7. ANCHOR 8. CONCRETE BASE 12 -SLAB INTERIOR CONCRETE FLOOR SLAB 9. FOUNDATION
44 14
14
15
15
000 - Event Level 140' - 9"
55 66 77 8 89 9
12
12
16
16
31
15. DOUBLE PANEL CURTAIN WALL GLAZING 16. HORIZONTAL GLASS CURTAIN WALL CONNECTION
3
__1/4" Full Detail - Stone Detail 1" = 1'-0"
FORMING THE BOWL
ESTABLISH SIGHTLINES 32
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
DETERMINE BREAKS
SWEEP BOWL
SWEEP STRUCTURE the new
TARGET CENTER
33
PERFORATED SKIN
34
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
Roof 260' - 0"
BOWL SIGHTLINES
600 - Catwalk 248' - 5"
500 - Press 238' - 5"
basketball transverse section 400 - Upper Concourse 204' - 4 1/2"
300 - Suite Level 193' - 1 1/2"
200 - Loge Level 180' - 3"
100 - Main Concourse 169' - 4"
050 - Skywalk/Club 157' - 4"
000 - Event Level 140' - 9"
1
Sightline - Trans_BBall 3/16" = 1'-0"
35
Roof 260' - 0"
600 - Catwalk 248' - 5"
500 - Press 238' - 5"
basketball longitudinal section (east end)
Top of Column 220' - 5"
400 - Upper Concourse 204' - 4 1/2"
300 - Suite Level 193' - 1 1/2"
200 - Loge Level 180' - 3"
100 - Main Concourse 169' - 4"
050 - Skywalk/Club 157' - 4"
000 - Event Level 140' - 9"
1
36
Sightline - Long_BBall 3/16" = 1'-0"
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
Roof 260' - 0"
600 - Catwalk 248' - 5"
500 - Press 238' - 5"
basketball longitudinal section (west end) 400 - Upper Concourse 204' - 4 1/2"
300 - Suite Level 193' - 1 1/2"
200 - Loge Level 180' - 3"
100 - Main Concourse 169' - 4"
050 - Skywalk/Club 157' - 4"
000 - Event Level 140' - 9"
1
Sightline - MB_Long_BBall 3/16" = 1'-0"
37
LEGEND A EVENT LEVEL B COURT SIDE SUITES C MAIN CONCOURSE D CLUB/ LOGE LEVEL E SUITE LEVEL F UPPER CONCOURSE G PRESS LEVEL H SKYWALK LEVEL I ROOF
SECTIONS I
legend a - EVENT LEVEL b - COURT SIDE SUITES c - MAIN CONCOURSE d - CLUB/LOGE LEVEL e - SUITE LEVEL f - UPPER CONCOURSE g - PRESS LEVEL h - SKYWALK LEVEL i - ROOF
260' - 0"
H
248' - 5" G
238' - 5"
F
204' - 4 1/2" E
193' - 1 1/2" D
180' - 3" C
169' - 4"
157' - 4" B
A
140' - 9"
basketball longitudinal section BASKETBALL LONGITUDIAL SECTION SCALE: 3/64” = 1’ - 0”
10’
38
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
20’
40’
LEGEND A EVENT LEVEL B MAIN CONCOURSE C CLUB/ LOGE LEVEL D SUITE LEVEL E UPPER CONCOURSE F PRESS LEVEL G SKYWALK LEVEL H ROOF
H
260' - 0"
G
248' - 5" F
E
238' - 5"
legend a - EVENT LEVEL b - COURT SIDE SUITES c - MAIN CONCOURSE d - CLUB/LOGE LEVEL e - SUITE LEVEL f - UPPER CONCOURSE g - PRESS LEVEL h - SKYWALK LEVEL i - ROOF
204' - 4 1/2"
D
193' - 1 1/2" C
180' - 3" B
169' - 4"
157' - 4"
A
140' - 9"
BASKETBALL transverse section BASKETBALL TRANSVERSE SECTION SCALE: 3/64” = 1’ - 0”
10’
20’
40’
39
LEGEND A EVENT LEVEL B MAIN CONCOURSE C CLUB/ LOGE LEVEL D SUITE LEVEL E UPPER CONCOURSE F PRESS LEVEL G SKYWALK LEVEL H ROOF
H
legend a - EVENT LEVEL b - COURT SIDE SUITES c - MAIN CONCOURSE d - CLUB/LOGE LEVEL e - SUITE LEVEL f - UPPER CONCOURSE g - PRESS LEVEL h - SKYWALK LEVEL i - ROOF
260' - 0"
G
248' - 5" F
E
238' - 5"
204' - 4 1/2"
D
193' - 1 1/2" C
180' - 3" B
169' - 4"
157' - 4"
A
140' - 9"
hockey transverse section HOCKEY TRANSVERSE SECTION SCALE: 3/64” = 1’ - 0”
10’
40
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
20’
40’
LEGEND A EVENT LEVEL B MAIN CONCOURSE C CLUB/ LOGE LEVEL D SUITE LEVEL E UPPER CONCOURSE F PRESS LEVEL G SKYWALK LEVEL H ROOF
H
260' - 0"
G
248' - 5" F
E
238' - 5"
