Architectural and Design Project Management report

Page 1

BE 1200

RE- PURPOSING OF STEPHENSON WORKS BUILDING

MANAGEMENT PORTFOLIO

SANDRA ABABIO-DANSO w12032331

BA INTERIOR ARCHITECTURE 2014/2015 NORTHUMBRIA UNIVERSITY

page1


0

STRATEGIC DEFINITION

3 - 14

1

PREPARATION AND BRIEF

15 - 27

2

CONCEPT DESIGN

28 - 37

3

DEVELOPED DESIGN

38 - 43

4

TECHNICAL DESIGN

44 - 50

REFERENCE

51 - 53 2


LETTER OF APPOINTMENT AND CONDITIONS OF AGREEMENTS 3


[From the Designer] Sandra Ababio-Danso Danso and Associates 4c Bridge View House NE1 6PN Newcastle upon Tyne [To the Client] Nikon Corporations EN1 4UJ London 9 October 2014 Dear Nikon Corporations [Stephenson Works] at [20 South Street] Thank you for inviting me to act as a Designer for the Project. This letter sets out the basis on which I have agreed with you to provide interior architecture services. Subject to you having read through this letter and the enclosures I would be pleased if you would sign and return the attached copy in order to confirm your acceptance of the terms and conditions of my agreement with you. Subject to receiving your signed copy I will date and countersign that copy and return it to you. My contract of appointment with you is made based on this letter and the BIID CID/14 Conditions of Agreements which are enclosed along with the attachments which together constitute the agreement. I will provide the following services in regard to the Project: Design a facility for the task of re-purposing and the creative reuse within the historic Stephenson Works building. Further details of the Project, my proposals and services are included in the attachments to this letter. We have agreed that you wish me to undertake building works in regard to the Project as a principal in accordance with Annex A of the conditions and to procure FF&E as a principal in accordance with Annex B of the Conditions. In regard to fees and expenses we have agreed as follows: That fees will be paid at the completion of work stages However stages AB Inception and feasibility will be carried out on a time charged basis of ÂŁ60.00 an hour. Works Stage C D E FG HJKL

Outline Proposals Scheme Design Detail Scheme Production Information Tendering, Planning and Operations on site

Proportion of Fee % 10-15 15-20 20 20-35

4


Where applicable VAT will be charged on the interior architects’ fees and expenses, at the appropriate current rate and subject to the usual statutory criteria, at the time of invoicing. In regard to other appointments for the Project, the details are as follows: Structural Engineer, Quantity Surveyor, Services Engineer (Mechanical and Electrical Services), CDM Coordinator (Health and Safety Advisor), Nikon Corporations Legal Advisers. Your representative for all matters arising in connection with our agreement will be you and/or: Michelle Young Head of Development,UK Nikon Corporations The law applicable to the argument shall be English Law. We have agreed that, as referred to in clause 8.1 in the Conditions, no action or proceedings against me arising out of or in connection with our agreement shall be commenced after the period of 3 years from the completion of the Project or of the Services, whichever is the earlier. The same period shall apply in relation to my obligation to maintain professional indemnity insurance(PII) in accordance with clause 9 of the Conditions. Also, we have agreed that the limit of our liability and the amount of professional indemnity insurance to be provided in connection with this Agreement (as referred to in clause 8.2.1) shall be the amount of £250,000. If a dispute or difference arising out of or in connection with our agreement is to be referred to an adjudicator as provided for in clause 11.2 of the Conditions, the adjudicator shall be nominated by the Construction Industry Council. I am required to inform you that as a member of BIID I am subject to their Code of Conduct in relation to complaints of unacceptable professional conduct or serious professional incompetence. You will have a license to copy and use drawings, documents for the purposes of construction of the project, and for its operation, maintenance, repair, alteration and/or sale. We retain the copyright of the original work. It cannot be used for reproduction of the design and/or for any other project except with our agreement and on payment of a license fee. I look forward to working with you on your Project. Yours sincerely. Signed Sandra Ababio-Danso Date: 25 / 09 /2014 For and on behalf of Danso and Associates

5


Agreement Client:

Nikon Corporations -UK

I/WE Michelle Young Signed: Michelle young

(please print name) agree to the above Terms of Appointment. dated:

27 / 09 / 2014

On behalf of Nikon Corporations - UK Interior Architect: Signed: Sandra Danso

dated: 25 / 09 / 2014

On behalf of Danso& Associates

6


CONDITIONS OF AGREEMENT 1. DEFINITIONS AND INTERPRETATION 1.1 Definitions The defined terms in these Conditions shall have the meanings set out below: AGREEMENT The agreement between the Client and the Designer consisting of the Letter, these Conditions and any associated documentation which is identified in the Letter and the Letter all take precedence in the event of any conflict wit the Conditions. BUILDING WORKS Any construction, repair or maintenance works in regard to the Project including but not limited to work for special staircases, fire surrounds, wall panelling, joinery, fittings, bathrooms, kitchens, utility rooms, selection and specification or electrical and light fittings, appliances and sanitary ware. CDM REGULATIONS The Construction (Design and Management) Regulations 2007 FF&E Furniture, fittings and equipment, including loose furniture, curtains, carpets, fixtures, materials, etc designed and/or specified by the Designer or others Letter The Letter of Appointment setting out the basis of the Agreement. PROJECT THE project which the Agreement relates as identified in the Letter. PROJECT COST The total cost of the Project including any construction, repair or maintenance works and decoration works of any kind, together with the retail price of the supply, delivery and installation of any FF&E as determined by Initially a fair and reasonable amount estimated by the Designer B. subsequently when available the latest professionally prepared estimate or the lowest acceptable tender(s)/ quotation (s) as applicable C. Subsequently when available the final cost. The Project Cost shall include (without limitation): Any contingency or design reserve cost allowance. b. The cost as if new of any equipment and/or materials provided or to be provided by the Client to a contractor for installation during construction of the Project

7


c. Any direct works carried out by or on behalf of the Client d. Reasonable provision for contractors profit and overheads But excludes: Value Added Tax (VAT) b. Fees c. The cost of resolution of any dispute d. The Client’s legal and in-house expenses e. Any loss and/or expense payments paid to a contractor f. An adjustment for liquidated damages deducted by the Client SITE/PREMISES Services The services to be undertaken by the Designer and which are identified in the Letter and this term shall include any variation to those services agreed in accordance with the Agreement. 1.2 The headings to theses Conditions are for convenience only and do not affect interpretation. Words denoting natural persons nuclide corporations and firms and vice versa. 1.3 Any notice or other documents required under the Agreement shall be in writing and given or served by any effective means to the stress of the recipient specified in the letter or such other address notified to the other party in writing 1.4 Communications between the Client and the Designer that are not such notices or documents may be sent to any other address, including an email address, notified by the other party as an appropriate address for specific communications. Communications take effect on receipt, but if not in writing are of no effect unless and until conformed in writing by the sender or the other party. 1.5 Communications sent by special delivery or recorded delivery all be deemed (subject to proof to the contrary) to have arrived at the appropriate address on the second working day after posting. 1.6 Where under the Agreement an action is required within a period of days from a specified date, that period commences immediately after that date. The period shall include Saturdays and Sundays but shall exclude any day hat is a public holiday 1.7 The Agreement is subject to the law and the parties submit to the exclusive jurisdiction of the courts of England and Wales(or Northern Ireland or Scotland if so specified in the Letter)

