Local Area Plan (TOD Model) Dwarka, New Delhi , CEPT University

Page 1

An approach to Make Dwarka : A regional Hub through TOD model Urban Expansion and Regeneration Panning Studio | Semester 3 Amrutha Balan PG190115 Master of Urban planning Faculty of Planning CEPT University

PO

RT FO L

IO


ABOUT THE STUDIO

The studio incorporated an extensive learning on Local area planning throughout this semester. We were exposed to Local area planning as well as TP Scheme to achieve an envisioned development of the City . The studio included : Exercise 1 :Area Based Development Case Study Exercise 2 :Development Feasibility Study Studio Project : Local Area Plan Iteration 1 :Existing Situation Analysis, Statutory Provisions and Policies , Initial Vision & Concept Iteration 2 :Preparation of Master Plan with proposed Road Network and other major Proposals Iteration 3 :Street Network detailed out, Regularions ,Proposals , L-Form Iteration 4 :Final masterplan ,Final proposals, Final regulations,final L-Form

ABOUT THE SITE

Dwarka, New Delhi was selected as one of the sites for the preparation of the LAP as a TOD Model. The study area considered is the stretch from Sector 10 to Sector 13 and has city-wide connectivity majorly via the blue Metro line . Dwarka being in the South West of Delhi has the potential to develop as a Sub city forming a diplomatic enclave. The area is an envisioned Smart city with abundant social amenities and is one of the largest residential suburbs in Asia. Despite enormous potential, the TOD model is not being followed and the presence of sizeable under-utilized plots reduces the social connectivity between populations residing there making the city unsafe for women.UERP studio aims to reconsider the micro-level planning of Dwarka through a local area plan to provide planning visions that cater to the needs of the area to make Dwarka an active regional Hub.

Led the topic with major contribution to data and graphics

Shared work of 4

Shared work of 2

Individual Output


2.

3.

1.

STRUCTURE

1.Development feasibility study

2. Area Development Model-Micro level planning example

3. Local Area Plan Model

Kanhangad, Kerala

Kop Van Zuid Rotterdam, Netherlands

Dwarka,Delhi

Pages 4-5

Pages 6-7

Pages 9-27

4 . Key Leanings

Pages 28-29


Kanhangad,Kerala

Development Feasilibity Study 63.5 m Coverage 1334 m2

21 m

d Roa 45m

rea: Site A

2187

sq.m

Buildable area Yard

wid th

Additional open space as the height increases Car parking : Basement- 89 cars (1 car per 15 mtr sq) Open space area parking :1021 sq m68 cars

Residential (40%) Commercial (60%)

60.5 m Coverage 1089 m2

18 m

Basement Commercial Residential Car parking : Basement- 74 cars (1 car per 15 mtr sq) Open space area parking :1335 sq m-89 cars

4


Land Cost

Development Scenario

Land Rate

a CommerRs 74147 cial

Mixed use (ComRs 74147 mercial+ Apartment )

Land Area

Total Land Cost

b

c (= a x b)

2187 Sq m

Rs 16.2 Cr

2187 Sq m

Revenue Estimate Development PermissiScenario ble Built Floor Space on the plot (As per FAR, Ht, Setback & other regs)

Rs 16.2 Cr

Construction cost Built Floor Space (Super built up = Construction Total Permissible Cost Rate Construction Floor Space (e.g. 25000 cost + additional Rs/Sqm) 30%-40% for lobbies, common areas etc) d

e

f (= d x e)

8529 sq m

Rs 16,700

Rs 14.2 Cr

8529 sq m

Comm.(60%) : Rs 16,700Rs 19.0 Cr Resid.(40%) : Rs 31,000

super built up (Permissible Built Up x 20% - 40%)

Total Built up space

Market Rate for the Total Revenue area (based on market survey of similar properties in similar location / surrounding areas

l

m

n

p (=mxn)

1321

7882

Rent Rs 555/Sq m

Rs 4,3.75 Lakhs/ Month

Mixed use 6561 (Commercial+ Apartment )

1321

7882

Residential: 3bhk(159Sq m)(10)Rs 52,466/Sq m 2bhk (106 sq m)(10)Rs 41,666/Sq m Commercial : Rent Rs Rs 555/Sq m

