Mr lee, 6 years experience, chinese architect

Page 1

ⴤࢃ⣬ᘷφӰ൞俏⑥θいࢃ3н5左右Ӱ≇ᐷ∅ᴾ ဉ੃φᶄ‫⭕ݾ‬ ᒪ喺φ29኷ ᐛ֒㔅僂φ6ᒪ 䈣䀶φѣᮽθ㤧ᮽ ∋ѐᰬ䰪φ2010ᒪ∋ѐӄ঄ѣ〇ᢶཝᆜ ᆜփφᔰㆇᆜᵢ〇 䇴䇗亼ตφᔰㆇ䇴䇗 ᫻䮵亼ตφᯯṾ䇴䇗θᢟࡓ䇴䇗 ਥᐛ֒൦⛯φ都可以 李先生先后在北京华汇设计,Atkins北京任职,目前在10 Design香港工作,方案能力 强,公建擅长,项目经验包括日照山海天阳光海岸,青岛世界园艺博览会天水地池展馆, 三亚海棠湾国际购物中心(二期),迪拜蓝水住宅区,武汉长城汇综合体,重庆华发中讯 时代广场等。 Current Status: In Hong Kongθ35k RMB/month before tax Name: Mr Li Age: 29 years old Working Experience: 6 years Language(s): Mandarin, English Year of graduation: Graduated in 2010 from Huazhong University of Science and Technology Degree: Bachelor of Architecture Design area: Architectural design Field of specialization: Concept design, Detail design Cities to work in: Hong Kong


LI 㜵ℯ䔆

UNDERGRADUATE 㜓䦸

INTERN ⮅ṇ

WORKING ⷌὃ

WORKING ⷌὃ

2005-2010

2009

2010-2014

2014-NOW

WUHAN ࠶ࡎ

BEIJING Ԙч

BEIJING Ԙч

HONGKONG ௚࢔

EDUCATION 㕀備傳㙖 09/2005-06/2010

Bachelor of ARCHITECTURE ‫ڏ‬উ؆؆‫ ב‬

Huazhong University of Science and Technology ԢИॠ‫ם܉‬؆

EXPERIENCE ⷌὃ亶⍭ 2009.06-2009.09

INTERN ⮅ṇ

Central-South Architectural Design Institute Ḕ⌾⻡䬸宥守䟻䩝晉

2009.10-2010.03

INTERN ⮅ṇ

HHD-FUN ⋾ẓ⌵㰮⻡䬸宥守⒏寉㛰昷⅓⏟

2010.07-2012.05

ARCHITECT ⻡䬸ⷯ

HHD-FUN ⋾ẓ⌵㰮⻡䬸宥守⒏寉㛰昷⅓⏟

2012.06-2014.04

ARCHITECT ⻡䬸ⷯ

Atkins Consultants Co. Ltd. Beijing Branch 昦䉠憸㖖桥旕㛰昷⅓⏟⋾ẓ⇭⅓⏟

2014.09 NOW

PROJECT ARCHITECT 桠䛕⻡䬸ⷯ

IO Design Group Limited Hongkong ㋥䨣宥守㛰昷⅓⏟榀㸖〢惏

SKILLS ᷺ḁ㉧僤 Strong design capabilities and Advanced knowledge of parametric design 彪⼡䙫㖠㠯㝫〄僤⊂⑳ḗ⮳䙫⎩㕗⋽宥守亶橳 Assist design director in the design development, implementation and construction drawing design. 彬⊐宥守〢䚸忂堳宥守㷘⋽˚吤⮅⻡䬸宥守⎱Ḣ奨宥守⛥亟䙫亿∝ Participate in the project management,Communication with clients, consultants. ⎩᷵桠䛕䮈䏭Ə᷵ḁḢ˚桥旕忂堳㗌⸟䙫㉧㜖㲆态 Strong sense of team work. 剖⥤䙫⛉昆⏯ὃヶ宭 Involved in reporting and on-site services. ⤁㬈⎩᷵㰮㊌⎱䎗✡㛴⊈

So ware 彖ờ: Rhino,Grasshopper(VB.NET,C#,Python) , Revit,Adobe Suite,CAD,SKP.