legend a - EVENT LEVEL b - COURT SIDE SUITES c - MAIN CONCOURSE d - CLUB/LOGE LEVEL e - SUITE LEVEL f - UPPER CONCOURSE g - PRESS LEVEL h - SKYWALK LEVEL i - ROOF
204' - 4 1/2"
D
193' - 1 1/2" C
180' - 3" B
169' - 4"
157' - 4"
A
140' - 9"
CONCERT transverse section CONCERT TRANSVERSE SECTION SCALE: 3/64” = 1’ - 0”
10’
20’
40’
41
04
ENHANCE THE FAN EXPERIENCE The New Target Center Arena promises to bring exclusive premium amenities to the Timberwolves and Lynx professional basketball teams. As a part of the New Target &HQWHU $UHQD ZH KDYH FUHDWHG 7KH 'HQ D WZR VWRU\ 9,3 club and bar that services Target Center before and after games plus the offseason. It not only serves as an entrance for premium ticket holders, but as the most exclusive club in Minneapolis. It has two full-service bars, two executive lounges, and a private speakeasy for VVIP guests. As for the premium amenities inside of the arena, we have designed three different private suites: a mega-suite, a bunker suite, and a standard suite. In addition to the suites, we have designed several exclusive clubs within the arena. On the event level there’s a club tucked behind the bunker suites so VIP fans can recap the game and connect. Going up the arena, located on the skyZDON OHYHO \RX¡OO ÀQG &OXE 7 7KLV FOXE ZLWK YLHZV RYHUORRNV WKH à RRU VR \RX FDQ FRQYHUVH ZLWK IULHQGV DQG ZDWFK WKH Wolves play. Lastly we have our 5-Star Loge which is loFDWHG RQ WKH OHYHO DERYH WKHVH VHDWV EULQJ WKH FRPIRUWV of a sit-down restaurant to the basketball experience. The New Target Center Arena will provide the most exciting and highest quality fan experience in the NBA.
42
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
43
Premimum amenities
2
4
3
1
event level amenities
1 - VIP CLUB OFFERS THE MOST EXCITING GAMEDAY EXPERIENCE 2 - BUNKER SUITES BRINGS LUXURY TO COURT-SIDE SEATING 3 - CLUB WITHOUT VIEWS OFFERS A PRIVATE RETREAT
44
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
skywalk level amenities
4 - cLUB WITH VIEWS ALLOWS FANS TO NEVER MISS THE ACTION
6
8
5
7
loge level amenities
5 - LOGE BOOTH BRINGS A COMFORTABLE DINING EXPERIENCE TO THE EXCITING ARENA ATMOSPHERE 6 - LOGE BOX CATERS TO GROUPS THAT WANT ADDED COMFORT TO THEIR GAME EXPERIENCE
suite level amenities
7 - THE TYPICAL SUITE ALLOWS FOR FRIENDS TO SHARE IN THE PRIVATE AND LUXURIOUS ACCOMMODATION WHILE REMAINING CLOSE TO THE ACTION 8 - EXPAND THE PARTY FROM THE TYPICAL SUITE WITH THE MEGA SUITE ACCOMMODATION
45
BUNKER SUITE
event level total available: 4 46
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
47
LOGE BOOTH
loge level total available: 42
48
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
49
standard SUITE
suite level total available: 8
50
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
51
MEGA SUITE
suite level total available: 20
52
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
53
05
FLEXIBILITY AND COMFORT In order to cater to the arena market in ZKLFK 0LQQHDSROLV LV ORFDWHG à H[LELOLW\ DQG FRPfort are a top priority in our design. In addition to basketball, the New Target Center Arena will be able to host professional hockey and big-name concerts. Our design takes into consideration Minneapolis’ potential bid for a NCAA Final Four and can adequately accommodate other national-scale events. In addition to all of these events, the New Target Center Arena will be able to host rodeo, bull riding, monster trucks, circuses, motocross, X-Games, and WWE Wrestling.
