Mr israel, 6 years working experience, spanish architect

Page 1

ISRAEL NAGORE SETIEN. MA Architect Pamplona (Spain) 08/12/1981. ARB no. 082710J 01 PROFILE • Dedicated Architect with 7 years experience in the design of healthcare, office, housing and mix-use buildings. • Experienced in all parts of architectural design from the beginning through design studies to the completion . • Experienced on the design of large-complex multi-functional bulding.

cv.01 • Juan Miguel Ochotorena architect (Pamplona, Spain). May 2005 – October 2006. • Interior reform hospital Clinica Universitaria de Navarra (Pamplona). Preparation of design and construction drawings. • Competition Centro Psicosocial en Alicante (Spain). Preparation of desing presentation. • Teacher Assistant in Projects Department at the University of Navarra. October 2004- May 2005.

• Experienced in preparation of work technical drawings, schedules and architectural specifications. • Experienced in preparation of planning applications. • Experienced as project architect able to work also as part of a team. • Solid on site experience dealing with contractors, subcontractors and manufacturers and consultant part of design team. • Experienced in design coordination with consultants part of design team. 02 QUALIFICATIONS • Degree in architecture awarded by “Escuela Superior de Arquitectura Universidad de Navarra”.2000-2006. ARB no. 082710J • Master degree in architecture. “Laboratory Housing of the 21st Century”.ETSAB UPC. (Barcelona).2009-2010. • Master by research in architecture. Kingston University(UK).Guest-researcher Delft University.(Holland).2011. • Part III Course Postgraduate Diploma -Lectures only-. Barlett School of Architecture (London).2014. 03 WORK HISTORY • Pringle Brandon Perkins+Wills (London Office). August 2011 – Present. • ICAEW. Institute of Chartered Accountants (London). 12 m.£ fit out project including an extension to add NIA.Team (6 people) Role: Architect on charge of base build elements, including design coordination and drawing production (stage C&D). • Linklaters premises (Colchester). 2m. £ fit out project. Team (3 people) Role: Project architect on site, on charge of drawings production and project delivery (from stage D to project completion) • Anglian Water premises (Huntingdon). 5 million £ fit out project including an extension to add NIA. Team (2-3 people) Role: Project architect on site, on charge of drawings production and project delivery (from stage D to project completion) • Project Triton. Siemens Windmill turbine manufacturing complex (Hull City). Budget confidential.Team (4-5 people) Role: Architect on charge of warehouse facilities, including design coordination and drawing production (stage C&D). • 90 Cannon Street offices.(London).7m. £ fit out project. Team (2-3 people) Role: Project architect on site, on charge of drawings production and project delivery (from stage D to project completion) • During his stay at PBPW collaborated as well (for less than a month) in the following projects: MGPA, Blackrock Zurich, Google London, Allied World, CCBL (China Construction Bank). • Own practice in Pamplona, (Spain).April 2009 – September 2010. • Interior reform. Restaurant Jarauta 79(Pamplona).

04 ACHIEVEMENTS • Awards • 1st Prize Competition centro Social en Alicante. As collaborator of Juan Miguel Ochotorena Architect.2006. • Honourable mention in 1st International housing competition.Coarq.2010. • Honorouable mention. Fisac Competition. This is tomorrow.2011. • Honorouable mention. Perkins+Will’s annual design competition. 2013. • 3rd prize. International competition RIGENERAZIONE URBANA SOSTENIBILE. New York Babylon.2013. • Grants, talks and juries. • Awarded grant to attend “ISHSUM” Congress in the Hague. October 2010. • Awarded grant from Camara de Comercio Navarra to carry out Ma by research.June 2010. • Awarded grant from Ministerio de Educacion espanol to attend “Congreso Arquitecture +x-”. June 2010. • Awarded grant from UPC to study Master “Laboratory Housing of the 21st Century” April 2009. • Invited talk at “Jornadas de Internacionalizaci6n de la Arquitectura”. Madrid.May 2013. • Invited talk at “Jornadas del Urbanismo para la ciudadanfa”. Seville.October 2013. • Invited talk at AA Architectural Association London.July 2012. • Invited talk at ETSAM School of architecture of Madrid.January 2012. • Invited talk at Congress “This is tomorrow”.October 2011. • Jury member at AA. Unit 8.December 2012 • Jury member Young Comitee exhibition “Barcelona files for contemporary housing”. October 2012. • Publications and papers. • Paper presented Congress “Fixed?: Architecture, Incompleteness and change”Plymouth.April 2011. • Final studies project. Magazine Memoria de proyectos. ETSAUN. • Centro psicosocial de Alicante. Publication.Cuadernos TC.Juan Miguel Ochotorena Arquitecto. • Article “Open Building in the 21st century”.Magazine Visions. ETSAB. • Article “Soporte”. Glosario de Reciclaje urbano. General Ediciones de arquitectura. 2014 • Collaborator of spanish magazine and website La Ciudad Viva.