8


2. GENERAL Mutual al obligations to provide advice 2.1 The Client and the Designer shall each promptly advise the other upon becoming aware of: 2.1.1 a need to vary the Services, any Project timetable or any part of the agreement 2.1.2 Incompatibility in or between any of the Clients’ requirements for the Project; or between such information and any Clients’ instruction, any Project budget or timetable and/or the approved design; and the parties shall seek to agree how to deal with the matter CMD Regulations 2.2 The Client and the Designer shall comply with their respective obligations under the CDM Regulations, as may be applicable to the Project. Photographs and information about the Project 2.3 Designer shall have the right to the and publish photographs of the Project and the Client shall give reasonable access to the Project for this purpose. the Designer shall obtain the consent of the Client (not to be unreasonably withheld or delayed) before publications of any other information about the Project unless reasonably necessary for the performance of the Services.

3. OBLIGATIONS AND AUTHORITY OF THE DESIGNER 3.1

the Designer shall: 3.1.1 in performing the Services and discharging all obligations excrete reasonable skill, care and diligence in accordance with the normal standards of the Designer’s profession. 3.2.2 keep the Client informed of progress and of any issue that may materially affect any timetable for or the cost of or quality of the Project 3.1.3 collaborate with others engaged in relation to the Project 3.1.4 not make any material alteration to or addition to or commission rom the approved design without the Client’s prior approval. Limitations of warranty 3.2 the Designer does not warrant:

9


3.2.1 that the Project or the Services will be completed in accordance with any timetable or budget 3.2.2 the performance, work or products of other persons engaged on connection with the Project, except in connection with those others (if any) in regard to which the Designer is acting as principal 3.2.3 the solvency or competence of any other person engaged in connection with the Project 3.2.4 that approvals from third parties will be granted 3.2.5 the accuracy of any surveys made by the Designer

4. OBLIGATIONS AND AUTHORITY OF THE CLIENT 4.1 the Client shall provide for the Designer to rely upon, free of charge, accurate and reliable information relating to the project which is necessary for the proper and timely performance pf the Services 4.2 the Client shall be responsible for (including for all costs and expenses) any applications for consents under planning legislation, building Acts, regulations or other statutory requirements and by any other party relevant to the Project 4.3 the Client shall: 4.3.1 Give decisions and approvals as necessary for the proper and timely performance of the Services 4.3.2 Advise the Designer of the relative priorities of any stated requirements or brief, any Project budget or timetable 4.4 Designer shall comply with the Client’s instructions, subject to the Designer’s right of reasonable objection 4.5 the Client, in respect of any work or services in connection with the Project performed by any person other than the Designer (e.g. other consultants, contractors), shall hold such persons and not the Designer responsible for the competence and performance of there works and services including for the management and operational methods in connection with the carrying out and completion of work and services undertaken by such persons and for compliance with health and safety requirements

10


5. ASSIGNMENT AND SUB-CONTRACTING neither the Designer not he Client shall assign or sub-contract the whole or any part of the Agreement without the prior written consent of the other which consent shallot be unreasonably withheld or delayed

6. FEES AND PAYMENT 6.1 fess and other payments for the Services shall be calculated, charged and paid as set out in the Letter. VAT shall be payable on all sums due to the Designer at the applicable rate. percentage fees 6.2 where percentage fees apply, the fee shall be calculated by applying the percentage stated in the Letter in the Project Cost. If the Client instructs an alteration to his/her requirements and/or any brief urging the performance of the Services, the percentage fee up to date of the instruction shall be calculated on the basis that the current professionally prepared estimate of the Project Cost at the lowest acceptable tender (whichever is later) is based on the requirements of brief prior to the instructions shall be charged on a time charge basis. Lump sums 6.3 Where a lump sum fee applies then the sum(s) set out in the Letter shall apply and shall be adjusted on a time charge basis in accordance with theses conditions if changes are made to the Client’s requirements or any brief and/or the approved design and/or any Project timetable Time charges 6.4 Where a time based fee applies it shall be ascertained by multiplying the time spent in the performance of the Services by the relevant hourly rates set to in Letter. Fee adjustment 6.5 The Designer shall be entitled to additional fees: 6.5.1 Based on due allowance (including for any loss and/or expense) if : 6.5.1.1 Material changes are made to the previously agreed Client’s requirements or brief and/or budget or timetable for the Project and or 6.5.1.2 The Services are varied by argument including where for any reason only part of the previously agreed Services are to be provided 6.5.2 Calculated on a time change basis, as per clause 6.4 (unless another basis for payment is agreed), where the Designer for reasons beyond the Designer’s control incurs extra work or loss and expense for which the Designer would not otherwise be fully remunerated. Matters in relation to which the Designer shall be entitled to additional fees include but are not limited to circumstances where:

11


6.5.2.1 The Designer is required to vary any item of design work commenced or completed pursuant to the Agreement or to provide a new design after the Client has authorised the Designer to develop an approved design 6.5.2.2 Performance of the Services is delayed, disrupted or prolonged 6.5.2.3 The cost of any work, installation or equipment, for which the Designer performs design Services, is omitted from or not included in the budget for the Project 6.5.2.4 The Designer performs services in connection with any work, installation or equipment which re not executed under the direction of or by the Designer Expenses and disbursements 6.6 The Client shall reimburse the Designer for reasonably incurred expenses and disbursements at net cost plus any handling charge, unless otherwise stated in the Letter. Payment 6.7 Payments shall become due on the date of issue of the DESIGNER’S ACCOUNT’s. The final date for payment of sums due by the Client shall be 28 days after the date of issue of an account. The Designer’s accounts all be issued at intervals as set out in the Letter or, if not provided for, of not less than one month and shall include any additional amounts due and the basis of calculation. Account instalments shall be calculated on the percentage of completion of the work stage and/or other Services or such other method specified in the letter. Payment notices 6.8 The Client shall give a written notice to the Designer: 6.8.1 Within 5 days of the date of issue of an account specifying the amount Client proposes to pay and the basis of calculation of that amount; and 6.8.2 Not later than 5 days before the final date for payment of any amount due to the Designer if the Client intends to withhold payment of any part of that amount stating the amount proposed to be withheld and the ground for doing so or, if there is more than one ground, each ground and the amount attributes to it. If no such notices are given the amount due shall be the amount stated as due in the account. The Client shall not delay payment of any undisputed part of the account. Set off 6.9 The Client shall not withhold any amount due to the Designer under the Agreement unless the amount has been agreed with the Designer or has been decided by any tribunal to which the matter is referred as not being due to the Designer. All rights of set-off at common law or in equity which the Client would otherwise be entitled to exercise are expressly excluded