54
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
55
BASKETBALL: LOWER BOWL
UPPER BOWL
SECTION |
SECTION |
101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123
SEAT COUNT 218 357 504 357 246 278 264 300 281 278 246 357 552 357 218 391 257 255 258 387 254 312 254
125 - 145 14646 - 149 150 151 - 154 155 - 156 157 - 160 161 162 - 165 166 - 186
56
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
219 218 280 332 332 280 218 219 451 451 219 218 280 332 332 280 218 219 451 451
SEAT COUNT
188
211
129
14 8 4 8 10 8 4 8 14
187 - 210
SEAT COUNT 40 (each)
***FLOOR SEATS AVAILABLE = 375***
216
101
127 126
192
130 131 132 133 134 135 136 137
128
187
191
190
189
102
138
193
194
139 140 141 142 143 144
103
104
145
195
146
218
147
105
148
120
125
149
106
196 150 0 1 151
230
152
123
109
160
116
110
185
210
115
184
114
113
112
111
228
209
182
181
180 179 178 177 176 175
208
207
174
206
205
204
166
201
165 5
221
202
203
227
222
TOTALS LOWER BOWL LOGE SUITE UPPER BOWL
162 164 4
173 172 171 170 169 168 167
7,164 SEATS 1,508 SEATS 768 SEATS 6,650 SEATS
TOTAL SEATS = 16,000
225
224
223
220 199
161 163
183
198
158 159
186
198
156 157
121
219
155
108
117
197
153 154
118
122 229
107
119
226
SECTION |
215
217
212
SEAT COUNT
214
SUITE
LOGE SECTION |
211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230
213
57
HOCKEY: LOWER BOWL
UPPER BOWL
SECTION |
SECTION |
SEAT COUNT
101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 120 121 122 123
218 357 504 357 246 278 264 300 281 278 246 357 552 357 218 N/A N/A N/A N/A N/A
211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230
213
N/A N/A 280 332 332 280 218 219 451 451 219 218 280 332 332 280 N/A N/A N/A N/A
188
211
129
101
127 126
SEAT COUNT
130 - 145 146 - 149 150 151 - 154 155 - 156 157 - 160 161 162 - 165 166 - 181
58
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
14 8 4 8 10 8 4 8 14
SECTION | 189 - 208
SEAT COUNT 40 (each)
***FLOOR SEATS NOT AVAILABLE***
102
138
193
194
139 140 141 142 143 144
103
104
145
195
146
218
147
105
148
120
125
149
106
196 150 0 1 151
230
152
123
107
109
121
160
116
110
185
210
115
184
114
113
112
111
228
209
182
181
180 179 178 177 176 175
208
207
174
206
205
204
201
166
165 5
221
202
203
227
222
TOTALS LOWER BOWL LOGE SUITE UPPER BOWL
162 164 4
173 172 171 170 169 168 167
3,901 SEATS 1,368 SEATS 608 SEATS 4,874 SEATS
TOTAL SEATS = 10,751
225
224
223
220 199
161 163
183
198
158 159
186
198
156 157
229
219
155
108
122
197
153 154
SUITE
LOGE
216
192
130 131 132 133 134 135 136 137
128
187
191
190
189
226
SECTION |
215
217
212
SEAT COUNT
214
59
CONCERT: LOWER BOWL
UPPER BOWL
SECTION |
SECTION |
101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 120 121 122 123
SEAT COUNT 218 357 504 357 246 278 264 300 281 278 246 357 552 357 218 N/A N/A N/A N/A N/A
211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230
213
N/A N/A 280 332 332 280 218 219 451 451 219 218 280 332 332 280 N/A N/A N/A N/A
215
216 217
212
SEAT COUNT
214
188
211
129
101
127 126
192
130 131 132 133 134 135 136 137
128
187
191
190
189
102
138
193
194
139 140 141 142 143 144
103
104
105
148
230
130 - 145 146 - 149 150 151 - 154 155 - 156 157 - 160 161 162 - 165 166 - 181
60
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
14 8 4 8 10 8 4 8 14
SECTION | 189 - 208
SEAT COUNT 40 (each)
***FLOOR SEATS AVAILABLE = 1,570***
150 0
152
123
107
109
121
160
116
110
185
210
115
184
114
113
112
111
228
209
182
181
180 179 178 177 176 175
208
207
174
206
205
204
201
166
165 5
221
202
203
222
TOTALS LOWER BOWL LOGE SUITE UPPER BOWL