3 bhk- Rs 85 Cr 2 bhk- Rs 45 Cr

Revenue of rent per month

Revenue Estimate Through rent Cost Estimate

Total= Rs 13 Cr Commercial : Rs 43.75 Lakhs / Month

No. of years required to generated the profit

q (p - j) Commercial

Commercial

Mixed Use

Residential (40%) Commercial (60%)

Residential

High Sale % High Demand

Residential saleable price : Rs.13 Cr Commercial rental price : Rs. 555 per sq m

But Low Supply

Recommendation to the Authority

6561

Profit Estimate Development Revenue at Scenario sale

Market feasibility

Retal Demand

k Commercial

Recommendation to the Client :

Rs 4,3.75 -262054490 Lakhs / Month

Mixed use Rs Rs 43.75 (Commercial+ 130,000,000 Lakhs / Apartment ) Month

-219061405

5.2 years

The car parking of 1 car per every 60 sq m constraint costs additional parking space requirement for the building .As the basement is included in built up area ,increasing the basement area will decrease the saleable space rate in case of plots less than 1000 sq m.

Recommendarion to the Authority: Parking requirement : 142 car parking Basement car parking : 74 Additional car parking : 89 Here the car parking is met . But in case of small plot >1000 m, after leaving the mandatory yard it is difficult to meet this requirement and has to be met on the open space or additional land to be purchased or leased if insufficient for car parking. The car parking of 1 car per every 60 sq m constraint costs additional parking space requirement for the building .As the basement is included in built up area ,increasing the basement area will decrease the saleable space rate in case of plots less than 1000 sq m. This is again affected by the open area restriction and total coverage possible on the ground floor

4.0 years

High demand -Tabasco 50% residential sold at and 30% commercial rented construction stage (First apartment proposed at Kanhangad) Commercial complexes are occupied at 80% and above

Local Area Plan for Dwarka

Parking requirement : 142 car parking Basement car parking : 74 Additional car parking : 68 to be met on the open space or additional land to be purchased or leased if insufficient for car parking

Height and additional open space: The margin of above 10 m could be increased to 20 m as the market is trend is towards a higher commercial development which will invite more commercial structures to develop vertically and horizontally utilizing the coverage 65% . A minimum open space of 10 % could be provided as per the built up area and rest shall be incentivized considering the benefits of the developer and the public.

5


Kop Van Zuid, Netherlands Development Feasilibity Study

Purpose/Vision -Reuniting a divided city -Changing the city’s image -Spreading the benefits -Social reordering and housing management

Area of the Scheme 122 Hectare Contextualizing the Scheme

To

Port city

Wilhelminaplein – Design destination plan 2007(Muncipal corporation) Area -0.26 Sq Km

Residential ,Recreational and Commercial centre

Project development Kop Van Zuid Integrated Zoning scheme .Finally revised -2013(Muncipal corporation) Area-1.22 Sq Km

City master plan, 2011 (Land use) Area 325 sq Km

Spatial Policy(National Spatial Structure) Netherlands

Area Development Model Micro level planning

Land use

: Commercial

The old structures are revitalized and used as affordable residential units.New structure comprise of mixed uses.

6


Dutch Major cities policies,1994

Fig 2: Wilhelminaplein

Low riselinear

Niewe mass river

Promotion deregulation ,decentralisation

High rise

Institutional Framework Leadership capacity of local authorities to take on more powers

National

Inferences

The urban pattern observed is a mixed of high-rise structures in Wilhelminaplein area and rest are low rise arranged in linear pattern

Provinces

Open Green Water City centre Residential Office Mixed Retail Recreation Company

Central zone (Height permitted 150 m) Transition zone (Height permitted 30-70 m

Redeployment of national government funds

Urban Renewal Policy,1970 Collaboration between central and local government.

Structural vision (sets the policy framework) Structural vision

Municipalities (City council)

Structural vision(proactive and entrepreneurial approach in both planning and policy implementation)

National and provincial government can make Integration Plan, in case national/ provincial interests are at stake

Zoning Scheme (Entire territory of the municipality) Project team (PPP) will implement the projects in the planning areas

Duration Activities

Legal provisions

One month

Spatial planning Ministry of economic policy ,Article 9 affairs ,Ministry of Infrastructure and environment ,Municipal corporation

Municipal contracts through Major cities policy under National govt.