Double Infinity ՄҔ‫ݸ‬ୡ


?KGX

)USVRKZK

9ZGMK

/TYZGRRGZOUT

:_VK

9O`K

:OZRK

/TZKXT

(KOPOTM

2UIGZOUT

A B

'-------------get point symmetry points-----------Dim pt1sym As point3d pt1sym = ptsymmetry(pt1, pt6) Dim pt2sym As point3d pt2sym = ptsymmetry(pt2, pt6) Dim pt3sym As point3d pt3sym = ptsymmetry(pt3, pt6) '------------roof fillet radius calculation------------Dim distance1 As Double distance1 = pt1.DistanceTo(pt2) Dim distance2 As Double distance2 = pt3.DistanceTo(pt2) Dim ln1 As New line(pt2, pt1) Dim ln2 As New line(pt2, pt3)

D

Dim ptRadius As point3d Dim distance As Double Dim divN As Integer If distance1 > distance2 Then ptRadius = ln2.PointAt(k2) distance = ptRadius.DistanceTo(pt2) divN = math.Round(distance1 / 3) Else ptRadius = ln1.PointAt(k2) distance = ptRadius.DistanceTo(pt2) divN = math.Round(distance2 / 3) End If ----------------------------------------------------------------------------------------------------------------------------------------------------

C A

B

Function sideTruss(ByVal crv As curve, ByVal lns As list(Of line))As list(Of line) Dim roofCurves As New List(Of Curve) roofCurves.Add(crv) Dim i As Integer

Function sideTruss(ByVal crv As curve, ByVal lns As list(Of line))As list(Of line) Dim roofCurves As New List(Of Curve) roofCurves.Add(crv) Dim i As Integer Dim trusspt1 As New list(Of point3d) Dim trusspt2 As New list(Of point3d) Dim Tpt1 As Point3d Dim Tpt2 As point3d Dim Zcoordinate1 As Point3d Dim Zcoordinate2 As Point3d Dim trussLine As New Line Dim trusslines As New List(Of Line) For i = 0 To lns.Count - 2 trusspt1 = secLocation(roofCurves, lns(i)) trusspt2 = secLocation(roofCurves, lns(i + 1)) Tpt1 = trusspt1(0) Tpt2 = trusspt2(0)

Dim trusspt1 As New list(Of point3d) Dim trusspt2 As New list(Of point3d) Dim Tpt1 As Point3d Dim Tpt2 As point3d Dim Zcoordinate1 As Point3d Dim Zcoordinate2 As Point3d Dim trussLine As New Line Dim trusslines As New List(Of Line) For i = 0 To lns.Count - 2 trusspt1 = secLocation(roofCurves, lns(i)) trusspt2 = secLocation(roofCurves, lns(i + 1)) Tpt1 = trusspt1(0) Tpt2 = trusspt2(0) Zcoordinate1 = lns(i).pointAt(0) Zcoordinate2 = lns(i + 1).pointAt(0) Tpt1.Z = Zcoordinate1.Z Tpt2.Z = Zcoordinate2.Z