12


Late payment 6.10 In the event that any amounts under the Agreement are not paid when properly due, the payee shall be entitled to simple interest on such amounts until the date that payment is received at the daily equivalent to 8% over the dealing rate of the Bank of England Rate current at the date that payments becomes overdue, together with such costs reasonably incurred and dully mitigated by the payee (including costs of time spent by principals, employees and advisors) in obtaining payment of any sums due under the Agreement Recovery of costs 6.11 The Client or the Dsigner shall pay to the other party who successfully pursues, lists or detained by claim or part of a claim brought by the other such costs reasonably incurred and duty mitigated including costs of time spent by principals, employees and advisors Payment on suspension or determination 6.12 If the Designer or the Client suspends performance of any or all the Services or terminates performance of the Services and/or other obligations, the Designer shall be entitled to: 6.12.1 Payment of any part of the fee for the Project and other amounts properly due on the expiry date of the notice; and 6.12.2 Reimbursements of any loss and/or expense properly and necessarily incurred by the Designer by reason of the material or persistent breach of the Agreement by the Designer. 6.13 If the reason for suspension is remedied, the Designer shall be entitled to reimbursement of the reasonable costs of resumption of performance of the Services and other obligations on a time charge basis

7 INTELLECTUAL PROPERTY; USE OF INFORMATION 7.1 The Designer shall own al intellectual property rights including copyright in the drawing all other works produced in the performance of the Services and generally asserts the Designer’s moral rights and all other rights to be identified as the author of such work 7.2 The Client shall have a license to copy and use and allow others providing services to the Project to copy and use drawings, documents, bespoke software and all other such work produced by or on behalf of the Designer in performing the Services (the ‘Material’) but only for purposes related to the Project 7.3 Such purposes shall include the operation, maintenance, repair, reinstatement, alteration, extending, promotion, leasing and or/sale of the Project but shall exclude the reproduction of the Designer’s design for any part of any extension of the Preheat and/or for any other project, unless a license fee in respect of any identified part of the Designer’s deign is agreed 7.4 The Designer shall not be liable if the Material is modified other than by or with the consent of the Designer or used for any purpose other than the purposes for which it was prepared

13


7.5 If at any time the Client is in default of payment of any fees or other amounts properly due, the Designer may suspend further use of the license on giving 7 days’ notice of the intention of doing so. Use of the license may be resumed on receipt of such outstanding amounts

8 LIABILITIES AND INSURANCE Time limit for action or proceedings 8.1 No action or proceedings arising out of or in connection with the Agreement, whether in contract, tort, statutory duty or otherwise, shall be connected after period specified in the Letter or, if earlier, the day of practical completion of the Project or such earlier date as prescribed by law. Limit of liability 8.2 In any such action or proceedings: 8.2.1 The Designer’s liability for loss or damage shall not exceed the lesser of the limit of liability specified in the Letter or the amount of the Designer’s professional indemnity insurance. The Designer shall not in any event be liable for any indirect or consequential loss or expense incurred as a result of any alleged breach by the Designer.

14


FEASIBILITY : OVERVIEW This report informs the client how the Interior Architect plans to work I.e.. how the re-purposing will be prepared, agreed and implemented

15


PROJECT INTRODUCTION Project:

Re purposing of the Grade II Stephenson Works building into a creative space geared toward traditional photography.

Client:

Nikon Corporation

Statement of Need: Nikon Corporations is one of the world’s leading developers and manufacturers of cameras, photography equipment and accessories. Its UK division wishes to have a facility that will function as a traditional photographic darkroom and studio. It will serve both professional and amateurs and function as an educational facility to those interested in the art of traditional photography

16


RIBA PLAN OF WORKS This report is based on the RIBA Plan of Work: Multi -Disciplinary Services 2007. The full plan of woks does not fit my project of working in an existing building thus it has been amended to fit the project. However the Plan of Works that were included has been followed closely to ensure that the design will mesh with the other participants of this project.

CLIENT’S STRATEGIC BRIEF ‘Design a facility for the task of re purposing and creative reuse within the Historic Stephenson Works building. The nature of the re purposing facility should be individually defined as part of the design development process and should be supported by research. Establish a coherent design philosophy that drives your approach and language. This space will act as a centre for traditional photography and will provide place for people to meet, work, share and learn. Equally, your scheme will be open to the public and will offer opportunities to support the learning of traditiional photography or provide job skills training program, to give discarded items a new life guided by designers and crafts people. It should operate day and night and the nature of its operation should transform accordingly. It will need to provide food and drink and should cater for quick, casual use, prolonged stay as well as events. Your proposal could look at alternative ways of providing the required provision, could be mixed programme and could add additional features which may relate to a specific group. You should consider the following accommodation schedule… Entrance reception Workshops/studios Retail Education + multi-purpose spaces Event/exhibition/gallery space Toilets Staff area/office Eatery/café/bar

17


PROPOSED SCOPE OF SERVICE This is to explain to the client the procedures that the Interior Architect will follow for the scheme. This proposed scope

INFORMATION COLLECTION The first step will be to assemble key information about the existing building/ site including: 1 measured drawings and photographic survey of building/site 2 any original building contract documents that may exist with key drawings being digitised 3 any building or services surveys that have been carried out since the buildings completion. ASSEMBLE DESIGN TEAM Advice on the following should be sought: 1 cost and time estimating [quantity surveyor] 2 architectural design of any major proposed building alterations or new extensions [ Danso and Associates]

Client’s Requirements (RIBA Work Stages AB) Having assembled the design team, the next step will be to define Nikon’s requirements by doing the following: 1 identify and evaluate possible existing building(s) 2 compile a list of spaces to accommodate the required functions and prepare a room schedule 3 interview key staff to determine precise requirements for each space and prepare room requirements schedules 4 analyse desired adjacencies and prepare a space relationship diagram 5 prepare a planning diagram based on the space relationship diagram 6 provide the planning diagram to the quantity surveyor for the approximation of cost and time 7 assist Nikon to determine priorities in the light of the approximated costings and amend floor plans as necessary, perhaps with phasing 8 advise Nikon on alternative refurbishment and FF&E procurement strategies 9 prepare a creative spatial strategy illustrating the general design approach