Municipal Development Authorities using municipal property holdings tounderpin investment projects

scheme is helping to attract high and middle income groups to come to live and work in Kop Van Zuid

Finding new economic roles to replace lost jobs e.g. logistics, offices -Public led mixed use development

Local Area Plan for Dwarka

Maintaining social order through good Neighbourhood management and a high-quality public realm

Developing programmes “Mutual benefit” Community engagement in development

The Municipal corporation after preparation of draft plans apply to the Minister of Economic Affairs with the feasibility study .The Minister will agree a joint timetable in consultation with the other competent authorities. Two The municipal development corpomonths ration will prepare a draft for the public consultation and submit it to the Minister of Economic Affairs. The EIR Advisory Committee will be requested to issue formal advice. In case of EIA not mandatory ,the project impact on environment is assessed. 3-6 The government authorities months involved will prepare their draft decisions in mutual consultation. If necessary, they prepare a draft zoning integration plan Six weeks The draft decisions, along with any environmental impact report that has been prepared, will be collectively available for public examination Two The government authorities will months process the advice and opinions and finalize their decisions.

Built V/s Open (Private & Public)

10% 30%

52%

30%

Open land area

Total permissible FSI 5.75 Total consumed FSI 3.57

Public open (parks,roads and squares) Buildings Semi private open space(Accessible to block residents) Water

Road Network

Well connected Network Vacant land network to be developed

Level 1 50 m ROW

Level 2 40 m ROW

Level 3 20 m ROW

Level 4 12 m ROW

Block size and intersection

Statutory/Legislative Framenwork Key Take aways

8%

Institutions involved

Spatial planning Municipal corporapolicy ,Article 9 tion,City council,developers,planners,architects Environment EIR Committee Protection Act

Smaller block size Walkable

Link Node ratio

0.76 Areas under the scheme Vacant lands

3%

Public buildings (Wilhelminaplein area)

6%

Public space(parks and squares) Water Mixed use blocks Housing Public buildings Area under road Vacant land

National ,Provincial,Municipal

National ,Provincial, Municipality

Public parks and squares integrated in neighborhoods. The recreational spaces are yet to be developed.

Public amenities highlighted

But these space are not taking the development of actual ecosystem into consideration as they remain as a recreation facility.

7


8


Evolution

DWARKA ,Delhi

Local Area Plan:Urban Transformation(TOD)

1977

NSUT Campus NSUT Campus

Increased in-migration patterns in Delhi

1980 Further Expansion of Najafgarh Corridor Sector 14 Metro Station

1988

Sector 14 Metro Station Sector 14 Metro Station

Cleaning Najafgarh Corridor Proposed International Sports Complex Sector 19

Habitat Centre Hangout Zone

People resorted to Jhuggi Jhopri clusters on the peripheries of Delhi due to lack of formal housing

DDA announces Rohini and Papan Kalan for leapfrogging housing schemes

1990

Major Urban Infrastructure and road connectivity to facilitate planning of Dwarka

2001

MPD’01 identifies Dwarka as a sub city under it’s Urban Expansion Plan `

Sector 14 Metro Station

Dwarka City Centre

MPD’62 announces Dwarka as green belt

Dwarka is opened for residential development

Diplomatic Enclave Bus Terminal

International Conventional Centre Airport Line Extension

DDA Key decision authority for proposing land use and its change Infrastructure Water Supply

Local Area Plan for Dwarka

State PWD

2005

2011

Delhi Jal Board

Waste Management

SDMC

Public Transport

DMRC & DTC

2017

Phase 1 of Blue Line is launched in September’ 05 DDA Sports Complex is set up in Sector 19 along with major educational institutes

Sector 24 in Dwarka is announced as the site for the Diplomatic Enclave

9


With the aim to reduce the need to commute for work or recreation, living and commuting easier and making urban development more sustainable at Karkardooma and on Green and Blue Line

Can Dwarka be a potential Regional hub?

Sector 13 Sector 12 Sector 11 Sector 10

Airport

Proximity to Gurgaon

Sector 13 Sector 12

Highway Link

Sector 11

Implementa tion of TOD policy

Sector 10

Existing land distribution....