162 164 4
173 172 171 170 169 168 167
5,991 SEATS 1,368 SEATS 608 SEATS 4,874 SEATS
TOTAL SEATS = 12,841
225
224
223
220 199
161 163
183
198
158 159
186
198
156 157
229
219
155
108
122
197
153 154
SUITE SEAT COUNT
218 196
1 151
226
SECTION |
149
106
227
LOGE
195
146
147
120
125
145
61
06
A SUSTAINABLE FUTURE NOT TO SCALE
Sports facilities leave some of the largest carbon footprints in buildings today. Our goal is to create an arena that can actually give back to the environment rather than take away from it. We want to establish a precedent in professional sports arena design by achieving a United States Green Building Council LEED Silver accreditation for our projects. The Target Center is no exception. The New Target Center Arena has several features that help eliminate its carbon footprint and creates a better environment for the City of Minneapolis. One of these features are solar panels located on WKH URRI WKHVH SDQHOV ZLOO KHOS RIIVHW VRPH RI WKH HOHFWULcal cost of the arena and therefore use less coal. Along with this, we will use power from the St. Anthony Falls dam to help offset these electrical costs as well. We will also implement a water collection system that harvests rain water for use in toilets throughout the arena. The New Target Center Arena will not only set the standard in architectural design but from an environmental design standpoint as well.
existing sidewalk
bike lane
westbound traffic
eastbound traffic
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
PED. landscape
(PRACTICE FACILITY)
- 15'
+
pedestrian
(TARGET CENTER)
- 5'
+
- 19'
+
- 19'
+
complete streets 62
bike lane - 5'
+
- 8'
+
- 3'
+
- 8'
+
LEED CERTIFICATION LEED v4 for BD+C: New Construction and Major Renovation Project Checklist Y
?
Target Center 05-04-2015
N Credit
Integrative Process
26 0
6 Location and Transportation
10
6
1 4
LEED for Neighborhood Development Location
16
Y
1
Credit
Sensitive Land Protection
1
Y
2
Credit
High Priority Site
2
5
5
Credit
Surrounding Density and Diverse Uses
5
2
Credit
5
Credit
Access to Quality Transit
5
1
Credit
Bicycle Facilities
1
1
Credit
Reduced Parking Footprint
1
1
Credit
Green Vehicles
1
2 2
0
2 Sustainable Sites
Storage and Collection of Recyclables
Required
Prereq
Construction and Demolition Waste Management Planning
Required
Credit
Building Life-Cycle Impact Reduction Building Product Disclosure and Optimization - Environmental Product Declarations Building Product Disclosure and Optimization - Sourcing of Raw Materials
5
Building Product Disclosure and Optimization - Material Ingredients Construction and Demolition Waste Management
2
Credit Credit
0
13
Prereq
Credit
2
11 8
0
9 Materials and Resources
16
Credit
5 Indoor Environmental Quality
10
Y
Prereq
2 2 2
16
Minimum Indoor Air Quality Performance
Required
Y
Prereq
Construction Activity Pollution Prevention
Required
Y
Prereq
Environmental Tobacco Smoke Control
Required
1
Credit
Site Assessment
1
2
Credit
Enhanced Indoor Air Quality Strategies
2
Credit
Site Development - Protect or Restore Habitat
2
Credit
Low-Emitting Materials
3
1
Credit
Open Space
1
1
Credit
1
3
Credit
Rainwater Management
3
2
Credit
Construction Indoor Air Quality Management Plan Indoor Air Quality Assessment
2
Credit
Heat Island Reduction
2
1
Credit
Thermal Comfort
1
1
Credit
Light Pollution Reduction
1
Credit
Interior Lighting
2
3
Credit
Daylight
3
11
1
Credit
Quality Views
1
1
Credit
Acoustic Performance
1
2
7
0
4 Water Efficiency
Y
Prereq
Outdoor Water Use Reduction
Required
Y
Prereq
Indoor Water Use Reduction