3 health and safety advice 4 Listed Building consultant

IMPLEMENTATION

5 mechanical and electrical services engineer

Having determined the clients requirements, the next steps will be to determine the appropriateness of the existing building and prepare designs:

and advice may need to be sought regarding: 6 sustainability adviser 7 fire engineer 8 an analysis of existing building mechanical and electrical systems 9 service providers 10 planning consultant 11 legal advisers

Design Stage (RIBA Work Stages CDE) 1 analyse Nikon’s requirement and prepare a design showing the layout of the various spaces and preliminary schedules of materials and FF&E 2 provide information to discuss proposals with, and incorporate input of, other consultants 3 provide information to the quantity surveyor to prepare preliminary cost and time estimates

18


Pre-Construction Stage (RIBA Work Stages FGH)

5 procure manufactured items of FF&E on a pro forma basis on behalf of Nikon, and monitor the fabrication of bespoke FF&E items

1 hold discussions with the relevant statutory authorities and make any necessary applications

6 monitor the delivery and installation of FF&E items

2 prepare technical drawings, specification and contract conditions for the re purposing work showing type of construction, materials and appearance together with technical details 3 obtain quotations from FF&E suppliers and prepare a costed schedule of FF&E suppliers and prepare a costed schedule of FF&E; prepare designs for any bespoke items 4 provide information to discuss proposals with, and incorporate input of, other consultants

7 carry out a final inspection, monitoring the remedying of defects 8 provide information to the quantity surveyor to prepare final account 9 assist Nikon to acquire and install photography

Use Stage (RIBA Work Stage L)

1 monitor the refurbishments performance

5 provide information to the quantity surveyor to prepare detailed cost and time estimates 6 agree the form of refurbishment contract with Nikon 7 if seeking tenders, advise on and obtain Nikon’s approval to a list of tenderers for the refurbishment contract 8 provide information to the quantity surveyor to prepare a work schedule in order to obtain competitive tenders or agree a negotiated price ( depending on the procurement route chosen) for the refurbishment contract and to prepare a pre -tender estimate. 9 invite and obtain tenders for the refurbishment contract and submit them to Nikon 10 upon acceptance of a tender, prepare construction documentation for execution

Construction Stage (RIBA Work Stages JK) 1 provide to the contractor any further technical information required 2 administer the terms of the refurbishment contract 3 visit the works to monitor the progress and overall quality of the works and conduct periodic site meetings with the contractor to review progress 4 issue to the refurbishment contractor payment certificates based on the quantity surveyor’s periodic

19


FEASIBILITY : CONSULTANTS & SURVEYS Advice the Client on the need for other consultants’ services and involve them as necessary

20


ACCOMMODATION SCHEDULE Below is an outline of the building schedule based on the clients project requirement. Schedule was created from feedback from interviewing key staff, professional traditional photographers and photography development specialists Entrance reception : should accommodate receptionist or a device which allows visitors/ users to inquire and book darkrooms and studios. 15 m². will have artwork or vintage camera’s reflecting Nikon’s history, products etc Workshop: 60m² open space for repairing cameras, restoring old pictures etc. Fire proof, sound proof Photography studios:3 photography studios or varying sizes. 60m², 56m² and 31m². All will include prop room and changing room. Dark rooms: will occupy the existing ground floor offices. 3 darkrooms, one designed for disabled access. Light tight Chemical prep rooms and finishing rooms: combined with darkrooms. 20m² Temperature controlled chemical and equipment storage: 60m². adjacent to darkrooms and plant room. Kept at temperature of 40-50 degree Celsius Education + multi- purpose space: 51m². conference table for 12. Projector/screen. Adjacent to workshop and chemical storage Exhibition/ gallery spaces: existing mezzanine space used. Open gallery Retail area: 70m².intervention will be added to accommodate this. Toilets : 10 m². 1 unisex and disabled toilet on the first floor. Male and female toilets on ground floor. Cleaning closet: 10m². locked Plant room: 8m². for HVAC, boiler, integrated system strategies Staff area/office : existing office spaces on first floor will be retained for office use;open office for permanent staff of 6 and 6 visiting staff. Kitchen 16m². secure staff lockers space. Eatery/cafe 32m². open eating area 60m².

21


Approach to the site from Forth St.

22


Nikon Corporations,UK 1-60 Dowland House EN1 4UJ London 13 December 2014 Dear Ms Young Proposed Re-Purposing and Intervention to Stephenson Works Building Thank you for signing and returning the copies of the Letter of Appointment. I have dated both copies and returned one for your file. Although the vendor’s estate agent prepared floor plans, they are not accurate enough for us to rely on, and so we will need to have measured drawings prepared for us to base our own drawings on. Before we do this, we need to know the precise extent of your ownership. Can you please ask your solicitor to send us a coloured copy of the plan in your title deeds. I would be grateful if he/she could advise if there are any restrictive covenants, easements, rights of light, etc. Over the site and ownership of walls on the boundaries. I will then arrange for three surveyors to provide quotations to carry out this work and then recommend one for you to employ. As the premises share a common wall with two adjacent properties, you may have to obtain advice from a party wall surveyor. If so we will help you arrange this. Having come to a conclusion regarding the brief, it is clear that the appointment of certain consultants should be appointed so that I can proceed in preparing a concept design with the benefit of their advice. I therefore recommend the following consultants: Rowntree & Partners Ltd to carry out cost estimating and to provide periodic valuations of the work as it is being built. W T Parson Associates Ltd to provide structural engineering services for the new extension to the first floor and where we plan to alter the structure of the existing building Treacle Ltd to provide heating, ventilation and electrical engineering services. I have worked with these practices before and believe that they would provide you with a good service. Subject to your agreement, I will ask each of theses practices to contact you with regard to their terms of employment. Yours Sincerely, Sandra Danso Sandra Ababio-Danso

23


PROJECT CONSULTANTS Below are the consultants appointed for this particular scheme with a description of their roles/responsibilities

Interior Architect As lead consultant, the architect’s roles are : - show approximate FF&E layouts on the concept scheme drawings - carry out studies to determine the general design approach, present to, and review with client - receive from client and evaluate initial statement of requirements - advise the client on the need for other consultants’ services and involve them as necessary - obtain from consultants necessary information to aid the creation of time-scale estimates and preliminary cost - outline planning application - advise client of their responsibilities under the CDM Regulations - consult with statutory authorities as necessary

Building Surveyor (measured drawings) Estate agents and English Heritage provide drawings but here are not accurate and extensive enough to inform any design decision. Building surveyor’s role is to provide: - floor plans of the ground floor, first floor . these will include all details of the building fabric with floor levels, ceiling heights, floor to sill and sill to head heights of windows, door heights, beams, all existing electrical and plumbing fittings and radiators. - the front and rear, with all its plantings, ground levels and contour lines at 0.2m intervals - all external elevations of the above property - all internal elevations of all rooms - two longitudinal and one transverse section with all background elevation detail shown - Architraves and other mouldings to be profiled on both plans and sections.