Principle for delineation

19%

1% 5%

Residential

25%

6% Commercial Vacant lands

<50% area of a plot in

1%

10%

5% Open green (Majorly along Naala)

the influence zone

Influence area

13%

12%

3%

Metro Station

Considering the above

plots were delineated aspect the

accordingly

10


Feasibility Study

CONCERNS Larger block sizes

8

Low pedestrian accessibility

lakhs/m²

Automobile oriented design of roads

High market rate

5,62,123 Buyers

Missing links

POTENTIAL POTENTIAL Inter city road connectivity and high linkage

More emphasis on private open

High Demand and Supply of land

Infrastructural challenges (nalla cleaning and sewage pipes) Mismatched green network

0.5-1.4

Under utilised FSI Vacant land

Green & blue resourced

30% Unintegration context to metro

Under utilised lands

18%

Unsafe

Higher land rate under commercial land use Circle Rate

Residential ₹ Plot

Vacant lands surrounding the metro

Gated communities Lack of active dedicated public realms

Market Rate

₹₹₹₹₹₹₹₹₹₹ ₹₹₹₹₹ 15 times

Active neighbourhoods

Institutional ₹ Plot Commercial ₹ Plot Local Area Plan for Dwarka

₹₹₹₹₹₹₹₹₹₹ ₹₹₹ The rates are higher along the metro but due to under developed 13 times infrastructure developers prefer the area away from the metro. ₹₹₹₹₹₹₹ ₹ 8 times Rates are according to land use and a notified road in the area but the ground reality of rates are different in areas away from the metro.

11


Does Dwarka have the potential to redevelop? a. Sector 13 Station b. Sector 12 Station Density a

b

c

c. Sector 11 Station

d

Built vs Open Public Open Built Private Open

DU / Hectare

33%

50%

17%

36

15%

21% 62

1 hectare

10% 18%

65%

60%

57

1 hectare

1 hectare

Open Space (m²) /capita

14.81

6.94

7.52

Job Density

364.13

204.22

110

Diversity a

b

c

d. Sector 10 Station

a. Sector 13 Station

b. Sector 12 Station

c. Sector 11 Station

d. Sector 10 Station

d

Identified Dominant character(%)

39 %

Residential Commercial Institutional Others

25 %

49 %

36 %

0 Entropy: Heterogeneity of Area Character

0

0.26

Homogeneous

1

Heterogeneous

28 %

44 %

23 %

26 %

28 % 28 %

40 %

1 0.16

0 0 0.13

34 %

1

1 0.24

12


Design a

b

c

a. Sector 13 Station

b. Sector 12 Station

c. Sector 11 Station

d. Sector 10 Station

d

Mean Block Perimeter (m)

1050 m

Porosity

1040 m

Poor edges

1300 m

Most Active

935 m

Poor edges with higher block sizes

Poor edges inspite of having smaller blocks

Linkage to Metro Intersection Density (/m²)

4.17

4.17

1.59

3.38

Link to Node Ratio

1.19

1.14

0.87

0.94

Street Connectivity 1.4

Footpath Yes

Threshold

a. Sector 13 Station b

1.4

1.4

No

Inference a

1.4

c

b. Sector 12 Station

c. Sector 11 Station

d. Sector 10 Station

d

Intensive job generation especially from commercial activities

Prominently Residential

Prominently Residential & Socio-cultural

Intensive job generation especially from Institutional entities

Dominant Character

Metro Corridor Character

Inadequate Lighting

Local Area Plan for Dwarka

Poor Public realm

No eyes on the street

Non-porous edges

On street parking

13


What are the Major Concerns? Intangible

Women Safety

Work far from home

More time spent in commuting

TOD Principles

Tangible

Socially Under Utilised disconnected land, especially along the metro line

Inactive street edges

Low Walkability

Planned but Inactive Green Spaces

Streets for private vehicles not for people

No free-flowing greens connecting the entire site

Interconnected street network

Value capture financing

Compact Development

Mixed land use

Last mile connectivity

NMT Network

Affordable Housing

Managed parking

Vision and Objectives

1

2

3

Making it a Regional Hub

Increase Walkability

Vibrancy

Supporting Job Generators

Interconnected green network

Mixed Use development along metro corridor

Boosting the existing institutional hub

Well designed pedestrian walkways

Active Frontages

Scope for Planned informal economy

Promoting Public Transport in intense Influence zone.

