POR TFO LIO
AntoniO Mas tria 2010 2016
ecological sustainability and social disparity are the defining challenges of our generation. the architecture of inclusivity offers solutions to these key challenges. zaha hadid
ANTONIO MASTRIA Via Luigi Einaudi, 24 Tito (PZ), Italy +39 380 18 14 151 a.mastria@hotmail.it aantoniomastria.wordpress.com
EDUCATION AND TRAINING 21/12/2016 Qualification to the profession of architect University of Basilicata Matera, Italy
EQF level 7
01/10/2009 22/07/2016
EQF level 7
Master’s Degree in Architectural Engineering 4/S Universita’ degli studi della Basilicata, Matera (Italy)
Graduation work in technical and urban planning: THE URBAN REGENERETION OF BROWNFIELDS SITES AS OPPORTUNITY, THE CASE OF TITO SCALO (PZ) AREA Published on ISSUU platform at: https://issuu.com/antoniomastra/docs/tesi_antonio_mastria 15/09/2013 16/07/2014
LLP Erasmus 2013/14 Universidad de Les Illes Balears Escuela Politecnica Superior, Palma De Mallorca (Spain)
EQF level 7
Experience in architectural design and comparison with other professionals at the host university. This also give me the possibility to expand my way of thinking. 15/04/2012 Qualification to the profession of land Surveyor State Institute of Higher Technical Education ‘G.De Lorenzo’’ Potenza, Italy
EQF level 5
28/05/2008 ECDL_European Computer Driving License AICA, Italian Association for informatics and automatic calculation 15/09/2003 High school diploma as Land-Surveyor 30/06/2009 State Institute of Higher Technical Education ‘‘G.De Lorenzo’’ Potenza, Italy
EQF level 4
EXPERIENCE 29/07/2016 30/12/2016
Internship in architecture studio, Erasmus+ Bet for Jobs SAS TORRES GARCIA ARTE & ARCHITECTURE. Stage in Architecture, Urbanism and Landscape , Paris (France) Collaboration with Bruno Fortier architecte urbaniste agency for the creation of 3D models in general and co-participation in the competition for the urban regeneration of quartier du Jardins Exotiques at Monaco Principate. Preparation of application dossiers for restricted contest
15/05/2012 16/04/2015
Student’s Rappresentative DiCEM Department, Universita’ degli studi della Basilicata, Matera (Italy)
01/09/2009 31/10/2011
Internship Professional studio, surveyor Pace Tommaso, Potenza (Italy)
01/09/2011 30/09/2011
Collaborator Realization of architetural model with colleague Luigi Simone, assignment of work for Architectural office: B.E.AR.CHITETTURA .
JOB RELATED SKILLS Development of sustainable projects and not, from the aesthetic, functional, technical and economic points of view. Skills and experience of the project for the regeneration of brownfield and urban sites. To have attended the course of 120 hours to be coordinator for safety on construction sites (D.lgs. 9 aprile 2008, n. 81). Excellent expertise in designing and constructing architectural models.
COMPUTER SKILLS Excellent knowledge of Microsoft Office tools: Basic Concepts of IT (Information Technology); Use of computer / file management; Word Processing(Word); Spreadsheet (Excel); Database; Presentation (PowerPoint); Computer networks (Internet). Excellent use of GIS software (QGis) used at the university for urban planning themes. Excellent use of CAD/3D modelling and BIM software (AutoCAD, ArchiCAD, Revit, Rhinoceros, SketchUP, 3DS Max, Cinema 4D) used for university and work. Excellent ability to use photo editing and pagination programs (Photoshop, Indesign), used at university and working.