D C


Յէ‫ޗ‬ஒީਾҺਫߐИ‫ۺ׹ڶ‬ਾҺ<GT 'HHKԨ࣒ௗչ'XZN[H৻ՠঌ‫ي‬ङЊЍԨѫգߊङ‫ي‬ઃͫ‫ر֨ޜ‬ДЗ֢‫؟‬澝Д‫ֽڇ‬١ȍȍИ֢ЊਾҺ澝ЇࢁЊּ֜ம࢓ȍȍ৻঩૜ߛͫ଒੧▲֫ਗ਼‫ثܧ‬ઢ澞 ୒й‫ي‬ઃҼࡨДЗ֢‫؟‬ङ‫ކ‬ԗਫߐсࡶͫОд҅‫ي‬ઃॱ୿Ҏй㌿֛‫ي‬ઃͫ֜࠴୊ՈՕ‫ܜ‬Գङୖ߫Њ‫ڙ‬ԃৃ࣒ҟОৈߣՃ֠‫މߕܔ‬澞रѷ‫ߒז‬ङॱ୿ৈߣҿ‫ंީؘ‬ЊФ‫ܢ‬۷ঈџङІઅ‫ۨুڥ‬ङ澞ଣ‫ܫ‬Іઅ‫ڥ‬ङԽ֜֨йІઅ ‫ڥ‬ङ६ؔ‫ۅ‬͹Ց੽Іଆङ୸‫ؔेچ‬дͫІઅ‫ڥ‬ङ‫ࣙڥ‬澝‫شם‬Э‫ؼ‬ӇЭЉਈ‫ݷ‬Պ澞Ѹީ‫ٵ‬வङәѾৈߣஒӲдॱ୿ङ‫ܢ‬۷Պ‫ͫڥ‬Од‫׍‬Ԇॱ୿ৈߣङ६ؔ‫۩ۅ‬ћ֨Іઅ‫ڥ‬ङ࠿▲ЗઅЇୃ‫׍‬Ԇ▲Зߔўͫ଑߽֨࠿▲ЗઅЇୃ ‫ۨڥ‬д▲З‫ش‬ङІઅ‫׍ͫڥ‬Ԇд‫ޅ‬ѽङ६ؔ‫ۅ‬澞ପଋঈџङ‫ܢ‬۷ՊԗՃুՠ‫ۨڥؼ‬дঅՠ੽ࡌङॱ୿ৈߣ澞߂եऀ‫ڙ‬ԃৃ࣒‫߫ୖر‬ৈߣব‫إ‬ङে֡֨▲૜澞 ‫߫ୖ߿▲࠿ر‬ৈߣङॱ୿޼ি૴ԗОକ৒ङԡ‫ڬ‬Љգङ֤‫ؼڜ‬Օљं‫ڮ‬এԥङߑ֘ࣿфӟߛͫ‫ؘ࣫‬д֨Ѻ‫ߚ܉‬ўЈ‫޼୿ॱߒזؘ࣫‬িङՕਈ澞Іઅ‫ڥ‬ৈߣՃҿঈџङ‫ܢ‬۷Պ‫ڥ‬Њ‫ڙ‬ԃৃ࣒बৈՠҟО▲ЗׂߎઁөͫՕљ‫ځ‬ ऀ֨՟य़Љգङ‫ە‬ӑЈͫљଠ‫ځ‬Љգङॱ୿੽ࡌ澞 Double Infinity is a collaborative exhibition by Holland Van Abbe Museum and Arthub, commissioned by Holland Art Center. The design inspiration comes from the theme of the exhibition. The concept tries to introduce infinite circulation into the spatial design of the exhibition. After the consideration of many infinitive-circulation mathematical-models and the interaction between the site and display items, it was decided that the circulation would be a ∞ shape. Although it is quite a coincidence that this is also the mathematical symbol for infinity, the design was not conceived as a metaphor based on meaning of the simple symbol. The concept of the initial design consisted of three-dimensional infinitive circulations, afterwards because of time and financial constraints; the circulation was changed to a two-dimensional concept. The former cross points of the three-dimensional design turned into the crisscross of the two-dimensional concept. This provides the visitors with a junction point, from where they can choose content to explore. This configuration also provides multiple visiting routes. Owing to an important focus on cultural communication between these two countries, it is anticipated that this exhibition will go on tour. As such, all the structures are made of the dismountable steel frame and tension fabric. The complicated three-dimensional structures actually consist of topologically equivalent triangles. The reason for using the triangle here is stability: once the length is set, the shape and size can not be changed. Unfortunately, the two-dimensional geometric construction restricts the scope for spatial topological transformation. In order to increase the stability of the spatial structure, additional structure was added to the corners of the triangles, so that small triangles are formed on every corner, successfully increasing stability. By means of topologically-equivalent transformation and combination, the final design responds to site requirements. The last step in the process is to bind up the steel frames tightly with the tension fabric.