Usable community spaces

14


Concept proposal

Using Character Based Zoning to

Envisioned Land-uses

Existing Land-uses

Potential land-use

Capturing the potentiality of the land-use into defining an Urban character

Is the existing network robust to cater to the development envisioned ? Carrying capacity of same road change drastically

Mix use Using Form Based Regulations to create

Sub Arterial changes to Arterial road Metro road working as collector road

Sector 13 Sector 12 Promote Development

Presence of metro influenced corridor

Active Edges

Sector 11 Sector 10

Well laid out city wide network

Initiating Placemaking to create

Integrating Green Blue Network

Socio-cultural Centers

Metro Station area Development

High Intensity mixed use corridor

Mixed use 2 (MU2)

Low Intensity Moderate Intensity

Green corridor Mixed use 1 (MU1)

Low Intensity

Mixed use 3 (MU3)

Low Intensity

Moderate Intensity

Commercial Belt facilitating TOD

Merging the built urban form with the Green Network

But lacks inter sectoral connectivity

Leads to congestion and delay in travel time

Moderate Intensity

Merging the Metro station wise Urban Characters

Huge Block size

Poor Connectivity

Inactive Edges

Non-porous Edges

Actual Distance to be travelled Metro Stop

Sector 13 Metro Station Sector 12 Metro Station Sector 11 Metro Station

Source Spatial Distance

Sector 10 Metro Station

Local Area Plan for Dwarka

15


Street Network Derivation layers

2 links

Incorporating the missing layers

Missing connectivity in the existing collector metro road

The collector road(metro) link between sector 12 and sector 11 Missing link at and beyond sector 10 Redefined Collector to sub-arterial

4 links

11 links

Introducing direct links to stations

Proposed sub arterial 60 m

Links which connects the metro station to the parallel arterials dedicated to Bus/ IPTs and pedestrians

Introducing links connecting to major arterials, sub arterials and Collector roads

Redefined Collector to sub-arterial Proposed sub arterial 60 m Redefined local to collector 24 m Proposed collector

Connectivity to metro corridor as well as a feeder to other major roads catering to private traffic

58,306 Improving block sizes Sq m

Large block sizes reducing the connectivity and walkability and threatens the safety.

Redefined Collector to sub-arterial Proposed sub arterial 60 m Redefined local to collector 24 m Proposed collector Redefined local to collector 18 m Proposed collector 18 m

Adding green links Missing network connecting the greens and increase walkability sub-dividing the blocks

Redefined Collector to sub-arterial Proposed sub arterial 60 m Redefined local to collector 24 m Proposed collector Redefined local to collector 18 m Proposed collector 18 m Local NMT 9 m Local Flexible NMT

16


PARKING

Sub arterial 60 m wide (Metro )

Upgrading the collector metro road to Sub arterial 60 m The upgraded link along the metro corridor shall cater to NMT and bus /IPT traffic and encourages the vending activities in the dedicated lane(active edge).The high intensity corridor shall be proposed along this link. Footpath

Vending

Cycle track

Bus stop +Green

Bus /IPT Lane

(6m)

(4m)

(4m) 2 way

(2m)

(3.5m)

Metro lane

Carriage way (7m)

New proposed Collector roads 24 m The network shall act as the direct link to the metro sub-arterial road. The moderate intensity zone shall be proposed along this link. Central green corridor underneath the metro line

Pedestrian / Vending/Cycling lanes

Dedicated Bus /IPT lane

Collector 24 m wide

Upgrading local to Collector roads 18 m

PARKING

The network shall act as the next feeder to the existing arterial and proposed sub-arterial roads. Footpath (4m)

Cycle track

Green

(4m) 2 way

(1m)

Carriage way Car/Bus/IPT/2wheeler s (7m)

Green

Vending

Footpath

(1m)

(3m)

(4m)

Proposed NMT local roads 9m Reducing block sides and redefining the connectivity

The NMT roads are the pedestrian/ cycling dedicated roads which subdivide the larger blocks and cater to green connectivity