LANGUAGES ITALIAN
SPANISH
CATALAN
ENGLISH
FRENCH
MOTHER TONGUE
C1
A2
B1
A2
Works during traineeship in architecture studio
12
18
098
Graduation work
22
28
PROSPETTO - OVEST
Selection of academic works
PROSPETTO - NORD EST 30
36
SEZIONE PROSPETTICA B - B
60
66
44
52
72
76
CONTENTS 12 - 17
11/2016 ‘
Urban regeneration Renovation urbaine du quartier du Jardins Exotiques, Principaute’ de Monaco
18 - 21
09/2016
Urban planning Concours d’urbanisme pour la ZAC de la Costance a Aix en Provence France
,
22 - 29
2015 - 2016
30 - 35
2014 - 2015
Urban planning - graduation work La dismissione di aree industriali come opportunita’ di rigenerazione urbana, il caso dell’area di Tito scalo, Potenza
Organization of building site ExFornace Matera
,
portfolio
Antonio Mastria
36 - 43
2013 - 2014
Urban regeneration ExBarilla Matera
,
44 - 51
2012 - 2013Restoration project Santa Maria del Sagittario, Chiaromonte
52 - 65
2011 - 2012
Urban regeneration Serra venerdi’, Matera Urban regeneration Ex factory Latte Rugiada, Matera
66 - 81
2010 - 2011
Work experience B.E.Ar.chitettura, costructing architectural model Architectural Office Workshop "nuovi balconi per Spine Bianche", Matera Court-House Matera
stage in architecture studio sas torres garcia arte & architecture
Lavoro svolto nel periodo di tirocinio presso lo studio di architettura JesusTorresGarcia Argomento: concorso di rigenerazione urbana Collaborazione con l’Agence Bruno Fortier architecte urbaniste
’
URBAN REGENERATION RENOVATION URBAINE DU QUARTIER DU JARDINS EXOTIQUES PRINCIPAUTE’ DE MONACO
12
+55.4
+57.4
BASE G
61.13 1
ett e
TOUR G
Par c ces se An toin
+57.9
Le Castel II
Be lgiq ue
Rain
ier III
Prin
+47.5
TOUR F
+38 +38
+41
BASE F TOUR E +40 +41
+41
ti Pla
+42
TOUR N
TOUR D1 5.47M
+44
BASE D
TOUR D +45
+45
+47
+46
BASE C
TOUR M1
TOUR C
de
TOUR B
+-34
+47 +51
BASE A
BASE M
+48
TOUR A
+49
leva
rd
TOUR M
Bou
+50
+51
+30.6
Aven u
e Prin
e
Ru
+43.
ce Pie
rre
va rd
ule
Bo
B
Coupe transversale sur l’aménagement projeté regardant vers le Port de Fontvieille 1:1000
062
14
15
054
042
048
16
17
Realizzazione modello 3D durante lo stage presso lo studio di architettura JesusTorresGarcia Argomento: concorso di urbanistica Collaborazione con l’Agence Bruno Fortier architecte urbaniste
U R B A N
P L A N N I N G
CONCOURS D’URBANISME POUR LA ZAC DE LA CONSTANCEAIX-EN-PROVENCE FRANCE
18
20
21
graduation work university of Basilicata
Tesi di laurea Argomento: tecnica e pianificazione urbanistica Relatore: Prof. Piergiuseppe PONTRANDOLFI
U R B A N
P L A N N I N G
LA DISMISSIONE DI AREE INDUSTRIALI COME OPPORTUNITA’ DI RIGENERAZIONE URBANA, IL CASO DELL’AREA DI TITO SCALO (PZ) TITO
residenziale (Superficie coperta) 79.500 m2
Chiesa e Piazza di Tito Scalo, centro urbano
Residenziale, centro urbano
Residenziale su SS 94
Servizi alla persona su SS 94
terziario e servizi 150.300 m2
produttivo industriale 260.800 m2
Centro Polivalente Santa Cecilia, ambito extraurbano
Edificio dismesso (ex liquichimica), zona industriale
attivitĂ dismesse 130.000 m2
Raccordo autostradale Potenza - Sicignano
Area della stazione ferroviaria
24
25
Questo lavoro di tesi nasce con la finalita’ di studiare in maniera approfondita l’argomento della dismissione industriale, in un’ottica di riqualificazione sostenibile, e di avere maggiore consapevolezza al momento della progettazione riguardante l’area industriale e Sito d’Interesse Nazionale di Tito. Il progetto sara’ incentrato, seguendo le buone prassi in materia di Aree Produttive Ecologicamente attrezzate, sul tema della rigenerazione di un’area industriale che allo stato attuale vede il 35% delle attivita’ economiche dismesse. Per quanto riguarda l’area perimetrata, ovvero l’ambito di analisi, sono state intraprese strategie di pianificazione tese a migliorare la situazione attuale di fruibilita’ e vivibilita’ nell’area urbana e periurbana di Tito scalo, con l’obiet-
tivo di recuperare aree ed edifici inutilizzati quindi sfruttare le risorse esistenti con scelte sostenibili volte ad un’integrazione dell’area industriale all’interno di un tessuto urbano caratterizzato da una edificazione incontrollata e condotta senza regole. La scelta del tema e’ avvenuta durante l’esperienza universitaria e dalla crescente necessita’ di trasformare e rinnovare le sempre piu’ frequenti aree industriali abbandonate. Il lavoro e’ stato articolato in tre fasi [...]