• Foster&Partners F+P (London Office). February 2007 – March 2009. • Aldar Central Market. Mix use development (Abu Dhabi).Collaborates in the preparation of Tender drawings. • World Trade Center (Abu Dhabi). Participates as part of the design team in different stages from concept to detail design. • Branded Villas Mater Plan. (Abu Dhabi). Collaborates in the preparation of concept drawings for scheme design Submission. • During his stay at Foster&Partners collaborated as well (for less than a month) in the following projects: Masdar Master Plan University of Masdar (Abu Dhabi),Pinacle Housing Competition (Singapore). • David Chipperfield Architects DCA (London Office). November 2006 – January 2007.

05 LANGUAGES • Spanish. Native. • Enlglish. Fluent. • French. Intermediate. 06 SOFTWARES • Drawing production. Autocad (2d and 3d).Advance/Microstation (2d and 3d).Advance

• Sant Louis Extension Museum (USA). Physical Model and Design Drawings for Scheme Design Submission.

• 3d/ Sketch up. Advance. 3d-Max. Basic. Hand sketching.Advance. Model making. Advance

• Private Housing (Belgium). Physical Model and Concept Design Drawings for workshop with the client.

• Adobe Design. Advance. MS Office.Advance • BIM-Revit.Basic.


HAND SKETCHES.

own work.14


INTERIOR REFORM JARAUTA 79 RESTAURANT PAMPLONA (SPAIN)

own work.12

+0.38m +0.38m

+0.38m

+0.00m

-2.84m -2.84m

-4.15m

-2.84m


ANGLIAN WATER HEAD QUARTERS. HUNTINGDON (UK). PBPW.

work experience.10

SIKA-TROCAL 'S' MEMBRANE. COLOUR : TBC

SIKA-TROCAL 'S' MEMBRANE. COLOUR : TBC

W

GALVANISED STEEL SUPPORT SIKA TROCAL METAL DOWNSTAND

210mm POLYISOCYANURATE FOAM BOARD INSULATION 150 MIN

S-VAP 500E VAPOUR CONTROL LAYER METAL STRUCTURAL DECK. NOMIMAL THICKNESS: 1.6mm

ALUMINIUM VENTILATION LOUVRE SCREEN

STRUCTURAL BEAM

SECONDARY STEEL SUPPORT

50 MM INSULATION GALVANISED STEEL SUPPORT SIKA TROCAL METAL DOWNSTAND

SIKA-TROCAL 'S' MEMBRANE. COLOUR : TBC

100MM MEDIUM DENSITY BRICKWORK. COLOUR TO MATCH EXISTING

120mm POLYISOCYANURATE FOAM BOARD INSULATION

100MM MEDIUM DENSITY BRICKWORK.

S-VAP 500E VAPOUR CONTROL LAYER METAL STRUCTURAL DECK. NOMIMAL THICKNESS: 1.6mm

NEW INSULATION LAYER TO LAP WITH EXISTING TO FORM CONTINUOUS BARRIER

40 MM CAVITY

S-VAP 500E VAPOUR CONTROL LAYER SIKA TROCAL 'S' MEMBRANE

VARIES

SIKA TROCAL METAL SHEET

120mm POLYISOCYANURATE FOAM BOARD INSULATION

160

STRUCTURAL METAL DECK. NOMINAL THICKNESS: 1.6mm NEW VAPOUR CONTROL LAYER TO LAP WITH EXISTING TO FORM CONTINUOUS BARRIER

A

150mm ROCKWOOL INSULATION

200mm P

PLASTERBOARD CEILING

100mm POLYISOCYANURATE FOAM BOARD INSULATION

SIKA-TROCAL 'S' MEMBRANE. COLOUR : TBC

SIKA-TROCAL 'S' MEMBRANE. COLOUR : TBC

X

210mm POLYISOCYANURATE FOAM BOARD INSULATION

GALVANISED STEEL SUPPORT SIKA TROCAL METAL DOWNSTAND

S-VAP 500E VAPOUR CONTROL LAYER

60

METAL STRUCTURAL DECK. NOMIMAL THICKNESS: 1.6mm

SPANDREL PANEL. REFER TO SPEC.