Required
Y
Prereq Credit
Building-Level Water Metering Outdoor Water Use Reduction
Required
2 3
Credit
Indoor Water Use Reduction
6
1
1
Credit
Cooling Tower Water Use
2
Credit
Water Metering
1
13 0 20 Energy and Atmosphere
2
1
0
1
0
0
2
0 Innovation
2
3 1
3
6
Credit
Innovation
5
Credit
LEED Accredited Professional
1
4 Regional Priority
4
1
Credit
Regional Priority: Specific Credit
1
33
1
Credit
Regional Priority: Specific Credit
1
Y
Prereq
Fundamental Commissioning and Verification
Required
1
Credit
Regional Priority: Specific Credit
1
Y
Prereq
Minimum Energy Performance
Required
1
Credit
Regional Priority: Specific Credit
1
Y
Prereq
Building-Level Energy Metering
Required Required
Prereq
Fundamental Refrigerant Management
6
Credit
Enhanced Commissioning
6
11
Credit
Optimize Energy Performance
18
1
Credit
Advanced Energy Metering
1
2
Credit
Demand Response
2
3
Credit
Renewable Energy Production
3
1
Credit
Enhanced Refrigerant Management
1
2
Credit
Green Power and Carbon Offsets
2
Y 7
70
0
50 TOTALS
Possible Points:
110
Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110
63
hvac air movement
AHU
press level PRESS LEVEL
VAV
64
Minnesota timberwolves + minnesota lynx UNIVERSITY OF KANSAS SADP
added greenery on site solar panels for harvesting sunlight as well as providing natural daylighting rain and melted snow water can be reused as part of the buildings potable water excess water can be stored on site in a large cistern potable water can be used in the locker room showers as well rainwater can be harvested and used for many purposes throughout the building melted snow water can also be repurposed and distributed throughout the building for use
65
07
COST analysis
ESTIMATED RANGE OF SYSTEMS COST $200.00 $190
$180.00 $160.00 $140.00
$ $143.40
$120.00 COST / SF
When it comes to getting more bank for your buck, MTAD will be able to provide the highest quality of service to the New Target Center Arena design at the lowest cost possible. We have estimated the costs of the arena consulting with the top contractors in the country. We were able to use their resources to provide an accurate cost estimate with contingency included (for any unforeseen costs that may occur). We estimate that the New Target Center arena will be complete in fall 2018, ready for the Timberwolves’ 2018-2019 season. Demolition of the existing Target Center will occur in May 2015 and be complete in June 2015. After this point foundations will be laid and the bulk of the construction will begin.
$110
$100.00 $91 $80.96 $76 $62.13
UNIVERSITY OF KANSAS SADP
minnesota lynx
$54
$ $47
$40.00 $33
$34
$35.74
$20.00
$37
$22.38
$22
$14 $20
$22
$9.33 $4
$10 STRUCTURE
$ $29
$ $32
$28 98 $28.98
SITE WORK
Minnesota timberwolves
$7041
$60.00
$0.00
66
$90
$80.00
ENCLOSURE
ROOFING AND SHEET METAL
$11 $5
FINISHES
SPECIALITIES AND EQUIPMENT
$22.96
$17.90 $8.43
ELEVATORS
MECH/ PLUMB /FP
ELECT/ AV
pricing analysis provided by jedunn
$13
$12
SCOREBOARD
FOOD SERVICE
= average
budget: project COST proposal 1) Project Hard Costs
2) Project Soft Costs
Site.................................................................$12,983,040
Specalities & Equipment........................$14,616,000
Demo............................................................$6,000,000
Elevators......................................................$4,032,000
Structure......................................................$82,414,080
Scoreboard.................................................$9,072,000
Enclosure.....................................................$20,321,280
