HAVE YOUR SAY AND FIND OUT MORE PLANNING PUBLIC CONSULTATION FOR THE STADIUM FOR WEST CUMBRIA, WORKINGTON
Your invitation to learn about the plans for the stadium and share your thoughts: Workington Leisure Centre, Griffin Street, Workington CA14 2DX 4 December 2018 from 1pm until 8pmÂ
Allerdale Borough Council were approached by Workington Town rugby league club and Workington Reds football club, to look into developing fantastic new facilities for the clubs and their fans, and also create a stadium that everyone in west Cumbria can use and enjoy. It is also hoped the stadium will act as an inspiration for the sports men and women of tomorrow.
THE PROPOSALS The proposed development would be situated around the current location for the Workington A.F.C ground, to the north of Allerdale House, to the east of Tesco, and to the west of the new leisure centre, bowls and cricket clubs. The scheme includes an 8,000-capacity stadium and a full-size synthetic pitch for community use. There are also plans to open-up and enhance access to the River Derwent, as well as providing a corporate hospitality suite; offices; and community facilities. The stadium is proposed to be the home of both Workington Reds and Workington Town who approached the council to jointly look into developing first rate shared facilities that will benefit the clubs, players, supporters and the wider community.
THE PUBLIC CONSULTATION
THE PLANNING APPLICATION PROCESS
The proposal is in the design development phase, with the project team drawing up concepts for the scheme’s layout and design. These will be available to view on 4 December, with the project team members on hand to explain, discuss, and listen to your views.
The scheme will be submitted to Allerdale Borough Council’s planning department as a detailed planning application. This means that the architects’ plans will be supported by detailed technical documents, setting out all the necessary considerations for the Council. These will address topics such as flood risk, ecology, highways, and heritage.
The purpose of the public consultation is to ensure that everyone can provide feedback on the design, the scheme, and the overall proposal, to help shape and design the stadium for your community. This feedback is reviewed by the project team as part of the design process to ensure that the development balances the needs of the community, the environment, and the client.
These documents will be publicly available, along with the planning policy review, and final design, via the Council’s website.
THE ANNOTATED PLAN BELOW SETS OUT OUR INITIAL DESIGN PROPOSAL FOR THE SCHEME, OUTLINING THE VARIOUS USES AND THEIR POTENTIAL LOCATION WITHIN THE SCHEME
k Th eN oo
36
68
70
71
34
38 42
56
47
58
NO RT HS ID ER OA D
48
89
53
17.7m 58
16.8m
52
76
D GE ROA NEW BRID
Hig h
68
Riv er De rw en t MLW
Shi ng le
W at er
FB
h Pat
+
Path
Stainton Hole
Community facilities A substantial space within the front of the stadium has been allocated for community use; the specifics of which are to be determined.
e ingl Sh
FB
th
WILLIAM STREET
B Content revised A Site Boundary Revised # First Issue REV DESCRIPTION
The Green
9.2m
C FB
DERWEN T STREET
57
59
63
23
10m
20m
PROPOSED SITE PLAN
8
WYBROW TERRACE
3
27 to
32
21 to
21 15
13
Swimming Pool
De f
22
26
to
1
18
9
10
21 23
to 17
Ingarth
13
St Patrick's Catholic Primary School
12
se ds Clo Headlan
17 19
0
Holmes Miller 89 Minerva Street Glasgow G3 8LE T 0141 204 2080 F 0141 204 2082 glasgow@holmesmiller.com
STADIUM FOR WEST CUMBRIA Allerdale Borough Council 7 to
se ds Clo Headlan
9 to 15
Posts
DRAWING
Play Area 6
10 7to10 to 12
1 to
to 40
28 13 to 20 15 16 to
ET STRE DUKE
to 20
14 REET TT ST H WA NORT
22 24
1 : 1000
Parking The main public car park is to be located to the south of the stadium, offering spaces for both coaches and cars. PROJECT
Head Park
7
PROPOSED SITE PLAN
Bowling Green 13.7m 35
6
BANK ROSEURT CO
RMH RMH 15.11.18 YZ AC 12/11/18 YZ AC 08/11/18 DRAW APPR DATE
Scale 1:1000
Posts Def
Pavilions
11.6m
1
to
8.7m
ED &
Recreation Ground
Ward Bdy
Navvies Bridge
Pat h
CHURCH STREET
NTL
Bdy
Pa
ED
Allerdale House
The Green
Nursery
Main entrance and fan-zone There will be multiple entrances into the 8,000-capacity stadium. The main entrance will be located on the southwestern corner. This would form a clear arrival point to those travelling via public transport and car/coach. As this appears to be the key focal point of the scheme, there will also be a designated fan-zone in this area.