Carriageway (2 way) Vending lane

Local Area Plan for Dwarka

Pedestrian /Cycling lane

17


Comparison with the existing network

Proposed Street Network

27% Area under Streets

33% Area under Streets

Arterial 45 m Sub-arterial 60 m (Metro) Sub-arterial 45 m Collector 24 m Collector 18 m Collector 12 m Local NMT 9 m Local Flexible NMT

957 m Average Block Perimeter (Existing)

Maximum block size

422467 Sq. m Minimum block size:

2370 Sq. m

Average block size:

58,306 Sq. m

627 m Average block Perimeter (Proposed) Maximum block size

122432 Sq. m

Minimum block size:

1131 Sq. m Average block size:

26,930 Sq. m

18


Proposed Zoning In MU1 zone, at least 50% of the total built up is developed as commercial, EDC charges shall be reduced up to Rs. 350/m2

Sector 13

In MU2 zone, at least 40% of the total built up is developed as residential, EDC charges shall be reduced up to Rs.350/m2

Sector 12

In MU3 zone, at least 50% of the total built up is developed as institutional, EDC charges shall be reduced up to Rs. 350/m2

Sector 11

High intensity First plot

Plot 1 >50%

Sector 10

First plot considered

Plot 1 <50% Plot 2

Plot 3 >50%

First plot Plot 2 <50%

Principle 1: If >50% of the plots in the influence zone of 200 m then the plot will be taken

(MU1)

Low Intensity

(MU2)

Moderate Intensity First plot

Low Intensity

(MU3)

Low Intensity

Moderate Intensity

Moderate Intensity

High Intensity Mixed Use 4 Green

First plot considered

Plot 1 <50%

PLANNING

Plot 2

Plot 3 >50%

URBAN DESIGN

First plot Plot 2 <50%

Principle 2: The first plot abutting the metro corridor, if principle 1 is not fulfilled

Underutilized FSI

Moderate intensity Principle : First plot abutting the secondary road fall under moderate intensity

Non-Conducive Environment

No eyes on streets Underutilized land along the metro land

Plot 1 Plot 2

Plot 3

Local Area Plan for Dwarka

Higher land market rates deter development

Poor street Design

19


ZONE

HIGH INTENSITY

MODERATE INTENSITY

LOW INTENSITY

GREEN CORRIDOR

6 1.5 7.5

4 1.5 5.5

3 1.5 4.5

0.3 0 0.3

FSI

Base *Additional **Max. Permissible

Dwelling-3, Mercantile -1,2, Educational-1,2, Assembly-1,2, Institutional, Religious, Hospitality, Permissible Uses Service Establishment, Transport, Public Institutional, Health-1,2 and 3, Tourism Services

Dwelling-1,2 and 3, Mercantile 1,Educational 1 and Dwelling -3, Mercantile 1 and 2, Educational 1 and 2, Assembly 1,2,3 and 4, Institutional, Religious, 2, Assembly 1,2 and 3, Institutional, Religious, Hospitality, Service Establishments, Storage, Hospitality, Service Establishment, Public Transport, Temporary Use, Public Utility, Public Institutional, Public Utility, Heath -1,2 and 3, Institutional, Health 1,2,3 and 4, Tourism Services, Tourism Services Recreational Use, Sports and Leisure

Religious, Temporary Use, Tourism Services, Recreational Use, Sports and Leisure

*Additional FSI can be purchased from DDA and or as TDR from plots within Dwarka **Affordable Housing will be incentivized by 1.5 additional FAR over and above the Max. Permissible FAR Floor Plate

ZONE

HIGH INTENSITY

LOW INTENSITY

MODERATE INTENSITY

Side setback is to be applied after min. 8m frontage built Side setback not applicable to corner facing plot

Setback (m) Frontage Common Plot FSI

• • •

Front

Side

Rear

Front

Side

Rear

Front

Side

Rear

0

3 100%

6

0

3 100%-Setback

6

NA

3 NA

3

Mandatory open space minimum 20% for public domain shall be followed according to the uses Only temporary construction shall be permitted in this space such as wholesale markets, vending stalls, community activities etc. The open space shall be increased according to the uses

(6+1.5)  7.5

(4+1.5)  5.5

(3+1.5)  4.5

20


ZONE

HIGH INTENSITY

LOW INTENSITY

MODERATE INTENSITY * The area can be shaded and only temporary structures will be allowed to be erected in this step-back

Built-to-line (m)