Building Surveyor (listed building) A survey has to be carried out the existing building before works can be carried out. As this is a grade II listed building, a listed building surveyor will be consulted. The listed building surveyor’s role is to provide a full building survey of Stephenson Works which includes (but not limited to) : - comments on all apparent major and minor building defects and their possible implications - results of damp testing on all susceptible floors and walls - damage due to infestation of woodworm, dry and wet rot etc - the condition of damp- proofing, insulation and drainage - technical information on the construction of the property and the materials used - any aspects of the buildings location (e.g. recent flooding, soils etc) that might affect its condition - recommendations for any further inspections that might be necessary

Building Surveyor (party wall) A party wall surveyor’s role is to : - determine if there is a party wall(s) shared with neighbours - determines if the scheme will have effect on the party wall - provides party wall services to satisfy all applicable legal requirements.

Quantity Surveyor Quantity Surveyor provides cost advice. QS responsibility is to: - provide cost estimations - provide periodic valuations of the work as it is builtpreparation of tender documents - analysis of tender - preparation of tender documents for client

24


Structural Engineer The structural engineers role is to provide advice on: - structural engineering services for the new extension of the mezzanine (first floor) , the new retail structure, that also connects to the mezzanine - provide cost advice to the QS

Services Engineer (mechanical and electrical services) services engineer’s role is to : - provide plans showing the location and depth below/ height above ground of all the services in the property - upgrade the services - if no services exist; to provide heating, ventilation and electrical engineering services

Other Consultants As the scheme progresses, more professional opinions might be sought. These are (but not limited to) - Legal Adviser - Planning Consultant - Fire Engineer - Acoustic Engineer - Service Providers - English Heritage trained Conservation Adviser * Project roles adapted from BIID Interior Design book

25


PROJECT REGISTER For reference, a project register containing the names and contact details of people and practices involved in the project should be kept. This is particularly useful to those new to the project and clients *All names and addresses are fictional

CLIENT

STRUCTURAL ENGINEER:

Name: Nikon Corporations-UK

Engineer’s name : W T Parson Associates

Contact: Michelle Young

Engineer’s Address: 112 Delta House NE34 9PO

Address: Nikon Corporations-UK 1-60 Dowland House EN1 4UJ

Project Engineer: Walter Tanoh

PROJECT

SERVICES ENGINEER:

Name: Re-purposing of Stephenson Works Building

Engineer’s Name: Treacle Ltd

Site Address: 20 South Street NE1 3PE

Engineer’s Address: 1 Antin Place NE2 3RT Project Engineer: Mary Ava Treacle

CLIENT’S REQUIREMENTS

QUANTITY SURVEYOR:

Brief: (see brief document)

Surveyor’s Name: Rowntree & Partners

Desired Budget: £600 000

Surveyor’s Address: 27 Kirk Close NE1 6BF

Desired Programme: completed b’fore Christmas 2015 Special Requirements:

Project Surveyor: Mark Atkins

INTERIOR ARCHITECT

PARTY WALL SURVEYORS:

Name: Danso and Associates

Surveyor’s Name: Jardin+Partners

Address: 4C Bridge View House NE1 6PN

Surveyor’s Address: 100 Long Road NE12 7UY

Project Interior Architect: Sandra Ababio-Danso

Project Surveyor: Parr T. Wall

26


SITE REPORT AND CONDITION SCHEDULES Upon formal appointment, the architect visits the site to inspect the areas relevant to the brief. A site report comments on the condition of relevant exterior elements and any neighbouring properties that might affect the proposed works. However, as the scheme deals only with the interior, a site report will not be needed. An extensive building survey will be carried out on the conditions of: - Existing floors - Existing walls - Existing ceilings/roof - Doors (type, size, finish, ironmongery, fire rating, condition etc) - Windows (type, size, finish, ironmongery, glazing, condition etc) - Existing fittings - Existing services (gas, electricity, water, telecommunication and drainage)

27


CONCEPT DESIGN AND ELEMENTAL COSTING 28


DEVELOPED BRIEF Accommodation Schedule

Organisational Structure Ground floor: dark

Entrance reception : should accommodate receptionist or a device which allows visitors/ users to inquire and book darkrooms and studios. 15 m². will have artwork or vintage camera’s reflecting Nikon’s history, products etc

STUDIOS EDUCATIONAL SPACE WORKSHOP

Photography studios:3 photography studios or varying sizes. 60m², 56m² and 31m². All will include prop room and changing room.

Chemical prep rooms and finishing rooms: combined with darkrooms. 20m² Temperature controlled chemical and equipment storage: 60m². adjacent to darkrooms and plant room. kept at temperature of 40-50 degree Celsius

CAFE RECEPTION light front

First floor: quiet

Retail area: 70m².intervention will be added to accommodate this. Toilets : 10 m². 1 unisex and disabled toilet on the first floor. Male and female toilets on ground floor. Cleaning closet: 10m². locked Plant room: 8m². for HVAC, boiler, integrated system strategies Staff area/office : existing office spaces on first floor will be retained for office use;open office for permanent staff of 6 and 6 visiting staff. Staff kitchen 16m². secure staff lockers space.

rear

OFFICES/ STAFF AREA GALLERY

Education + multi- purpose space: 51m². conference table for 12. Projector/screen. Adjacent to workshop and chemical storage Exhibition/ gallery spaces: existing mezzanine space used. Open gallery

DARK ROOMS CHEMICAL STORAGE

Workshop: 60m² open space for repairing cameras, restoring old pictures etc. Fire proof, sound proof

Dark rooms: will occupy the existing ground floor offices. 3 darkrooms, one designed for disabled access. Light tight

rear

RETAIL loud

front

Organisational structure for the scheme separates the space into dark and light , loud and quiet The organisation of the accommodation was organically arranged to take advantage of the dark and light areas in the existing building. The darkrooms and offices are placed at the rear of the building which is naturally dark and quiet. At the front of the building which has large open glazing, the accommodations which activates the building are placed.

Eatery/cafe 32m². open eating area 60m². 29


Comfort Requirement

Outline Specification

Temperature range:

The intention of the outline specification is provide information for cost estimating and to inform the client of the Architect’s intention as the project progresses. There is no need to indicate details of workmanship unless it has an effect on the appearance of the materials proposed.