123
igh Wat Sh er ing le
M ea n
Path
Bro w
2
Ha gw orm
113
Mea nH
Cloffocks
46
60
43 ing mas on ry
4
67
39
Slop
77
Shingle
TOTAL SITE AREA: 93474 m2
1 10
Water
DEVELOPMENT AREA AS DESCRIBED IN THE PLANNING APPLICATION
Sports pitch and changing facilities In addition to the main stadium, an outdoor full-size 3G synthetic sports pitch and changing facilities will be provided, for both club training and community use.
Drain
SS MO
Mean High
7.2m
Hybrid pitch To meet the playing demands of both clubs, the pitch will exploit the latest hybrid technology using both plastic and real grass. Pitches like this are successfully in use in shared facilities elsewhere. Many of the premiership clubs use this pitch technology and it appeared at the recent World Cup in Russia.
67
Hospitality suite The on-site hospitality suite provides event and conferencing space for hire, ensuring efficient use of space.
R FA
Shingle
Drain
18.3m
E 89 NU VE LA EL CH MIT
Riverbank
55
Mean Shingle Low Wa ter
11.0m
De rw en t Vi ew
Holmes Miller accepts responsibility for this document only to the commissioning party and not to any other. Holmes Miller does not accept liability for accuracy or veracity of survey information provided by others and used in the preparation of this drawing. All vertical and horizontal dimensions and levels provided by Holmes Miller and based on the survey information provided by others must be checked and verified on site.
n Drai
ED Bdy
79
Me an Shing High le Wate r Me an Low Wate r
Mean Low Wate r Shingle
Riverside Walk Riverside area opened up for public recreational use. NOTE: Copyright and not to be reproduced without the consent of Holmes Miller DO NOT SCALE:Use figured dimensions only.
NO RT HS IDE RO AD
DW
Offices The eastern stand will comprise a seated area overlooking the pitch, as well as offices below it.
Club SCALE @ A1
As indicated NUMBER
4268-AL(0)011
CHECKED
RMH REV
B
THE BENEFITS The scheme would see numerous benefits for Workington, including: •
New community facilities;
•
Creation of an attractive area for residents, with improved access to the River Derwent;
•
The sharing of stadium running costs and the improved facilities for players and fans;
•
An accessible location via all transport modes;
•
Encouraging a greater fanbase;
•
Creation of jobs, both during and after the construction phase;
•
Increased engagement for local businesses due to additional footfall;
•
Increased visitors, boosting the local economy; and
•
Income creation from tenants and the hospitality facilities, helping to maintain the sustainability of the stadium.
HOW TO SHARE YOUR VIEWS As local residents, we welcome your views on the proposals for the new stadium. Attend the meeting on 4 December, view the plans and meet the project team members on hand to explain, discuss, and listen to your views. Complete a feedback form to ensure your responses are taken into consideration. Alternatively, view the scheme via our website: www.allerdale.gov.uk/stadium You can email your comments to us: corp.comms@allerdale.gov.uk Or, write to us at: Community Stadium Project Allerdale Borough Council Allerdale House Workington CA14 3YJ