continua a leggere su: aantoniomastria.wordpress.com
26
27
Area residenziale e di piccolo commercio, centro Tito scalo
Area residenziale di completamento e ampliamento edifici per la pubblica istruzione
Area residenziale (edifici semi-ipogei), orti urbani
Nuova viabilitĂ , area industriale Area nodo ntermodale
Polo per le attivitĂ di ricerca e firistiche
28
29
academic works university of Basilicata
Lavoro accademico svolto presso l’Universita’ degli studi della Basilicata Argomento: organizzazione dei cantieri Colleghi: Luigi Simone, Raffaele Petrozza, Rocco Nella
ORGANIZATION OF BUILDING SITE SCUOLA DEL CINEMA (EX FORNACE) MATERA
32
33
PROSPETTO - OVEST
PROSPETTO - NORD EST
SEZIONE PROSPETTICA B - B
SEZIONE A - A
Il progetto sviluppato nell’ambito del corso di organizzazione del cantiere (D.lgs. 9 aprile 2008, n. 81) e’ stato molto interessante per comprendere, nelle sue varie fasi esecutive, come realizzare in sicurezza un manufatto edile. Per la realizzazione della "Scuola del Cinema”, si e’ passati dalla sistemzione del cantiere, alla demolizione delle pre- esistenze fino alla sua Realizzazione, con la redazione del PSC (Piano di Sicurezza e Coordinamento) e del DVR (Documento di Valutazione dei Rischi). Degli elaborati sono stati riportati il Layout di cantiere, alcune fasi di realizzazione, prodotte con software BIM (Revit architecture) ed il manufatto al suo completamento.
34
35
Lavoro accademico svolto presso l’Universita’ degli studi della Basilicata Argomento: rigenerazione urbana Colleghi: Luigi Simone, Roma Vincenzo, Signorelli Stefano
URBAN REGENERATION EX FACTORY BARILLA MATERA
La rigenerazione urbana dell’area Ex Barilla e’ volta alla riconnessione di una zona potenzialmente strategica per la citta’ di Matera, che al momento risulta in stato di abbandono. Tre i principali comparti, da est a ovest, un grande edificio che ospita il teatro sullo sfondo della grande insenatura del fiume Gravina, nel mezzo l’area Residenziale, ed in fine un edificio dedicato ai servizi con adiacente orto e parco urbano. Le scelte progettuali e l’estetica architettonica valorizzano i principali assi del quartiere contiguo all’area e ridanno un grande significato al costruito e non, anche sotto il profilo della sostenibilita’.
38
39
40
41
The urban regeneration of the Ex Barilla area wants to reconnect this area with the city of Matera because even though it is potentially strategic it is in a state of abandonment. There are three main compartments, from east to west, a large building that is a theatre situated on the background of the large bay of Gravina river, in the middle there is a residential area, and in the end a building allocated to services with adjacent garden and urban park. The design choices and architectural aesthetics enhance the main axes of the neighborhood adjacent to the area and restore a great significance to the constructed and not, even under the sustainability.