Food Service..............................................$11,592,000
Roof/ Sheet Metal.....................................$5,080,320
Architect Fee.............................................$16,237,267
Finishes........................................................$45,158,400
Basic Project Cost Breakdown
SOFT COST TOTAL $55,543,267
17% 7%
76%
Mech. & Plumbing...................................$34,997,760 Elect. / AV....................................................$39,513,600 Project Hard Cost Total.........................$246,468,480
Construction Contingency (7%) $246,468,480
X
7%
=
$17,252,793
SUBTOTAL CONSTRUCTION COST $263,721,273
3) Total Project Cost 1 (Project Hard Costs) + 2 (Project Soft Costs) = 3 (Total Project Cost)
HARD COSTS SOFT COSTS
TOTAL PROJECT COST $319,270,540
PROJECT GMP $325,000,000
CONTINGENCY
67
budget: project fee proposal Budget (SF X Cost/SF)............................504,000 SF@ $523/SF = $263,592,000
68
ARCHITECTS FEE 7% 5.5% X $263,592,000
=
$16,237,267
A/E Fees:
SD (15%)
DD (25%)
CD (40%)
BN (5%)
CA(15%)
TOTALS
Architect/ Interiors.......50%
$1,217,795
$2,029,658
$3,247,454
$405,931
$1,217,795
$8,118,633
Struct/ Civil.....................20%
$487,118
$811,863
$1,298,981
$162,372
$487,118
$3,247,452
Landscape.......................4%
$97,423
$162,373
$259,796
$32,474
$97,423
$649,489
Mech/Plumbing............8%
$194,847
$324,745
$519,592
$64,949
$194,847
$1,298,980
Electrical..........................6%
$146,137
$243,559
$389,697
$48,713
$146,137
$974,244
Acoustic...........................4%
$97,423
$162,373
$259,796
$32,474
$97,423
$649,489
Misc/ Other....................8% Consultants
$194,847
$324,745
$519,592
$64,949
$194,847
$1,298,980
TOTALS
$2,4351,590
$4,059,316
$6,494,908
$811,863
$2,4351,590
$16,237,267
Minnesota timberwolves UNIVERSITY OF KANSAS SADP
minnesota lynx
PRIMARY PROJECT SCOPE
DESIGN & CONSTRUCTION INTEGRATION
CONSTRUCTION SCHEDULE
2015
2016
J
APRIL M
J
A
S
0
N
D
J
2017
F
M
A
M
J
J
S
A
0
N
J
D
F
M
A
M
J
J
A
PROJECT MEETINGS STATE / TIMBERWOLVES REVIEW SAFETY & QUALITY CONTROL
Implament Sittet Safety Plan NOSA Compliant
BIM & MODELS
DEMO
>>>>>>>>>>> >> >
>>>
STRUCTURE COOORDINATION >> >>>>>>>>>>> > >>>>>>>>>>>> > >>>>>>>>> MEPP CCORDINATIONN >>>>>>>>>>>>>>>>>>>>>>> > >>>>>>>>>>>>>>>>>>> > AS - BU B ILT MODEL UPPD PDA DATES >>>>>> >>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>> > >>>>>>>>>>>>>>>>>>> >
DIGGITTAL MOCKUPSS
MODEL TURRNO R OVER
EARTHWORK AR & SITEE/ UTILITIES
TARGEET CENTER
ARENA | PROJECT WEST
STRUCTURE URR
FOUNDATIONS FO O
ARENA | PROJECT EAST
SKIN
STRUCTURE
FFOUNDATIONNS
INTTTERIOR ROUGGH GH - IN
SKIN
FINISHESS
INNTERIOR ROUGHH - IN
FINISHES
PROJECT MANAGEMENT
WORKSHOPS BUILDING & SCHEDULE FORECAST & REPORT FF&E & MOVE MANAGEMENT TURNOVER & OPS PLAN
TIMBERWOLVES ACTIVITIES
GMP ESSTIMATE
$
SOFT COSTT CCORDINATIONN >>>>>>>>>>>>
$
F NNALIZE SOFT CO FIN COOSTS
FAAC ACILITY OPERATTIOONS EXPECTATTIO T OONS
Womeens Baskkeetball Reegular Se Season e
F & E RELEASEED FF
>>>>>> >> > >>>>
MOVE PLAN
OWNER MOVE INN OW
ESTABLISH CX C PLAN >>>>
COMMISSIOON ONNING PLAN >>>>>
Mens Basketbal M a ll Regulaarr Seasonn
CLOSEOUT LOO DELIVVERRABLE MATRIXX
ONGGO GOOING START UP AAND CX >>>>>
Womens e Baskkeeetball Re Regular Se Season e
PUNCH PROCESS
>>>>>>> >>>>>>>>>> > OOWNER TRAININNG N
Mens Baasketballll Regulaarr Seasonn M
POST CONSTRUCTIOON ON SUPPORT
Wom mens Reggular Season a
69
thank you for your consideration
Minnesota timberwolves UNIVERSITY OF KANSAS SADP
minnesota lynx