ሟ乊

䗮亢ঞ䞛‫ܝ‬ ᣵೳ๭ ϔሖ

ഄϟϔሖ

ഄϟሖᑩᵓ

Rizhao Shanghaitian Sunshine Beach ‫୕םࡢً࢑ݺ‬үࡢَ

ഄϟሖܹষ


Northern District Beach facilities

Service Center Multi-use complex

Club House

Public Facilities


Location Rizhao, China

Title Architect

Size 9WS

Type Architecture

Finished

Year


shopping ૆࣒ cafe պ⮈ culture ‫ކ‬ԗ sports&leisure ଍Ԉѧ୾

2326

72

46

Skylight

2327

41

71

Skylight

2405

36

118

3731

72

31

4523

67

28

4615

205

70

5535

103

41

5630

106

36

8261

286

97

Skylight

ԥѽঝֺ֣આ

՚ԥѽৈߣؔѹ֣੮


参数化设计 Parametric Design Private Sub RunScript(ByVal pt1 As Point3d, ByVal pt2 As Point3d, ByVal pt3 As Point Point3d, ByVal pt6 As Point3d, ByVal k1 As Double, ByVal k2 As Double, ByVal dis1 As basementH As Double, ByVal dis2 As Double, ByVal n As Integer, ByVal m As Object, B ByRef B As Object, ByRef C As Object, ByRef D As Object, ByRef E As Object, ByRef F A Object, ByRef AA As Object, ByRef AB As Object, ByRef AC As Object) '-------------get point symmetry points-----------Dim pt1sym As point3d pt1sym = ptsymmetry(pt1, pt6)

ROOF

Dim pt2sym As point3d pt2sym = ptsymmetry(pt2, pt6) Dim pt3sym As point3d pt3sym = ptsymmetry(pt3, pt6) '------------roof fillet radius calculation------------Dim distance1 As Double distance1 = pt1.DistanceTo(pt2) Dim distance2 As Double distance2 = pt3.DistanceTo(pt2) Dim ln1 As New line(pt2, pt1) Dim ln2 As New line(pt2, pt3)

WALLS

Dim ptRadius As point3d Dim distance As Double Dim divN As Integer If distance1 > distance2 Then ptRadius = ln2.PointAt(k2) distance = ptRadius.DistanceTo(pt2) divN = math.Round(distance1 / 3) Else ptRadius = ln1.PointAt(k2) distance = ptRadius.DistanceTo(pt2) divN = math.Round(distance2 / 3) End If ----------------------------------------------------------------------------------------------------------------------------------------------------

Function sideTruss(ByVal crv As curve, ByVal lns As list(Of line))As list(Of line)

CEILING

Dim roofCurves As New List(Of Curve) roofCurves.Add(crv) Dim i As Integer Dim trusspt1 As New list(Of point3d) Dim trusspt2 As New list(Of point3d) Dim Tpt1 As Point3d Dim Tpt2 As point3d Dim Zcoordinate1 As Point3d Dim Zcoordinate2 As Point3d Dim trussLine As New Line Dim trusslines As New List(Of Line) For i = 0 To lns.Count - 2 trusspt1 = secLocation(roofCurves, lns(i)) trusspt2 = secLocation(roofCurves, lns(i + 1))

STEEL STUCTURE

Tpt1 = trusspt1(0) Tpt2 = trusspt2(0) Zcoordinate1 = lns(i).pointAt(0) Zcoordinate2 = lns(i + 1).pointAt(0) Tpt1.Z = Zcoordinate1.Z Tpt2.Z = Zcoordinate2.Z trussLine = New Line(Tpt1, Tpt2) trusslines.Add(trussline) Next Return trusslines End Function

----------------------------------------------------------------------------------------------------------------------------------------------------

FLOOR

R

ratio=0.6

pts(i)

end_pt

pts(i+1)

Crv_a

Crv_b


‫୿ޞ‬

‫ۨڏ‬

உ࠼

‫ڏ‬উ

‫ૅۅ‬

‫ٵ‬জ

ઁࠥ

ாऩ‫ڏ‬উ٤

৺ુ

‫ࣁޙ‬

ѹ৥


গ߄Ѽॸ z

‫و‬஽

z

‫ځ޼ڝ‬ԃ֣

z

௎ਾૺЈৈߣѹ१

z

૸է‫ځ‬ԃ֣

9:8;):;8+ */3+4:':/54 :'(2+ ୖৈߣؔѹ֣੮


JNBY Fashion Pavilion 㾲Ԧ١਻‫ੇݿ‬प‫ى‬Ե


‫୿ޞ‬

؏ۨ

உ࠼

‫ي‬ઃ

‫ૅۅ‬

ઁࠥ

‫ڏ‬উ٤

৺ુ

Їࢁͫߝٖ

ѹ৥

Formation of the structure

Plan view of combination

Formation of an isosceles triangle.

Tent formation

Physical Model

Original triangle divided by 4 triangles into 12 sections, identifying 7 control points.