42
43
Lavoro accademico svolto presso l’Universita’ degli studi della Basilicata Argomento: restauro Colleghi: Roma Vincenzo, Signorelli Stefano, Luigi Simone
RESTORATION PROJECT ABBAZIA DI SANTA MARIA DEL SAGITTARIO CHIAROMONTE
L’abbazia di Santa Maria del Sagittario fu eretta nel 1152 dal conte di Chiaromonte Ugone, per ospitare circa 150 persone, tra cui monaci cistercensi ed inservienti. E’ stato possibile realizzare il progetto di restauro solo dopo un accurato rilievo effettuato tramite misurazioni in sito e con il metodo del fotoraddrizzamento. Attraverso documenti storici e’ stato possibile ricreare l’impianto originario dell’abbazia. Per il progetto e la valorizzazione dell’area, che prevede il recupero di alcune preesistenze piu’ importanti come il campa-
nile e l’accesso principale, sono state adottate le seguenti scelte: - rifacimento della pavimentazione su tutta l’area, con particolari in prossimita’ del campanile, costituiti da variazione di materiali che ricrea l’impronta della chiesa e del chiostro; - installazione di una copertura leggera con rivestimento in lastre di acciaio cor.ten; - Protezione del muro d’ingresso con una struttura in legno con capriata, ospitante un laboratorio ed uno spazio espositivo temporaneo realizzati ex-novo.
46
47
48
49
The Abbey of Santa Maria del Sagittario was erected in 1152 by the earl of Chiaromonte Ugone, it was created to accommodate about 150 people, including Cistercian monks and attendants. It has been possible to realize the restoration project only after a careful assessment performed by on-site measurements and the method of straightening. Through historical documents it has been possible to recreate the original layout of the abbey. For the project and valorisation of the area, which provides for the recovery of some of the most important existing structures such as the bell tower and the main entrance, we took the following decisions: −− the resurfacing of the entire area with particulars near the bell tower; details, created with different materials, recreate the footprint of the church and of the cloister; −− installation of a light covering created with some cor.ten steel plates; −− protection of the entry wall with a wooden structure with truss, this space will host a laboratory and a temporary exhibition space made ex novo.
50
51
Lavoro accademico svolto presso l’Universita’ degli studi della Basilicata Argomento: tecnologia dell’architettura II
RESTORATION PROJECT SERRA VENERDI’ MATERA
L’obiettivo del progetto e’ quello di recuperare un edificio del quartiere Serra Venerdi’, uno dei primi costruiti dopo lo sfollamento dei Sassi di Matera (nel 1951), per migliorarne le prestazioni energetiche e la qualita’ della vita. Al fine di valorizzare lo stabile l’entrata delle botteghe e’ stata spostata da nord a sud per favorirne la visibilita’, vista la presenza della piazza principale, e l’installazione di pannelli fotovoltaici e solari per garantire una buona entrata di energia pulita. L’eliminazione dei ponti termici e la coibentazione unite ad un’ottima ventilazione diminuiscono il consumo di energia e di conseguenza le emissioni di co2.
1 9 5 7
2 0 1 2
54
55
56
57
The objective of the project is to recover a building in "Serra Venerdi’" district, the goal was to improve the energy performance and the quality of life; this edifice was one of the first built after the displacement of Sassi di Matera ( in 1951). In this particular case, after a careful study of all the district, we took in consideration the building used as shops and flats. In order to enhance the stable, the entry of the shops has been moved from the north to the south to promote their visibility , thanks to the presence of a square , and the installation of photovoltaic and solar panels to ensure the entry of clean energy. The elimination of thermal bridges and the insulation joined to an optimum ventilation decrease energy consumption and consequently the emissions of CO2.