NEW VAPOUR CONTROL LAYER TO LAP WITH EXISTING TO FORM CONTINUOUS BARRIER

STRUCTURAL BEAM

60 MINUTE FIRE BARRIER TOS Extension: +32.357

GALVANISED STEEL SUPPORT SIKA TROCAL METAL DOWNSTAND SIKA TROCAL METAL SHEET

SIKA-TROCAL 'S' MEMBRANE. COLOUR : TBC 210mm POLYISOCYANURATE FOAM BOARD INSULATION S-VAP 500E VAPOUR CONTROL LAYER METAL STRUCTURAL DECK. NOMIMAL THICKNESS: 1.6mm 265 150 MIN

STRUCTURAL BEAM 40 FCL (L01): +31.640

100mm ROCKWOOL INSULATION MOISTURE RESISTANT PLASTERBOARD SOFFIT 75mm FLOOR SCREED WITH UNDERFLOOR HEATING

CURTAINWALL EDPM TO LAP WITH DPM

EXISTING WINDOW

40mm INSULATED METAL PANEL

1 LAYER 12.5mm GLASROC 'F' MULTIBOARD TO MAINTAIN 1HR FIRE INTEGRITY

SSL +25.425 200mm CONCRETE. REFER TO STRUCTURAL ENGINEER'S DETAILS

50mm ISOVER INSULATION

50mm STYROZONE H350R

48mm GYPFRAME 'C' STUDS @ 600mm CENTRES

48mm GYPFRAME 'C' STUDS @ 600mm CENTRES

50 x 25mm S/W TIMBER STUD FIXED ONTO WINDOW SILL

REFER TO STRUCTURAL ENGINEER'S DETAILS FOR FOUNDATION NFORMATION

TIMBER BLOCKING

U

6610

100mm STYROZONE H350R 1200 GAUGE DPM BLINDED HARDCORE

V

V Q

A

FFL +25.520

GL

1200 GAUGE DPM

1 LAYER 12.5mm GLASROC 'F' MULTIBOARD TO MAINTAIN 1HR FIRE INTEGRITY

R

S

1865

6600

T

25

24

1580

6905

26

27

8190

6880

19

18

17

1580

6575

20

1

16

1920

6570

3

2 5669

5826

6

5

4

7590

5199

4512

7 5180

8 5813

9 8077

T

S 6575

1580

Existing

New

New

U

R

1580

Q 1919

6076

2919

A 6568 6067

Existing

+32.630

1 1.1

TOS 32.024

ROOF LEVEL

CEILING LEVEL L01 FCL 31.600

30

01

31

01

IT COMMS

32

01

REGULATORY OPEN PLAN

25

01

LIFT LOBBY

11

01

OPEN PLAN

08

4P MTG ROOM

01

07

01

AUDIT OFFICE

01-W20

01-W4

01-W5

2511

01-W18

13

CORPORATE AFFAIRS OPEN PLAN

W-67a

FIRST FLOOR L01

W-67a

FFL 29.090

CW6

00

49

BOARD ROOM

00

46

CORRIDOR

00

48

LOUNGE

00

50

8P MTG ROOM

00

45

8P MTG ROOM

00

44

4P INTERVIEW ROOM

00

24

RECEPTION

00

16

CS 2P MTG ROOM

00

15

H&S OFFICE

00

W-68

00-W37

00-W38

00-W39

11

00-W40

00-W41

00-W42

00-W43

00-W8

CW2

W-66a

RESTAURANT

SSL Exis

W-67a

3570

01

REGULATORY 6P MTG ROOM

00-W9

W-66a W-67a

FLOOR LEVEL L00 FFL 25.520

SSL

GL 25.165


REGENERATION ENSANCHE CERDA. BARCELONA (SPAIN).

own work.17


RECREATIONAL CENTER FOR YOUNG PEOPLE. LEKUNMBERRI (SPAIN). The project involves the creation of a new multifunctional facility for the young people of Lekunberri, a small town located in Navarra (Spain). This multifunctional complex will accommodate various activities and spaces such as concerts (music hall), kids play ground, computer/IT facilities, library, and a polyvalent/flexible room for lectures and workshops. The building is located next to the town’s football pitch and other sport facilities in a dedicated area for the collective facilities of the village. The site is characterized by its great value as a nature environment. The project proposes a small volume made of two blocks conceived from the maximum respect to the context, including both nature and built heritage, aiming to give form to a new settlement able to coexist with the pre-existing infrastructures and environment.

university.02


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.