Mid-length control points of original triangle are raised, forming a new isosceles triangle at the top.

Centre control point of original triangle is raised, above the newly formed triangle.

Mid-length control points of the top triangle are created and pulled out wards.

In line with the original mid-length control points, a new control point is created, raised and pulled outwards.


Location Shanghai, Hangzhou

Architect

Title Size Type Exhibition

Complete

Year


Qingdao International Horticultural Expo ஀ٍЌࣙⳓ৺ԧ੒Ѫ‫ى࠱֩ࠫם‬஦


‫୿ޞ‬

؏ۨ

உ࠼

‫ڏ‬উ

‫ૅۅ‬

ઁࠥ

‫ڏ‬উ٤

৺ુ

றَ

ѹ৥

,XKO 5ZZUȑY 8KYKGXIN :NK SUYZ KTKXM_ YG\OTM XUGJ TKZ]UXQ Y_YZKS -KUSKZXOIGR INGXGIZKXOYZOIY UL G VUR_MUT JKZKXSOTJ ZNK XUGJ TKZ]UXQ Y_YZKS ]NOIN LUXSY YG\K SUXK ZOSK ZNGT UXJOTGX_ YW[GXK MXOJ XUGJ TKZ]UXQ ZN[Y HKIUSOTM ZNK SUYZ KTKXM_ KLLOIOKTZ XUGJ TKZ]UXQ Y_YZKS


‫୿ޞ‬

؏ۨ

உ࠼

‫ڏ‬উ

‫ૅۅ‬

ઁࠥ

‫ڏ‬উ٤

৺ુ

றَ

ѹ৥

=NKT ZNXKK XUGJY SKKZ GZ UTK VUOTZ ZNKT ZNK XUGJ UTR_ VXU\OJK G YVGIK LUX ZXGLLOI TU YVGIK ZU YZG_ ([Z ]NKT ZNK XUGJ YZGMMKX IKXZGOT GTMRK ZU LUXS G YVGIK VXU\OJK \OYOZUXY ZU XKYZ 'TJ ]OZN JOLLKXKTZ GTMRKY HKZ]KKT ZNXKK XUGJY V[HROI YVGIK YNGVK YO`K GTJ UXOKTZGZOUT GXK GRYU HKIUSOTM OTZKXKYZOTM


Location Qing Dao

Architect

Title Size Type Architecture

Complete

2012

Year


SanYa HaiTang Bay Shopping Center Phase II Ѕнࡢ㱪ࡸ֡ଢ଼કࢢЗ‫ͣڵ‬зޫͤ஍ࣹ


WELCOME PLAZA

≪Ქᒩਦ

ᡭཌ҆ണ

WATER TERRACE

FAMILY EVEN SPACE

㔵ौਦ൦

✣ᑜ㣧ണ

GREEN TERRACE

TROPICAL GARDEN

ᰖ䗯〈⊖

ᡅ≪〈⊖

INFINITY POOL

FAMILY POOL

SanYa

䘄ᇴᒵ൰

WELCOME PLAZA

Location

Architect

䘄ᇴᒵ൰

Duty

Size

9WS

SCHEMATIC ROUND1

Type

CONCEPT ROUND2

Masterplan&Architecture

2

Schematic Design

CONCEPT OPTION

Year

1

CONCEPT OPTION


REMODEL IN REVIT IN SD STAGE


3(

67 D 0 C-CHANNEL

67 E

0 C-CHANNEL

0

67 D EERO SAARINEN COFFEE TABLE -(WHITE LAMINATED TOP) ARNE JACOBSEN SWAN CHAIR.

67 E LOUVRE T TO DESIGN AND

*/

0

REFLECTED POOL

CESSED LIGHT. SIGN AND SPECIFY)