- chemical processes slows down or quit working below 60 degree Fahrenheit - water does not work the chemicals if its below 50 degree Fahrenheit - above 80 degree Fahrenheit the photo paper and film begin to melt Acoustics: - the intervention frames will be made of cross- laminate timber, which have a decent acoustic control for the purpose of the scheme. the acoustic requirements of the scheme aren’t strict due to the purpose being creative and low noise pollution. but the report from an Acoustic Engineer will be considered and incorporated into the scheme User Control: - user control of services is an integral part of the scheme. The light and temperature in dark room will be controlled entirely by the user. the light intensity in the workshop and studios will be controlled by the users also but control of the services of the other spaces will be controlled by the staff/building manager from the secured plant room

PLASTERED/RENDERED/ROUGH-CAST COATING GYPSUM PLASTER SKIM ON PLASTERBOARD Location: all new partitions Background: 12.5 mm plasterboard Plasterboard Manufacturer: Wessex Gypsum Plaster manufacturer: contractor’s choice Thickness: 3mm Finish: smooth WOOD/METAL/LEATHER/CERAMIC FACADE - CROSS LAMINATED TIMBER Location: all new frames Manufacturer: KLH UK Ltd Supplier: KLH UK Ltd Colour: Natural finish Size: 3m x 300mm x 0.50m - ANO-SIL ANODISED ALUMINIUM SHEET Location: workshop and cafe structures Manufacturer: Gooding Aluminium Supplier: Goodding Aluminium Colour: Natural Finish Size: 1m x 1m - LEATHER CLAD WOODED PANELS Location: rear studios and chemical storage intervention Manufacturer: General Leather company Supplier : General Leather company Colour: black brown Size 300 x 300 mm PAINTING/ CLEAR FINISHING - FLAT/MATT BLACK Location: light traps (wall, ceiling, floor) Manufacturer: Blackfriar Number of coats: 2 coats 30


- WHITE, SATIN FINISH Location: darkroom ceiling Manufacturer: Dulux Number of coats: 2 SURFACES NOT TO BE COATED radiators, existing fireplaces, mouldings, ironmongery GENERAL FIXTURES/FURNISHINGS/EQUIPMENT - KITCHEN UNITS: Manufacturer and reference : TinyKitchens Surface finishes: whitecore worktop material: polished granite Appliances: Bosch - SHELVES: Location : kitchen, office, cleaning store, chemical storage, workshop, cafe kitchen Fabricator: purpose made finish: natural finish (spruce) SERVICES FIXTURES/EQUIPMENT - EXTRACTORS: Location: darkrooms, workshop, cafe, toilets Manufacturer: TEKA Specifications: pvc

31


Building Element External Works Substructure Superstructure Internal Finishes Fixtures and fittings M&E Services Specialist Items Preliminaries

per unit cost 400 480 600 1000 80 -

no. of unit (m2) 16 30 25 35 15 -

cost 6 400 14 400 15 000 35 000 1 200 5 000

32


Payment of Fees The normal arrangement is for clients to pay architect’s fees by instalments on a daily basis. The certainty of this arrangement is usually welcomed, since payments an be budgeted over a period. Alternatively, fees can be paid at the completion of work stages. Where this arrangement is agreed, the following appointment might be appropriate:

33


TIME & PROGRAMME INFORMATION COLLECTION 34


PRE- CONSTRUCTION PROGRAMME INFORMATION COLLECTION the first step will be to assemble key information about the existing building/ site including: 1 measured drawings and photographic survey of building/site 2 any original building contract documents that may exist with key drawings being digitised 3 any building or services surveys that have been carried out since the buildings completion. ASSEMBLE DESIGN TEAM Advice on the following should be sought: 1 cost and time estimating [quantity surveyor] 2 architectural design of any major proposed building alterations or new extensions [ Danso and Associates] 3 health and safety advice 4 Listed Building consultant 5 mechanical and electrical services engineer and advice may need to be sought regarding: 6 sustainability adviser 7 fire engineer 8 an analysis of existing building mechanical and electrical systems 9 service providers 10 planning consultant 11 legal advisers CLIENT’S REQUIREMENTS (RIBA WORK STAGES AB) Having assembled the design team, the next step will be to define Nikon’s requirements by doing the following: 1 identify and evaluate possible existing building(s) 2 compile a list of spaces to accommodate the required functions and prepare a room schedule 3 interview key staff to determine precise requirements for each space and prepare room requirements schedules 4 analyse desired adjacencies and prepare a space relationship diagram 35


5 prepare a planning diagram based on the space relationship diagram 6 provide the planning diagram to the quantity surveyor for the approximation of cost and time 7 assist Nikon to determine priorities in the light of the approximated costings and amend floor plans as necessary, perhaps with phasing 8 advise Nikon on alternative refurbishment and FF&E procurement strategies 9 prepare a creative spatial strategy illustrating the general design approach IMPLEMENTATION Having determined the clients requirements, the next steps will be to determine the appropriateness of the existing building and prepare designs: Design stage (RIBA Work Stages CDE) 1 analyse Nikon’s requirement and prepare a design showing the layout of the various spaces and preliminary schedules of materials and FF&E 2 provide information to discuss proposals with, and incorporate input of, other consultants 3 provide information to the quantity surveyor to prepare preliminary cost and time estimates Pre-construction stage (RIBA Work Stages FGH) 1 hold discussions with the relevant statutory authorities and make any necessary applications 2 prepare technical drawings, specification and contract conditions for the re purposing work showing type of construction, materials and appearance together with technical details 3 obtain quotations from FF&E suppliers and prepare a costed schedule of FF&E suppliers and prepare a costed schedule of FF&E; prepare designs for any bespoke items 4 provide information to discuss proposals with, and incorporate input of, other consultants 5 provide information to the quantity surveyor to prepare detailed cost and time estimates 6 agree the form of refurbishment contract with Nikon 7 if seeking tenders, advise on and obtain Nikon’s approval to a list of tenderers for the refurbishment contract 8 provide information to the quantity surveyor to prepare a work schedule in order to obtain competitive tenders or agree a negotiated price ( depending on the procurement route chosen) for the refurbishment contract and to prepare a pre -tender estimate. 9 invite and obtain tenders for the refurbishment contract and submit them to Nikon 10 upon acceptance of a tender, prepare construction documentation for execution 36


Construction stage (RIBA Work Stages JK) 1 provide to the contractor any further technical information required 2 administer the terms of the refurbishment contract 3 visit the works to monitor the progress and overall quality of the works and conduct periodic site meetings with the contractor to review progress 4 issue to the refurbishment contractor payment certificates based on the quantity surveyor’s periodic valuations 5 procure manufactured items of FF&E on a pro forma basis on behalf of Nikon, and monitor the fabrication of bespoke FF&E items 6 monitor the delivery and installation of FF&E items 7 carry out a final inspection, monitoring the remedying of defects 8 provide information to the quantity surveyor to prepare final account 9 assist Nikon to acquire and install photography Use stage (RIBA Work Stage L) 1 monitor the refurbishments performance

37


STATUTORY CONSENTS

38


Newcastle City Council building regulations charges. From this table, the council’s fee can be calculated for schemes under £100 000

39


Nikon Corporations,UK 1-60 Dowland House EN1 4UJ London 23 January 2015 Dear Ms. Young Proposed Re-Purposing and Intervention to Stephenson Works Building Now that you have approved the design development stage, it is clear that we shall have to obtain a planning consent for our proposals. As you know, I have met the planning officer on site and he has indicated his general approval. The next step is to make planning and listed building applications. The council’s fee for this is £2900.80 and I would be grateful therefore if you would send me a cheque in that sum made out to Newcastle City Council. Yours Sincerely Sandra Danso Sandra Ababio-Danso

40


DESIGN AND ACCESS STATEMENT

The 7490 sqm building is situated in the Stephenson Quarter. It is an industrial neighbourhood, with Newcastle train station to its north-west. The area is quite and characterised by the mix of Industrial era architecture and modern architecture. Social: The building is to be re purposed for creative re-use; the art of traditional photography. This compliments the area, as it is being re developed into the creative hub for Newcastle. The re purposing will activate the area and re new residents interest through the gallery, educational facility, workshop and darkrooms.