58
59
Lavoro accademico svolto presso l’Universita’ degli studi della Basilicata Argomento: rigenerazione urbana
URBAN REGENERATION EX FACTORY LATTE RUGIADA MATERA
Il progetto di recupero dell’edifico in analisi e’ stato ideato al fine di valorizzare la raccolta di materiali recuperabili conferiti da parte dei cittadini residenti del quartiere Serra Venerdi’ e zone limitrofe. Il procedimento di raccolta rifiuti e’ strutturato in tre punti principali: 1.il punto di raccolta, che rappresenta il primo anello dell’intero processo; 2.il centro di separazione e valorizzazione, dove avviene la scelta dei materiali idonei alla trasformazione o al riutilizzo; 3.commercializzazione del materiale recuperato e trasformato, all’interno del polo acquisti. Per rafforzare il concetto di riutilizzo l’intera struttura recuperata e’ costituita per circa il 50% di materiali di ‘’scarto’’ che le conferiscono uno stile architettonico innovativo ed ecosostenibile.
62
63
The regeneration project of the building in analysis has been designed to enhance the collection of recyclable materials conferred by citizens that are residents in Serra VenerdĂŹ district and in the neighboring areas. The process for the waste collection is structured in three main points: 1.The Collection Point, which represents the first step of the entire process; 2.The center of separation and valorisation, where it takes place the choice of suitable materials for processing or re-use; 3.commercialization of the recovered and transformed material, inside the purchase area. To strengthen the concept of reusing the entire structure is constituted by approximately 50% of waste materials which give to the building an architectural innovative style and environmentally sustainable.
64
65
concorso di idee ECO LUOGO, ministero dell’ambiente
casa alle Eolie, 2011 casa di montagna, 2011
CONSTRUCTING ARCHITECTURAL MODELS B.E.AR. ARCHITETTURA WORK EXPERIENCE
Realization of architetural models with colleague Luigi Simone, assignment of work for Architectural studio: B.E.AR.CHITETTURA . Designer is Arch. Luca Lanini and Arch. Manuela Raitano for architetural contest ECO LUOGO
Casa alle Eolie
68
69
Casa di montagna
70
71
Lavoro accademico svolto presso l’Universita’ degli studi della Basilicata Argomento: workshop "nuovi balconi per spine bianche" Colleghi: Luigi Simone
WORKSHOP SPINE BIANCHE MATERA
Analisi stato di fatto
Nel workshop con tema "nuovi balconi per spine bianche", celebre quartiere di Matera (1955) del progettista Luigi Piccinato, viste le esigenze degli abitanti, si pensa di creare spazi aggiuntivi dando una nuova identita’ agli edifici. Terminata la prima fase, di studio e rilievo, la nostra idea di balcone e’ stata quella di creare una struttura completamente estranea all’edificio (in acciaio e vetro) cosi’ da non essere confusa con l’architettura esistente. L’aggetto del balcone e’ stato enfatizzato ed aumenta man mano che ci si avvicina in sommita’, culminando con un appoggio al di sopra della copertura con la possibilita’ di installarvi pannelli solari o fotovoltaici.
The workshop had the theme "New balconies for Spine Bianche", the famous district of Matera (1955) realized by the architect Luigi Piccinato. After considering the needs of the inhabitants, it plans to create additional spaces giving a new identity to the buildings. After the first phase of the study and relief, our idea of balcony has been to create a structure completely different from the building (created in steel and glass) so as not to mix itself with the existing architecture. The projection of the balcony has been emphasized and it increases gradually to the top, it culminates with a support placed above the cover, there is the possibility of installing on t solar or photovoltaic panels.
74
75
Lavoro accademico svolto presso l’Universita’ degli studi della Basilicata Argomento: casa a patio
C O U R T - H O U S E
Il progetto della casa a patio e’ stato fra i miei primi approcci alla progettazione presso la facolta’ di architettura. La possibilita’ di poter affiancare su tre lati questa tipologia di abitazione la rende molto funzionale, i pati interni sono pensati per rendere gli ambienti caldi e luminosi, ma allo stesso tempo alcuni aggetti combinati con oscuramenti meccanici gli conferiscono ventilazione e riparo dai raggi solari.
The project of the patio house was one of my first approaches to design at the architecture faculty. The possibility of placing side by side three facades of this kind of building makes it very functional. The interior patios are designed to make warm and bright the interiors , but at the same time the projections, combined with mechanical occulting, confer ventilation and shelter from the sun rays.
78
79
80
81
To learn more visit my blog on:
aantoniomastria.wordpress.com
december 2016
thank you!