67 D REFLECTED POOL

67 E

0 FRAME

DUBAI BLUEWATERS RESIDENTIAL ૦‫܇‬ਡࠫѺ؉ԙҵ૚स੦ਗ਼


re to stri jab cte al d v ali i e w in s du str ial

w at er vi ew s

zo n

LI

LA

BA

e

E

ZO N

S

S

W

district

IE

EV

EW

VI

IV

ED

entertai nment + retail

AL

RI

ST

DU

IN

SIT

CT

RI

ST

RE

w rro

SITE CONSTRAINS plo

es zone

SITE OPPORTUNITIES na

utiliti

JA

PO

views to Dubai Marina + wheel

district

CONSTRAIN VIEWS pe de str ian pr om en

t en nm lig da oa r P ML

ad

BEACHFRONT HOSPITALITY

rd sunset bouleva

e qu os fm no io t ca lo

t

GREEN COURTYARD

FRONTEDGE VIEW GREEN SPINE RETAIL ENTERTAINMENT

CENTRAL SPINE

e

?KGX

;TJKX )UTYZX[IZOUT

9ZGMK

'XINOZKIZ[XK

:_VK

YWS

9O`K

'XINOZKIZ

:OZRK

*[(GO

2UIGZOUT


2350

550

1600

2000

+H

700 525300 700

4 BR

1300

7300

2750

DU

900 4200

4000

1400

2200 700 2100

950

700

1400

1400

700

2050

3300

575

2100

2100

APAERTMENT MOCKUP

2100

1550 1875

400

APAERTMENT MOCKUP

APAERTMENT MOCKUP


WUHAN GREATWALL MIX-USE ࠗ࠯େּ࠮ণ՟Ѽ


6+*+9:8'/4 ,25= :?6+9 5, ;9+89 6;(2/) 9'6)+9 *+49/:? 5, :.+ 6+562+

?KGX

)USVRKZK

9ZGMK

'XINOZKIZ[XK

:_VK

YWS

9O`K

'XINOZKIZ

:OZRK

=[NGT

2UIGZOUT


Notes: 1500.000

93.75

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

1500.000

93.75 93.75

93.75 93.75

93.75 93.75

93.75

93.75

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

1500.000

93.75 93.75

93.75 93.75

93.75 93.75

93.75

93.75

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

1500.000

93.75 93.75

93.75 93.75

93.75 93.75

93.75

93.75

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

1500.000

93.75 93.75

93.75 93.75

93.75 93.75

93.75

93.75

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

1500.000

93.75 93.75

93.75 93.75

93.75 93.75

93.75

93.75

93.75

93.75

93.75 93.75

93.75 93.75

1500.000

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75

93.75

93.75

93.75

93.75 93.75

93.75 93.75

1500.000

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75

93.75

93.75

93.75

93.75 93.75

93.75 93.75

1500.000

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75

93.75

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

1.

1500.000

93.75 93.75

93.75 93.75

93.75 93.75

93.75

93.75

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

THIS DRAWING ISSUE HAS BEEN CHECKED AND APPROVED IN ACCORDANCE WITH 10 DESIGN GROUP LTD. QUALITY MANAGEMENT. FOR GENERAL NOTES, SYMBOLS AND ABBREVIATIONS, REFER TO DRAWING ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE STATED. ALL DRAWINGS HAVE TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL AND SERVICES ENGINEER'S DRAWINGS AND SPECIFICATIONS. DO NOT SCALE OFF THIS DRAWING.

93.75 93.75

2.

46.88

3.

92.31

92.31

90.00

90.00

46.92

46.88

92.31

92.31

4.

92.31

92.31

1500.000 93.75

92.31

93.75

93.75 93.75

93.75 93.75

93.75 93.75

1500.000 93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

1500.000 93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

5.

92.31

92.31

92.31

90.00

90.00

46.92

92.31

93.75

92.31

92.31

䁱䠁

92.31 93.75

93.75

93.75

93.75

93.75 93.75

93.75

93.75

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75

92.31 93.75 93.75

93.75 93.75

46.88

92.31 92.31 92.31

92.31

92.31

92.31

92.31

㍘ᕋഴ

H

92.31

RT

KEY PLAN

90.00

90.00

1800.000

90.00

90.00

90.00

90.00

90.00

92.31

92.31

ᴿ䰒࡬ൌஅ亂ᐨ䙐䚄 '(6,*1 *5283 /7' 䌠䠅㇗⨼儊㌱ Ⲻ⃘ḛૂ䃃䁲 ᴿ䰒ж㡢䁱䠁θ㑤ሡθ⁏⽰ㅿ䃠᱄θ䄁৹䯧 䲚⢯࡛䁱䠁ཌθᡶᴿተሮൽԛ∡㊩⛰௤փ ᡶᴿൌ㍏䴶㾷㎆ਾᡶᴿ⴮䰒ᔰㇿȽ‫ޝ‬䜞㎆ ਀ᐛぁᢶ㺉ൌ㍏ ਀䃠᱄ ࠽व⴪᧛ᗔൌ㍏ѣ䠅ᓜተሮθ៿ԛ⁏䁱ተሮ⛰Ⓦ

