I ANDY TECHNOLOGY Automotive ROYALTY 100 Mn$/Yr/Factory/Vehicle Technology: Double Speed for same Ton-HP-ENGINE RWD, FWD, EV, AM. Andy Engine,Andy Bearing, Jet For
Item one year
Cost $
Shed
Land,build,power,tools
252,000
Shed
Help ,EB 1000*12 mo
12,000
Exp
Personal 500*12 mo
6,000
Patent
Patent 2 no
25,000
Coy Reg
Coy Reg
4000
Misc
2500
Bike, Car
Initiate
38,700 $
Bearing, Jet, R/FWD, EV 3+3
40,000 $
Run
19,800 $
1800* 11 months
Total I, II, III Total INV. = 0.4+15.42+270+14.18
400,000 $ 300 mn$
II ANDY TECHNOLOGY Automotive,Ship ROYALTY 100 Mn$/Yr/Factory/Vehicle Technology: Double Speed,1/3 Fuel for same Ton-HP RWD, FWD, EV, AM, SHIP Andy Engine,Andy Bearing, Jet Vehicle
15.42 mn$ 270 mn$
Trial / Make
Cost $
Shed
Land,build,power,tools
10 mn$
Bike, Car 6pc
Bearing, Jet, R/FWD, Coal
50,000$
Truck
Bearing, Jet, R/FWD, Coal
130,000$
3 pc
Ship 100 T,330knt
Engine,Bearing, Jet, 4hp
Bike, Car R/FWD
Engine,Bearing, Jet, AM 6pc
70,000$
Truck
Engine,Bearing, Jet, AM 3pc
170,000$
R/FWD
CSP Solar, Coal III
SHIP
Trial 1+1 MW
15.42mn$
1 mn$
4 mn$
Make,Own,Operate,Maintain
150 mn$
Automotive RWD
Make,Own,Operate,Maintain
60 mn$
Automotive FWD
Make,Own,Operate,Maintain
60 mn$
Designer/TL
M Andy Appan, M.E, 50 yrs Expert, India.
I, II, III STAGES of INVEST = 300 Mn$. RP 600 Mn$ in 2 Yrs