Mandatory (In case of plots with two ROWs both the Mandatory (In case of plots with two ROWs both the sides have to follow the built-to-line setback) sides have to follow the built-to-line setback)

*Step-back (m)

Porosity

min. Step-back

min. Height below

min. Step-back

min. Height below

min. Step-back

min. Height below

6m

15 m

4m

7m

3m

7m

clear width

Arcade

NA

6m

Clear depth

NA

6m

Façade Treatment

Compound Wall

Façade Treatment

Compound Wall

Façade Treatment

Compound Wall

70% transparent

Not Allowed

50% transparent

Not Allowed

NA

Permitted height 1.2m

Proposed Land Development Mechanism 3.Change in DDA regulations in TOD areas

1.Compensation Mechanism

Partial land is taken for roads and public use

More flexibility of permissible uses in the list of proposed land use

Saleable TDR

PPP model for development works of serviced public land

Compensation through providing additional FAR on the now reduced plot size.

If deduted plot cannot utilize the total permissible FAR

2.Incentivizing Development/ Re-Development

Lower EDC charges if property redevelops within a stipulated period

Reduced fee On chargeable FAR on remaining plot (20% of market rate instead of current the 40%)

FAR

Local Area Plan for Dwarka

Charge proposed Rs. 700/ m2

Rs. 350/m2 if land redevelops within 5 years of declaration of intent

Rs. 500/m2 if land redevelops within 10 years of declaration of intent

Providing of outright sale of public land as an alternative option to the existing lease model Incentivizing private developers for EWS and affordable housing on government land through PPP Revamping the existing lease structure and updating the lease amount

21


Land Development Mechanism-Cases Identified plots for the proposed roads

O.P Area plot 299 -4011 sq.mt O.P Area plot 327a -22812 sq.mt

Analysing the deductions after laying proposed road network 142 sq.mt(299) and 1898sq. mt (327a)

Compensation mechanism “Since it is a public plot, readjustments of plots based on the current trends is proposed”

Sector 13

Sector 12

Final Plot division.The plots can amalgamate for large scale developments.

Sector 11

F.P Area plot 2993869 sq.mt

Sector 10

F.P Area plot 299-10433 sq.mt

Plot identified fro proposed road

O.P Area plot 130 -818 sq.mt

Deductions after proposed road network 297 sq.mt.

Compensation mechanism “Compensation through allowing initial built up on the now reduced plot size, if buildable and more F.A.R. (usable as TDR)”

Final Plot division. Plot number 327a and 299 can amalgamate for large scale developments. F.P Area plot 130-572 sq.mt.

22


Identified plots for the proposed roads O.P Area plot 974 -441 sq.mt. O.P Area plot 985 -404 sq.mt.

Deductions after proposed road network Compensation mechanism “Since the land is unbuildable, compensation is provided through land transfer of same size in same zone, along with Saleable TDR.”

Compensation mechanism “Compensation through allowing initial built up on the now reduced plot size, if buildable and more F.A.R. ”

205 sq.mt. and 214 sq.mt. .

Same Size Plots will be allotted to the plot owners in same intensity zone with an additional F.A.R of 1.5 (Non chargeable) F.P Area plot 974 -236 sq.mt. and F.P Area plot 985-194 sq.mt.

Identified plot for the proposed roads

O.P Area plot 692-15,261 sq.mt. Deductions after proposed road network 2032 sq.mt.

Since its is a Private plot with built, the owner can develop it as a single model with applicable changes in the built form F.P Area plot -13,229 sq.mt. Local Area Plan for Dwarka

23


Special Proposals -Metro Station Area Development

Barrier free design for pedestrians

1 Bus lane + 2 private vehicle lanes; only drop-off allowed

Café edges improves public engagements in plazas

Bike Lane

Station Bay

Plaza / Public Realm

Existing Building

Vehicular road

Green Pockets

Proposed Building

Green Pockets maintains the ecological balance

Skywalks -access to commercial buildings & malls

Play Zones

Footpath

Plazas enhance the socio-cultural needs

Theatre (OAT)