T3

NO

92.31

92.31

92.31

92.31

92.31

92.31

92.31

1200.000

92.31 93.75

92.31

93.75

92.31

93.75

1500.000

93.75

92.31

93.75

93.75

45.00

93.75

93.75

92.31

93.75

93.75

92.31

93.75

93.75

93.75

92.31

93.75

93.75

92.31

93.75

93.75

92.31

93.75

1500.000

93.75

92.31

93.75

93.75

46.92

93.75

93.75

92.31

92.31

46.87

93.75

45.00

1500.000

93.75

93.75

90.00

90.00

90.00

ḽ߼

T2

92.31

92.31

92.31

1440.000

92.31

92.31

92.31

90.00

90.00

90.00

90.00

90.00

90.00

90.00

90.00

90.00

90.00

T1

92.31

92.31

92.31

92.30

92.31

90.00

90.00

90.00

90.00

90.01

90.00

90.00

90.00

1800.000

90.00

90.00

90.00

90.00

90.00

䙅᱄཯㜬⧱⪹ ᑜ㜂ᶵ 1(875$/ &/($5 /$0,1$7(' */$66 :,7+ %$&. 3$1(/

*/

ᖟ䟿཯㜬ѣグ⧱⪹ )5,77(' '28%/( */$=,1* /$0,1$7(' */$66

90.00

90.00 90.00

/2: (䙅᱄཯㜬ѣグ⧱⪹ 1(875$/ &/($5 '28%/( */$=,1* /$0,1$7(' /2: ( */$66

*/

90.00

92.31

92.31

92.31

*/ ḽ߼

ᔬծ 00 ঀᖺ഼⛯ 㠩⧱⪹⮂䶘с䗯⮂

*/

ḽ߼

ᖟ䟿཯㜬⧱⪹θᑜ㜂ᶵ )5,77(' /$0,1$7(' */$66 :,7+ %$&. 3$1(/

*/

/2: (䙅᱄཯㜬ѣグ⧱⪹ 1(875$/ &/($5 '28%/( */$=,1* /$0,1$7(' /2: ( */$66

*/

/2: (䙅᱄཯㜬ѣグ⧱⪹ ᑜ㜂ᶵ 1(875$/ &/($5 '28%/( */$=,1* /$0,1$7(' /2: ( */$66 :,7+ %$&. 3$1(/

ḽ߼

T3

07

䬓ᶵ㜂䶘 $/80,180 3$1(/

07

93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

81.60

93.75 93.75

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

1206.600 93.75

93.75

93.75 93.75

81.60

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

1206.600 93.75

93.75

93.75 93.75

81.60

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

1206.600 93.75

93.75

93.75 93.75

81.60

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

1206.600 93.75

93.75

93.75 93.75

81.60

93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

1206.600 93.75

93.75

81.60 93.75

93.75 93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

䱨䴞Ⲵਬ :($7+(5 5(6,67$17 /289(5

1206.600 81.60 93.75

93.75 93.75

93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

93.75 93.75

40.80

93.75

61

ᓍᤑ⚥㇧ 6,*1$*( /,*+7,1* %2;

92.31

92.31

92.31

92.31

92.31

92.31

92.31

92.31

90.00

90.00

40.80

1206.600

51.92

1206.600

Rev. 1230.900

‫ؤ‬䇘

1230.900 105.90

93.75

93.75

93.75

93.75

93.75

93.75

52.95 93.75

93.75

93.75

93.75

93.75

Description

Date ᰛᵕ

ᨅ䘦

DR. CH.

AP.