41


INVOLVEMENT

SITE REPORT

The consultants involved in the scheme are

GENERAL:

Interior Architect: Sandra Ababio-Danso Danso and Associates 4c Bridge View House NE1 6PN Newcastle upon Tyne

Project title: Stephenson works re-purposing Date: 16/01/2015 Time: morning

Structural Engineer: W T Parson Associates

Address: 20 south street NE1 3PE

Mechanical and Electrical (Services) Engineer: Treacle Ltd

SITE BOUNDARIES:

Quantity Surveyor: Rowntree & Partners

Front : open space, car park

Party Wall Surveyor: Jardin + Partners Party Wall Surveyors Ada Road NE14 3PR

Left side : royal mail

Building Surveyor: OPQ Land & Building Surveys Ltd 300 Cobalt House Silver Fox Way NE44 6JK Cadbury Surveys Ltd Building Surveyors Danton Road NE6 7KL Outline Conservation Report: PLD Consulting Ltd Unit 14 The Maltings Malton Y017 7DP

Right side: boutique hotel Rear : central square offices PARTY WALLS: Left side : none Right side : neighbour: boutique hotel OVERLOOKING BUILDINGS; Front (street) : n/a Left: n/a Right: n/a Rear : n/a SITE SERVICES: Water/drains:original iron cast drains. leaks detected. Gas: no problems reported Electricity ; no problem reported Telephone: new lines needed

42


SITE ACCESS:

EVALUATION

Vehicle: available. parking accessed through Forth st.

the findings of the surveys taken on the existing building were that there were no unrepeatable damages nor any defects that would hinder the the re use of the space into photography studio and darkrooms.

Pedestrian: 2 entrance/exit. South street and forth street entrance LANDSCAPE: Front: mostly paved. box bushes Rear: pavement and pedestrian path. OTHER:

CONDITION SCHEDULE GENERAL: Project title: Stephenson works re-purposing Date: 16/01/2015

the English Heritage report and the Outline Conservation Report highlighted what need and need not be retained. This meant the scheme was designed to incorporate that which couldn’t be changed such as the floors. The arrangement of the intervention was strategically placed to protect the fragile parts from exposure and further deterioration. Decision made upon evaluation of consultants feedback: Intervention raised 150mm of the floor to allow services to be laid underneath Surface water runoff to be harvested for re-use together with grey water recovery Plant room built to house the building services New extension to the mezzanine structure to house retail area and eatery.

Time: morning Address: 20 south street NE1 3PE FLOOR: Ground floor: concrete floor in good conditions. First floor: original floor boards retained. In good condition. WALLS: Original brick work. Wet patches from drainage leakage. Require replacement CEILING/ROOF: Beams in good condition. One wood beam is split. Vine growth on beam on first floor DOORS: Automatic doors;front only. 43


BUILDING REGULATIONS

44


BUILDING CONTROL

PART G: SANITATION

Approved Documents

- Adequate sanitation facilities, that is, a toilet - Restrictions apply to who can install unvented hot water storage systems

They provide guidance about compliance in some of the more common building situation. Since the scheme involves an existing building, some approved documents do not apply. The Approved documents provide advice and guidance on the standard required in buildings so that:PART B: FIRE SAFETY - Requires safe means of escape from the building PART C: RESISTANCE TO CONTAMINANTS & WATER - “Nothing should be growing on the ground covered by the building. - avoiding excessively intrusive gas protective measures - ensuring that moisture ingress to the roof structure is limited and the roof can breathe4

PART H: DRAINAGE AND WASTE DISPOSAL - An adequate system to carry rainwater away from the roof of a building, for example, guttering carrying water to a sewer - A cesspool or settlement tank must be impermeable to liquids and have adequate ventilation. It must also have means of access for emptying, not harm the health of any person and not contaminate water or water supply - An adequate system to carry water used for cooking, washing, toilet, bath or shower to a sewer cesspool or settlement tank must be in place PART J: COMBUSTION APPLIANCES & FUEL STORAGE SYSTEMS

- Where it is not possible to provide dedicated ventilation to pitched roofs it is important to seal existing service penetrations in the ceiling and to provide draught proofing to any loft hatches. Any new loft insulation should be kept sufficiently clear of the eaves so that any adventitious ventilation is not reduced.

- Any heating appliances, boilers or similar devices must work safely, efficiently and be provided with sufficient air supply to burn correctly, protecting against the risk of pollution and ill health, whilst associated chimneys or flues must be safe to use and protect the building and fuel storage from a risk of fire. Building owners and users need to be given information regarding the safe use of the appliances, flues and equipment. Where solid fuel appliances are installed in dwellings, a carbon monoxide detector must be fitted

PART D: TOXIC SUBSTANCES

PART K: PROTECTION FROM FALLING

- Insulating materials inserted into cavity walls can give off fumes. Prevention must be taken to stop these fumes reaching occupants of the building.