Dedicated Vending zones in plazas enhances the public realm

Proposed Recreation centre Bus & IPT Stop

Sector 12 Metro Station

Sector 13 Metro Station

Bus & IPT Stop

Metro Station/Rail

1 Bus lane + 2 private vehicle lanes; only drop-off allowed

Café edges improves public engagements in plazas

Plazas enhance the socio-cultural needs

Barrier free design for pedestrians

Ensured shading for Bicycle Network

Skywalks -access to recreation building & mall

Dedicated Vending zones in plazas enhances the public realm

24


Metro Station/Rail

Footpath

Bike Lane

Station Bay

Plaza / Public Realm

Existing Building

Vehicular road

Green Pockets

Proposed Building

Bus & IPT Stop

1 Bus lane + 2 private vehicle lanes; only drop-off allowed

Ensured shading for Bicycle Network

Skywalks giving access to community centre & Footpath

Redevelopment of Open setback areas into vending zones & market complexes for active edge

Redevelopment of Open setback areas into vending zones & market complexes for active edge

Local Area Plan for Dwarka

Ensured shading for Bicycle Network

Skywalks themed around a walkway library towards city centre giving direct access

Digital Library

Sector 11 Metro Station

1 Bus lane + 2 private vehicle lanes; only drop-off allowed

Green Pockets maintains the ecological balance

Green Pockets maintains the ecological balance

Digital & interactive Museum

Sector 10 Metro Station

Barrier free design for pedestrians

Food Food Court Court & & Exhibition Exhibition

Barrier free design for pedestrians

Proposed City Centre

Bus & IPT Stop

Socio-cultural Socio-cultural Amenities Amenities

Proposed Community Centre

25


Special Proposals-Nala Front Development A 20 m intense green zone accessible to public but no vending allowed

A 50m Activity green zone with allowed vending, kiosk etc. for public use

Foot-over Ramp (Bridge)

Pedestrian Under-pass

A 100m green buffer zone for additional services (if required) and public access. Vending along the walkway

Intense Green (20M)

Children’s play area

Activity Green (50M)

Green Buffer (100m)

Café and clubs

Cycling track

Activity green zone

Intense green

26


Costing

238 Crores

91 Crores

49.2 Crores

Affordable housing

Road Network For total Network addition of

28 Crores

Infrastructure

Projects

50.47km

Total Cost

405 Crores

Phasing done according to the envisaged change in character to develop

Dwarka into an active TOD

Revenue Sources for DDA Funds generated through development in LAP

Funds generated from public land Total land area available with DDA 10,89,907m2

Chargeable FSI and EDC to be included in TOD fund in addition to the grants received

Chargeable FSI

External Development Charges

*to be calculated at 40% of market rate Est. Revenue

Rs. 700/m2 for commercial built up Rs. 350/m2 for residential built up Est. Revenue

₹ 1895.84

crores

₹ 411

10%

Sale of DDA Land ₹ 1861

Vending Charges

Rs. 100 hourly for 200 cars

Rs. 5000 a month on primary and secondary road system

crores

*Rs. 15873 per sq. ft.

Est. Revenue

Est. Revenue

crores

₹ 138

₹ 2450 cr Local Area Plan for Dwarka

Sale of existing leasehold DDA land

crores

Parking Charges

₹ 5.93

10%

crores

₹ 1221

crores

*calculated on current conversion charges from leasehold to freehold land used by DDA for residential property

30% of the remaining 80% land

Leasing land ₹ 53

crores

*calculated on 2.5% of current circle rate for residential property

₹ 3135 cr

27


Key Learnings

Developing Dwarka into a regional Hub

Sector 13 Nala Front Development

Sector 12

Sector 11

Sector 10 Enhanced Street Network

Sector 12

Unlocking Land Potentials

Station Area Development

28


Mixed use & heterogeneity to instigate activeness and regional transactions

Strengthening the Street network within the Dwarka sector oriented to the TOD corridor enhance the connectivity within the area as well as to the areas around (to the other cities and connectivity fromnearby gamtals)

Well designed active streets -Introduction of Street vending and enhancng the street edges.

Safer streets for women active during day and night through place making

Local Area Plan for Dwarka

Compact and sustainable developemnt

Increased walkability

Active public realm -enhanced socio cultural activities

Job generating centresMetro station developmentMarket plaza,Recreational centre,Digital Museum

Public transport /IPTs to the TOD Zone

Interconnected greens

29


THANK YOU


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.