⭱ഴ ṗሯ ᢯߼

93.75

52.95 93.75

93.75

93.75

93.75

93.75

93.75

93.75

93.75

93.75

93.75

93.75

93.75

2015.01.13 Podium Frited Pattern Design Drawings

1230.900

1230.900

105.90 93.75

93.75

93.75

93.75

93.75

92.31

1230.900 52.95

92.31

92.31

92.31

92.31

92.31

92.31

92.31

90.00

90.00

㼏ᾲᖟ䟿⧱⪹ഴṾ䇴䇗ഴ㓮

105.90

93.75

93.75

93.75

93.75

93.75

93.75

93.75

93.75

93.75

93.75

93.75

93.75

93.75

T4

52.95

92.31 92.31 92.31

92.31

92.31 92.31

92.31 92.31 92.31

92.31 92.31 92.31 92.31 92.31

92.31

1200.000

Consultant 亴䰤

90.00

90.00

90.00

90.00

90.00

92.31

92.31

92.31

92.31

92.31

92.31

92.31

93.75

92.31

93.75

92.31

93.75

92.31

93.75

92.31

93.75

92.31

93.75

92.31

93.75

92.31

93.75

92.31

93.75

92.31

93.75

45.00

93.75

92.31

93.75

92.31

93.75

92.31

93.75

92.31

93.75

92.31

93.75

92.31

93.75

92.31

93.75

90.00

1800.000

90.00

90.00

Client ѐѱ

↜≿⍠京㖤ѐᴿ䲆‫ޢ‬ਮ

90.00

90.00

90.00

ḽ߼

90.00

90.00

90.00

90.00

90.00

90.00

90.00

90.00

90.00

Wuhan Hongding Real Estate Co., Ltd

92.31

92.31

92.31

Project Stage 主ⴤ䳄⇫

92.31

92.31

92.31

92.31

ᔰㆇཌ㄁䶘਀⴮ީཝṭ␧ौ䇴䇗

92.31

92.31

92.31

92.31

92.31

92.31

92.31

92.31

92.31

92.31

92.31

92.31

92.31

92.30

92.31

90.00

90.00

90.00

90.00

90.01

90.00

90.00

90.00

90.00

PODIUM BLOWUP UNFOLDED ELEVATION

90.00

1800.000

90.00

㼏ᡵኋᔶ㄁䶘᭴ཝഴ

ൌ㍏੃で

90.00

90.00

Wuhan Changcheng Hui Project Drawing Title

ᔬծ 00 ঀᖺ഼⛯ 㠩⧱⪹⮂䶘с䗯⮂

90.00

90.00 90.00

ɋ↜≿ᐸ↜᱂॰ѣ्䐥䮵ค≽Ɍ

Scale at A1 ∊ׁ

90.00

2172.000

92.31

Architectural Facade and Detail Development

Project Title 亯ⴤ੃で

1:50

ḽ߼

T4

ᖉ䶘ᶵᇳᓜᴿ਎ौᰬθሼḽ߼ഴṾሯ喆䶘ᶵѣ㓵

1:100

俏⑥⒴Ԋ倧‫ށ‬䚉 ਭђคཝড় ⁉ 3F, East Town Building 41 Lockhart Road Wanchai, Hong Kong T +852 3975 2010 W www.10design.co

Project No. 亯ⴤ㐞㲕

Drawing No.

ഴਭ

Rev. ‫ؤ‬䇘

12036 TEN_12036_PD_SHEETS_20150119 B


CHONGQIN HUAFA ZHONGXUN PLAZA ଜ‫ٻ‬ԡՆЗ੡‫ݿ‬і‫֪ٹ‬


?KGX

;TJKX )UTYZX[IZOUT

9ZGMK

3O^ [YK

:_VK

9O`K

YWS

:OZRK

'XINOZKIZ

)NUTMWOT

2UIGZOUT

䪲杉䳢仆 )a )

❩䛛憸ⱅ杉㝦

❩䛛憸ⱅ杉㝦

䪲杉䳢仆 )a )

‥㖃憸ⱅ杉㝦

‥㖃憸ⱅ杉㝦

⼎⽉憸ⱅ杉㝦

('9+ -+53+8:?

-+53+8:? )'4:/4-

-+53+8:? ,/22+:

❩䛛憸ⱅ杉㝦

❩䛛䎢䑪

ṳ仛⹚杉ⰲ杉

‥㖃憸ⱅ杉㝦

‥㖃䎢䑪

当妹ⰲ杉

⼎⽉憸ⱅ杉㝦

,')'*+ 962/:

-2'@/4- :?6+9

,/22+:+* 855,


裙楼立面图- 北及西向 WK /hD > s d/KEͲ EKZd, Θ t ^d


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.