- Stairs, ramps, floors and balconies shall be adequately guarded

PART E: RESISTANCE TO PASSAGE OF SOUND - “Floors and walls between domestic buildings should have a certain resistance to the passage of sound PART F: VENTILATION - “The building should be adequately ventilated to provide a healthy and comfortable environment, whilst protecting against the risk of air borne pollution”

PART L: CONSERVATION OF FUEL & POWER - The aim for these buildings should be to improve energy efficiency as far as is reasonably practicable without prejudicing the character of the building or increasing the risk of long-term deterioration PART M: ACCESS TO & USE OF BUILDING -“Reasonable provision shall be made for people with disabilities at entrances to and within new dwellings and buildings 45


- For people with disabilities to gain access and use the building -If toilets are provided, reasonable provision shall be made available for people with disabilities PART N: GLAZING MATERIAL & PROTECTION - Glazing that people come into contact with whilst in a building should, if broken, break in a way unlikely to cause injury, resist impact without breaking or be shielded or protected from impact - Buildings, other than dwellings that have transparent glazing which people come into contact with while moving around a building, must have features to make it apparent. Windows that can be opened must be operated safely and provision made for safe accessible cleaning PART P: ELECTRICAL SAFETY - Electrical work should be carried out by a contractor or installer who is registered with a competent person scheme (if using this route then building control are notified under the competent person scheme)

46


PROCUREMENT, TENDERING & FORMS OF CONTRACT 47


CONSTRUCTION (DESIGN AND MANAGEMENT) CDM REGULATIONS To address the problem of unsatisfactory safety reports, The Health and Safety Executive (HSE) was established and the Construction (Design and Management)2007 (CDM) Regulations were enacted. All clients have duties under the CDM Regu;lations, save for ‘domestic’ clients. A domestic client, for the purposes of the CDM Regulations, is a person or persons who lives or will live in the premises where the building work is being carried out , and such premises must not relate to any trade, business or other undertaking. Although a domestic client does not have duties under the CDM Regulations, those who work for them on construction projects do. On all projects clients will need to: - check competence and resources of all appointees - ensure that there are suitable management arrangements for the project welfare facilities

PROCUREMENT STRATEGIES While there are a wide range of procurement strategies available, the most appropriate for a project of this size is :

Obtaining Competitive Tenders Advantage - the client receives the most competitive price for the job - it is useful when the building is quite and builders are keen to tender - builders/contractors often have previous experience working with existing buildings and thus know how to work around them Disadvantage - in busy times they wont risk the cost of tendering - the lowest tenders will have submitted the lowest price because of an error in pricing and will then cut corners to avoid making a loss *(Interior Design Job Book,2010.p 186)

- allow sufficient time and resources for all stages - provide pre-construction information to designer and constructors Under the CDM Regulations, all projects where the construction phase is likely to take more than30 days or involve more than 500 person-days of works are ‘notifiable’ . Where projects are notifiable, non-domestic clients must: - appoint a CDM Co-ordinator - appoint a principal contractor - ensure that construction work does not start unless a construction phase is in place and there are adequate welfare facilities on site - provide information relating to the health and safety file to the CDM Co-ordinator - retain and provide access to the health and safety file. 48


FORM OF CONTRACT It is important to determine which form of contract between the client and the main contractor should be used. If a client is unsure which contract is best suited then should consult a specialist solicitor and/or quantity surveyor. For the size of this project, the most suitable form of contract is the INTERMEDIATE BUILDING

CONTRACT.

This contract is more detailed and contains more extensive control procedures than the Minor Works Building Contract (MW) but is less detailed than the Standard Building Contract (SBC) This form of contract is used where: - where the proposed building works are of simple content involving the normal, recognised basic trades And skills of the industry, without building service installations of a complex nature or other complex specialist work; - where the works are designed by or on behalf of the Employer, fairly detailed contract provisions are necessary and the Employer is to provide the Contractor with drawings and bills of quantities, a specification or work schedules to define adequately the quantity and quality of the work; and - where an Architect/Contract Administrator and Quantity Surveyor are to administer the conditions. - where the works are to be carried out in sections; - by both private and local authority employers; - where provisions are required to cover named specialists.

This contract requires the Employer through his professional consultants to provide at tender stage a set of drawings together with another document. Where the other document consists of bills of quantities or work schedules, the Contractor is required to have priced it. Where the other document consists of a specification, the Contractor is required either to have priced it or, if only a lump sum is quoted, then also to have supplied a Schedule of Rates or a Contract Sum Analysis. The priced bills, specification or work schedules or, as the case may be, the Schedule of Rates or Contract Sum Analysis provide price data for the valuation of variations. The contract conditions and procedures are less detailed than those of the Standard Building Contract. All subcontractors, whether chosen by the Contractor or named by the Employer, are domestic, and their performance is the responsibility of the Contractor, although the Employer does assume additional risks in respect of Named Sub-Contractors whose contracts are terminated because of insolvency. For Named Sub-Contractors, the use of the Intermediate Named Sub-Contract documents is required. Even though a Named Sub-Contractor is a domestic sub-contractor, the Contractor is not responsible for any design carried out by a Named SubContractor *JCT (2011) ‘Deciding on the Appropriate JCT contract

2011�, Sweet & Maxwell, London. [Online] available at (/http://www.jctltd.co.uk/docs/Deciding%20on%20the%20appropriate%20JCT%20contract%202011%20Sept11.pdf)

With this contract the payment is based on lump sum with monthly interim payments.

49


INTERMEDIATE SUB- CONTRACT with SUB-CONTRACTOR’S DESIGN (ICSub/D/A/ and ICSub/D/C) This sub-contract is for use only with the Intermediate Building Contract with contractor’s design and where the sub-contractor is designing. The Intermediate Sub-Contract with sub-contractor’s design is published in two parts, namely, the Sub-Contract Agreement (ICSub/D/A), which includes the Recitals, Articles and Sub-Contract Particulars; and the Sub-Contract Conditions (ICSub/D/C).

50


REFERENCES 51


Building regs (2013) building regulations. [Online] Available at: http://www.building-regs.org. uk/?[building_regulations] (Accessed: 12.01.15) Chappell, D. (2003) ‘Understanding JCT standard building contracts’, 7th ed. London, Spon Press

‘Newcastle City Council Building control’. [online] Available at : http://www.Newcastle.gov.uk/ sites/drupalncc.Newcastle.gov.uk/files/wwwfileroot/ planning-and-buildings/building_control/building_ regulation_charges_guidance_note_3_non-domestic_new_build_extensions__april_2012.pdf (accessed at 13.01.2015)

JCT (2011) ‘Deciding on the Appropriate JCT contract 2011”, Sweet & Maxwell, London. [online] available at (/http://www.jctltd.co.uk/docs/Deciding%20on%20 the%20appropriate%20JCT%20contract%202011%20 Sept11.pdf) Yakely(2010),’ The BIID Interior Design Job Book’. London,RIBA Publications BIID(2011). The BIID Concise Agreement for Interior Design Services.London,RIBA Publications Planning Portal (2013) ‘Design & Access Statements’ [Online] Available at: http:// www.planningportal.gov. uk/planning/applications/howtoapply/ whattosubmit/ designaccess (Accessed 5.01.15) Planning portal (2013) professionals application. Avaliable at: http://www. planningportal.gov.uk/ england/professionals/en/1115314110382.html (Accessed: 5.01.15) RIBA (2013), ‘RIBA Plan of Work’. London,RIBA Publications RIBA (2007), ‘RIBA Plan of Work’. London, RIBA Publications English Heritage(2004) ‘Building Regulations and Historic Buildings’. [online] available at : http://www. english-heritage.org.uk/publications/building-regulations-and-historic-buildings-balancing-the-needs/ (accessed at 13.01.2015)